VUNG ANG 1 THERMAL POWER PLANT 2 x 600MW
STG ISLAND
CONTRACT No.
280510 / LILAMA-LILAMA69-1 SUB-CONTRACTOR
DOCUMENT TITLE Method statement for ERECTION Steam TURBINE
FUNCTION
LILAMA 69-1, JSC
DOCUMENT No : VA1-L691-00100-M-M8-DRC-0001
NAME
SUBMIT
Nguyễn Văn Trọng
CHKD
Nguyễn Văn Viện
APPD
Phạm Thế Kiên
SIGN
DATE
SCALE
REV A
1
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
1/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
C«ng ty cæ phÇn LILAMA 69-1 LILAMA 69 69-1 JSC
LILAMA 69-1
Add: 17 Ly Thai To street - Bac Ninh city - Bac Ninh province Tel: (0241) 3821212 - 3854396 Fax: (0241) 3820584 E-mail:
[email protected] Website: www.lilama69-1.com.vn
Tuabine installation Project Project: Vung an thermal power plant A. Introduction
Vung ang thermal power plant build in the Vung ang zone, ky anh district, Ha tinh province. It consists of two units with a capacity of 600 MW per unit (2x600MW). The owner is Vietnam Oil and Gas Group, the equipment supplers Toshiba Janpan. Viet nam LILAMA Erection Coporation is the general contractor EPC, assigned the task of processing, manufacturing , installing, test run without load and load of equipments. In there, LILAMA 69-1 is responsible for installation of Tuabine-Generator and additional equipments related Tuabine – Generator is a high-pressure turbine, condensing pure with intermediate steam superheating. Tuabine includes three parts, high-presure part, medium presure part, low presure A and low presure B are supported on the bearing numbers 1, 2, 3, 4, 5, 6. Tubine is operated and protected by electro-hydralic system to ensure safety in all turbine operating regime I. Base compiled
1.1Base on the explanatory drawings, tubine-generation installation instructions, take condensing type VA1-TSB-00M-M-M1B-MAN-8000 1.2 Base on the explanatory and technical drawings of installation of tubine and generator number 0KS00201-0KS002014. 1.2 Base on the documentation of Tubine – generator installation test Record. II. Brief introduction of specifications of Turbine.
2.1. Turbine-generator are provided by Toshiba Japan, every unit with 600MW capacity, Turbine is a condensing pure type with three parts( high presure, medium presure in the same body, low presure A and low presure B in the separated body)?
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
2/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
C«ng ty cæ phÇn LILAMA 69-1 LILAMA 69 69-1 JSC
LILAMA 69-1
Add: 17 Ly Thai To street - Bac Ninh city - Bac Ninh province Tel: (0241) 3821212 - 3854396 Fax: (0241) 3820584 E-mail:
[email protected] Website: www.lilama69-1.com.vn
2.2 Main parameters. 2.2.1 Rated Capacity: (MV)
600
2.2.2 Rated turn round speed (V/P):
3000
2.2.3 Number of nozzle diaphragm laminates - 8 nozzle diaphragm laminates for high presure part. (AP) - 7 nozzle diaphragm laminates for medium presure part (IP). - 12 nozzle diaphragm laminates for low presure (LP A). - 12 nozzle diaphragm laminates for low presure (LP B). 2.2.4. Inlet presure of Turbine (Kg/cm2):
169.
2.2.5. Inlet temperature of Turbine (oC): 538 III. Define of abbreviated words B. Organizational and human Resource Plan. I. Human resource plan for execution of generator installation
Position
Quantity
Site manager:
01 person
- Executive Engineer:
03 persons
- Material Officer:
02 persons
- Production Foreman:
02 persons
- Fitter:
25 persons
- Plumber:
12 persons
- Wood grain:
16 persons.
- Welder:
06 persons
- Electrician:
10 persons
- Others:
20 persons
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
3/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
C«ng ty cæ phÇn LILAMA 69-1 LILAMA 69 69-1 JSC
LILAMA 69-1
Add: 17 Ly Thai To street - Bac Ninh city - Bac Ninh province Tel: (0241) 3821212 - 3854396 Fax: (0241) 3820584 E-mail:
[email protected] Website: www.lilama69-1.com.vn
II. Organizational chart.
ORGANIZATION CHART ERECTION TURBINE EPC CONTRACTOR (LILAMA)
CONSULTANT
DIRECTOR SITE OFFICE
POYRY
OWNER (PVN)
PROJECT DIRECTOR
SUB CONTRACTOR (LILAMA 69-1)
DIRECTOR
Enterspire Erection SAO MAI
Capital Erection Turbine Health Service
Safety
• Fitter:
20 person
• Figer:
11 person 03 person 03 person 06 person 15 person
• Electric Welder: • Gas
Welder: • Electrician: • Other:
Group control Bridge Crane: • Manager: • Control: • Other
:
01 person 03 person 03 person
Notice Line instruction; Line information.
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
4/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
C«ng ty cæ phÇn LILAMA 69-1 LILAMA 69 69-1 JSC
LILAMA 69-1
Add: 17 Ly Thai To street - Bac Ninh city - Bac Ninh province Tel: (0241) 3821212 - 3854396 Fax: (0241) 3820584 E-mail:
[email protected] Website: www.lilama69-1.com.vn
I II. Human chart. Human resource plan for execution of TUARBINE installation
Person
60
50
40
30
20
10
0
Time May-11
Jun-11
Jul-11
Aug-11
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
Sep-11
Oct-11
Nov-11
Dec-11
Jan-12
5/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
C«ng ty cæ phÇn LILAMA 69-1 LILAMA 69 69-1 JSC
LILAMA 69-1
Add: 17 Ly Thai To street - Bac Ninh city - Bac Ninh province Tel: (0241) 3821212 - 3854396 Fax: (0241) 3820584 E-mail:
[email protected] Website: www.lilama69-1.com.vn
C: Equipments and tools.
STT
Equipment
Unit
Q’ty
1
Container 12 fit (for office)
Piece
01
2
Container 12 fit (storegrate)
Piece
02
3
Welding Machine 6 head
Piece
2
4
Cable electric welding 50 ÷ 90 mm2
M
800
5
Head electric welding
Piece
8
6
TIG welding machine
Piece
1
7
TIG welding cables
Set
2
8
Chain block 20 tons
Piece
4
9 10
Chain block 10 tons Chain block 5 tons
Piece Piece
4 6
11
Chain block 3 tons
Piece
8
12
Chain block 1,5 tons
Piece
4
13
Chain block hand 3,2 tons
Piece
4
14
Grinding machine Φ125 ÷ 150
Piece
15
15
Grinding machine
Piece
2
16
Oil jack 100 tons
Piece
4
17
Oil jack 70 tons
Piece
4
18
Oil jack 50 tons
Piece
4
19
Oil jack 20 tons
Piece
4
Φ180
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
Remark
6/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
C«ng ty cæ phÇn LILAMA 69-1 LILAMA 69 69-1 JSC
LILAMA 69-1
Add: 17 Ly Thai To street - Bac Ninh city - Bac Ninh province Tel: (0241) 3821212 - 3854396 Fax: (0241) 3820584 E-mail:
[email protected] Website: www.lilama69-1.com.vn
20
Bosch Drill
Piece
4
21
Drill Φ3 - Φ 30
Piece
60
22
Cable electric 2 x 2,5
M
500
23
Socket + Plug (electric)
Piece
100
24
Rod heator
Piece
8
25
Dial Gauge (EX 0,01)
Set
12
26
Level vial (EX 0,01)
Piece
2
27
Level construction
Piece
10
28
Electric Boot 70
Set
8
29
Electric Boot 150
Set
2
30
Calip (CX 0,02) L > 350
Piece
2
31
Calip (CX 0,02) L=250
Piece
1
32
Deep rule (CX 0,02) L>300
Piece
1
33
Panme 0-25 (CX 0,01)
Piece
2
34
Panme 25-50(CX 0,01)
Piece
1
35
Panme 50-75(CX 0,01)
Piece 1
36
Panme 75-100 (CX 0,01)
Piece
1
37
Panme 100-250(CX 0,01)
Piece
3
38
Panme 300
Piece
1
39
Panme inner 25-500
Set
1
40
Set Depth Micrometer 0- 2"
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
2
7/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
C«ng ty cæ phÇn LILAMA 69-1 LILAMA 69 69-1 JSC
LILAMA 69-1
Add: 17 Ly Thai To street - Bac Ninh city - Bac Ninh province Tel: (0241) 3821212 - 3854396 Fax: (0241) 3820584 E-mail:
[email protected] Website: www.lilama69-1.com.vn
41
Roll rule tape 3m; 5m
Piece
20
42
Roll rule tape 50m
Piece
2
43
Hammers 0,5-7kg
Piece
8
44
Hammer Cu từ 3-7kg
Piece
6
45
Rubber hammer
Piece
3
46
Adjustable Spanner 250; 500
Piece
6
47
Socket 8- 32
Set
2
48
Spanner 8-32
Set
2
49
Spanner 42- 76
Piece
8
50
Hexagon key wrench 1/8"-3/4"
Set
2
51
Cutter for rivet
Set
1
52
Jyg for rivet
Set
1
53
Steel saw + Wood saw
Piece
6
54
Feeler gauge 0,03-1 mm
Piece
8
55
Feeler gauge 0,5-2 mm
Piece
4
56
Feeler gauge wire 0,03-1
Piece 6
57
Force wrench 1000Nm
Piece
1
58
Force wrench 500Nm
Piece
2
59
Shalke 20 tons
Piece
4
60
Shalke 10 tons
Piece
6
61
Piece Shalke 5 tons
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
8
8/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
C«ng ty cæ phÇn LILAMA 69-1 LILAMA 69 69-1 JSC
LILAMA 69-1
Add: 17 Ly Thai To street - Bac Ninh city - Bac Ninh province Tel: (0241) 3821212 - 3854396 Fax: (0241) 3820584 E-mail:
[email protected] Website: www.lilama69-1.com.vn
62
Shalke 3 tons
Piece
10
63
Knifte
Piece
8
64
Square Level 300x600 mm
Piece
1
65
Square Level 150x100 mm
Piece
1
66
Straightedge 1m
Piece
2
67
Straightedge 3m
Piece
1
68
Straightedge 5m
Piece
1
69
Straight table (300x500) đến (600x1200)
Piece
70
Clamp table (vise)
Set
1
71
Tranfomer 36V (cable + 10 light)
Set
1
72
Wire Rope Φ32 (4m)
Sợ i
4
73
Thickless gauge
Set
1
74
Grind stone 600 (40x60x200)
Piece
8
75
Grind stone Oil 10x10x100
Piece
20
76
Grinding pressure
Piece
4
77
Grinding machine
1
78
Compressor machine
Piece Set
79
Measure gap machine
Set
1
80
Audio ampelier
Set
5
81
Remark flour
Kg
10
82
Color flour
Kg
5
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
5
1
9/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
C«ng ty cæ phÇn LILAMA 69-1 LILAMA 69 69-1 JSC
LILAMA 69-1
Add: 17 Ly Thai To street - Bac Ninh city - Bac Ninh province Tel: (0241) 3821212 - 3854396 Fax: (0241) 3820584 E-mail:
[email protected] Website: www.lilama69-1.com.vn
83
Grease
kg
40
84
Oil diezen
lít
200
85
Oil
lít
200
86
Oil P4
lít
10
87
Sand Paper
Sheet
200
88
Clout
kg
500
89
Anti-rust sweep
Piece
1000
90
Safety Clother
Set
10
91
Wire 0.5
kg
20
92
Support Wire on
Set
4
93
Theodolite
Set
1
94
Y - Level
Set
1
95
Knift
Piece
6
96
Font Number 10
Set
1
97
Flour
kg
20
98
Polyme wire Ø22
100
99
Crane TADANO 50 ton
M Piece
100
Bridge Crane
Piece
01
101
Truck crane 10 tấn
Piece
01
102
Truck
Piece
01
103
Tool hand
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
01
Set
10/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
C«ng ty cæ phÇn LILAMA 69-1 LILAMA 69 69-1 JSC
LILAMA 69-1
Add: 17 Ly Thai To street - Bac Ninh city - Bac Ninh province Tel: (0241) 3821212 - 3854396 Fax: (0241) 3820584 E-mail:
[email protected] Website: www.lilama69-1.com.vn
D. Generator installation method 1. Turbine installation sequence.
1.1- Zoning, selecting the foundation to transport Turbine into the foundation installation. 1.2. Leveling, compacting, constructing
a way to transport Turbine into the
position. 1.3. Acceptance of foundation. 2. Turbin installation.
2.1. Installing the benchmark on the foundation of Turbine 2.2. Carve rough concrete on the foundation of Turbine. 2.3. Receive, check and clean the equipments 2.4. Installing sole plates ( steel baseplate of Turbine) 2.5. Combine and install cylonder on the outside bottom of the low presure of Turbine A&B. a- Select the cable to hoist equipments. b- Hoist and install the cylinder on the outside bottom of the low presure of Turbine A&B. 2.6. Install the cylinder on the inside bottom of the low presure of Turbine A&B. 2.7. Install the nozzle diaphragms into the bottom of the cylinder of the low presure A&B. 2.8. Install and alignment Bearing Standard 1 2 3 4 5 6. 2.9. Install the cylinder on the outside bottom of the high-medium presure. 2.10. Install nozzle diaphragm into the high-medium presure of Turbine. 2.11. Pour non-shrinkage mortar into the cylinder of the low presure A&B. 2.12. Install Rotor low presure A&B.
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
11/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
C«ng ty cæ phÇn LILAMA 69-1 LILAMA 69 69-1 JSC
LILAMA 69-1
Add: 17 Ly Thai To street - Bac Ninh city - Bac Ninh province Tel: (0241) 3821212 - 3854396 Fax: (0241) 3820584 E-mail:
[email protected] Website: www.lilama69-1.com.vn
2.13. Align shaft coupling between Rotor low presure A and Rotor low presure B, rotor high presure and rotor low presure A. 2.14. Install nozzle diaphragm on the top of the cylinder of the low presure. 2.15. Break off Turbin low presure A&B. a- Break off the cylinder inside of the low presure A&B. b- Break off the cylinder outside of the low presure A&B. 2.16. Install Rotor high presure. 2.17.Align shaft coupling between Rotor low presure A and Rotor high presure. 2.18. Install nozzle diaphragm on the top of Turbine high presure. 2.19. Break off Turbine high presure. 2.20. Bolts installed and secured by heat. 2.21. Installation steam system and extraction. 2.22. Installation to connect the oil piping systerm. 2.23. Installation the control and measuring equipment. II. Installation procedure.
1.1- Zoning, selecting the foundation to transport turbine into the most convenient position for installing, sufficient road width for vehicles and cranes to move safely and must have signposts. 1.2- Aggrading, compacting, making a way to transport Turbine into the installation foundation. 1.3. Acceptance of machinery foundation, possession of site plan from building contractor, check centre and altitude of the machinery foundation, to ensure specifications as the drawings. The building contractor will supply the as-constructed drawings. A permissible error of the foundation dimesion. + Foundation coordinates (cross-crisis) ± 2mm + Level deviation
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
± 20mm.
12/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
C«ng ty cæ phÇn LILAMA 69-1 LILAMA 69 69-1 JSC
LILAMA 69-1
Add: 17 Ly Thai To street - Bac Ninh city - Bac Ninh province Tel: (0241) 3821212 - 3854396 Fax: (0241) 3820584 E-mail:
[email protected] Website: www.lilama69-1.com.vn
+ The horizon of the entire length’s surface ≤10mm. + Bolt hole of machine base
+20mm.
+ Bolt hole of machine base center
± 5mm.
+ Inside of bolt hole must be cleaned, error of the centre of bolt hole and the centre of foudation is ≤ 0.01d. (in there, d is a inner diameter of steel pipe) and ≤10mm, error of squarness <10mm. 2. Turbine installation. 2.1. Install benchmarks on the turbine foundation. - Use painting or ink to sign the level and centre of benchmark on the turbine foundation
and generator foundation. - Install benchmarks on the surface of turbine foundation. - Benchmarks aligned by the grandienter and degree of measuring. + Error of benchmarks ≤ 0.4mm. + Error of adjacent vertices ≤ 0.02mm - Break off protecting benchmarks, avoid to differ in making error of benchmarks.
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
13/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
C«ng ty cæ phÇn LILAMA 69-1 LILAMA 69 69-1 JSC
LILAMA 69-1
Add: 17 Ly Thai To street - Bac Ninh city - Bac Ninh province Tel: (0241) 3821212 - 3854396 Fax: (0241) 3820584 E-mail:
[email protected] Website: www.lilama69-1.com.vn
hip
lp B
lp A
generator
bench mark
detail
bench mark
Figure 01
2.2 Carve rough concrete on the suface of turbine foundation.
- Check altitude of turbine foundation, after that note down make report. Drafting for carving rough concrete on the foundation. - Use a gradienter to carve rough powder out of the surface of concrete, depth ≥ 30mm. - Concrete carved rough to put into sole plate, carving deep enough, wider than edges of sole plate from 150 to 200mm, the surface of carved rough concrete must be flush, roughness from 10mm to 20mm and bolt hole-casing be cut higher about 6mm than concrete surface. - Pouring sika plate (support plate 50x50x6) in the M36 adjusted bolt position.
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
14/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
C«ng ty cæ phÇn LILAMA 69-1 LILAMA 69 69-1 JSC
LILAMA 69-1
Add: 17 Ly Thai To street - Bac Ninh city - Bac Ninh province Tel: (0241) 3821212 - 3854396 Fax: (0241) 3820584 E-mail:
[email protected] Website: www.lilama69-1.com.vn
- The concrete sufaces can be clean by air compressor and exhauster. 2.3. Receive, check and clean equipments.
- After turbine house is roof covering. - When receipt of equipments, transport equipments on the floor turbine height 24500mm (the floor turbine is roof covering), check equipments to follow the list after dismouting and clean, maintain all of equipments, check the position, built-up dimesions, note down make report of quantity, measuring data and in comparision with the design, which supplied by manufacturer. 2.4. Install and adjust sole plate ( steel shim of turbine).
- Checking, classiffication, installation position of sole plate. - Reject oil preservative film out of the top and the bottom of sole plate by oil, oil stone, soft wiper.
- Use oil stone shine surface of sole plate. - Use a bridge crane to put sole plate into the installation position as the drawings. - Install anchor botls, anchor bolt –head is higher at least 3 threads than screw, anchor bolt-head is lower at least 3mm than surface of sole plate. - Use a gradienter observe the balance of sole plate, adjust sole plate lower than 0.05mm as level of drawings. 2.2 Carve rough concrete on the suface of turbine foundation.
- Check altitude of turbine foundation, after that note down make report. Drafting for carving rough concrete on the foundation. - Use a gradienter to carve rough powder out of the surface of concrete, depth ≥ 30mm. - Concrete carved rough to put into sole plate, carving deep enough, wider than edges of sole plate from 150 to 200mm, the surface of carved rough concrete must
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
15/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
C«ng ty cæ phÇn LILAMA 69-1 LILAMA 69 69-1 JSC
LILAMA 69-1
Add: 17 Ly Thai To street - Bac Ninh city - Bac Ninh province Tel: (0241) 3821212 - 3854396 Fax: (0241) 3820584 E-mail:
[email protected] Website: www.lilama69-1.com.vn
be flush, roughness from 10mm to 20mm and bolt hole-casing be cut higher about 6mm than concrete surface. - Pouring sika plate (support plate 50x50x6) in the M36 adjusted bolt position. - The concrete sufaces can be clean by air compressor and exhauster. 2.3. Receive, check and clean equipments.
- After turbine house is roof covering. - When receipt of equipments, transport equipments on the floor turbine height 24500mm (the floor turbine is roof covering), check equipments to follow the list after dismouting and clean, maintain all of equipments, check the position, built-up dimesions, note down make report of quantity, measuring data and in comparision with the design, which supplied by manufacturer. 2.4. Install and adjust sole plate (steel shim of turbine).
- Checking, classiffication, installation position of sole plate. - Reject oil preservative film out of the top and the bottom of sole plate by oil, oil stone, soft wiper. - Use oil stone shine surface of sole plate. - Use a bridge crane to put sole plate into the installation position as the drawings. - Install anchor botls, anchor bolt –head is higher at least 3 threads than screw, anchor bolt-head is lower at least 3mm than surface of sole plate. - Use a gradienter observe the balance of sole plate, adjust sole plate lower than 0.05mm as level of drawings. level vial
sole plate
edgestraight 5M
sole plate
foundation
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
16/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
C«ng ty cæ phÇn LILAMA 69-1 LILAMA 69 69-1 JSC
Add: 17 Ly Thai To street - Bac Ninh city - Bac Ninh province Tel: (0241) 3821212 - 3854396 Fax: (0241) 3820584 E-mail:
[email protected] Website: www.lilama69-1.com.vn
LILAMA 69-1
Figure 02
- Make sole plate balance, insert steel pad block under sole plate, number of steel pad block from 3 to 5 plates. - Steel pads must be good contact, tight, use measuring tape 0.03 to cram inside, if it can not cram that mean to meet requirements. - Use colouring matter check to connect of sole plate’s surface, connection ≥ 80%. - Align sole plate of low presure of turbine, use a measuring rule, magnetic support, mechanic level CX 0.02. - Level out balance between sole plate with error ≤ 0.10. - Level out balance inside of sole plate ≤ 0.03. - Secure bolts to fix sole plates, secure bolts on the same plate steadily, during securing process, always check balance and altitude of sole plate regularly, - Invitation related parties to check before acceptance, record data and prepare for installing cylinder in the bottom of low presure A and B. 2.5. Combine and install cylinder in lower part’s outer of low presure A&B.
- Received equipment from yards, carried on special purpose vehicles, forcing the tight ligaments prevent leakage during transport, hoisting gently pull collisions do not damage equipment a. Select cable for hoisting equipments - Select a load test cable to folllow the formula. Sstator =
Q
/ α
M
Includes :
S (ton) rope cap. Q (ton) Freight. M number of ropes α
conner with cable
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
17/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
C«ng ty cæ phÇn LILAMA 69-1 LILAMA 69 69-1 JSC
LILAMA 69-1
Add: 17 Ly Thai To street - Bac Ninh city - Bac Ninh province Tel: (0241) 3821212 - 3854396 Fax: (0241) 3820584 E-mail:
[email protected] Website: www.lilama69-1.com.vn
Apply the formula above, we have this force sheet. (Table I. Rope cap caculation because of freight) Works
freigh
Number of
Conner with
Rope
Q (ton)
ropes M
cable α
cap S (ton)
Hoist and install cylinder in lower part’s outer of low presure
54
4
30
15,588
Hoist and install cylinder in lower part’s inner of low presure
35
4
30
10,103
Hoist and install cylinder in lower part’s outer of highmedium presure
55
4
30
15,877
Hoist and break off cylinder outer of low presure
42
4
30
12,124
Hoist and break off cylinder outer of low presure
42
4
30
12,124
b. Hoist and install cylinder in lower part’s outer of low presure.
From table I above, it is - Combination, condenser’s weld have completed before carrying out installing cylinder in lower part’s outer of low presure . - Clean cylinder, use soft wiper clean the surface’s oil preservative film, lower surface of support leg, adjust defects on the surface. - Use a bridge crane in the engine compartment hoist every detail (in lower part of low presure of turbine and generator) in the position and fit together. These workers are highly skill, skilled workers on hoisting, have already experienced the pull of heavy cranes, super-length, super-weight, the operator must have a signal whistle. In the process of hoisting, everyone must conform to orders of the commander,
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
18/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
C«ng ty cæ phÇn LILAMA 69-1 LILAMA 69 69-1 JSC
LILAMA 69-1
Add: 17 Ly Thai To street - Bac Ninh city - Bac Ninh province Tel: (0241) 3821212 - 3854396 Fax: (0241) 3820584 E-mail:
[email protected] Website: www.lilama69-1.com.vn
during hoisting process must use nilon rope in order to retain equipment, put cylinder in the position must be covered carefully , avoid colliding with others. - Adjust centre, level as techical requirement, use a centerline stringing wire attach on the bracket at both ends of turbine and balancing makes string stretch, use a inside micrometer chech cylinder’s centre and level as centreline stringing wire, after that note down make report, if have any offsets, should use a jack put cylinder into turbine’s centre, adjusted error of two joints <0.03mm. - Installation surface has good connection without clearance, use measuring tape 0.04 not cram inside of clearance, contact of joints ≥80%. - Install aligning punch in the correct position with good contact. - Horizontal surface of the cylinder must be flat, situated on a straight line. - After exposure gap and specifications make ensure, it was used to sealed material (for example: heat resistant resin) to lute on the assembly surface, then carring out securing a screw joint between 2 lower parts of cylinder. - Use centreline stringing wire, inside micrometer, gradienter check centre, level, if there is no problem, bolt head, should be welded to avoid rotating. 2.6. Install cylinder in lower part’s inner of turbine low presure A&B (35 tons)
- Joint position cleaned by soft wiper, oil, wire brush and rubbing stone, air compressor. - Check installing dimensions, keyholes, surface-mount. - Use a bridge crane in the engine compartment to connect cables in order to flipping the cylinder ( as figure No.3).
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
19/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
C«ng ty cæ phÇn LILAMA 69-1 LILAMA 69 69-1 JSC
LILAMA 69-1
Add: 17 Ly Thai To street - Bac Ninh city - Bac Ninh province Tel: (0241) 3821212 - 3854396 Fax: (0241) 3820584 E-mail:
[email protected] Website: www.lilama69-1.com.vn
wire rope Φ 36.5
Lower outer casing lp a weight: 55 tÊn
Figure 03
Half Lower Inner casing LP A Half Lower Inner casing LP A Figure 04
- When the cylinder flipped by the right way.
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
20/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
21/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
C«ng ty cæ phÇn LILAMA 69-1 LILAMA 69 69-1 JSC
LILAMA 69-1
Add: 17 Ly Thai To street - Bac Ninh city - Bac Ninh province Tel: (0241) 3821212 - 3854396 Fax: (0241) 3820584 E-mail:
[email protected] Website: www.lilama69-1.com.vn
- Before installing laminates, must carry out checking parts from the bottom (as keyholes, joggles, cotters) to meet a technical requirements. - Laminates fixed without sink, cracks because of casing, processing part keyway must be flat and parallel. - When install laminates, must be clean grease and lead powder layer is applied. - Installation of laminates must comply with the sequence, hoist gently, need to use a special – purpose catch, the commander must be highly skill to handle in the hoisting process accurately. - Adjust laminate’s centre and level, use a theodolite, a centreline stringing wire, earphone, micrometer gauge check error of the laminate, make schedule, need to adjust the centre, level of laminates as the turbine’s centre and level. - Laminate adjusted and inserted shim into tab, error follow the instruction document for installation. - Error value for all parts as upper, lower, left, right ± 0.05mm/m. - Error vertical ± 0.03mm/m. - Error clearance with the left-right ± 0.03mm/m - Check daylight of axial and radial, error daylight within crope of permission to meet request. 2.8 Install and adjust pedestal bearing No 1 2 3 4 5 6 -
Clean abutment in the joint position above, below by oil, wire brush, rubbing stone anf soft wiper. - Measure blocks, keyholes and assembly surface (blocks, keyholes, assembly surface are smooth and plane. When the technical requirements are met and, error within crope of permission) carry out installing. -
Use a bridge crane in the engine compartment attach to cable and and a pully adjusts the balance (as the figure), after that, hoisting every pedestal bearing into the position.
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
22/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
C«ng ty cæ phÇn LILAMA 69-1 LILAMA 69 69-1 JSC
LILAMA 69-1
Add: 17 Ly Thai To street - Bac Ninh city - Bac Ninh province Tel: (0241) 3821212 - 3854396 Fax: (0241) 3820584 E-mail:
[email protected] Website: www.lilama69-1.com.vn
Crane
Chain Block Wire rope
Standard
Figure 06
- Install blocks to control the fedestal bearing’s vertical and horizon, install anchor bolts. - Mating the contacting surface of the pedestal bearing with sole plate, use the coloring matter check the contact, in the same time must continue to scratch until the contact of bearings and sole plate ≥80% to meet requirements. - A measuring tape 0.05mm used to cram into the clearances between the pedestal bearing and sole plate, if not cram through is achieved. - Check and adjustment of sole plate’s block with the pedestal bearings. + Error of clearance from 0.00 to 0.05 for one side. - Use a theodolite and a gradienter adjust the altitude of pedestal bearing. + Error of level ±0.5mm + Total error of bearings: 0.10mm. - Adjust the pedestal bearing, use a inside micrometer take centre line stringing wire of turbine get be standard, measure the oil seal positions, check amount of deflection of the pedestal bearing, use a hydraulic jack push the pedestal bearing to follow the centre of turbine. + Error of radial ≤ 0.05mm + Error of axial ≤ 0.05mm - Securing anchor botls as the instruction.
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
23/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
C«ng ty cæ phÇn LILAMA 69-1 LILAMA 69 69-1 JSC
LILAMA 69-1
Add: 17 Ly Thai To street - Bac Ninh city - Bac Ninh province Tel: (0241) 3821212 - 3854396 Fax: (0241) 3820584 E-mail:
[email protected] Website: www.lilama69-1.com.vn
* Pouring nonshrink concrete to fix the pedestal bearings.
- The concrete sufaces can be clean by air compressor and exhauster. - To nail framework to screen for pouring nonshrink concrete for the pedestal bearings of turbine. - Mix nonshrink concrete, pour in accordance with the process, compact for concrete not pock-mark, after pouring process finish, damp for concrete about 72 hours. * Installation of jounal bearing. -
Jounal bearing cleaned by oil, soft wiper, use felt burnish assembly positions after that, carry out measuring specifications.
-
Check white alloy layer without breach, blow- hole, cinder perlingual and oil bath. - Assembly surface’s horizon of bearings checked by a feeler gauge 0.05mm, sine elbow and bearings must be close, contact regularly, the contact ≥80% contact area. - When pad attached to bearings, use coloring matter mate contact surface of pad and bearings, the contact ≥ 80% be reached. -
steel supports which used to adjust pads, are thin steel plates, amount of steel supports from 3 to 5 plates., if there are any oil holes, they must be larger than old holes, note down the thinkness and quantity of every bearing.
2.9 Installation of the cylinder in lower part’s outer of high-medium presure (amount of 55 tons). -
-
After the assembly position cleaned and measured to check notches, feather key for assembly, burnish surface completed, carry out installing.
a bridge crane in the engine compartment hoist and flit the cylinder (as the Use figure). When the cylinder flipped according to the right way for assembly, attach cable for hoisting equipment out of the screen, adjust pully to keep the cylinder balanced, at once hoisting pully into the position.
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
24/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
25/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
C«ng ty cæ phÇn LILAMA 69-1 LILAMA 69 69-1 JSC
LILAMA 69-1
Add: 17 Ly Thai To street - Bac Ninh city - Bac Ninh province Tel: (0241) 3821212 - 3854396 Fax: (0241) 3820584 E-mail:
[email protected] Website: www.lilama69-1.com.vn
- Use a hydraulic jack push up and push down until the cylinder’s surface is smooth, error ≤ 0.05mm/m, in the same time, insert shims to fix it. - Use a centreline stringing wire, inside micrometer to check error as the axial and the radial. Error of axial ≤ 0.10, error of radial ≤ 0.05, invite related parties to accept, next step. 2.10. Installation of diaphragm laminates for turbine’s high-medium presure.
- Before installing diaphragm laminates, must carry out checking the below parts (as keyhole, cut-in catch and joggles) must meet technical requirements. - The diaphragm laminate fixed without sink, bastard breaks, handling prismatic key - - -
must be smooth and parallel. Laminates fixed without sink, cracks because of casing, processing part keyway must be flat and parallel. When install laminates, must be clean grease and lead powder layer is applied. Installation of laminates must comply with the sequence, hoist gently, need to use a special – purpose catch, the commander must be highly skill to handle in the
hoisting process accurately. - Adjust laminate’s centre and level, use a theodolite, a centreline stringing wire, earphone, micrometer gauge check error of the laminate, make schedule, need to adjust the centre, level of laminates as the turbine’s centre and level. - Laminate adjusted and inserted shim into tab, error follow the instruction document for installation. - Error value for all parts as upper, lower, left, right ± 0.05mm/m. - Error vertical ± 0.03mm/m. - Error clearance with the left-right ± 0.03mm/m - Check daylight of axial and radial, error daylight within crope of permission to meet request. 2.11. Pouring nonshrink concrete for the cylinder of low pressure A&B.
- The concrete sufaces can be clean by air compressor and exhauster. - To nail framework to screen for pouring nonshrink concrete for sole plates of turbine.
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
26/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
C«ng ty cæ phÇn LILAMA 69-1 LILAMA 69 69-1 JSC
LILAMA 69-1
Add: 17 Ly Thai To street - Bac Ninh city - Bac Ninh province Tel: (0241) 3821212 - 3854396 Fax: (0241) 3820584 E-mail:
[email protected] Website: www.lilama69-1.com.vn
- Mix nonshrink concrete, pour in accordance with the process, compact for concrete not pock-mark, after pouring process finish, damp for concrete about 72 hours. 2.12. Installation of Rotor for low pressure A&.B.
- The Roto of turbine is a device to work in high temperature conditions, rotating at great speed, the processing and manufacturing of high precision while a large load, so in the course of transportation, installation must be careful, in accordance with procedures and regulation documentation provided by manufacturers and under the guidance of the equipment specialists. - Use special purpose vehicles to transport equipment, when hoisting the origin of component, it must be skided firmly by turn buckle or chain hoist (figure No.08)
ROTOR BOX ChainBlock Wire rope
ChainBlock Wood
Wire rope
TRUCK
Figure 08
- When the equipment to be transported to the installation location of the machine compartment, open the container and invite related parties to check the equipments. - Flanged coupling make ensure dimensions, without defects, surface reach burnish, bolt hole of coupler must be correct dimension. + Trunnion is burnished and correct dimension. + Rotating blades without sinks, defects and plates used to pack must be straight, not warping. + Cleaned by oil, soft wiper, use felt clean oil preservative film, after that, check all of specifications again, note down make report.
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
27/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
28/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
C«ng ty cæ phÇn LILAMA 69-1 LILAMA 69 69-1 JSC
LILAMA 69-1
Add: 17 Ly Thai To street - Bac Ninh city - Bac Ninh province Tel: (0241) 3821212 - 3854396 Fax: (0241) 3820584 E-mail:
[email protected] Website: www.lilama69-1.com.vn
Figure 10
- Attach to arms, special -purpose cables in the position, where is attaced on the axis of rotor. - Lifting Rotor up to about 1000mm, a rope clamp rotor, use a mechnical level check the axis, adjust rotor balanced, when rotor balanced to continue to hoist in the position. - When Rotor is near the position, should adjust a bridge crane dismount slowly, must not knock against laminate absolutely, in the same time, the axis is applied a solid viscid oil film and cleaned before the axis is on the bearing. 2.13. Adjust and check the clearances between rotor and laminate.
- Adjust rotor of turbine’s low pressure, use a micrometer gauge, mechnical level, centreline stringing wire, feeler gauge adjust the clearances between rotor and laminate according to assembly requirements. - Check, adjust a daylight of axis of laminate and rotor’s low pressure, use lever push a laminate to move to follow the axial and radial, note down the specifications and compare with the design, daylight of axis within scope of permission to be reached. - Check the daylight of axis of rotor, use a jack push and push back, the daylight of axis is about 0.6-0.8mm be reached. - 2.14. Adjust the coupler of the axis of rotor’s low pressure A and rotor’s low pressure B.
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
29/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
30/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
C«ng ty cæ phÇn LILAMA 69-1 LILAMA 69 69-1 JSC
LILAMA 69-1
Add: 17 Ly Thai To street - Bac Ninh city - Bac Ninh province Tel: (0241) 3821212 - 3854396 Fax: (0241) 3820584 E-mail:
[email protected] Website: www.lilama69-1.com.vn
Degree of accuracy of coaxial 2.15. Installation of
+ Tolerance of radial ≤ 0.05mm + Tolerance ≤ 0.05mm
diaphragm laminates
of upper part
of the cylinder’s low
pressure.
- Clean the upper diaphragm laminate, check dimensions, notches, key joinings, if reach the design requirements to continue to assembly. - Diaphragm laminates must install in accordance with the process, hoist gently, need adjusting pulley, the commander must be highly skill to handle in the hoisting process accurately, everybody must comply with the commander’s order. - When the upper diaphragm laminate, we must use a seal check the clearance between the rotating blade and diaphragm laminate, at once use a measuring tape 0.03 check the clearance of assembly surface, if a measuring tape 0.03 isn’t cramed into inside, that means to meet requirements. Botls installed and secured by a force spanner, head- bolt locked without rotation, so on until finishing. 2.16. Put on the lid of low-pressure turbine A&B. * Put on the lid of the inner cylinder.
- Similar to hoist the cylinder in lower part’s inner of low presure , use a bridge crane in the engine compartment, hoisting cable and shackle applied to the cylinder in lower part’s inner of low pressure (as the figure No.13). - When install to use 4 bolts guide in the bottom part of the 4 corners of the cylinder. - When the cylinder put into the position, seal, check the clearance between diaphragm laminate and the inner cylinder, the clearance must be met the design, the dilatation produced beacause of movement of engine, at once use a measuring tape 0.03 check the clearance of assembly surface, if a measuring tape 0.03 isn’t cramed into inside, that means to meet requirements. Bolt secured to install by heat in accordance with the process, then fixed.
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
31/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
C«ng ty cæ phÇn LILAMA 69-1 LILAMA 69 69-1 JSC
LILAMA 69-1
Add: 17 Ly Thai To street - Bac Ninh city - Bac Ninh province Tel: (0241) 3821212 - 3854396 Fax: (0241) 3820584 E-mail:
[email protected] Website: www.lilama69-1.com.vn
Xi lanh trong h¹ ¸p nö a trªn
Figure 13
* Put on the lid of the outer cylinder of the low-pressure.
- Cover of the cylinder has been combined to the lower part of the cylinder, use a bridge crane in the engine compartment (attached as the figure No.14)
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
32/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
C«ng ty cæ phÇn LILAMA 69-1 LILAMA 69 69-1 JSC
LILAMA 69-1
Add: 17 Ly Thai To street - Bac Ninh city - Bac Ninh province Tel: (0241) 3821212 - 3854396 Fax: (0241) 3820584 E-mail:
[email protected] Website: www.lilama69-1.com.vn
Wire rope Φ 42
upper outer casing lp weihgt: 42 tons
Figure 14
- Attached as the figure, applied the formula, we have the result of the above table. - Select cable for hoisting the cylinder in low pressure, apply the above table Q Sstator = / α M
Includes :
S (ton) rope cap. Q (ton) = 42000kg M = 4 ropes α = 30o 42000 S= / 0.7 = 15000kg . 4
From the diagram above, we will find rope-cap S= 15000kg. - Look in the cable table standard of vietnam 4244-86. - Steel cable of HK-PO 8x38(1+7+7+7+14) + 1 deformed bar IOCT 7668-69.
- Select cable
∅
36.5mm
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
33/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
C«ng ty cæ phÇn LILAMA 69-1 LILAMA 69 69-1 JSC
LILAMA 69-1
Add: 17 Ly Thai To street - Bac Ninh city - Bac Ninh province Tel: (0241) 3821212 - 3854396 Fax: (0241) 3820584 E-mail:
[email protected] Website: www.lilama69-1.com.vn
- -
S rope cap =33203 kg S tensile force = 15000 Kg < S rope-cap of cable = 33203 Kg. S rope cap =34396 kg S tensile force = 15000 Kg < S rope-cap of cable = 33203 Kg Tensile force compared with rope-cap of cable to ensure safety. - Before carry out cover, all the work inside the cylinder has been completed, written confirmation of the parties. - Use a bridge crane in the engine compartment to hoist, when the cylinder is in the right position, use a measuring tape 0.03 isn’t cramed into inside, that means to meet requirements. - Bolt installed in accordance with the process, at once, bolt secured symmetrically, must not buckle flanges. 2.17. Installation and adjustment for rotor’s high-pressure.
- The Roto of turbine is a device to work in high temperature conditions, rotating at great speed, the processing and manufacturing of high precision while a large load, so in the course of transportation, installation must be careful, in accordance with procedures and regulation documentation provided by manufacturers and under the guidance of the equipment specialists. - Use special purpose vehicles to transport equipment, when hoisting the origin of component, it must be skided firmly by turn buckle or chain hoist When the equipment to be transported to the installation location, open the container and invite related parties to check the equipments, if have any defects or problems, we should take the minutes to settle together, then use a canvas and nylon cover again. - The rotor’s rack processed, put rotor on the rack (as figure No 15) - Cleaned by oil, soft wiper, use felt clean oil preservative film, after that, check all of specifications again, note down make report, carry out installing.
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
34/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
35/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
36/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
C«ng ty cæ phÇn LILAMA 69-1 LILAMA 69 69-1 JSC
LILAMA 69-1
Add: 17 Ly Thai To street - Bac Ninh city - Bac Ninh province Tel: (0241) 3821212 - 3854396 Fax: (0241) 3820584 E-mail:
[email protected] Website: www.lilama69-1.com.vn
- 2.18. Adjust the coupler of the axis of rotor’s low pressure A and rotor’s high pressure.
- Use a micrometer gauge ưith degree of accuracy 0.01. Check the rotation of axis and note report, adjustment of concentricity of the radial and axial. - A gauge attached (as the figure below), the flanged coupling divided into 4 points, carry out rotating about fouth of revolution to note down make report, apply this formula, insert shims into bearings A&B.
Rotor hip
Rotor lp A
dial gauge
Figure 17 L1
1 a
D
2 a
A M L2
B N
Figure 18
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
37/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
C«ng ty cæ phÇn LILAMA 69-1 LILAMA 69 69-1 JSC
LILAMA 69-1
A=
B=
( L1 − L 2) * M D
Add: 17 Ly Thai To street - Bac Ninh city - Bac Ninh province Tel: (0241) 3821212 - 3854396 Fax: (0241) 3820584 E-mail:
[email protected] Website: www.lilama69-1.com.vn
+
a1 + a 2
( L1 − L 2) * ( M + N ) D
2 +
a1 + a 2
2
Degree of accuracy of coaxial
+ Tolerance of radial ≤ 0.03mm + Tolerance of axial ≤ 0.03mm
- Follow the above formula, we insert shims with the same thickness into A&B point.
2.19. Installation of diaphragm laminates of upper part of turbine’s high pressure
- Installation of diaphragm laminate must comply with the process, hoist gently, before installing, every diaphragm laminate adjusted to meet requirement for the clearance and contact, should continue to install the next diaphragm laminate. - Adjustment of diaphragm laminate’s centre and altitude. Use A micrometer gauge, seal, feeler gauge to check ad adjust the clearance, asembly, bolt installed and secured by a torque wrench or hammer or lock against rotating. 2.20. Put on the lid of turbine’s high- pressure
- Specifications of the equipment in the cylinder checked, (attached checked documents). - Clean, check the dimension of keyhole, assembly tabs, apply white-lead on the surface. - Cover use a bridge crane on the engine compartment, pulley, cable, specialpurpose shackle, attach to cable (as the figure No.19), hoisting up about 1000mm, check cable, the safety of hoisting device, in the same time, istall 4 pilot-pins into turbine’s lower part. Use mechnical level balance the cylinder, when ensure the safety conditions to continue to hoist the cylinder into the position. - The cylinder is near the position, far from the flange about 250mm, stop to clean the upper assembly surface and lower assembly surface, after that apply the colloidal film for the assembly surface and continue to get down until 2 flanges touch together.
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
38/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
C«ng ty cæ phÇn LILAMA 69-1 LILAMA 69 69-1 JSC
Add: 17 Ly Thai To street - Bac Ninh city - Bac Ninh province Tel: (0241) 3821212 - 3854396 Fax: (0241) 3820584 E-mail:
[email protected] Website: www.lilama69-1.com.vn
LILAMA 69-1
wire rope
half lower casing hip
Figure 19
- Select cable for hoisting the cylinder of high- pressure’s upper part, apply the above table - Select cable for hoisting the cylinder’s low- pressure, apply the above table Q Sstator = / α M
Includes :
S (ton) rope cap. Q (ton) = 30000kg M = 4 ropes α
= 30o
30000 S= / 0.7 = 10714kg. 4
From the diagram above, we will find rope-cap S= 10714kg. - Look in the cable table standard of vietnam 4244-86. - Steel cable of HK-PO 8x38(1+7+7+7+14) + 1 deformed bar IOCT 7668-69. - Select cable ∅ 36.5mm - S rope cap =33203 kg - S tensile force = 10714 Kg < S rope-cap of cable = 33203 Kg.
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
39/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
C«ng ty cæ phÇn LILAMA 69-1 LILAMA 69 69-1 JSC
LILAMA 69-1
Add: 17 Ly Thai To street - Bac Ninh city - Bac Ninh province Tel: (0241) 3821212 - 3854396 Fax: (0241) 3820584 E-mail:
[email protected] Website: www.lilama69-1.com.vn
- S rope cap =34396 kg - S tensile force = 10714 Kg < S rope-cap of cable = 33203 Kg Tensile force compared with rope-cap of cable to ensure safety. 2.21. Bolt installed and secured by heating.
- Bolt for installation must be correct type, nipples greased by white-lead. - Use the colouring matter check the contact surface of nuts of bolt and the cylinder. The contact must be steady. - Bolt secured symmetrically.
- Calculation of conner for securing, heating, secure in accordance with the manufacturer’s instruction. Heater (Gas)
Nut Bolt Upper Casing
Lower Casing Bolt
Nut
Figure 20
2.24. Installaiong of vapor phrase system (steam system) and extraction. * Valve installed into the main steam piping.
- Bearing of valve handled definitely and ensure safety (as the figure 21)
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
40/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
C«ng ty cæ phÇn LILAMA 69-1 LILAMA 69 69-1 JSC
LILAMA 69-1
-
Add: 17 Ly Thai To street - Bac Ninh city - Bac Ninh province Tel: (0241) 3821212 - 3854396 Fax: (0241) 3820584 E-mail:
[email protected] Website: www.lilama69-1.com.vn
When valve transported to the foundation for installing, must hoist the entire on the bearing, dismount the plate (which is used to tip the flug of vavle) to clean, check specifications of valve, magnetic. msv (A) (b) H200x200 SHIM H150x150 H150x150
H200x200 H200x200 H200x200
Figure 21 -
Schedule and record specifications, ensure safety to carry out installing into the postion. - Use a bridge crane in the engine compartment sling cable as the figure, hoisting into the position, adjustment the valve’s centre and altitude, in the same time must adjust connetion of inlet pipe and outlet pipe in according with the clearance and junstion standard , after that, use measured steel force to fix valve. - When valve installed into the position, make report and invite related parties to -
-
accept. Welded pipe joints, pipe joints must be heated before welding, weld every film steadily, at once must weld symmetrically, welding stick must be correct type and always sured with the correct temperature. * Installation of extractions
When carry out connecting, must use TIG welding machine, and welding sticks be correct types.
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
41/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
C«ng ty cæ phÇn LILAMA 69-1 LILAMA 69 69-1 JSC
LILAMA 69-1
Add: 17 Ly Thai To street - Bac Ninh city - Bac Ninh province Tel: (0241) 3821212 - 3854396 Fax: (0241) 3820584 E-mail:
[email protected] Website: www.lilama69-1.com.vn
MS-1R (A) HANGER CV1
MSV (A) CV2
CV4
MSV (B) CV3
(B) HANGER
MS-2R
Figure 22
2.22. Installation of connection of the oil piping system. of the oil pump and oil tank. * Installation The oil pump combined with the oil tank. -
The oil tank installed into the position, adjust the centre of tank as the installing drawing. - Dismount the cover, oil screen out of the tank, clean inside of the tank, use wheat flour clean dust, iron filing, the oil screen blown by the air compressor. - Install and adjust a oil pump, use a bridge crane in the engine compartment to hoist the pump into the position, use grandienter, theodolite check and adjust the pump’s centre and altitude as the drawings. - Adjust pump’s propeller and pump so that the clearance is according to the design, the coupler of the axis of pump and the motor is the same way with the coupler of the axis of turbine-generator. + Tolerance of radial ≤ 0.04mm + Tolerance of axial ≤ 0.04mm -
* Installation of the oil piping.
The oil piping cleaned and ứahed through by acid before carry out connecting. - The flanges must be smooth, correct type, between the flanges must have oilresistant washers,the oil tank’s input and output must perpendicular to the design acclivity.
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
42/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
C«ng ty cæ phÇn LILAMA 69-1 LILAMA 69 69-1 JSC
LILAMA 69-1
Add: 17 Ly Thai To street - Bac Ninh city - Bac Ninh province Tel: (0241) 3821212 - 3854396 Fax: (0241) 3820584 E-mail:
[email protected] Website: www.lilama69-1.com.vn
-
Piping welded by Tig welding, welded joints must be checked by supersonic and osmosis. - Installation of the oil systerm has completed,tipped flug bearings run circulately for washing through. - Installing the control and measuring equipment on the oil piping. 2.23. – Installation of the control and measuring equipment.
-
The control and measuring equipment installed in the correct positon, stored carefully, avoid colliding, accurate connection with the centre.
F. Safety method. I. Safety in the construction site. 1. Project and establishment at site.
After construction site established, commander have to take interest in occupational health and safety,
preventation and fighting fire
and enviromental
protection. + Based on the legislation on occupational health and safety, preventation and fighting fire and enviromental protection to make the design parameters. + Planning premises, site huts zone, warehouses, internal transportation, oxygencompressed air – water- electric supply system. + Establish advantage conditions for laborers (the most possible advantages). - At site: Preventation from sunlight, rain, interval place, take exercise, lavatory etc…in order to create comfort in working to reduce accidents and increase productivity. - At site hut zone: Besides huts are commodious, clean, it should need a collective activities place as refectory, amusement park, lavatories, club-houses, recreation rooms etc… 2. Activities at site.
Oil pipelines are clean, washed with acid before connecting tube.
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
43/50
schedule of installation turbine 5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
project: thermal power plant vung ang 1
STT 1 1.1
Description works
Time
ERECTION STEAM TURBINE
315 days?
Sun 5/1/11
Sat 3/10/12
6 days
Sun 5/1/11
Fri 5/6/11
287 days?
Tue 5/10/11
Mon 2/20/12
1- Prepare plant for transportion, erection Turbine 2- Erection steam turbine.
1.2
Start
Finish
1.2.1
- Setting Bench Mark on foundation
10 days
Tue 5/10/11
Thu 5/19/11
1.2.2
- Chipping concrete on foundation.
6 days
Tue 5/24/11
Sun 5/29/11
1.2.3
- Delivery and check, cleaner equipment.
20 days?
W ed 5/25/11
Mon 6/13/11
1.2.4
- Setting on Soleplates
7 days
Mon 6/20/11
Sun 6/26/11
1.2.5
- Assembly and installation Lower Outer Casing LP A&B - Assembly and installation Lower Inner Casing LP A&B - Install the nozzle diaphragms into the bottom of the cylinder LP A&B. - Install and alignment Bearing Standard 1 2 3 4 5 6. - Installation Lower casing HIP.
15 days
Sat 6/25/11
Sat 7/9/11
12 days
Fri 7/15/11
Tue 7/26/11
20 days
Tue 8/2/11
Sun 8/21/11
20 days
Sat 8/27/11
Thu 9/15/11
14 days
Sat 9/24/11
Fri 10/7/11
12 days
Mon 10/17/11
Fri 10/28/11
5 days
Mon 10/31/11
Fri 11/4/11
15 days
Sat 11/5/11
Sat 11/19/11
1.2.6 1.2.7 1.2.8 1.2.9 1.2.10 1.2.11
-bottom Install of thethe nozzle diaphragms into the cylinder HIP - Grout pads for LP A&B.
1.2.12
- Installation Rotor LP A&B.
1.2.13
- Adjusting coupling of shaft LPA & LPB.
7 days
Fri 11/25/11
Thu 12/1/11
1.2.14
4 days
Mon 12/5/11
Thu 12/8/11
1.2.15
- Install the nozzle diaphragms into the top of the cylinder LP A&B. - Installation LP A&B Upper Casing.
1.2.16
5 days
Fri 12/9/11 Tue 12/13/11
- Installation Rotor HIP
12 days
Fri 12/9/11 Tue 12/20/11
1.2.17
- Adjusting coupling of shaft LPA & shaft
10 days
Tue 12/27/11
Thu 1/5/12
1.2.18
HIP. - Install the nozzle diaphragms into the top of the cylinder HIP - Installation HIP Upper Casing.
12 days
Tue 1/10/12
Sat 1/21/12
15 days
Thu 1/26/12
Thu 2/9/12
- Tighting Bolts by heaters. 3- Installation steam system and extraction 4- Installation to connect the oil piping syst 5- Installation the control and measuring e 6- Flushing oil pipe system.
5 days 20 days 30 days 7 days 25 days
Thu 2/16/12 W ed 2/1/12 Sun 1/15/12 Sun 2/12/12 W ed 2/15/12
Mon 2/20/12 Mon 2/20/12 Mon 2/13/12 Sat 2/18/12 Sat 3/10/12
1.2.19 1.2.20 1.3 1.4 1.5 1.6
April
May
June
July
August
Septembe Octobe
CÔNG TY CỔ PHẦN LILAMA 69-1
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
44/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
45/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
46/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
47/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
48/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
49/50
5/28/2018
VA1-L691-00100-M-M8-DRC-0001(STEAM TURBINE) - slide pdf.c om
http://slide pdf.c om/re a de r/full/va 1-l691-00100-m-m8-drc -0001ste a m-turbine
50/50