Sui Northern Gas Pipelines Limited (SNGPL) was incorporated as a private limited Company in 1963 and converted into a public limited company in January 1964 under the Companies Act 1913, now Companies Ordinance 1984, and is listed on all the three Stock Exchanges of the Country. The Company took over the existing Sui-Multan System (217 miles of 16 inch and 80 miles of 10 inch diameter pipelines) from Pakistan industrial Development Corporation (PIDC) and DhulianRawalpindi-Wah system (82 miles of 6 inch diameter pipeline) from Attock Oil Company Limited. The Company's commercial operations commenced by selling an average of 47 MMCFD gas in two regions viz. Multan and Rawalpindi, serving a total number of 67 consumers. Sui Northern Gas Pipelines Limited (SNGPL) is the largest integrated gas company serving more than 4.2 million consumers in North Central Pakistan through an extensive network in Punjab, Khyber Pakhtoon Khwa and Azad Jammu & Kashmir and is certified against ISO 14001:2004 & OHSAS 18001:2007 Standards. SNGPL’s 11 sites have been registered under the "SMART2" Program by Pakistan Environmental Protection Agency (PAK-EPA).. The Company has over 50 years of experience in operation and maintenance of high-pressure gas transmission and distribution systems. It has also expanded its activities as Engineering, Procurement and Construction (EPC) Contractor to undertake the planning, designing and construction of pipelines, both for itself and other organizations. SNGPL transmission system extends from Sui in Baluchistan to Peshawar in Khyber Pakhtoon Khwa (KPK) comprising over 7,676 KM of Transmission System (Main lines & Loop lines). The distribution activities covering 2,650 main towns along with adjoining villages in Punjab & Khyber Pakhtoon Khwa are organized through 13 regional offices. Distribution system consists of 87,796 KM of pipeline. SNGPL has 4,585,371 consumers comprising Commercial, Domestic, General Industry, Fertilizer, and Power & Cement Sectors. Annual gas sales to the consumers were 597,056 MMCF worth Rs. 216,652 million during Jul 2011 - Jun 2012. ASSOCIATED COMPANIES AS AT MARCH 31,2013
[As per Companies Ordinance 1984 Sec.2(2)] MCB BANK LIMITED
(www.mcb.com.pk)
Dawood Foundation
(www.dawoodgroup.com)
1
Industry
Oil & Gas
Founded
1963
Headquarters
Lahore, Pakistan
Products
Natural Gas Transmission & Distribution
Revenue
PKR 216,652.317 million (2012) [1]
Net income
PKR 3,043.996 million (2012)
Website
www.sngpl.com.pk
Chairman
Mian Misbah-ur-Rehman
Chief Executive/Managing Director
Mr. M. ARIF HAMEED
Dy. Managing Director (Operations)
Mr. AMJAD LATIF
Dy. Managing Director (Services)
Mr. Amir Tufail
[1]
SNGPL's Key Objectives
SNGPL is committed for:
Enhancement of System Capacity.
Expansion of Transmission and Distribution Network.
Increase in Gas Sales.
Rehabilitation of Transmission and Distribution Network.
Reduction in Unaccounted for Gas Losses.
Improvement in Profitability. 2
Improvements in Consumer Services.
Adoption of Information Technology.
Human Resource Development.
Pursue Pipelines construction and Advisory Business.
CONTRACT PROJECTS Manzalai Field Development Project
SNGPL has recently completed 12” dia x 20 KM Maramzai flow line and 8” dia x 14.7 KM Mamikhel-1 flow line for MOL. With the completion / commissioning of this gas gathering network additional 65 MMCFD has been added to our system. Formerly the 52 KM long network in assorted diameters 8” to 18” at Manzalai field was laid in January 2010 which facilitated an additional intake of 210 MMCFD gas in to our system. Recently Manzalai-8 flow line of diameter 8” x 6 KM long has also been completed bringing in an additional supply of 20 MMCFD to our system. MOL has also awarded the 12” dia x 16 KM pipeline construction work to SNGPL for their newly finds at MakoriEast where work has already been started by SNGPL which is likely to bring in 20 MMCFD gas to our system. Moreover MOL has shown their strong desire to award the pipeline construction work to SNGPL for their new exploration at Tolanj. On the completion of all wells approximately 300-350 MMCFD will be available to the company. Reti & Maru Field Development Project
SNGPL has been awarded a job at Reti & Maru field by OGDCL which involves construction of 18 Km gathering system of assorted diameters ranging from 4-8 inches. This project carries national importance as the country is already facing energy crises. Work on this project has been started which is likely to be completed within four to six months. By the completion of this project 12-14 MMCFD gas would be available for use. Mari Deep Pipeline Project
SNGPL has also recently been awarded 12” / 10” dia x 10KM pipeline construction project from Mari deep well to GENCO – II dehydration plant. The completion of this project would facilitate the supply of 44 MMCFD gas to Guddu power station. This project is likely to start in the coming few weeks