www.SINOPECEngineering.com
Introduction of SINOPEC Engineering
Outline of SINOPEC Engineering Engineering and R&D Strength Procurement Strength Construction Strength Project Execution Summary Ongoing Project Summary
2
All rights reserved © 2008, SINOPEC All rights reserved © 2009 SINOPEC
Outline of SINOPEC Engineering
The parent of SINOPEC Engineering, SINOPEC is the 3rd largest refiner and 4th petrochemicals producer in the world and the 2nd largest crude producer in China , who ranked the 9th in the “Fortune Global 500” , Listing with Revenue US$ 207.8 billion in 2008 when it produced 44million tons of crude and 8.3 billion m3 natural gas; processed 190 million tons of crude and produced 6.3 million tons of ethylene.
3
All rights reserved © 2008, SINOPEC All rights reserved © 2009 SINOPEC
Outline of SINOPEC Engineering
SINOPEC Engineering was reorganized by SINOPEC in July 2007 as a wholly owned subsidiary of SINOPEC. SINOPEC Engineering is authorized on behalf of SINOPEC to organize and integrate the resources and expertise of refining and petrochemical engineering services under SINOPEC to develop and execute global refining and petrochemical projects.
All rights reserved © 2009 SINOPEC
Outline of SINOPEC Engineering
SINOPEC Engineering was first presented in 1953. All through the years, SINOPEC Engineering successfully completed and delivered hundreds of EPC projects in fields of refining and petrochemical for both domestic and overseas clients, Participated developing and commercialized series proprietary technologies of refining and petrochemical industries. After reorganization, SINOPEC Engineering manages five leading engineering companies and three leading construction companies in China, total employee reaches 20,000, they are: SINOPEC Engineering -SEI SINOPEC Engineering -LPEC SINOPEC Engineering -SSEC SINOPEC Engineering -SNEC SINOPEC Engineering –SNEI SINOPEC Engineering –FCC SINOPEC Engineering –SFCC SINOPEC Engineering -TCC
5
All rights reserved © 2008, SINOPEC All rights reserved © 2009 SINOPEC
Outline of SINOPEC Engineering
All rights reserved © 2008, SINOPEC All rights reserved © 2009 SINOPEC
Outline of SINOPEC Engineering
7
All rights reserved © 2009 SINOPEC
Outline of SINOPEC Engineering
Main Fields of Business: ¾ ¾ ¾ ¾ ¾ ¾ ¾
Refinery Petrochemical complex Fertilizer Plants Pharmaceutical Plants LNG plant Long-distance pipeline Municipal facilities
All rights reserved © 2009 SINOPEC
Outline of SINOPEC Engineering
Scope of Services: ¾
Project Concept
¾
Master Planning
¾
Technology transfer & licensing
¾
Feasibility study
¾
Environmental Impact Assessment
¾
Geo-technical Engineering & Engineering Surveying
¾
Process Design Package
¾
Basic & Detailed Engineering
¾
Procurement
¾
Construction & Construction Supervision
¾
Commissioning
¾
Manufacturing and Fabrication
¾
Training
¾
Maintenance and Overhaul
All rights reserved © 2009 SINOPEC
Engineering and R&D Strength
Human Resources:
General
To bring the SINOPEC group advantages to execute the overseas projects , SINOPEC Engineering was reorganized in 2007, with four engineering companies , four construction companies and an independent engineering technology institute .SINOPEC Engineering employees 19,000 people of which 6,000 are technical staff. Except above human resource, all 100,000 people within SINOPEC for petroleum refining and petrochemical engineering and construction are available for SINOPEC Engineering.
10
All rights reserved © 2009 SINOPEC
Engineering and R&D Strength
Engineering Strength:
Total 4065
Process
191 122
309
Equipment & Mechanical Piping
427 487
695
549
1285
Electrical & Instrumentation Civil,Structural & Architectural Health,Safety & Environmental Utility Draft Man
All rights reserved © 2009 SINOPEC
Engineering and R&D Strength
SINOPEC Engineering has experienced engineering team with 6000 person, and has engineering experience for 10 million t/a refinery complex, 1 million t/a ethylene complex, 150,000 m3 single storage tank and so on. Especially, SINOPEC Engineering as PMC or EPC contractor has executed and delivered Nanhai (Joint Venture by Shell and CNOOC) 800,000t/a ethylene complex; SECCO (Joint Venture by BP and Sinopec) 900,000 t/a ethylene complex; BYC (Joint Venture by BASF and Sinopec) 600,000t/a ethylene complex since 2000. Fujian refinery and petrochemical integrated project (Joint Venture by Sinopec, ExxonMobile and Saudi Aramco) with 800,000t/a ethylene complex and 1.2 million tons per year refinery has 2500
100%
been finished by SINOPEC Engineering in 2009.
90%
2000
80%
60%
50%
1000
% Complete
Total Construction Manpower
70%
1500
40%
30%
500
20%
10%
0 Manpower % Compltete
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
0
0
0
0
0
0
106
186
292
292
345
451
557
663
822
954
1,087
1,140
1,166
1,405
1,643
1,908
1,961
1,961
1,961
1,961
1,855
1,670
1,246
716
159
0.0%
0.4%
1.1%
2.2%
3.3%
4.6%
6.3%
8.4%
10.9%
14.0%
17.6%
21.7%
26.0%
30.4%
35.7%
41.9%
49.1%
56.5%
63.9%
71.3%
78.7%
85.7%
92.0%
96.7%
0%
99.4% 100.0%
Project Month
12
All rights reserved © 2009 SINOPEC
Engineering and R&D Strength
450,000 t/a PE
1 million t/a Ethylene 12 million t/a CDU & VDU
260,000 t/a AN
1.5 million t/a catalytic reformer
300,000 t/a PP 15 Billion m3/a gas purification
Maximum capacity of single unit
2000 t/a Coal Gasification 450,000 t/a Ammonia
4.1 million t/a diesel hydro-finishing
13
850,000 t/a Methanol 2 million t/a hydro-cracker
3 million t/a catalytic cracker
3.1 million t/a Residual Hydro-finishing
All rights reserved © 2009 SINOPEC
Engineering and R&D Strength
Integrated IT system
Process DB
e-Doc.Management
PRO II ,ASPEN Eng. Suite, FRI,HTFS,HTRI, ZYQAD, CFX,PFR,SP PID,PDS P&ID, ASPECT, Plant Builder/Auto Router, SP Explorer, ICARUS,IPE
DOCUMENTUM 4i, LOTUS NOTES
Engineering 3D Model DB
Engineering DB , II VANTAGE PE, INTOOLS, CAESAR ANSYS, INSTRUCALC, FE/PIPE, Pvelite , TANK , EDSA
PDS 3D, ISOGEN, SP REVIEW,PDMS,REVIEW, I STAAD PRO Sketch, 2000
Procurement Material Control &
Project Management P3 , STAT, PMCV, PMCF, ACCPAC, Expedition,
Construction Construction Management
Procurement Management MARIAN, PMCS
SPOOLGEN, CQCS
All rights reserved © 2009 SINOPEC
Engineering and R&D Strength
Examples For 3 D Design Hydrocracking Unit For Qingdao Refinery
Model
200,000 t/a Polypropylene Unit In Hainan Refinery 15
All rights reserved © 2009 SINOPEC
Engineering and R&D Strength
Major Technology Applications in The Last Ten Years
16
No.
Project Description
Project Scale (10 thousand per year)
1
CDU/ VDU
300-1200
SINOPEC
37
EPC
2
Catalytic Cracking
60-300
SINOPEC
74
EPC
3
Delayed Coking
80-250
SINOPEC
33
EPC
4
Hydrofining
60-410
SINOPEC
75
EPC
5
Hydro Cracking
80-360
60
EPC
6
Catalytic Reforming
15-240
49
EPC
Technology/Licensor
Numbers of Project
Service Scope
SINOPEC
SINOPEC
All rights reserved © 2009 SINOPEC
Engineering and R&D Strength
Major Technology Applications in The Last Ten Years
No.
17
Project Description
Project Scale (10 thousand per year)
Technology/Licensor
Numbers of Project
Service Scope
1
Ethylene
60-100
Stone Webster Lummus--SINOPEC
8
EPC
2
Polyolefin
20-60
Basell BP Innovene SINOPEC
10
EPC
3
Synthetic Rubber
6
EPC
4
Synthetic Fiber
5
EPC
5
C1 Chemical
2
EPC
6
Ammonia
2
EPC
Dow Chemical SINOPEC BP-AMOCO、INVISTA 60-100 、Mitsubishi、 EASTMAN SINOPEC BP acetic acid: 35 Shell Methanol:85 8-30
30~45
KBR
All rights reserved © 2009 SINOPEC
Engineering and R&D Strength
Technology Research & Development
Depending on demands of oil refining and petrochemical, Sinopec Engineering has
establish
a science & technology innovation system. A set of core technologies and specific technologies with international competitiveness have been developed, the whole level of science & technology have stepped into advanced train of the world.
All rights reserved © 2009 SINOPEC
Engineering and R&D Strength
The Organization Mode of Key Process Technologies Commercialization
All rights reserved © 2009 SINOPEC
Procurement Strength
General
As a wholly owned subsidiary of SINOPEC GROUP, SINOPEC Engineering takes full advantages of the Group’s integrated resource network, shares the super Purchasing Capability of the Group. A reliable supply network established with more than 20,000 qualified suppliers is always a success guarantee to our projects.
20
All rights reserved © 2009 SINOPEC
Procurement Strength
Procurement manager 35
96
Procurement coordinator
42
Senior buyer Buyer 60
38 19
33
69
Purchasing clerk Traffic clerk Expediter Others
Total 392
All rights reserved © 2009 SINOPEC
Procurement Strength
MARIAN Application Program
3D Plant Design Model
Other system/ manual take off
ISO’s MTO
Sinopec Eng. Finance System
MRR's MIR’s
PO's
MARIAN
MLCL •Comm. Group •Comm. Part •Comm.Code •Ident Code •Description
E&PI
MSCM
•BOM by WBS,Version •Req Template
BOMS
Sinopec Eng. Reports
•Inquiry •Quote •PO •Supplier Lib Requisitions •Req Planning •Expedite •Traffic
Sinopec Eng. Reports
SITE MRR's OS&D's
•MRR’s •MIR’s •OS&D’s •MRS’s
PO's Matl Res.
Sinopec Eng. Reports
All rights reserved © 2009 SINOPEC
Procurement Strength
Inspection-Sequence and Execution
Quality Requirements Specification Requisition
Notice to Client Approval of Vendor’s QC Documents
Application for Inspection
Request for Inspection Inspectors Assignment
Inspection Release Certificate
Inspection Resident Inspection
MDR Review & Approval
Witness Inspection Confirmation by Records Review
Finding Non Conformance
Corrective Action by Vendor
Inspection
All rights reserved © 2009 SINOPEC
Procurement Strength
Expediting-TYPICAL ACTIVITIES
P.O. Copy
Attending Kick-off Meeting
Shipment Receiving Cargo Readiness Notice
Monitoring Material Suborders Status
Expediting Vendor’s Documents Not Completed
Specification Requisition
Expediting As-Built Document Submission
Monitoring Fabrication Progress
Completed Expediting Shipping Preparation
Issuing Release for Shipping Preparation
Issuing Inspection Release Certificate
Inspection
All rights reserved © 2009 SINOPEC
Procurement Strength
Packing and Shipping
Purchase Order
Manufacturing
Logistic Planning
Space Booking
Ready for Shipment
Export Packing
Export Clearance
Forwarding Contract Loading in Ship
Unloading from Ship
Import Customs Clearance
Inland Transport’ to Site
Unloading at Plant Site
All rights reserved © 2009 SINOPEC
Procurement Strength
Strong procurement and supply capability for oil & petrochemical related equipment and materials
20.41
22 20
16.97
18 14.52
16 13.03
14 12 10
9.14
Total Purchase Value (Billion US$)
7.87
8 6 4 2 0 2002 26
2003
2004
2005
2006
2007
All rights reserved © 2009 SINOPEC
Procurement Strength
Overseas Procurement Subsidiaries
All rights reserved © 2009 SINOPEC
Procurement Strength
Domestic Offices
Yanshan Tianjin Qilu Jiangsu Jinling Yizheng Nanhua Yangzi Jinshan East Shanghai Gaoqiao Zhenhai Fujian Guangzhou Maoming Zhongnan Chongqing
28
All rights reserved © 2009 SINOPEC
Procurement Strength
Procurement
Supplier Sourcing Worldwide ♦
Total Qualified:
20,098 Suppliers (including 1211 offshore suppliers)
♦
A Level: 2,286 Suppliers 33 Strategic suppliers: 23(onshore)+10(offshore)
♦
B Level: 16,601 Suppliers
All rights reserved © 2009 SINOPEC
Procurement Strength
Procurement
Annually Purchasing Volume (Onshore/offshore)
2006 :
2007 :
Total:
Total:
RMB
131.5
billion
Import/export:
USD
3.23
billion
E-Procurement:
RMB
113.0
billion
RMB
158.2
billion
Import/export:
USD
4.61
billion
E-Procurement:
RMB
145.5
billion
All rights reserved © 2009 SINOPEC
Procurement Strength
Procurement
Operation Platform for Material Control
For EPC Projects: Intergraph Marian VPRM
SINOPEC Internal ERP System SAP
E-Commerce: www.SINOPEC-ec.com.cn
All rights reserved © 2009 SINOPEC
Procurement Strength
Procurement
Logistics
Rich Experienced Logistics Experts/Engineers,
Professional Management of the Door to Door Service for Projects of different nature.
Comprehensive range of sea, air forwarding and land transportation, combined shipment & Transshipment etc.
All rights reserved © 2009 SINOPEC
Procurement Strength
Pre-fabrication Shop For Pipe Spool Pre-fabrication Shop For Pipe Spool Pre-fabrication Shop For Structural Steel
SINOPEC has Advanced Structural Steel And Pipe Spool Pre-fabrication Shop with more than 60% Pre-fabrication capability
33
All rights reserved © 2009 SINOPEC
Procurement Strength
Manufactured Reactor Manufacture d Reactor
Manufactured Reactor SINOPEC owns three large equipment manufacturing plants, i.e. Ningbo Mechanical Manufacturing Company, Shanghai Petrochemical Machinery Manufacturing Company and Nanjing Chemical Machinery Manufacturing Factory. Compared with other petrochemical equipment manufacturers in China, all the three plants have the most advanced process equipments and information management system capable of developing and manufacturing of petrochemical patent and proprietary equipments. The total production capacity of manufacturing more than 200,000 t/a customized equipment.
34
All rights reserved © 2009 SINOPEC
Procurement Strength
Over Size Equipment Handling
All rights reserved © 2009 SINOPEC
Construction Strength
General
With the most experienced engineers, skilled workers, and equipped with the most advanced machineries, SINOPEC Engineering is fully capable of constructing, construction supervision and management for large-scale refinery, petrochemical and Chemical plants, thermal power plant, and hoisting and erecting oversized and heavy equipment, large size storage tank and long distance pipeline etc.
36
All rights reserved © 2009 SINOPEC
Construction Strength
Construction Manpower
Construction Managers Construction Supervisors
805
Welders
740 751
2473
Plumbers Riveters
639
3225 Locksmithes 497
757
2114
Total 12001
Cranemen Electricians/Instrument staffs Others
All rights reserved © 2009 SINOPEC
Construction Strength
Construction Strengths
Lifting And Transportation Of Large Equipments
Installation Of Large Machinery Train
Construction Experien ce In Low and High Te mperature Region
Technical Advantage of Project Execution
Construction Of Large Storage Tank
Equipment Manufacturing
Shop Pre-fabrication For Pipe And Structural Steel
38
All rights reserved © 2009 SINOPEC
Construction Strength
Construction Equipment Tools
¾ Crane
200-1600Tons
19
¾ Auto Welding Machine
1000
¾ Metal Machining Equipment
460
¾ Transportation Facilities
210
¾ Testing & Inspection Equipment
1260
All rights reserved © 2009 SINOPEC
Construction Strength
Heavy Lifting SINOPEC posses the world top Lifting and Transportation Super-Larger and heavy Equipment
SINOPEC Own 6*500t crane
10*726t reactor
SINOPEC Own the 1100t crane
“A” Type frame lifting Flare
SINOPEC Own the1250T Crane
40
SINOPEC Own the 4*1200t trailer
SINOPEC Own 8*500t trailer
5200mm x 120m Reactor from harbor to job site
All rights reserved © 2009 SINOPEC
Construction Strength
This is unique software for lifting system in the world so far
Hoisting Simulating
Safety First
Lifting software
All rights reserved © 2009 SINOPEC
Construction Strength
Installation of Large Assemblage Compressor of Large Compressor
Tuning of Large Compressor
42
All rights reserved © 2009 SINOPEC
Construction Strength
Tank Farm
43
All rights reserved © 2009 SINOPEC
Construction Strength
Certification of Safety Performance
All rights reserved © 2009 SINOPEC
Construction Strength
Safety Performance Award
All rights reserved © 2009 SINOPEC
Construction Strength
On Schedule Award
All rights reserved © 2009 SINOPEC
Project Execution Summary
General
SINOPEC Engineering has EPC execution experience for 10 million t/a refinery complex, 1 million t/a ethylene complex, 150,000 m3 storage tank, 160,000 m3 Cryogenic LNG storage tank.
47
All rights reserved © 2009 SINOPEC
Project Execution Summary
Project Execution Strength
180
320
Management
195
Project Manager
450
410
SHEMS&Welfare QA/QC (Sub)Contracting Administrative Estimating
380
420 360
185
Cost Controllers Scheduling
Total 2900
All rights reserved © 2009 SINOPEC
Project Execution Summary
Project Management and Engineering Software
Application Software
Project Management
Engineering
Process Simulation •PROII •ASPEN •HTRI •TSWEET
49
3-D Design •PDS •PDMS •SP3D
Project Management •PREMERVIA •GPLAN •PROJECT
Material Control •MARIAN •PMCS
Document Control •DOCUMENTUM •SHAREPOINT •WISE
All rights reserved © 2009 SINOPEC
Project Execution Summary
Project Management Objective Definition
Project management
Effective use of management resources
Integration/Optimization of Objectives
Project Goals
Resources zManpower zEquipment /Machinery zMaterial
zMoney/fund zTechnology
/ Methods zInformation
Achievement of Project Targets
zQuality::high-quality zSafety
product
:zero lost time incidents
zSchedule:On-time zCosts
:within budgets
All rights reserved © 2009 SINOPEC
Project Execution Summary
Project Control Cycle
Defined Scope Of Work
Define Measure Method & Std.
Change Log Management
Establish A Control Baseline Defect Completion
Trace Check Measures To Be Taken Trend Analysis
All rights reserved © 2009 SINOPEC
Project Execution Summary
Project control based on Engineering Database
Contract
Costs Schedule
Project Finance Materials Control Procurement
All rights reserved © 2009 SINOPEC
Project Execution Summary
Achievement
Fujian 10MTA Refinery and 800,000TA Ethylene Project JV by SINOPEC/ Aramco/Exxon
All rights reserved © 2009 SINOPEC
Project Execution Summary
Achievement
Shanghai SECCO 900,000TA Ethylene Project
JV by SINOPEC/bp
All rights reserved © 2009 SINOPEC
Project Execution Summary
Achievement
YBPC600,000TA Ethylene Project
JV by SINOPEC/BASF
All rights reserved © 2009 SINOPEC
Project Execution Summary
Achievement CSPC 800,000TA Ethylene Project
JV by CNOOC/SHELL
All rights reserved © 2009 SINOPEC
Project Execution Summary
Achievement Zhenhai Refinery (Video)
All rights reserved © 2009 SINOPEC
Project Execution Summary
Achievement
Rehabilitation of the Unit 1 & 2 of Mehardeh Power Plant, Syria
Oil Receiving Terminal in Caspian Sea, Iran
All rights reserved © 2009 SINOPEC
Project Execution Summary
Domestic Major Achievements
All rights reserved © 2009 SINOPEC
Project Execution Summary
Overseas Achievements N O
DESCRIPTION
WORK SCOPE
CONTRACT TYPE
APPROXIMATE CONTRACT VALUE (US $)
CONTRACT DURATION
COUNTRY
EPC
Consortium Partner, Lump Sum
750 Million
2005-2008
Saudi Arabia
1
YANSAB Polyolefin Complex Project
2
Rabigh Development Project
C
Subcontractor, Lump Sum
194 Million
2006-2008
Saudi Arabia
3
Hawiyah Gas Plant Expansion Project
C
Subcontractor, Lump Sum
52 Million
2006-2008
Saudi Arabia
4
SABIC EO/EG Project
CM+C
Subcontractor, Lump Sum
96 Million
2007-2009
Saudi Arabia
5
Yanbu BBTX Project
C
Subcontractor, Lump Sum
40 Million
2008-2008
Saudi Arabia
6
Shazand Arak Refinery Expansion And Upgrading Project
EPC
Consortium Partner, Lump Sum
3184 Million
2006-2009
Iran
7
Esfahan Refinery Upgrading Project
EPC
Main Contractor, Lump Sum
700 Million
2007-2010
Iran
8
Tabriz Refinery Upgrading Project
EPC
Main Contractor, Lump Sum
140 Million
2006-2009
Iran
9
CROS (Caspian-sea Republic Oil Swap) Project
EPC
Main Contractor, Lump Sum
140 Million
2002-2003
Iran
10
Khartoum Refinery Expansion to 5,000,000 t/y
E
Subcontractor, Lump Sum
40 Million
2000-2003
Sudan
11
2,500,000 t/y Khartoum Refinery Project
E
Subcontractor, Lump Sum
45 Million
1996- 2000
Sudan
12
Meharden Power Plant Project
CM+C
Construction Contractor, Lump Sum
50 Million
2004-2006
Syria
13
Fertilizer Project
C
Construction Contractor, lump Sum
20 Million
2000-2002
Jordan
14
Mina Al-Ahamadi Refinery Restoration Project
Unit Price Contract
140 Million
1992-1994
Kuwait
15
Shuaiba Refinery Tankage Project
Main Contractor, Lump Sum
9.97 Million
1997-1998
Kuwait
E, P, C, EPC
All rights reserved © 2009 SINOPEC
Financing Ability
General
SINOPEC Engineering has established good relationship with resources which can provide beneficial financing solutions, includes equipment financing and capital loans; we can structure financing which will satisfy your specific business requirements - which can hedge your current and future needs.
61
All rights reserved © 2009 SINOPEC
Partial Project Summary
General
SINOPEC Engineering has done refinery and petrochemical projects in Saudi Arabia. It is partial example for EPC execution.
62
All rights reserved © 2009 SINOPEC
Partial Project Summary
SABIC YANSAN Polyolefin Project
Owner:YANSAB SABIC EPC Contractor:Consortium of SINOPEC Engineering and Aker Solution Contract schedule: 2005.7.20 to 2008.3.30,31.5 months Contract value:750M USD Peaking manpower: 3000
All rights reserved © 2009 SINOPEC
Partial Project Summary
PP/PE/PHU Design Bird View
All rights reserved © 2009 SINOPEC
Partial Project Summary
PP/PE Site Pictures
All rights reserved © 2009 SINOPEC
Partial Project Summary
PP/PE Site Pictures
All rights reserved © 2009 SINOPEC
Partial Project Summary
RABIGH Refinery Development Project
Owner:PETRORABIGH ARAMCO EPC Contractor:Tecnicas Reunidas Contract Scope: Construction Contract Schedule: 2006.5.4 to 2008.6.15,24 months Contract Value:192M USD Peaking Manpower: 3200
All rights reserved © 2009 SINOPEC
Partial Project Summary
Refinery Project Site Picture
All rights reserved © 2009 SINOPEC
Partial Project Summary
Refinery Project Site Pictures
All rights reserved © 2009 SINOPEC
Partial Project Summary
Mechanical Completion
All rights reserved © 2009 SINOPEC
Partial Project Summary
SABIC KAYAN EO/EG Project
Owner:SAUDI KAYAN EPC Contractor:CTCI and SINOPEC Engineering Contract Scope: Construction and CM Contract Schedule: 2006.11 to 2009.7,33 months Contract value:96M USD Peaking manpower: 1400
All rights reserved © 2009 SINOPEC
Partial Project Summary
EO/EG 3D Model
All rights reserved © 2009 SINOPEC
Partial Project Summary
EO/EG Project Site Pictures
All rights reserved © 2009 SINOPEC
Partial Project Summary
EO/EG Washing Tower lifting
All rights reserved © 2009 SINOPEC
Partial Project Summary
On going project in Saudi Arabia
Name of the Project: HAWIYAH Gas Plant Expansion Project Owner: ARAMCO EPC Contractor: Tecnicas Reunidas Contract Scope: Construction Contract Schedule: 2006.10.31 to 2008.6.30, 20 months Contract value:52M USD Peaking manpower: 2000
All rights reserved © 2009 SINOPEC
Partial Project Summary
Gas Plant Site Pictures
All rights reserved © 2009 SINOPEC
Partial Project Summary
Heavy lifting
Shop Fabricating
All rights reserved © 2009 SINOPEC
Partial Project Summary
SABIC YANSAB BBTX Project
Owner: YANSAB SABIC EPC Contractor:Stone Webster Contract Scope: Construction Contract Schedule: 2008.1.16 to 2008.9.30, 8.5 months Contract value:39.6M USD Peaking manpower: 1200
All rights reserved © 2009 SINOPEC
Partial Project Summary
BBTX Project Site Pictures
All rights reserved © 2009 SINOPEC
Partial Project Summary
SINOPEC Engineering Camps in Saudi Arabia
JUBAIL:1800
YANBU:3000
HAWIYAH:2200 PETRORABIGH:3200
All rights reserved © 2009 SINOPEC
Partial Project Summary
Camps in Saudi Arabia
All rights reserved © 2009 SINOPEC
Concluded
•One Project One Team, Team up with both International Engineering and Local Companies
• Know how to manage and realize safety approaches for gross root and revamping refinery and petrochemical projects
•Know how to manage and get on schedule for gross root and revamping refinery and petrochemical projects
All rights reserved © 2009 SINOPEC
Concluded
All rights reserved © 2009 SINOPEC