PROJECT:
JUBAIL EXPORT REFINERY PACKAGE 8 PIPELINES and OFFPLOT FACILITY
CONTRACT NO. (SA)
PROJ. NO. (GCC)
3000235451
XX
DOCUMENT NO.
SA-JER-PI-801-GCCC-59-0035
SATORP SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
CONTRACT FOR THE ENGINEERING, PROCUREMENT AND CONSTRUCTION
JUBAIL EXPORT REFINERY PACKAGE 8 PIPELINES AND OFFPLOT FACILITY
REQUISITION
CUSTODY METERING SYSTEM PREPARED BY PAL FOR
GCC
03 02 01 00 Rev.
(GULF CONSOLIDATED CONTRACTORS CO. LTD.)
June 2010 May 2010 March 2010 October 2009
Date
Issued for Review/Acceptance Issued for Review/Acceptance Issued for Review/Acceptance Issued for Review
PAL PAL PAL PAL
GCC GCC GCC GCC
SATORP SATORP SATORP SATORP
Description
Prepared
Checked
Approved
Page 1 of 18
PROJECT:
JUBAIL EXPORT REFINERY PACKAGE 8 PIPELINES AND OFFPLOT FACILITY DOCUMENT TITLE:
REQUISITION – CUSTODY METERING SYSTEM DOCUMENT NO.:
SA-JER-PI-801-GCCC-59-0035
REVISION:
03
1.0 REVISIONS Item
Description
1.
Revision 00 Issued for Review
•
Revision 01 L/I: 001 Corrected.
Remarks
Previously Reviewed Under (JER-35451-LET-PINPGCCC-2010-000298
• • 2.
Package Scope Corrected. Inspection Level Specified. Issued for Review / Acceptance Revision 02
1.
Delete L/I: 002 (Turbine Type) Update Specification Sheet No. SA-JERP1801-GCCC-64-2113 & SA-JER-P1801GCCC-64-2202 Add New Specification Sheet No. SA-JERP1801-GCCC-64-2376 & SA-JER-P1801GCCC-64-2415 Update P&ID No. SA-JER-PI-801-GCCC48-1027 & SA-JER-PI-801-GCCC-48-1028 Delete L/I: 1.03 Issued for Review / Acceptance Revision 03
2. 3. 4. 5.
1.
Update FSD No. SA-JER-P1801-GCCC-64-2113 & SA-JER-P1801-GCCC-64-2415 as Per SATORP Comments
2. 3.
Add JERES-J-503 Issued for Review / Acceptance
Page 2 of 18
PROJECT:
JUBAIL EXPORT REFINERY PACKAGE 8 PIPELINES AND OFFPLOT FACILITY DOCUMENT TITLE:
REQUISITION – CUSTODY METERING SYSTEM DOCUMENT NO.:
SA-JER-PI-801-GCCC-59-0035
REVISION:
03
Table of Contents
1.0 REVISIONS..............................................................................................................................................2 2.0 SCOPE OF SUPPLY..............................................................................................................................4 2.1 EQUIPMENT / MATERIAL DESCRIPTION ....................................................................................................5
3.0 GENERAL REQUIREMENTS............................................................................................................9 3.1 DESIGN CHANGES.....................................................................................................................................................9 3.2 MARKING................................................................................................................................................................9 3.3 INTERPRETATION.......................................................................................................................................................9 3.4 PACKING .................................................................................................................................................................9 3.5 SHIPPING WEIGHTS AND VOLUME.......................................................................................................................10 3.6 TAGGING ..............................................................................................................................................................10 3.7 CONFLICTS, DEVIATIONS & EXCEPTION.....................................................................................................................10 3.8 THE PROPOSAL........................................................................................................................................................10 3.9 INCONSISTENCIES.....................................................................................................................................................10 3.10PAINTING & COATING ............................................................................................................................................10 3.11INSPECTION AND TESTING.........................................................................................................................................11 11 11 3.12 WARRANTY PASS-THROUGH STATEMENT.................................................................................................................11 11 3.13 ENVIRONMENTAL CONDITIONS.................................................................................................................................11 3.14 SPARE PARTS ......................................................................................................................................................11 3.14.1 SPARE PART LISTS..............................................................................................................................................11 3.14.2 SPARE PART – MANUFACTURING OR SUPPLYING .....................................................................................12 3.15 SPECIAL TOOLS ...................................................................................................................................................12 12 3.16 ASSISTANCE DURING ERECTION ..............................................................................................................................12 3.17 ASSISTANCE DURING START-UP AND COMMISSIONING ................................................................................................12 3.18 REPORTING ..........................................................................................................................................................12 3.19 ALTERNATIVES......................................................................................................................................................12
4.0 VENDOR DOCUMENT REQUIREMENT.......................................................................................13 4.1 LANGUAGE.............................................................................................................................................................13 4.2 VENDOR ENGINEERING REQUIREMENTS........................................................................................................................13 4.3 IDENTIFICATION.......................................................................................................................................................13
5.0 LIST OF ATTACHMENTS.................................................................................................................14 6.0 NON-MATERIAL REQUIREMENTS...............................................................................................18
Page 3 of 18
PROJECT:
JUBAIL EXPORT REFINERY PACKAGE 8 PIPELINES AND OFFPLOT FACILITY DOCUMENT TITLE:
REQUISITION – CUSTODY METERING SYSTEM DOCUMENT NO.:
SA-JER-PI-801-GCCC-59-0035
REVISION:
03
6.1 NON MATERIAL REQUIREMENTS (ATTACHED NRM-7907, 7918, 7919, 7923, 7925, 7927. 7930).............................18 6.2 ISO 9000 QUALITY SYSTEM REQUIREMENTS.............................................................................................................18 6.3 INSPECTION & TEST PLAN (ITP) .............................................................................................................................18
2.0 SCOPE OF SUPPLY Vendor shall be responsible for the design, engineering, supply of materials, manufacturing, and assembly, shop testing, packing for delivery and operating and maintenance manuals for the Equipment / materials listed in the present requisition. All items not specifically mentioned in this specification, but necessary and required to form an operational system as described herein, shall be identified and provided by the Vendor as part of the system. Any errors or omissions in this specification shall not absolve the Vendor from the responsibility of designing and providing complete and fully functional equipment as described in this requisition. The design / manufacturing of the Equipment / Materials shall be in accordance to all specifications, drawings, procedures, standards and other documents attached hereto and with the best modern practice and shall be such to facilitate inspection, cleaning, maintenance and repair to ensure satisfactory operation of the Equipment / Materials under all service Conditions.
Page 4 of 18
PROJECT:
JUBAIL EXPORT REFINERY PACKAGE 8 PIPELINES AND OFFPLOT FACILITY DOCUMENT TITLE:
REQUISITION – CUSTODY METERING SYSTEM DOCUMENT NO.:
SA-JER-PI-801-GCCC-59-0035
2.1 EQUIPMENT / MATERIAL DESCRIPTION Line DESCRIPTION Item
Page 5 of 18
REVISION:
03
PROJECT:
JUBAIL EXPORT REFINERY PACKAGE 8 PIPELINES AND OFFPLOT FACILITY DOCUMENT TITLE:
REQUISITION – CUSTODY METERING SYSTEM DOCUMENT NO.:
SA-JER-PI-801-GCCC-59-0035
REVISION:
03
Inspection Level: 1 001
Material No. = 6000009921 CUSTODY METERING SYSTEM (CORIOLIS TYPE) QTY: 3 EACH SUPPLY, DESIGN, ENGINEERING, FABRICATION, ASSEMBLY, DELIVERY, TESTING AND COMMISSIONNING CUSTODY METERING SKIDS, METER PROVER SKID AND THE METERING CONTROL SYSTEM TO SUPERVISE AND ASSISTS DURING INSTALLATION OF THE SYSTEM. ALL IN ACCORDANCE WITH THE ATTACHED JER ENGINEERING STANDARDS, MATERIAL SYSTEMS SPECIFICATIONS, STANDARD DRAWINGS, INSPECTION AND TEST PLAN, INTERNATIONAL CODES AND STANDARDS AS LISTED AND PROJECT DRAWINGS PROCESS FLOW DIAGRAM, PIPING AND INSTRUMENT DIAGRAMS AND FUNCTIONAL SPECIFICATION DOCUMENT AS TABULATED BELOW:
Item
Pipeline Description
Document #
QTY (LT)
1.01 1.02 1.03 1.04
Benzene Products Propylene Products LPG Export Products Liquid Sulphur Products
SA-JER-P1801-GCCC-64-2113 SA-JER-P1801-GCCC-64-2202 SA-JER-P1801-GCCC-64-2376 SA-JER-P1801-GCCC-64-2415
1 1 1 1
JER ENGINEERING STANDARD: JERES-A-112 JERES -B-019 JERES -B-054 JERES -B-055 JERES -B-058 JERES -B-067 JERES -B-068 JERES -H-001 JERES -H-102 JERES -J-002 JERES -J-003 JERES -J-200 JERES -J-400 JERES-J- 503 JERES -J-902 JERES -L-105 JERES -L-108
Line Item
DESCRIPTION
Page 6 of 18
PROJECT:
JUBAIL EXPORT REFINERY PACKAGE 8 PIPELINES AND OFFPLOT FACILITY DOCUMENT TITLE:
REQUISITION – CUSTODY METERING SYSTEM DOCUMENT NO.:
SA-JER-PI-801-GCCC-59-0035
JER ENGINEERING STANDARD:
001
JERES -M-001 JERES -N-001 JERES -P-100 JERES -P-104 JERES -P-111 JERES -P-123 JERES -W-011 JERES -Y-103 JERES -Z- 001
JER MATERIAL SPECIFICATIONS: JERMS-H-9080 JERMS –J-4118 JERMS -J-4119 JERMS –J-4120 JERMS -J-4511 JERMS -J-4517 JERMS -J-4525 JERMS -J-4611 JERMS -J-4711 JERMS -J-4718 JERMS -J-4820 JERMS -J-4821 JERMS -J-4830 JERMS -J-4831 JERMS -J-4913 JERMS -L-1010 JERMS -L-1017 JERMS -L-1038 JERMS -L-2005 JERMS -L-2011 JERMS -L-4001 JERMS -L-4035 JERMS -L-4041 JERMS -L-4042 JERMS -L-4048 JERMS -L-4051 JERMS -M-2007 JERMS -P-7503 JERMS -P-7515
JER STANDARD DRAWINGS: JERSD-J-0002 JERSD-J-0073 JERSD-J-0048 JERSD-J-0049 JERSD-J-0050 JERSD-J-0080 JERSD-M-0015 JERSD-Y-0001
Line Item
DESCRIPTION
Page 7 of 18
REVISION:
03
PROJECT:
JUBAIL EXPORT REFINERY PACKAGE 8 PIPELINES AND OFFPLOT FACILITY DOCUMENT TITLE:
REQUISITION – CUSTODY METERING SYSTEM DOCUMENT NO.:
SA-JER-PI-801-GCCC-59-0035
JER INSPECTION AND TESTING:
001
JERITP-A-000003 JERITP-H-091300 JERITP-H-091900 JERITP-J-340100 JERITP-J-340200 JERITP-J-341000 JERITP-J-341900 JERITP-J- 342800 JERITP-J-342900 JERITP-J-343100 JERITP-J-344000 JERITP-J-347600 JERITP-L-010700 JERITP-L-013100 JERITP-L-022501 JERITP-L-026100 JERITP-L-043000 JERITP-L-043600 JERITP-M-120100 JERITP-P-170200 JERITP-P-173700 NON MATERIAL REQUIREMENTS:
NRM-7907 NRM-7918 NRM-7919 NRM-7923 NRM-7925 NRM-7927 NRM-7930
Page 8 of 18
REVISION:
03
PROJECT:
JUBAIL EXPORT REFINERY PACKAGE 8 PIPELINES AND OFFPLOT FACILITY DOCUMENT TITLE:
REQUISITION – CUSTODY METERING SYSTEM DOCUMENT NO.:
SA-JER-PI-801-GCCC-59-0035
REVISION:
03
3.0 GENERAL REQUIREMENTS 3.1
Design Changes Any design changes recommended by the manufacturer, which will affect this Requisition and/or Specifications, drawings, etc., shall be brought to the buyer’s attention for buyer’s written approval before proceeding with the work.
3.2
Marking Marking of the Equipment / Materials shall be as per requirements of the Requisition and applicable standard.
3.3
Interpretation In any instance where the name of a particular manufacturer appears herein, such shall be interpreted to mean the product of that manufacturer or its equivalent (unless purchase of a particular manufacturer’s product is shown as mandatory).
3.4
Packing Vendor shall pack material to ensure environmental and transit protection of the equipment and shall submit packing design and packing details for buyer’s approval. The shipping marks are as follows: CONTRACTOR CONSIGNEE PROJECT NAME
: : :
SATORP Requisition No. Place of Destination Equipment Item No Type of Storage Package No. Dimensions (L x B x H in cm) Gross Weight (Kilogram)
: : : : : : :
GCC (Gulf Consolidated Contractors Co. Ltd.) GCC (Gulf Consolidated Contractors Co. Ltd.) Jubail Export Refinery Package 8 Pipelines and Offplot Facility SA-JER-PI-801-GCCC-59-0035 Kingdom of Saudi Arabia
___________x__________x_________
Page 9 of 18
PROJECT:
JUBAIL EXPORT REFINERY PACKAGE 8 PIPELINES AND OFFPLOT FACILITY DOCUMENT TITLE:
REQUISITION – CUSTODY METERING SYSTEM DOCUMENT NO.:
3.5
SA-JER-PI-801-GCCC-59-0035
REVISION:
03
Shipping Weights and Volume Vendor shall provide shipping weights and volume per each equipment.
3.6
Tagging Vendor shall provide and install stainless steel tags with all referenced engineering tag numbers in accordance with the required attachments.
3.7
Conflicts, Deviations & Exception In case of any conflict between the requirements of this document and the attached specification or data sheet or deviations from the relevant SATORP Standard, the conflict, deviation or exception shall be brought to the attention of the buyer for resolution. Vendor shall provide listing of the exceptions, deviations or conflicts to all Standards referred herein. Listing is to refer to number, name and section of the standard to which reference is made. If no exceptions, conflicts or deviations to a Standard, the Vendor is to state the same. Vendor shall provide a point by point compliance to the applicable SATORP Material specifications (JERMS). Any deviations and/or exceptions should be noted in the point by point submission.
3.8
The proposal The Proposal must include a list of exceptions / exclusions to the specifications attached to the present enquiry. Any exclusions I exceptions are not indicated in the proposal it will be understood the proposal is in full agreement with the specification
3.9
Inconsistencies If any inconsistency exists between these requisitions, the attached documentation and other applicable SATORP documents, industry standards or drawings, the inconsistency will be solved in writing.
3.10 Painting & Coating
Page 10 of 18
PROJECT:
JUBAIL EXPORT REFINERY PACKAGE 8 PIPELINES AND OFFPLOT FACILITY DOCUMENT TITLE:
REQUISITION – CUSTODY METERING SYSTEM DOCUMENT NO.:
SA-JER-PI-801-GCCC-59-0035
REVISION:
03
Painting shall be in accordance with the attached Data Sheets. 3.11 Inspection and Testing Inspection and Testing requirements shall be in accordance with SATORP JERITP FORMS. Inspection Level for Equipment / Materials Mentioned in this MR shall be: 1 Level 1: Includes, as a minimum, pre-inspection meetings, “in progress” surveillance inspection shall be on a regular basis (daily, weekly or bi-weekly), all witness and hold points, final inspection, and release for shipment. 3.12 Warranty Pass-Through Statement “Vendor and GCC (Gulf Consolidated Contractors Co. Ltd.) understand that GCC (Gulf Consolidated Contractors Co. Ltd.) is contracting with Seller for the purchase of goods hereunder for ultimate transfer to, and use by, the Saudi Aramco TOTAL Refining & Petrochemical Company (SATORP) in Saudi Arabia. Therefore, Seller agrees that, in any event, all rights of GCC (Gulf Consolidated Contractors Co. Ltd.) for any failure to meet specifications, or any other breach of warranty, shall run to the benefit of and be fully enforceable by SATORP. 3.13 Environmental Conditions Vendor shall consider the Environmental Conditions at the site(s) as per SATORP Standard JERES-A-112. 3.14 Spare Parts 3.14.1 Spare Part Lists Vendor to submit following spare parts lists with the tender: •
Recommended spare parts for Initial Start up and Commissioning.
•
Recommended special tools for Initial Start up and Commissioning.
•
Recommended Spare Parts for two year Operation
•
Recommended Materials / Consumables for one year Operation
•
Recommended Capital Spares. Page 11 of 18
PROJECT:
JUBAIL EXPORT REFINERY PACKAGE 8 PIPELINES AND OFFPLOT FACILITY DOCUMENT TITLE:
REQUISITION – CUSTODY METERING SYSTEM DOCUMENT NO.:
SA-JER-PI-801-GCCC-59-0035
REVISION:
03
3.14.2 Spare Part – Manufacturing or Supplying Vendor to provide statement that spare parts for equipment/material quoted will be produced for a minimum period of 10 years. 3.15 Special Tools Special Tools required for the Erection of the Equipment or Materials shall be included in the scope of supply. 3.16 Assistance during Erection Vendor shall quote separately for vendor representation in event it is required during Erection. 3.17 Assistance during Start-up and Commissioning Should Services of the Vendor’s Representative be required during Start-up and Commissioning that these services shall be included in vendor price. 3.18 Reporting Progress Reporting shall be on a bi weekly basis starting one week from the date of issue of the Requisition until fulfillment by the Vendor of all its duties and obligations under the Purchase Order. 3.19 Alternatives Vendor may submit or propose an alternative design. As a minimum, following data is required: • Detailed drawings, showing the design • Description of the design and methods of Construction Calculations, clearly justifying all the details of the design. The calculations shall be self-explanatory and shall indicate the sources of information and the derivation of all parameters, formula’s and assumptions used.
Page 12 of 18
PROJECT:
JUBAIL EXPORT REFINERY PACKAGE 8 PIPELINES AND OFFPLOT FACILITY DOCUMENT TITLE:
REQUISITION – CUSTODY METERING SYSTEM DOCUMENT NO.:
SA-JER-PI-801-GCCC-59-0035
REVISION:
03
4.0 VENDOR DOCUMENT REQUIREMENT 4.1
Language All literature, documentation, correspondence, and other printed matter pertaining to this Requisition shall be in the English language.
4.2
Vendor engineering requirements The vendor shall be responsible as a minimum for: A. Preparation and submittal of data sheets, calculations and drawings in English Languages with Metric units. B. Submittal of all manufacturers and sub-vendors drawing and data sheets as identified in the non-material requirements section and attachments to this requisition. C. All vendor submittals shall be of microfilm quality (CAD drawings are preferred). D. Requirements for final and Certified Documents are specified elsewhere. E. Responsibility for all auxiliary equipment and their associated controls (if any). F. Recommended spare parts and catalogue of all spare parts as per SATORP requirements Submission of all documents is an integral part of the Purchase Order Obligation. The Purchase Order shall only be complete, when all document requirements have been fulfilled and are accepted by Purchaser and Client.
4.3
Identification All drawings, literatures, data sheets, certifications, etc., supplied by vendor shall show the following information: (a) SATORP Requisition No.: SA-JER-PI-801-GCCC-59-0035 (b) Purchaser Line Item Nº: 001 (c) Purchaser Plant Nº: 801 (d) Vendor’s Order Nº: (e) Vendor’s name and address: (f) Vendor’s Drawing Number: (g) NRM Number:
Page 13 of 18
PROJECT:
JUBAIL EXPORT REFINERY PACKAGE 8 PIPELINES AND OFFPLOT FACILITY DOCUMENT TITLE:
REQUISITION – CUSTODY METERING SYSTEM DOCUMENT NO.:
SA-JER-PI-801-GCCC-59-0035
REVISION:
03
5.0 LIST OF ATTACHMENTS SHT.
REV.
ISSUE DATE
SA-JER-PI-801-GCCC-59-0035
1~18
03
06/2010
NRM-7907
1~2
NMR - Instrumentation
NRM-7918
1~2
NMR - Safety Relief Valves
NRM-7919
1~2
NMR - Fabricated Pipe Bends
NRM-7923
1~2
NMR - Control Panels
NRM-7925
1~2
NMR - Valves All Types
NRM-7927
1~2
NMR - Fabricated Structure Steel
NRM-7930
1~2
NRM- For Custody Metering System
JERITP-A-000003
001
0
Inspection & testing requirement – Guidelines
JERITP-H-091300
001
0
Inspection & testing requirement – Coating
JERITP-H-091900
001
0
JERITP-J-340100
1~2
0
JERITP-J-340200
1~2
0
JERITP-J-341000
001
0
JERITP-J-341900
001
0
JERITP-J-342800
001
JERITP-J-342900
001
0
JERITP-J-343100
001
0
JERITP-J-344000
001
0
JERITP-J-347600
001
0
JERITP-L-010700
001
0
Inspection & testing requirement – Coating Inspection & testing requirement – Valves ControlGeneral Service, Pneumatic Inspection & testing requirement – Instrumentation for Packaged Units Inspection & testing requirement – Actuators Valves Inspection & testing requirement – Valves Inspection & testing requirement – Mechanical Meter Provers Inspection & testing requirement – Meter: Flow, Turbine. Inspection & testing requirement – Instrument Control Panels Indoor -Outdoor Inspection & testing requirement – Programmable Logic Controllers Inspection & testing requirement – Instrumentation and Thermocouple Extension Cable Inspection & testing requirement – Pipe
JERITP-L-013100
001
0
Inspection & testing requirement – Pipe
JERITP-L-022501
001
0
Inspection & testing requirement – Flanges
JERITP-L-026100
001
0
Inspection & testing requirement – Fittings
JERITP-L-043000
001
0
Inspection & testing requirement – Valve Material
JERITP-L-043600
001
0
Inspection & testing requirement – Valves
JERITP-M-120100
001
0
Inspection & testing requirement – Steel Structure
DOCUMENT
Page 14 of 18
TITLE Requisition (This document)
PROJECT:
JUBAIL EXPORT REFINERY PACKAGE 8 PIPELINES AND OFFPLOT FACILITY DOCUMENT TITLE:
REQUISITION – CUSTODY METERING SYSTEM DOCUMENT NO.:
DOCUMENT
SA-JER-PI-801-GCCC-59-0035 ISSUE DATE
REVISION:
03
SHT.
REV.
JERITP-P-170200
001
0
JERITP-P-173700
1~2
0
JERES-A-112
1 ~ 12
3
1/29/2009
JERES-B-019
1 ~ 11
1
9/15/2008
JERES-B-054
1 ~ 17
2
4/14/2009
JERES-B-055
1 ~ 41
3
3/5/2009
JERES-B-058
1 ~ 14
1
12/20/2008
Emergency Shutdown, Isolation & Depressuring
JERES-B-067
1 ~ 14
1
4/15/2009
Safety Identification and Safety Colors
JERES-B-068
1 ~ 66
1
10/22/2008
Determination of Explosion Hazard Zones 0,1,2
JERES-H-001
1 ~ 93
5
5/22/2009
Coating Selection & Application Requirements
JERES-H-102
1 ~ 12
1
2/3/2009
Safety Requirements for Coating Applications
JERES-J-002
1 ~ 76
5
5/22/2009
Regulated Vendors List for Instruments
JERES-J-003
1~8
0
4/28/2008
Instrumentation – Basic Design Criteria
JERES-J-200
1~11
0
4/29/2008
Pressure
JERES-J-400
1~17
1
5/07/2009
Temperature
JERES-J-503
1~123
1
09/15/2008
Process connection for Instruments & Analyzers
JERES-J-902
1 ~ 28
2
10/2/2008
Electrical Systems for Instrumentation
JERES-L-105
1 ~ 403
5
5/20/2009
Piping Material Specification
JERES-L-108
1 ~ 36
5
5/15/2009
Selection of Valves
JERES-M-001
1 ~ 41
3
5/12/2009
JERES-N-001
1 ~ 22
3
2/10/2009
Structural Design Criteria For non-Building Structure Basic Criteria for Industrial Insulation
JERES-P-100
1 ~ 53
4
4/21/2009
Basic Power System Design Criteria
JERES-P-104
1 ~ 32
3
4/21/2009
Wiring Methods and Materials
JERES-P-111
1 ~ 42
1
1/27/2009
Grounding
JERES-P-123
1 ~ 14
0
4/28/2009
Lighting
JERES-W-011
1 ~ 51
4
2/10/2009
Welding Requirements for On-Plot Piping
JERES-Y-103
1 ~ 136
2
9/26/2008
Royalty / Custody Metering of Hydrocarbon Liquid
JERES-Z-001
1 ~ 32
1
10/27/2008
JERMS-H-9080
1 ~ 20
0
4/28/2008
Shop-Applied Baked Internal Coatings
JERMS-J-4118
1 ~ 12
0
4/28/2008
Positive Displacement Meters
Page 15 of 18
TITLE Inspection & testing requirement – Motors, Electric Inspection & testing requirement – Auxiliary Electrical Systems Meteorological and Seismic Design Data Portable, Mobile and Special Fixed Firefighting Access, Egress and Materials Handling for Plant Facilities Plant Layout
Process Control Systems
PROJECT:
JUBAIL EXPORT REFINERY PACKAGE 8 PIPELINES AND OFFPLOT FACILITY DOCUMENT TITLE:
REQUISITION – CUSTODY METERING SYSTEM DOCUMENT NO.:
SA-JER-PI-801-GCCC-59-0035
REVISION:
SHT.
REV.
ISSUE DATE
JERMS-J-4119
1 ~ 18
0
11/20/2008
Bi-Directional Meter prover
JERMS-J-4120
1 0 0
5/14/2008 4/28/2008 4/28/2008
Uni-Directional Meter Prover
JERMS-J-4517
1 ~ 18 1 ~ 12 1 ~ 14
JERMS-J-4525
1 ~ 29
1
9/30/2008
JERMS-J-4611
1 ~ 11
0
4/29/2008
JERMS-J-4711
JERMS-M-2007
1 ~ 19 1 ~ 15 1 ~ 23 1 ~ 11 1 ~ 20 1 ~ 30 1 ~ 14 1 ~ 15 1 ~ 15 1 ~ 10 1 ~ 16 1 ~ 27 1 ~ 16 1 ~ 18 1~9 1~8 1 ~ 11 1 ~ 12 1 ~ 30
2 0 0 0 1 2 2 0 1 0 0 2 1 2 1 0 0 1 3
4/16/2009 4/29/2008 4/29/2008 4/29/2008 9/24/2008 9/24/2008 2/2/2009 4/28/2008 5/20/2008 4/28/2008 4/28/2008 10/31/2008 5/20/2008 10/31/2008 5/20/2008 4/28/2008 4/28/2008 5/20/2008 5/12/2009
JERMS-P-7503
1~2
1
11/5/2008
JERMS-P-7515
1 ~ 26
0
4/28/2008
JERSD-J-0002
001 1 ~ 70 1 ~ 42 1 ~ 41 001 1 ~ 18
0 1 0 0 0 0
01/2002 07/2008 03/2008 03/2008 07/2008 07/2008
DOCUMENT
JERMS-J-4511
JERMS-J-4718 JERMS-J-4820 JERMS-J-4821 JERMS-J-4830 JERMS-J-4831 JERMS-J-4913 JERMS-L-1010 JERMS-L-1017 JERMS-L-1038 JERMS-L-2005 JERMS-L-2011 JERMS-L-4001 JERMS-L-4035 JERMS-L-4041 JERMS-L-4042 JERMS-L-4048 JERMS-L-4051
JERSD-J-0048 JERSD-J-0049 JERSD-J-0050 JERSD-J-0073 JERSD-J-0080
Page 16 of 18
03
TITLE
Chromatographs Density Meters Automatic Sampling Systems for Crude Oil and Refined Products Safety Relief Valves Conventional and Balanced Types Control Valve Electric Motor Operated Valve Actuators Instrument Control Cabinets- Indoor Instrument Control Cabinets- Outdoor Programmable Logic Controller Instrumentation for Packaged Units Instrumentation and Thermocouple Cable Fabricated Carbon Steel Piping Auxiliary Pipeline for Mechanical Equipment Small Direct Charge Purchases of Pipe Butt Welding Pipe Fittings Forged Steel Weld Neck Flanges Gate Valves General Requirements for Valves Expanding Plug Valve 4-Way Diverter Valve Valve Inspection and Testing Requirements Ball Valves, API SPEC 6D Fabrication of Structural and Miscellaneous Steel Severe Duty, Totally Enclosed Squirrel Cage Induction Motors to 500 HP Auxiliary Electrical Systems for Skid-Mounted Equipment Thermowell Assembly and Details Pressure measurement on gas services Pressure measurement on steam services Pressure measurement on LPG services Field Mounting Details For Instruments General Rules for Instrument & Installation
PROJECT:
JUBAIL EXPORT REFINERY PACKAGE 8 PIPELINES AND OFFPLOT FACILITY DOCUMENT TITLE:
REQUISITION – CUSTODY METERING SYSTEM DOCUMENT NO.:
DOCUMENT
SA-JER-PI-801-GCCC-59-0035
REVISION:
ISSUE DATE
03
SHT.
REV.
1 0
08/2002
Anchor Bolts Details
JERSD-Y-0001
001 001
08/1998
Custody Transfer Metering and Proving Station
SA-JER-P1801-GCCC-64-2113
1-65
00
05/2010
Specification for Benzene Product Line
SA-JER-P1801-GCCC-64-2202
1-65
00
05/2010
Specification for Propylene Product Line
SA-JER-P1801-GCCC-64-2415
1-60
00
05/2010
Specification for Liquid Sulphur Product Line
SA-JER-PI-801-GCCC-48-1027
001
00
04/26/2010
Piping and Instrument Diagram
SA-JER-PI-801-GCCC-48-1028
001
00
04/26/2010
Piping and Instrument Diagram
SA-JER-PI-801-GCCC-48-1030
001
00
04/26/2010
Piping and Instrument Diagram
JERSD-M-0015
Page 17 of 18
TITLE
PROJECT:
JUBAIL EXPORT REFINERY PACKAGE 8 PIPELINES AND OFFPLOT FACILITY DOCUMENT TITLE:
REQUISITION – CUSTODY METERING SYSTEM DOCUMENT NO.:
SA-JER-PI-801-GCCC-59-0035
REVISION:
03
6.0 NON-MATERIAL REQUIREMENTS Failure to submit the documents listed below shall cause the supply to be considered unfulfilled. All documents, even if preliminary, shall be stamped and signed by the supplier and show SATORP Requisition number. Final and Certified Documentation Package to be submitted in a format approved by Purchaser and Client. 6.1
Non Material Requirements (Attached NRM-7907, 7918, 7919, 7923, 7925, 7927. 7930)
Vendor should submit NMR to GCC for verification and approval. SATORP should approve any modification. 6.2
ISO 9000 Quality System Requirements
Vendor shall meet the Technical & Quality Requirements of the Work. Vendors Quality System shall meet the appropriate ISO 9000 system requirements; The Vendor shall be evaluated, approved and listed as accepted supplier by GCC and SATORP prior to placing the purchase order. 6.3
Inspection & Test Plan (ITP)
Vendor shall prepare a Quality Control Plan for Review and Approval according to the requirements of the Requisition, and Particularly SATORP JERITP FORMS. Note: The ITP is required to be submitted by vendor along with the bid submission.
Page 18 of 18