PROJECT MANAGEMENT GENERAL BID SLATES (GBS) PREQUALIFICATION QUESTIONNAIRE PART-B Electrical Systems Group Electrical & Instrumentation Cathodic Protection & Transmission Lines
Contents Instructions: GBS Experience Section .......................................................................................................... 2 Area Of Expertise .......................................................................................................................................... 3 Exhibit F: Summary Of Work Experience ..................................................................................................... 4 Exhibit G: Human Resources ........................................................................................................................ 7 Exhibit H: Equipment................................................................................................................................... 38
Saudi Aramco: Public Saudi Aramco Prequalification Questionnaire, General Bid Slates (GBS). Version: March 2015
Saudi Aramco Prequalification Questionnaire – General Bid Slates (GBS) Part - B
INSTRUCTIONS: GBS EXPERIENCE SECTION Part B of the Prequalification Questionnaire (PQQ) supplements Part A and requests information specific to the scope of work of the General Bid Slate (GBS) including relevant work experience, human resources, and equipment. Saudi Aramco manages 15 Project GBS which are categorized into 7 groups. Each group has a unique Part B questionnaire. This Part B of the PQQ for the Electrical Systems Group is for companies requesting prequalification for the Electrical & Instrumentation GBS and the Cathodic Protection & Transmission Lines GBS. You will have an opportunity to identify areas of specialized expertise on these GBS, as well as your company’s financial capacity for these projects. You are required to provide detailed experience and construction resource information for each GBS listed below that you are requesting prequalification under. The Prequalification Evaluation Team (PQET) will use the information submitted in the Exhibits of this Part B to verify that you possess the required experience, and resources to be part of the GBS.
Saudi Aramco: Public Page 2 of 40
Saudi Aramco Prequalification Questionnaire – General Bid Slates (GBS) Part - B
AREA OF EXPERTISE Identify Areas of Expertise/Specialty #
General Bid Slate
1)
Electrical Systems & Instrumentation:
a)
Electrical Substations
b)
Electrical Transmission Lines
2)
Cathodic Protection & Transmission Lines:
a)
Cathodic Protection & Transmission Lines
Saudi Aramco: Public Page 3 of 40
Description of Scope of Work
Construction of: Electrical Substations, Power distribution grids, installation of transformers and circuit breakers/ switchgear, and all associated instrumentation and interconnections. Construction of: power transmission lines, and all associated site preparation and earth works. Construction of galvanic anodes, Impressed Current Cathodic Protection (ICCP) system installation, power transmission lines, and all associated site preparation and earth works.
Company Specialty? (Yes/No)
YES NO
NO
Value of Largest Project Completed (in USD)
Saudi Aramco Prequalification Questionnaire – General Bid Slates (GBS) Part - B
EXHIBIT F: SUMMARY OF WORK EXPERIENCE Projects Completed and Ongoing List all completed and ongoing projects within the last 10 years, which are related to selected GBS(s) scope of work. Project Type
Project Title
Contract Value in US $
Award Date
Completion Date
Status (Completed /Ongoing)
LSTK/ LSPB/ other
Prime or SubContract
Location (Country & City)
Electrical Substations
Sadaba
11,100,250
Nov 8, 2007
June 2008
Completed
LSTK
Prime
Spain, Aragon
Electrical Substations
Espejo I
5,600,000
Dec, 2007
June 2008
Completed
LSTK
Prime
Spain, Andalucia
Electrical Substations
Lucaiena
3,000,000
2009
Completed
LSTK
Prime
Spain, Andalucia
Electrical Substations
Espejo II
6,540,075
February 2009
Completed
LSTK
Prime
Spain, Andalucia
Electrical Substations
Espejo III
5,000,000
2009
Completed
LSTK
Prime
Spain, Andalucia
Electrical Substations
Sevilla PV
3,500,000
Nov, 2007
April 2008
Completed
LSTK
Prime
Spain, Andalucia
Electrical Substations
Cordoba PV
8,000,000
Oct, 2007
September 2008
Completed
LSTK
Prime
Spain, Andalucia
Electrical Substations
Parque FV Ciudad Real
10,000,000
2008
Completed
LSTK
Prime
Spain, Ciudad Real
Electrical Substations
Almonacid PV Plant
5,600,000
Dec 10, 2007
July 2008
Completed
LSTK
Prime
Spain, Aragon
Electrical Substations
Seat Al Sol 5
1,943,040
May 16, 2012
November 2012
Completed
LSTK
Prime
Spain, Cataluna
Electrical Substations
Seat Al Sol 6
852,580
May 16, 2012
November 2012
Completed
LSTK
Prime
Spain, Cataluna
Electrical Substations
Frio Limpio
446
July 10, 2012
December 2012
Completed
LSTK
Prime
Spain, Aragon
Electrical Substations
Planta Fotovoltai ca Curbans
32,952,560
Feb, 5 ,2010
September 2011
Completed
LSTK
Prime
France, Hautes Alpes
Electrical Substations
Batilly Fotovoltai que
10,372,000
June 6, 2011
December 2011
Completed
LSTK
Prime
France, Creuse
Electrical Substations
PV Panameric ana
20,000,000
July 6, 2012
December 2012
Completed
LSTK
Prime
Peru, Tacna
Saudi Aramco: Public Page 4 of 40
July , 2008
Saudi Aramco Prequalification Questionnaire – General Bid Slates (GBS) Part - B Complete the following form for each ongoing project or projects completed in the last ten (10) years. Duplicate the below form for each project. Provide copies of completion certificates, performance evaluation reports (signed/stamped by client) and copies of the contract showing signature pages, contract value, type, scope of work and contract duration. A project will not be considered as part of your experience if above back-up documents are not provided. GBS Specialty
Select one or more GBS specialty related to the scope of work of this project. GBS Specialty 1 Electrical Substations Choose an item. 2 Choose an item. 3
Contract Info
Title: SADABA
Number:
Award Date: 2007
Contract Value (US$): 11,100,250
Contractual Completion Date: June 2008
Actual Completion Date: June 2008
Planned % Complete:
Actual % Complete:
Value of Supplied Material (US$): X
Value of Subcontracts (US$):
Client's Company Info
Client Name: Parques FV Del Espartal Client Address: Spain, Aragon Representative Name/Tel & Email:
Contract Type
☒ Primary ☐ Subcontractor
Designer
LSTK Detailed Design was done: ☒ In-House Design Office ☐ Outsourced ☐ Not LSTK
Scope of Work
Project’s Location: Spain, Aragon Country: Spain City: Aragon
☒ LSTK ☐ LSPB ☐ Unit Rate ☐ Construction Management ☐ Others, specify: _______________________
Project’s Brief Description (related to your scope of work only) :
Saudi Aramco: Public Page 5 of 40
☒ Sole Contractor ☐ Consortium ☐ JV, with share %:
Saudi Aramco Prequalification Questionnaire – General Bid Slates (GBS) Part - B Subcontracts
If applicable, list your main four (4) subcontracts under this project: Scope of Work Value US$ 1
Subcontractor Name
2 3 4 Human Resources
Provide human resources details for this project: 1 2 3 4 5 6 7 8 9 10 11
Number of Resources
Position Management & Administration Project Cost & Scheduling Project Managers Senior Design Engineers Design Engineers Project Engineers Procurement Personnel Quality Department Personnel Construction Supervisors Construction Skilled Labor Construction Unskilled Labor Total
Saudi Aramco: Public Page 6 of 40
Saudi Aramco Prequalification Questionnaire – General Bid Slates (GBS) Part - B Complete the following form for each ongoing project or projects completed in the last ten (10) years. Duplicate the below form for each project. Provide copies of completion certificates, performance evaluation reports (signed/stamped by client) and copies of the contract showing signature pages, contract value, type, scope of work and contract duration. A project will not be considered as part of your experience if above back-up documents are not provided. GBS Specialty
Select one or more GBS specialty related to the scope of work of this project. GBS Specialty Choose an item. 1 Choose an item. 2 Choose an item. 3
Contract Info
Title: ESPEJO I
Number:
Award Date: Dec, 2007
Contract Value (US$): 5,600,000
Contractual Completion Date: June 2008
Actual Completion Date: June 2008
Planned % Complete: X
Actual % Complete: X
Value of Supplied Material (US$): X
Value of Subcontracts (US$): X
Client's Company Info
Client Name: IDECON Client Address: Spain, Andalucia Representative Name/Tel & Email:
Contract Type
☒ Primary ☐ Subcontractor
Designer
LSTK Detailed Design was done: ☒ In-House Design Office ☐ Outsourced ☐ Not LSTK
Scope of Work
Project’s Location: Spain, Andalucia Country: Spain City: Andalucia
☒ LSTK ☐ LSPB ☐ Unit Rate ☐ Construction Management ☐ Others, specify: _______________________
Project’s Brief Description (related to your scope of work only) :
Saudi Aramco: Public Page 7 of 40
☒ Sole Contractor ☐ Consortium ☐ JV, with share %:
Saudi Aramco Prequalification Questionnaire – General Bid Slates (GBS) Part - B Subcontracts
If applicable, list your main four (4) subcontracts under this project: Scope of Work Value US$ 1
Subcontractor Name
2 3 4 Human Resources
Provide human resources details for this project: 1 2 3 4 5 6 7 8 9 10 11
Number of Resources
Position Management & Administration Project Cost & Scheduling Project Managers Senior Design Engineers Design Engineers Project Engineers Procurement Personnel Quality Department Personnel Construction Supervisors Construction Skilled Labor Construction Unskilled Labor Total
Saudi Aramco: Public Page 8 of 40
Saudi Aramco Prequalification Questionnaire – General Bid Slates (GBS) Part - B Complete the following form for each ongoing project or projects completed in the last ten (10) years. Duplicate the below form for each project. Provide copies of completion certificates, performance evaluation reports (signed/stamped by client) and copies of the contract showing signature pages, contract value, type, scope of work and contract duration. A project will not be considered as part of your experience if above back-up documents are not provided. GBS Specialty
Select one or more GBS specialty related to the scope of work of this project. GBS Specialty Choose an item. 1 Choose an item. 2 Choose an item. 3
Contract Info
Title: LUCAIENA
Number:
Award Date: X
Contract Value (US$): 3,000,000
Contractual Completion Date: 2009
Actual Completion Date: 2009
Planned % Complete: X
Actual % Complete: X
Value of Supplied Material (US$): X
Value of Subcontracts (US$): X
Client's Company Info
Client Name: FIRST SOLAR Client Address: Spain, Andalucia Representative Name/Tel & Email:
Contract Type
☒ Primary ☐ Subcontractor
Designer
LSTK Detailed Design was done: ☒ In-House Design Office ☐ Outsourced ☐ Not LSTK
Scope of Work
Project’s Location: Spain, Andalucia Country: Spain City: Andalucia
☒ LSTK ☐ LSPB ☐ Unit Rate ☐ Construction Management ☐ Others, specify: _______________________
Project’s Brief Description (related to your scope of work only) :
Saudi Aramco: Public Page 9 of 40
☒ Sole Contractor ☐ Consortium ☐ JV, with share %:
Saudi Aramco Prequalification Questionnaire – General Bid Slates (GBS) Part - B Subcontracts
If applicable, list your main four (4) subcontracts under this project: Scope of Work Value US$ 1
Subcontractor Name
2 3 4 Human Resources
Provide human resources details for this project: 1 2 3 4 5 6 7 8 9 10 11
Number of Resources
Position Management & Administration Project Cost & Scheduling Project Managers Senior Design Engineers Design Engineers Project Engineers Procurement Personnel Quality Department Personnel Construction Supervisors Construction Skilled Labor Construction Unskilled Labor Total
Saudi Aramco: Public Page 10 of 40
Saudi Aramco Prequalification Questionnaire – General Bid Slates (GBS) Part - B Complete the following form for each ongoing project or projects completed in the last ten (10) years. Duplicate the below form for each project. Provide copies of completion certificates, performance evaluation reports (signed/stamped by client) and copies of the contract showing signature pages, contract value, type, scope of work and contract duration. A project will not be considered as part of your experience if above back-up documents are not provided. GBS Specialty
Select one or more GBS specialty related to the scope of work of this project. GBS Specialty Choose an item. 1 Choose an item. 2 Choose an item. 3
Contract Info
Title: ESPEJO II
Number:
Award Date: July , 2008
Contract Value (US$): 6,540,075
Contractual Completion Date: February 2009
Actual Completion Date: February 2009
Planned % Complete: X
Actual % Complete: X
Value of Supplied Material (US$): X
Value of Subcontracts (US$): X
Client's Company Info
Client Name: IDECON Client Address: Spain, Andalucia Representative Name/Tel & Email:
Contract Type
☒ Primary ☐ Subcontractor
Designer
LSTK Detailed Design was done: ☒ In-House Design Office ☐ Outsourced ☐ Not LSTK
Scope of Work
Project’s Location: Spain, Andalucia Country: Spain City: Andalucia
☒ LSTK ☐ LSPB ☐ Unit Rate ☐ Construction Management ☐ Others, specify: _______________________
Project’s Brief Description (related to your scope of work only) :
Saudi Aramco: Public Page 11 of 40
☒ Sole Contractor ☐ Consortium ☐ JV, with share %:
Saudi Aramco Prequalification Questionnaire – General Bid Slates (GBS) Part - B Subcontracts
If applicable, list your main four (4) subcontracts under this project: Scope of Work Value US$ 1
Subcontractor Name
2 3 4 Human Resources
Provide human resources details for this project: 1 2 3 4 5 6 7 8 9 10 11
Number of Resources
Position Management & Administration Project Cost & Scheduling Project Managers Senior Design Engineers Design Engineers Project Engineers Procurement Personnel Quality Department Personnel Construction Supervisors Construction Skilled Labor Construction Unskilled Labor Total
Saudi Aramco: Public Page 12 of 40
Saudi Aramco Prequalification Questionnaire – General Bid Slates (GBS) Part - B Complete the following form for each ongoing project or projects completed in the last ten (10) years. Duplicate the below form for each project. Provide copies of completion certificates, performance evaluation reports (signed/stamped by client) and copies of the contract showing signature pages, contract value, type, scope of work and contract duration. A project will not be considered as part of your experience if above back-up documents are not provided. GBS Specialty
Select one or more GBS specialty related to the scope of work of this project. GBS Specialty Choose an item. 1 Choose an item. 2 Choose an item. 3
Contract Info
Title: ESPEJO III
Number:
Award Date: X
Contract Value (US$): 5,000,000
Contractual Completion Date: 2009
Actual Completion Date: 2009
Planned % Complete: X
Actual % Complete: X
Value of Supplied Material (US$): X
Value of Subcontracts (US$): X
Client's Company Info
Client Name: IDECON Client Address: Spain, Andalucia Representative Name/Tel & Email:
Contract Type
☒ Primary ☐ Subcontractor
Designer
LSTK Detailed Design was done: ☒ In-House Design Office ☐ Outsourced ☐ Not LSTK
Scope of Work
Project’s Location: Spain, Andalucia Country: Spain City: Andalucia
☒ LSTK ☐ LSPB ☐ Unit Rate ☐ Construction Management ☐ Others, specify: _______________________
Project’s Brief Description (related to your scope of work only) :
Saudi Aramco: Public Page 13 of 40
☒ Sole Contractor ☐ Consortium ☐ JV, with share %:
Saudi Aramco Prequalification Questionnaire – General Bid Slates (GBS) Part - B Subcontracts
If applicable, list your main four (4) subcontracts under this project: Scope of Work Value US$ 1
Subcontractor Name
2 3 4 Human Resources
Provide human resources details for this project: 1 2 3 4 5 6 7 8 9 10 11
Number of Resources
Position Management & Administration Project Cost & Scheduling Project Managers Senior Design Engineers Design Engineers Project Engineers Procurement Personnel Quality Department Personnel Construction Supervisors Construction Skilled Labor Construction Unskilled Labor Total
Saudi Aramco: Public Page 14 of 40
Saudi Aramco Prequalification Questionnaire – General Bid Slates (GBS) Part - B Complete the following form for each ongoing project or projects completed in the last ten (10) years. Duplicate the below form for each project. Provide copies of completion certificates, performance evaluation reports (signed/stamped by client) and copies of the contract showing signature pages, contract value, type, scope of work and contract duration. A project will not be considered as part of your experience if above back-up documents are not provided. GBS Specialty
Select one or more GBS specialty related to the scope of work of this project. GBS Specialty Choose an item. 1 Choose an item. 2 Choose an item. 3
Contract Info
Title: SEVILLA PV
Number:
Award Date: November 2007
Contract Value (US$): 3,500,000
Contractual Completion Date: April 2008
Actual Completion Date: April 2008
Planned % Complete: X
Actual % Complete:X
Value of Supplied Material (US$): X
Value of Subcontracts (US$): X
Client's Company Info
Client Name: SEMI Client Address: Spain, Andalucia Representative Name/Tel & Email:
Contract Type
☒ Primary ☐ Subcontractor
Designer
LSTK Detailed Design was done: ☒ In-House Design Office ☐ Outsourced ☐ Not LSTK
Scope of Work
Project’s Location: Spain, Andalucia Country: Spain City: Andalucia
☒ LSTK ☐ LSPB ☐ Unit Rate ☐ Construction Management ☐ Others, specify: _______________________
Project’s Brief Description (related to your scope of work only) :
Saudi Aramco: Public Page 15 of 40
☒ Sole Contractor ☐ Consortium ☐ JV, with share %:
Saudi Aramco Prequalification Questionnaire – General Bid Slates (GBS) Part - B Subcontracts
If applicable, list your main four (4) subcontracts under this project: Scope of Work Value US$ 1
Subcontractor Name
2 3 4 Human Resources
Provide human resources details for this project: 1 2 3 4 5 6 7 8 9 10 11
Number of Resources
Position Management & Administration Project Cost & Scheduling Project Managers Senior Design Engineers Design Engineers Project Engineers Procurement Personnel Quality Department Personnel Construction Supervisors Construction Skilled Labor Construction Unskilled Labor Total
Saudi Aramco: Public Page 16 of 40
Saudi Aramco Prequalification Questionnaire – General Bid Slates (GBS) Part - B Complete the following form for each ongoing project or projects completed in the last ten (10) years. Duplicate the below form for each project. Provide copies of completion certificates, performance evaluation reports (signed/stamped by client) and copies of the contract showing signature pages, contract value, type, scope of work and contract duration. A project will not be considered as part of your experience if above back-up documents are not provided. GBS Specialty
Select one or more GBS specialty related to the scope of work of this project. GBS Specialty Choose an item. 1 Choose an item. 2 Choose an item. 3
Contract Info
Title: CORDOBA PV
Number:
Award Date: October, 2007
Contract Value (US$): 8,000,000
Contractual Completion Date: September 2008
Actual Completion Date: September 2008
Planned % Complete: X
Actual % Complete:X
Value of Supplied Material (US$): X
Value of Subcontracts (US$): X
Client's Company Info
Client Name: SEMI Client Address: Spain, Andalucia Representative Name/Tel & Email:
Contract Type
☒ Primary ☐ Subcontractor
Designer
LSTK Detailed Design was done: ☒ In-House Design Office ☐ Outsourced ☐ Not LSTK
Scope of Work
Project’s Location: Spain, Andalucia Country: Spain City: Andalucia
☒ LSTK ☐ LSPB ☐ Unit Rate ☐ Construction Management ☐ Others, specify: _______________________
Project’s Brief Description (related to your scope of work only) :
Saudi Aramco: Public Page 17 of 40
☒ Sole Contractor ☐ Consortium ☐ JV, with share %:
Saudi Aramco Prequalification Questionnaire – General Bid Slates (GBS) Part - B Subcontracts
If applicable, list your main four (4) subcontracts under this project: Scope of Work Value US$ 1
Subcontractor Name
2 3 4 Human Resources
Provide human resources details for this project: 1 2 3 4 5 6 7 8 9 10 11
Number of Resources
Position Management & Administration Project Cost & Scheduling Project Managers Senior Design Engineers Design Engineers Project Engineers Procurement Personnel Quality Department Personnel Construction Supervisors Construction Skilled Labor Construction Unskilled Labor Total
Saudi Aramco: Public Page 18 of 40
Saudi Aramco Prequalification Questionnaire – General Bid Slates (GBS) Part - B Complete the following form for each ongoing project or projects completed in the last ten (10) years. Duplicate the below form for each project. Provide copies of completion certificates, performance evaluation reports (signed/stamped by client) and copies of the contract showing signature pages, contract value, type, scope of work and contract duration. A project will not be considered as part of your experience if above back-up documents are not provided. GBS Specialty
Select one or more GBS specialty related to the scope of work of this project. GBS Specialty Choose an item. 1 Choose an item. 2 Choose an item. 3
Contract Info
Title: PARQUE FV CIUDAD REAL
Number:
Award Date: X
Contract Value (US$): 10,000,000
Contractual Completion Date: 2008
Actual Completion Date: 2008
Planned % Complete: X
Actual % Complete:X
Value of Supplied Material (US$): X
Value of Subcontracts (US$): X
Client's Company Info
Client Name: RENOVALIA Client Address: Spain, Ciudad Real Representative Name/Tel & Email:
Contract Type
☒ Primary ☐ Subcontractor
Designer
LSTK Detailed Design was done: ☒ In-House Design Office ☐ Outsourced ☐ Not LSTK
Scope of Work
Project’s Location: Spain, Ciudad Real Country: Spain City: Ciudad Real
☒ LSTK ☐ LSPB ☐ Unit Rate ☐ Construction Management ☐ Others, specify: _______________________
Project’s Brief Description (related to your scope of work only) :
Saudi Aramco: Public Page 19 of 40
☒ Sole Contractor ☐ Consortium ☐ JV, with share %:
Saudi Aramco Prequalification Questionnaire – General Bid Slates (GBS) Part - B Subcontracts
If applicable, list your main four (4) subcontracts under this project: Scope of Work Value US$ 1
Subcontractor Name
2 3 4 Human Resources
Provide human resources details for this project: 1 2 3 4 5 6 7 8 9 10 11
Number of Resources
Position Management & Administration Project Cost & Scheduling Project Managers Senior Design Engineers Design Engineers Project Engineers Procurement Personnel Quality Department Personnel Construction Supervisors Construction Skilled Labor Construction Unskilled Labor Total
Saudi Aramco: Public Page 20 of 40
Saudi Aramco Prequalification Questionnaire – General Bid Slates (GBS) Part - B Complete the following form for each ongoing project or projects completed in the last ten (10) years. Duplicate the below form for each project. Provide copies of completion certificates, performance evaluation reports (signed/stamped by client) and copies of the contract showing signature pages, contract value, type, scope of work and contract duration. A project will not be considered as part of your experience if above back-up documents are not provided. GBS Specialty
Select one or more GBS specialty related to the scope of work of this project. GBS Specialty Choose an item. 1 Choose an item. 2 Choose an item. 3
Contract Info
Title: ALMONACID PV PLANT
Number:
Award Date: December 10, 2007
Contract Value (US$): 5,600,000
Contractual Completion Date: July 2008
Actual Completion Date: July 2008
Planned % Complete: X
Actual % Complete:X
Value of Supplied Material (US$): X
Value of Subcontracts (US$): X
Client's Company Info
Client Name: PAGOLA, S.A. Client Address: Spain, Aragon Representative Name/Tel & Email:
Contract Type
☒ Primary ☐ Subcontractor
Designer
LSTK Detailed Design was done: ☒ In-House Design Office ☐ Outsourced ☐ Not LSTK
Scope of Work
Project’s Location: Spain, Aragon Country: Spain City: Aragon
☒ LSTK ☐ LSPB ☐ Unit Rate ☐ Construction Management ☐ Others, specify: _______________________
Project’s Brief Description (related to your scope of work only) :
Saudi Aramco: Public Page 21 of 40
☒ Sole Contractor ☐ Consortium ☐ JV, with share %:
Saudi Aramco Prequalification Questionnaire – General Bid Slates (GBS) Part - B Subcontracts
If applicable, list your main four (4) subcontracts under this project: Scope of Work Value US$ 1
Subcontractor Name
2 3 4 Human Resources
Provide human resources details for this project: 1 2 3 4 5 6 7 8 9 10 11
Number of Resources
Position Management & Administration Project Cost & Scheduling Project Managers Senior Design Engineers Design Engineers Project Engineers Procurement Personnel Quality Department Personnel Construction Supervisors Construction Skilled Labor Construction Unskilled Labor Total
Saudi Aramco: Public Page 22 of 40
Saudi Aramco Prequalification Questionnaire – General Bid Slates (GBS) Part - B Complete the following form for each ongoing project or projects completed in the last ten (10) years. Duplicate the below form for each project. Provide copies of completion certificates, performance evaluation reports (signed/stamped by client) and copies of the contract showing signature pages, contract value, type, scope of work and contract duration. A project will not be considered as part of your experience if above back-up documents are not provided. GBS Specialty
Select one or more GBS specialty related to the scope of work of this project. GBS Specialty Choose an item. 1 Choose an item. 2 Choose an item. 3
Contract Info
Title: SEAT AL SOL 5
Number:
Award Date: May 16, 2012
Contract Value (US$): 1,943,040
Contractual Completion Date: November 2012
Actual Completion Date: November 2012
Planned % Complete: X
Actual % Complete:X
Value of Supplied Material (US$): X
Value of Subcontracts (US$): X
Client's Company Info
Client Name: GESTAMP SOLAR Client Address: Spain, Cataluna Representative Name/Tel & Email:
Contract Type
☒ Primary ☐ Subcontractor
Designer
LSTK Detailed Design was done: ☒ In-House Design Office ☐ Outsourced ☐ Not LSTK
Scope of Work
Project’s Location: Spain, Cataluna Country: Spain City: Cataluna
☒ LSTK ☐ LSPB ☐ Unit Rate ☐ Construction Management ☐ Others, specify: _______________________
Project’s Brief Description (related to your scope of work only) :
Saudi Aramco: Public Page 23 of 40
☒ Sole Contractor ☐ Consortium ☐ JV, with share %:
Saudi Aramco Prequalification Questionnaire – General Bid Slates (GBS) Part - B Subcontracts
If applicable, list your main four (4) subcontracts under this project: Scope of Work Value US$ 1
Subcontractor Name
2 3 4 Human Resources
Provide human resources details for this project: 1 2 3 4 5 6 7 8 9 10 11
Number of Resources
Position Management & Administration Project Cost & Scheduling Project Managers Senior Design Engineers Design Engineers Project Engineers Procurement Personnel Quality Department Personnel Construction Supervisors Construction Skilled Labor Construction Unskilled Labor Total
Saudi Aramco: Public Page 24 of 40
Saudi Aramco Prequalification Questionnaire – General Bid Slates (GBS) Part - B Complete the following form for each ongoing project or projects completed in the last ten (10) years. Duplicate the below form for each project. Provide copies of completion certificates, performance evaluation reports (signed/stamped by client) and copies of the contract showing signature pages, contract value, type, scope of work and contract duration. A project will not be considered as part of your experience if above back-up documents are not provided. GBS Specialty
Select one or more GBS specialty related to the scope of work of this project. GBS Specialty Choose an item. 1 Choose an item. 2 Choose an item. 3
Contract Info
Title: SEAT AL SOL 6
Number:
Award Date: May 16, 2012
Contract Value (US$): 852,580
Contractual Completion Date: November 2012
Actual Completion Date: November 2012
Planned % Complete: X
Actual % Complete:X
Value of Supplied Material (US$): X
Value of Subcontracts (US$): X
Client's Company Info
Client Name: GESTAMP SOLAR Client Address: Spain, Cataluna Representative Name/Tel & Email:
Contract Type
☒ Primary ☐ Subcontractor
Designer
LSTK Detailed Design was done: ☒ In-House Design Office ☐ Outsourced ☐ Not LSTK
Scope of Work
Project’s Location: Spain, Cataluna Country: Spain City: Cataluna
☒ LSTK ☐ LSPB ☐ Unit Rate ☐ Construction Management ☐ Others, specify: _______________________
Project’s Brief Description (related to your scope of work only) :
Saudi Aramco: Public Page 25 of 40
☒ Sole Contractor ☐ Consortium ☐ JV, with share %:
Saudi Aramco Prequalification Questionnaire – General Bid Slates (GBS) Part - B Subcontracts
If applicable, list your main four (4) subcontracts under this project: Scope of Work Value US$ 1
Subcontractor Name
2 3 4 Human Resources
Provide human resources details for this project: 1 2 3 4 5 6 7 8 9 10 11
Number of Resources
Position Management & Administration Project Cost & Scheduling Project Managers Senior Design Engineers Design Engineers Project Engineers Procurement Personnel Quality Department Personnel Construction Supervisors Construction Skilled Labor Construction Unskilled Labor Total
Saudi Aramco: Public Page 26 of 40
Saudi Aramco Prequalification Questionnaire – General Bid Slates (GBS) Part - B Complete the following form for each ongoing project or projects completed in the last ten (10) years. Duplicate the below form for each project. Provide copies of completion certificates, performance evaluation reports (signed/stamped by client) and copies of the contract showing signature pages, contract value, type, scope of work and contract duration. A project will not be considered as part of your experience if above back-up documents are not provided. GBS Specialty
Select one or more GBS specialty related to the scope of work of this project. GBS Specialty Choose an item. 1 Choose an item. 2 Choose an item. 3
Contract Info
Title: FRIO LIMPIO
Number:
Award Date: July 10,2012
Contract Value (US$): 446
Contractual Completion Date: December 2012
Actual Completion Date: December 2012
Planned % Complete: X
Actual % Complete:X
Value of Supplied Material (US$): X
Value of Subcontracts (US$): X
Client's Company Info
Client Name: SOLAVANTI, S.L. Client Address: Spain, Aragon Representative Name/Tel & Email:
Contract Type
☒ Primary ☐ Subcontractor
Designer
LSTK Detailed Design was done: ☒ In-House Design Office ☐ Outsourced ☐ Not LSTK
Scope of Work
Project’s Location: Spain, Aragon Country: Spain City: Aragon
☒ LSTK ☐ LSPB ☐ Unit Rate ☐ Construction Management ☐ Others, specify: _______________________
Project’s Brief Description (related to your scope of work only) :
Saudi Aramco: Public Page 27 of 40
☒ Sole Contractor ☐ Consortium ☐ JV, with share %:
Saudi Aramco Prequalification Questionnaire – General Bid Slates (GBS) Part - B Subcontracts
If applicable, list your main four (4) subcontracts under this project: Scope of Work Value US$ 1
Subcontractor Name
2 3 4 Human Resources
Provide human resources details for this project: 1 2 3 4 5 6 7 8 9 10 11
Number of Resources
Position Management & Administration Project Cost & Scheduling Project Managers Senior Design Engineers Design Engineers Project Engineers Procurement Personnel Quality Department Personnel Construction Supervisors Construction Skilled Labor Construction Unskilled Labor Total
Saudi Aramco: Public Page 28 of 40
Saudi Aramco Prequalification Questionnaire – General Bid Slates (GBS) Part - B Complete the following form for each ongoing project or projects completed in the last ten (10) years. Duplicate the below form for each project. Provide copies of completion certificates, performance evaluation reports (signed/stamped by client) and copies of the contract showing signature pages, contract value, type, scope of work and contract duration. A project will not be considered as part of your experience if above back-up documents are not provided. GBS Specialty
Select one or more GBS specialty related to the scope of work of this project. GBS Specialty Choose an item. 1 Choose an item. 2 Choose an item. 3
Contract Info
Title: PLANTA FOTOVOLTAICA CURBANS
Number:
Award Date: Feb, 5 ,2010
Contract Value (US$): 32,952,560
Contractual Completion Date: September 2011
Actual Completion Date: September 2011
Planned % Complete: X
Actual % Complete:X
Value of Supplied Material (US$): X
Value of Subcontracts (US$): X
Client's Company Info
Client Name: GDF Client Address: France, Hautes Alpes Representative Name/Tel & Email:
Contract Type
☒ Primary ☐ Subcontractor
Designer
LSTK Detailed Design was done: ☒ In-House Design Office ☐ Outsourced ☐ Not LSTK
Scope of Work
Project’s Location: France, Hautes Alpes Country: France City: Hautes Alpes
☒ LSTK ☐ LSPB ☐ Unit Rate ☐ Construction Management ☐ Others, specify: _______________________
Project’s Brief Description (related to your scope of work only) :
Saudi Aramco: Public Page 29 of 40
☒ Sole Contractor ☐ Consortium ☐ JV, with share %:
Saudi Aramco Prequalification Questionnaire – General Bid Slates (GBS) Part - B Subcontracts
If applicable, list your main four (4) subcontracts under this project: Scope of Work Value US$ 1
Subcontractor Name
2 3 4 Human Resources
Provide human resources details for this project: 1 2 3 4 5 6 7 8 9 10 11
Number of Resources
Position Management & Administration Project Cost & Scheduling Project Managers Senior Design Engineers Design Engineers Project Engineers Procurement Personnel Quality Department Personnel Construction Supervisors Construction Skilled Labor Construction Unskilled Labor Total
Saudi Aramco: Public Page 30 of 40
Saudi Aramco Prequalification Questionnaire – General Bid Slates (GBS) Part - B Complete the following form for each ongoing project or projects completed in the last ten (10) years. Duplicate the below form for each project. Provide copies of completion certificates, performance evaluation reports (signed/stamped by client) and copies of the contract showing signature pages, contract value, type, scope of work and contract duration. A project will not be considered as part of your experience if above back-up documents are not provided. GBS Specialty
Select one or more GBS specialty related to the scope of work of this project. GBS Specialty Choose an item. 1 Choose an item. 2 Choose an item. 3
Contract Info
Title: BATILLY FOTOVOLTAIQUE
Number:
Award Date: June 6, 2011
Contract Value (US$): 10,372,000
Contractual Completion Date: December 2011
Actual Completion Date: December 2011
Planned % Complete: X
Actual % Complete:X
Value of Supplied Material (US$): X
Value of Subcontracts (US$): X
Client's Company Info
Client Name: GESTAMP SOLAR Client Address: France, Creuse Representative Name/Tel & Email:
Contract Type
☒ Primary ☐ Subcontractor
Designer
LSTK Detailed Design was done: ☒ In-House Design Office ☐ Outsourced ☐ Not LSTK
Scope of Work
Project’s Location: France, Creuse Country: France City: Creuse
☒ LSTK ☐ LSPB ☐ Unit Rate ☐ Construction Management ☐ Others, specify: _______________________
Project’s Brief Description (related to your scope of work only) :
Saudi Aramco: Public Page 31 of 40
☒ Sole Contractor ☐ Consortium ☐ JV, with share %:
Saudi Aramco Prequalification Questionnaire – General Bid Slates (GBS) Part - B Subcontracts
If applicable, list your main four (4) subcontracts under this project: Scope of Work Value US$ 1
Subcontractor Name
2 3 4 Human Resources
Provide human resources details for this project: 1 2 3 4 5 6 7 8 9 10 11
Number of Resources
Position Management & Administration Project Cost & Scheduling Project Managers Senior Design Engineers Design Engineers Project Engineers Procurement Personnel Quality Department Personnel Construction Supervisors Construction Skilled Labor Construction Unskilled Labor Total
Saudi Aramco: Public Page 32 of 40
Saudi Aramco Prequalification Questionnaire – General Bid Slates (GBS) Part - B Complete the following form for each ongoing project or projects completed in the last ten (10) years. Duplicate the below form for each project. Provide copies of completion certificates, performance evaluation reports (signed/stamped by client) and copies of the contract showing signature pages, contract value, type, scope of work and contract duration. A project will not be considered as part of your experience if above back-up documents are not provided. GBS Specialty
Select one or more GBS specialty related to the scope of work of this project. GBS Specialty Choose an item. 1 Choose an item. 2 Choose an item. 3
Contract Info
Title: PV AMERICANA
Number:
Award Date: June 6, 2011
Contract Value (US$): 20,000,000
Contractual Completion Date: December 2012
Actual Completion Date: December 2012
Planned % Complete: X
Actual % Complete:X
Value of Supplied Material (US$): X
Value of Subcontracts (US$): X
Client's Company Info
Client Name: GESTAMP SOLAR Client Address: Peru, Tacna Representative Name/Tel & Email:
Contract Type
☒ Primary ☐ Subcontractor
Designer
LSTK Detailed Design was done: ☒ In-House Design Office ☐ Outsourced ☐ Not LSTK
Scope of Work
Project’s Location: Peru, Tacna Country: Peru City: Tacna
☒ LSTK ☐ LSPB ☐ Unit Rate ☐ Construction Management ☐ Others, specify: _______________________
Project’s Brief Description (related to your scope of work only) :
Saudi Aramco: Public Page 33 of 40
☒ Sole Contractor ☐ Consortium ☐ JV, with share %:
Saudi Aramco Prequalification Questionnaire – General Bid Slates (GBS) Part - B Subcontracts
If applicable, list your main four (4) subcontracts under this project: Scope of Work Value US$ 1
Subcontractor Name
2 3 4 Human Resources
Provide human resources details for this project: 1 2 3 4 5 6 7 8 9 10 11
Number of Resources
Position Management & Administration Project Cost & Scheduling Project Managers Senior Design Engineers Design Engineers Project Engineers Procurement Personnel Quality Department Personnel Construction Supervisors Construction Skilled Labor Construction Unskilled Labor Total
Saudi Aramco: Public Page 34 of 40
Saudi Aramco Prequalification Questionnaire – General Bid Slates (GBS) Part - B
EXHIBIT G: HUMAN RESOURCES 1.1
Project Management Key Personnel Provide information of company’s key project management personnel in the table below and provide copies of educational academic degrees and resumes for each management personnel: Name
Job Title
Years with Company
Total Experience Years in Discipline
1
Jose Luis Celorrio
General Manager
12
24
2
Jose Igancio del Barrio
Project Controls Manager
3
Construction Manager
4
Engineering Manager
5
Alona Ibisate
QA/QC Manager
6
Mrs. Raquel Bueno
Safety Manager
7
Jose Ruiz Sanjoaquin
Procurement Manager
8
Pre-commissioning Manager
Education: Graduate, Undergrad., Diploma
1.2
Project Construction Workforce In the tables below, provide numbers of resources In-Kingdom (IK) and/or Out-of-Kingdom (OOK). Provide scanned copies of IK Labor Office approved block visas and General Organization for Social Insurance (GOSI) Certificates, which is mandatory for your IK resources.
1.2.1
Provide numbers of your company project management personnel in the table below. No
Title
Current Number of Resources IK OOK
Number of unused block visas for work IK
1 Project Engineers 2 Cost Engineers 3 Estimators 4 Schedules /Planners Sub Total 1.2.2
Provide numbers of your company engineering and construction field personnel. #
Title
1 2 3 4 5 6 7 8 9
Civil Engineers Mechanical Engineers Electrical Engineers Process & Control Engineers Instrumentation & Control Engineers Communications Engineers QA/QC Engineer Control System Engineers Superintendent (Piping/Mech.)
Saudi Aramco: Public Page 35 of 40
Current Number of Resources IK
OOK
Number of unused block visas for work IK
Saudi Aramco Prequalification Questionnaire – General Bid Slates (GBS) Part - B
#
Title
Current Number of Resources IK OOK
Number of unused block visas for work IK
10 Superintendent (Civil) 11 Superintendent (Elect. /Instr.) 12 Foremen/Supr. (Piping/Mech.) 13 Foremen/Supr. (Civil) 14 Foremen/Supr. (Elect/Instrument) 15 Safety Engineers 16 Others (Specify) Sub Total 1.2.3
In the table below, provide numbers of skilled/ craft personnel resources. #
Skilled Labor Specialty
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
Masons Carpenters Surveyors Iron Workers Pipe Fitters Mech. technicians Elect. Technicians Steel Fixers Painters Millwrights Painters Scaffolders Sand Blasters Structural Steel Fabricator Welders Structural Welders Piping Pipe Fabricators Riggers Electricians (LV/HV) Instr. & Control Technicians Certified Cable Splicers NDT Technicians Cathodic Protection Technicians Side Booms Operators Rock Breakers Light Crane Operators Heavy Crane Operators Bulldozer Operator Grader Operators
Saudi Aramco: Public Page 36 of 40
Current Number of Resources IK OOK
Number of unused block visas for work IK
Saudi Aramco Prequalification Questionnaire – General Bid Slates (GBS) Part - B
#
Skilled Labor Specialty
Current Number of Resources IK OOK
Number of unused block visas for work IK
30 Backhoe/Excavator Operator 31 Truck Drivers 32 Others (Specify) Subtotal
1.2.4
In the table below, provide numbers of unskilled/ labors personnel resources. #
Unskilled Labors
1
Laborers
Saudi Aramco: Public Page 37 of 40
Current Number of Resources IK OOK
Number of unused block visas for work IK
Saudi Aramco Prequalification Questionnaire – General Bid Slates (GBS) Part - B
EXHIBIT H: EQUIPMENT Construction Equipment Equipment Types: in the table below, provide information about company currently owned and leased equipment relevant to the scope of work of the GBS you are requested to be prequalified for. Equipment types may be lifting such as cranes, tower cranes etc., transportation equipment such as trucks, civil work equipment such as excavators and leveling etc. Equipment Type 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39
Hammer Drill Hammer Drill Hammer Milwaukee Cordless Hammer Drill Hilti TE6A Rotary Hammer Fence Truck Iveco ML120E18Bas Crane Palfinger PK 15002 SE Hydraulic Pressure Pipe Bender Vas CH4 MOD 8 Generator Set Angle Grinder Bosch 230 1900 Generator G-5000 Floor Saw Lux-13 Rotary Hammer Hilti TE 6S Rotary Hammer Hilti TE 6C Magnetic Base Drill Generator M 2,25 Gasoline Jointing Kit Cordless Drill 12V Hilti or Battery Generator M 25 Gasoline Kit Hilti Ditect Fastening System Tools Cable Stripper Hydraulic Pump Cable Stripper Hydraulic Pump Coil Support Coil Support Reel Stand RDSI Tester Analyzer TV Cable Inc. Tester Analyzer Tester for Cable Quality Professional Kit Fujikura Tachymeter TC1105 Set HP-Calan 3010R Set Calan 3010R Site Master 25 MHZ – 4GHZ Laser Rot PR16 Plotter HP Desingjet 105
Saudi Aramco: Public Page 38 of 40
Current Number of Units 1 1 2 15 6 60 1 1 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Saudi Aramco Prequalification Questionnaire – General Bid Slates (GBS) Part - B
Equipment Type 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85
Digitizing Tablet Digital Camera Mavicva F Digital Camera Mavicva M Digital Camera Sony Mavi Plotter HP Desingjet 105 Plotter Canon BJ W-3000 Plotter IPF500 FO Slices Machine Reflectometer Wiring Certification Sound Level Meter Multi Gas Detector Laser Detector ADSL-ISDN Meter ADSL Meter. Module ISDN ADSL Meter. Module ADSL Field Meter mediamax Sweep Analyzer CATV Agilent Impedance Meter Cable Tester Cable Explorer TDR Field Meter cablrlab Sweep Analyzer Measuring Forward and Contact Systems Meter ELCB Tester Earth Meter Thermal Graphic Camera Torque Wrench Torque Wrench Clamp Meter Clamp Meter Process Meter Multifunction Process Meter Multifunction Insulation Tester Power Supply Process Meter Multifunction Insulation Tester High Voltage Mkoban 0775823 (MG-146-2) 9053087 Insulation Tester Koban KRA 2550 0775032 (9676789) Process Multimeter 11950345 Process Multimeter 12250490 Process Multimeter 10780329 Process Multimeter 12220664 Process Multimeter 13130271 Process Multimeter 98540130 High Voltage Insulation Tester Koban KRA 2804 (8951976) Insulation Tester Koban KRA 2550 9053087
Saudi Aramco: Public Page 39 of 40
Current Number of Units 1 2 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Saudi Aramco Prequalification Questionnaire – General Bid Slates (GBS) Part - B
Equipment Type 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100
Process Multimeter 12220664 Process Multimeter Fluke. 289 15460280 Thermal Graphical Camera Thickness Meter Measuring Forward and Contact Systems Meter Hart Emerson 475 Communicator Multi Gas Detector. Drugger X-AM 2000 (8318911) Hexafasic Tester Megaohmeter Network Analyzer Dynamometer Total Station Digital Tellurometer Portable Turbidity Meter Turbidity Meter
Current Number of Units 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Equipment Maintenance: Describe or attach your equipment maintenance/fleet management program and your company’s maintenance facilities, including the size of each facility and number of maintenance technicians.
Equipment Maintenance/Fleet Management Program:
Saudi Aramco: Public Page 40 of 40