Temporary structures have evolved considerably over the years, bringing a wide range of marquee hire options for anyone organizing a festival, exhibition, product launch, wedding or private …Full description
TEMPORARY REPAIR/CHANGE AUTHORIZATION FORM
Permanenet Repair Work Order No. --------------------Temporary Repair Work Order No. --------------------TR No.____________ (Given by inspection)
Temporary repair implementation date
EQUIPMENT / PIPING / INSTRUMENT / ELECTRICAL TAG NO. /LOCATION
10-07-2016
2001-JCT After Cooler
DESCRIPTION OF PROBLEM: Seepage from 16 No. Tubes (02 Nos. Tubes above acceptable limit) in the cooler.
REASON FOR TEMPORARY REPAIR Due to plant start up, Re-tubing is not feasible in short time.
SUGGESTED TEMPORARY REPAIRS (Use separate sheet for sketches) Plugging of seeping tubes.
PROPOSED PERMANENT SOLUTION Fabrication of new tube bundle. PROPOSED CHANGE IN PERMANENT SOLUTION
Date by which Temporary repair would be removed
31-Dec-2016
Extended removal date
Monitoring Checks
Frequency
Responsibility
Monitoring of Air outlet temperature
Daily
Operations
REQUESTED BY
REVIEWED BY
Maint/E &I Engineer/Prod. Engr/Civil Engr
FUNCTIONAL REVIEWS
Relevant Section Head/UM
initial
Project Engg. S.H.
(Signature)
(Comments)
Operations U.M/Section Head Process Engr (Where applicable) U.M Inspection UM Safety
APPROVED BY Relevant SUB –SOC CHAIRMAN The above Temporary repair has been removed on Requestor
Verified by Operations
& Inspection Engineer
CHECKLIST FOR TEMPORARY REPAIRS (MECHANICAL) REVIEW
TR NO. ___________________
DATE :_______________
Is it a confirmatory Temporary repair? No. ITEM 1 2 3
4
5
6 7
8 9 10 11 12
13
14
YES
YES NO N/A
HAS INSPECTION ASSIGNED THE TEMPORARY REPAIR NUMBER TO THIS JOB? DOES THE TEMPORARY REPAIR INVOLVE MATERIAL CHANGE? DOES THE REPAIR INVOLVE ANY TEMPORARY MODIFICATIONS? IF YES, HAS IT BEEN REVIEWED BY PROCESS/ PROCESS SUB-SOC? DOES THE TEMPORARY REPAIR INVOLVE MACHINERY? HAS IT BEEN REVIEWED BY MACHINERY ENGINEER/SH /UM? HAS THE BOX UP BEEN DESIGNED FOR ALL COMBINATIONS OF INTERNAL AND EXTERNAL LOADING AS PER RELEVANT VESSEL AND PIPING CODE? IS BOX UP DESIGNED FOR ALL MODES OF OPERATIONS e.g. START-UP, SHUTDOWN ETC.? HAVE INSPECTION REQUIREMENTS BEEN REVIEWED BY INSPECTION ENGINEER/UM OR ANY OTHER INTERFACES? IS WELDING PROCEDURE PROVIDED WITH NECESSARY SPECIFICATIONS? IS WELDING DESIGN IN ACCORDANCE WITH CODE REQUIREMENTS? ARE ALL SMALL PIPING CONNECTIONS ADEQUATELY GUSSETED? IS THERE ADEQUATE WORKING SPACE FOR FIELD WORK? WOULD ANY ADDITIONAL LIGHTING BE REQUIRED IF WORK AT SITE HAS TO BE CARRIED OUT DURING NIGHT? THE EXECUTION OF BOX UP/TEMPORARY REPAIR WILL BE DONE UNDER THE DIRECT SUPERVISION OF EXPERIENCED MAINTENANCE PERSONNEL? IS THERE A FIRE HAZARD DURING FIELD WORK?
15 HAVE ADEQUATE MEASURES (PLACING OF ADDITIONAL FIRE EXTINGUISHERS / HOSES) BEEN TAKEN IN CASE THE AREA IS NOT COVERED BY EXISTING FIRE WATER FACILITY? REQUIREMENT SHOULD BE MENTIONED IN WORK PERMIT.. 16 HAVE THE REQUISITIONS/RESERVATIONS MADE TO REVERT THE TEMPORARY REPAIR? 17 HOT PERMIT REQUIRED IN HAZARDOUS AREA? 18 RELEVANT SKETCHES AND DIAGRAM PROVIDED WITH TR FORM? 19 TEST PROCEDURES FOR TR ARE AVAILABLE IF REQUIRED? 20 DOES THE JOB EXECUTION REQUIRED JSA? 21 DOES THE JOB REQUIRE ANY SPECIAL TRAINING FOR OPERATIONS / MAINTENANCE PERSONNEL? 22 DOES THE JOB REQUIRE ANY SAFETY AUDIT /PSSR? (BASED ON CONSEQUENCE ANALSIS) 23 DOES THE REPAIR REQUIRE ANY BARRICADING, MARKING OR LABELLING IN THE FIELD?