Basic information about paper packageDescripción completa
Full description
A Word document with allegedly doctored email exchanges provided to Huffington Post that was then sent to CNN
Full description
Attachment and Loss
QG II Onshore Project LNG Storage Facilities
Ishikawajima - Harima Heavy Industries Co., Ltd.
Jurong Engineering Limited
TEST PACKAGE NO. TB-T7101-
QG II Onshore Project LNG Storage Facilities
Ishikawajima - Harima Heavy Industries Co., Ltd.
Jurong Engineering Limited
TEST PACKAGE ATTACHMENT
UNIT
SYSTEM NUMBER
SYSTEM DESCRIPTION
27
TEST PACKAGE NUMBER
LNG TANK 27-T-7101
S/No.
ATTACHMENT
1
PRESSURE TEST CONFIRMATION RECORD
2
PIPING PRESSURE TEST RELEASE / REPORT
3
PRE-TEST PUNCH LIST FOR PIPING WORKS
4
POST TEST AND REINSTATEMENT CHECKLIST
5
LINE LIST
6
DAILY WELDING REPORT
7
PIPING ISOMETRIC DRAWING
8
MARKED UP P & ID
9
LOCATION MAP
10
BLIND THICKNESS CHART
11
PIPE CLEANING RECORD
12
PNEUMATIC TESTING PRE-TEST CHECKLIST
13
BOLT TORQUE RECORD
YES
NO
N/A
Proposed Residential Development at Gerrard Road.
Mellavin Engineering Co. Ltd Test Date:
PIPING PRESSURE AND AIR TIGHTNESS TEST Room Location: Line Purpose: Gas Line: Liquid Line: Test Period: Starting Pressure (Psi): Finishing Pressure (Psi): Pressure (Differential): Remarks: