A short grammar of Irish to be used together with the book Progress in Irish
CAE 2015
Book
Descripción: progress testt
CAE 2015Descripción completa
progress testt
scale
Full description
SKF
Progress By St.John G.Ervine Professor Henry Corrie Mrs. MeldonFull description
Descripción: Equivalenza PDF 2017_work in Progress
Descripción completa
Description of how to perform creep analysis with solidworks.Full description
Full description
Bombas hidraulicas SKFDescripción completa
Estudios de ingeniería Solidworks
Analysis
Progress Analysis with SKF in PS This document is to briefly explain the way progress of a project/wbs in terms of POC is calculated when planning is performed based on SKF. There is no detail business scenario as this document is mainly to see the steps involved in using the SKF to check the progress of a project. 1. Create SKF Transactions : KK01/02/03
Here, the SKF category 'Fixed Value' is used. Usually Fixed value is used when the SKF does not change very often, as in the case of number of employees, area etc. The rest of the document will consider the fixed value type of SKF. 2. POC customizing Transaction : SPRO
• PS customzing path for progress analysis
Generated by Jive on 2015-03-01+01:00 1
Progress Analysis with SKF in PS
• Maintain Progress Version
Generated by Jive on 2015-03-01+01:00 2
Progress Analysis with SKF in PS
• Define Measurement method
Generated by Jive on 2015-03-01+01:00 3
Progress Analysis with SKF in PS
• Details of Measurement method definition
Generated by Jive on 2015-03-01+01:00 4
Progress Analysis with SKF in PS
3. Cj20n : Progress on WBS
• Progress version : 132 • The planned and actual measurement method :MEG_QUANT defined above. • The WBS is released and saved.
Generated by Jive on 2015-03-01+01:00 5
Progress Analysis with SKF in PS
Here, both the planned and actual measurement method has been taken as : MEG_QUANT. 4. Posting Planned and Actual SKF Planning SKF on WBS
If the SKF is defined is a ‘ Fixed’ category, then the value of the key figure entered in one month will be used for the remainder of the fiscal year. If the SKF is defined as a ‘ Total’ category, then the value of the key figure entered in one month will be used in one particular month and not the following ones. In our case SKF - 1304 is Fixed value.
• Transactions to plan & distribute SKF values on WBS: CJS2/ CJS3. • SKF can be planned in CJ20n also on activities & WBS. • Transactions to plan & distribute SKF values on network: CJK2/ CJK3.
The below snap shots will show the Planning of SKF on WBS via CJS2
Generated by Jive on 2015-03-01+01:00 6
Progress Analysis with SKF in PS
In CJ20n, the dates tab will have dates which will show the period for which the SKF was planned.
Generated by Jive on 2015-03-01+01:00 7
Progress Analysis with SKF in PS
Posting actual SKF on WBS Transaction for posting actual SKF values for WBS is KB31N
Generated by Jive on 2015-03-01+01:00 8
Progress Analysis with SKF in PS
5. Progress Calulation and analysis Run transaction CNE1 for calculating project progress
Generated by Jive on 2015-03-01+01:00 9
Progress Analysis with SKF in PS
Run Transaction CNE5 for checking the POC for the project
6. Reporting SKF Data Transaction for displaying SKF data both planned & actual is S_ALR_87013548
On running this standard SAP report
Generated by Jive on 2015-03-01+01:00 12
Progress Analysis with SKF in PS
The actual and planned SKF values above are the average values across all the periods. Actual = 50+50+50+50+50+50 / 12 = 300 /12 = 25. Planned = 100+ 100 /12 = 200/12 = 16.6667 On drilling down
Hope the document will provide an insight into the SKF and progress functionality and how it works in PS. I have mentioned below a few importanat notes which have the recent corrections in the SKF area in PS.
Generated by Jive on 2015-03-01+01:00 13
Progress Analysis with SKF in PS
1376215 -Statistical Key Figure - FAQ note 1733126 - SKF functionality is not working correctly in CJ20N 1901566 - SKF- Period distribution incorrect when fiscal variant used