DAFTAR HARGA SATUAN UPAH SATUAN KERJA
:
PEKERJAAN
: JALAN RABAT BETON KECAMATAN PINOGU
LOKASI
: KABUPATEN BONE BOLANGO
THN. ANGGARAN
: 2016
NO.
I
URAIAN
0
SAT
HARGA (Rp)
UPAH
1
Mandor
OH
90,000.00
2
Kepala Tukang
OH
125,000.00
3
Tukang Batu
OH
110,000.00
4
Tukang Besi
OH
110,000.00
5
Tukang Kayu
OH
110,000.00
6
Tukang Las
OH
110,000.00
7
Tukang Listrik
OH
110,000.00
8
Tukang Cat
OH
110,000.00
9
Pekerja
OH
80,000.00
10
Kameraman
OH
110,000.00
11
Pimpinan Teknik
OB
1,250,000.00
B.
ALAT
1
Tangki Air
Hari
50,000.00
2
Pompa Air
Jam
15,000.00
3
Dump Truk
Hari
700,000.00
4
Mesin Las
Jam
125,000.00
Gorontalo,
Juni 2015
Dibuat Oleh : 0 0
0 Direktur
DAFTAR HARGA SATUAN BAHAN SATUAN KERJA
:
PEKERJAAN
: JALAN RABAT BETON KECAMATAN PINOGU
LOKASI
: KABUPATEN BONE BOLANGO
THN. ANGGARAN
NO.
A.
0
2016
URAIAN
SAT
HARGA (Rp)
BAHAN LOKAL
1
Batu Bata (Standart)
Bh
750.00
2
Batu Kali Belah (15/20 cm)
M3
175,000.00
3
Batu Kerikil
M3
175,000.00
4
Batu Karang
M3
90,000.00
5
Ijuk
M2
50,000.00
6
Kayu Kls I (Balok)
M2
5,000,000.00
7
Kayu Kls I (Papan)
M3
5,000,000.00
8
Kayu Kls II (Balok)
M3
2,800,000.00
9
Kayu Kls II (Papan)
M3
2,800,000.00
10
Kayu Kls III (Balok)
M3
2,000,000.00
11
Kayu Kls III (Papan)
M3
2,000,000.00
12
Dolken Kayu / Bambu Dia. 10-15 Cm Pjg 4 M
Btg
17,500.00
13
Pasir Pasang
M3
175,000.00
14
Pasir Urug
M3
100,000.00
15
Pasir Domato
M3
85,000.00
B. I
BAHAN NON LOKAL SEMEN
1
Semen @50 Kg Tonasa
Zak
75,000.00
2
Semen Putih @ 40 Kg
Zak
100,000.00
3
Drymix Floor Hardener @ 25 Kg
Zak
85,000.00
4
Semen Warna
Kg
12,500.00
NO.
II
URAIAN
SAT
HARGA (Rp)
ATAP
1
Genteng Metal
Lbr
37,500.00
2
Bubungan Genteng Metal
Lbr
28,200.00
3
Seng Gelombang BJLS 20
Lbr
39,000.00
4
Atap Onduline (Uk. 90x2,00 M)
Lbr
167,500.00
5
Bubungan Onduline
Lbr
95,000.00
6
Listplank GRC
M1
55,000.00
7
Bubungan Seng
M1
13,500.00
8
Talang Karet
M1
10,000.00
III
BESI
1
Besi Beton
Kg
10,400.00
2
Besi Strip T = 5 mm
Kg
17,500.00
3
Kawat Beton
Kg
25,000.00
4
Pipa Galvanis 2,5 Inch
M1
118,333.33
5
Pipa Galvanis 3/4 Inch
M1
30,000.00
IV
ALUMINIUM
1
Tripleks Lapis Alumunium
Lbr
80,000.00
2
Kuda-kuda Baja Ringan setara taso
M2
176,700.00
3
Rangka Plafond Baja Ringan
M1
11,500.00
4
Silmar Aluminium 5x10
M1
85,000.00
5
Silmar Aluminium 3x10
M1
80,000.00
6
Baut Fisher 8 mm
Bh
400.00
7
Engsel Aluminium
Bh
7,500.00
8
Handel Stainlesteel
Set
370,000.00
9
Handel Pintu
Set
325,000.00
Karet Aluminium
Bh
3,750.00
10
NO.
URAIAN
SAT
HARGA (Rp)
11
Treck moor
Bh
45,000.00
12
Kunci Pintu Aluminium
Bh
220,000.00
13
Handel Pintu
Psg
250,000.00
14
Door Closer
Bh
225,000.00
15
Besi Strip
M1
22,500.00
16
Pintu Aluminium
Bh
425,000.00
17
Lem Sealant
18
Rangka Hollow 4.2
19
Pintu Harmonika
V
Tube
30,000.00
M
15,000.00
M2
750,000.00
CAT
1
Cat Kayu
Kg
52,000.00
2
Cat Meni Kayu
Kg
21,200.00
3
Cat Tembok Dasar
Kg
22,000.00
4
Cat Tembok Penutup
Kg
22,000.00
5
Cat Vernis
Kg
36,700.00
6
Dempul
Kg
37,500.00
7
Kertas Ampelas
Lbr
10,000.00
8
Plamur
Kg
7,340.00
9
Waterprofing
Kg
45,000.00
Membran 3 mm
M2
85,700.00
10 VI
KERAMIK
1
Keramik Lantai 40x40 cm Setara Kw1
Bh
11,387.63
2
Anti Slip Tangga
Bh
40,000.00
3
Keramik 25x25 Cm Anti Slip Setara Kw1
Bh
4,843.75
4
Keramik Dinding 25x40 Cm Setara Kw1
Bh
7,500.00
VII
INSTALASI LISTRIK
1
Kabel Listrik NYM 3 x 1 1/2 mm
M'
10,930.00
2
Lampu SL 18 Watt (Philips)
Bh
45,000.00
3
Lampu SL 11 Watt (Philips)
BH
40,000.00
4
Lampu SL 8 Watt (Philips)
BH
37,500.00
5
Peteng Lampu Down Light
BH
45,000.00
6
Lampu Armateru 2x18 Watt
Bh
475,000.00
7
Saklar Ganda
BH
29,000.00
8
Saklar Tripel
BH
35,000.00
9
Saklar Tunggal
BH
25,000.00
NO.
10
URAIAN
Seal Tape
SAT
BH
HARGA (Rp) 5,000.00
NO.
URAIAN
SAT
HARGA (Rp)
11
Pipa Instalasi 5/8 Inchi
Ujg
7,000.00
12
Peteng Lampu
BH
7,500.00
13
Isolatip
Bh
3,000.00
14
Stop Kontak
BH
25,000.00
15
T. Dos PVC 1/2 inch
Bh
1,500.00
16
Bok PVC 1/2"
Bh
4,900.00
17
MCB
Bh
55,000.00
18
Panel Box
Bh
850,000.00
19
Klem PVC 1/2 inch
Lot
4,900.00
20
Kabel LAN
M1
15,000.00
21
Kabel Sound
M1
32,500.00
22
Stop kontak AC
M1
85,000.00
23
Socket TV
M1
67,500.00
24
PABX PANASONIC Type TA 616
M1
15,000,000.00
25
Socket Telepon
M1
75,000.00
26
Ceilling Speaker 6 W
M1
200,000.00
27
Horn Speaker
M1
350,000.00
28
Attenuator
M1
175,000.00
29
Exhaust Fan
BH
550,000.00
30
Lampu Sorot Hologen 10 watt
Bh
475,000.00
31
Elektroda
Kg
75,000.00
VIII
KACA
1
Kaca Bening 3 mm
M2
95,000.00
2
Kaca Bening 5 mm
M2
120,000.00
3
Kaca Reyband 5 mm (Degree)
M2
130,000.00
4
Kaca Tempered 10 MM
M2
765,000.00
IX
BAHAN KUNCI DAN GANTUNGAN
3
Engsel Pintu 4"
Bh
22,500.00
4
Engsel Jendela 3"
Bh
17,500.00
5
Hak Angin Kuningan
Bh
15,000.00
6
Grendel
Bh
12,500.00
7
Expanyolet
Bh
45,000.00
8
Tarikan Jendela
Bh
12,500.00
9
Kunci Pintu 2 Slaag
Bh
135,000.00
10
Kunci Pintu 3 Slaag
Bh
150,000.00
NO.
X.
URAIAN
SAT
HARGA (Rp)
PAKU, MUR & BAUT
1
Paku
Kg
16,500.00
2
Paku Genteng
Kg
25,000.00
3
Paku Seng
Kg
25,000.00
4
Paku Triplex
Kg
25,000.00
5
Paku Skrup Kuda2 Baja ringan
Bh
650.00
6
Paku skrup Genteng Metal + karet
Bh
500.00
7
Mur Baut
Kg
29,000.00
8
Paku River
Kg
500.00
9
Lem Kayu
Kg
19,000.00
10
Paku Gyfsum
Kg
30,000.00
11
Baut Sekrup Baja
Bh
200.00
XI
PELUMAS
1
Pelumas Bekisting
Ltr
25,000.00
2
Solar
Ltr
11,450.00
3
Minyak Pelumas
Ltr
30,000.00
XII
BAHAN INSTALASI AIR
1
Pipa Galv Æ ¾ inch
M1
40,000.00
2
Pipa PE Æ 1/2 inch
M1
7,000.00
3
Pipa PVC AW Æ 2 inch
M1
9,125.00
4
Pipa PVC AW Æ 4 inch
M1
23,250.00
5
Pintu PVC Pabrikasi
Bh
300,000.00
6
Bak Air Fiber
Bh
450,000.00
7
Kloset Duduk / Monoblok
BH
1,750,000.00
8
Kloset Jongkok
BH
240,000.00
9
Mata Kran
BH
40,000.00
10
Floor Drain Besi
BH
33,000.00
11
Wastafel
Bh
300,000.00
12
Mata Kran
BH
40,000.00
13
Roof Drain
BH
42,500.00
NO.
XIII
URAIAN
HARGA
SAT
(Rp)
BAHAN PALFOND
1
Tripleks 3 MM
Lbr
55,000.00
2
Plywood 9 mm
Lbr
155,000.00
3
Gyfsum Board 9 mm
Lbr
75,700.00
4
GRC 4 mm
Lbr
75,700.00
5
Profil Gyfsum
M1
25,000.00
6
Tepung Gypsum
Kg
18,000.00
7
Profil Sp. 3
M1
2,750.00
8
Profil Sp. 4
M1
3,125.00
9
Multipleks 12 MM
Lbr
225,000.00
10
HPL
Lbr
250,000.00
11
Perekat
Kg
35,000.00
12
ACP (Seven)
M2
225,000.00
XIV
KERTAS
1
Kertas A3
Rim
65,000.00
2
Kertas A4
Rim
40,000.00
3
Tinta Printer
Dos
37,500.00
XV
HURUF & Logo
1
Huruf
Rim
325,000.00
2
Logo
Rim
4,500,000.00
Gorontalo,
Juni 2015
Dibuat Oleh : 0 0
0 Direktur
ANALISA HARGA SATUAN PEKERJAAN
: JALAN RABAT BETON KECAMATAN PINOGU
JENIS PEKERJAAN SATUAN
: Pengecetan Dinding : M2
No.
Uraian
A.
Sat
Volume
Harga
Jumlah
Satuan (Rp.)
Harga (Rp.)
BAHAN 1 2
Plamir Cat Dasar
Kg Kg
0.1000 0.1000
7,340.00 22,000.00
734.00 2,200.00
3
Cat Penutup (Jotun)
Kg
0.2600
22,000.00
5,720.00
Sub Total A B.
8,654.00
UPAH 1 2
Mandor Kepala Tukang
OH OH
0.0030 0.0060
90,000.00 125,000.00
270.00 750.00
3 4
Tukang Cat Pekerja
OH OH
0.0630 0.2000
110,000.00 80,000.00
6,930.00 16,000.00
Sub Total B C.
23,950.00
Jumlah Harga Satuan ( A + B )
PEKERJAAN
: JALAN RABAT BETON KECAMATAN PINOGU
JENIS PEKERJAAN SATUAN
: Pengecetan Plafond : M2
No.
Uraian
A. 2 3
32,604.00
BAHAN Cat Dasar Cat Penutup
Sat
Volume
Harga
Jumlah
Satuan (Rp.)
Harga (Rp.)
Kg
0.1500
22,000.00
3,300.00
Kg
0.1800
22,000.00
3,960.00
Sub Total A B. 1
C.
UPAH Mandor
7,260.00
OH
0.0030
90,000.00
270.00
2 3
Kepala Tukang Tukang Cat
OH OH
0.0060 0.0630
125,000.00 110,000.00
750.00 6,930.00
4
Pekerja
OH
0.2000
80,000.00
16,000.00
Sub Total B Jumlah Harga Satuan ( A + B )
23,950.00 31,210.00
ANALISA HARGA SATUAN PEKERJAAN JENIS PEKERJAAN
: JALAN RABAT BETON KECAMATAN PINOGU : Pengecetan Kayu (Mengkilap)
SATUAN
: M2
No.
Uraian
A. 4
BAHAN Cat Meni
Sat
Volume
Harga Satuan
Jumlah Harga
(Rp.)
(Rp.)
Kg
0.2000
21,200.00
4,240.00
2 3
Plamir Cat Dasar
Kg Kg
0.1500 0.1700
7,340.00 52,000.00
1,101.00 8,840.00
1
Cat Penutup 3x lapis
Kg
0.2600
52,000.00
13,520.00
Sub Total A B.
27,701.00
UPAH 1 2
Mandor Kepala Tukang
OH OH
0.0025 0.0060
90,000.00 125,000.00
225.00 750.00
3 4
Tukang Cat Pekerja
OH OH
0.0090 0.0700
110,000.00 80,000.00
990.00 5,600.00
Sub Total B C.
7,565.00
Jumlah Harga Satuan ( A + B ) PEKERJAAN JENIS PEKERJAAN SATUAN
No.
: JALAN RABAT BETON KECAMATAN PINOGU : Pengecetan Waterproof : M2
Uraian
A. 1 2
35,266.00
BAHAN Waterproof Membran 3 mm
Sat
Kg M2
Volume
2.9000 1.1000
Harga Satuan (Rp.)
45,000.00 85,700.00
Sub Total A B. 1 2 3 4
UPAH Mandor Kepala Tukang Tukang Cat Pekerja Sub Total B
C.
Jumlah Harga Satuan ( A + B )
Jumlah Harga (Rp.)
130,500.00 94,270.00
224,770.00
OH OH OH OH
0.0150 0.0100 0.1000 0.3000
90,000.00 125,000.00 110,000.00 80,000.00
1,350.00 1,250.00 11,000.00 24,000.00 37,600.00 262,370.00
ANALISA HARGA SATUAN PEKERJAAN
: JALAN RABAT BETON KECAMATAN PINOGU
JENIS PEKERJAAN SATUAN
: MCB 3 Phase : Bh
No.
Uraian
A. 1 2
BAHAN MCB 3 Phase Panel Box
Sat
Volume
Harga
Jumlah
Satuan
Harga
(Rp.)
(Rp.)
Bh
1.0000
55,000.00
55,000.00
Bh
1.0000
850,000.00
850,000.00
Sub Total A B. 1 2 3 4
UPAH Mandor
905,000.00
OH
Kepala Tukang Tukang Listrik Pekerja
OH OH OH
0.0375 0.3750 0.2500
90,000.00 125,000.00 110,000.00 80,000.00
Sub Total B C.
65,937.50
Jumlah Harga Satuan ( A + B ) PEKERJAAN JENIS PEKERJAAN SATUAN
No.
970,937.50
: JALAN RABAT BETON KECAMATAN PINOGU : Instalasi Titik Lampu : TTk
Uraian
A.
Sat
Volume
Harga Satuan (Rp.)
Jumlah Harga (Rp.)
BAHAN 1 2 3 4 5 6
Kabel NYM 3x1 1/2 Mm Pipa PVC 5/8" Klem PVC 1/2" T. Dos PVC 1/2" Bok PVC 1/2" Isolatip
M1 M1 Lot Bh Bh Bh
3.0000 1.3000 0.4500 3.0000 3.0000 1.0000
10,930.00 7,000.00 4,900.00 1,500.00 4,900.00 3,000.00
Sub Total A B. 1 2 3 4
UPAH Mandor Kepala Tukang Tukang Listrik Pekerja Sub Total B
C.
4,687.50 41,250.00 20,000.00
Jumlah Harga Satuan ( A + B )
32,790.00 9,100.00 2,205.00 4,500.00 14,700.00 3,000.00 66,295.00
OH OH OH OH
0.0100 0.5350 0.0500
90,000.00 125,000.00 110,000.00 80,000.00
1,250.00 58,850.00 4,000.00 64,100.00 130,395.00
ANALISA HARGA SATUAN PEKERJAAN
: JALAN RABAT BETON KECAMATAN PINOGU
JENIS PEKERJAAN SATUAN
: Saklar Ganda : Bh
No.
Uraian
A. 1
BAHAN Saklar Ganda
Sat
Bh
Volume
1.0000
Harga
Jumlah
Satuan
Harga
(Rp.)
(Rp.)
29,000.00
29,000.00
Sub Total A B.
29,000.00
UPAH 1 2
Mandor Kepala Tukang
OH OH
3 4
Tukang Listrik Pekerja
OH OH
0.0100 0.1000 0.0500
90,000.00 125,000.00
1,250.00
110,000.00 80,000.00
11,000.00 4,000.00
Sub Total B C.
16,250.00
Jumlah Harga Satuan ( A + B ) PEKERJAAN JENIS PEKERJAAN SATUAN
No.
: JALAN RABAT BETON KECAMATAN PINOGU : Saklar Tunggal : Bh
Uraian
A. 1
45,250.00
BAHAN Saklar Tunggal
Sat
Bh
Volume
1.0000
Harga Satuan (Rp.)
25,000.00
Sub Total A B. 1 2 3 4
UPAH Mandor Kepala Tukang Tukang Listrik Pekerja Sub Total B
C.
Jumlah Harga Satuan ( A + B )
Jumlah Harga (Rp.)
25,000.00 25,000.00
OH OH OH OH
0.0100 0.1000 0.0500
90,000.00 125,000.00 110,000.00 80,000.00
1,250.00 11,000.00 4,000.00 16,250.00 41,250.00
ANALISA HARGA SATUAN PEKERJAAN
: JALAN RABAT BETON KECAMATAN PINOGU
JENIS PEKERJAAN
: Stop Kontak
SATUAN
: Bh
No.
Uraian
A.
Sat
Volume
Harga Satuan
Jumlah Harga
(Rp.)
(Rp.)
25,000.00
25,000.00
BAHAN 1
Stop Kontak
Bh
1.0000
Sub Total A B. 1
UPAH Mandor
25,000.00
OH
2 3
Kepala Tukang Tukang Listrik
OH OH
4
Pekerja
OH
0.0100 0.1000 0.0500
90,000.00 125,000.00 110,000.00
1,250.00 11,000.00
80,000.00
4,000.00
Sub Total B C.
16,250.00
Jumlah Harga Satuan ( A + B ) PEKERJAAN JENIS PEKERJAAN SATUAN
No.
41,250.00
: JALAN RABAT BETON KECAMATAN PINOGU : Pas. Lampu Armateure RMI 2 x 18 W : Bh
Uraian
A.
Sat
Volume
Harga
Jumlah
Satuan (Rp.)
Harga (Rp.)
BAHAN 1
Armateure 2x18 W
Bh
1.0000
475,000.00
Sub Total A B. 1 2 3 4
UPAH Mandor Kepala Tukang Tukang Listrik Pekerja Sub Total B
C.
-
Jumlah Harga Satuan ( A + B )
475,000.00
475,000.00
OH OH OH OH
0.0100 0.1000 0.0500
90,000.00 125,000.00 110,000.00 80,000.00
1,250.00 11,000.00 4,000.00 16,250.00 491,250.00
ANALISA HARGA SATUAN PEKERJAAN JENIS PEKERJAAN SATUAN
No.
A. 1 2
: JALAN RABAT BETON KECAMATAN PINOGU : Pas. Lampu SL 8 Watt : Bh
Uraian
Sat
BAHAN Lampu SL 8 Watt Peteng Lampu
Bh Bh
Volume
1.0000 1.0000
Harga Satuan (Rp.)
37,500.00 -
Sub Total A B. 1 2 3 4
UPAH Mandor Kepala Tukang Tukang Listrik Pekerja Sub Total B
C.
Jumlah Harga Satuan ( A + B )
Jumlah Harga (Rp.)
37,500.00 37,500.00
OH OH OH OH
0.0100 0.1000 0.0500
90,000.00 125,000.00 110,000.00 80,000.00
1,250.00 11,000.00 4,000.00 16,250.00 53,750.00
ANALISA HARGA SATUAN PEKERJAAN
: JALAN RABAT BETON KECAMATAN PINOGU
JENIS PEKERJAAN SATUAN
: Pasang Pipa PVC AW Æ 4 inci : M1
No.
Uraian
A. 1 2
BAHAN Pipa PVC AW Æ 4 inci Perlengkapan (35% harga pipa)
Sat
Volume
Harga Satuan
Jumlah Harga
(Rp.)
(Rp.)
M'
1.2000
23,250.00
27,900.00
Ls
1.0000
8,137.50
8,137.50
Sub Total A B.
36,037.50
UPAH 1 2
Mandor Kepala Tukang
OH OH
0.0041 0.0135
90,000.00 125,000.00
369.00 1,687.50
3 4
Tukang Batu Pekerja
OH OH
0.1350 0.0810
110,000.00 80,000.00
14,850.00 6,480.00
Sub Total B C.
23,386.50
Jumlah Harga Satuan ( A + B ) PEKERJAAN JENIS PEKERJAAN
: JALAN RABAT BETON KECAMATAN PINOGU : Pasang Pipa PVC AW Æ 2 inci
SATUAN
: M1
No.
Uraian
A. 1 2
59,424.00
BAHAN Pipa PVC AW Æ 2 inci Perlengkapan (35% harga pipa)
Sat
Volume
Harga Satuan
Jumlah Harga
(Rp.)
(Rp.)
M'
1.2000
9,125.00
10,950.00
Ls
1.0000
3,193.75
3,193.75
Sub Total A B.
UPAH 1 2
Mandor Kepala Tukang
OH OH
0.0027 0.0090
90,000.00 125,000.00
243.00 1,125.00
3 4
Tukang Batu Pekerja
OH OH
0.0900 0.0540
110,000.00 80,000.00
9,900.00 4,320.00
Sub Total B C.
14,143.75
Jumlah Harga Satuan ( A + B )
15,588.00 29,731.75
ANALISA HARGA SATUAN PEKERJAAN JENIS PEKERJAAN
: JALAN RABAT BETON KECAMATAN PINOGU : Pasang Pipa PE Æ 1/2 inci
SATUAN
: M1
No.
Uraian
A.
Sat
Volume
Harga
Jumlah
Satuan (Rp.)
Harga (Rp.)
BAHAN 1 2
Pipa PE Æ 1/2 inci Perlengkapan (35% harga pipa)
M' Ls
1.2000 1.0000
7,000.00 2,450.00
Sub Total A B. 1
UPAH Mandor
10,850.00
OH
0.0018
90,000.00
162.00
2 3
Kepala Tukang Tukang Batu
OH OH
0.0060 0.0600
125,000.00 110,000.00
750.00 6,600.00
4
Pekerja
OH
0.0360
80,000.00
2,880.00
Sub Total B C.
10,392.00
Jumlah Harga Satuan ( A + B ) PEKERJAAN JENIS PEKERJAAN SATUAN
No.
21,242.00
: JALAN RABAT BETON KECAMATAN PINOGU : Pasang Pipa Galv Æ 3/4 inci : M1
Uraian
A.
Sat
Volume
Harga
Jumlah
Satuan (Rp.)
Harga (Rp.)
BAHAN 1 2
Pipa Galv Æ 3/4 inci Perlengkapan (35% harga pipa)
M' Ls
1.2000 1.0000
40,000.00 14,000.00
Sub Total A B. 1
UPAH Mandor
48,000.00 14,000.00 62,000.00
OH
0.0270
90,000.00
2,430.00
2 3
Kepala Tukang Tukang Batu
OH OH
0.0090 0.0900
125,000.00 110,000.00
1,125.00 9,900.00
4
Pekerja
OH
0.0540
80,000.00
4,320.00
Sub Total B C.
8,400.00 2,450.00
Jumlah Harga Satuan ( A + B )
17,775.00 79,775.00
ANALISA HARGA SATUAN PEKERJAAN
: JALAN RABAT BETON KECAMATAN PINOGU
JENIS PEKERJAAN SATUAN
: Pasang Mata Kran Æ 1/2 inci : Bh
No.
A. 1 2
Jumlah
Satuan (Rp.)
Harga (Rp.)
Uraian
Sat
BAHAN Mata Kran Æ 4 inci
Bh
1.0000
40,000.00
40,000.00
Bh
0.0250
5,000.00
125.00
Seal Tape
Volume
Harga
Sub Total A B. 1
UPAH Mandor
40,125.00
OH
0.0050
90,000.00
450.00
2 3
Kepala Tukang Tukang Batu
OH OH
0.0100 0.1000
125,000.00 110,000.00
1,250.00 11,000.00
4
Pekerja
OH
0.0100
80,000.00
800.00
Sub Total B C.
13,500.00
Jumlah Harga Satuan ( A + B ) PEKERJAAN
: JALAN RABAT BETON KECAMATAN PINOGU
JENIS PEKERJAAN SATUAN
: Pasang Floor Drain : Bh
No.
Uraian
A. 1
53,625.00
BAHAN Floor Drain
Sat
Bh
Volume
1.0000
Harga
Jumlah
Satuan (Rp.)
Harga (Rp.)
33,000.00
Sub Total A B.
33,000.00
UPAH 1 2
Mandor Kepala Tukang
OH OH
0.0050 0.0100
90,000.00 125,000.00
450.00 1,250.00
3 4
Tukang Batu Pekerja
OH OH
0.1000 0.0100
110,000.00 80,000.00
11,000.00 800.00
Sub Total B C.
33,000.00
Jumlah Harga Satuan ( A + B )
13,500.00 46,500.00
ANALISA HARGA SATUAN PEKERJAAN JENIS PEKERJAAN
: JALAN RABAT BETON KECAMATAN PINOGU : Pasang Kloset Duduk
SATUAN
: Bh
No.
Uraian
A.
Sat
Volume
Harga
Jumlah
Satuan (Rp.)
Harga (Rp.)
BAHAN 1 2
Kloset Duduk / Monoblok Perlengkapan (6 % Harga)
Bh Ls
1.0000 1.0000
1,750,000.00 105,000.00
Sub Total A B. 1
UPAH Mandor
1,855,000.00
OH
0.1600
90,000.00
14,400.00
2 3
Kepala Tukang Tukang Batu
OH OH
0.1500 1.5000
125,000.00 110,000.00
18,750.00 165,000.00
4
Pekerja
OH
1.0000
80,000.00
80,000.00
Sub Total B C.
278,150.00
Jumlah Harga Satuan ( A + B ) PEKERJAAN JENIS PEKERJAAN SATUAN
No.
2,133,150.00
: JALAN RABAT BETON KECAMATAN PINOGU : Pasang Kloset Jongkok : Bh
Uraian
A.
Sat
Volume
Harga
Jumlah
Satuan (Rp.)
Harga (Rp.)
BAHAN 1 2
Kloset Jongkok Semen @50 Kg
Bh Zak
1.0000 0.1200
240,000.00 75,000.00
240,000.00 9,000.00
3
Pasir Pasang
M3
0.0100
175,000.00
1,750.00
Sub Total A B.
250,750.00
UPAH 1 2
Mandor Kepala Tukang
OH OH
0.1600 0.1500
90,000.00 125,000.00
14,400.00 18,750.00
3 4
Tukang Batu Pekerja
OH OH
1.5000 1.0000
110,000.00 80,000.00
165,000.00 80,000.00
Sub Total B C.
1,750,000.00 105,000.00
Jumlah Harga Satuan ( A + B )
278,150.00 528,900.00
ANALISA HARGA SATUAN PEKERJAAN JENIS PEKERJAAN
: JALAN RABAT BETON KECAMATAN PINOGU : Pasang Wastafel
SATUAN
: Bh
No.
Harga
Jumlah Harga (Rp.)
Sat
1 2
Wastafel Perlengkapan (12 % Harga)
Bh Ls
1.0000 1.0000
300,000.00 36,000.00
300,000.00 36,000.00
3 4
Semen @50 Kg Pasir Pasang
Zak M3
0.1200 0.0100
75,000.00 175,000.00
9,000.00 1,750.00
A.
Volume
Satuan (Rp.)
Uraian
BAHAN
Sub Total A B. 1
UPAH Mandor
346,750.00
OH
0.1600
90,000.00
14,400.00
2 3
Kepala Tukang Tukang Batu
OH OH
0.1500 1.5000
125,000.00 110,000.00
18,750.00 165,000.00
4
Pekerja
OH
1.0000
80,000.00
80,000.00
Sub Total B C.
Jumlah Harga Satuan ( A + B ) : JALAN RABAT BETON KECAMATAN PINOGU
JENIS PEKERJAAN SATUAN
: Septicktank Lengkap : Unit
Uraian
A.
624,900.00
PEKERJAAN
No.
Sat
Volume
Harga
Jumlah
Satuan (Rp.)
Harga (Rp.)
BAHAN 1 2 3 4 5 6 7 8 9
B
278,150.00
Galian Tanah
M3
8.5000
Urugan Pasir Pas. Batu Bata Sp 1:3 Plesteran Sp 1:3
M3 M3 M2
0.6500 12.3000 23.0000
Cor Beton Tumbuk Sp. 1:3:5 Batu Gunung
M3 M3
0.4200 0.8000
Ijuk Pipa PVC Dia. 4"
M2 M1
5.5000 6.0000
Pipa Galv. Dia. 2"
M1
2.1500
Jumlah Harga Satuan
62,250.00 144,900.00
529,125.00 94,185.00
118,655.00 59,414.00 740,075.00
1,459,456.50 1,366,522.00 310,831.50
727,825.00 50,000.00
582,260.00 275,000.00
59,424.00 29,731.75
356,544.00 63,923.26 5,037,847.26
ANALISA HARGA SATUAN PEKERJAAN JENIS PEKERJAAN SATUAN
No.
: JALAN RABAT BETON KECAMATAN PINOGU : Pasang Pipa PVC AW Æ 2,5 inci : M1
Uraian
A. 1 2
BAHAN Pipa PVC AW Æ 2 inci Perlengkapan (35% harga pipa)
Sat
M' Ls
Volume
Harga Satuan (Rp.)
1.2000 1.0000
9,125.00 3,193.75
Sub Total A B. 1 2 3 4
UPAH Mandor Kepala Tukang Tukang Batu Pekerja
OH OH OH OH
0.0027 0.0090 0.0900 0.0540
90,000.00 125,000.00 110,000.00 80,000.00
No.
1
29,731.75
: JALAN RABAT BETON KECAMATAN PINOGU : Pasang roof Drain : bh
Uraian
A.
BAHAN Roof Drain
Sat
M'
Volume
1.0000
Harga Satuan (Rp.)
42,500.00
Sub Total A B. 1 2 3 4
UPAH Mandor Kepala Tukang Tukang Batu Pekerja Sub Total B
C.
243.00 1,125.00 9,900.00 4,320.00 15,588.00
Jumlah Harga Satuan ( A + B ) PEKERJAAN JENIS PEKERJAAN SATUAN
10,950.00 3,193.75 14,143.75
Sub Total B C.
Jumlah Harga (Rp.)
Jumlah Harga Satuan ( A + B )
Jumlah Harga (Rp.)
42,500.00
42,500.00
OH OH OH OH
0.0027 0.0090 0.0900 0.0540
90,000.00 125,000.00 110,000.00 80,000.00
243.00 1,125.00 9,900.00 4,320.00 15,588.00 58,088.00
ANALISA HARGA SATUAN PEKERJAAN
: JALAN RABAT BETON KECAMATAN PINOGU
JENIS PEKERJAAN SATUAN
: Beton tumbuk 1:3:5 : M3
No.
Uraian
A.
Sat
Volume
Harga Satuan
Jumlah Harga
(Rp.)
(Rp.)
1
BAHAN Semen @50 Kg
Zak
4.3600
75,000.00
327,000.00
2 3
Pasir Pasang Batu Kerikil
M3 M3
0.5200 0.8700
175,000.00 175,000.00
91,000.00 152,250.00
Sub Total A B. 1
UPAH Mandor
570,250.00
OH
0.0800
90,000.00
7,200.00
2 3
Kepala Tukang Tukang Batu
OH OH
0.0250 0.2500
125,000.00 110,000.00
3,125.00 27,500.00
4
Pekerja
OH
1.6500
80,000.00
132,000.00
Sub Total B C.
169,825.00
Jumlah Harga Satuan ( A + B ) PEKERJAAN JENIS PEKERJAAN SATUAN
No.
: JALAN RABAT BETON KECAMATAN PINOGU : Lantai Keramik Anti Slip 25 x 25 : M2
Uraian
A. 1 2 3 4
740,075.00
BAHAN Keramik 25 x 25 cm (Anti slip) Semen @50 Kg Pasir Pasang Semen Warna (grout)
Sat
Volume
Bh Zak M3 Zak
16.0000 0.2080 0.0450 0.0405
Harga Satuan (Rp.)
4,843.75 75,000.00 175,000.00 100,000.00
Sub Total A B. 1 2 3 4
UPAH Mandor Kepala Tukang Tukang Batu Pekerja
C.
Jumlah Harga Satuan ( A + B )
77,500.00 15,600.00 7,875.00 4,050.00 105,025.00
OH OH OH OH Sub Total B
Jumlah Harga (Rp.)
0.0140 0.0140 0.1350 0.2700
90,000.00 125,000.00 110,000.00 80,000.00
1,260.00 1,750.00 14,850.00 21,600.00 39,460.00 144,485.00
ANALISA HARGA SATUAN PEKERJAAN JENIS PEKERJAAN SATUAN
No.
: JALAN RABAT BETON KECAMATAN PINOGU : Dinding Keramik 25 x 40 Cm : M2
Uraian
A. 1 2 3 4
BAHAN Keramik 25x40 cm Semen @50 Kg Pasir Pasang Semen Warna (grout)
Sat
Volume
Bh Zak M3 Zak
10.0000 0.2080 0.0450 0.0405
Harga Satuan (Rp.)
7,500.00 75,000.00 175,000.00 100,000.00
Sub Total A B. 1 2 3 4
UPAH Mandor Kepala Tukang Tukang Batu Pekerja
OH OH OH OH
0.0140 0.0140 0.1350 0.2700
90,000.00 125,000.00 110,000.00 80,000.00
No.
1 2 3 4
141,985.00
: JALAN RABAT BETON KECAMATAN PINOGU : Lantai Keramik 40 x 40 Setara Kw1 : M2
Uraian
A.
BAHAN Keramik 40x40 Cm Setara Kw1 Semen @50 Kg Pasir Pasang Semen Warna (grout)
Sat
BH Zak M3 Zak
Volume
6.6300 0.1960 0.0450 0.0325
Harga Satuan (Rp.)
11,387.63 75,000.00 175,000.00 100,000.00
Sub Total A B. 1 2 3 4
UPAH Mandor Kepala Tukang Tukang Batu Pekerja
Jumlah Harga Satuan ( A + B )
Jumlah Harga (Rp.)
75,500.00 14,700.00 7,875.00 3,250.00 101,325.00
OH OH OH OH Sub Total B
C.
1,260.00 1,750.00 14,850.00 21,600.00 39,460.00
Jumlah Harga Satuan ( A + B ) PEKERJAAN JENIS PEKERJAAN SATUAN
75,000.00 15,600.00 7,875.00 4,050.00 102,525.00
Sub Total B C.
Jumlah Harga (Rp.)
0.0130 0.0130 0.1250 0.2500
90,000.00 125,000.00 110,000.00 80,000.00
1,170.00 1,625.00 13,750.00 20,000.00 36,545.00 137,870.00
ANALISA HARGA SATUAN PEKERJAAN JENIS PEKERJAAN SATUAN
No.
: JALAN RABAT BETON KECAMATAN PINOGU : Plint Lantai Keramik 10 x 40 Setara Kw1 : M1
Uraian
A. 1 2 3
BAHAN Keramik 10x40 Cm Setara Kw1 Semen @50 Kg Pasir Pasang
Sat
Bh Zak M3
Volume
2.6500 0.0228 0.0030 0.0025
Harga Satuan (Rp.)
11,387.63 75,000.00 175,000.00
Sub Total A B. 1 2 3 4
UPAH Mandor Kepala Tukang Tukang Batu Pekerja
Jumlah Harga Satuan ( A + B )
30,177.22 1,710.00 525.00 32,412.22
OH OH OH OH Sub Total B
C.
Jumlah Harga (Rp.)
0.0045 0.0090 0.0900 0.0900
90,000.00 125,000.00 110,000.00 80,000.00
405.00 1,125.00 9,900.00 7,200.00 18,630.00 51,042.22
ANALISA HARGA SATUAN PEKERJAAN JENIS PEKERJAAN SATUAN
No.
: PEMBANGUNAN GEDUNG RKB (1 RKB) : Rangka Plafond Kayu Kls.II : M2
Uraian
A. 1 2
BAHAN Kayu Kls II Paku
Sat
M3 Kg
Volume
0.0120 0.1000
Harga Satuan (Rp.)
2,800,000.00 20,500.00
Sub Total A B. 1 2 3 4
UPAH Mandor Kepala Tukang Tukang Kayu Pekerja
OH OH OH OH
0.0750 0.0250 0.2500 0.1500
90,000.00 125,000.00 110,000.00 80,000.00
No.
1 2
85,025.00
: PEMBANGUNAN GEDUNG RKB (1 RKB) : Plafond Tripleks 3 mm : M2
Uraian
A.
BAHAN Tripleks 3 mm Paku Tripleks
Sat
Lbr Kg
Volume
0.3750 0.0300
Harga Satuan (Rp.)
47,000.00 25,000.00
Sub Total A B. 1 2 3 4
UPAH Mandor Kepala Tukang Tukang Kayu Pekerja
OH OH OH OH
0.0050 0.0100 0.1000 0.1000
90,000.00 125,000.00 110,000.00 80,000.00
No.
1
BAHAN Kayu Profil SP4
450.00 1,250.00 11,000.00 8,000.00
39,075.00
: PEMBANGUNAN GEDUNG RKB (1 RKB) : List Plafon Profil SP4 : M1
Uraian
A.
17,625.00 750.00
20,700.00
Jumlah Harga Satuan ( A + B )
PEKERJAAN JENIS PEKERJAAN SATUAN
Jumlah Harga (Rp.)
18,375.00
Sub Total B C.
6,750.00 3,125.00 27,500.00 12,000.00 49,375.00
Jumlah Harga Satuan ( A + B )
PEKERJAAN JENIS PEKERJAAN SATUAN
33,600.00 2,050.00 35,650.00
Sub Total B C.
Jumlah Harga (Rp.)
Sat
M'
Volume
1.0500
Harga Satuan (Rp.)
2,750.00
Jumlah Harga (Rp.)
2,887.50
2
Paku
Kg
0.0100
20,500.00
Sub Total A B. 1 2 3 4
C.
UPAH Mandor Kepala Tukang Tukang Kayu Pekerja Sub Total B Jumlah Harga Satuan ( A + B )
205.00 3,092.50
OH OH OH OH
0.0030 0.0050 0.0500 0.0500
90,000.00 125,000.00 110,000.00 80,000.00
270.00 625.00 5,500.00 4,000.00 10,395.00 13,487.50
ANALISA HARGA SATUAN PEKERJAAN JENIS PEKERJAAN SATUAN
No.
: JALAN RABAT BETON KECAMATAN PINOGU : Plafond Gyfsum Board 9 mm : M2
Uraian
A. 1 2
BAHAN Gyfsum Board 9 mm Paku Sekrup Gyfsum
Sat
Lbr Kg
Volume
Harga Satuan (Rp.)
0.3640 0.1100
75,700.00 30,000.00
Sub Total A B. 1 2 3 4
UPAH Mandor Kepala Tukang Tukang Kayu Pekerja
OH OH OH OH
0.0050 0.0050 0.0500 0.1000
90,000.00 125,000.00 110,000.00 80,000.00
No.
1 2
45,429.80
: JALAN RABAT BETON KECAMATAN PINOGU : List Plafon Gyfsum 14 Cm : M1
Uraian
A.
BAHAN profil Gyfsum 14 Cm Tepung Gypsum
Sat
M' Kg
Volume
1.0500 0.1500
Harga Satuan (Rp.)
25,000.00 18,000.00
Sub Total A B. 1 2 3 4
UPAH Mandor Kepala Tukang Tukang Kayu Pekerja Sub Total B
C.
450.00 625.00 5,500.00 8,000.00 14,575.00
Jumlah Harga Satuan ( A + B )
PEKERJAAN JENIS PEKERJAAN SATUAN
27,554.80 3,300.00 30,854.80
Sub Total B C.
Jumlah Harga (Rp.)
Jumlah Harga Satuan ( A + B )
Jumlah Harga (Rp.)
26,250.00 2,700.00 28,950.00
OH OH OH OH
0.0030 0.0060 0.0600 0.0600
90,000.00 125,000.00 110,000.00 80,000.00
270.00 750.00 6,600.00 4,800.00 12,420.00 41,370.00
ANALISA HARGA SATUAN PEKERJAAN JENIS PEKERJAAN SATUAN
No.
: JALAN RABAT BETON KECAMATAN PINOGU : Pek. Rangka Plafond Hollow Aluminium : M2
Uraian
A. 1 2 3
B. 1 2 3 4
BAHAN Hollow Aluminium Mur Baut Alat Bantu Sub Total A UPAH Mandor Kepala Tukang Tukang Kayu Pekerja
Sat
Volume
Harga Satuan (Rp.)
M1 Kg Ls
3.6000 0.2000 1.0000
11,500.00 29,000.00 5,000.00
41,400.00 5,800.00 5,000.00 52,200.00
OH OH OH OH
0.0750 0.0250 0.2500 0.1500
60,000.00 75,000.00 70,000.00 50,000.00
4,500.00 1,875.00 17,500.00 7,500.00
Sub Total B Jumlah Harga Satuan ( A + B )
C.
PEKERJAAN JENIS PEKERJAAN SATUAN
No.
1 2 3 4 5
31,375.00 83,575.00
: JALAN RABAT BETON KECAMATAN PINOGU : Partisi Gyfsum Board 9 mm : M2
Uraian
A.
BAHAN Rangka Hollow Mur Baut Alat Bantu Gyfsum Board 9 mm Paku Sekrup Gyfsum
Sat
M1 Kg Ls Lbr Kg
Volume
3.6000 0.2000 1.0000 0.7280 0.2200
Harga Satuan (Rp.)
11,500.00 29,000.00 5,000.00 75,700.00 30,000.00
Sub Total A B. 1 2 3 4
UPAH Mandor Kepala Tukang Tukang Kayu Pekerja Sub Total B
C.
Jumlah Harga (Rp.)
Jumlah Harga Satuan ( A + B )
Jumlah Harga (Rp.)
41,400.00 5,800.00 5,000.00 55,109.60 6,600.00 113,909.60
OH OH OH OH
0.0050 0.0050 0.0500 0.1000
90,000.00 125,000.00 110,000.00 80,000.00
450.00 625.00 5,500.00 8,000.00 14,575.00 128,484.60
ANALISA HARGA SATUAN PEKERJAAN JENIS PEKERJAAN SATUAN No.
: JALAN RABAT BETON KECAMATAN PINOGU : Pek. Kuda - Kuda Baja Ringan dan Atap Metal : M2 Uraian
A. 1 2 3
BAHAN Rangka Atap Baja Ringan Atap Genteng Metal Paku skrup Genteng Metal + karet
Sat
M2 Lbr Bh
Volume
1.000 1.560 14.000
Harga Satuan (Rp.)
176,700.00 37,500.00 500.00
Sub Total A B. 1 2 3 4
UPAH Mandor Kepala Tukang Tukang Pekerja
OH OH OH OH
0.022 0.022 0.222 0.444
90,000.00 125,000.00 110,000.00 80,000.00
No.
1 2
306,977.78
: JALAN RABAT BETON KECAMATAN PINOGU : Jurai Dalam : M1
Uraian
A.
BAHAN Talang Karet Paku
Sat
M Bh
Volume
1.1000 6.0000
Harga Satuan (Rp.)
10,000.00 500.00
Sub Total A B. 1 2 3 4
UPAH Mandor Kepala Tukang Tukang Kayu Pekerja Sub Total B
C.
2,000.00 2,777.78 24,444.44 35,555.56 64,777.78
Jumlah Harga Satuan ( A + B ) PEKERJAAN JENIS PEKERJAAN SATUAN
176,700.00 58,500.00 7,000.00 242,200.00
Sub Total B C.
Jumlah Harga (Rp.)
Jumlah Harga Satuan ( A + B )
Jumlah Harga (Rp.)
11,000.00 3,000.00 14,000.00
OH OH OH OH
0.0130 0.0120 0.1500 0.2500
90,000.00 125,000.00 110,000.00 80,000.00
1,170.00 1,500.00 16,500.00 20,000.00 39,170.00 53,170.00
ANALISA HARGA SATUAN PEKERJAAN JENIS PEKERJAAN SATUAN
No.
: JALAN RABAT BETON KECAMATAN PINOGU : Bubungan Genteng Metal : M1
Uraian
A. 1 2
BAHAN Bubungan Genteng Metal Paku skrup Genteng Metal + karet
Sat
bh bh
Volume
1.1000 6.0000
Harga Satuan (Rp.)
28,200.00 500.00
Sub Total A B. 1 2 3 4
UPAH Mandor Kepala Tukang Tukang Kayu Pekerja
OH OH OH OH
0.0130 0.0120 0.1500 0.2500
90,000.00 125,000.00 110,000.00 80,000.00
No.
1 2
73,190.00
: JALAN RABAT BETON KECAMATAN PINOGU : Listplank GRC : M1
Uraian
A.
BAHAN GRC Paku Sekrup
Sat
M1 Bh
Volume
1.1000 6.0000
Harga Satuan (Rp.)
55,000.00 500.00
Sub Total A B. 1 2 3 4
UPAH Mandor Kepala Tukang Tukang Kayu Pekerja Sub Total B
C.
1,170.00 1,500.00 16,500.00 20,000.00 39,170.00
Jumlah Harga Satuan ( A + B ) PEKERJAAN JENIS PEKERJAAN SATUAN
31,020.00 3,000.00 34,020.00
Sub Total B C.
Jumlah Harga (Rp.)
Jumlah Harga Satuan ( A + B )
Jumlah Harga (Rp.)
60,500.00 3,000.00 63,500.00
OH OH OH OH
0.0010 0.0100 0.1000 0.0100
90,000.00 125,000.00 110,000.00 80,000.00
90.00 1,250.00 11,000.00 800.00 13,140.00 76,640.00
ANALISA HARGA SATUAN PEKERJAAN JENIS PEKERJAAN SATUAN
No.
: JALAN RABAT BETON KECAMATAN PINOGU : Ventilasi Atap Grc : M2
Uraian
A. 1 2 3 4
BAHAN Rangka Hollow Paku Sekrup GRC Board 4 mm Paku Sekrup Gyfsum
Sat
M1 Kg Lbr Kg
Volume
1.1000 6.0000 0.3640 0.1100
Harga Satuan (Rp.)
11,500.00 500.00 75,700.00 30,000.00
Sub Total A B. 1 2 3 4
UPAH Mandor Kepala Tukang Tukang Kayu Pekerja Sub Total B
C.
Jumlah Harga Satuan ( A + B )
Jumlah Harga (Rp.)
12,650.00 3,000.00 27,554.80 3,300.00 46,504.80
OH OH OH OH
0.0050 0.0050 0.0500 0.1000
90,000.00 125,000.00 110,000.00 80,000.00
450.00 625.00 5,500.00 8,000.00 14,575.00 61,079.80
ANALISA HARGA SATUAN PEKERJAAN
: JALAN RABAT BETON KECAMATAN PINOGU
JENIS PEKERJAAN SATUAN
: Kosen Pintu / Jendela / Ventilasi Kayu Kls I : M3
No.
Uraian
A. 1 2
BAHAN Kayu Kls I Paku
Sat
Volume
Harga
Jumlah
Satuan (Rp.)
Harga (Rp.)
M3
1.2000
5,000,000.00
6,000,000.00
Kg
0.2000
20,000.00
4,000.00
Sub Total A B. 1
UPAH Mandor
6,004,000.00
OH
0.3000
90,000.00
27,000.00
2 3
Kepala Tukang Tukang Kayu
OH OH
2.0000 18.0000
125,000.00 110,000.00
250,000.00 1,980,000.00
4
Pekerja
OH
6.0000
80,000.00
480,000.00
Sub Total B C.
2,737,000.00
Jumlah Harga Satuan ( A + B ) PEKERJAAN
: JALAN RABAT BETON KECAMATAN PINOGU
JENIS PEKERJAAN SATUAN
: Daun Pintu Panel Kayu Kls II : M2
No.
Uraian
A. 1 2
8,741,000.00
BAHAN Kayu Kls II Paku
Sat
Volume
Harga
Jumlah
Satuan (Rp.)
Harga (Rp.)
M3
0.0400
2,800,000.00
112,000.00
Kg
0.1000
20,000.00
2,000.00
Sub Total A B. 1
UPAH Mandor
OH
0.0500
90,000.00
4,500.00
2 3
Kepala Tukang Tukang Kayu
OH OH
0.2500 2.5000
125,000.00 110,000.00
31,250.00 275,000.00
4
Pekerja
OH
1.0000
80,000.00
80,000.00
Sub Total B C.
114,000.00
Jumlah Harga Satuan ( A + B )
390,750.00 504,750.00
PEKERJAAN
: JALAN RABAT BETON KECAMATAN PINOGU
JENIS PEKERJAAN SATUAN
: Daun Pintu Panel Lapis Alumunium Kayu Kls II : M2
No.
Uraian
A. 1 2 3
BAHAN Kayu Kls II Paku Tripleks Aluminium
Sat
Volume
Harga Satuan
Jumlah Harga
(Rp.)
(Rp.)
M3
0.0400
2,800,000.00
112,000.00
Kg Lbr
0.1000 0.4098
20,000.00 105,000.00
2,000.00 43,032.79
Sub Total A B.
157,032.79
UPAH 1 2 3
Mandor Kepala Tukang Tukang Kayu
OH OH OH
0.0500 0.2500 2.5000
90,000.00 125,000.00 110,000.00
4,500.00 31,250.00 275,000.00
4
Pekerja
OH
1.0000
80,000.00
80,000.00
Sub Total B C.
390,750.00
Jumlah Harga Satuan ( A + B ) PEKERJAAN
: JALAN RABAT BETON KECAMATAN PINOGU
JENIS PEKERJAAN SATUAN
: Daun Pintu / Jendela / Ventilasi Kaca 4,5 mm Kayu Kls II : Bh
No.
Uraian
A.
547,782.79
Sat
Volume
Harga
Jumlah
Satuan (Rp.)
Harga (Rp.)
BAHAN 1 2
Kayu Kls II Kaca Bening 4,5 mm
M3 M2
0.0350 0.6000
2,800,000.00 93,000.00
Sub Total A B. 1
UPAH Mandor
153,800.00
OH
0.0400
90,000.00
3,600.00
2 3
Kepala Tukang Tukang Kayu
OH OH
0.2000 2.0000
125,000.00 110,000.00
25,000.00 220,000.00
4
Pekerja
OH
0.8000
80,000.00
64,000.00
Sub Total B C.
98,000.00 55,800.00
Jumlah Harga Satuan ( A + B )
312,600.00 466,400.00
PEKERJAAN JENIS PEKERJAAN
: JALAN RABAT BETON KECAMATAN PINOGU : Engsel Pintu 4 Inci
SATUAN
: Bh
No.
Uraian
A.
Sat
Volume
Harga Satuan (Rp.)
BAHAN 1
Engsel Pintu 4 "
Bh
1.0000
27,000.00
Sub Total A B. 1
UPAH Mandor
27,000.00 27,000.00
OH
0.0008
90,000.00
67.50
2 3
Kepala Tukang Tukang Kayu
OH OH
0.0150 0.1500
125,000.00 110,000.00
1,875.00 16,500.00
4
Pekerja
OH
0.0150
80,000.00
1,200.00
Sub Total B C.
19,642.50
Jumlah Harga Satuan ( A + B )
A. 1
46,642.50
PEKERJAAN
: JALAN RABAT BETON KECAMATAN PINOGU
JENIS PEKERJAAN SATUAN
: Engsel Jendela 3 Inci : Bh
No.
Uraian
Sat
BAHAN Engsel Jendela 3"
Bh
Volume
1.0000
Harga
Jumlah
Satuan (Rp.)
Harga (Rp.)
13,000.00
Sub Total A B.
13,000.00 13,000.00
UPAH 1 2
Mandor Kepala Tukang
OH OH
0.0008 0.0150
90,000.00 125,000.00
67.50 1,875.00
3 4
Tukang Kayu Pekerja
OH OH
0.1500 0.0150
110,000.00 80,000.00
16,500.00 1,200.00
Sub Total B C.
Jumlah Harga (Rp.)
Jumlah Harga Satuan ( A + B )
19,642.50 32,642.50
PEKERJAAN JENIS PEKERJAAN
: JALAN RABAT BETON KECAMATAN PINOGU : Kunci Tanam 2 Slaag
SATUAN
: Bh
No.
Uraian
A.
Sat
Volume
Harga Satuan (Rp.)
Jumlah Harga (Rp.)
115,000.00
115,000.00
BAHAN 1
Kunci 2 Slaag
Bh
1.0000
Sub Total A B. 1
UPAH Mandor
115,000.00
OH
0.0003
90,000.00
22.50
0.0050 0.5000 0.0050
125,000.00 110,000.00
625.00 55,000.00
80,000.00
400.00
2 3
Kepala Tukang Tukang Kayu
OH OH
4
Pekerja
OH
Sub Total B C.
56,047.50
Jumlah Harga Satuan ( A + B ) PEKERJAAN
: JALAN RABAT BETON KECAMATAN PINOGU
JENIS PEKERJAAN SATUAN
: Grendel : Bh
No.
Uraian
A. 1
171,047.50
BAHAN Grendel
Sat
Bh
Volume
1.0000
Harga
Jumlah
Satuan (Rp.)
Harga (Rp.)
5,000.00
Sub Total A B.
5,000.00
UPAH 1 2
Mandor Kepala Tukang
OH OH
0.0008 0.0150
90,000.00 125,000.00
67.50 1,875.00
3 4
Tukang Kayu Pekerja
OH OH
0.1500 0.0150
110,000.00 80,000.00
16,500.00 1,200.00
Sub Total B C.
5,000.00
Jumlah Harga Satuan ( A + B )
19,642.50 24,642.50
PEKERJAAN JENIS PEKERJAAN
: JALAN RABAT BETON KECAMATAN PINOGU : Kait Angin
SATUAN
: Bh
No.
Uraian
A.
Sat
Volume
Harga Satuan (Rp.)
BAHAN 1
Kait Angin
Bh
1.0000
7,000.00
Sub Total A B. 1
UPAH Mandor
OH
0.0008
90,000.00
67.50
0.0150 0.1500 0.0150
125,000.00 110,000.00
1,875.00 16,500.00
80,000.00
1,200.00
2 3
Kepala Tukang Tukang Kayu
OH OH
4
Pekerja
OH
C.
19,642.50
Jumlah Harga Satuan ( A + B ) : JALAN RABAT BETON KECAMATAN PINOGU
JENIS PEKERJAAN SATUAN
: Tarikan Jendela : Bh
Uraian
A. 1
26,642.50
PEKERJAAN
No.
BAHAN Tarikan
Sat
Bh
Volume
1.0000
Harga
Jumlah
Satuan (Rp.)
Harga (Rp.)
7,000.00
Sub Total A B.
7,000.00 7,000.00
Sub Total B
7,000.00 7,000.00
UPAH 1 2
Mandor Kepala Tukang
OH OH
0.0008 0.0150
90,000.00 125,000.00
67.50 1,875.00
3 4
Tukang Kayu Pekerja
OH OH
0.1500 0.0150
110,000.00 80,000.00
16,500.00 1,200.00
Sub Total B C.
Jumlah Harga (Rp.)
Jumlah Harga Satuan ( A + B )
19,642.50 26,642.50
PEKERJAAN JENIS PEKERJAAN
: JALAN RABAT BETON KECAMATAN PINOGU : Expanyolet Tanam
SATUAN
: Bh
No.
Uraian
A.
Sat
Volume
Harga Satuan (Rp.)
BAHAN 1
Expanyolet Tanam
Bh
1.0000
40,500.00
Sub Total A B. 1
UPAH Mandor
OH
0.0008
90,000.00
67.50
0.0150 0.1500 0.0150
125,000.00 110,000.00
1,875.00 16,500.00
80,000.00
1,200.00
2 3
Kepala Tukang Tukang Kayu
OH OH
4
Pekerja
OH
C.
19,642.50
Jumlah Harga Satuan ( A + B ) PEKERJAAN JENIS PEKERJAAN SATUAN
No.
1 2 3
60,142.50
: JALAN RABAT BETON KECAMATAN PINOGU : Jalusi Papan Kayu Kls II : M2
Uraian
A.
BAHAN Papan Kayu Kls I Paku Pengecatan
Sat
M3 Kg M2
Volume
0.0252 0.0600 2.52
Harga Satuan (Rp.)
2,800,000.00 20,000.00 35,266.00
Sub Total A B. 1 2 3 4
40,500.00 40,500.00
Sub Total B
UPAH Mandor Kepala Tukang Tukang Kayu Pekerja Sub Total B
C.
Jumlah Harga (Rp.)
Jumlah Harga Satuan ( A + B )
Jumlah Harga (Rp.)
70,560.00 1,200.00 88,870.32 160,630.32
OH OH OH OH
0.0500 0.0100 0.7200 0.1000
90,000.00 125,000.00 110,000.00 80,000.00
4,500.00 1,250.00 79,200.00 8,000.00 92,950.00 253,580.32
PEKERJAAN JENIS PEKERJAAN SATUAN
No.
: JALAN RABAT BETON KECAMATAN PINOGU : Pas. Pintu Harmonika : M2
Uraian
A. 1
BAHAN Pintu Harmonika
Sat
M2
Volume
1.0000
Harga Satuan (Rp.)
Jumlah Harga (Rp.)
750,000.00
750,000.00
Sub Total A B. 1
UPAH Mandor
750,000.00
OH
2 3
Kepala Tukang Tukang Batu
OH OH
4
Pekerja
OH
0.0320 0.0650 0.6500 0.2000
90,000.00
2,880.00
125,000.00 110,000.00
8,125.00 71,500.00
80,000.00
16,000.00
Sub Total B Jumlah Harga Satuan ( A + B )
C.
PEKERJAAN JENIS PEKERJAAN SATUAN
No.
: JALAN RABAT BETON KECAMATAN PINOGU : Ventilasi Besi : M2
Uraian
A. 1
98,505.00 848,505.00
BAHAN Besi Dia. 19 mm
Sub Total A B.
UPAH
C.
Sub Total B Jumlah Harga Satuan ( A + B )
Sat
Volume
Kg
11.8500
Harga Satuan (Rp.)
10,400.00
Jumlah Harga (Rp.)
123,240.00
123,240.00
123,240.00
ANALISA HARGA SATUAN PEKERJAAN JENIS PEKERJAAN SATUAN No.
: JALAN RABAT BETON KECAMATAN PINOGU : Membuat 1 M1 Kusen Pintu / Jendela Aluminium : M1 Uraian
A. 1 2
BAHAN Silmar Aluminium 5x10 Baut Fisher 8mm
Sat
M' Bh
Volume
1.100 2.000
Harga Satuan (Rp.)
85,000.00 400.00
Sub Total A B. 1 2 3 4
UPAH Mandor Kepala Tukang Tukang Aluminium Pekerja
PEKERJAAN JENIS PEKERJAAN SATUAN No.
OH OH OH OH
0.002 0.004 0.043 0.043
90,000.00 125,000.00 110,000.00 80,000.00
BAHAN Silmar Aluminium 3x10 Baut Fisher
8,896.50 103,196.50
Sat
M' Bh
Volume
1.100 2.000
Harga Satuan (Rp.)
80,000.00 400.00
Sub Total A B. 1 2 3 4
C.
189.00 537.50 4,730.00 3,440.00
: JALAN RABAT BETON KECAMATAN PINOGU : Membuat 1 M2 Pasang Pintu Aluminium : M2 Uraian
A.
93,500.00 800.00
94,300.00
Sub Total B Jumlah Harga Satuan ( A + B )
C.
Jumlah Harga (Rp.)
UPAH Mandor Kepala Tukang Tukang Aluminium Pekerja Sub Total B Jumlah Harga Satuan ( A + B )
Jumlah Harga (Rp.)
88,000.00 800.00
88,800.00
OH OH OH OH
0.002 0.004 0.043 0.043
90,000.00 125,000.00 110,000.00 80,000.00
189.00 537.50 4,730.00 3,440.00 8,896.50 97,696.50
ANALISA HARGA SATUAN PEKERJAAN JENIS PEKERJAAN SATUAN No.
: JALAN RABAT BETON KECAMATAN PINOGU : Memasang 1 M Karet Kosen : M2 Uraian
A.
BAHAN Karet Kosen
Sat
M'
Volume
Harga Satuan (Rp.)
1.100
3,750.00
Sub Total A B. 1 2 3 4
UPAH Mandor Kepala Tukang Tukang Aluminium Pekerja
PEKERJAAN JENIS PEKERJAAN SATUAN No.
OH OH OH OH
0.002 0.004 0.043 0.043
90,000.00 125,000.00 110,000.00 80,000.00
1
8,896.50 13,021.50
BAHAN Handel Stenless
Sat
Bh
Volume
1.000
Harga Satuan (Rp.)
370,000.00
Sub Total A B. 1 2 3 4
C.
189.00 537.50 4,730.00 3,440.00
: JALAN RABAT BETON KECAMATAN PINOGU : Memasang 1 Set Handel Stenlees : Set Uraian
A.
4,125.00
4,125.00
Sub Total B Jumlah Harga Satuan ( A + B )
C.
Jumlah Harga (Rp.)
UPAH Mandor Kepala Tukang Tukang Aluminium Pekerja Sub Total B Jumlah Harga Satuan ( A + B )
Jumlah Harga (Rp.)
370,000.00
370,000.00
OH OH OH OH
0.003 0.050 0.500 0.050
90,000.00 125,000.00 110,000.00 80,000.00
270.00 6,250.00 55,000.00 4,000.00 65,520.00 435,520.00
ANALISA HARGA SATUAN PEKERJAAN JENIS PEKERJAAN SATUAN No.
: JALAN RABAT BETON KECAMATAN PINOGU : Memasang 1 Set Handel Pintu : Set Uraian
A.
BAHAN Handle Pintu
Sat
Bh
Volume
1.000
Harga Satuan (Rp.)
325,000.00
Sub Total A B. 1 2 3 4
UPAH Mandor Kepala Tukang Tukang Aluminium Pekerja
PEKERJAAN JENIS PEKERJAAN SATUAN No.
OH OH OH OH
0.003 0.050 0.500 0.050
90,000.00 125,000.00 110,000.00 80,000.00
BAHAN Engsel Pintu 4 "
65,520.00 390,520.00
Sat
Bh
Volume
1.000
Harga Satuan (Rp.)
22,500.00
Sub Total A B. 1 2 3 4
C.
270.00 6,250.00 55,000.00 4,000.00
: JALAN RABAT BETON KECAMATAN PINOGU : Pasangan 1 Bh Engsel Pintu : Bh Uraian
A.
325,000.00
325,000.00
Sub Total B Jumlah Harga Satuan ( A + B )
C.
Jumlah Harga (Rp.)
UPAH Mandor Kepala Tukang Tukang Aluminium Pekerja Sub Total B Jumlah Harga Satuan ( A + B )
Jumlah Harga (Rp.)
22,500.00
22,500.00
OH OH OH OH
0.008 0.015 0.150 0.015
90,000.00 125,000.00 110,000.00 80,000.00
720.00 1,875.00 16,500.00 1,200.00 20,295.00 42,795.00
ANALISA HARGA SATUAN PEKERJAAN JENIS PEKERJAAN SATUAN No.
: JALAN RABAT BETON KECAMATAN PINOGU : Pasangan 1 Bh Engsel Jendela : Bh Uraian
A.
BAHAN Engsel Pintu 3 "
Sat
Bh
Volume
1.000
Harga Satuan (Rp.)
17,500.00
Sub Total A B. 1 2 3 4
UPAH Mandor Kepala Tukang Tukang Aluminium Pekerja
PEKERJAAN JENIS PEKERJAAN SATUAN No.
OH OH OH OH
0.008 0.015 0.150 0.015
90,000.00 125,000.00 110,000.00 80,000.00
BAHAN Hak Angin
20,295.00 37,795.00
Sat
Bh
Volume
1.000
Harga Satuan (Rp.)
15,000.00
Sub Total A B. 1 2 3 4
C.
720.00 1,875.00 16,500.00 1,200.00
: JALAN RABAT BETON KECAMATAN PINOGU : Pasangan 1 Bh Hak Angin : Bh Uraian
A.
17,500.00
17,500.00
Sub Total B Jumlah Harga Satuan ( A + B )
C.
Jumlah Harga (Rp.)
UPAH Mandor Kepala Tukang Tukang Aluminium Pekerja Sub Total B Jumlah Harga Satuan ( A + B )
Jumlah Harga (Rp.)
15,000.00
15,000.00
OH OH OH OH
0.008 0.015 0.150 0.015
90,000.00 125,000.00 110,000.00 80,000.00
720.00 1,875.00 16,500.00 1,200.00 20,295.00 35,295.00
ANALISA HARGA SATUAN PEKERJAAN JENIS PEKERJAAN SATUAN No.
: JALAN RABAT BETON KECAMATAN PINOGU : Pasangan 1 Bh Grendel : Bh Uraian
A.
BAHAN Grendel
Sat
Bh
Volume
1.000
Harga Satuan (Rp.)
12,500.00
Sub Total A B. 1 2 3 4
UPAH Mandor Kepala Tukang Tukang Aluminium Pekerja
PEKERJAAN JENIS PEKERJAAN SATUAN No.
OH OH OH OH
0.008 0.015 0.150 0.015
90,000.00 125,000.00 110,000.00 80,000.00
BAHAN Kunci Tanam
20,295.00 32,795.00
Sat
Bh
Volume
1.000
Harga Satuan (Rp.)
135,000.00
Sub Total A B. 1 2 3 4
C.
720.00 1,875.00 16,500.00 1,200.00
: JALAN RABAT BETON KECAMATAN PINOGU : Pasangan 1 Bh Kunci Tanam : Bh Uraian
A.
12,500.00
12,500.00
Sub Total B Jumlah Harga Satuan ( A + B )
C.
Jumlah Harga (Rp.)
UPAH Mandor Kepala Tukang Tukang Aluminium Pekerja Sub Total B Jumlah Harga Satuan ( A + B )
Jumlah Harga (Rp.)
135,000.00
135,000.00
OH OH OH OH
0.008 0.015 0.150 0.015
90,000.00 125,000.00 110,000.00 80,000.00
720.00 1,875.00 16,500.00 1,200.00 20,295.00 155,295.00
ANALISA HARGA SATUAN PEKERJAAN JENIS PEKERJAAN SATUAN No. A.
: JALAN RABAT BETON KECAMATAN PINOGU : Pas. Kaca Bening 5 mm : M2 Uraian
Sat
Kaca Bening 5 mm Karet Kaca
M2 M
Volume
Harga Satuan (Rp.)
BAHAN 1 2
1.100 4.000
120,000.00 3,750.00
Sub Total A B. 1 2 3 4
UPAH Mandor Kepala Tukang Tukang Aluminium Pekerja
PEKERJAAN JENIS PEKERJAAN SATUAN No.
OH OH OH OH
0.001 0.015 0.150 0.015
90,000.00 125,000.00 110,000.00 80,000.00
90.00 1,875.00 16,500.00 1,200.00 19,665.00 166,665.00
: JALAN RABAT BETON KECAMATAN PINOGU : Pas. Kaca Bening 10 mm : M2 Uraian
A.
132,000.00 15,000.00
147,000.00
Sub Total B Jumlah Harga Satuan ( A + B )
C.
Sat
Volume
Harga Satuan (Rp.)
Jumlah Harga (Rp.)
BAHAN 1 2 3
Kaca Bening 10 mm Karet Kaca Perlengkapan 15% x Harga Bahan
M2 M Ls
1.100 4.000 1.000
765,000.00 3,750.00 115,312.50
Sub Total A B. 1 2 3 4
C.
Jumlah Harga (Rp.)
UPAH Mandor Kepala Tukang Tukang Aluminium Pekerja Sub Total B Jumlah Harga Satuan ( A + B )
841,500.00 15,000.00 115,312.50 971,812.50
OH OH OH OH
0.001 0.015 0.150 0.015
90,000.00 125,000.00 110,000.00 80,000.00
90.00 1,875.00 16,500.00 1,200.00 19,665.00 991,477.50
ANALISA HARGA SATUAN PEKERJAAN JENIS PEKERJAAN SATUAN No.
: JALAN RABAT BETON KECAMATAN PINOGU : Memasang 1 Bh Door Closer : Bh Uraian
A.
Sat
Volume
Harga Satuan (Rp.)
BAHAN 1
Door Closer
Bh
1.000
225,000.00
Sub Total A B. 1 2 3 4
UPAH Mandor Kepala Tukang Tukang Aluminium Pekerja
PEKERJAAN JENIS PEKERJAAN SATUAN No.
OH OH OH OH
0.001 0.015 0.150 0.001
90,000.00 125,000.00 110,000.00 80,000.00
90.00 1,875.00 16,500.00 80.00 18,545.00 243,545.00
: JALAN RABAT BETON KECAMATAN PINOGU : Pasang Pintu Double P1 : 1 Unit Uraian
A.
225,000.00
225,000.00
Sub Total B Jumlah Harga Satuan ( A + B )
C.
Sat
Volume
Harga Satuan (Rp.)
Jumlah Harga (Rp.)
BAHAN 1 2 3 4 5 6
C.
Jumlah Harga (Rp.)
Silmar Aluminium 3x10 Kaca Bening T=5 mm Karet Kusen Aluminium Handel Pintu Door Closer Engsel Pintu Jumlah Harga Satuan Pekerjaan
M1 M2 M1 Bh Bh Bh
10.960 2.470 20.560 1.000 1.000 4.000
97,696.50 166,665.00 13,021.50 390,520.00 243,545.00 42,795.00
1,070,753.64 411,729.22 267,722.04 390,520.00 243,545.00 171,180.00 2,555,449.90
ANALISA HARGA SATUAN PEKERJAAN JENIS PEKERJAAN SATUAN No. A.
Uraian
Sat
Silmar Aluminium 3x10 Kaca Panassa Blue T=5 mm Karet Kusen Aluminium Handel Pintu Door Closer Engsel Pintu
M1 M2 M1 Bh Bh Bh
Volume
Harga Satuan (Rp.)
Jumlah Harga (Rp.)
BAHAN 1 2 3 4 5 6
C.
5.500 2.280 10.000 1.000 1.000 2.000
97,696.50 166,665.00 13,021.50 390,520.00 243,545.00 42,795.00
Jumlah Harga Satuan Pekerjaan
PEKERJAAN JENIS PEKERJAAN SATUAN No. A.
537,330.75 379,996.20 130,215.00 390,520.00 243,545.00 85,590.00 1,767,196.95
: JALAN RABAT BETON KECAMATAN PINOGU : Pasang Daun Jendela : Unit Uraian
Sat
Silmar Aluminium 3x10 Kaca Panassa Blue T=5 mm Karet Kusen Aluminium Grendel Hak Angin Engsel Jendela
M1 M2 M1 Bh Bh Bh
Volume
Harga Satuan (Rp.)
Jumlah Harga (Rp.)
BAHAN 1 2 3 4 5 6
C.
: JALAN RABAT BETON KECAMATAN PINOGU : Pasang Pintu Single : Unit
Jumlah Harga Satuan Pekerjaan
4.000 0.560 3.600 1.000 2.000 2.000
97,696.50 166,665.00 13,021.50 32,795.00 35,295.00 37,795.00
390,786.00 93,332.40 46,877.40 32,795.00 70,590.00 75,590.00 709,970.80
ANALISA HARGA SATUAN PEKERJAAN JENIS PEKERJAAN SATUAN No. A.
: JALAN RABAT BETON KECAMATAN PINOGU : Pasang Ventilasi : Unit Uraian
Sat
Silmar Aluminium 3x10 Kaca Panassa Blue T=5 mm Karet Kusen Aluminium Grendel Hak Angin Engsel Jendela
M1 M2 M1 Bh Bh Bh
Volume
Harga Satuan (Rp.)
BAHAN 1 2 3 4 5 6
C.
2.040 0.200 3.600 1.000 2.000 2.000
97,696.50 166,665.00 13,021.50 1,875.00 1,875.00 1,875.00
Jumlah Harga Satuan Pekerjaan
PEKERJAAN JENIS PEKERJAAN SATUAN No.
1
288,886.26
BAHAN Pintu Aluminium
Sat
Set
Volume
1.000
Harga Satuan (Rp.)
425,000.00
Sub Total A B. 1 2 3 4
199,300.86 33,333.00 46,877.40 1,875.00 3,750.00 3,750.00
: JALAN RABAT BETON KECAMATAN PINOGU : Pintu KM/Wc Aluminium : Bh Uraian
A.
C.
Jumlah Harga (Rp.)
UPAH Mandor Kepala Tukang Tukang Aluminium Pekerja Sub Total B Jumlah Harga Satuan ( A + B )
Jumlah Harga (Rp.)
425,000.00
425,000.00
OH OH OH OH
0.050 0.100 1.000 1.000
90,000.00 125,000.00 110,000.00 80,000.00
4,500.00 12,500.00 110,000.00 80,000.00 207,000.00 632,000.00
ANALISA HARGA SATUAN PEKERJAAN
: JALAN RABAT BETON KECAMATAN PINOGU
JENIS PEKERJAAN SATUAN
: Dinding Batu ½ Bata sp. 1 : 3 : M2
No.
Uraian
A. 1
BAHAN Batu Bata
Sat
Volume
Harga
Jumlah
Satuan
Harga
(Rp.)
(Rp.)
Bh
70.0000
750.00
52,500.00
2
Semen @50 Kg
Zak
0.2874
75,000.00
21,555.00
3
Pasir Pasang
M3
0.0400
175,000.00
7,000.00
Sub Total A B.
81,055.00
UPAH 1 2 3 4
Mandor Kepala Tukang Tukang Batu Pekerja
OH OH OH OH
0.0150 0.0100 0.1000 0.3000
90,000.00 125,000.00 110,000.00 80,000.00
Sub Total B C.
37,600.00
Jumlah Harga Satuan ( A + B )
No.
A. 1 2 3
118,655.00
PEKERJAAN JENIS PEKERJAAN
: JALAN RABAT BETON KECAMATAN PINOGU : Dinding Batu ½ Bata sp. 1 : 5
SATUAN
: M2
Uraian
BAHAN Batu Bata Semen @50 Kg Pasir Pasang
Sat
Volume
Harga Satuan (Rp.)
Bh Zak M3
70.0000 0.1936 0.0450
750.00 75,000.00 175,000.00
Sub Total A B. 1 2 3 4
UPAH Mandor Kepala Tukang Tukang Batu Pekerja Sub Total B
C.
Jumlah Harga Satuan ( A + B )
1,350.00 1,250.00 11,000.00 24,000.00
Jumlah Harga (Rp.)
52,500.00 14,520.00 7,875.00 74,895.00
OH OH OH OH
0.0150 0.0100 0.1000 0.3000
90,000.00 125,000.00 110,000.00 80,000.00
1,350.00 1,250.00 11,000.00 24,000.00 37,600.00 112,495.00
ANALISA HARGA SATUAN PEKERJAAN
: JALAN RABAT BETON KECAMATAN PINOGU
JENIS PEKERJAAN
: Plesteran Dinding Trasraam,Beton + Pondasi sp.1 : 3 Tbl = 15 MM
SATUAN
: M2
No.
Uraian
A.
Sat
Volume
Harga Satuan
Jumlah Harga
(Rp.)
(Rp.)
BAHAN 1 2
Semen @50 Kg Pasir Pasang
Zak M3
0.1555 0.0230
75,000.00 175,000.00
Sub Total A B.
15,689.00
UPAH 1 2
Mandor Kepala Tukang
OH OH
0.0150 0.0150
90,000.00 125,000.00
1,350.00 1,875.00
3 4
Tukang Batu Pekerja
OH OH
0.1500 0.3000
110,000.00 80,000.00
16,500.00 24,000.00
Sub Total B C.
43,725.00
Jumlah Harga Satuan ( A + B ) PEKERJAAN JENIS PEKERJAAN SATUAN
No.
1 2
59,414.00
: JALAN RABAT BETON KECAMATAN PINOGU : Plesteran Dinding sp. 1 : 5 Tbl = 15 MM : M2
Uraian
A.
BAHAN Semen @50 Kg Pasir Pasang
Sat
Zak M3
Volume
0.1037 0.0260
Harga Satuan (Rp.)
75,000.00 175,000.00
Sub Total A B. 1 2 3 4
UPAH Mandor Kepala Tukang Tukang Batu Pekerja Sub Total B
C.
11,664.00 4,025.00
Jumlah Harga Satuan ( A + B )
Jumlah Harga (Rp.)
7,776.00 4,550.00 12,326.00
OH OH OH OH
0.0150 0.0150 0.1500 0.3000
90,000.00 125,000.00 110,000.00 80,000.00
1,350.00 1,875.00 16,500.00 24,000.00 43,725.00 56,051.00
ANALISA HARGA SATUAN PEKERJAAN
: JALAN RABAT BETON KECAMATAN PINOGU
JENIS PEKERJAAN
: Acian Dinding
SATUAN
: M2
No.
Uraian
A.
Sat
Volume
Harga Satuan
Jumlah Harga
(Rp.)
(Rp.)
BAHAN 1
Semen @50 Kg
Zak
0.0650
75,000.00
Sub Total A B. 1
UPAH Mandor
4,875.00
OH
0.0100
90,000.00
900.00
2 3
Kepala Tukang Tukang Batu
OH OH
0.0100 0.1000
125,000.00 110,000.00
1,250.00 11,000.00
4
Pekerja
OH
0.2000
80,000.00
16,000.00
Sub Total B C.
29,150.00
Jumlah Harga Satuan ( A + B ) PEKERJAAN JENIS PEKERJAAN SATUAN
No.
1 2
34,025.00
: JALAN RABAT BETON KECAMATAN PINOGU : Plesteran Ciprat sp 1 : 2 : M2
Uraian
A.
BAHAN Semen @50 Kg Pasir Pasang
Sat
Zak M3
Volume
0.0864 0.0060
Harga
Jumlah
Satuan (Rp.)
Harga (Rp.)
75,000.00 175,000.00
Sub Total A B. 1 2 3 4
UPAH Mandor Kepala Tukang Tukang Batu Pekerja Sub Total B
C.
4,875.00
Jumlah Harga Satuan ( A + B )
6,480.00 1,050.00 7,530.00
OH OH OH OH
0.0150 0.0100 0.1000 0.3000
90,000.00 125,000.00 110,000.00 80,000.00
1,350.00 1,250.00 11,000.00 24,000.00 37,600.00 45,130.00
ANALISA HARGA SATUAN PEKERJAAN
: JALAN RABAT BETON KECAMATAN PINOGU
JENIS PEKERJAAN SATUAN
: List Tali Air Dinding : M1
No.
Uraian
A.
Sat
Volume
Harga
Jumlah
Satuan
Harga
(Rp.)
(Rp.)
BAHAN
Sub Total A B.
UPAH 1 2
Mandor Kepala Tukang
OH OH
0.0020 0.0020
90,000.00 125,000.00
180.00 250.00
3 4
Tukang Batu Pekerja
OH OH
0.0200 0.1360
110,000.00 80,000.00
2,200.00 10,880.00
Sub Total B C.
-
Jumlah Harga Satuan ( A + B )
13,510.00 13,510.00
ANALISA HARGA SATUAN PEKERJAAN JENIS PEKERJAAN SATUAN
No.
: JALAN RABAT BETON KECAMATAN PINOGU : Beton K250 : M3
Uraian
A. 1 2 3 4
BAHAN Semen @50 Kg Pasir Beton Split Air
Sat
Volume
Harga
Jumlah
Satuan (Rp.)
Harga (Rp.)
Zak
7.6800
75,000.00
576,000.00
M3 M3 Ltr
0.5930 0.7700 215.0000
175,000.00 175,000.00 25.00
103,775.00 134,750.00 5,375.00
Sub Total A B.
819,900.00
UPAH 1 2 3 4
Mandor Kepala Tukang Tukang Batu Pekerja
OH OH OH OH
0.0830 0.0280 0.2750 1.6500
90,000.00 125,000.00 110,000.00 80,000.00
Sub Total B C.
173,220.00
Jumlah Harga Satuan ( A + B ) PEKERJAAN JENIS PEKERJAAN SATUAN
No.
1 2
993,120.00
: JALAN RABAT BETON KECAMATAN PINOGU : Pekerjaan Pembesian : Kg
Uraian
A.
BAHAN Besi Beton Kawat Beton
Sat
Volume
Harga Satuan (Rp.)
1.1000
10,400.00
11,440.00
Kg
0.0150
25,000.00
375.00 11,815.00
UPAH 1 2 3
Mandor Kepala Tukang Tukang Besi
OH OH OH
0.0003 0.0007 0.0070
90,000.00 125,000.00 110,000.00
27.00 87.50 770.00
4
Pekerja
OH
0.0070
80,000.00
560.00
Sub Total B C.
Jumlah Harga (Rp.)
Kg
Sub Total A B.
7,470.00 3,500.00 30,250.00 132,000.00
Jumlah Harga Satuan ( A + B )
1,444.50 13,259.50
ANALISA HARGA SATUAN PEKERJAAN
: JALAN RABAT BETON KECAMATAN PINOGU
JENIS PEKERJAAN SATUAN
: Memasang Bekisting Untuk Pondasi : M2
No.
Uraian
A.
Sat
Volume
Harga Satuan
Jumlah Harga
(Rp.)
(Rp.)
BAHAN 1 2
Kayu Kls III Paku
M3 Kg
0.0400 0.3000
### 16,500.00
3
Minyak Bekisting
Lt
0.1000
25,000.00
Sub Total A B.
2,500.00 87,450.00
UPAH 1 2
Mandor Kepala Tukang
OH OH
0.0260 0.0260
90,000.00 125,000.00
2,340.00 3,250.00
3 4
Tukang Kayu Pekerja
OH OH
0.2600 0.5200
110,000.00 80,000.00
28,600.00 41,600.00
Sub Total B Jumlah Harga Satuan ( A + B )
C.
PEKERJAAN JENIS PEKERJAAN SATUAN
No.
75,790.00 163,240.00
: JALAN RABAT BETON KECAMATAN PINOGU : Memasang Bekisting Untuk Sloef : M2
Uraian
A.
Sat
Volume
Harga Satuan (Rp.)
Jumlah Harga (Rp.)
BAHAN 1 2 3
Kayu Kls III Paku Minyak Bekisting
M3 Kg Lt
0.0450 0.3000 0.1000
### 16,500.00 25,000.00
Sub Total A B.
C.
80,000.00 4,950.00
90,000.00 4,950.00 2,500.00 97,450.00
UPAH 1 2 3
Mandor Kepala Tukang Tukang Kayu
OH OH OH
0.0260 0.0260 0.2600
90,000.00 125,000.00 110,000.00
2,340.00 3,250.00 28,600.00
4
Pekerja
OH
0.5200
80,000.00
41,600.00
Sub Total B Jumlah Harga Satuan ( A + B )
75,790.00 173,240.00
ANALISA HARGA SATUAN PEKERJAAN JENIS PEKERJAAN SATUAN
No.
A. 1 2 3 4 5 6
: JALAN RABAT BETON KECAMATAN PINOGU : Memasang Bekisting Untuk Kolom : M2 Jumlah
Satuan (Rp.)
Harga (Rp.)
Uraian
Sat
BAHAN Kayu Terentang Kls III
M3
0.0400
###
80,000.00
M4 Kg Lt Lbr Btg
0.0150 0.4000 0.2000 0.3500 2.0000
### 16,500.00 25,000.00 155,000.00 17,500.00
30,000.00 6,600.00 5,000.00 54,250.00 35,000.00
Kayu Balok Kls III Paku Minyak Bekisting Plywood T = 9 mm Dolken Kayu Dia. 10-15 Cm Pjg 4 M
Volume
Harga
Sub Total A B. 1 2 3 4
UPAH Mandor Kepala Tukang Tukang Kayu Pekerja
210,850.00
OH OH OH OH
0.0330 0.0330 0.3300 0.6600
90,000.00 125,000.00 110,000.00 80,000.00
Sub Total B Jumlah Harga Satuan ( A + B )
C.
PEKERJAAN JENIS PEKERJAAN SATUAN
No.
A. 1
96,195.00 307,045.00
: JALAN RABAT BETON KECAMATAN PINOGU : Memasang Bekisting Untuk Balok : M2
Uraian
Sat
BAHAN Kayu Terentang Kls III
Volume
Harga
Jumlah
Satuan (Rp.)
Harga (Rp.)
M3
0.0400
###
80,000.00
2 3
Kayu Balok Kls III Paku
M4 Kg
0.0180 0.4000
### 16,500.00
36,000.00 6,600.00
4 5 6
Minyak Bekisting Plywood T = 9 mm Dolken Kayu Dia. 10-15 Cm Pjg 4 M
Lt Lbr Btg
0.2000 0.3500 2.0000
25,000.00 155,000.00 17,500.00
Sub Total A B. 1
UPAH Mandor
5,000.00 54,250.00 35,000.00 216,850.00
OH
0.0330
90,000.00
2,970.00
2 3
Kepala Tukang Tukang Kayu
OH OH
0.0330 0.3300
125,000.00 110,000.00
4,125.00 36,300.00
4
Pekerja
OH
0.6600
80,000.00
52,800.00
Sub Total B C.
2,970.00 4,125.00 36,300.00 52,800.00
Jumlah Harga Satuan ( A + B )
96,195.00 313,045.00
ANALISA HARGA SATUAN PEKERJAAN JENIS PEKERJAAN SATUAN
No.
A. 1 2 3 4 5 6
: JALAN RABAT BETON KECAMATAN PINOGU : Memasang Bekisting Untuk Plat Lantai : M2 Jumlah
Satuan (Rp.)
Harga (Rp.)
Uraian
Sat
BAHAN Kayu Terentang Kls III
M3
0.0400
###
80,000.00
M4 Kg Lt Lbr Btg
0.0150 0.4000 0.2000 0.3500 6.0000
### 16,500.00 25,000.00 155,000.00 17,500.00
30,000.00 6,600.00 5,000.00 54,250.00 105,000.00
Kayu Balok Kls III Paku Minyak Bekisting Plywood T = 9 mm Dolken Kayu Dia. 10-15 Cm Pjg 4 M
Volume
Harga
Sub Total A B. 1 2 3 4
UPAH Mandor Kepala Tukang Tukang Kayu Pekerja
280,850.00
OH OH OH OH
0.0330 0.0330 0.3300 0.6600
90,000.00 125,000.00 110,000.00 80,000.00
Sub Total B Jumlah Harga Satuan ( A + B )
C.
PEKERJAAN JENIS PEKERJAAN SATUAN
No.
96,195.00 377,045.00
: JALAN RABAT BETON KECAMATAN PINOGU : Membongkar Cetakan dan Menyiram Beton : Ls
Uraian
A.
Sat
Volume
Harga
Jumlah
Satuan (Rp.)
Harga (Rp.)
BAHAN
Sub Total A B. 1
UPAH Pekerja
-
OH Sub Total B
C.
2,970.00 4,125.00 36,300.00 52,800.00
Jumlah Harga Satuan ( A + B )
4.0000
80,000.00
320,000.00 320,000.00 320,000.00
ANALISA HARGA SATUAN PEKERJAAN
: JALAN RABAT BETON KECAMATAN PINOGU
JENIS PEKERJAAN SATUAN
: Membuat Beton Bertulang K 250 : M3
No.
Uraian
Sat
Volume
Harga Satuan
Jumlah Harga
(Rp.)
(Rp.)
A.
Pek. Beton
M3
1.0000
993,120.00
993,120.00
B. C.
Pek. Pembesian Memasang Bekisting Untuk Pondasi
Kg M2
1.0000 1.0000
13,259.50 163,240.00
13,259.50 163,240.00
M2 M2 M2 M2 Ls
1.0000 1.0000 1.0000 1.0000 1.0000
173,240.00 307,045.00 313,045.00 377,045.00 320,000.00
173,240.00 307,045.00 313,045.00 377,045.00 320,000.00
Dengan Memakai Besi (Kg)
1,313,120.00 Jumlah Harga (Rp.)
D. E. F. G. H. C. No.
Memasang Bekisting Untuk Sloef Memasang Bekisting Untuk Kolom Memasang Memasang Bekisting Bekisting Untuk Untuk Balok Plat Lantai Membongkar & Menyiram Beton Jumlah Harga Beton / M3
Dengan Memasang Bekisting (M2)
Uraian
Sat
1
Beton Pondasi Telapak
M³
0.3000
110.00
2,820,637.00
2
Beton Sloof (15X20)
M³
3.3333
174.00
4,197,739.67
3
Beton Sloof (20X25)
M³
3.3333
215.00
4,741,379.17
4
Beton Kolom (30x30) Cm
M³
4.0000
141.00
3,875,669.50
5
Beton Kolom (20x20) Cm
M³
6.1667
254.00
5,749,346.33
5
Beton Balok (15x30) Cm
M³
9.5556
167.00
5,182,860.94
6
Beton Balok (20x40) Cm
M³
4.6250
115.00
3,639,197.50
7
Beton Kolom Praktis (12x12)
M³
5.5556
248.00
6,307,281.56
8
Beton Balok Latei (12x12)
M³
5.5556
248.00
6,340,614.89
9
Beton Ring Balok (15x25)
M³
4.4444
146.00
4,640,318.11
10
Beton Ring Balok (15x20)
M³
4.4444
174.00
5,011,584.11
11
Beton Plat Lantai
M³
100.00
2,639,070.00
ANALISA HARGA SATUAN PEKERJAAN
: JALAN RABAT BETON KECAMATAN PINOGU
JENIS PEKERJAAN SATUAN
: Aanstamping Batu Kali / Belah : M3
No.
Uraian
A.
Sat
Volume
Harga
Jumlah
Satuan (Rp.)
Harga (Rp.)
BAHAN 1
Batu Kali Belah (15/20 cm)
M3
1.2000
175,000.00
Sub Total A B.
210,000.00
UPAH 1 2
Mandor Kepala Tukang
OH OH
0.0390 0.0390
90,000.00 125,000.00
3,510.00 4,875.00
3 4
Tukang Batu Pekerja
OH OH
0.3900 0.7800
110,000.00 80,000.00
42,900.00 62,400.00
Sub Total B C.
113,685.00
Jumlah Harga Satuan ( A + B ) : JALAN RABAT BETON KECAMATAN PINOGU : Pasangan Batu kali 1 : 5
SATUAN
: M3
Uraian
A. 1 2 3
323,685.00
PEKERJAAN JENIS PEKERJAAN
No.
BAHAN Semen @50 Kg Pasir Pasang Batu Kali Belah (15/20 cm)
Sat
Volume
Harga Satuan
Jumlah Harga
(Rp.)
(Rp.)
Zak M3
2.7200 0.5440
75,000.00 175,000.00
204,000.00 95,200.00
M3
1.2000
175,000.00
210,000.00
Sub Total A B. 1
UPAH Mandor
509,200.00
OH
0.0750
90,000.00
6,750.00
2 3
Kepala Tukang Tukang Batu
OH OH
0.0750 0.7500
125,000.00 110,000.00
9,375.00 82,500.00
4
Pekerja
OH
1.5000
80,000.00
120,000.00
Sub Total B C.
210,000.00
Jumlah Harga Satuan ( A + B )
218,625.00 727,825.00
ANALISA HARGA SATUAN PEKERJAAN
: JALAN RABAT BETON KECAMATAN PINOGU
JENIS PEKERJAAN SATUAN
: Galian Tanah Biasa : M3
No.
Uraian
A.
Sat
Volume
Harga Satuan
Jumlah Harga
(Rp.)
(Rp.)
BAHAN Sub Total A
B. 1 2
UPAH Mandor Pekerja
-
OH OH
0.0250 0.7500
90,000.00 80,000.00
Sub Total B C.
62,250.00
Jumlah Harga ( A + B ) : JALAN RABAT BETON KECAMATAN PINOGU
JENIS PEKERJAAN SATUAN
: Galian Tanah Telapak : M3
Uraian
A.
62,250.00
PEKERJAAN
No.
Sat
Volume
Harga Satuan
Jumlah Harga
(Rp.)
(Rp.)
BAHAN Sub Total A
B.
C.
2,250.00 60,000.00
-
1
UPAH Mandor
OH
0.0450
90,000.00
4,050.00
2
Pekerja
OH
0.9000
80,000.00
72,000.00
Sub Total B Jumlah Harga ( A + B )
76,050.00 76,050.00
ANALISA HARGA SATUAN PEKERJAAN
: JALAN RABAT BETON KECAMATAN PINOGU
JENIS PEKERJAAN SATUAN
: Urugan Tanah Kembali : M3
No.
Uraian
A.
Sat
Volume
Harga Satuan
Jumlah Harga
(Rp.)
(Rp.)
BAHAN Sub Total A
B. 1 2
UPAH Mandor Pekerja
-
OH OH
0.0190 0.1920
90,000.00 80,000.00
Sub Total B C.
17,070.00
Jumlah Harga ( A + B ) : JALAN RABAT BETON KECAMATAN PINOGU
JENIS PEKERJAAN SATUAN
: Urugan Domato Bawah Lantai : M3
Uraian
A. 1
17,070.00
PEKERJAAN
No.
BAHAN Domato
Sat
M3
Volume
1.2000
Harga Satuan
Jumlah Harga
(Rp.)
(Rp.)
85,000.00
Sub Total A B.
102,000.00 102,000.00
UPAH 1 2
C. 1 2
Mandor Pekerja PEMADATAN (Per 20 Cm) Mandor Pekerja Sub Total B
C.
1,710.00 15,360.00
Jumlah Harga Satuan ( A + B )
OH OH
0.0250 0.2500
90,000.00 80,000.00
2,250.00 20,000.00
OH
0.0500
90,000.00
4,500.00
OH
0.5000
80,000.00
40,000.00 66,750.00 168,750.00
ANALISA HARGA SATUAN PEKERJAAN
: JALAN RABAT BETON KECAMATAN PINOGU
JENIS PEKERJAAN SATUAN
: Urugan Pasir Dibawah Lantai & Pondasi : M3
No.
Uraian
A. 1
BAHAN Pasir Urug
Sat
M3
Volume
1.2000
Harga Satuan
Jumlah Harga
(Rp.)
(Rp.)
100,000.00
120,000.00
Sub Total A B.
120,000.00
1
UPAH Mandor
OH
0.0100
90,000.00
900.00
2
Pekerja
OH
0.3000
80,000.00
24,000.00
Sub Total B C.
24,900.00
Jumlah Harga Satuan ( A + B ) PEKERJAAN JENIS PEKERJAAN SATUAN
No.
: JALAN RABAT BETON KECAMATAN PINOGU : Pas. Cerucut Dolken Kayu/Bambu Dia. 10-15 Cm : Bh
Uraian
A. 1
144,900.00
BAHAN Dolken Kayu / Bambu 10-15 C
Sat
M1
Volume
2.0000
Harga Satuan (Rp.)
4,375.00
Sub Total A B. 1 2
C.
UPAH Mandor Pekerja Sub Total B Jumlah Harga Satuan ( A + B )
Jumlah Harga (Rp.)
8,750.00 8,750.00
OH OH
0.0100 0.1000
90,000.00 80,000.00
900.00 8,000.00 8,900.00 17,650.00
ANALISA HARGA SATUAN PEKERJAAN JENIS PEKERJAAN
: JALAN RABAT BETON KECAMATAN PINOGU : Bongkaran Dinding
SATUAN
: M2
No.
Uraian
A.
Sat
Volume
Harga
Jumlah
Satuan (Rp.)
Harga (Rp.)
BAHAN
Sub Total A B. 1 2 3 4
C.
UPAH Mandor Kepala Tukang Tukang Batu Pekerja
OH OH OH OH
0.0150 0.0100 0.1000 0.2000
90,000.00 125,000.00 110,000.00 80,000.00
1,350.00 1,250.00 11,000.00 16,000.00
Sub Total B
29,600.00
Jumlah Harga Satuan ( A + B )
29,600.00
PEKERJAAN JENIS PEKERJAAN SATUAN
No.
: JALAN RABAT BETON KECAMATAN PINOGU : Bongkaran Atap : #REF!
Uraian
A.
-
Sat
Volume
Harga Satuan (Rp.)
Jumlah Harga (Rp.)
BAHAN
Sub Total A B. 1 2 3 4
UPAH Mandor Kepala Tukang Tukang Batu Pekerja
-
OH OH OH OH
0.0010 0.0100 0.1000 0.1600
90,000.00 125,000.00 110,000.00 80,000.00
90.00 1,250.00 11,000.00 12,800.00
ANALISA HARGA SATUAN C.
Sub Total B
25,140.00
Jumlah Harga Satuan ( A + B )
25,140.00
ANALISA HARGA SATUAN PEKERJAAN
: JALAN RABAT BETON KECAMATAN PINOGU
JENIS PEKERJAAN SATUAN
: Bongkaran Kosen : #REF!
No.
Uraian
A.
Sat
Volume
Harga
Jumlah
Satuan
Harga
(Rp.)
(Rp.)
BAHAN
Sub Total A B.
-
UPAH 1 2 3 4
C.
Mandor Kepala Tukang Tukang Batu Pekerja
OH OH OH OH
90,000.00 125,000.00 110,000.00 80,000.00
90.00 1,250.00 11,000.00 20,000.00
Sub Total B
32,340.00
Jumlah Harga Satuan ( A + B )
32,340.00
PEKERJAAN
: JALAN RABAT BETON KECAMATAN PINOGU
JENIS PEKERJAAN SATUAN
: Bongkaran Pondasi : #REF!
No.
Uraian
A.
0.0010 0.0100 0.1000 0.2500
Sat
Volume
Harga Satuan (Rp.)
Jumlah Harga (Rp.)
BAHAN
Sub Total A B. 1 2 3 4
UPAH Mandor Kepala Tukang Tukang Batu Pekerja Sub Total B
-
OH OH OH OH
0.0750 0.0600 0.1000 0.0500
90,000.00 125,000.00 110,000.00 80,000.00
6,750.00 7,500.00 11,000.00 4,000.00 29,250.00
ANALISA HARGA SATUAN C.
Jumlah Harga Satuan ( A + B )
29,250.00
ANALISA HARGA SATUAN PEKERJAAN
: JALAN RABAT BETON KECAMATAN PINOGU
JENIS PEKERJAAN
: Bongkaran Bangunan Lama
SATUAN
: M2
No.
Uraian
A.
Sat
Volume
Harga Satuan
Jumlah Harga
(Rp.)
(Rp.)
BAHAN
Sub Total A B. 1 2 3 4
UPAH Mandor Kepala Tukang Tukang Batu Pekerja
-
OH OH OH OH
0.0150 0.0100 0.1000 0.4000
90,000.00 125,000.00 110,000.00 80,000.00
Sub Total B C.
45,600.00
Jumlah Harga Satuan ( A + B )
PEKERJAAN JENIS PEKERJAAN SATUAN
No.
1 2 3
45,600.00
: JALAN RABAT BETON KECAMATAN PINOGU : Asbuild Drawing : Ls
Uraian
A.
BAHAN Kertas A3 Tinta Printer foto Copy Dokumen
Sat
Volume
Rim Dos Lbr
3.0000 2.0000 35.0000
Harga Satuan (Rp.)
65,000.00 37,500.00 1,500.00
Sub Total A B.
Jumlah Harga (Rp.)
195,000.00 75,000.00 52,500.00 322,500.00
1
UPAH Operator Komputer
Hari
12.0000
80,000.00
960,000.00
1
ALAT Komputer
Hari
12.0000
45,000.00
540,000.00
C
D.
1,350.00 1,250.00 11,000.00 32,000.00
Sub Total B Jumlah Harga Satuan ( A + B )
1,500,000.00 1,822,500.00
PEKERJAAN JENIS PEKERJAAN SATUAN
No.
: JALAN RABAT BETON KECAMATAN PINOGU : Pembersihan lapangan : Ls
Uraian
A.
Sat
Volume
Harga Satuan (Rp.)
Jumlah Harga (Rp.)
BAHAN
Sub Total A B. 1 2
UPAH Pekerja Mandor
-
OH OH
1.1500 15.0000
80,000.00 90,000.00
Sub Total B Jumlah Harga Satuan ( A + B )
D.
PEKERJAAN JENIS PEKERJAAN SATUAN
No.
1 2 3
1,442,000.00 1,442,000.00
: JALAN RABAT BETON KECAMATAN PINOGU : Pengukuran & Pasang Bowplank : M2
Uraian
A.
BAHAN Papan Bouwplank Kayu Kls III Balok Bouwplank Kayu Kls III Paku
Sat
M3 M3 Kg
Volume
0.3200 0.2500 0.9000
Harga Satuan (Rp.)
2,000,000.00 2,000,000.00 16,500.00
Sub Total A B. 1 2 3 4
C.
92,000.00 1,350,000.00
UPAH Mandor Kepala Tukang Tukang Batu Pekerja Sub Total B Jumlah Harga Satuan ( A + B )
Jumlah Harga (Rp.)
640,000.00 500,000.00 14,850.00 1,154,850.00
OH OH OH OH
0.1000 1.0000 1.0000
90,000.00 125,000.00 110,000.00 80,000.00
9,000.00 110,000.00 80,000.00 199,000.00 1,353,850.00
PEKERJAAN JENIS PEKERJAAN SATUAN
No.
: JALAN RABAT BETON KECAMATAN PINOGU : Alat Bantu / Steling / Perancah : Ls
Uraian
A. 1 2 3
BAHAN Kayu bulat Kayu Kls III Papan alas Kayu Kls III Paku
Sat
M3 M3 Kg
Volume
0.6700 0.5500 0.5000
Harga Satuan (Rp.)
2,000,000.00 2,000,000.00 16,500.00
Sub Total A B. 1 2 3 4
UPAH Mandor Kepala Tukang Tukang Batu Pekerja
PEKERJAAN JENIS PEKERJAAN SATUAN
No.
OH OH OH OH
0.1000 0.0500 0.5000 2.0000
90,000.00 125,000.00 110,000.00 80,000.00
1 2
230,250.00 2,678,500.00
BAHAN Tangki Air pompa Air
Sat
Volume
Hari Jam
40.0000 30.0000
Harga Satuan (Rp.)
50,000.00 15,000.00
Sub Total A B. 4
C.
9,000.00 6,250.00 55,000.00 160,000.00
: JALAN RABAT BETON KECAMATAN PINOGU : Air Kerja : Ls
Uraian
A.
1,340,000.00 1,100,000.00 8,250.00 2,448,250.00
Sub Total B Jumlah Harga Satuan ( A + B )
C.
Jumlah Harga (Rp.)
UPAH Pekerja Sub Total B Jumlah Harga Satuan ( A + B )
Jumlah Harga (Rp.)
2,000,000.00 450,000.00
2,450,000.00
OH
15.1400
80,000.00
1,211,200.00 1,211,200.00 3,661,200.00
PEKERJAAN JENIS PEKERJAAN SATUAN
No.
: JALAN RABAT BETON KECAMATAN PINOGU : pembersihan Sisa-sia Material : Ls
Uraian
A. 1
BAHAN Dump Truk
Sat
Hari
Volume
3.0000
Harga Satuan (Rp.)
700,000.00
Sub Total A B. 4
UPAH Pekerja
OH
PEKERJAAN JENIS PEKERJAAN SATUAN
No.
2.0000
80,000.00
1 2 3 4 5
160,000.00 2,260,000.00
BAHAN Kertas A4 Kertas A3 Tinta Printer Foto Dokumentasi Foto Copy Laporan
Sat
Volume
Rim Rim Dos Lbr Lbr
3.0000 1.0000 2.0000 35.0000 666.0000
Harga Satuan (Rp.)
40,000.00 65,000.00 37,500.00 1,500.00 250.00
Sub Total A B. 1 2
C.
160,000.00
: JALAN RABAT BETON KECAMATAN PINOGU : Administrasi & Dokumentasi : Ls
Uraian
A.
2,100,000.00
2,100,000.00
Sub Total B Jumlah Harga Satuan ( A + B )
C.
Jumlah Harga (Rp.)
UPAH Kameraman Pimpinan Teknik
Sub Total B Jumlah Harga Satuan ( A + B )
Jumlah Harga (Rp.)
120,000.00 65,000.00 75,000.00 52,500.00 166,500.00
479,000.00
OH OB
1.0000 1.0000
110,000.00 1,250,000.00
110,000.00 1,250,000.00
1,360,000.00 1,839,000.00
PEKERJAAN JENIS PEKERJAAN SATUAN
No.
: JALAN RABAT BETON KECAMATAN PINOGU : Pas. Huruf Stenlees : Ls
Uraian
A. 1
BAHAN Huruf Stenlees
Sat
Bh
Volume
1.0000
Harga Satuan (Rp.)
Jumlah Harga (Rp.)
325,000.00
325,000.00
Sub Total A B. 1
UPAH Upah Pemasangan 15% dr Har
325,000.00
Ls
1.0000
-
Sub Total B Jumlah Harga Satuan ( A + B )
C.
PEKERJAAN JENIS PEKERJAAN SATUAN
No.
1
48,750.00 373,750.00
: JALAN RABAT BETON KECAMATAN PINOGU : Pas. Logo : Ls
Uraian
A.
BAHAN Logo
Sat
Bh
Volume
1.0000
Harga Satuan (Rp.)
Jumlah Harga (Rp.)
4,500,000.00
Sub Total A B. 1
C.
48,750.00
UPAH Upah Pemasangan 15% dr Har
Sub Total B Jumlah Harga Satuan ( A + B )
4,500,000.00
4,500,000.00
Ls
1.0000
-
675,000.00
675,000.00 5,175,000.00
PEKERJAAN JENIS PEKERJAAN
No.
A. 1 2 3 4 B. 1
2 C.
Volume
Harga Satuan (Rp.)
Sat
BAHAN Kayu Klas III Seng Gelombang Paku Seng Paku
M3 Lbr Kg Kg
0.0900 1.0000 0.0400 0.4000
2,000,000.00 39,000.00 25,000.00 16,500.00
180,000.00 39,000.00 1,000.00 6,600.00
UPAH Mandor Kepala Tukang Tukang Pekerja
OH OH OH OH
0.0500 0.0800 0.4500 0.7500
90,000.00 125,000.00 110,000.00 80,000.00
4,500.00 10,000.00 49,500.00 60,000.00
Jumlah Harga ( A + B )
No.
350,600.00
: JALAN RABAT BETON KECAMATAN PINOGU : Papan Nama Proyek
Uraian
A.
Jumlah Harga (Rp.)
Uraian
PEKERJAAN JENIS PEKERJAAN
Sat
Volume
Harga Satuan (Rp.)
Jumlah Harga (Rp.)
1 2 3 4
BAHAN MultiPleks Kayu Klas II Cat Minyak Paku
Lbr M3 Kg Kg
0.2500 0.0568 0.3400 0.4920
300,000.00 2,800,000.00 52,000.00 16,500.00
75,000.00 159,040.00 17,680.00 8,118.00
1 2
UPAH Mandor Pekerja
OH OH
0.1500 1.0000
90,000.00 80,000.00
13,500.00 80,000.00
B.
C.
: JALAN RABAT BETON KECAMATAN PINOGU : Direksi Keet
Jumlah Harga ( A + B )
353,338.00
DAFTAR HARGA SATUAN JADI SATUAN KERJA
:
0
PEKERJAAN
: JALAN RABAT BETON KECAMATAN PINOGU
LOKASI
: KABUPATEN BONE BOLANGO
TAHUN ANGGARAN : 2016
NO
URAIAN PEKERJAAN
SAT
HARGA SATUAN (Rp)
1.
Pek. Galian Tanah Pondasi Jalur
M³
62,250.00
2.
Pek. Galian Tanah Pondasi Telapak
M³
76,050.00
3.
Pek. Urugan Tanah Kembali
M³
17,070.00
4.
Pek. Pasir Alas Bwh Lantai & Pondasi teras
M³
144,900.00
5.
Pek. Urugan Pasir Domato Bawah Lantai & Pemadatan
M³
168,750.00
6.
Pas. Aanstamping Batu Kali
M³
323,685.00
7.
Pek. Pondasi Batu Kali Sp. 1:5
M³
727,825.00
8.
Pek. Lantai Kerja Pondasi Telapak
M³
740,075.00
9.
Pek. Cor Beton Bertulang Telapak
M³
2,820,637.00
10.
Pek. Cor Beton Bertulang Sloef (15/20) Cm
M³
4,197,739.67
11.
Pek. Cor Beton Bertulang Sloef (20/25) Cm
M³
4,741,379.17
12.
Pek. Cor Beton Bertulang kolom (30x30) Cm
M³
3,875,669.50
13.
Pek. Cor Beton Bertulang kolom (20x20) Cm
M³
5,749,346.33
14.
Pek. Cor Beton Bertulang Kolom Praktis (12x12) Cm
M³
6,307,281.56
15.
Pek. Cor Beton Bertulang Balok Latey (12x12)
M³
6,340,614.89
16.
Pek. Cor Beton Bertulang Balok (20x40) Cm
M³
3,639,197.50
17.
Pek. Cor Beton Bertulang Balok (15x25) Cm
M³
4,640,318.11
18.
Pek. Cor Beton Bertulang Balok (15x20) Cm
M³
5,011,584.11
19.
Pas. Dinding Batu ½ Bata sp. 1 : 3
M²
118,655.00
20.
Pas. Dinding Batu ½ Bata sp. 1 : 5
M²
112,495.00
21.
Pek. Plesteran Dinding,Beton, dan Pondasi sp. 1 : 3
M²
59,414.00
22.
Pek. Plesteran Dinding sp. 1 : 5
M²
56,051.00
23.
Pek. Acian Semen
M²
34,025.00
24.
Pek. Kosen Kayu Kls I
M³
103,196.50
25.
Pek. Daun PintuPanel Kayu Kls II
M²
504,750.00
26.
Pek. Daun Pintu Panel Kayu Kls II Belakang lapis Tripleks Aluminium
M²
547,782.79
27.
Pek. Daun Ventilasi Kaca 5 mm Panel Kayu Kls II
M²
466,400.00
28.
Pek. Teralis Pengaman Ventilasi
M²
123,240.00
29.
Pas. Pintu Harmonika
M²
848,505.00
30.
Pas. Engsel Pintu 4"
Bh
46,642.50
31.
Pas. Engse Jendela 3"
Bh
32,642.50
32.
Pas. Kunci Pintu 2 Slaag
Bh
171,047.50
33.
Pas. Tarikan Jendela
Bh
26,642.50
34.
Pas. Grendel Jendela
Bh
24,642.50
35.
Pas, Hak Angin Jendela
Bh
26,642.50
36.
Pas. Expanyolet
Bh
60,142.50
NO
URAIAN PEKERJAAN
HARGA SATUAN
SAT
(Rp)
37.
Pek. Rangka Plafond Hollow Aluminium
M²
38.
Pas. Plafond Gypsum Board 9 mm
M²
45,429.80
39.
Pek. Cor Beton Tumbuk Lantai Sp 1:3:5
M³
740,075.00
40.
Pas. Lantai keramik 40x40 Cm Setara Kw1
M²
137,870.00
41.
Pas. Plint Lantai Keramik 10x40 Cm Setara Kw1
M¹
51,042.22
42.
Pas. Lantai Keramik Anti Slip 25x25 Cm Setara Kw1
M²
144,485.00
43.
Pas. Dinding Keramik 25x40 Cm Setara Kw1
M²
141,985.00
44.
Pas. Pipa PVC (AW). Dia 4" + Accessories (Air kotor)
M¹
59,424.00
45.
Pas. Pipa PVC (AW). Dia 2" + Accessories (Air kotor)
M¹
29,731.75
46.
Pas. Pipa PE Dia 1/2" + Accessories (Air bersih)
M¹
21,242.00
47.
Pas. Mata Kran Air 1/2"
Bh
53,625.00
48.
Pas. Floor Drain
Bh
46,500.00
49.
Pas. Kloset Jongkok Setara Toto
Bh
528,900.00
50.
Pek. Septick Tank
Bh
5,037,847.26
51.
Pek. Rangka Atap Baja Ringan setara taso & Genteng Metal
M²
306,977.78
52.
Pek. Bubungan Genteng Metal
M¹
73,190.00
53.
Pek. Listplank GRC
M¹
76,640.00
54.
Pas. Jurai Dalam
M¹
53,170.00
55.
Pas. MCB 3 Phase + Panel Box
Bh
970,937.50
56.
Pas. Instalasi Listrik (Lengkap Acc. + Kabel Listrik)
Ttk
130,395.00
57.
Pas. Saklar Ganda
Bh
45,250.00
58.
Pas. Stop Kontak
Bh
41,250.00
59.
Pas.Lampu Armateure RMI 2 x18 W
Bh
491,250.00
60.
Pas. Lampu SL 8 Watt
Bh
53,750.00
61.
Pek. Pengecatan Dinding & Beton
M²
32,604.00
62.
Pek. Pengecatan Plafond
M²
31,210.00
63.
Pek. Pengecatan Kosen, Daun Pintu & Ventilasi
M²
35,266.00
Gorontalo,
83,575.00
Juni 2015
Dibuat Oleh : -
Direktur
ENGINEERING ESTIMATE (EE) SATUAN KERJA PEKERJAAN LOKASI T. A NO
: 0 : JALAN RABAT BETON KECAMATAN PINOGU : KABUPATEN BONE BOLANGO : 2016 URAIAN PEKERJAAN
SAT
VOL
HARGA SATUAN (Rp)
A. 1. 2. 3. 4. 5. B.
PEKERJAAN PERSIAPAN
JUMLAH HARGA (Rp) 4,450,000.00
Pengukuran & Pasang Bowplank Papan Nama Proyek Alat Bantu / Steling / Perancah Direksi Keet Penggunaan Air Kerja dan listrik kerja
Ls Bh Ls Ls Ls
1.00 1.00 1.00 1.00 1.00
500,000.00 250,000.00 850,000.00 2,000,000.00 850,000.00
500,000.00 250,000.00 850,000.00 2,000,000.00 850,000.00
PEKERJAAN GEDUNG WAREHOUSE
1. 2. 3. 4. 5.
I. Pekerjaan Tanah Pek. Galian Tanah Pondasi Jalur Pek. Galian Tanah Pondasi Telapak Pek. Urugan Tanah Kembali Pek. Pasir Alas Bwh Lantai & Pondasi teras Pek. Urugan Pasir Domato Bawah Lantai & Pemadatan
M³ M³ M³ M³ M³
91.53 9.22 25.19 20.91 115.73
62,250.00 76,050.00 17,070.00 144,900.00 168,750.00
29,387,848.31 5,698,022.63 700,876.80 429,952.76 3,030,402.38 19,528,593.75
1. 2. 3.
II. Pekerjaan Pondasi Pas. Aanstamping Batu Kali Pek. Pondasi Batu Kali Sp. 1:5 Pek. Lantai Kerja Pondasi Telapak
M³ M³ M³
20.74 69.73 0.38
323,685.00 727,825.00 740,075.00
57,752,272.43 6,714,117.03 50,753,966.59 284,188.80
III. Pekerjaan Beton Pek. Cor Beton Bertulang Pek. Cor Beton Bertulang Pek. Cor Beton Bertulang Pek. Cor Beton Bertulang Pek. Cor Beton Bertulang Pek. Cor Beton Bertulang Pek. Cor Beton Bertulang Pek. Cor Beton Bertulang Pek. Cor Beton Bertulang Pek. Cor Beton Bertulang Pek. Cor Beton Bertulang
M³ M³ M³ M³ M³ M³ M³ M³ M³ M³ M³
1.92 0.62 5.40 9.94 1.74 0.86 0.84 0.91 0.34 4.30 0.65
2,820,637.00 4,197,739.67 4,741,379.17 3,875,669.50 5,749,346.33 6,307,281.56 6,340,614.89 3,639,197.50 5,182,860.94 4,640,318.11 5,011,584.11
121,122,532.29 5,415,623.04 2,613,092.94 25,579,740.60 38,508,652.15 10,003,862.62 5,418,585.58 5,302,985.94 3,318,948.12 1,749,215.57 19,941,767.08 3,270,058.63
IV. Pekerjaan Dinding & Plesteran Pas. Dinding Batu ½ Bata sp. 1 : 3 Pas. Dinding Batu ½ Bata sp. 1 : 5 Pek. Plesteran Dinding,Beton, dan Pondasi sp. 1 : 3 Pek. Plesteran Dinding sp. 1 : 5 Pek. Acian Semen
M² M² M² M² M²
28.53 355.86 252.98 711.72 964.70
118,655.00 112,495.00 59,414.00 56,051.00 34,025.00
131,165,035.70 3,385,227.15 40,032,695.69 15,030,339.83 39,892,841.92 32,823,931.11
V. Pekerjaan Pintu / Jendela Pek. Kosen Kayu Kls I Pek. Daun PintuPanel Kayu Kls II Pek. Daun Pintu Panel Kayu Kls II Belakang lapis Tripleks Alumini Pek. Daun Ventilasi Kaca 5 mm Panel Kayu Kls II Pek. Teralis Pengaman Ventilasi Pas. Pintu Harmonika Pas. Engsel Pintu 4" Pas. Engse Jendela 3" Pas. Kunci Pintu 2 Slaag Pas. Tarikan Jendela Pas. Grendel Jendela Pas, Hak Angin Jendela Pas. Expanyolet
M³ M² M² M² M² M² Bh Bh Bh Bh Bh Bh Bh
0.60 10.71 1.47 1.80 6.72 27.90 16.00 12.00 6.00 6.00 6.00 12.00 4.00
103,196.50 504,750.00 547,782.79 466,400.00 123,240.00 848,505.00 46,642.50 32,642.50 171,047.50 26,642.50 24,642.50 26,642.50 60,142.50
34,646,484.79 62,124.29 5,405,872.50 805,240.70 839,520.00 828,172.80 23,673,289.50 746,280.00 391,710.00 1,026,285.00 159,855.00 147,855.00 319,710.00 240,570.00
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 1. 2. 3. 4. 5.
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13.
Telapak Sloef (15/20) Cm Sloef (20/25) Cm kolom (30x30) Cm kolom (20x20) Cm Kolom Praktis (12x12) Cm Balok Latey (12x12) Balok (20x40) Cm Balok (15x30) Cm Balok (15x25) Cm Balok (15x20) Cm
NO
URAIAN PEKERJAAN
SAT
HARGA SATUAN
VOL
JUMLAH HARGA
(Rp)
(Rp)
1. 2. 3.
VI. Pekerjaan Plafon Pek. Rangka Plafond Hollow Aluminium Pas. Plafond Gypsum Board 9 mm Pas. Listprofil Gypsum 9 cm
M² M² M¹
265.93 265.93 166.15
83,575.00 45,429.80 41,370.00
41,179,871.96 22,225,099.75 12,081,146.71 6,873,625.50
1. 2. 3. 4. 5. 6.
VII. Pekerjaan Lantai & Keramik Pek. Cor Beton Tumbuk Lantai Sp 1:3:5 Pek. Cor Beton Bertulang Ad. 1 : 2 : 3 T = 15 Cm Pas. Lantai keramik 40x40 Cm Setara Kw1 Pas. Plint Lantai Keramik 10x40 Cm Setara Kw1 Pas. Lantai Keramik Anti Slip 25x25 Cm Setara Kw1 Pas. Dinding Keramik 25x40 Cm Setara Kw1
M³ M³ M² M¹ M² M²
10.62 18.80 69.23 67.80 2.08 7.84
740,075.00 2,639,070.00 137,870.00 51,042.22 144,485.00 141,985.00
71,886,152.32 7,857,820.32 49,609,237.86 9,544,740.10 3,460,662.84 300,528.80 1,113,162.40
M¹ M¹ M¹ Bh Bh Bh Bh
4.00 5.25 8.00 1.00 1.00 1.00 1.00
59,424.00 29,731.75 21,242.00 53,625.00 46,500.00 528,900.00 5,037,847.26
6,230,595.95 237,696.00 156,091.69 169,936.00 53,625.00 46,500.00 528,900.00 5,037,847.26
468.63 85.85 154.50 20.00 12.32
306,977.78 73,190.00 76,640.00 53,170.00 61,079.80
163,797,605.75 143,857,461.11 6,283,361.50 11,840,880.00 1,063,400.00 752,503.14
1. 2. 3. 4. 5. 6. 7.
VIII. Pekerjaan Jaringan Sanitasi Air Bersih / Kotor Pas. Pipa PVC (AW). Dia 4" + Accessories (Air kotor) Pas. Pipa PVC (AW). Dia 2" + Accessories (Air kotor) Pas. Pipa PE Dia 1/2" + Accessories (Air bersih) Pas. Mata Kran Air 1/2" Pas. Floor Drain Pas. Kloset Jongkok Setara Toto Pek. Septick Tank
1. 2. 3. 4. 5.
IX. Pekerjaan Atap & Penutup Pek. Rangka Atap Baja Ringan setara taso & Genteng Metal Pek. Bubungan Genteng Metal Pek. Listplank GRC Pas. Jurai Dalam Pek. Grc Ventilasi Atap + Rangka
M² M¹ M¹ M¹ M²
1. 2. 3. 4.
X. Pekerjaan Instalasi Listrik Pas. MCB 3 Phase + Panel Box Pas. Instalasi Listrik (Lengkap Acc. + Kabel Listrik) Pas. Saklar Ganda Pas. Stop Kontak
Bh Ttk Bh Bh
1.00 49.00 9.00 6.00
970,937.50 130,395.00 45,250.00 41,250.00
23,842,542.50 970,937.50 6,389,355.00 407,250.00 247,500.00
Bh Bh
32.00 2.00
491,250.00 53,750.00
15,720,000.00 107,500.00
M² M² M²
964.70 265.93 44.39
32,604.00 31,210.00 35,266.00
41,318,224.88 31,453,091.84 8,299,675.30 1,565,457.74
5. 6.
1. 2. 3. C. 1.
Pas.Lampu Armateure RMI 2 x18 W Pas. Lampu SL 8 Watt XI. Pekerjaan Finishing Pek. Pengecatan Dinding & Beton Pek. Pengecatan Plafond Pek. Pengecatan Kosen, Daun Pintu & Ventilasi PEKERJAAN LAIN-LAIN Administrasi / Dokumentasi
500,000.00 Ls
1.00
500,000.00
Gorontalo, Juni 2015 Dibuat Oleh : -
Ir. HELMI LATADA Direktur
500,000.00
REKAPITULASI ENGINEER ESTIMATE (EE) SATUAN KERJA
:
PEKERJAAN
: JALAN RABAT BETON KECAMATAN PINOGU
LOKASI
: KABUPATEN BONE BOLANGO
THN. ANGGARAN
: 2016
NO
KOMPONEN PEKERJAAN
A.
PEKERJAAN PERSIAPAN
B.
PEKERJAAN GEDUNG WAREHOUSE
JUMLAH
Rp.
4,450,000.00
I. Pekerjaan Tanah
Rp.
29,387,848.31
II. Pekerjaan Pondasi
Rp.
57,752,272.43
III. Pekerjaan Beton
Rp.
121,122,532.29
IV. Pekerjaan Dinding & Plesteran
Rp.
131,165,035.70
V. Pekerjaan Pintu / Jendela
Rp.
34,646,484.79
VI. Pekerjaan Plafon
Rp.
41,179,871.96
VII. Pekerjaan Lantai & Keramik
Rp.
71,886,152.32
Rp.
6,230,595.95
IX. Pekerjaan Atap & Penutup
Rp.
163,797,605.75
X. Pekerjaan Instalasi Listrik
Rp.
23,842,542.50
XI. Pekerjaan Finishing
Rp.
41,318,224.88
PEKERJAAN LAIN-LAIN
Rp.
500,000.00
JUMLAH
Rp.
727,279,166.88
PAJAK PERTAMBAHAN NILAI (PPN) 10%
Rp.
72,727,916.69
TOTAL
Rp.
800,007,083.57
DIBULATKAN
Rp.
800,000,000.00
VIII. Pekerjaan Jaringan Sanitasi Air Bersih / Kotor
C.
Terbilang
:
Delapan Ratus Juta
Rupiah Gorontalo,
Mengetahui/Menyetujui :
Juni 2015
Dibuat Oleh :
PENGGUNA ANGGARAN
Direktur
NIP. 196004051988037002
`
Hitungan Volume gedung Kantor KSOP
NO
URAIAN PEKERJAAN Galian Tanah Biasa
PJG 121.15 26.00
LBR LBR RT2 0.90 0.90
TGGI 0.70 0.65
JMLH
Total Galian Telapak
0.80
###
0.80
0.80
12.00
0.05
12.00
0.38 0.38
0.25
12.00
1.92 1.92
Total Galian Cor. Telapak
0.80
0.80 Total Galian
Urugan Tanah Kembali Urugan Tanah Bwh Lantai
5.70 5.70 1.55 6.00 3.80 7.80 4.80
3.80 4.80 1.30 2.75 2.75 5.85 5.85
0.50 0.50 0.50 0.50 0.50 0.50 0.50
2.00 1.00 2.00 1.00 2.00 2.00 1.00
22.88 21.66 13.68 2.02 8.25 10.45 45.63 14.04
2.00 1.00 2.00 1.00 2.00 2.00 1.00
115.73 2.17 2.74 0.20 1.65 1.05 4.56 2.81
1.00 1.00
5.74 20.91 17.23 3.51 20.74 60.63 9.10
Total Urugan Pasir Bwh Lantai & P
5.70 5.70 1.55 6.00 3.80 7.80 4.80 127.65
Pas. Batu Kosong
127.65 26.00
Pek. Pondasi
127.65 26.00 -
3.80 4.80 1.30 2.75 2.75 5.85 5.85 0.90 0.90 Total Uruga Pasir 0.90 0.90 0.90 Total Pas. Batu Kosong 0.50 0.50
91.53 9.22 9.22
1.20
Total Galian Cor. Lantai Kerja
VOLUME 76.32 15.21
0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.05 0.05 0.15 0.15
0.95 0.70
Total Pas. Batu Pondasi
69.73 -
0.20 0.25 0.15 0.20 0.15 Total cor Sloef 0.11 0.11 Total Klom Praktis 0.30 0.20
5.40 0.62 -
Pas. Rolag Bata Sloef 20/25 Sloef 15/20
107.90 20.75 -
Kolom praktis 11x11
5.35 1.75
Kolom Utama Kolom 20x20
9.20 7.25
Balok 20/40 Rb 15/25 Ring Balok 15/20 Balok 15/30
11.40 114.60 21.75 3.75
Balok Latey 11/11
Plat leufel
Pas. Batu Bata Trasram
0.20 0.15 0.15 0.15
0.11 0.11
10.00 10.00
0.30 0.20
12.00 6.00
0.40 0.25 0.20 0.30
2.00
0.91 4.30 0.65 0.34
69.12
0.11
0.11
0.84
8.80 3.65
0.75 1.00
0.08 0.08
0.53 0.29
0.60 0.60
28.53 -
4.60 1.75 2.00
28.53 317.95 39.55 9.30 366.80
47.55
Total Pas. Sp. 1:3 Total Pas. Dinding 1 Bata Sp
Kurang Luas Kusen
0.65 0.21 0.86 9.94 1.74
69.12 22.60 2.33
1.55 2.15 2.15 2.15
0.70 1.30 1.00 0.80
Total Luas Kosen
###
8.00 2.00 2.00 1.00
8.68 5.59 4.30 1.72
20.29
Pas. Batu Bata Sp. 1:5
Pek. Plesteran Kolom
366.80
20.29
Total Penebalan Sp.1:5 0.90 0.90 0.60 0.46 0.25 0.22 0.50
7.55 5.60 5.60 74.00 74.00 69.12 74.00
Plesteran Pondasi Plesteran Sloef Plesteran Balok Laty Plesteran Balok
355.86
6.00 6.00 6.00 1.00 1.00 1.00 1.00
Total Plester Kolom dan Balok
Kosen Kayu
5.30 5.00 4.80 5.10 4.30 3.10
40.77 30.24 20.16 34.04 18.50 15.21 37.00 195.92
2.00 3.00 1.00 8.00 2.00 2.00 total Pjg Kosen
10.60 15.00 4.80 40.80 8.60 6.20 86.00
Volume Kosen
86.00
0.05
Daun Pintu Panel Kayu
2.10 2.10
1.20 0.90
2.00 3.00
Daun Pintu Km/Wc
2.10
0.70
1.00
Daun Ventilasi
0.50 0.50
### 0.80
2.00 1.00
2.00 2.00
1.00 0.80 1.80
Teralis
0.70
0.60
2.00
8.00
6.72
Pek. Rangka Plafond
5.70 5.70 1.55 6.00 3.80 7.80 4.80 43.10 Total
3.80 4.80 1.30 2.75 2.75 5.85 5.85 0.80
0.14
0.60
2.00 1.00 2.00 1.00 2.00 2.00 1.00 1.00
5.04 5.67 10.71 1.47
1.00 1.00 1.00 1.00 1.00 1.00 1.00 ###
43.32 27.36 4.03 16.50 20.90 91.26 28.08 34.48 265.93
Cor Lantai Beton Tumbuk
Cor Tulangan
Floor Hardener
Pas. Keramik 60x60
5.70 5.70 1.55 6.00 3.80 7.80 4.80 21.00
3.80 0.07 4.80 0.07 1.30 0.07 2.75 0.07 2.75 0.07 5.85 0.07 5.85 0.07 1.85 0.07 Total Cor Lantai Beton tumbuk 7.80 5.85 0.10 5.70 4.80 0.10 21.00 2.00 0.10
2.00 2.00 1.00 2.00 1.00 1.00 2.00 2.00 1.00
5.70 5.70 21.00 21.00
4.80 4.80 2.00 0.85
1.00 1.00 1.00 1.00
2.00 2.00 ### ###
54.72 54.72 42.00 17.85 169.29
3.85 6.10 1.75 3.85
5.65 2.75 1.30 2.75
1.00 1.00 1.00 1.00
2.00 2.00 2.00
43.51 4.55 21.18
Total Keramik Kurang Keramik Km/WC
1.60
1.30
69.23 1.00
2.08 2.08
1 1
5.12 4.16 9.28 1.44 7.84
Total Keramik 20x25
1.6 1.3
Kurang Luas Kusen
0.8
Rangka Atap Baja Ringan
6.875 6.55 10.5 15.4
1.6 1.6
2 2
Total 1.8 1 Total Keramik Dinding 5.15 5 4 5
4 4 1 2
Total List Plank Talang Bumbungan
3.03 0.28 1.16 1.46 1.97 2.72 10.62 9.13 5.47 4.20 18.80
20 85.85
141.625 131 42 154
468.625 154.5