End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Project Sarthak
Table of Content. Last changed on:
Last changed by:
Version:
(23/11/2010) (23/11/2 010)
RAVINDER KUMAR
1.0
Page: 1 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
S.No.
Page No.
1.
Introduction Introduction ............................................ .................................................................. ............................................ .......................................... .................... 4
2.
Getting Started ........................................... ................................................................. ............................................ ...................................... ................ 6
3.
Master Data ............................................ .................................................................. ............................................ ........................................ .................. 18 3.1
Functional Location ..................................................................... .............................................. 18
3.2
Equipment ............................................................... ................................................................. .. 29
3.3
Equipment Bill of Material ................................................ ........................................................ 43
3.4
General maintenance Task T ask lists .................................................................................................. 50
3.5
Work Permit P ermit ............................................................ ................................................................. .. 59
3.6
Characteristic .......................................................................................... ................................... 67
3.7
Measuring Points ....................................................................................................................... 71
3.8
Work Center ............................................................ ................................................................. .. 80
3.9
Maintenance Planning ........................................................ ........................................................ 85
3.10
Maintenance Plan Scheduling ....................................................................................... ............. 92
4.
Maintenance Maintenance Processing Processing ........................................... ................................................................. ......................................... ................... 102 4.1
Measuring documents ............................................................................. ................................. 102
4.2
Breakdown Maintenance Process: .................................... ....................................................... 123
4.3
Preventive Maintenance ................................................................................................ ........... 160
4.4
Regular Maintenance : ................................................................. ............................................ 203
4.5
Calibration Process: ................................................................................ ................................. 209
5.
Plant Maintenance Maintenance Information System .......................................... .......................................................... ................ 217 5.1
Standard Reports ................................................................................................ ...................... 217
Last changed on:
Last changed by:
Version:
(23/11/2010) (23/11/2 010)
RAVINDER KUMAR
1.0
Page: 2 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Last changed on:
Last changed by:
Version:
(23/11/2010) (23/11/2 010)
RAVINDER KUMAR
1.0
Page: 3 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
1. Introduction SAP R/3 is an “integrated and industryindustry-independent standard software” software” which covers integrates and connects all functional areas in a business. SAP AG defines integration as "defined communication". Although R/3 is designed for complete integration, it can also be used for a couple of business areas.
SAP is the abbreviation for “Systems Applications Applications and Products in Data Processing”.
The purpose of this document is to provide an overview of SAP PM Functionality and the details of how the transactions are carried out in SAP R/3.
The document has been organized as follows;
Master data maintenance required for PM module is covered covered first. Master data maintenance is the most important aspect as these t hese data affects all the transaction where that Master data is used. It is very much controlled by authorizations as per the policy of the company.
As a PM user, you you will be using various transactions to replicate day-to-day work work in SAP R/3. So all the transactions, which are relevant to you for carrying out Plant Maintenance activities, are covered in this.
Last changed on:
Last changed by:
Version:
(23/11/2010) (23/11/2 010)
RAVINDER KUMAR
1.0
Page: 4 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Master data maintenance and transaction processes are explained with the help of SAP screen Shots. This will help you in executing the same perfectly.
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 5 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
2. Getting Started LOG ON:
Select SAP Log in Icon
On PC Desktop & press enter key or double click,
Or follow the menu path as shown in following screen:
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 6 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
The following screen will appear.
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 7 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Select Server and click on Log on icon
Logging onto the SAP R/3 system
Sap R/3 systems are client systems. The client enables you to run several business operations at the same time in one SAP R/3 system.
Client is, in organizational terms, an independent unit in the system. Clients have their own data environment and therefore their own user master and transaction data, assigned user master records and chart off accounts and specific customizing parameters.
So that you log on to SAP R/3 system, you must have a master record created for you for corresponding client. For reasons of access
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 8 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
protection, you must enter a password when you log onto the sap system. The system does not display the password you enter.
SAP R/3 system is available in several languages. Use the language input field to select the logon language for each session.
Elements of the screen layout
Command Field: Use command field (hidden as default) to go to applications directly by entering the transaction code.
Standard Tool Bar: the push buttons in the standard tool bar are found on every screen in an SAP R/3 system. Any push buttons that cannot be used in a particular application are grayed out. If you place your
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 9 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
cursor on a push button for a while the system displays a quick info text that explains the push button function.
The Application Tool bar : shows which functions are available in the current application.
A Tab page: provides a clearer overview of several information screens
Status bar: the status bar displays information on the current system status, for example. Warning or error messages
Menu bar: the menus shown here depend on which application you are working in.
Title bar : the title bar displays the functions that are available for the user.
Checkboxes: checkboxes enable you to select several options simultaneously within a group.
Radio Buttons: allow you to choose exactly one item form a selection.
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 10 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
The below shown screen gives you a detail explanation. Menu Standard Title bar
Command
Application toolbar Tab Page
Input Fields Check boxes,
Status
SAP Easy Access
Sap easy access is the standard entry screen displayed after the logon. You navigate through the system using the tree structure.
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 11 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
You are greeted by your logo in the right-hand part of the window
Selecting Functions
You can call functions in the system as follows o
Menu Option
Favourites
o
o
Entry in the SAP easy Access menu
“/n” ends the current session
“/i” delets the current session
“/oCV01N” opens a new session and branches out to the transaction specified (CV01N)
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 12 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
By entering “ search_sap_menu” in the command field, you can display menu paths for the desired SAP transaction.
Command Field
Menu SAP easy Access and Favorite List
Field help : F1 and F4
Use F1 to display an explanation of fields, menus, functions and messages.
F1 Help also provides technical information on the relevant field.
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 13 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
F1 Help
Use F4 to display possible inputs . you can also access F4 help for a selected field using the button immediately to the right of that field.
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 14 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
F4 help
User – Specific Personalization
The end user has many possibilities for personalizing the system. For example as shown in the screen below.
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 15 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
SAP – Symbols or icons
Button
Keyboard
Description
Shortcut Enter Key
Ctrl + S
Button
Enter/Continue Save database
to
Keyboard
Description
Shortcut Ctrl
+
Page First page
Up Page Up
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Previous page
Page: 16 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
F3
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Back
Shift + F3
Exit
Page Down System
Task
Ctrl
+
Page
Down
Next page
Last page Create
F12
Cancel
None
Ctrl + P
Print
None
Ctrl + F
Find
F1
Ctrl + G
Find next
Alt + F12
New
session
Create
shortcut
on Desktop F1 Help
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Customize Local Layout
Page: 17 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
3. Master Data 3.1 Functional Location Functional locations are elements of a technical structure (for example, functional units within a system). Functional locations can be created according to the hierarchy, and can be structured based on the f ollowing criteria:
Functional
Process-related
Spatial
Each functional location is managed independently in the system, to :
Manage individual data from a maintenance perspective for the object
Perform individual maintenance tasks for the object
Keep a record of the maintenance tasks performed for the object
Collect and evaluate data over a long period of time for the object
Trigger: Functional locations need to be structured according to functional, process-related or spatial criteria. Whenever any new location identified we need to create Functional location.
BUSINESS PROCESS PROCEDURE OVERVIEW A functional location is an organizational unit to structure the maintenance objects of a company according to functional, process-related or spatial criteria. Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 18 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
BUSINESS PROCESS PROCEDURE OVERVIEW A functional location represents the place at which equipment(s) can be installed and a maintenance task is to be performed.
Output – Results
Comments
Functional location created
Procedural Steps
Title: Maintaining of Master data – functional
ID: PM
location Business process: Transaction IL01, IL02
Functional Location
code: Menu
path:
Logistics
Plant
Management of Technical Objects location
maintenance functional
Create (IL01)
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 19 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Description: Use this transaction for creating structured location Double CLICK on selected line or press Enter to get following screen
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 20 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Instructions In the initial screen, enter the values in the following fields:
Required
Field name
User action and allowed values
/ Optional Functional location
R
Functional location code is to be entered as per the structure
Structure indicator
R
Structure of func. With hierarchy level
Fuct. loc. cat.
R
Type of fictional loc.
“Press enter key“ or click on icon
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 21 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
Field name
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Required
User action and allowed values
Optional Description
Functional Location. Name is to be entered
R
(40characters). If the name exceeds, use long text.
Ensure General data screen is open or click on GENERAL TAB
Field name
Required
User action and allowed values
/ Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 22 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Optional
Weight
O
Weight of the Functional Location
Size
O
Size of the Functional Location
Start up date
O
Actual start date of usage
Acquisition value
O
Value of the Functional Location at the time of acquiring
Acquisition date
O
Date on which the Functional Location was acquired
Manufacturer
O
Manufacturer of the Functional Location
Manufacturing
O
Country, where the Functional Location was
country
manufactured
Model number
O
Model number of the Functional Location supplied by the manufacturer
Constr. Yr/mth
O
Year
and
month
of
Functional
Location
constructed Manuf Part No.
O
Part number of the Functional Location as supplied by the manufacturer
Manuf Serial No.
O
Serial number of the Functional Location as supplied by the manufacturer
After entering required data click on LOCATION TAB
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 23 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Required
Field name
User action and allowed values
Optional Maintenance plant
O
Maintenance
plant,
where
the
Functional
Location is located Location
O
Location of the Functional Location, for ex: Building where it is installed.
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 24 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
Field name
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Required
User action and allowed values
Optional Plant section
O
Further low level identification of location.
Work center
O
Production work center, for blocking from production during maintenance work.
ABC Indic
O
As detailed below :
After entering required data click on ORGANISATION TAB
TO GET FOLLOWING SCREEN :
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 25 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
Field name
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Required
User action and allowed values
Optional Company code
R
R/3 will copy the respective company of the maintenance plant.
Business area
O
For viewing profit and loss statement/area wise costing.
Asset
O
Appropriate asset number should be assigned to the Functional Location.
Cost center
O
All the costs incurred at the Functional Location level are collected at these cost centers level.
Planning Plant
O
Maintenance planning plant, defaulted as that of maintenance plant.
Planner group
O
Planner
groups
as
per
the
maintenance
planning activities. Maintenance
work O
center Catalog profile
Maintenance work center, currently represents the departments like ME, EE, IE, CE & SE
O
For Functional Location history generation all the codes are maintained in a catalog profile.
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 26 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
After entering required data click on STRUCTURE TAB You will reach the following screen
Required
Field name
User action and allowed values
/ Optional Functional Location
O
Functional location under which the Functional Location is functioning.
Superior Functional O
Superior Functional Location under which the
Location
Functional Location is functioning.
Tech Ident. no
O
Technical
identification
number
of
the
Functional Location. Const Type
O
Material of construction.
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 27 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
Click on
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
to
Save and following message will be given by
the system
The Functional Location is saved.
Through transaction code IL02, required functional location can be opened for editing If Functional location installation is to be changed, click on icon on structure tab, to get the following screen
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 28 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
First dismantle the already existing installation and then input / select new installation location and click on
Click on
Enter / Continue icon
to
Save the changes made and following
message will be given by the system.
3.2 Equipment A piece of equipment is an individual object that is to be maintained independently. Each piece of equipment is managed independently in the system, so that you can:
Manage individual data from a maintenance perspective for the object
Perform individual maintenance tasks for the object
Keep a record of the maintenance tasks performed for the object
Collect and evaluate data over a long period of time for the object Pieces of equipment can be installed and dismantled at functional locations. The usage times for a piece of equipment at a functional location are documented over the course of time.
Trigger: Maintenance history needs to be captured for a physical technical object.Whenever any new Machine/Computer etc. Purchased we need to create Equipment Master. Correct Equipment Type has to be choosen always for proper functioning.
BUSINESS PROCESS PROCEDURE OVERVIEW Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 29 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
BUSINESS PROCESS PROCEDURE OVERVIEW This document describes how to create Equipment for use in PM functions. Equipment are master data to manage physical objects in PM and Customer Service. An Equipment master data object must be created here before it may be associated with a Functional Location object.
Output - Results
Comments
Equipment Master created
ID: PM Transaction
Title: Maintaining of Master data - Equipment code: Menu
IE01, IE02, IE03,
path:
Logistics
Plant
Management of Technical Objects
maintenance Equipment
Create (IE01)
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 30 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Description: Use this transaction for creating & maintaining Equipment Double click or press Enter Key to reach the following screen
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 31 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Instructions In the initial screen, enter the values in the following fields:
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 32 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Required
Field name
User action and allowed values
/ Optional No in put is required as system creates an
Equipment
internal no, Valid on
R
By default system proposes current date, one can change to the appropriate valid from date.
Equipment category R
Appropriate equipment category to be selected from the list
REFERENCE Equipment
O
Already existing equipment can be used to copy the data Not
Material
applicable
this
is
required
when
a
material/equipment link is required
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 33 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Press Enter key or click on
Enter / Continue icon to reach the following
screen
Enter the parameters as detailed below: in „General‟ screen Screen fields data entry instruction: Field name
Required
User action and allowed values
/ Optional Description
R
Equipment
Name
is
to
be
entered
(40characters). If the name exceeds, use long text. Object type
O
Type of machine ex: “select from list”
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 34 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Required
Field name
User action and allowed values
/ Optional
Weight
O
Weight of the equipment
Size
O
Size of the equipment
Start up date
O
Actual start date of usage
Acquisition value
O
Value of the equipment at the time of acquiring acquiring
Acquisition date
O
Date on which the equipment was was acquired
Manufacturer
O
Manufacturer of the equipment
Manufacturing
O
Country,
country
where
the
equipment
was
manufactured
Model number
O
Model number of the equipment supplied by the
Last changed on:
Last changed by:
Version:
(23/11/2010) (23/11/2 010)
RAVINDER KUMAR
1.0
Page: 35 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Required
Field name
User action and allowed values
/ Optional manufacturer Constr. Yr/mth
O
Year and month of equipment constructed
Manuf Part No.
O
Part number of the equipment as supplied by the manufacturer
Manuf Serial No.
O
Serial number of the equipment as supplied by the manufacturer
Click on
Location Tab to get the following
screen
Last changed on:
Last changed by:
Version:
(23/11/2010) (23/11/2 010)
RAVINDER KUMAR
1.0
Page: 36 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Required
Field name
User action and allowed values
/ Optional Maintenance plant
R
Maintenance plant, where the equipment is located
Location
O
Location of the equipment, for ex: Building where it is installed.
Plant section
R
Further low level identification of location.
Work center
O
Production work center, for blocking from production during maintenance work.
ABCD
Indicator
O
As detailed below:
Strategy
A
Critical
B
Important
C
Non-critical
Now Click on
Organization tab tab to get the following
screen
Last changed on:
Last changed by:
Version:
(23/11/2010) (23/11/2 010)
RAVINDER KUMAR
1.0
Page: 37 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Required
Field name
User action and allowed values
/ Optional Company code
R
R/3 will copy the respective company of the maintenance plant.
Business area
O
For viewing profit and loss statement/area wise costing.
Asset
O
Appropriate asset number should be assigned to the equipment.
Cost center
R
All the costs incurred at the equipment level are collected at these cost centers level.
Planning Plant
O
Maintenance planning plant, defaulted as that of maintenance plant.
Last changed on:
Last changed by:
Version:
(23/11/2010) (23/11/2 010)
RAVINDER KUMAR
1.0
Page: 38 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Required
Field name
User action and allowed values
/ Optional Planner group
O
Planner
groups
as
per
the
maintenance
planning activities. Maintenance
work O
center
Maintenance work center, currently represents the departments like ME, EE, IE, CE & SE
Catalog profile
O
For equipment history generation all the codes are maintained in a catalog profile.
Now Click on
Structure tab to get the following screen
Click here for Installation at functional location
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 39 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Required
Field name
User action and allowed values
/ Optional Functional Location
O
Functional location under which the equipment is functioning.
Superior Equipment
O
Superior equipment under which the equipment is functioning.
Tech Ident. no
O
Technical
identification
number
of
the
equipment. Const Type
O
Material of construction.
The field in the Function location blank, so it is to be selected for the Hierarchy Icon.
Click on icon
on structure tab, to get the following
screen
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 40 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
First dismantle the already existing installation and then input / select new installation location and click on
Enter / Continue icon
If you select the Superior Equipment Instead of Functional Location then that Equipment will be called SubEquipment.
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 41 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
WARRANTY END DATE
WARRANTY START DATE
Click on
to
Save the Equipment and following message
will be given by the system
Warranty is the commitment of the manufacturer, vendor, or retailer to guarantee services to a customer either free-of-charge or only charged in part, over a certain period of time.
Warranty details of equipment can be incorporated during equipment creation or can be done in equipment data change transaction and can be viewed through display mode
Whenever we try to create a notification or order, SAP system will alert with a warning message with warranty details if the equipment is still under warranty [period Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 42 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
To accommodate different warranty conditions against different warranty services, a separate master warranty is to be created and the same is to be assigned to the equipment master data
Required
Field name
User action and allowed values
/ Optional Master Warranty
O
N.A
Begin guarantee
O
Start date of warranty
Warranty end
O
End date of warranty
3.3 Equipment Bill of Material A “Bill Of Material” (BOM) is a complete, formally structured list of the components making up a technical object or an assembly. The list contains the object numbers of the individual components together with their quantity and unit of measure. The components can be stock or non-stock spares or assemblies, which in turn can be described using maintenance BOMs. BOMs are primarily used for the following purposes:
Structure description BOM describes the structure of a technical object or material. Using maintenance BOMs maintenance tasks can be planned
Assignment of spare parts BOM is used in plant maintenance to assign spares for a technical object or material. This is shown in the figure below: Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 43 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Trigger: A piece of maintenance equipment requires a bill of material for maintenance purposes.Whenever any Equipment created we can create its BOM for Structuring. But Before creating Equipment BOM we need to create Material Master.
BUSINESS PROCESS PROCEDURE OVERVIEW Create a bill of material for a piece of maintenance equipment to describe the equipment components, maintenance requirements or the assignment of spare parts.
Output - Results
Comments
Equipment BOM created
ID: PM
Title: Maintaining of Master data – Equipment
Business process:
Bill of Material
Transaction
Menu
code:IB01, IB02
Management material
path:
Logistics of
Plant
Technical
Equipment BOM
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
maintenance
Objects
Bill
of
IB01 create
Page: 44 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Description: Use this transaction for creating & maintaining Equipment bill of material
Press Enter key or use mouse double click to get following screen
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 45 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Equipment no
Plant BOM USAGE
Press enter key In the initial screen, enter the values in the following fields: Field name
Required User action and allowed values / Optional
Equipment
R
Select Equipment for which BoM
is being
created Plant
R
Enter plant
BOM usage
R
Select – 4 for Plant Maintenance
Press Enter Key or Click on
Enter / Continue icon
To get the following screen
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 46 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Enter the parameters as detailed below : in „Material‟ screen Screen fields data entry instruction: Required
Field name
User action and allowed values
/ Optional Item category
R
Select Item Category
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 47 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
Field name
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Required
User action and allowed values
/ Optional
Component
R
Select item code
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 48 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
Field name
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Required
User action and allowed values
/ Optional
Component
R
description
System
defaults
description
of
selected
component
Quantity
R
Enter installed quantity
Units
R
System defaults UOM of selected component
Click on
to save the entered data
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 49 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
3.4 General maintenance Task lists Task Lists. Task list is defined as the set of work instructions that will help a maintenance planner schedule his day-to-day job in a predefined manner Maintenance task lists describe a sequence of individual maintenance activities, which must be performed repeatedly within a company. Task l ists are used to standardize these recurring work sequences and to plan them more effectively. Task lists can be grouped, for example in to two groups -
"Inspection" and
"Mechanical Repairs". The individual maintenance task lists within the group "Mechanical Repairs" and are identified by the task list counter numbers 01 and 02 as shown in following fig.
General Maintenance Task List This type of task list is generic in nature i.e. the same general task list can be used both for
equipment and functional location and also for more than one
equipment or functional location of the same type or different types. Similar general task lists can be grouped and several individual general maintenance task lists can be created. General task lists can be used to reduce the time spent creating individual functional location/equipment task lists.
Trigger: Need to prepare a sequence of activities that must be repeatedly performed within a company.
BUSINESS PROCESS PROCEDURE OVERVIEW Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 50 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
BUSINESS PROCESS PROCEDURE OVERVIEW Maintenance task lists describe a sequence of individual maintenance activities which must be repeatedly performed within a company. They are used to standardize repetitive work processes, to plan them more effectively, and to save time when creating maintenance orders and maintenance plans.
Output – Results
Comments
General Task List created
For General Task Lists Title: Maintaining of Master data - Functional
ID: PM
location Business process: Transaction IA05
General Task List
code: Menu
path:
Logistics
maintenance preventive scheduling lists
task list
maintenance
Plant Work
General maintenance Task
Create (IA05)
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 51 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Description: Use this transaction for creating & maintaining General task list Press Enter Key to get the following screen
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 52 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
Field name
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Required
User action and allowed values
/ Optional Group
R
Enter a group name (8 characters only)
Profile
R
PDIL
Key date
R
Date from which the task list is to be used
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 53 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Enter the field value according to the following table Required
Field name
User action and allowed values
/ Optional Group CNTR
R
System defaults grp cntr is to be entered
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 54 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Work Center
O
Select responsible work center from the list
Usage
O
Select 4 for plant maintenance
R
Select 4 for plant maintenance
Status
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 55 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Click on operation tab
Following screen can be viewed
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 56 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
In the initial screen, enter the values in the following fields:
Field name
Required
User action and allowed values
/ Optional Work center
R
Select work center
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 57 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
Plant code
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
R
Define plant code like for Noida Engineering= 1100
Ctrl key
R
Pm 01 for internal operations & PM 03 for external operations
Operation
O
Describe the operation to be carried out
O
System
description Work
will
automatically
calculate
by
calculation key UN
O
Unit of measurement for mh
NO
O
No of persons required to perform the activity
Duration
O
Duration of Operation
Unit
O
Unit of measurement for duration
C
O
Calculation key –2
( for calculating duration )
Repeat the same above operation for required no of activities
Select components tab for allotting spares required for that acti vity.
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 58 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Material
O
Select required item code
Qty
O
Enter the required qty
Click on
to save the task list.
3.5 Work Permit Permits are to ensure that special approval must be obtained before maintenance orders are executed.
Permits can be assigned to the following objects:
Technical objects (functional locations and equipments)
Maintenance orders
Different types of work permit are required Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 59 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Permits can be grouped into permit categories, like
Work permit – General jobs
Hot work permit - Hot job
Confined space work permit - permit to work at confined areas
High reach work permit-Permit to work at elevated places
Trigger: A regulation or condition needing to be observed when maintenance work is being performed.
BUSINESS PROCESS PROCEDURE OVERVIEW A permit is a regulation or condition that must be observed when maintenance work is to be performed on a technical object. The creation of the permit master record is covered in this procedure. The permit can be attached to a Functional Location, Equipment master, or directly t o a work order. The requirement can be observed at the release or the completion of a work order. The permit can only be for reference, provide a warning, or cause an error message unless issued.
Output – Results
Comments
Permit master created
Master record can be viewed again by selecting row and choosing details.
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 60 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
ID: PM
Title: Maintaining of Master data – Work Permits
Business process:
Work permits
Transaction
code: Menu path: Logistics
IPMD
objects
Environment
Management of tech. IPMD permits
Select the transaction as shown in the following screen
Press enter key or double click to reach the following screen Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 61 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
To view the next screen press Enter key or click on icon
AND THEN ON
to view the following screen : Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 62 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Enter the filed values as explained in following table :
Field name
Required
User action and allowed values
/ Optional Permit
R
Enter permit name
Text
R
Enter description of the permit
Category
R
Select category of permit from the list
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 63 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Required
Field name
User action and allowed values
/ Optional
Order release
O
Select required control on order releasing from the drop down list
1 – while releasing order system will only warn Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 64 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Required
Field name
User action and allowed values
/ Optional about the issue of assigned permit to the order
2 – Order release is possible after issuing the permit only
(Blank) – No need for issue of Permit
Order Completn
O
Select required control on order releasing from the drop down list
1 – while completing order system will only Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 65 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Required
Field name
User action and allowed values
/ Optional warn about the issue of assigned permit to the order
2 – Order completion is possible after issuing the permit only
(Blank) – No need for issue of Permit Permit class
R
System defaults Permit class
Print
O
Select the Print
Not modifiable
O
N.A
Click on
If you want to write some more thing about the permit. You can use the Long Text.
Maintain required permit instructions and click on ICON
Click on save button
to save the Permit.
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 66 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
3.6 Characteristic The pre-requisite for creating a Measuring Point is characteristic.
Creation of a Characteristic: The Pre-requisite for creating a characteristic is “Unit of Measurement”, and almost all standard “units of measurement” are available in the system. If a standard Unit of Measurement is not available, contact administrator for creation of the same.
Trigger: Format need for characteristic values and the need to display characteristics when classifying master data
Output – Results
Comments
List of characteristics
Used to classify and identify objects
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 67 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Double click or press Enter Key to reach the following screen
In the initial screen, enter the values in the following fields:
Required
Field name
User action and allowed values
/ Optional Characteristics
R
Select characteristics & characteristic screen appear & (If you want to change a Existing Charecteristic) Select find by group & click. The next screen appears & select plant maint. From drop down list. If you want to create a new characteristic
please
enter
the
new
characteristic name and then go to the menu bar “Charecteristic” and click on “new”
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 68 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
Field name
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Required
User action and allowed values
/ Optional
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 69 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
Field name
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Required
User action and allowed values
/ Optional
After selecting the above screen double click you get the following screen. Then select the required characteristic & double click
Change no
O
If require fill
Validity
O
Select the date of validity from the calendar
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 70 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
Field name
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Required
User action and allowed values
/ Optional
If the values are of standard type , values can be entered e.g., Speed of pumps 1500
RPM, 3000 RPM, 1000 RPM, 750 RPM etc.,
OR
If Make is a characteristic, the values could be Akay, KSB. Maag etc.,
Click on
The Characteristic is saved.
3.7 Measuring Points Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 71 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Measuring Points:
Measuring points in MY SAP ERP System describe the physical and/or logical locations at which a condition is described (for example, the feed water temperature of a boiler, or the number of run hours of a machine) In Plant Maintenance, measuring points are located on technical objects, in other words, on pieces of equipment or functional locations. Measuring points are classified into: Measuring points Normal inspection points like temperature, pressure readings Counters Counter is a provision in my SAP ERP to represent the wear and tear of an object, consumption, or the reduction of an object‟s useful life Counters can be used to accumulate the readings like equipment run hours, Energy Consumption readings, etc.
Trigger: A measurement or counter reading for any Equipment/ Functional location to capture its current condition.
Business Process Procedure Overview Measurement will be at a measuring point or a counter.
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 72 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Output – Results
Comments
Measurement Point created
Creation of Measuring Point : Measuring Points can be created for Functional location and Equipment.
ID: PM
Title: Maintaining of Master data - Equipment
Business process:
6.4.1.7 – Measuring Points
Transaction
Menu
code:IK01
Management
path:
Logistics of
Plant
Technical
Environment Measuring point
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
maintenance Objects
Create (IK01)
Page: 73 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Case 1 : Normal Measuring Point
As shown in the following screen, Select the transaction
Double click or press Enter Key to reach the following screen
Meas. Point cate or
Screen fields data entry instruction: Required
Field name
User action and allowed values
/ Optional Measurement
R
Object
Select IEQ for equipment /IFL for Functional Location. Now press enter key if corresponding field is not displayed as per IEQ or IFL
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 74 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Required
Field name
User action and allowed values
/ Optional Equipment / fuct.loc
R
Equip/Flo code is to be selected
Meas Pnt Cat
R
Select required cato. Or use gen cato.
Measuring
point O
counter check box
Select if measuring point is counter or leave blank
Press Enter Key or click on
Details icon to reach the following
screen
Screen fields data entry instruction: Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 75 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Required
Field name
User action and allowed values
/ Optional Measurement
O
Position
Position
of
the
measuring
point
on
the
equipment or functional location.
Characteristic
R
Characteristic for Unit of Measurement
Name Description of the R
Detailed description of the measuring point
measuring point Target Value
O
Normal operating value should be entered: Example: 10.0kg/cm2
Text
O
Text can be entered: Example: Pressure under ambient condition.
If measuring point is normal measuring point and if data like max. and min. range is to be given then click on Additional data tab. This data will determine for automatic generation of notification whenever entered reading is beyond extreme limits.
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 76 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Additional data TAB
Go to : Additional data for entering Maximum and Minimum Values :
Screen fields data entry instruction: Required
Field name
User action and allowed values
/ Optional Upper Range Limit
O
The Maximum pressure condition
Lower Range Limit
O
The Minimum pressure condition
Click on
The Measuring Point is saved. Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 77 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
C a s e 2 : M ea s u r i n g P o i n t a s Co u n t e r
Check this box measuring point counter
if the is a
Screen fields data entry instruction: Required
Field name
User action and allowed values
/ Optional Measurement
R
Object
Select IEQ for equipment /IFL for Functional Location. Now press enter key if corresponding field is not displayed as per IEQ or IFL
Equipment / fuct.loc
R
Equip/Flo code is to be selected
Meas Pnt Cat
R
Select required cato. Or use gen cato.
Measuring
point R
Select Check box
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 78 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Required
Field name
User action and allowed values
/ Optional counter check box
Press Enter Key to view the following screen
Counter over reading / Reset value Annual Estimate Note : This is required for Counter based planning
Screen fields data entry instruction:
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 79 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Required
Field name
User action and allowed values
/ Optional Measurement
O
Position
Position
of
the
measuring
point
on
the
equipment or functional location.
Characteristic
R
Characteristic for Unit of Measurement
Name Description of the O
Detailed description of the measuring point
measuring point Counter Reading
O
Max displayable reading of the counter
Annual Estimate
O
Annual Estimate of readings
Click on The Measuring Point (Counter) is saved.
3.8 Work Center Trigger: Need identified for a new Work Center within a plant.
Business Process Description Overview A work center is an organizational unit that defines where and when an operation should be carried out within a plant. A work center is unique within a plant. Work centers can be machines, people or production lines. Operations that need to be executed are defined on a task list and executed at the corresponding user assigned work center. This transaction enables the user to create basic data, set defaults, assignments, and define capacities and scheduling data pertinent to a work center. Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 80 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Work centers contain default values that are copied or referenced in operations at the time of task list creation. They also contain costing, scheduling and capacity data required for leadtime scheduling and capacity planning.
Output – Results
Comments
New work center within a plant
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 81 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 82 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 83 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 84 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
3.9 Maintenance Planning
Mainten ance Plan (Single Cyc le):
Single cycle plan allows only one cycle frequency, whereas strategy plan allows multiple frequencies. Single cycle maintenance plan adopts exactly one time-based or performance based maintenance cycle, with interval at which the maintenance plan should be executed.
Trigger: To plan maintenance events to occur in a regular, periodic manner, based on one cycle parameter.
Business Process Procedure Overview Maintenance plans merge the records of specific strategies, task li sts, items and measuring points (when necessary) to generate a recurring maintenance schedule for the resultant orders which are copied from the task lists. In addition, they can be used for condition-based maintenance which can generate notifications or orders based on pre-established performance parameters. There can be multiple maintenance items in a maintenance plan. A separate order will generated from the plan for each item.
Output – Results
Comments
Maintenance plan is created.
The outputs of all three types of maintenance plans
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 85 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
are work orders (and notifications) automatically created based on pre-established work requirements and planning parameters. In addition, the upcoming maintenance can be budgeted. You will be able to look at what orders are coming due in up to the next several days, months or years (scheduled calls). In addition, you can use date monitoring to create the orders as far in advance as necessary. In this case, all the maintenance events produced from this type of plan will be due with at the same time and in the same frequency. Refer to business process procedure „Display Maintenance Plan‟ to verify results.
Title: PREVENTIVE MAINTENANCE –SINGLE CYCLE
ID: PM
PLAN Business process: Transaction IP41
6.4.2.2 – Single cycle Maintenance Plan
code: Menu
path:
Logistics
Preventive maintenance Maintenance Plans
Plant
maintenance
Maintenance Planning
Create
Single Cycle Plan
(IP41)
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 86 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Select the transaction and Double click or
press Enter Key
to reach the
following screen
In the initial screen, enter the values in the following fields:
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 87 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
Field name
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Required
User action and allowed values
/ Optional Maintenance
Plan R
Category
Choose
the
Maintenance
Plan
Category:
“Maintenance Order”
Press Enter to get the following screen
In the screen, enter the values in the following fields:
Field name
Required
User action and allowed values
/ Optional Maintenance
plan R
Enter
appropriate
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
description
for
the Page: 88 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Required
Field name
User action and allowed values
/ Optional description
maintenance plan. Ex: “Periodic shutdown plan for BI/BWM/01 SOP:BI0003”
Cycle/unit
R
The maintenance period and the unit of period should be entered. Ex: 2 mon, 30 day etc.
Cycle text
O
Enter proper text to describe the cycle duration.
Offset/unit
O
The time period by which the first scheduled call object should be postponed.
Counter
O
If the maintenance activity is performance based, counter should be used. Example “Number of operations/hrs a motor is run” etc.
Reference
object: O/R
Reference object on which the maintenance
Functional Location
activity should be carried out.
Reference
Reference object on which the maintenance
object: O/R
Equipment
activity should be carried out. After selecting equip press enter key so that system selects data from master
Planning plant
R
Planning plant
Order type
R
Enter maintenance order type: Ex: PM02 on which the maintenance call objects will be created.
Main Work Center
R
Main Work Center
Business Area
R
Business Area
Task list
O
Assign a task list either general, equipment of
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 89 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
Field name
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Required
User action and allowed values
/ Optional functional location task list.
Click on icon
to reach the following screen
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 90 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
In the screen, enter the values in the following fields:
Required
Field name
User action and allowed values
/ Optional Call horizon
O
%
of
scheduling
period
that
should
be
considered in planning. If nothing is mentioned 100% will be considered. Scheduling period
O
Planning period during which call objects will be created as per the cycle duration”.
Start of cycle
O
Enter the date on which the planning cycle should start.
Scheduling
O
indicator
If a day of a month is critical and cycle period is in months choose Time-key date other wise choose Time. If only the working days are to be considered, choose time-factory calendar.
Equipments
O
New equipments or functional locations that are to be added in the same plan should be created and added in the same plan.
Completion
O
requirement
If the fresh maintenance order to be created by the system after successful completion of the previous
maintenance
order,
then
check
completion requirement check box.
In item overview all the maintenance items that are considered in the current plan are displayed. To add a counter for performance based preventive maintenance: Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 91 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Enter required counter no. in “Counter” Field (Counter no. can also be searched using icon
)
After entering all the planning data click on
to save the plan
3.10 Maintenance Plan Scheduling Maintenance Schedulin g:
Scheduling for maintenance jobs as per prepared maintenance plans During a schedule run, system schedules the planned dates and the call dates Call date is the advance date of order generation by the system (as defined in maintenance scheduling parameters) to facilitate maintenance planner to arrange for execution of maintenance activity on planned date. The call date is the date on which a maintenance order is created in the system. This is determined by the call horizon of the maintenance plan.
Trigger: To schedule the maintenance plan and monitor its progress, including making scheduling modifications as necessary.
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 92 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Business Process Procedure Overview Maintenance plans in SAP are designed to automatically generate calls for orders, notifications, or service requests when the parameters attached to the item are met. When an order is created, a request for the resources outlined in the order is made. However, they are not reserved until the order is released. Once released an order may have goods, labor, and services charged to it. Releasing a work order gives the others the authority to reserve its resources, purchase additional ones, and start charging costs. If you decide not to do this work you can release and technically complete the order immediately.
Note: The plan is constantly adjusting itself to keep consistent with the cycle lengths linked to the items. Thus, each time a call is closed outside the cycle length and the associated tolerances, the plan is adjusted accordingly. If this is a recurring practice, future planned call dates will be fluctuate sporadically and could be difficult to keep track of.
Output – Results
Comments
A view of the scheduled calls for a maintenance plan
ID: PM
Title: PREVENTIVE MAINTENANCE –MAINTENANCE PLANNING
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 93 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
Business process: Transaction IP10
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Maintenance Scheduling
code: Menu
path:
Logistics
Preventive maintenance
Plant
maintenance
Maintenance Planning
Scheduling for Maintenance Plans
Schedule
(IP10)
Select the transaction and Double click or press Enter Key to reach the following screen
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 94 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
In the initial screen, enter the values in the following fields: Required
Field name
User action and allowed values
/ Optional Maintenance Plan
R
Press Enter key Enter key or click on
Select the Maintenance Plan from the list
Enter / Continue icon to get the following screen
and then Click on the “Start” or the “start in cycle” cycle” Push button as per Requirement. Requirement.
Last changed on:
Last changed by:
Version:
(23/11/2010) (23/11/2 010)
RAVINDER KUMAR
1.0
Page: 95 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
The plan is ready for a schedule run. Press start button start button to Run Scheduling from the Start. If you want to Start the Plan from within the Cycle then one needs to use “Start in Cycle‟.
Use
“Start”
when
Use “Start in Cycle”
you need to start the Plan from the Start of the Cycle.
when you need to start the Plan from with in the cycle.
The Following Screen appears.
Last changed on:
Last changed by:
Version:
(23/11/2010) (23/11/2 010)
RAVINDER KUMAR
1.0
Page: 96 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Click on “Scheduling
Overview.
The scheduled call call object will be displayed displayed as above. If the overview list list is to be analyzed click on Scheduling overview list. Release the scheduled plan for creating the maintenance orders. The Overview will appear as below
Last changed on:
Last changed by:
Version:
(23/11/2010) (23/11/2 010)
RAVINDER KUMAR
1.0
Page: 97 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
For list displays of schedule plans and call objects:
Use the following transactions for various list displays;
Trigger: To list the scheduled calls for a maintenance plan or group of plans
Business Process Procedure Overview To view the scheduled calls for a maintenance plan in a list format
Output – Output – Results Results
Comments
List of scheduled calls for review
Last changed on:
Last changed by:
Version:
(23/11/2010) (23/11/2 010)
RAVINDER KUMAR
1.0
Page: 98 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
For viewing plan / execution status select transaction IP24 and press Enter key to reach the Following screen
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 99 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Select by maint plan category as PM (or use the available fields for different search criteria)
click on
to view the following screen
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 100 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Calibration process is as same as Preventive maintenance in PDIL Case. So Kindly follow the same Process.( Only maintenane Order type, Planner Group, Work Center will be changed as per the Calibration)
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 101 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
4. Maintenance Processing 4.1 Measuring documents Measurement readings are to be taken at measuring points in particular measurement units at particular intervals. (For example, the feed water temperature in degrees Celsius of the boiler daily at 6.00 am) Measurement readings describe a condition at a measuring point at a particular point in time, and represent the transaction data for measuring points in the MY SAP ERP System. They are documented in the form of measurement documents. An optimum value for a particular measuring point to which the device concerned is calibrated can be maintained as a target value for the measuring point.
Creation of Measuring Document: Measuring documents can be created for Functional location & equipment measuring points.
Trigger: A measurement or counter reading from a measurement point needs to be entered into the system.
Business Process Procedure Overview After a measurement has been taken at a measuring point or a counter, the data needs to be entered into the system. A measurement document comprises the data entered in the system
Output - Results
Comments
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 102 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Measurement Document
Document may be verified by running transaction IK13
created
(display measurement document). Refer to business process procedure „Display Measurement Document‟ to verify results.
Case 1 : Normal Measuring Point
Transaction IK11
code: Menu
path:
Management
Logistics of
Technical
location/equipment
Plant
maintenance
Objects
functional
measuring document
create
(IK11).
Double click or press Enter Key to reach the following screen
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 103 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
In the initial screen, enter the values in the following fields:
Required
Field name
User action and allowed values
/ Optional Measurement point
R
Select the measuring point on which the measuring point to be entered
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 104 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Required
Field name
User action and allowed values
/ Optional
Measurement time
R
Enter date & time when measurement is taken
by
R
Enter the name of person who has taken reading .
Press Enter Key
Case 1- if the measuring point is a counter following screen will appear as below
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 105 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Screen fields data entry instruction: Required
Field name
User action and allowed values
/ Optional Counter reading
R
Either counter or difference reading has to be entered to calculate the second parameter Enter the display reading of counter if the physical counter is maintained press enter to calculate difference of reading in the system
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 106 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Required
Field name
User action and allowed values
/ Optional Counter reading
R
Either counter or difference reading has to be entered to calculate the second parameter Enter the display reading of counter if the physical counter is maintained press enter to calculate difference of reading in the system
difference
Either counter or difference reading has to be
R
entered to calculate the second parameter Enter the difference of reading & press enter the system will calculate counter reading
Click on
to save the readings
Case 2- if the measuring point is not a counter following screen will appear
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 107 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Screen fields data entry instruction:
Field name
Required
User action and allowed values
/ Optional Meas rdg
Click on
R
Enter the reading of measurement
to save the readings
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 108 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
MEA SURING POINT ENTRY LIST
Trigger: A measurement or counter reading from a measurement point needs to be entered into the system.
Business Process Procedure Overview After a measurement has been taken at a measuring point or a counter, the data needs to be entered into the system. A measurement document comprises the data entered in the system
Output - Results
Comments
Measurement Document
Document may be verified by running transaction IK13
created
(display measurement document). Refer to business process procedure „Display Measurement Document‟ to verify results.
Creating Entry List Transaction IK31
code: Menu
path:
Logistics
Plant
maintenance
Management of Technical Objects
Environment
measuring points
measuring reading entry list
(IK31).
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 109 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Double click or press Enter Key to reach the following screen
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 110 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Type entry list name
Type entry list name & press Enter key or click on
Enter / Continue icon
To reach the following screen
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 111 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
In the initial screen, enter the values in the following fields:
Required
Field name
User action and allowed values
/ Optional MeasPoint/ Counter
R
Select the measuring point on which the measuring point to be entered
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 112 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Required
Field name
User action and allowed values
/ Optional
Measu point
short R
System defaults from master data
O
System defaults from master data
text Meas Position
Click on
Following message will appear on the screen
Measur ement reading s entry throug h Measur ement reading s Entry List
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 113 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
Transaction IK34
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
code: Menu
path:
Logistics
maintenance Maintenance completion documents
confirmation collective entry
Plant Processing measurement with entry list
(IK34).
Press Enter Key or Double click on selection To reach the following screen
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 114 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
In the initial screen, enter the values in the following fields: Required
Field name
User action and allowed values
/ Optional Entry list
R
Enter the entry list number or select from the drop down list
Measurement time
R
Enter date & time when measurement is taken
Read by
R
Enter the name of person who has taken reading.
Press Enter Key or Click on tab
To reach the following screen Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 115 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Reading/Counter
Required
reading
/ Optional
For measuring point enter read value or For counter either counter reading or difference reading has to be entered to calculate the second parameter by the system
(Enter the display reading of counter if the physical counter is maintained press enter to calculate difference of reading in the system) Difference
(for R
counters)
Either counter or difference reading has to be
entered
to
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
calculate
the
second
Page: 116 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Reading/Counter
Required
reading
/ Optional
For measuring point enter read value or For counter either counter reading or difference reading has to be entered to calculate the second parameter by the system
(Enter the display reading of counter if the physical counter is maintained press enter to calculate difference of reading in the system) parameter Enter the difference of reading & press enter the system will calculate counter reading
Click on
to save the data
Notifications Notification is a means, by which internal company notifications like equipment malfunctions; breakdowns, maintenance requests or activity reports etc are entered and managed in Plant Maintenance. Notifications can be created on Equipment and Functional locations.
Trigger: An internal problem or maintenance request needs to be logged for problem reporting and technical resolution. Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 117 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Business Process Procedure Overview This document describes how to create a PM notification for any notification type. A notification is used to capture technical information and assign tasks that do not involve the tracking of costs. The user can create a maintenance order or a quality notification from the PM notification. Note: With this transaction, the screen layout will differ based on the notification type as defined in customizing. Refer to Business Procedure document for Create Maintenance Request, Create PM Malfunction Report and Create PM Activity Report.
Output – Results
Comments
Creation of a notification
Refer to Business Process Procedure „Display PM Notification', to verify this result.
ID: PM
Title: CREATING NOTIFICATION
Business process:
6.4.3.1 - Maintenance Processing - Notifications
Transaction
code: Menu
IW21
path:
Logistics
Maintenance Processing
Plant
maintenance
Notification
create
(IW21)
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 118 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Use this transaction for creating Notifications on Functional Locations and Equipment.
As technical objects like buildings are installed as Functional locations, all jobs that are required to be carried for buildings are to be created on Functional Locations.
Maintenance Request (M1) Maintenance requests are notifications used to request the maintenance department to perform an activity. Unlike malfunctions reports, maintenance requests are not used in the event of malfunctions. They are typically used in conjunction with investments, reconstruction or replacement.
Malfunction Report (M2) A malfunction report describes a malfunction of an object, which restricts the performance of that object in some way. A user can use a malfunction report to inform the maintenance department that a system is not functioning correctly, is not Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 119 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
working at all, or is producing poor results. Malfunction reports are intended to prompt the maintenance department to carry out a maintenance task to restore the target condition of the object.
Activity Report (M3) An activity report describes a maintenance activity that has already been carried out and was not necessitated by a malfunction, problem or damage. An activity report is a technical document and is used to verify which activities were carried out when, and for what reason, as well as the result of these activities. Typical examples of activity reports include inspection or maintenance findings. These documents all the results of an inspection, or the technical values of an object determined during or after regular preventive maintenance work. Inspection tasks are not requested explicitly via a malfunction report and are usually based on inspection orders. Preventive maintenance work is carried out to preserve the target condition of the object, and is based on preventive maintenance plans.
IT Report (IT) An IT report describes a malfunction of an object, which restricts the performance of that object in some way. A user can use a malfunction report to inform the maintenance department that a system is not functioning correctly, is not working at all, or is producing poor results. Malfunction reports are intended to prompt the maintenance department to carry out a maintenance task to restore the target condition of the object.
After selecting the transaction, press Enter key or double click to reach the following screen
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 120 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
In the Initial screen , you can select the type of Notification and press ENTER key or click on
Enter / Continue icon to reach the next screen
Type Of Notification:
Maintenance Orders To carry out internal maintenance jobs or external services as per the maintenance requests or according to day to day observations and for preventive maintenance activities, a
maintenance order is to be prepared to plan for material, manpower
and services requirement. On the basis of maintenance orders only, maintenance jobs costing, reservation for material and manpower planning can be done. Maintenance Orders are to be created by Maintenance dept on: Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 121 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Functional Locations Equipments
Maintenance Orders can be created against: Notifications Direct/Adhoc
Maintenance plans (thro. maintenance plans and schedules)
Maintenance Orders are to be created on the following conditions: When a material is to be drawn from the storage location When External Services are required. When history of activities are need to be captured.
The different types of Maintenance Orders configured in the system are as follows:
Type
Description
PM01
Breakdown/malfunction maintenance order
PM02
Preventive Maintenance order
PM05
Calibration order
PM07
Regular Maintenance
Please use appropriate type of order, for capturing the data under various categories.
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 122 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
As technical objects like buildings are installed as Functional locations, for jobs that are required to be carried out, Maintenance orders are to be created on Functional Locations.
4.2 Breakdown Maintenance Process: Malfunction Report (M2) A malfunction report describes a malfunction of an object, which restricts the performance of that object in some way. A user can use a malfunction report to inform the maintenance department that a system is not functioning correctly, is not working at all, or is producing poor results. Malfunction reports are intended to prompt the maintenance department to carry out a maintenance task to restore the target condition of the object.
i) Create Notification for reporting Machinery malfunctions/Breakdown (M2)
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 123 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
>Fill the Description of the Problem
>Fill/Select Functional location & Equipment
>Fill the Reported BY
>Press ENTER
>WE find this screen which show last 3 activities status on that particular equipment
Notification Header
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 124 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Click ENTER
/
Press
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 125 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Notification Description
>For M2 type Notification >we have to click in box of Breakdown > In this screen we can correct the date/time of Malfunctioning start >Click/Press ENTER
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 126 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Here we can see Warranty Status of Equipment
Long Text Can be Written at this place
Required
Field name
User action and allowed values
/ Optional Notification
R
Description of activity to be carried out
Description Functional location/ O
Select from the List of Equipment.
Equipment Required start
O
System copies the present date, a different date and time also can be entered, as required.
Priority
O
Select the priority as required
Required End
O
Enter the date and time on which the job to be completed
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 127 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Required
Field name
User action and allowed values
/ Optional Planner group
O
Planner
groups
as
per
the
maintenance
planning activities. Maintenance
work O
center
Maintenance work center, currently represents the departments
Reported by
R
Mention
the
Name
of
the
Person,
for
identification Purpose Malfunction start
O
Time of Malfunction
Malfunction end
O
Time of end of malfunction.
Cause text
O
Give reason for failure
Long text
O
Mention required details
IMPORTANT : If it is a Breakdown, checkbox „Breakdown to be selected.
After entering all the required values, click on
to
save
the
Notification.
i i ) N o t i f i c at i o n Pr o c e s s i n g
Initially Notification will have the status “OSNO” when it is created, Notification is to be released for changing the status as “NOPR” and after completing the notification, status will change to “NOCO”, if any order is assigned to this notification, status “ORAS” will be there.
Different Notification Status codes are shown below Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 128 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
After entering all the required values, click on
to
save
the
Notification. And following message will appear on the screen
If NO cost is involve we can document all work in Notification Only.There is no need to create Maintenance Order.
Notification – Put in process :
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 129 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Check for status change from OSNO to NOPR
i i i ) No t i f i c a t i o n C o m p l e t i o n
Notification is to be selected by using transaction codes IW22 / IW28 to reach the following screen
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 130 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Enter the notification number in Notification box or select from the list Press Enter key or click on “Notification” to reach the following screen Click completion flag to get the completion screen
Enter completion details as explained in following table
Required
Field name
User action and allowed values
/ Optional Malfunction start
R
Time of malfunction begin
Malfunction end
R
Time of end of malfunction
Complete the notification by clicking on
Complete Flag.
Observe status change from NOPR to NOCO (Notification completion.)
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 131 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
The Notification is completed, If the activity is unsatisfactory, the notification can again be opened and again put into operation.
With reference to this notification, If Maintenance order is to be created for carrying out the above work,
then click on
create Icon.
Click here
Or go to menu path PM Notification -> Order -> Create -> Direct as shown in the following screen
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 132 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
You will reach the following screen
Enter / check Order Type, Main work center and click on
Enter / Continue
icon To reach the following screen
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 133 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
For planning in terms of manpower and material and for further processing of order,
After entering required details, save the order and following message will appear on the screen.
iv) Maintenance Order Creation/Change
Trigger: Internal work hours and costs need to be captured and transferred to other cost objects for maintenance / service work. Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 134 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Business Process Procedure Overview A detailed work planning document which holds details on resources, components, costs, and labor required to complete specific maintenance work. Can be created with or without a notification. The costs are settled to other cost objects, such as cost center.
Output - Results
Comments
Creation of a PM Order
Refer to Business Process Procedure „Display PM Order to verify this result
Observe the system status, during creation and order processing : CRTD - Order created Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 135 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
MANC - Material availability not checked NTUP - Dates Not updated NMAT - No Material components PRC - Order Precosted SETC - Settlement Rule created TECO - Technical Completion CNF - Complete confirmation REL
- Order released
CLSD - Order Closed PCNF - Partial confirmation
Enter the field values in different tabs like
as explained in following table
Required
Field name
User action and allowed values
/ Optional Header data : Planner Group
O
Default is copied from the system by Master data
Maint .work center
R
Default is copied from the Equipment, but it can be changed , if required. This is required for tracking purpose.
Costs
O
The approx. cost can be given
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 136 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Required
Field name
User action and allowed values
/ Optional PM Activity type
O
Activity type can be selected from the drop down list.
System condition
O
This activity is to be carried out when the Equipment/System is
in operation or to be
stopped Basic start
O
Enter the proposed date of start
Basic Finish
O
Enter the proposed date of end
Priority
O
Copied form the system, if already given.
Revision
O
Revision is to be selected form the drop down list (Pl see the Notes.#1)
Reference object
R
The functional location or Equipment is copied form the initial screen
First Operation Operation
R
Name of the operation
Work Center
R
Work center
Control key
R
To be mentioned whether „PM01‟ or „PM03‟ – PM01 indicates the job to be done internally,
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 137 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Required
Field name
User action and allowed values
/ Optional PM03 - if the job to be carried out externally
Work
duration, O
Depending on the calculation key, enter any 2
Number, Operation
or 3 values, so that the 3rd value will be
duration
calculated automatically / manually.
Calculation key
O
Select from the drop down list
Notes:
If the operations are more than one operation, use the operation tab strip, and enter as many operations as required.
The work centers for different operations can be different. (If required).
Control Key PM01 Denotes – Work done by Own Employee & PM03 denotes work done by External Vendor. For PM03 Purchase Requisition will be created automatically. Which will go for Release Process & then Purchase
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 138 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Order will be created.This is MM Module Process, can be viewd in MM User Manual.
Fill the Material Group,Purchasing Group,Requisitioner name,Tracking No. Then Click on this
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 139 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Purchase Requisition Number Genrated.
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 140 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Required
Field name
User action and allowed values
/ Optional Component
R
Indicate Material code of the component.
Requirement Qty
O
Indicate the quantity of the components
Description
and O
Automatically copied from the system.
UM I Category
R
Indicate whether it is stockable or Nonstockable, „L‟ or „N‟
S LOC
O
Stock can be checked thro. this.
Notes : Item category - significance of „L‟ and „N‟ .
L – Generally stockable item, when a component is
selected „L‟
-
a
reservation is created .
Reservation creation is irrespective of material stock. (Means, even if the material is not available in the storage Location, reservation will be created.).
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 141 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
N – means Non-stockable, but coded item. – Even if stock is available , „N‟ can be indicated. The system will create a PR for the Items for which „N‟ is indicated.
Reservation Number Generated for Stock Item. Material Issue against Reservation process can be viewd in MM End User Manual as it is MM Process.
Click on
to save the Order
v) PROCESSING THE ORDER 1.RELEASING THE ORDER
ORDER CAN BE RELEASED WHILE CREATING OR AFTER CREATION ALSO. RELEASING WHILE CREATING Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 142 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
CLICK ON RELEASE FLAG
, THE SYSTEM STATUS WILL CHANGE
FROM “CRTD” TO “REL”
RELEASE FLAG
RELEASING AFTER CREATION and then SAVE the Order.
SELECT THE ORDER WHICH IS TO BE RELEASED BY TRANS CODE “IW32”
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 143 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 144 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
ENTER THE ORDER NO OR SELECT FROM THE DROP DOWN LIST
Select the Release Button
to release the order
The order will be released., Check status as below..
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 145 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Check for status changed to REL
v) COMPLETION CONFIRMATION
A.TIME CONFIRMATION Trigger: Actual hours worked and materials used need to be recorded and posted to the PM order. Business Process Procedure Overview The actual hours worked per operation are recorded/posted to the PM/CS order via time confirmation. Any materials used may be posted at this time. Technical reporting to the notification may also be performed at this time.
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 146 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Output – Results
Comments
Time confirmed to PM order
Refer to Business Process Procedure 'Display PM Order' (and view cost report) or 'Display PM Order Confirmation' to verify results. The document flow on the PM order will also show any time confirmations posted.
Press Enter key or double click (with mouse Left key) to reach the following screen;
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 147 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
ENTER ORDER NO SELECT FROM LIST
OR
PRESS ENTER KEY TO REACH THE FOLLOWING SCREEN SELECT THE OPERATIONS TO BE CONFIRMED AND FOLLOW THE MENU PATH SHOWN IN THE NEXT SCREEN
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 148 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
DOUBLE CLICK ON THE ACTUAL DATA FOLLOWING SCREEN WILL APPEAR Last changed on:
Last changed by:
Version:
(23/11/2010) (23/11/2 010)
RAVINDER KUMAR
1.0
Page: 149 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
FOR NEXT OPERATION
ENTER THE OPERATION ENTER THE START & END DATE WITH TIME CONFIRM ACTUAL MAN HOURS IF WE ARE DOING FINAL CONFIRMATION SELECT THE FINAL CONFIRMATION BOX CLICK ON CLEAR OPEN RES. IF NO MORE MATERIALS ARE REQUIRED AGAINST THE RESERVATION. RESERVATION. IF THERE IS NO REMAINING JOBS TICK THE NO REMAIN WORK BOX CLICK ON RIGHT ARROW KEY FOR NEXT OPERATION SAVE THE CONFIRMATION BY CLICKING ON
AND FOLLOWING MESSAGE WILL APPEAR ON THE SCREEN
Last changed on:
Last changed by:
Version:
(23/11/2010) (23/11/2 010)
RAVINDER KUMAR
1.0
Page: 150 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
vi) SERVICE ENTRY SHEET SERVICE ENTRY SHEET HAS TO BE FILLED FOR CLEARING THE INVOICE.
Trigger: Requirement for recording services performed by service provider
Business Process Description Overview This document document describes the procedure for creating a service entry sheet.
Within
purchasing, this service entry sheet document is designed for the recording of the services that have been been performed by the service service provider. The service entry sheet is a list of all planned services services that have actually been performed. performed. It can also be used used to lust and specify unplanned services that have been performed and whose precise scope and nature were unknown at time of planning phase.
Output – Output – Results Results
Comments
Service Entry Sheet
Menu Path
Via Menus
Logistics> Plant Maintenance> Maintenance Processing> Completion Confirmation> Services
Via Transaction Code
ML81n
Last changed on:
Last changed by:
Version:
(23/11/2010) (23/11/2 010)
RAVINDER KUMAR
1.0
Page: 151 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
or use transaction transaction code “ML81N” to reach the following following screen
Click Last changed on:
Last changed by:
Version:
(23/11/2010) (23/11/2 010)
RAVINDER KUMAR
1.0
Page: 152 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
select Purchase order number as shown in next screen
click on the
Enter / Continue icon
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 153 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Click on This tab service entry sheet
create
Click on the service selection tab
SERVICE SELECTION TAB
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 154 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Following screen will appear
Following screen will appear
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 155 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Click here
then click on Services Push button
Click to line item
Select
The following screen will appear ACCEPTING SERVICE ENTRY SHEET Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 156 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
3. Click on this flag for accepting
2.
Service Entry sheet Number
2. Confirm the required quantity
Click on the green flag for accepting the services. Save the transaction clicking save button
Following message will appear
B.GOODS ISSUE Part will be taken care in MM User manual.
vii)
ORDER TECHNICAL COMPLETION
SELECT THE ORDER FROM MENU PATH
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 157 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Complete the order by clicking on
Complete Flag.
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 158 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Click Nov‟10 on Tech.
Completion flag
WHILE COMPLETING TECHNICALLY SYSTEM DEFAULTS CURRENT DATE & TIME BUT STILL IT CAN BE CHANGED FOR PAST CONFIRMATIONS
Check status – TECO
viii) Order Settlement Order settlement is used to control costs and to identify where maximum costs are being incurred for maintenance. Costs associated with the maintenance work are assigned to Cost centres. Costs arising out of executing an order are initially collected on the order. These costs are then transferred to a receiver, for e.g. Cost centre. The receiver of costs are specified in the order and settlement carried out at regular intervals by FI.
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 159 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
ix) Business Completion The business completion of an order is usually performed when no further costs are expected to be posted to the order. An order can only have business completion when: It has been technically completed It has been settled and the order balance is 0 No outstanding purchase orders (commitments) exist for it All data that refers to the reference object of the maintenance order is available and correct All relevant data in the operations and sub-operations is available and correct The business completion function for an order defines the following information for the order: The order obtains the status Completed. It is indicated as fully completed. The order cannot receive any more postings, even for posting of costs. It is locked for all collective-processing changes. Business completion can be performed for An individual order Several orders using collective processing Business completion of the order can also be cancelled.
4.3 Preventive Maintenance To ensure higher equipment availability and reliability, preventive maintenance plans are required for critical equipments and systems. The preventive maintenance plans can generate PM order/Notification /service Entry Sheet as per the pre-defined schedules, based on time elapsed or any other Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 160 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
performance criteria.
i) Maintenance task lists Maintenance task lists describe a sequence of individual maintenance activities, which must be performed repeatedly within a company. In PDIL we are using only one maintenance task list: i.e. General Maintenance Task List Tcode :IA05
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 161 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
ii) Maintenance Plan Maintenance plan describes the maintenance and inspection tasks to be performed at maintenance objects with the dates and scope of the tasks.
Time-Based maintenance Plans In time-based maintenance planning maintenance is performed in specific cycles, for example, every two months or every six months.
Maintenance Planning: Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 162 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Maintenance planning is done to describe the dates and scope of corrective maintenance and inspection activities at technical objects. This ensures that the technical objects are maintained on time and thereby function optimally.
Based on analysis by the maintenance personnel, equipments are identified, where planned maintenance needs to be carried out.
Apart from the experience,
maintenance person may refer manufactures‟ recommendations and the history of the equipment to define the basis.
The maintenance planner also needs to identify the units for the maintenance plans time (weekly, monthly, yearly, etc.) or performance (every 100 running hours, every 10,000 shots etc.). For performance based maintenance plans, relevant measuring counter needs to be defined for the technical object and measurement readings need to be updated regularly.
The maintenance planner decides the maintenance call objects for the plan. The call object can be maintenance order, notification or service entry sheet. Based on the selection, system generates a call object for a maintenance plan, when a maintenance call is due. The maintenance planner decides initially which call object is required.
As mentioned earlier, maintenance plans can be single cycle, strategy based or multiple counters, as per the requirement of each equipment / functional location.
Maintenance task lists shall be prepared for equipments / functional location, as per the requirement. The task lists contains detailed sequence of activities to be performed, spares and estimated time required for completing the job. Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 163 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
For the activities, which are common amongst group of equipments, a general task list may be prepared.
A maintenance plan includes the task list, maintenance strategy along with other scheduling parameters.
Tcode :IP01
Fill here maintenance plan category- Maintenance Order.
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 164 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Fill the maintenance plan cycle with its unit i.e. when we require the Maintenance order to be generated. As we select yearly cycle then the order will generate every year.
Here fill the detail of maintenance item on which the Maintenance Order will generate.
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 165 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Here fill the detail of calibration task list. As its type & its no.
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 166 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Call horizon – here fill percentage when the call to be come for maintenance. Exp.If cycle = 100 days, & call horizon =90%, means at 90th day we will receive the order, for planning the man & material required to complete the maintenance order. Scheduling Period Now we fill the maintenance plan scheduling parameters i.e. the time for which we will schedule this plan. If we take sch. Period 10 year then total 10 Nos. maintenance orders will generate with yearly cycle.
iii) Maintenance Plan Scheduling Once the maintenance plans are created, then these plans are scheduled.
It is
important to input “Start date” or “Starting counter reading” in the individual maintenance plan. This date or counter reading decides the schedule dates.
Scheduling can be done manually as well as by system. It is recommended to do the scheduling by system to avoid manual errors.
Whenever a schedule falls due, the system creates a maintenance order, notification Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 167 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
or service entry sheet depending on definition of the call object of the plan.
The maintenance planner shall schedule the maintenance plan. Before the call objects are created by the system, maintenance planner may manually call the job or skip the job, depending on the situation.
If the call object is a maintenance order, then maintenance planner shall release it manually after checking the order.
There is provision in the system to shift the next scheduled maintenance date of a maintenance plan, if there is considerable delay in completing the order or the orders are completed much ahead of the schedule. These tolerance ranges for shifting can be decided while defining maintenance plan by the maintenance planner depending on the nature of the job.
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 168 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Tcode:IP10
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 169 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 170 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 171 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Tcode : IW39
iv) Maintenance Order Processing The maintenance order is a detailed planning assistance for maintenance tasks to be performed. The order is used to:
Add tasks (if required) in Task List attached in Preventive Maintenance Order with detail regard to type, scope, dates and resources
Monitor the execution of tasks (operations)
Define rules for account assignment, settlement and budgets
Enter, assign and settle the costs which arise from tasks
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 172 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
The order can be processed internally by own employees, or can be processed externally, that is, assign it to another company for processing. An order consists of:
Order header
Object list
Operations
Material list
Settlement rule
Costs
Observe the system status, during creation and order processing : CRTD - Order created MANC - Material availability not checked NTUP - Dates Not updated NMAT - No Material components PRC - Order Precosted SETC - Settlement Rule created TECO - Technical Completion CNF - Complete confirmation REL
- Order released
CLSD - Order Closed PCNF - Partial confirmation
Order Release
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 173 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Preventive Maintenance orders will be already released. If order has been released and subsequently additional operations are entered for it, these are automatically released. Following activities can only be performed when order is released:
Printing shop papers
Withdrawing material
Posting goods receipts
Entering time completion confirmations
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 174 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Tcode:IW32
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 175 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 176 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Fill the Material Group,Purchasing Group,Requisitioner Group,Requisitioner name,Tracking No. Then Click on this
Last changed on:
Last changed by:
Version:
(23/11/2010) (23/11/2 010)
RAVINDER KUMAR
1.0
Page: 177 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Fill the various components /spares with No. (From component list) & quantity required for completing the work.
Notes :
Item category - significance of „L‟ and „N‟ .
L – Generally stockable item, when a component is
selected selected „L‟
-
a
reservation is created .
Reservation creation is irrespective of material stock. (Means, even if the material is not available in the Last changed on:
Last changed by:
Version:
(23/11/2010) (23/11/2 010)
RAVINDER KUMAR
1.0
Page: 178 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
storage Location, reservation will be created.).
N – means – means Non-stockable, but coded item. – item. – Even if stock is available , „N‟ can be indicated. The system will create a PR for the Items for which „N‟ is indicated.
Reservation Number Generated for Stock Item. Material Issue against Reservation process can be viewd in MM End User Manual as it is MM Process.
Last changed on:
Last changed by:
Version:
(23/11/2010) (23/11/2 010)
RAVINDER KUMAR
1.0
Page: 179 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Required
Field name
User action and allowed values
/ Optional Component
R
Indicate Material code of the component.
Requirement Qty
O
Indicate the quantity of the components
Description
and O
Automatically copied from the system.
UM I Category
R
Indicate whether it is stockable or Nonstockable, „L‟ or „N‟
S LOC
O
Stock can be checked thro. this.
Last changed on:
Last changed by:
Version:
(23/11/2010) (23/11/2 010)
RAVINDER KUMAR
1.0
Page: 180 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 181 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Change of Purchase Requisition (Tcode : ME52N)
We Need to fill the DOP Clause & Pre Qualification for each PR.
Creation of PO & Material Issue is covered under MM Module.
v) SERVICE ENTRY SHEET SERVICE ENTRY SHEET HAS TO BE FILLED FOR CLEARING THE INVOICE.
Trigger: Requirement for recording services performed by service provider
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 182 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Business Process Description Overview This document describes the procedure for creating a service entry sheet.
Within
purchasing, this service entry sheet document is designed for the recording of the services that have been performed by the service provider. The service entry sheet is a list of all planned services that have actually been performed. It can also be used to lust and specify unplanned services that have been performed and whose precise scope and nature were unknown at time of planning phase.
Output – Results
Comments
Service Entry Sheet
Menu Path
Via Menus
Logistics> Plant Maintenance> Maintenance Processing> Completion Confirmation> Services
Via Transaction Code
ML81n
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 183 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
or use transaction code “ML81N” to reach the following screen
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 184 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Click
select Purchase order number as shown in next screen
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 185 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
click on the
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Enter / Continue icon
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 186 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Click on the service selection tab
SERVICE SELECTION TAB
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 187 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
then click on Services Push button
Click to line item
Select
The following screen will appear ACCEPTING SERVICE ENTRY SHEET
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 188 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
1.
Service Entry sheet Number
2. Confirm the required quantity
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 189 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Only Authorized person can release the Service Entry Sheet.
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 190 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
3. Save
Tcode ML85 or ML81n Can be used to release the Service Entry Sheet with proper autherization.
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 191 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Fill the code & Group Execute
release release then
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 192 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
2. Release
1.Select the Line
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 193 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 194 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Released Saved
vi) COMPLETION CONFIRMATION
A.TIME CONFIRMATION
Trigger: Actual hours worked and materials used need to be recorded and posted to the PM order.
Business Process Procedure Overview The actual hours worked per operation are recorded/posted to the PM/CS order via time confirmation. Any materials used may be posted at this time. Technical reporting to the notification may also be performed at this time.
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 195 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Output – Results
Comments
Time confirmed to PM order
Refer to Business Process Procedure 'Display PM Order' (and view cost report) or 'Display PM Order Confirmation' to verify results. The document flow on the PM order will also show any time confirmations posted.
Press Enter key or double click (with mouse Left key) to reach the following screen;
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 196 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
ENTER ORDER NO SELECT FROM LIST
OR
PRESS ENTER KEY TO REACH THE FOLLOWING SCREEN
SELECT THE OPERATIONS TO BE CONFIRMED
AND FOLLOW THE MENU PATH SHOWN IN THE NEXT SCREEN
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 197 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
CLICK ON THE ACTUAL DATA FOLLOWING SCREEN WILL APPEAR
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 198 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
FOR NEXT OPERATION
ENTER THE OPERATION ENTER THE START & END DATE WITH TIME CONFIRM ACTUAL MAN HOURS IF WE ARE DOING FINAL CONFIRMATION SELECT THE FINAL CONFIRMATION BOX CLICK ON CLEAR OPEN RES. IF NO MORE MATERIALS ARE REQUIRED AGAINST THE RESERVATION. IF THERE IS NO REMAINING JOBS TICK THE NO REMAIN WORK BOX CLICK ON RIGHT ARROW KEY FOR NEXT OPERATION SAVE THE CONFIRMATION BY CLICKING ON
AND FOLLOWING MESSAGE WILL APPEAR ON THE SCREEN
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 199 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
vii)
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
ORDER TECHNICAL COMPLETION
SELECT THE ORDER FROM MENU PATH
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 200 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Complete the order by clicking on
Complete Flag
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 201 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
WHILE COMPLETING TECHNICALLY SYSTEM DEFAULTS CURRENT DATE & TIME BUT STILL IT CAN BE CHANGED FOR PAST CONFIRMATIONS
Check status – TECO
viii) Order Settlement Order settlement is used to control costs and to identify where maximum costs are being incurred for maintenance. Costs associated with the maintenance work are assigned to Cost centres. Costs arising out of executing an order are initially collected on the order. These costs are then transferred to a receiver, for e.g. Cost centre. The receiver of costs are specified in the order and settlement carried out at regular intervals by FI.
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 202 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
ix) Business Completion The business completion of an order is usually performed when no further costs are expected to be posted to the order. An order can only have business completion when: It has been technically completed It has been settled and the order balance is 0 No outstanding purchase orders (commitments) exist for it All data that refers to the reference object of the maintenance order is available and correct All relevant data in the operations and sub-operations is available and correct The business completion function for an order defines the following information for the order: The order obtains the status Completed. It is indicated as fully completed. The order cannot receive any more postings, even for posting of costs. It is locked for all collective-processing changes. Business completion can be performed for An individual order Several orders using collective processing Business completion of the order can also be cancelled.
4.4 Regular Maintenance : i) Notification Creation: Notification for new Requirement/or any kind of Modification request.
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 203 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
>Fill the Description of the Request/Modification
>Fill/Select Functional location & Equipment
>Fill the Reported BY
>Press ENTER
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 204 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Click ENTER
/
Press
>WE find this screen which show last 3 activities status on that particular equipment & then Save notification.
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 205 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Notification number generated. You can see the list of Notifications through Tcode :IW29
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 206 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Select the Desired Notification & create the Regular maintenance Order (Type:PM07).
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 207 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 208 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
ii) Maintenance Order Do your Planning in Regular Maintenance Order. Tcode:IW32
After that whole Process is same as Breakdown Maintenance Process. So Kindly follow the Breakdown process( mentioned Above).
4.5 Calibration Process: Test equipment is used for performing quality inspections. In order to ensure that the test equipment used always fulfils the defined performance criteria, we have to regularly test and calibrate these test equipment. Using the functions in the component Test Equipment Management, we can manage equipment data, plan and schedule inspections, and perform calibration inspections for the equipment. Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 209 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
i) Task List for Calibration Calibration task lists describe a sequence of individual calibration activities, which must be performed repeatedly within a company. Creation of Task List
Transaction code – IA05
Fill the External AlphaNumeric Number for Calibration TaskList & the in Profile fill -PDIL And press enter.
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 210 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Fill the header data for the Calibration task list. As Usage-4, Status-4, System condition-0, Work Center, planner Goup And Now click on operations.
Fill the operations required to carry out the calibration process with estimated time & manpower required.
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 211 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Calibration Task list is saved with number generated.
ii) Creation of Calibration Plan Tcode :IP01
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 212 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Fill here maintenance plan category- Maintenance Order.
Fill the maintenance plan cycle with its unit i.e. when we require the Maintenance order to be generated. As we select yearly cycle then the order will generate every year.
Here fill the detail of maintenance item on which the Maintenance Order will generate.
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 213 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Here fill the detail of maintenance item on which the Maintenance Order will generate. Order Type of Calibration Order should be PM05.
Here fill the detail of calibration task list. As its type & its no.
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 214 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Call horizon – here fill percentage when the call to be come for maintenance. Exp.If cycle = 100 days, & call horizon =90%, means at 90 th day we will receive the order, for planning the man & material required to complete the maintenance order. Now we fill the maintenance plan scheduling parameters i.e. the time for which we will schedule this plan. If we take sch. Period 10 year then total 10 Nos. maintenance orders will generate with yearly cycle.
Now save the maintenance plan. Number displays here.
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 215 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
After Wards Calibration Process is same as Prevntive Maintenance. So Kindly Follow Preventive Maintenance Cycle.
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 216 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
5. Plant Maintenance Information System 5.1 Standard Reports There are so many Standard Reports in PM.
Some of the UseFul reports are shown below:
Transactio n c od e : IK17
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 217 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Trigger: Need to display measurement documents with similar characteristics.
Business Process Procedure Overview Search for measurement documents by various search criteria to compile a list of measurement documents to display. You may search for a measurement document whose number is unknown or perform collective processing for measurement documents that have particular characteristics in common.
Output – Results
Comments
One or many measurement documents selected for display Input – Required Fields
Field Value/Comments
Procedural Steps Via Menus
Logistics
Plant
Maintenance Maintenance
Processing Completion Confirmation Measurement Document
Via Transaction Code
List
Editing
Display
IK17
Select the transaction as shown in following screen
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 218 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
on double click you will reach the following screen
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 219 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Input data for selection , you can get the report based on the input data like Measuring points Equipment Functional location etc., After the entry of required data click on to execute the transaction and you will get the following report
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 220 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Spares and consumables consumption Report Transactio n co de : MB51
Trigger: User wishes to search for material movements by material.
Business Process Description Overview This process describes the method to search for and display the material movements by material.
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 221 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Output – Results
Comments
Materials with the associated movement types.
Procedural Steps Via Menus
(a) Logistics > Materials Management > Inventory Management > Environment > List Displays > Material Documents Logistics > Materials Management > Physical Inventory >Environment > Mat. Doc. For Material
Via Transaction Code
MB51
Select the transaction as shown in following screen
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 222 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
on double click you will reach the following screen
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 223 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Enter required data like Plant, Storage Location, Movement type etc., as per your report requirement After the entry of required data click on to execute the transaction and you will get the following report
Report of spares consumption against Maintenance Orders T r an s a c t i o n c o d e : I W 3M
Reach the selection screen with help of following menu
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 224 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Selection screen
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 225 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Enter required selection filed values like Order no, Material, storage location as per your requirement requirement and click on click on
to
execute
the
transaction and you will get the report
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 226 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Status Report of Notifications Transact ion co des : IW28 / IW29 Reach the selection screen with help of following menu
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 227 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Selection screen Status check boxes
Enter Plant
Enter the selection screen values like Maint. Plants, Start & end dates, Notification no., Equipment or Function locations and select required check boxes according to the status. Click on
to execute the transaction and you will get the
following report Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 228 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Status Report of Maintenance Orders Transact ion co des : IW38 / IW39
Trigger: To review a list of maintenance orders and make any necessary changes
Business Process Procedure Overview To generate a work list of maintenance orders to modify.
Output – Results
Comments
A list of orders.
Orders will be displayed based on the selection criteria.
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 229 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Procedural Steps Via Menus
A: Logistics
Plant
Maintenance Maintenance
Processing
Order Order
List Change
B: Logistics Plant Maintenance Processing Via Transaction Code
History
Maintenance
List of Orders Change
IW38
Reach the selection screen with help of following menu
Selection screen
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 230 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Status check boxes
Enter the selection screen values like Start & end dates, Notification no., Equipment aor Function locations and select required check boxes according to the status. Click on
to execute the transaction and you will get the
following report
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 231 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Display (Multi Level) : List of Orders Transactio n c od e : IW40
Trigger: To review a list of PM orders and associated documents and master records Business Process Procedure Overview This transaction allows the planner to review a specific order along with several selected master records and documents associated with the notification.
Output – Results
Comments
A list of orders with associated documents and master records
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 232 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Procedural Steps Via Menus
Logistics Plant Maintenance Maintenance Processing
Order List
of Orders
Display (Multi-level)
Via Transaction Code
IW40
Reach the selection screen with help of following menu
Selection Screen
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 233 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Select Required Order type, Enter period dates and select different parameters for the multilevel display Now click on
to execute the transaction and you will get the
following report
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 234 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Functional Location List Transaction code : IH06 Trigger: Need to look up Functional Locations. Business Process Procedure Overview You wish to search for Functional Locations by various search criteria. You may search for a location whose label is unknown, compile a list of locations that have particular characteristics in common.
Output – Results
Comments
List of Functional Locations
Procedural Steps Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 235 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Via Menus
Logistics
Plant
Functional
Via Transaction Code
Maintenance Technical Objects
location List editing
Display
IH06
Reach the selection screen with help of following menu
Selection Screen
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 236 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Select Required Planning Plant, Maintenenace Plant, Planner Gorup etc. different parameters for the display Now click on
to execute the transaction and you will get the
following report
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 237 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Equipment List Transactio n cod e : IH08
Trigger: To display a list of equipment by certain selection criteria. Business Process Procedure Overview This report is used to output a list of equipment. Equipment data comprises general data, serial number data, location data, maintenance data and sales/distribution data. You can use an equipment list to:
Search for a piece of equipment whose number you do not know
Compile a list of equipment based on particular criteria
Perform collective processing for pieces of equipment with particular characteristics
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 238 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Output – Results
Comments
A list of equipment records
Procedural Steps Access transaction by: Via Menus
A. Logistics Plant Maintenance System Report Selection Technical Objects
Information
Management
Display
Equipment
B. Logistics Plant Maintenance
Planned
Maintenance Maintenance Task Lists Environment Engineering Technical Objects
of
Environment
Equipment List
Editing
Display
Via Transaction Code
IH08
Reach the selection screen with help of following menu
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 239 of 241
End User Manual Title: SAP PM Module: Release: Created by: Created on:
PLANT MAINTENANCE ECC 6.0 RAVINDER KUMAR 23 Nov‟10
Selection Screen
Last changed on:
Last changed by:
Version:
(23/11/2010)
RAVINDER KUMAR
1.0
Page: 240 of 241