1/13 1/13/2 /201 017 7
SAP SAP ERP ERP Produ Product ctio ion n Plan Planni ning ng and and Manu Manufa fact ctu uring (PP) (PP) Certif Certifica icatio tions ns Pract Practice ice Exam Exam - Full Full | ERPP ERPPre rep p
SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Full You got 79 of 80 possible points. Your score: 99 %
Question Results Question:
Score 1 of 1
In production order processing, for which of the following objects can you enter a confirmation? There are 3 correct answers to this question. Response: Work Center
Operation / Suboperation
Trigger Point
Individual Capacity
Order
Question:
Score 1 of 1
Which information is contained in production versions for selecting routings and bills of material? Please choose the correct answer. Response: The explosion date on which the validity of the routing and bill of material is checked
All the control parameters for selecting routings and bills of material http://www.er ppr ep.com /node/872/take
1/37
1/13 1/13/2 /201 017 7
SAP SAP ERP ERP Produ Product ctio ion n Plan Planni ning ng and and Manu Manufa fact ctu uring (PP) (PP) Certif Certifica icatio tions ns Pract Practice ice Exam Exam - Full Full | ERPP ERPPre rep p
The plant for which the routing and BOM have to be created
The routing and BOM alternatives to be used for production
Question:
Score 1 of 1
What functions can you use for sub operations? There are 2 correct answers to this question. Response: Production/Resource tools allocation
Material component allocation
Capacity planning
Costing
Question:
Score 1 of 1
What are the names of the objects for process integration of production orders? There are 2 correct answers to this question. Response: PI sheets
Control instructions
Work instructions
Control recipes
Question:
Score 1 of 1
You want to use the function "Read PP master data" in the production order. However, while calling the function you receive an error message. What could be http://www.er ppr ep.com /node/872/take
2/37
1/13 1/13/2 /201 017 7
SAP SAP ERP ERP Produ Product ctio ion n Plan Planni ning ng and and Manu Manufa fact ctu uring (PP) (PP) Certif Certifica icatio tions ns Pract Practice ice Exam Exam - Full Full | ERPP ERPPre rep p
the reason? Please choose the correct answer. Response: The material availability check has been performed.
Order papers have been printed.
The production order has been released.
Goods movements have been posted.
Question:
Score 1 of 1
Which of the following requirements is supported by using process orders? Please choose the correct answer. Response: Documentation of the production using an electronic batch record
Use of production/resource tools
Linkage of documents to orders
Use of reference operation sets
Question:
Score 1 of 1
Which of the following aspects characterize repetitive manufacturing in a manufacturing plant? There are 3 correct answers to this question. Response: Production without using production orders and without status management
Automatic line loading by capacity limits across all production lines
Continuous material consumption, production flow and output http://www.er ppr ep.com /node/872/take
3/37
1/13/2017
SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Full | ERPPrep
Shop fabrication
Period-based planning of the quantities to be produced
Question:
Score 1 of 1
A final assembly process takes place at three work centers, one after the other. The routing, which consists of three associated operations (10, 20 and 30), plans for a specific BOM component to be installed during operation 30 and not before. The component should therefore only be requested at the start of operation 30. What sequence do you follow in master data maintenance in SAP ECC to make this component available in line with operations during final assembly? Please choose the correct answer. Response: 1. Create BOM 2. Create work centers 3. Create routing 4. Carry out component assignment in work center
1. Create routing 2. Create work centers 3. Create BOM 4. Carry out component assignment in BOM or routing
1. Create BOM 2. Create work centers 3. Create routing 4. Carry out component assignment in BOM or routing
1. Create work centers 2. Create routing 3. Create BOM 4. Carry out component assignment in work center
Question:
Score 1 of 1
An enterprise wants to use SAP ECC requirements planning together with the NETPL procedure (net change planning in the planning horizon). The planning horizon should be set equally for all materials by default. However, some materials need to have a different planning horizon. Which procedure do you recommend for setting the planning horizon? Please choose the correct answer. Response: Set the planning horizon in the MRP groups and assign deviant entries via the plant parameter settings in Customizing. http://www.erpprep.com/node/872/take
4/37
1/13/2017
SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Full | ERPPrep
Set the planning horizon in the plant parameters in Customizing and store deviant entries in the material masters for corresponding materials.
Set the planning horizon in the MRP groups in Customizing and store deviant entries in the material masters for the corresponding materials.
Set the planning horizon in the plant parameters in Customizing and assign deviant entries via the MRP groups for the corresponding materials.
Question:
Score 1 of 1
In which of the following objects can you activate backflushing of components if you want to use this functionality during order confirmation? There are 3 correct answers to this question. Response: Routing
Material Master (Finished Product)
Work Center
Production Scheduling Profile
Material Master (Component)
Question:
Score 1 of 1
A user of the SAP ECC system wants a rolling planning time fence (firming type = 1) to be set up for a material; in other words, new planned orders are firmed within a planning time fence. When an unforeseen production failure occurs, it can happen that such firmed planned orders are not being processed because time passes. What solution would automatically delete firmed planned orders? Please choose the correct answer. Response:
http://www.erpprep.com/node/872/take
5/37
1/13/2017
SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Full | ERPPrep
In the material master, an MRP type is used in which the roll-forward mechanism is activated (Customizing for requirements planning).
Firmed planned orders can only ever be deleted manually because of the header data firming.
The demand adjustment activated in the Customizing for demand adjustment is used.
Question:
Score 1 of 1
What data can be posted directly via the Plant Data Collection (PP-PDC) interface? Please choose the correct answer. Response: Maintenance notifications
Goods receipts
Goods issues
Confirmations
Question:
Score 1 of 1
You are using MRP controllers in an SAP ECC system. Which of the following statements concerning MRP controllers are correct? There are 2 correct answers to this question. Response: In multilevel single-item planning, materials are selected using the MRP controller.
An employee responsible for the planning of materials can be assigned to multiple MRP controllers.
The MRP controller is a central selection criterion for evaluating material requirements planning.
http://www.erpprep.com/node/872/take
6/37
1/13/2017
SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Full | ERPPrep
The MRP controller is maintained in production versions.
Question:
Score 1 of 1
Which of the following master data can be used with process orders? There are 3 correct answers to this question. Response: Production versions
Serial numbers
Master recipes
Resources
Production/resource tools
Question:
Score 1 of 1
Which repetitive manufacturing options can you use to carry out line loading in the SAP ECC system, and thus generate run schedule quantities (RSQ) from normal planned orders? There are 3 correct answers to this question. Response: Automatic selection of the production version by applying quota arrangement records in material requirements planning (MRP)
Automatic selection of the production line assigned to the MRP group used during material requirements planning (MRP)
Automatic selection of the production version in material requirements planning (MRP) using the selection methods setting
Manual assignment of planned production quantities in a planning table
A planning algorithm from capacity planning
http://www.erpprep.com/node/872/take
7/37
1/13/2017
SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Full | ERPPrep
Question:
Score 1 of 1
A user you advise wishes to transfer variable process instructions for automated processing directly to certain work centers and machines in the production department (for example, feed speed, pressing pressure, dry temperature). The user also wishes to receive variable as-is messages (such as actual quantities, actual times) from these work centers and machines and to process these messages for feedback concerning production orders. Which of the following options would you recommend to implement these requirements? Please choose the correct answer. Response: Plant data collection (PP-PDC) interface
SAP Application Link Enabling (ALE)
Execution Steps (XSteps) and process messages
SAP Business Intelligence (BI)
Question:
Score 1 of 1
In your company planning strategies are used in the SAP-ECC demand management that are based on consumption. Which of the following statements about consumption is true? There are 2 correct answers to this question. Response: A consumption situation is dynamic and is always restructured with the planning run.
Consumption always takes place on the material level between the planned independent requirements and the planned orders.
The consumption parameters (consumption mode and consumption interval) can be set in the material master or in the MRP group.
Consumption can also take place between order reservations and planned independent requirements, depending on the strategy.
http://www.erpprep.com/node/872/take
8/37
1/13/2017
SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Full | ERPPrep
Question:
Score 1 of 1
In your enterprise, a planning strategy is used in SAP ECC that enables joint planning of all MRP scheduled assemblies for a finished product to trigger procurement of these assemblies. It is important to ensure that the finished product is only produced when there is a customer order present. When a customer order is received, production of the finished product should be triggered in the form of make-to-order planning and production. Which planning strategy covers this scenario? Please choose the correct answer. Response: Planning with final assembly (strategy 40)
Planning with make-to-stock (strategy 10)
Planning at the assembly level (strategy 70)
Planning without final assembly (strategy 50)
Question:
Score 1 of 1
Which objects can you use in the production order for a material component to propose the storage location in its reservation? There are 3 correct answers to this question. Response: Routing
Work center
Production version
Material master (component)
Material master (product)
http://www.erpprep.com/node/872/take
9/37
1/13/2017
SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Full | ERPPrep
Question:
Score 1 of 1
The master data for a logistical process is to be stored in the SAP ECC system. In this context, you require the production versions for subsequent planning and production. You know a mass maintenance transaction that you could use here. Where else in the SAP ECC system could you define production versions? Please choose the correct answer. Response: In the repetitive manufacturing profile in Customizing.
In the line routing.
In the material master.
In the work center.
Question:
Score 1 of 1
Which of the following functions occur when a production order is created? There are 3 correct answers to this question. Response: Calculating the lead time for the production order
Copying a document that is assigned to the material master for the product to be produced
Calculating the quantity to be produced on the basis of the available material stocks
Selecting and copying a bill of material
Selecting and copying a routing
Question:
Score 1 of 1
In the SAP ECC system, a material is produced using production orders. The planning table for repetitive manufacturing should be used to plan line loading for this material. On the initial screen of the planning table, you select this http://www.erpprep.com/node/872/take
10/37
1/13/2017
SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Full | ERPPrep
material and then receive a message informing you that you cannot use the planning table for this material. Planning Table Initial Screen: Change Mode
Planning Table No elements exist for the selection
MF50
t37tdc00
INS
What could be the reason? Please choose the correct answer. Response: There is no valid production version for this material.
There are no requirements present.
The repetitive manufacturing indicator has been set.
There are no planned orders or production orders present.
Question:
Score 1 of 1
Which of the following master data do you always have to make available for material replenishment using the KANBAN procedure? There are 2 correct answers to this question. Response: Production supply areas
Product cost collector
Control cycles
Production versions
Rate routings
Question:
http://www.erpprep.com/node/872/take
Score 1 of 1
11/37
1/13/2017
SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Full | ERPPrep
Which of the following properties about the planning functions available in SAP ECC applies? Please choose the correct answer. Response: Master production scheduling (MPS) refers to preferred planning of important materials.
In demand management (DM) material shortage situations are identified and corresponding receipt elements are created.
Long-term planning (LTP) is a long-term form of forecasting.
Material requirements planning (MRP) includes automatic capacity leveling.
Question:
Score 1 of 1
The company you are advising uses a plant data collection system from company XYZ and would like to distribute production orders to the terminals on this system and enter feedback using these terminals. Which integration possibilities would you recommend so that as little work as possible is required for the customer to implement this? Please choose the correct answer. Response: The plant data collection interface (PP-PDC)
SAP Manufacturing Integration and Intelligence (SAP MII)
Execution Steps (XSteps)
The process control system interface PI-PCS
Question:
Score 1 of 1
After a material has been included in a NETCH material requirements planning run you change its BOM (bill of materials). Which of the following planning file entries for this material are set by the system? Please choose the correct answer. http://www.erpprep.com/node/872/take
12/37
1/13/2017
SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Full | ERPPrep
Response: The BOM explosion indicator
The BOM explosion and the NETPL planning indicator
The NETCH and NETPL planning indicators
The BOM explosion, the NETCH, and the NETPL planning indicators
Question:
Score 1 of 1
Where in the SAP ECC system can you define production versions? Please choose the correct answer. Response: In the work center
In the bill of material
In the material master
In the routing
Question:
Score 1 of 1
What options for selecting a routing exist when creating a production order? There are 3 correct answers to this question. Response: Automatic selection, controlled via settings in Customizing
Manual selection
Selection on the basis of the production control profile
Selection on the basis of the routing number in the material master for the material to be produced http://www.erpprep.com/node/872/take
13/37
1/13/2017
SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Full | ERPPrep
Question:
Score 1 of 1
Which of the following organizational units does the manufacturing, planning, and execution process use? There are 2 correct answers to this question. Response: Plant
Purchase Organization
Storage Location
Sales Area
Question:
Score 1 of 1
The master data for an in-house production process is to be set up in the SAP ECC system. To do this, you should create a suitable routing that plans for five operations in an initial sequence (10, 20, 30, 40, 50). There should be an option of relocating operations 30 and 40 to a second sequence on other work centers if there are capacity bottlenecks. What sequence type would you use to create the second sequence in the system? Please choose the correct answer. Response: Parallel sequence
Alternative sequence
Standard sequence
Substitute sequence
Question:
Score 1 of 1
Which of the following structural elements does a process order have? There are 3 correct answers to this question. http://www.erpprep.com/node/872/take
14/37
1/13/2017
SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Full | ERPPrep
Response: Phases
Characteristic-based process instructions
Relationships
Item data
Parallel sequences
Question:
Score 1 of 1
Where can you define the valid receivers for production order costs? Please choose the correct answer. Response: In the production scheduling profile
In the settlement profile
In the costing variant
In the valuation variant
Question:
Score 1 of 1
What are the consequences of a confirmation of an operation? There are 2 correct answers to this question. Response: Serial numbers are assigned for the confirmed quantity.
The produced and confirmed quantity is automatically posted to the warehouse stock as a receipt.
The operation's capacity requirements are reduced. http://www.erpprep.com/node/872/take
15/37
1/13/2017
SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Full | ERPPrep
Actual costs are posted for the production confirmed.
Question:
Score 1 of 1
Which statement regarding lot size procedures is correct? Please choose the correct answer. Response: If a make-to-order production strategy is in use, a lot for lot (exact) lot size is always determined for the corresponding procurement element.
The procurement quantity of a lot size procedure can be specified using a safety time period profile.
If a long-term lot size is in use, procurement is conducted with a long-term perspective.
The lot size quantity can be influenced using a minimum quantity and the rounding profile.
Question:
Score 1 of 1
What could be a consequence of confirming an operation? Please choose the correct answer. Response: The capacity requirements are updated
The actual costs are settled
The planned costs are updated
The production order is rescheduled
Question:
http://www.erpprep.com/node/872/take
Score 1 of 1
16/37
1/13/2017
SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Full | ERPPrep
In the task list, there is the possibility to work with suboperations. What can you do in more detail by using suboperations? There are 2 correct answers to this question. Response: Scheduling
Material component allocation
Capacity planning
Costing
Question:
Score 1 of 1
During the implementation of SAP ECC material requirements planning, the project team defines MRP controller numbers in Customizing under the entry "Define MRP Controller" that can be assigned to the planners responsible for the material. Which of the following statements are correct concerning these MRP controllers? There are 2 correct answers to this question. Response: A planner responsible for a material can have multiple MRP controller numbers.
The MRP controller number is a central selection
In multilevel single-item planning, materials are selected using the MRP controller number.
The MRP controller number is assigned using the production version.
Question:
Score 1 of 1
Which of the following requirements for a manufacturing plant can be supported by using process manufacturing? There are 3 correct answers to this question. Response:
http://www.erpprep.com/node/872/take
17/37
1/13/2017
SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Full | ERPPrep
Material requirements planning for production resources.
Master recipe-based manufacturing.
Variable calculation of material quantities (product output, material usage).
Manufacturing without orders.
Manufacturing in charge quantities.
Question:
Score 1 of 1
Which production order function can no longer be carried out after the order is released? Please choose the correct answer. Response: Posting a goods receipt from production to stock.
Posting a goods issue from stock to the production order.
Switching sequences.
Read PP master data.
Question:
Score 1 of 1
A project team member analyzes the following situation in SAP ECC in the stock/requirements list for a finished product: there is only one customer order and one fixed planned order with a similar quantity amount. The customer order and the planned order both have deadlines on work days but not on the same work day; the planned order has a later deadline. The project team member cannot find a rescheduling message referring to this deadline misalignment in the stock/requirements list. What reasons could there be for the missing message? There are 2 correct answers to this question. Response: http://www.erpprep.com/node/872/take
18/37
1/13/2017
SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Full | ERPPrep
The elements are linked to each other via fixed pegging.
Requirement planning has not yet been carried out to update the rescheduling message.
The requirement coverage element is outside the rescheduling horizon.
The time misalignment falls within the tolerance window defined in Customizing.
Question:
Score 1 of 1
Which of the following elements can be used in a process order? There are 3 correct answers to this question. Response: Relationships
Process instructions
Phases
Suboperations
Parallel sequences
Question:
Score 1 of 1
Which of the following possible errors would lead to the message shown? There are 2 correct answers to this question. Response: There are no valid routings or no routings available on the explosion date.
The Customizing for the order type is set to manual routing selection and a valid routing exists.
The material master (product) is set to manual routing selection and valid routing exists. http://www.erpprep.com/node/872/take
19/37
1/13/2017
SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Full | ERPPrep
In the material master, plan selection was set to production version. A production version was created and it is faulty.
Question:
Score 1 of 1
Which one of the following scheduling types cannot be assigned as default to an order type (production order)? Please choose the correct answer. Response: Midpoint
Backward
Forward
Only capacity requirements
Question:
Score 1 of 1
Which statements about the reorganization of planned independent requirements in SAP ECC are true? There are 2 correct answers to this question. Response: The reorganization can be parameterized using a plant-specific reorganization interval.
The reorganization is a form of demand adjustment in which non-settled planned independent requirements for the planning are set to inactive but are not deleted.
The reorganization only affects planned independent requirements that lie on a time axis to the past from a specified key date.
The reorganization only deletes planned independent requirements that have no fixed planned orders to them.
Question: http://www.erpprep.com/node/872/take
Score 1 of 1 20/37
1/13/2017
SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Full | ERPPrep
For a specific end product, you want to use a planning time fence and fixing type 1 to ensure that the planning situation in SAP ECC calms down in a short-term time window. Two customer orders arrive at short notice and their receipts should really be within the planning time fence, due to their date/time. Which statement is true with this scenario? Please choose the correct answer. Response: Requirements planning only examines changes that are relevant to scheduling within the planning time fence; the customer orders are covered in time.
The MRP controller has no possibility of creating planned orders within the planning time fence.
Newly created planned orders cannot be created by requirements planning before the end of the planning time fence, at the earliest.
Within the planning time fence, the newly created planned orders are automatically frozen by requirements planning (roll forward).
Question:
Score 1 of 1
Where are the standard operation times for an operation defined? Please choose the correct answer. Response: Production Resource/Tool (PRT)
Material Master
Work Center
Routing
Question:
Score 1 of 1
In the course of a customer project, you are confronted with an SAP ECC system that shows the error message displayed below when you test requirements planning in plant 1000. Large numbers of materials are already available in plant 1000. http://www.erpprep.com/node/872/take
21/37
1/13/2017
SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Full | ERPPrep
As a first step in solving the problem, you activate requirements planning in the Customizing for plant 1000. What further steps must you take before you can put requirements planning in plant 1000 into operation in SAP ECC? Please choose the correct answer. Response: Implement theplanning files in Customizing- Specify the plant parameters for plant 1000 in the requirement planning views
Activate requirements planning in Customizing for MRP areas in plant 1000- Specify the plant parameters for plant 1000 in the requirement planning views
Implement the planning files in Customizing- Specify the plant parameters for plant 1000 in Customizing
Createa planning file in Customizing- Specify the plant parameters for plant 1000 in Customizing
Question:
Score 1 of 1
You select the master data for production orders via production versions. Which information is contained in a production version? Please choose the correct answer. Response: The default order type to be used
The explosion dates for the routing and BOM
The control parameters for selecting routings and BOM
The routing and BOM alternatives to be used
Question:
Score 1 of 1
In modeling in-house production using SAP ECC, bills of material (BOM) are to be recorded in the system. On which business levels can you create a BOM? There are 2 correct answers to this question. Response: http://www.erpprep.com/node/872/take
22/37
1/13/2017
SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Full | ERPPrep
At the plant level
At the client level
At the business area level
At the company code level
Question:
Score 1 of 1
The availability check during production order creation should use a different scope of check than during order release. How can you fulfill this requirement? Please choose the correct answer. Response: Maintain appropriate checking rules in checking control for order creation and order release.
Maintain an appropriate availability checking group in the material master.
Maintain appropriate availability checking rules in the order type-dependent parameters.
Maintain appropriate availability checking rules in the production scheduling profile.
Question:
Score 1 of 1
You use a planning time fence and fixing type 1. You receive a customer order with a material availability date within the planning time fence. What do you have to consider in this scenario? Please choose the correct answer. Response: The MRP controller cannot create planned orders within the planning time fence.
Planned orders that are created by requirements planning are shifted to the end of the planning time fence.
http://www.erpprep.com/node/872/take
23/37
1/13/2017
SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Full | ERPPrep
Planned orders are created within the planning time fence and automatically firmed by requirements planning.
Requirements planning considers only changes that are relevant for scheduling within the planning time fence.
Score 1 of 1
Question: Which of the following items of master data are needed for repetitive manufacturing? There are 3 correct answers to this question. Response: Master record for serial numbers
Production supply area
Production version
Repetitive manufacturing profile
Product cost collector
Score 1 of 1
Question:
When testing requirements planning in plant 1000, you receive the error message displayed below. Large numbers of materials are already available in plant 1000. As a first step in solving the problem, you activate requirements planning in the Customizing for plant 1000. Single Item Multi-Level
Requirement planning is not active in plant 1000
MD02 t37tdc00 INS
What further tasks do you perform before you can use requirements planning in plant 1000 in SAP ECC? Please choose the correct answer. Response: Set up the planning file in Customizing and specify the plant parameters for plant 1000 in the MRP views in material master. http://www.erpprep.com/node/872/take
24/37
1/13/2017
SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Full | ERPPrep
Set up the planning file in Customizing and specify the plant parameters for plant 1000 in Customizing.
Set up the planning files in Customizing and specify the plant parameters for plant 1000 in Customizing of the MRP group.
Activate requirements planning in Customizing for MRP areas in plant 1000 and specify the plant parameters for plant 1000 in the MRP views in material master.
Question:
Score 1 of 1
You want to use production/resource tools in your manufacturing process. Which production type do you use? Please choose the correct answer. Response: KANBAN
Repetitive manufacturing
Process order
Production order
Question:
Score 1 of 1
Which of the following organizational efforts can be minimized using the KANBAN procedure? Please choose the correct answer. Response: Effort for Sales and Operations Planning (SOP)
Effort for capacity planning
Effort for master data maintenance
Effort for material staging http://www.erpprep.com/node/872/take
25/37
1/13/2017
SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Full | ERPPrep
Question:
Score 1 of 1
Which functions lead to a reduction in the capacity requirement for an individual operation at a work center? There are 3 correct answers to this question. Response: Rescheduling the operation
Setting the status technically complete (TECO)
Posting the goods receipt for the production order
Reducing the order quantity
Confirming the operation
Question:
Score 1 of 1
A customer has been using planning strategies 30 (production by lots) and 10 (anonymous make-to-stock production) in SAP ECC. The customer wishes to move in part to planning strategy 40 (planning with final assembly). The issue of consumption has an effect here for the first time. Which properties apply for consumption with planning strategy 40? There are 2 correct answers to this question. Response: Consumption creates a static and binding assignment, between the planned independent requirements recorded in advance and the customer requirements that arrive, for the entire procurement process.
Consumption can result in the subsequent specification and adjustment of planning elements in terms of quantity and date, by means of customer orders that arrive.
Consumption can reduce the originally planned production quantity.
http://www.erpprep.com/node/872/take
26/37
1/13/2017
SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Full | ERPPrep
Consumption can lead to an increase of the originally planned overall production quantity.
Question:
Score 1 of 1
When maintaining a work center, formulas can be assigned in the scheduling view. Formulas use formula parameters for calculation. What can be the origin of the formula parameters used for scheduling? There are 3 correct answers to this question. Response: General item values in bill of materials
User-defined field from operation in task list
Standard value from operation in task list
General values from work scheduling view in the material master
General operation values in task list
Question:
Score 1 of 1
Which data forms the basis for calculating the capacity requirement for an operation? There are 3 correct answers to this question. Response: Operation control key (routing)
Formulas (work center)
In-house production time (material master)
Standard values (routing)
Transport time (routing)
http://www.erpprep.com/node/872/take
27/37
1/13/2017
SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Full | ERPPrep
Question:
Score 1 of 1
Where can you maintain available capacities in an SAP ECC system? There are 2 correct answers to this question. Response: Work center
Routing
Pooled capacity
Production supply area
Question:
Score 1 of 1
Which types of objects can be changed with Engineering Change Management (ECM)? There are 3 correct answers to this question. Response: Material master
Bill of material
Task list
Work center
Production version
Question:
Score 1 of 1
Which objects can affect the calculation of capacity requirements for an operation? There are 3 correct answers to this question. Response: In-house production time (material master) http://www.erpprep.com/node/872/take
28/37
1/13/2017
SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Full | ERPPrep
Transport time (routing)
Standard values (routing)
Formulas (work center)
Operation control key (routing)
Question:
Score 1 of 1
Which of the following master data is necessary for the creation of material reservations for production orders? Please choose the correct answer. Response: Routings
Production/resource tools
Production versions
Material master records
Question:
Score 1 of 1
In the SAP ECC system, a material is produced with the help of production orders. Though originally used for rate-based planning only, the planning table is to be used to plan this material. On the initial screen of the planning table, you select this material and then receive a message informing you that you cannot use the planning table for this material. Which one of the following reasons for this message applies? Please choose the correct answer. Response: There are no planned orders or production orders present.
There is no valid production version for this material.
There are no requirements present. http://www.erpprep.com/node/872/take
29/37
1/13/2017
SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Full | ERPPrep
The series production indicator has not been set.
Question:
Score 1 of 1
The company that you advise does not want to manage certain value-intensive materials in the warehouse stock. Instead, the user wishes to control material provision in such a way that these materials are procured directly for the production and/or process order. How can you fulfill this request? There are 2 correct answers to this question. Response: Controlling the material in question as a co-product
Using the special procurement key direct procurement/external procurement in the material master for the component
Using the procurement type external procurement in the material master for the component
Using the item type non-stock item in the bill of material for the material in question
Using the special procurement key subcontracting in the material master for the component
Question:
Score 1 of 1
Which of the following statements about the planning functions available in SAP ECC are true? There are 2 correct answers to this question. Response: Long-term planning (LTP) is a long-term form of forecast planning.
Master production scheduling (MPS) refers to preferred planning of important materials.
Material requirements planning (MRP) does not include automatic capacity leveling.
http://www.erpprep.com/node/872/take
30/37
1/13/2017
SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Full | ERPPrep
In demand management (DM) material shortage situations are identified and given requirement coverage elements.
Question:
Score 1 of 1
During the processing of production orders planned and actual costs are determined. On which of the following objects can you collect these costs? There are 2 correct answers to this question. Response: Product cost collector
Production order
Work center
Planned order
Question:
Score 1 of 1
Which of the following organizational units can be used for planning and manufacturing in an SAP ECC system? There are 3 correct answers to this question. Response: Sales area
Distribution channel
MRP area
Storage location
Question:
Score 1 of 1
What sequence do you follow in master data maintenance to define the production of a material? http://www.erpprep.com/node/872/take
31/37
1/13/2017
SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Full | ERPPrep
Please choose the correct answer. Response: Create routing -> Create work centers -> Create BOM -> Carry out component assignment in BOM or routing
Create BOM -> Create work centers -> Create routing -> Carry out component assignment in BOM or routing
Create BOM -> Create work centers -> Create routing -> Carry out component assignment in work center
Create work centers -> Create routing -> Create BOM -> Carry out component assignment in work center
Question:
Score 1 of 1
What does SAP ERP mean? Please choose the correct answer. Response: SAP ERP is a system hardware that includes modules for purchasing, sales and distribution, materials management, production and so on.
SAP ERP is a technological platform, on the basis of which customer-specific extensions can be imported.
SAP ERP is a planning system in which extended planning processes can be mapped.
SAP ERP is an application that an enterprise can use to manage its business processes efficiently.
Question:
Score 1 of 1
Which of the following master data do you need to provide for process manufacturing? There are 3 correct answers to this question. Response:
http://www.erpprep.com/node/872/take
32/37
1/13/2017
SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Full | ERPPrep
Master recipe
Production versions
Serial numbers
Product cost collector
Resources
Question:
Score 0 of 1
Where can you define the default storage location for the material component of a production order? There are 3 correct answers to this question. Response: Routing
Production supply area of a work center
Production version (product)
BOM header (product)
Material master (component)
Question:
Score 1 of 1
What do you have to consider, when you use the ATP (Available To Promise) checks for material? There are 2 correct answers to this question. Response: ATP checks are automatically performed during Material Requirements Planning (MRP) runs.
ATP checks are used to evaluate the free capacity on a certain work center. http://www.erpprep.com/node/872/take
33/37
1/13/2017
SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Full | ERPPrep
ATP checks can be carried out automatically when releasing a production order.
ATP checks can be adjusted to also consider future requirements and receipts.
ATP checks are mandatory for lead-time scheduling.
Question:
Score 1 of 1
You want to plan a finished material using material requirements planning in an SAP ECC system. The resulting planned orders should be scheduled using basic date scheduling (not lead-time scheduling). Which of the following properties for the resulting dependent requirements applies? Please choose the correct answer. Response: If the individual material components are explicitly assigned to the operations of a routing, the requirement dates of the dependent requirements are scheduled at each start date of the operations.
In multi-level backward scheduling, dependent requirements are calculated to the exact second.
When a customer order is created for the finished material, the dependent requirements are automatically triggered for the components in the bill of material without a planning run.
In multi-level backward scheduling, dependent requirements are triggered at the start date for the planned order of the finished material.
Question:
Score 1 of 1
In which of the following objects can you activate back flushing for production orders? There are 3 correct answers to this question. Response: Work center
http://www.erpprep.com/node/872/take
34/37
1/13/2017
SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Full | ERPPrep
Routing
Material master (finished product)
Production scheduling profile
Material master (component)
Question:
Score 1 of 1
Which activities lead to a reduction of the capacity requirements for an operation? There are 3 correct answers to this question. Response: Posting the goods receipt for the production order
Setting the status technically complete (TECO)
Reducing the order quantity
Confirming the operation
Rescheduling the operation
Question:
Score 1 of 1
In SAP ECC, you want to map an in-house production process for general warehouse production. The fields in the area of the lot size-dependent in-house production time are to be populated when the material master for the final product is created. These fields can be maintained by updating from the scheduling result for the associated routing. You now think that there could be significant changes to the production times in the routing and decide against updating the material master. What problem could this lead to? Please choose the correct answer. Response: http://www.erpprep.com/node/872/take
35/37
1/13/2017
SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Full | ERPPrep
In the course of basic dates scheduling with requirements planning, dependent requirements request the components from the bill of materials at the wrong times.
Requirements planning runs up against an exception message in basic dates scheduling because the material master parameters do not match the scheduling result from the routing.
Lead time scheduling, which occurs by the time that a planned order is converted into a production order (at the latest), cannot take place on the basis of incorrect basic dates.
Subsequent capacity planning is no longer possible due to the obsolete scheduling parameters.
Question:
Score 1 of 1
Which options can you offer someone who uses the SAP ECC system for production orders and requires support for material supply in production? There are 3 correct answers to this question. Response: Pull list
Logistics Information System (LIS)
Material directory
Automatic generation of a transport order
Pick list
Question:
Score 1 of 1
Your customer tests the firming options for planned orders in SAP ECC using a test material. Therefore, the customer sets a firming date in the stock/requirements list manually. Additionally, the customer sets a planning time fence with firming type 1 in the material master. How is the resulting firming interval specified in this scenario? http://www.erpprep.com/node/872/take
36/37