Proposed Site Survey: Project Name: Region:
General Information Form
Sites Geographical Information Type of Site: Site Name: Site Number: GPS Co-ordinates Provided actual calculated on site
Remarks: ................................................................................... ...................................................................................
Company Representive during
Vendor Representive during Survey
Survey Name:
Name:
Signatures:
Signatures:
Date:
Date:
Do not Copy or Alter without Permission. All Rights Reserved.
Survey Date
Surveyor Company
Site Name
Site No.
Equip/Model
Transmission Ring name
Surveyor Name
Contact no.
Note: If Site name &/or number differ in field from information provided indicate here (SN/S#):
1. Type of Site:
Existing Site: Indoor Site Outdoor Site
New Site. 2. Floor Type:
Raised Floor (Height Between grounding level & upper surface of raised floor.) Cement Floor. Shelter.
3. Space(s) Located:
Available (Transmission Cabinet & W.S Location) Location-1: Location-2: Location-3:
4. DC Power Information:
Use Existing Fuse on DCDP (See DC Fuse Assignment Sheet) Use Existing CB/Fuse on GPS/LDB/Rectifier.
Need Install new DCDP. DCDP Proposed Location: Distance from Rectifier Room to Equipment: Distance from DCDP to Equipment:
No DC Power Availble.
5.Ground Bar: 6. AC Socket: 7. Cable Ladder Information:
Availble. Not Availble. Availble. Not Availble. Availble. Not Availble.
Other Installation (Materials,Comments):
(M).
(M).
Survey Date
Surveyor Company
Site Name
Site No.
Equip/Model
Transmission Ring name
Surveyor Name
Contact no.
Note: If Site name &/or number differ in field from information provided indicate here (SN/S#):
1. Type of Site:
Existing Site: Indoor Site Outdoor Site
New Site. 2. Floor Type:
Raised Floor (Height Between grounding level & upper surface of raised floor.) Cement Floor. Shelter.
3. Space(s) Located:
Available (Transmission Cabinet & W.S Location) Location-1: Location-2: Location-3:
4. DC Power Information:
Use Existing Fuse on DCDP (See DC Fuse Assignment Sheet) Use Existing CB/Fuse on GPS/LDB/Rectifier.
Need Install new DCDP. DCDP Proposed Location: Distance from Rectifier Room to Equipment: Distance from DCDP to Equipment:
No DC Power Availble.
5.Ground Bar: 6. AC Socket:
Availble. Not Availble. Availble. Not Availble.
7. Cable Ladder Information:
Availble. Not Availble.
Other Installation (Materials,Comments):
Do not Copy or Alter without Permission. All Rights Reserved.
Survey Date Site Name Equip/Model Surveyor Name
1. Rectifier
1-
Sketch
Surveyor Company Site No. Transmission Ring Contact no.
Survey Information:
Floor Plan.
2-
Assign Location W/L/H.
3-
Check for Floor Loading (Raised, Cement or other).
4-
Electricity Available.
5-
AC Panel Availble in Equipment Room.
6-
Check for Curr ent Availibility ______Amps.
2. Other Information (material, Coments):
(M).
(M).
Survey Date Site Name Equip/Model Surveyor Name
1. Rectifier
1-
Sketch
Surveyor Company Site No. Transmission Ring Contact no.
Survey Information:
Floor Plan.
2-
Assign Location W/L/H.
3-
Check for Floor Loading (Raised, Cement or other).
4-
Electricity Available.
5-
AC Panel Availble in Equipment Room.
6-
Check for Curr ent Availibility ______Amps.
2. Other Information (material, Coments):
Do not Copy or Alter without Permission. All Rights Reserved.
Survey Date Site Name Equip/Model Surveyor Name
Surveyor Company Site No. Transmission Ring Contact no.
Survey Date Site Name Equip/Model Surveyor Name
Surveyor Company Site No. Transmission Ring Contact no.
Attach Site Access Drawing Co-ordinates: X=
Y=
Do not Copy or Alter without Permission. All Rights Reserved.
Existing Site Survey Report Survey Date: Site Name/No. Site GPS position:
Surveyor:
N=
1. Site Room Environment: Floor No. Net Net heig height ht of
Surveyor Mobile: DISTRICT: Project:
E=
(Basement/Ground Floor/1st Floor/2nd Floor/...) Heig Height ht of
bl ladd ladd
Site Status (Expansion/New)
Existing Site Survey Report Survey Date:
Surveyor:
Site Name/No. Site GPS position:
N=
1. Site Room Environment: Floor No.
Surveyor Mobile: DISTRICT: Project:
E=
Site Status (Expansion/New)
(Basement/Ground Floor/1st Floor/2nd Floor/...)
Net Net heig height ht of room room::
Heig Height ht of cabl cable e ladd ladder er
Floor Type:
Cement Floor
mm
Raised Floor, the height of Raised floor (from cement to Raised floor above surface): Floorplan:
Available , need to to proposed the new location.
Pls see the Site Floorplan
Not available Grounding information:
Available
Pls mark the Protection Grounding on the floor plan.
Not available, We need report to make it ready. Cable Ladder information information:
Available, no not re require ne new ca cable la ladder.
m
Not Available, lucent should make new cable ladder 2.
Main Equipment Cabinet number:
Cabinet Proposed Location:
Pls mark on the floorplan
Pls write down the proposed location and mark on Floorplan (Floor/Row.Bay) (Floor/Row.Bay)
Spare Location: (more than 3 spare location) Length of grounding cable of Equipment: 3.
POWER (DC)
m
(Distance (Distance from Protection Protection Grounding Bar to equipment)
m
( 1)
Use existing CB/Fuse on DCDP Distance from DCDP to Equipment: DCDP name,CB/Fuse info pls see the DCDP Survey
( 2)
Use existing CB/Fuse on GPS/LDB in Rectifier Room (Sub Site) Distance from Rect to Equipment: m GPS/LDB name,CB/Fuse info pls see the GPSxx00/LDB/GPS48xx/RECT (Rectifier Room) Survey
( 3)
Need install new DCDP (Hub Site) DCDP Dimension: (N eed eed Survey Rectifier Room) DCDP proposed location Distance from Rectifer Room to Equipment: Distance from DCDP to Equipment:
(HxWxD) (Floor/Row.Bay)
m m
Length of grounding cable of DCDP: m (Distance (Distance from Protection Grounding Bar to equipment) GPS/LD GPS/LDB name,CB/Fuse info pls see see the GPS/LD GPS/LDB ( Rectifier Rectifier Room) Survey ( 4)
4.
No DC Power, only AC power SECCO No.
AC Distribution Bar location AC voltage (220V / 110V / 220V+110V)
information:
Note: Note:
1. Pls Pls take take the hard hardcop copy y of floo floorpla rplan n when when site site survey survey,, and make make sure sure the room room you surv survey ey is the right right room room and right right floor, floor, then check the existing eqpt. and vacant location on floorplan with actual site room , correct and mark them on floorplan. 2. When Propose eqpt. location, Pls proposed the location is in the same row as possible, especially expansion site.
Do not Copy or Alter without Permission. All Rights Reserved.
Actual Location Cable Lader Requirment Cable Entry requirement Cable routing requirement
Marked in FP False Ceings no CT Available Available
All these items to be marked in the floor plan.
Actual Location Cable Lader Requirment Cable Entry requirement Cable routing requirement
Marked in FP False Ceings no CT Available Available
All these items to be marked in the floor plan.
DCDP SURVEY REPORT
Site Name/No.:
Surveyor:
BUILDING TYPE:
Survey Date:
DISTRICT: Project: Distance from DCDP to Equipment:
m
DCDP DCDP Name: POSITIVE (+) COMMON TERMINALS
Note:
1. Measure the actual Current of the main fuse input by meter. For example, Current: 31.2A 2. Measure the Distance from DCDP to equipment. equipment . For example , Distance from DCDP to equipment: 18m 3. Write down the CBs use information (CBs/Fuse ( CBs/Fuse Rating), Rating), ON - CBs used by other equipment. OFF - Spare CBs If the position have no CBs, Pls keep mark as " Vacant" 4.Record the survey data as follow: DCDP Name - Top of the DCDP label DCDP Main Fuse Actual Current - use Meter measure the current drawn Main Fuse Rating CB Status - ON/OFF CB Rating If the Panel/Module not existing, pls mark it as N/A For example
A1
A2
N
D DP
ON OFF A
A
Do not Copy or Alter without Permission. All Rights Reserved.
LDB Site Name/No.
Global Power System
LDB
Cabinet Label
DC Output BIG CBs
DC Output BIG CBs Monitor Module DC Output BIG CBs
DC Output BIG CBs
DC Output Fus
LDB Site Name/No.
Global Power System
LDB
Cabinet Label
DC Output BIG CBs
DC Output BIG CBs Monitor Module DC Output BIG CBs
DC Output BIG CBs
DC Output Fus
Do not Copy or Alter without Permission. Permission. All Rights Reserved.
Site Name/No. Global Power System Cabinet Name
BATT 01
BATT 02
BATT 03
Amps
Amps
Amps
BIG CBs P01
P02
CB01
Amps
CB02
Amps
CB03
Amps
CB04
Amps
CB05
Amps
CB06
Amps
CB07
Amps
CB08
Amps
CB01 CB03 CB05 CB07 CB09 CB11 CB13
SMALL CBs Amps CB02 Amps CB04 Amps CB06 Amps CB08 Amps CB10 Amps CB12 Amps CB14
DC Output CBs
Amps Amps Amps Amps Amps Amps Amps
DC Output CBs
Note: USED/ON USED/ON ² Existing Existing CB/FUSE CB/FUSE and Power Power Cable Cable connected connected to it (used (used by other Equipment Equipment)) Spare/OFF ² Existing CBs/FUSE and no Power Cable connected to it (not used) Vacant ² Space for installing new CBs/FUSE Please check the OFF CBs have Power Cable connecting to it. If have the Monitor to display the actual current of the cabinet, please write down the information.
Record the survey data as follow: Cabinet Name - Top of the Cabinet label Cabinet Actual Current - If have the Moniter Display CB Rating and Status - ON/OFF/Vacant FUSE Rating and Status - USED/Spare/Vacant If the Panel/Module not existing, pls mark it as N/A
Site Name/No. Global Power System Cabinet Name
BATT 01
BATT 02
BATT 03
Amps
Amps
Amps
BIG CBs P01
P02
CB01
Amps
CB02
Amps
CB03
Amps
CB04
Amps
CB05
Amps
CB06
Amps
CB07
Amps
CB08
Amps
CB01 CB03 CB05 CB07 CB09 CB11 CB13
SMALL CBs Amps CB02 Amps CB04 Amps CB06 Amps CB08 Amps CB10 Amps CB12 Amps CB14
DC Output CBs
Amps Amps Amps Amps Amps Amps Amps
DC Output CBs
Note: USED/ON USED/ON ² Existing Existing CB/FUSE CB/FUSE and Power Power Cable Cable connected connected to it (used (used by other Equipment Equipment)) Spare/OFF ² Existing CBs/FUSE and no Power Cable connected to it (not used) Vacant ² Space for installing new CBs/FUSE Please check the OFF CBs have Power Cable connecting to it. If have the Monitor to display the actual current of the cabinet, please write down the information.
Record the survey data as follow: Cabinet Name - Top of the Cabinet label Cabinet Actual Current - If have the Moniter Display CB Rating and Status - ON/OFF/Vacant FUSE Rating and Status - USED/Spare/Vacant If the Panel/Module not existing, pls mark it as N/A For example CB# CB info(ON/OFF/Vacant) CB1 ON
CB2 CB01 CB03 CB05
OFF
CB Rating Amps Amps
Spare
Amps
USED
Amps
Do not Copy or Alter without Permission. All Rights Reserved.
Documents Similar To Survey Report for Radio/GSM
RAN14.0 Feature Activation Guide
Wireless Site Survey Report
GSM SITE SURVEY RULES
UPLOADED BY
UPLOADED BY
UPLOADED BY
c2poyraz
MSA Systems
tanujsatle
4_Handover
NV9.7-TPD-080808-1
UPLOADED BY
UPLOADED BY
Sachin Kumar
DiHLoS
LTE Parameter Setting Exercises UPLOADED BY
Witto Pere
More From Adeel Razzaq