REKAPITULASI RENCANA ANGGARAN BIAYA (RAB) PEMBANGUNAN 2 RUANG KELAS BARU (RKB) PEKERJAAN
: PEMBANGUNAN 2 RUANG KELAS BARU (RKB) SMA PERJUANGAN 78 ALAMAT : Kp. Ciparay RT 01 RW 05 Desa Giriawas KECAMATAN : Cikajang KABUPATEN : Garut TAHUN ANGGARAN : 2016 NO.
JENIS
1
KOMPOSISI BANTUAN SWADAYA ( Rp ) ( Rp ) 3 4
PEKERJAAN 2
I.
PEKERJAAN PERSIAPAN
II.
PEMBANGUNAN 1 RKB (PERSIAPAN 2 LT)
III.
PEMBANGUNAN 1 RKB (LANTAI 2)
IV.
PEKERJAAN INFRASTRUKTUR
JUMLAH HARGA ( Rp ) 5
-
1,719,600.00
1,719,600.00
###
1,898,719.00
126,904,221.66
92,276,365.45 -
-
92,276,365.45
250,000.00
250,000.00
JUMLAH BIAYA
###
3,868,319.00
221,150,187.12
DIBULATKAN
###
3,860,000.00
221,150,000.00
Garut, 04 Maret 2016 KEPALA SEKOLAH SMA PERJUANGAN 78
Hal 1 dari 30
ACEP SURYATNA, S.Pd, M.Pd
Hal 2 dari 30
RENCANA ANGGARAN BIAYA PEMBANGUNAN 2 RUANG KELAS BARU/RKB
SMA PERJUANGAN 78 KECAMATAN CIKAJANG - KABUPATEN GARUT
No.
URAIAN
1
PEKERJAAN 2
I.
3
KOMPOSISI BANTUAN SWADAYA ( Rp ) ( Rp ) 5 6
JUMLAH HARGA ( Rp ) 7
PEKERJAAN PERSIAPAN 1 2 3 4 5
Papan Informasi Kegiatan (Papan Proyek) Penyediaan listrik dan air kerja Pengukuran, Profil, Bouwplank Steiger, stootwerk, perancah dan alat bantu Mobilisasi dan Demobilisasi
II.
PEMBANGUNAN 1 RKB (PERSIAPAN 2 LT)
A.
PEKERJAAN TANAH & URUGAN Galian Pondasi Urugan Pasir Bawah Pondasi & Telapak Urugan Tanah Kembali dipadatkan (bks galian) Urugan Sirtu peninggian muka lantai
1 2 3 4
B.
VOLUME
HARGA SATUAN ( Rp ) 4
1.00 ls 1.00 ls 1.00 ls 1.00 ls 1.00 ls Jumlah Sub Total -
219,600.00 250,000.00 250,000.00 500,000.00 500,000.00
-
219,600.00 250,000.00 250,000.00 500,000.00 500,000.00 1,719,600.00
219,600.00 250,000.00 250,000.00 500,000.00 500,000.00 1,719,600.00
42.82 m3 35,500.00 2.12 m3 128,200.00 10.71 m3 9,970.00 0.00 m3 145,000.00 Jumlah Sub Total - II.A
-
1,520,110.00 271,880.15 106,728.85 1,898,719.00
1,520,110.00 271,880.15 106,728.85 1,898,719.00
I
PEKERJAAN PONDASI 1 Pasangan Aanstamping T.15 cm 2 Pondasi Pasangan Batu Kali/belah (1Pc ; 5Psr)
3.63 m3 10.23 m3
294,855.00 560,050.00
1,070,323.65 5,728,261.41
-
1,070,323.65 5,728,261.41 Hal 3 dari 30
No. 1
C.
D.
URAIAN
PEKERJAAN
2 3 Pondasi Telapak beton a. Cor Beton Site Mix K.175 b. Pabrikasi besi tulangan U-24 c. Bekisting Pondasi 4 Sloof Beton (S-1) Uk. 20/30 a. Cor Beton Site Mix K.175 b. Pabrikasi besi tulangan U-24 c. Bekisting Sloof (2X pakai) 5 Sloof Beton (S-1) Uk. 15/25 a. Cor Beton Site Mix K.175 b. Pabrikasi besi tulangan U-24 c. Bekisting Sloof (2X pakai) 6 Sloof Beton (S-1) Uk. 15/20 a. Cor Beton Site Mix K.175 b. Pabrikasi besi tulangan U-24 c. Bekisting Sloof (2X pakai)
PEKERJAAN DINDING dan STRUKTUR BETON 1 Pasang Dinding Bata (1Pc : 5Psr) 2 Plesteran + Acian (1Pc : 4Psr) Beton dan Transram 3 Plesteran + Acian (1Pc : 5Psr)
PEKERJAAN STRUKTUR BETON PEK. KOLOM BETON STRUKTUR 1 Pek. Kolom Struktur K-1 Uk. 30/40 cm ,Beton K-175 a. Cor Beton Site Mix K.175 b. Pabrikasi besi tulangan U-24
HARGA SATUAN ( Rp ) 4
KOMPOSISI BANTUAN SWADAYA ( Rp ) ( Rp ) 5 6
2.68 m3 348.50 kg 3.75 m2
765,730.00 10,460.00 105,310.00
2,049,093.48 3,645,351.84 394,912.50
-
2,049,093.48 3,645,351.84 394,912.50
1.92 m3 284.00 kg 4.80 m2
765,730.00 10,460.00 112,560.00
1,470,201.60 2,970,640.00 540,288.00
-
1,470,201.60 2,970,640.00 540,288.00
0.49 m3 85.90 kg 1.63 m2
765,730.00 10,460.00 112,560.00
373,293.38 898,487.85 182,910.00
-
373,293.38 898,487.85 182,910.00
0.12 m3 765,730.00 18.61 kg 10,460.00 0.40 m2 112,560.00 Jumlah Sub Total - II.B
91,887.60 194,639.68 45,024.00 19,655,314.98
-
91,887.60 194,639.68 45,024.00 19,655,314.98
87.57 m2 82,030.00 13.14 m2 47,455.00 162.01 m2 46,075.00 Jumlah Sub Total - II.C
7,183,695.22 623,373.63 7,464,698.29 15,271,767.14
-
7,183,695.22 623,373.63 7,464,698.29 15,271,767.14
2,646,362.88 5,673,252.96
-
2,646,362.88 5,673,252.96
VOLUME 3
3.46 m3 542.38 kg
765,730.00 10,460.00
JUMLAH HARGA ( Rp ) 7
Hal 4 dari 30
No. 1
URAIAN
PEKERJAAN
2 c. Bekisting Kolom 2 Pek. Kolom Struktur K-2 Uk. 30/30 cm ,Beton K-175 a. Cor Beton Site Mix K.175 b. Pabrikasi besi tulangan U-24 c. Bekisting Kolom 3 Pek. Kolom Struktur K-3 Uk. 20/30cm ,Beton K-175 a. Cor Beton Site Mix K.175 b. Pabrikasi besi tulangan U-24 c. Bekisting Kolom 4 Pek. Kolom Praktis KP-1 Uk. 12/12 cm ,Beton K-175 a. Cor Beton Site Mix K.175 b. Pabrikasi besi tulangan U-24 c. Bekisting Kolom
3 5.04 m2
HARGA SATUAN ( Rp ) 4 160,155.00
KOMPOSISI BANTUAN SWADAYA ( Rp ) ( Rp ) 5 6 807,181.20 -
1.30 m3 180.68 kg 2.16 m2
765,730.00 10,460.00 160,155.00
992,386.08 1,889,879.33 345,934.80
-
992,386.08 1,889,879.33 345,934.80
0.43 m3 61.10 kg 1.14 m2
765,730.00 10,460.00 160,155.00
330,795.36 639,089.26 182,576.70
-
330,795.36 639,089.26 182,576.70
0.00 m3 0.00 kg 0.00 m2
765,730.00 10,460.00 160,155.00
VOLUME
-
-
JUMLAH HARGA ( Rp ) 7 807,181.20
-
Hal 5 dari 30
No. 1 5
6
7
8
9
10
11
URAIAN
PEKERJAAN
2 PEK. BALOK BETON STRUKTUR Pek. Balok Induk (B-1) Uk. 30/60, Beton K-175 a. Cor Beton Site Mix K.175 b. Pabrikasi besi tulangan U-24 c. Bekisting Ringbalk Pek. Balok Anak (B-2) Uk. 20/40, Beton K-175 a. Cor Beton Site Mix K.175 b. Pabrikasi besi tulangan U-24 c. Bekisting balok Pek. Balok Beton (B-3) Uk. 25/50, Beton K-175 a. Cor Beton Site Mix K.175 b. Pabrikasi besi tulangan U-24 c. Bekisting balok Pek. Balok Beton (B-4) Uk. 20/30, Beton K-175 a. Cor Beton Site Mix K.175 b. Pabrikasi besi tulangan U-24 c. Bekisting balok Pek. Balok Beton (B-5) Uk. 25/40, Beton K-175 a. Cor Beton Site Mix K.175 b. Pabrikasi besi tulangan U-24 c. Bekisting balok Pek. Lislang Beton Uk. 10/50, Beton K-175 a. Cor Beton Site Mix K.175 b. Pabrikasi besi tulangan U-24 c. Bekisting balok Pek. Tangga Beton a. Cor Beton Site Mix K.175 b. Pabrikasi besi tulangan U-24 c. Pek. Bekisting Tangga Beton
HARGA SATUAN ( Rp ) 4
KOMPOSISI BANTUAN SWADAYA ( Rp ) ( Rp ) 5 6
2.10 m3 358.54 kg 5.01 m2
765,730.00 10,460.00 162,605.00
1,608,033.00 3,750,328.40 813,838.03
-
1,608,033.00 3,750,328.40 813,838.03
0.72 m3 104.63 kg 2.25 m2
765,730.00 10,460.00 162,605.00
551,325.60 1,094,377.50 365,861.25
-
551,325.60 1,094,377.50 365,861.25
1.75 m3 169.58 kg 1.40 m2
765,730.00 10,460.00 162,605.00
1,340,027.50 1,773,754.50 227,647.00
-
1,340,027.50 1,773,754.50 227,647.00
1.16 m3 203.02 kg 3.88 m2
765,730.00 10,460.00 162,605.00
891,309.72 2,123,599.66 630,907.40
-
891,309.72 2,123,599.66 630,907.40
1.80 m3 214.87 kg 1.80 m2
765,730.00 10,460.00 162,605.00
1,378,314.00 2,247,498.36 292,689.00
-
1,378,314.00 2,247,498.36 292,689.00
0.71 m3 93.34 kg 3.91 m2
765,730.00 10,460.00 162,605.00
543,668.30 976,350.35 634,972.53
-
543,668.30 976,350.35 634,972.53
2.14 m3 226.53 kg 10.42 m2
765,730.00 10,460.00 204,805.00
1,640,510.51 2,369,506.20 2,133,503.12
-
1,640,510.51 2,369,506.20 2,133,503.12
VOLUME 3
JUMLAH HARGA ( Rp ) 7
Hal 6 dari 30
No. 1
URAIAN
PEKERJAAN 2
E. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
F. 1
2 3 4 5
PEKERJAAN KUSEN PINTU & JENDELA + KACA Kusen Kayu Bahan 6/15, Kayu Lokal Kls. II Besi Angker Ø 10 mm Panjang 15 cm Neut Beton Pasang Papan Jalusi Kayu 2/14, Kls. II Pasang Daun Pintu Panel Papan, Kayu Lokal Kls. II Pasang Daun Pintu Double Triplek 4 mm Rangka Kayu Pasang Daun Jendela (Tanpa kaca) ,Rangka Kayu Kls. II Pasang Kunci Pintu 2 Slaag set, "ROYAL" Pasang Engsel Pintu (3 Buah/ 1 daun Pintu) Pasang Engsel Jendela Pasang Slot Pintu Tanam atas bawah (Espagnolet) Pasang Pasang Kait angin Jendela Pasang Tarikan Jendela Biasa Pasang Pasang Grendel/Slot Jendela Pas. Kaca Polos T. 3 mm + List Kaca
PEKERJAAN ATAP Pek. Plat Beton (Dak) T. 12 cm a. Cor Beton Site Mix K.225 b. Pabrikasi besi tulangan U-24 c. Pek. Bekisting Plat Lantai Pek. Konsol Exposed (Bag. Belakang Bangunan) Pek. Gording Kayu 6/12 Penutup atap genteng Press Ex. Jatiwangi Bubungan/Nok Sigitiga Ex. Jatiwangi
HARGA VOLUME SATUAN ( Rp ) 3 4 Jumlah Sub Total - II.C
0.74 m3 4,348,850.00 26.00 bh 1,500.00 2.00 bh 2,500.00 8.15 m2 166,150.00 3.40 m2 303,185.00 0.00 m2 223,455.00 1.92 bh 283,555.00 1.00 bh 185,050.00 3.00 bh 22,775.00 10.00 bh 18,835.00 2.00 bh 45,320.00 10.00 bh 20,205.00 10.00 bh 11,135.00 10.00 bh 13,060.00 6.47 m2 95,175.00 Jumlah Sub Total - II.D
8.75 886.95 60.75 0.12 0.16 12.70 11.00
m3 kg m2 m3 m3 m2 m1
821,665.00 10,460.00 150,290.00 4,080,750.00 3,418,950.00 54,455.00 58,140.00
KOMPOSISI BANTUAN SWADAYA ( Rp ) ( Rp ) 5 6 40,895,480.50 -
JUMLAH HARGA ( Rp ) 7 40,895,480.50
3,233,326.49 39,000.00 5,000.00 1,353,790.20 1,031,435.37 543,858.49 185,050.00 68,325.00 188,350.00 90,640.00 202,050.00 111,350.00 130,600.00 615,687.08 7,798,462.62
-
3,233,326.49 39,000.00 5,000.00 1,353,790.20 1,031,435.37 543,858.49 185,050.00 68,325.00 188,350.00 90,640.00 202,050.00 111,350.00 130,600.00 615,687.08 7,798,462.62
7,187,925.42 9,277,497.00 9,130,117.50 481,854.96 541,561.68 691,671.72 639,540.00
-
7,187,925.42 9,277,497.00 9,130,117.50 481,854.96 541,561.68 691,671.72 639,540.00 Hal 7 dari 30
No.
URAIAN
PEKERJAAN
1
2 6 Listplank Kayu 3/20 Kayu Kls. I 7 Flashing Seng Pinggiran
G.
PEKERJAAN PLAFOND 1 Rangka Plafond 5/7 Kayu Lokal (Alba) 2 Penutup Bidang Plafond (GRC 120x240) cm 3 List Profil Kayu 3 cm
H.
PEKERJAAN LANTAI 1 Urugan Pasir Bawah Pasangan Lantai t = 5 cm 2 Lantai Keramik 30x30 Warna KW.II Sekualitas " MULIA"
HARGA VOLUME SATUAN ( Rp ) 3 4 24.31 m1 35,670.00 2.31 m1 13,005.00 Jumlah Sub Total - II.E
0.00 m2 46,525.00 0.00 m2 29,785.00 0.00 m1 6,375.00 Jumlah Sub Total - II.F
0.00 m3 128,200.00 81.00 m2 91,075.00 Jumlah Sub Total - II.G
KOMPOSISI BANTUAN SWADAYA ( Rp ) ( Rp ) 5 6 867,116.37 30,033.78 28,847,318.43 -
-
7,377,075.00 7,377,075.00
-
-
JUMLAH HARGA ( Rp ) 7 867,116.37 30,033.78 28,847,318.43
-
7,377,075.00 7,377,075.00
Hal 8 dari 30
No. 1 I.
URAIAN
PEKERJAAN
1 2 3 4 5
2 PEKERJAAN PENGECATAN DAN LABURAN Pengecatan Dinding (2x) sek. "SANLEX WONDER" Pengecatan Plafond (2x) sek. "SANLEX" Pengecatan Kusen, Daun Pintu & Jendela cat sek. "AVIAN" Pengecatan List Profil Kayu cat sek."AVIAN" Pengecatan Listplank Kayu (3x) sek."SEIV"
1 2 3 4 5 6 7 8
PEKERJAAN INSTALASI LISTRIK & ARMATUR Pasang MCB 6A Pasang Instalasi Titik Lampu Pasang Instalasi Titik Saklar & Stop Kontak Pasang Stop Kontak Pasang Saklar Ganda Pasang Saklar Tunggal Pasang Lampu TL 1x20 w Philips + Arm Pasang Lampu Pijar + Fitting Plafond
J.
REKAPITULASI
VOLUME 3
HARGA SATUAN ( Rp ) 4
KOMPOSISI BANTUAN SWADAYA ( Rp ) ( Rp ) 5 6
JUMLAH HARGA ( Rp ) 7
175.15 m2 11,620.00 86.40 m2 9,085.00 22.46 m2 30,255.00 0.96 m2 30,255.00 6.08 m2 30,255.00 Jumlah Sub Total - II.H
2,035,219.76 784,944.00 679,420.20 29,044.80 183,870.24 3,712,499.00
-
2,035,219.76 784,944.00 679,420.20 29,044.80 183,870.24 3,712,499.00
1.00 bh 37,500.00 5.00 ttk 120,525.00 3.00 ttk 114,025.00 1.00 bh 29,835.00 1.00 bh 29,875.00 1.00 bh 26,875.00 4.00 unit 86,335.00 1.00 bh 33,460.00 Jumlah Sub Total - II.I
37,500.00 602,625.00 342,075.00 29,835.00 29,875.00 26,875.00 345,340.00 33,460.00 1,447,585.00
-
37,500.00 602,625.00 342,075.00 29,835.00 29,875.00 26,875.00 345,340.00 33,460.00 1,447,585.00
KOMPOSISI BANTUAN
JUMLAH
II.
PEMBANGUNAN 1 RKB (PERSIAPAN 2 LT)
SWADAYA
A.
PEKERJAAN TANAH & URUGAN
B.
PEKERJAAN PONDASI
19,655,314.98
-
19,655,314.98
C.
PEKERJAAN DINDING dan STRUKTUR BETON
15,271,767.14
-
15,271,767.14
D.
PEKERJAAN STRUKTUR BETON
40,895,480.50
-
40,895,480.50
E.
PEKERJAAN KUSEN PINTU & JENDELA + KACA
7,798,462.62
-
7,798,462.62
-
1,898,719.00
1,898,719.00
Hal 9 dari 30
No.
URAIAN
1
PEKERJAAN 2
VOLUME 3
HARGA SATUAN ( Rp ) 4
KOMPOSISI BANTUAN SWADAYA ( Rp ) ( Rp ) 5 6 28,847,318.43
JUMLAH HARGA ( Rp ) 7
F.
PEKERJAAN ATAP
G.
PEKERJAAN PLAFOND
H.
PEKERJAAN LANTAI
7,377,075.00
-
7,377,075.00
I.
PEKERJAAN PENGECATAN DAN LABURAN
3,712,499.00
-
3,712,499.00
J.
PEKERJAAN INSTALASI LISTRIK & ARMATUR
1,447,585.00
-
1,447,585.00
-
JUMLAH SUB.TOTAL II
III.
PEMBANGUNAN 1 RKB (LANTAI 2)
A.
PEKERJAAN DINDING dan STRUKTUR BETON Pasang Dinding Bata (1Pc : 5Psr) + Reiling Pagar T. 80 cm 100.53 Plesteran + Acian (1Pc : 4Psr) Beton dan Transram 15.08 Plesteran + Acian (1Pc : 5Psr) 185.98 Pek. Kolom Struktur K-1 Uk. 20/25 cm ,Beton K-175 a. Cor Beton Site Mix K.175 1.48 b. Pabrikasi besi tulangan U-24 148.67 c. Bekisting Kolom 6.66 Pek. Kolom Struktur K-3 Uk. 20/20cm (Selasar) ,Beton K-175 a. Cor Beton Site Mix K.175 0.42 b. Pabrikasi besi tulangan U-24 51.17 c. Bekisting Kolom 3.18 Pek. Kolom Praktis KP-1 Uk. 12/12 cm ,Beton K-175 a. Cor Beton Site Mix K.175 0.33 b. Pabrikasi besi tulangan U-24 43.22 c. Bekisting Kolom 1.33 Pek. Ring Balok Uk. 15/20, Beton K-175
1 2 3 4
5
6
7
###
-
1,898,719.00
28,847,318.43 -
126,904,221.66
m2 m2 m2
82,030.00 47,455.00 46,075.00
8,246,443.09 715,594.83 8,569,017.44
-
8,246,443.09 715,594.83 8,569,017.44
m3 kg m2
765,730.00 10,460.00 160,155.00
1,133,280.40 1,555,046.36 1,066,632.30
-
1,133,280.40 1,555,046.36 1,066,632.30
m3 kg m2
765,730.00 10,460.00 160,155.00
324,669.52 535,253.89 509,292.90
-
324,669.52 535,253.89 509,292.90
m3 kg m2
765,730.00 10,460.00 160,155.00
254,988.09 452,039.36 213,326.46
-
254,988.09 452,039.36 213,326.46
Hal 10 dari 30
No. 1
URAIAN
PEKERJAAN
2 a. Cor Beton Site Mix K.175 b. Pabrikasi besi tulangan U-24 c. Bekisting Ringbalk 8 Pek. Konsol beton selasar Uk. 15/20, Beton K-175 a. Cor Beton Site Mix K.175 b. Pabrikasi besi tulangan U-24 c. Bekisting balok 9 Pek. Balok Struktur Selasar Uk. 15/20, Beton K-175 a. Cor Beton Site Mix K.175 b. Pabrikasi besi tulangan U-24 c. Bekisting balok
B. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
PEKERJAAN KUSEN PINTU & JENDELA + KACA Kusen Kayu Bahan 6/15, Kayu Lokal Kls. II Besi Angker Ø 10 mm Panjang 15 cm Neut Beton Pasang Papan Jalusi Kayu 2/14, Kls. II Pasang Daun Pintu Panel Papan, Kayu Lokal Kls. II Pasang Daun Pintu Double Triplek 4 mm Rangka Kayu Pasang Daun Jendela (Tanpa kaca) ,Rangka Kayu Kls. II Pasang Kunci Pintu 2 Slaag set, "ROYAL" Pasang Engsel Pintu (3 Buah/ 1 daun Pintu) Pasang Engsel Jendela Pasang Slot Pintu Tanam atas bawah (Espagnolet) Pasang Pasang Kait angin Jendela Pasang Tarikan Jendela Biasa Pasang Pasang Grendel/Slot Jendela Pas. Kaca Polos T. 3 mm + List Kaca
3 0.96 m3 148.86 kg 4.80 m2
HARGA SATUAN ( Rp ) 4 765,730.00 10,460.00 162,605.00
0.36 m3 55.61 kg 2.47 m2
765,730.00 10,460.00 162,605.00
274,606.62 581,681.80 400,905.43
-
274,606.62 581,681.80 400,905.43
0.27 m3 765,730.00 41.87 kg 10,460.00 1.86 m2 162,605.00 Jumlah Sub Total - III.A
206,747.10 437,939.28 301,835.53 28,852,022.64
-
206,747.10 437,939.28 301,835.53 28,852,022.64
3,706,916.25 63,000.00 5,000.00 1,688,748.60 1,031,435.37 543,858.49 185,050.00 68,325.00 188,350.00 90,640.00 202,050.00 111,350.00 130,600.00 615,687.08
-
3,706,916.25 63,000.00 5,000.00 1,688,748.60 1,031,435.37 543,858.49 185,050.00 68,325.00 188,350.00 90,640.00 202,050.00 111,350.00 130,600.00 615,687.08
VOLUME
0.85 42.00 2.00 10.16 3.40 0.00 1.92 1.00 3.00 10.00 2.00 10.00 10.00 10.00 6.47
m3 bh bh m2 m2 m2 bh bh bh bh bh bh bh bh m2
4,348,850.00 1,500.00 2,500.00 166,150.00 303,185.00 223,455.00 283,555.00 185,050.00 22,775.00 18,835.00 45,320.00 20,205.00 11,135.00 13,060.00 95,175.00
KOMPOSISI BANTUAN SWADAYA ( Rp ) ( Rp ) 5 6 735,100.80 1,557,117.44 780,504.00 -
JUMLAH HARGA ( Rp ) 7 735,100.80 1,557,117.44 780,504.00
Hal 11 dari 30
No. 1
1
2 3 4 5 6
E.
F.
PEKERJAAN 2
C.
D.
URAIAN
PEKERJAAN ATAP Pek. Gable Beton Ampig 15/15 a. Cor Beton Site Mix K.175 b. Pabrikasi besi tulangan U-24 c. Bekisting Pek. Konst. Rangka atap Baja Ringan Penutup atap genteng Press Ex. Jatiwangi Bubungan/Nok Sigitiga Ex. Jatiwangi Listplank Kayu 3/20 Kayu Kls. I Flashing Seng Pinggiran
PEKERJAAN PLAFOND 1 Rangka Plafond 5/7 Kayu Lokal (Alba) 2 Penutup Bidang Plafond (GRC 120x240) cm 3 List Profil Kayu 3 cm
PEKERJAAN LANTAI 1 Urugan Pasir Bawah Pasangan Lantai t = 5 cm 2 Lantai Keramik 30x30 Warna KW.II Sekualitas " MULIA"
PEKERJAAN PENGECATAN DAN LABURAN 1 Pengecatan Dinding (2x) sek. "SANLEX WONDER" 2 Pengecatan Plafond (2x) sek. "SANLEX" 3 Pengecatan Kusen, Daun Pintu & Jendela cat sek. "AVIAN"
HARGA VOLUME SATUAN ( Rp ) 3 4 Jumlah Sub Total - III.B
0.50 m3 83.47 kg 5.37 m2 137.18 m2 137.18 m2 11.00 m1 46.94 m1 0.00 m1 Jumlah Sub Total -
KOMPOSISI BANTUAN SWADAYA ( Rp ) ( Rp ) 5 6 8,631,010.79 -
JUMLAH HARGA ( Rp ) 7 8,631,010.79
765,730.00 10,460.00 162,605.00 137,500.00 54,455.00 58,140.00 35,670.00 13,005.00 III.C
379,773.04 873,048.73 872,614.13 18,862,042.09 7,470,054.56 639,540.00 1,674,404.85 30,771,477.39
-
379,773.04 873,048.73 872,614.13 18,862,042.09 7,470,054.56 639,540.00 1,674,404.85 30,771,477.39
89.90 m2 46,525.00 89.90 m2 29,785.00 79.36 m1 6,375.00 Jumlah Sub Total - III.D
4,182,437.07 2,677,568.79 505,900.00 7,365,905.86
-
4,182,437.07 2,677,568.79 505,900.00 7,365,905.86
0.00 m3 128,200.00 81.00 m2 134,835.00 Jumlah Sub Total - III.E
10,921,635.00 10,921,635.00
-
10,921,635.00 10,921,635.00
2,336,307.90 816,710.17 749,611.80
-
2,336,307.90 816,710.17 749,611.80
201.06 m2 89.90 m2 24.78 m2
11,620.00 9,085.00 30,255.00
Hal 12 dari 30
No. 1
URAIAN
PEKERJAAN
2 4 Pengecatan List Profil Kayu cat sek."AVIAN" 5 Pengecatan Listplank Kayu (3x) sek."SEIV"
G. 1 2 3 4 5 6 7 8
PEKERJAAN INSTALASI LISTRIK & ARMATUR Pasang MCB 6A Pasang Instalasi Titik Lampu Pasang Instalasi Titik Saklar & Stop Kontak Pasang Stop Kontak Pasang Saklar Ganda Pasang Saklar Tunggal Pasang Lampu TL 1x20 w Philips + Arm Pasang Lampu Pijar + Fitting Plafond
HARGA VOLUME SATUAN ( Rp ) 3 4 0.96 m2 30,255.00 11.74 m2 30,255.00 Jumlah Sub Total - III.F
KOMPOSISI BANTUAN SWADAYA ( Rp ) ( Rp ) 5 6 29,044.80 355,054.10 4,286,728.77 -
1.00 bh 37,500.00 5.00 ttk 120,525.00 3.00 ttk 114,025.00 1.00 bh 29,835.00 1.00 bh 29,875.00 1.00 bh 26,875.00 4.00 unit 86,335.00 1.00 bh 33,460.00 Jumlah Sub Total - III.G
37,500.00 602,625.00 342,075.00 29,835.00 29,875.00 26,875.00 345,340.00 33,460.00 1,447,585.00
REKAPITULASI III.
PEMBANGUNAN 1 RKB (LANTAI 2)
A.
PEKERJAAN DINDING dan STRUKTUR BETON
B.
PEKERJAAN KUSEN PINTU & JENDELA + KACA
C.
PEKERJAAN ATAP
D.
PEKERJAAN PLAFOND
E.
PEKERJAAN LANTAI
F. G.
-
KOMPOSISI BANTUAN
JUMLAH HARGA ( Rp ) 7 29,044.80 355,054.10 4,286,728.77
37,500.00 602,625.00 342,075.00 29,835.00 29,875.00 26,875.00 345,340.00 33,460.00 1,447,585.00
JUMLAH
SWADAYA
28,852,022.64
-
28,852,022.64
8,631,010.79
-
8,631,010.79
30,771,477.39
-
30,771,477.39
7,365,905.86
-
7,365,905.86
10,921,635.00
-
10,921,635.00
PEKERJAAN PENGECATAN DAN LABURAN
4,286,728.77
-
4,286,728.77
PEKERJAAN INSTALASI LISTRIK & ARMATUR
1,447,585.00
-
1,447,585.00
92,276,365.45
-
92,276,365.45
JUMLAH SUB.TOTAL III
Hal 13 dari 30
No. 1
URAIAN
PEKERJAAN 2
VOLUME 3
HARGA SATUAN ( Rp ) 4
KOMPOSISI BANTUAN SWADAYA ( Rp ) ( Rp ) 5 6
JUMLAH HARGA ( Rp ) 7
Hal 14 dari 30
No. 1 IV.
URAIAN
PEKERJAAN 2
VOLUME 3
HARGA SATUAN ( Rp ) 4
KOMPOSISI BANTUAN SWADAYA ( Rp ) ( Rp ) 5 6
JUMLAH HARGA ( Rp ) 7
PEKERJAAN INFRASTRUKTUR 1 Saluran Keliling bangunan 2 Lantai Rabat beton selasar dgn Pasangan Plesteran 1;4 T. 3 Pembersihan area kembali
0.00 m1 92,105.00 0.00 m2 37,330.00 1.00 ls 250,000.00 Jumlah Sub Total - IV
-
JUMLAH SUB.TOTAL I s.d IV
###
250,000.00 250,000.00
250,000.00 250,000.00
3,868,319.00
221,150,187.12
Hal 15 dari 30
KAPITULASI
A ANGGARAN BIAYA (RAB) AN 2 RUANG KELAS BARU (RKB)
BOBOT (%) 6 0.78% 57.38% 41.73% 0.11% 100.00%
Hal 16 dari 30
Hal 17 dari 30
NA ANGGARAN BIAYA
NAN 2 RUANG KELAS BARU/RKB
A PERJUANGAN 78
N CIKAJANG - KABUPATEN GARUT BOBOT (%) 8
0.10% 0.11% 0.11% 0.23% 0.23% 0.78%
0.69% 0.12% 0.05% 0.00% 0.86%
0.48% 2.59% Hal 18 dari 30
BOBOT (%) 8 0.93% 1.65% 0.18% 0.66% 1.34% 0.24% 0.17% 0.41% 0.08% 0.04% 0.09% 0.02% 8.89%
3.25% 0.28% 3.38% 6.91%
1.20% 2.57% Hal 19 dari 30
BOBOT (%) 8 0.36% 0.45% 0.85% 0.16% 0.15% 0.29% 0.08% 0.00% 0.00% 0.00%
Hal 20 dari 30
BOBOT (%) 8
0.73% 1.70% 0.37% 0.25% 0.49% 0.17% 0.61% 0.80% 0.10% 0.40% 0.96% 0.29% 0.62% 1.02% 0.13% 0.25% 0.44% 0.29% 0.74% 1.07% 0.96% Hal 21 dari 30
BOBOT (%) 8 18.49%
1.46% 0.02% 0.00% 0.61% 0.47% 0.00% 0.25% 0.08% 0.03% 0.09% 0.04% 0.09% 0.05% 0.06% 0.28% 3.53%
3.25% 4.20% 4.13% 0.22% 0.24% 0.31% 0.29% Hal 22 dari 30
BOBOT (%) 8 0.39% 0.01% 13.04%
0.00% 0.00% 0.00% 0.00%
0.00% 3.34% 3.34%
Hal 23 dari 30
BOBOT (%) 8 0.92% 0.35% 0.31% 0.01% 0.08% 1.68%
0.02% 0.27% 0.15% 0.01% 0.01% 0.01% 0.16% 0.02% 0.65%
BOBOT 0.86% 8.89% 6.91% 18.49% 3.53% Hal 24 dari 30
BOBOT (%) 8 13.04% 0.00% 3.34% 1.68% 0.65% 57.38%
3.73% 0.32% 3.87% 0.51% 0.70% 0.48% 0.15% 0.24% 0.23% 0.12% 0.20% 0.10%
Hal 25 dari 30
BOBOT (%) 8 0.33% 0.70% 0.35% 0.12% 0.26% 0.18% 0.09% 0.20% 0.14% 13.05%
1.68% 0.03% 0.00% 0.76% 0.47% 0.00% 0.25% 0.08% 0.03% 0.09% 0.04% 0.09% 0.05% 0.06% 0.28% Hal 26 dari 30
BOBOT (%) 8 3.90%
0.17% 0.39% 0.39% 8.53% 3.38% 0.29% 0.76% 0.00% 13.91%
1.89% 1.21% 0.23% 3.33%
0.00% 4.94% 4.94%
1.06% 0.37% 0.34% Hal 27 dari 30
BOBOT (%) 8 0.01% 0.16% 1.94%
0.02% 0.27% 0.15% 0.01% 0.01% 0.01% 0.16% 0.02% 0.65%
BOBOT 13.05% 3.90% 13.91% 3.33% 4.94% 1.94% 0.65% 41.73% Hal 28 dari 30
BOBOT (%) 8
Hal 29 dari 30
BOBOT (%) 8
0.00% 0.00% 0.11% 0.11% 100.00%
Hal 30 dari 30