Submitte ubmitted d in accordance accordance with th e I NDU STRI AL VI SI T r equir eme ments nts for 5 seme emeste sterr of th e DM E course course I n the branch branch of
MECHANICAL ENGINEERING Of GUJARAT TECHNOLOGICAL UNIVERSITY YEAR 2015/16
Submitted By:-
Mr. VISHAL PATEL Mr. YOGESH PATEL
ACKNOWLEDGEMENT
We are gladly thankful to our Principal Dr. V.M PATEL , And our H.O.D Mr. Rajesh Lavingia and our staff members who give us a great guidance regarding training and instruct us the importance of training in Mechanical field. So we decided to take visit in thermal power plant which is situated at Wanakbori.
We are especially thankful to respected chief engineer,Thermal power station, Wanakbori and Janakkumar Gadhavi because we granted us permission for taking visit in wonderful campus.
GENERAL DETAILS
Industry Name
WTPS WANAKBORI
Detailed Address
Kheda dist ,Gujarat
Day & Date of Visit
Friday, 17th July 2015
Name of faculty
1. Lect. Vishal patel
supervisors
2. Lect. Yogesh Patel 3. Prof . Maulik Patel
Duration
Time of entry : 10.00 a.m. / Time of Exit: 02.10 p.m. Duration : 4hr & 10 mins t
Semester
5 DME Class
No. of Participants
Faculties
03 Nos.
Non Teaching Staff
00 Nos.
Students
31 Nos.
Total
34 Nos.
INTRODUCTION:-
1. W.T.P.S is the biggest power plant in GUJARAT. 2. Wanakbori Thermal Power Station is a coal-fired power station in Gujarat, India. It is located on the bank of Mahi river in Kheda district. 3. There are 7 Turbo Generator sets each of 210MW out of which first 3 units are equipped with Russian Turbines and other 4 Units are equipped with German Turbines. 4. Unit no 7 is entirely Computerized and we ll advanced. All the above units are of BHEL make.
Unit Number
Installed Capacity (MW)
Date of Commissioning
Status
Stage I
1
210
March 1982
Running
Stage I
2
210
January, 1983
Running
Stage I
3
210
March, 1984
Running
Stage I
4
210
March, 1986
Running
Stage I
5
210
September 1986
Running
Stage I
6
210
November 1987
Running
Stage II
7
210
December 1998
Running
PURPOSE OF VISIT: -
Mechanical Engineering Dept. of SVBIT College, VA SAN decided to arrange one day industrial visit for 5th Diploma Mechanical Engineering students to improve practical knowledge and get benefited their theoretical knowledge In W.T.P.S, Students will get benefit regarding their theoretical subject of conventional power engineering, thermal engineering and m any more.
BLOCK DIAGRAM OF POWER PLANT:-
Coal to Electricity Process
WORKING POWER PLANT MODELS @ WTPS:-
Generator, Generator Transformer Turbine Boiler, Boiler Drum Boiler Burners, Dampers arrangement Boiler Feed Pump Air Pre-heater ID Fan, FD Fan, PA Fan Coal Mill FW Pump
FEATURES:-
1. Installed Capacity : 7× 210 = 1470 MW 2. Total Area of Project : 1571 Acres 3.
PLF % : Between 84.64 to 91.24%
4. Plant Area : 626.2 ha 5. Ash Dump Area : 215.7 ha 6. Cooling Water Quantity Required : From 7. Canal of Mahi River Reservoir 60 to 70 Cusecs / month 8. Cooling Tower Heights : 9. Stage I & II – 112 Mtrs, Stage III – 118 Mtrs.
EQUIPMENT DETAILS:-
Fuel Details :-
1. Fuel: Bituminous Coal 2. Linked Coal Mines : Coal India 3. From Bihar, Orissa, M.P., West Bengal, Andhra Pradesh 4. Generally 400 Wagons [ 07 Racks ] received per day 5. Record of Unloading Wagons : 650 Wagons / Day 6. Gross Calorific Value of Coal : 4400 Kcal/Kg 7.
Nos of Wagon Tipplers: 05 NOS.
8. Coal Quantity Required : 9. With Design Coal : 16000 MT / Day 10. With Actual Coal: 18000 MT / Day 11. Stock Yard: Storage Capacity: 02 L acks MT (Approx.) 12. Area : 48000 m2