Kagira Drawing Solution PDMD Training Modules and Guides
MODULE
TITLE
Basic General Utilities I e m u l o V
-
Create Equipment
Modify Equipment
Pipe work Modeling I I e m u l o V
-
Modify Pipe Routing Pipe Route Checking
MODULE TRAINING GUIDE CONTENT SUMMARY
DURATION /Hrs
Introduction about Piping & PDMS, Project, Modules, Login, etc., Working with 3D view, Using command window, Clash detection, Representation tools. Creating Primitives, Creating Standard Equipment, Equipment Utilities, Attributes, Attributes Global, Hierarchy, Create Primitives using command window, Dragging and Orientation of Equipment. Equipment. Modifying Standard Equipment, Properties, Equipment Specification, Nozzle Specification, Specification, Positioning Equipment, Model editor, etc., Pipe Routing, Creation of Piping Components, Orientation of Pipe, Pipe Routing Using command line, Connection ref, etc., Dragging of Pipeline, Replacing Pipe Components, Pipe Spec. Modification, Sloping and Falling of Pipeline, etc.,
2
Data Consistency Checker, Isometric Production, Rectification Rectification of Pipe Routing Error.
6
PRE/ REQUISITES
None None
22 Knowledge of Primitives 20
15
15
3
Kagira Drawing Drawing Solution Solution #21A, First First Floor, Floor, Ramalinga Nagar, OMR (SRP (SRP Tools), Tools), Kottivakkam, Chennai -600 041 Ph: 044-2454 2454, Cell: 9500 100 966/ 966/ 9940 9940 582 820 www.kagira.com
Knowledge of Pipe Specification, Ratings
Titles you can't find anywhere else
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions! Start Free Trial Cancel Anytime.
Titles you can't find anywhere else
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions! Start Free Trial Cancel Anytime.
Kagira Drawing Solution PDMD Training Modules and Guides
I I I e m u l o V
-
Beams & Columns
Creating a Sections, Orientation of Beams, Joint Specification, Specification, Modifying Section Profile, Base Plate Creation, Material Apply, Weight calculation, Section Justification, Definition, etc.,
15
Panels & Plates
Creating Panels, Negative Extrusion, Modifying Panel, Panel Fittings, Panel Penetration, etc.,
5
Walls & Floors
Crating Walls & Floors, Applying Fittings for Walls & Floors, Mitre End Connections at Wall Ends, and Extension of Walls & Floors Length.
8
ASL Modeller
Creating a Platform, Stairs, Ladders, Floor Penetration, Modifying Platform Joints, Positioning of Platform, Stairs, and Ladders.
10
Hangers & Supports V I e m u l o V
-
HVAC
Cable Tray
Creating of Supports in Pipe Rack, Modifying the Hangers & Supports in the Pipe Rack. Creating Inline Plant Equipment like AHU, Duct Routing, Applying Grid and Tiles on grid, Specification Generator, CG and Surface area Calculation, etc., Crating Electrical Cable Trays and Modification, Modification, Modification of Cable Tray Specification. Specification.
Knowledge of Structures and Volume‐I
7
Knowledge of supports and Volume‐II
8
Knowledge about the HVAC System
7
Knowledge of Cable Tray and
Titles you can't find anywhere else
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions! Start Free Trial Cancel Anytime.
Kagira Drawing Solution PDMD Training Modules and Guides
V e m u l o V
Drafting
-
Iso generation
I V e m u l o V
-
Generating 2D View from 3D, Creating Labels, Dimensioning, Dimensioning, Auto Drawing Production, Copy of View, View Alignment, Text Creation and Modification, Modification, Scaling of Drawing, Schedule and Tagging, Interface to Other soft wares like Auto CAD, Micro station. Creating Iso metric Drawing, Convert to DXF, Generate BOM, and Preparing Isometric Fabrication Drawing.
10
Knowledge of Drafting
8
Knowledge of Volume‐II
Report Generation
Quick Reports, Nozzle Schedule, Pipe MTO, Steel MTO, Valve Schedule, Report Study.
10
PDMS Commands
Commands are used to Create the Utilities like Primitives, Equipment, Pipe work, etc.,
4
Total Time Total Time
175 Hrs
General Knowledge of Volume‐I, II & III Basic Design