STRUCTURAL STEEL
01 29537 04- 26737 2673738 38
DUBAI,, UAE DUBAI 04-2673663 04-26736 63
.
01
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
MASTER INDEX
SN
Description
SECTION – 1
HOW TO USE THE MANUAL 1.1. .1. Layo Layout ut of O& O&M Man Manua uall 1.2. .2. Scop Scope e of of Ma Manual 1.3. .3. Guid Guide e to Co Con nten tents
SECTION – 2
GENERAL OVERVIEW 2.1. Introduction 2.2 Brief Description of Fabrication & Installation.
SECTION – 3
DESCRIPTION 3.1 Product 3.2 Location and Purpose 3.3 Design Data 3.4 Reason for Selection
SECTION – 4
MATERIAL SCHEDULE 4.1 4.1 Material Schedule 4.2 Manufacturers and Suppliers
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page Page 1 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
MASTER INDEX
SN
Description
SECTION – 1
HOW TO USE THE MANUAL 1.1. .1. Layo Layout ut of O& O&M Man Manua uall 1.2. .2. Scop Scope e of of Ma Manual 1.3. .3. Guid Guide e to Co Con nten tents
SECTION – 2
GENERAL OVERVIEW 2.1. Introduction 2.2 Brief Description of Fabrication & Installation.
SECTION – 3
DESCRIPTION 3.1 Product 3.2 Location and Purpose 3.3 Design Data 3.4 Reason for Selection
SECTION – 4
MATERIAL SCHEDULE 4.1 4.1 Material Schedule 4.2 Manufacturers and Suppliers
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page Page 1 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
SN
Description
SECTION – 5
PARTS IDENTIFICATION AND RECOMMENDED SPARES 5.1 Spa Spare Parts Lis List 5.2 Manu Manufa factu cturi ring ng an and d Shipp Shippin ing g Tim Time Required for Imported Spare Parts
SECTION – 6
OPERATION 6.1 Ope Operati ration on Proced ocedu ure
SECTION – 7
MAINTENANCE 7.1 Routine Maintenance 7.2 Maintenance Maintenance for Painting Painting if any damages damages 7.3 Maintenan Maintenance ce for Fire proofing if any Damages 7.4 Schedule for maintenance and inspection For Fire Fire proofin proofing g 7.5 Warranty for Fire proofing
SECTION – 8
DISPOSAL INSTRUCTION
SECTION – 9
NAME AND ADDRESS OF MANUFACTURER
SECTION – 10
EMERGENCY INFORMATION
SECTION – 11
MANUFACTURERS’ LITERATURE 11.1 Operation & Maintenance Details 11.2 As Built Drawings
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page Page 2 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
SECTION - 1
HOW TO USE THE MANUAL INDEX 1.1 1.2 1.3
Layo Layou ut of of O& O&M Ma Manual Scope of of Ma Manual Guide to to Co Conten tents
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page Page 3 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
1. HOW TO USE THE MANUAL This operation and maintenance manual and its objective of providing to the reader with an overall & general view of design intent information required for operation and maintenance of Fire Proofing & Painting supplied & Applied by Eversendai Engineering L.L.C
1.1 Layout of O&M Manual This O&M manual has been organized and created to facilitate the reader to a magnitude of general information, manufacture’s literature, drawings, system details and other information’s on the fire proofing & Painting. No attempt has been made to furnish the basic technical details as it is presumed that only qualified and trained manpower will be employed for the operation and maintenance of the equipment
1.2 Scope of Manual This Maintenance manual was created to provide the reader and/or user on how the fire proofing and painting shall be maintained. To ensure safe and appropriate usage of the fire proofing and painting, please read the manual carefully prior to start using it. Not following the proper instruction may damage the fire proofing and painting.
1.3 Guide to content This manual is intended to provide an overview of the maintenance, operation & description of the supplied material on the building. The master index gives of the various sections & numbering in order to identify readily & locate specific information.
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 4 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
SECTION - 2
GENERAL OVERVIEW INDEX 2.1. Introduction 2.2 Brief Description of Fabrication & Installation.
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 5 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
2.1.
Introduction
This Operation and Manual covers structural steel works to the Alshams Tower 1 (AST) at Al reem island project, Abu Dhabi, U.A.E.
In order to have good finish, high grade structural steel member are being used to construct the structure. In generally, the structural steel members don’t require the maintenance expect protective coating and any special arrangement if applicable
In this structure, the structural members have been applied with two different paint systems & Fire proofing and it is explained briefly as follows 1.
Main Columns
–
2 Coat system with 200 microns
2.
Skypod Columns
–
3 Coat system with 250 microns
3.
Floor Beams from Level GF to Level 73 – 2 Hours fire rating.
4.
Outrigger Plates & Columns @ Level 20&21 and Level 40&41 – 2 Hours fire rating
The details of the said paint system are explained briefly in the following sections. Other than that the designed steel members have been fabricated and assembled at site by welding and bolting as per design requirement and as per approved drawings.
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 6 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
2.2
Brief Description of Fabrication & Installation.
FIRE PROOFING 1. Prior to the application of Monokote Type MK-6/HY, an inspection shall
be made to determine that all steel surfaces are acceptable to receive fireproofing. The steel to be fireproofed shall be free of oil, grease, excess rolling mill scale, excess rust, non-compatible primer, lock down agent or any other substance that will impair proper adhesion. When necessary, the cleaning of steel surfaces to receive fireproofing shall be the responsibility of the general contractor. 2. The project architect shall determine if the painted/primed structural steel to receive fireproofing is compatible with Monokote MK-6/HY. 3. Many Fire Resistance Designs allow the use of painted metal floor or roof deck in place of galvanized decking. Painted decking must be UL listed in the specific fire resistance designs and must carry the UL classification marking. 4. Prior to application of Monokote Type MK-6/HY, a bonding agent, approved by the fireproofing manufacturer, shall be applied to all concrete substrates to receive Type MK-6/HY. 5. Fireproofing to the underside of roof deck assemblies shall be done only after roofing application is complete and roof traffic has ceased. 6. No fireproofing shall be applied prior to completion of concrete work on steel decking. Features
Proven in-place performance Low in-place cost Fast, efficient application UL tested Building Code compliance (ICBO, SBCCI, BOCA, NBCC)
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 7 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
SECTION – 3
DESCRIPTION
INDEX 3.1 3.2 3.3 3.4
Product Location and Purpose Design Data Reason for Selection
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 8 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
3.1
Product
Please refer the attached manufacturer’s catalogue
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 9 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 10 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 11 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 12 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 13 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 14 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 15 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 16 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 17 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 18 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 19 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 20 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 21 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 22 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 23 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
3.2
Location and Purpose LOCATION
PAINT:
Level: Ground floor to Level 73 FI RE PROOFI NG:
Level: Ground floor to Level 73
PURPOSE PAINT:
Corrosion protection & Finishing of Structural Steel FI RE PROOFI NG:
Fire Protection (2 Hours Fire rating for Structural Steel)
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 24 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
3.3
Design Data
FIRE PROOFING : Monokote Type MK-6/HY Physical Properties
Value*
Test Method
Dry Density, minimum average
240 kg/m3 (15 pcf)
ASTM E 605, UBC STD 7-6
Bond Strength
16.2 KPa (339 psf)
ASTM E-736
Compression, 10% Deformation
68.9 KPa (1,440 psf)
ASTM E-761
Air Erosion
0.000 g/m2 (0.000 g/ft 2)
ASTM E-859
High Velocity Air Erosion
No continued erosion after 4 hours
ASTM E-859, UMC STD 6-1
Corrosion
Does not contribute to corrosion
ASTM E-937
Bond Impact
No cracking, spalling or delamination
ASTM E-760
Deflection
No cracking, spalling or delamination
ASTM E-759
Resistance to Mold Growth
No growth after 60 days
ASTM G 21
Flame Spread
Surface Burning Characteristics
0 ASTM E-84
Smoke Developed
0
Combustibility
Less than 5 MJ/m2 total, 20 kw/m2 peak heat release
ASTM E-1354
Impact Penetration
3.3 cm3
Developed by City of San Francisco
Abrasion Resistance
8.3 cm3
Developed by City of San Francisco
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 25 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 26 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 27 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 28 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 29 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 30 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 31 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 32 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
3.4
Reason for Selection
NOT APPLICABLE
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 33 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
SECTION – 4
MATERIAL SCHEDULE
INDEX 4.1 4.2
Material Schedule Manufacturers and Suppliers
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 34 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
4.1 Material Schedule PAINT
For Main Columns (Level: Ground floor to level 41) Primer: Carboguard - E19 & Thinner # 15 (75 Microns)
Intermediate / Final Coat: Carboguard - 893 MIO (Grey) & Thinner # 2 (125 Microns) Total: 200 Microns
For Skypod Columns (Level: 12 to 73) Primer: Carboguard - E19 & Thinner # 15 (75 Microns)
Intermediate Coat: Carboguard - 893 MIO (Grey) & Thinner # 2 (125 Microns)
Final Coat: Carbothane 834 (White) & Thinner # 25 (50 Microns) Total: 250 Microns
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 35 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
FIRE PROOFI NG ( Level GF t o 7 3 ) MUEHLHAN PROCON EMIRATES L.L.C.
PROJECT LOADING SCHEDULE - REV 2 CLIENT : M/s EVERSENDAI ENGINEERING PROJECT: AL SHAMS TOWER CEMENTITIOUS FIREPROOFING ON STRUCTURAL STEEL FIRE RATING 2 HOURS / BS 476-21 MATERIAL USED - MONOKOTE MK- 6 / HY S.No.
Member Type
Size
Coating Sides
DFT (mm)
1
Angle ( Deck Support ) ( L42 to L72)
EA 70x70x8
3
29
2
Angle ( Deck Support in Skypod Column & Skypod Beam ) ( L42 to L72 )
EA 100X100X10
3
25
3
Skypod Column ( L3 to L72 )
CHS 457x12
ALL
15
4
Skypod Beam ( L3 to L72 )
UB 356x171x51
3
29
5
Embedment ( L42 to L72 )
PL 20x300x340
Exposed Locations
21
6
Canopy ( L1, L2, L6, & L8 )
EA 100x100x8
Exposed Locations
29
7
Canopy ( L1, L2, L6, & L8 )
PFC 300x100x45.5
Exposed Locations
25
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 36 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
S.No.
Member Type
Size
Coating Sides
DFT (mm)
8
Canopy ( L1, L2, L6, & L8 )
RHS 450x250x16
Exposed Locations
15
9
Canopy ( L1, L2, L6, & L8 )
SHS 250x250x9
Exposed Locations
18
10
Canopy ( L1, L2, L6, & L8 )
UC 305x305x158
Exposed Locations
18
11
Retrofit ( Level - 05 )
UB 203x133x25
3
34
12
Retrofit ( Level - 05 )
UC 356x368x129
3
21
13
Retrofit ( Level - 05 )
UC 356x368x153
3
18
14
Retrofit ( Level - 05 )
F 400x30 B 390x12
3
18
Note 1
All thickness (DFT) is extracted from Warrington fire research test report - Table 1 as per BS 476:Part 21
2
For each steel section sizes, thickness of fireproofing is selected in combination of the section factor HP/A or m-1 and the period of fire rating hours.
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 37 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
4.2 Manufacturers and Suppliers
EVERSENDAI ENGG L.L.C #33, Al Qusais Industrial Area #1, Road #204, 19th Street, P.O.Box:29537, DUBAI, U.A.E. Tel: 04-2673738, Fax: 04-2673663 www.eversendai.com
STONECOR MIDDLE EAST L.L.C P.O.Box : 3034, Dubai, U.A.E Tel: 04-3470460, Fax: 04-3470242 Email :
[email protected]
ARABIAN VERMICULITE INDUSTRIES P.O.Box : 7137, Dammam 31462, Saudi Arabia Tel: 00966-3-8471450, Fax: 00966-8471575
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 38 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
SECTION – 5
PARTS IDENTIFICATION AND RECOMMENDED SPARES
INDEX 5.1 Spare Parts List 5.2
Manufacturing and Shipping Time Required for Imported Spare Parts
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 39 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
5.1 Spare Parts List
NOT APPLICABLE
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 40 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
5.2 Manufacturing and Shipping Time Required for Imported Spare Parts
NOT APPLICABLE
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 41 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
SECTION – 6
OPERATION
INDEX 6.1 Operation Procedure
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 42 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
6.1 Operation Procedure Cementitious fireproof coating is inorganic fireproofing formulation single Powder component that is mixed with potable water. Impact resistance for this material is very low, mechanical impact on these surfaces should be avoided. Pressure water should not be forced on cementitious fireproof surfaces.
Above impacts can result in damaging the cementitious coatings which affects the Fire resistance of the steel structure. But in case if any of this damages take place on the fireproofed surfaces, below mentioned repairing procedure shall be followed.
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 43 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
SECTION – 7
MAINTENANCE
INDEX 7.1 Routine Maintenance 7.2 Maintenance for Painting if any damages. 7.3 Maintenance for Fire proofing if any damages. 7.4 Schedule for maintenance and inspection for fire proofing 7.5 Warranty for Fire proofing
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 44 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
7.1 Routine Maintenance
NOT APPLICABLE
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 45 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
7.2 Maintenance for Painting if any damages Epoxy polymide (Primer), Cycoaliphatic Amine Epoxy (Intermediate coat) & Acrylic aliphatic polyurethane ( Final Coat ).
-
Use/Location
:
Internally steelwork
exposed
&
Concealed
-
Paint Manufacturer Shop Preparation
: :
Stonecor Middle east L.L.C Blast clean to Preparation Grade Sa2½ (BS 7079 Part A1 SA 2.5).
-
Shop Primer Dry Film Thickness Colour Environmental
: : : :
Carboguard E 19 75 µm minimum Grey VOC: 413 g/l
-
Shop Intermediate Dry Film Thickness Colour Environmental
: : : :
Carboguard 893 MIO 125 µm minimum Grey VOC: 216 g/l
-
Shop Top Coat
:
-
Dry Film Thickness Colour Environmental
: : :
Carbothane 834 (Skypod Columns only ) 50 µm minimum Grey VOC: 352 g/l
Refer to Carboline Protective Coatings Carbothane 834 Recommended Working Procedures to be read in conjunction with the Carbothane 834 technical data sheet and material safety data sheet (MSDS). Provided information is to be strictly adhered to. If the steel fabricator does not have the capability of applying the complete specified two coat system at works then they are to subcontract the painting programme to a contractor recommended by International Protective Coatings.
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 46 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
Surface Preparation and Touch Up at Site Surface Preparation Mark damaged area. Presence of oil/grease should be removed using a suitable degreaser. Presence of soluble contaminants should be removed using sweet water. Damage to Primer Area less than 0.1 sq.meter power tool clean to St 3, to bare metal, using 80 disc sander, feather edge to sound coating min. 50 mm. Apply Primer : Carboguard E 19 - Grey – Min. DFT of 75 microns Followed by Int. Coat : Carboguard 893 MIO -Grey – Min. DFT of 125 microns Top Coat : Carbothane 834 - Min. DFT of 50 microns (Skypod Columns only ) Damage to Int Coat Area less than 0.1 sq.meter Hand tool clean to St 2, to primer, using 80 disc emery paper, feather edge to sound coating min. 50 mm. Apply Int. Coat : Carboguard 893 MIO -Grey – Min. DFT of 125 microns Top Coat : Carbothane 834 - Min. DFT of 50 microns (Skypod Columns only ) Damage to Top Coat Area less than 0.1 sq.meter Hand tool clean to St 2, to intermediate coat, using 80 disc emery paper, feather edge to sound coating min. 50 mm. Apply Top Coat : Carbothane 834 - Min. DFT of 50 microns (Skypod Columns only )
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 47 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
7.3 Maintenance for Fire proofing if any damages Cementitious fireproofing that has been damaged or removed may be repaired by hand rush box or hand trowelling freshly mixed product to the affected areas.
Where damage occurs to fireproof coating, but where the damage does not Penetrate through the primer to the steel surface, then the loose coating should be knocked down around the affected area. Scratch and rough the existing surface to achieve the best possible adhesion.
The removed surface should then be cleaned with potable water or sweep air blast.
If existing coating has become very dry, dampen the surfaces adjacent to the repair area with potable water. Thoroughly soak existing coating with clean potable water to ensure Adhesion with new material to be placed.
Mix the cementitious fireproofing material in accordance with the Mixing Procedure of manufactures application instruction.
Apply cementitious fireproofing material using hand rush box or mason spoon and trowel to finish level with existing surface.
If more than one coat is required ensure that preceding coats are left with a rough finish well scratched to ensure good bonding of subsequent coats. MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 48 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
When patch is dry cover with hesin cloth, polythene sheet and cure as specified.
Where the damage is more severe, resulting in damage to the primer system exposing bare steel (particularly in external and humid internal conditions), then the primer should be touched up with a zinc rich epoxy primer and allowed to dry, prior to the application of cementitious fireproof coating material. It may be necessary to remove a further area of fireproof coating surrounding the exposed steel to facilitate primer touch-up depending on the scale of damage.
If the thickness of the patch is greater than 13 mm (1/2”), multiple coats will be necessary. Application of more thickness may result in cracking and extended drying times.
Materials to be used Monokote MK-6/HY Potable water for mixing
Safety Monokote MK-6/HY Material are Non-hazardous material as per the manufacturer’s material Safety data sheet. Dust masks shall be used while mixing and application.
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 49 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
7.4 Schedule for maintenance and inspection for Fire proofing
Inspection Schedule 1 First Inspection August 2011 2 Second Inspection August 2013 3 Third Inspection August 2015 4 Fourth Inspection August 2017 5 Fifth Inspection August 2019
Notes
All necessary access, equipments access to the fireproofing locations, removal of obstructions to access to be provided by the client for free charge.
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 50 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
7.5 Warranty for Fire proofing
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 51 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 52 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
SECTION – 8
DISPOSAL INSTRUCTION
NOT APPLICABLE
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 53 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
SECTION – 9
NAME AND ADDRESS OF MANUFACTURER
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 54 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
NAME AND ADDRESS OF MANUFACTURER
STRUCTURAL STEEL WORKS EVERSENDAI ENGG L.L.C #33, Al Qusais Industrial Area #1, Road #204, 19th Street, P.O.Box:29537, DUBAI, U.A.E. Tel: 04-2673738, Fax: 04-2673663 www.eversendai.com
PAINTING WORKS STONECOR MIDDLE EAST L.L.C P.O.Box: 3034, Dubai, U.A.E Tel: 04-3470460, Fax: 04-3470242 Email:
[email protected]
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 55 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
FIRE PROOFING WORKS CONTACT LIST - APPLICATOR Applicator Name : Procon Emirates L.L.C. Contact Name : Nagarajan Kothandan Designation : Project Manager Mobile : 050 4454951 Telephone : 02-6218662 Fax : 02-6218829 E-mail :
[email protected] Address : P.O. Box 27388 Location : Abu Dhabi Country : UAE
CONTACT LIST – SUPLLIER Supplier Name : Arabian Vermiculite Industries (AVI) Contact Name : Yogesh Harnal Designation : Sales Manager Mobile : 050 6440691 Telephone : 04-2211966 Fax : 04-2238600 E-mail : Yogesh:
[email protected] Address : P.O. Box 7137 Location : Dammam Country : Kingdom of Saudi Arabia
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 56 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
SECTION – 10
EMERGENCY INFORMATION
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 57 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
STRUCTURAL STEEL WORKS NORMAL WORKING HOURS
SATURDAY TO THURSDAY : 06.30 am to 06.30 pm
CONTACT PERSON
Mr.N.S.Rao Regional Director
COMPANY ADDRESS
EVERSENDAI ENGINEERING L.L.C # 33, Al Qusais Industrial Area # 1, Road # 204 19 th. Street, Post Box : 29537,Dubai, U.A.E Tele : 04-2673738, Fax : 04-2673663
Email id
[email protected]
Website
www.eversendai.com
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 58 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
FIRE PROOFING WORKS APPLICATOR CONTACT PERSON & COMPANY ADDRESS
Mr. Gautam Arya General Manager PROCON EMIRATES L.L.C Post Box : 27388,Abudhabi, U.A.E Tele : 02-6218662, Fax : 02-6218829 Email id :
[email protected] Website : www.muehlhan.com
ARABIAN VERMICULITE INDUSTRIES
PRODUCT SUPPLIER DETAILS
P.O.Box : 7137, Dammam 31462, Saudi Arabia Tel: 00966-3-8471450, Fax: 00966-8471575
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 59 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
PAINTING WORKS STONECOR MIDDLE EAST L.L.C P.O.Box : 3034, Dubai, U.A.E
PRODUCT SUPPLIER DETAILS
Tel: 04-3470460, Fax: 04-3470242 Email :
[email protected]
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 60 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
SECTION – 11
MANUFACTURERS’ LITERATURE INDEX 11.1 Operation & Maintenance Details 11.2 As Built Drawings
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 61 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
11.1 Operation & Maintenance Details
NOT APPLICABLE
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 62 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL
11.2 As Built Drawings
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 63 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL SL. NO.
DRAWING NO.
DRAWING TITLE
1
T1C-C-AR-S-C10-0001 ST-1
GF GA PLAN
2
T1C-C-AR-S-C10-0002 ST-1
LEVEL 1 GA PLAN
3
T1C-C-AR-S-C10-0003 ST-1
LEVEL 1 SECTIONAL DETAILS-1
4
T1C-C-AR-S-C10-0004 ST-1
LEVEL 1 SECTIONAL DETAILS-2
5
T1C-C-AR-S-C10-0005 ST-1
LEVEL 1 EMBEDMENT DETAILS-1
6
T1C-C-AR-S-C10-0006 ST-1
LEVEL 1 CONNECTION DETAILS-1
7
T1C-C-AR-S-C10-0007 ST-1
LEVEL 1 CONNECTION DETAILS-2
8
T1C-C-AR-S-C10-0008 ST-1
LEVEL 1 EMBEDMENT DETAILS-2
9
T1C-C-AR-S-C10-0009 ST-1
LEVEL 1 EMBEDMENT DETAILS-4
10
T1C-C-AR-S-C10-0010 ST-1
LEVEL 1 EMBEDMENT DETAILS-5
11
T1C-C-AR-S-C10-0011 ST-1
LEVEL 1 CONNECTION DETAILS-6
12
T1C-C-AR-S-C10-0013 ST-1
TOWER-1 COLUMN SPLICE DETAILS
13
T1C-C-AR-S-C10-0014 ST-1
LEVEL-1 CANOPY GA PLAN
14
T1C-C-AR-S-C10-0015 ST-1
LVL-1 CANOPY ROOF SUPPORT SECTIONS & CONNECTION DETAILS
15
T1C-C-AR-S-C10-0357 ST-01
LVL-1 CANOPY ROOF SUPPORT SECTIONS & CONNECTION DETAILS
16
T1C-C-AR-S-C10-P01-0001
LEVEL 1 EMBEDMENT LAYOUT & DETAILS-1
17
T1C-C-AR-S-C10-P01-0002
LEVEL 1 EMBEDMENT LAYOUT & DETAILS-2
18
TIC-C-AR-S-C10-01-D8001-01
LEVEL-1 DECKING SECTIONS & DETAILS
19
TIC-C-AR-S-C10-01-GA006-01
LEVEL -1 DECKING LAYOUT
20
T1C-C-AR-S-C10-0016 ST-1
LEVEL 2 CANOPY GA PLAN
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 64 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL SL. NO.
DRAWING NO.
DRAWING TITLE
21
T1C-C-AR-S-C10-0017 ST-1
LEVEL 2 CANOPY ROOF SUPPORT SECTIOS & CONNECTION DETAILS
22
T1C-C-AR-S-C10-0018 ST-1
LEVEL 2 GA PLAN
23
T1C-C-AR-S-C10-0023 ST-1
LEVEL-2 CONNECTION DETAILS-1
24
T1C-C-AR-S-C10-0024 ST-1
LEVEL-2 CONNECTION DETAILS-2
25
T1C-C-AR-S-C10-0025 ST-1
LEVEL-2 CONNECTION DETAILS-3
26
T1C-C-AR-S-C10-0026 ST-1
LEVEL-2 CONNECTION DETAILS-4
27
T1C-C-AR-S-C10-0027 ST-1
LEVEL-2 CONNECTION DETAILS-5
28
T1C-C-AR-S-C10-0028 ST-1
LEVEL-2 CONNECTION DETAILS-6
29
T1C-C-AR-S-C10-0029 ST-1
LEVEL-2 CONNECTION DETAILS-7
30
T1C-C-AR-S-C10-0030 ST-1
LEVEL-2 CONNECTION DETAILS-8
31
T1C-C-AR-S-C10-02-E9001
LEVEL 2 EMBEDMENT DETAILS-1
32
T1C-C-AR-S-C10-02-E9002
LEVEL 2 EMBEDMENT DETAILS-2
33
T1C-C-AR-S-C10-02-GA002
LEVEL 2 EMBEDMENT LAYOUT.
34
T1C-C-AR-S-C10-0383 ST-01
LEVEL-02 CANOPY ROOF SUPPORT SECTIONS & CONNECTION DETAILS
35
TIC-C-AR-S-C10-02-D8001-01
LEVEL-2 DECKING SECTIONS & DETAILS
36
TIC-C-AR-S-C10-02-GA006-01
LEVEL -2 DECKING LAY OUT
37
T1C-C-AR-S-C10-0019 ST-1
LEVEL 3 GA PLAN
38
T1C-C-AR-S-C10-0031 ST-1
LEVEL-3 CONNECTION DETAILS-1
39
T1C-C-AR-S-C10-0032 ST-1
LEVEL-3 CONNECTION DETAILS-2
40
T1C-C-AR-S-C10-0033 ST-1
LEVEL-3 CONNECTION DETAILS-3
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 65 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL SL. NO.
DRAWING NO.
DRAWING TITLE
41
T1C-C-AR-S-C10-0034 ST-1
LEVEL-3 CONNECTION DETAILS-4
42
T1C-C-AR-S-C10-0035 ST-1
LEVEL-3 CONNECTION DETAILS-5
43
T1C-C-AR-S-C10-0036 ST-1
LEVEL-3 CONNECTION DETAILS-6
44
T1C-C-AR-S-C10-0037 ST-1
LEVEL-3 CONNECTION DETAILS-7
45
T1C-C-AR-S-C10-0038 ST-1
LEVEL-3 CONNECTION DETAILS-8
46
T1C-C-AR-S-C10-0039 ST-1
LEVEL-3 CONNECTION DETAILS-9
47
T1C-C-AR-S-C10-03-E9001
LEVEL 3 EMBEDMENT DETAILS-1
48
T1C-C-AR-S-C10-03-E9002
LEVEL 3 EMBEDMENT DETAILS-2
49
T1C-C-AR-S-C10-03-GA002
LEVEL 3 EMBEDMENT LAYOUT.
50
TIC-C-AR-S-C10-03-D8001-01
LEVEL-3 DECKING SECTIONS & DETAILS
51
TIC-C-AR-S-C10-03-GA006-01
LEVEL -3 DECKING LAY OUT
52
T1C-C-AR-S-C10-0020 ST-1
LEVEL
53
T1C-C-AR-S-C10-0040 ST-1
LEVEL-4 CONNECTION DETAILS-1
54
T1C-C-AR-S-C10-0041 ST-1
LEVEL-4 CONNECTION DETAILS-2
55
T1C-C-AR-S-C10-0042 ST-1
LEVEL-4 CONNECTION DETAILS-3
56
T1C-C-AR-S-C10-0043 ST-1
LEVEL-4 CONNECTION DETAILS-4
57
T1C-C-AR-S-C10-0044 ST-1
LEVEL-4 CONNECTION DETAILS-5
58
T1C-C-AR-S-C10-0045 ST-1
LEVEL-4 CONNECTION DETAILS-6
59
T1C-C-AR-S-C10-0046 ST-1
LEVEL-4 CONNECTION DETAILS-7
60
T1C-C-AR-S-C10-0047 ST-1
LEVEL-4 CONNECTION DETAILS-8
4 GA PLAN
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 66 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL SL. NO.
DRAWING NO.
DRAWING TITLE
61
T1C-C-AR-S-C10-0048 ST-1
LEVEL-4 CONNECTION DETAILS-9
62
T1C-C-AR-S-C10-04-E9001
LEVEL 4 EMBEDMENT DETAILS-1
63
T1C-C-AR-S-C10-04-E9002
LEVEL 4 EMBEDMENT DETAILS-2
64
T1C-C-AR-S-C10-04-GA002
LEVEL-4 EMBEDMENT LAYOUT
65
TIC-C-AR-S-C10-04-D8001-01
LEVEL-4 DECKING SECTIONS & DETAILS
66
TIC-C-AR-S-C10-04-GA006-01
LEVEL -4 DECKING LAY OUT
67
T1C-C-AR-S-C10-0021 ST-1
LEVEL 5 GA PLAN
68
T1C-C-AR-S-C10-0049 ST-1
LEVEL-5 CONNECTION DETAILS-1
69
T1C-C-AR-S-C10-0050 ST-1
LEVEL-5 CONNECTION DETAILS-2
70
T1C-C-AR-S-C10-0051 ST-1
LEVEL-5 CONNECTION DETAILS-3
71
T1C-C-AR-S-C10-0052 ST-1
LEVEL-5 CONNECTION DETAILS-4
72
T1C-C-AR-S-C10-0053 ST-1
LEVEL-5 CONNECTION DETAILS-5
73
T1C-C-AR-S-C10-0054 ST-1
LEVEL-5 CONNECTION DETAILS-6
74
T1C-C-AR-S-C10-05-E9001
LEVEL 5 EMBEDMENT DETAILS-1
75
T1C-C-AR-S-C10-05-GA002
LEVEL-5 EMBEDMENT LAYOUT
76
TIC-C-AR-S-C10-05-D8001-01
LEVEL-5 DECKING SECTIONS & DETAILS
77
TIC-C-AR-S-C10-05-GA006-01
LEVEL -5 DECKING LAY OUT
78
T1C-C-AR-S-C10-05-RF-GA001
Marking Plan of Retrofit Beam @ Under HCS
79
T1C-C-AR-S-C10-0055 ST-1
LEVEL 6 GA PLAN
80
T1C-C-AR-S-C10-0056 ST-1
LEVEL-6 CONNECTION DETAILS-1
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 67 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL SL. NO.
DRAWING NO.
DRAWING TITLE
81
T1C-C-AR-S-C10-0057 ST-1
LEVEL-6 CONNECTION DETAILS-2
82
T1C-C-AR-S-C10-0058 ST-1
LEVEL-6 CONNECTION DETAILS-3
83
T1C-C-AR-S-C10-0059 ST-1
LEVEL-6 CONNECTION DETAILS-4
84
T1C-C-AR-S-C10-0060 ST-1
LEVEL-6 CONNECTION DETAILS-5
85
T1C-C-AR-S-C10-0061 ST-1
LEVEL-6 CONNECTION DETAILS-6
86
T1C-C-AR-S-C10-0062 ST-1
LEVEL-6 CONNECTION DETAILS-7
87
T1C-C-AR-S-C10-0388 ST-01
LEVEL-6 CANOPY GA PLAN
88
T1C-C-AR-S-C10-0389 ST-01
LEVEL-6 CANOPY ROOF SUPPORT SECTIONS & CONNECTION DETAILS
89
T1C-C-AR-S-C10-0390 ST-01
LEVEL-6 CANOPY ROOF SUPPORT SECTIONS & CONNECTION DETAILS
90
T1C-C-AR-S-C10-06-E9001
LEVEL-6 EMBEDMENT DETAILS-1
91
T1C-C-AR-S-C10-06-GA002
LEVEL-6 EMBEDMENT LAYOUT
92
TIC-C-AR-S-C10-06-D8001-01
LEVEL- 6 DECKING SECTIONS & DETAILS
93
TIC-C-AR-S-C10-06-GA006-01
LEVEL- 6 DECKING LAYOUT
94
T1C-C-AR-S-C10-0064 ST-01
LEVEL 7 GA PLAN
95
T1C-C-AR-S-C10-0065 ST-01
LEVEL-7 CONNECTION DETAILS-1
96
T1C-C-AR-S-C10-0066 ST-01
LEVEL-7 CONNECTION DETAILS-2
97
T1C-C-AR-S-C10-0067 ST-01
LEVEL-7 CONNECTION DETAILS-3
98
T1C-C-AR-S-C10-0068 ST-01
LEVEL-7 CONNECTION DETAILS-4
99
T1C-C-AR-S-C10-0069 ST-01
LEVEL-7 CONNECTION DETAILS-5
100
T1C-C-AR-S-C10-0070 ST-01
LEVEL-7 CONNECTION DETAILS-6
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 68 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL SL. NO.
DRAWING NO.
DRAWING TITLE
101
TIC-C-AR-S-C10-07-D8001-01
LEVEL- 7 DECKING SECTIONS & DETAILS
102
TIC-C-AR-S-C10-07-GA006-01
LEVEL- 7 DECKING LAYOUT
103
T1C-C-AR-S-C10-07-E9001
LEVEL-7 TO 19 EMBEDMENT DETAILS-1
104
T1C-C-AR-S-C10-07-GA002
LEVEL-7 TO 19 EMBEDMENT LAYOUT
105
T1C-C-AR-S-C10-0071 ST-01
LEVEL 8 GA PLAN
106
T1C-C-AR-S-C10-0072 ST-01
LEVEL-8 CONNECTION DETAILS-1
107
T1C-C-AR-S-C10-0073 ST-01
LEVEL-8 CONNECTION DETAILS-2
108
T1C-C-AR-S-C10-0074 ST-01
LEVEL-8 CONNECTION DETAILS-3
109
T1C-C-AR-S-C10-0075 ST-01
LEVEL-8 CONNECTION DETAILS-4
110
T1C-C-AR-S-C10-0076 ST-01
LEVEL-8 CONNECTION DETAILS-5
111
T1C-C-AR-S-C10-0077 ST-01
LEVEL-8 CONNECTION DETAILS-6
112
T1C-C-AR-S-C10-0078 ST-01
LEVEL-8 CONNECTION DETAILS-7
113
T1C-C-AR-S-C10-0391 ST-01
LEVEL-8 CANOPY GENERAL ARRANGEMENT PLAN
114
T1C-C-AR-S-C10-0392 ST-01
LEVEL-8 CANOPY ROOF SUPPORT SECTIONS & CONNECTION DETAILS
115
T1C-C-AR-S-C10-0393 ST-01
LEVEL-8 CANOPY ROOF SUPPORT SECTIONS & CONNECTION DETAILS
116
TIC-C-AR-S-C10-08-D8001-01
LEVEL- 8 DECKING SECTIONS & DETAILS
117
TIC-C-AR-S-C10-08-GA006-01
LEVEL- 8 DECKING LAYOUT
118
T1C-C-AR-S-C10-0079 ST-01
LEVEL 9 GA PLAN
119
T1C-C-AR-S-C10-0080 ST-01
LEVEL-9 CONNECTION DETAILS-1
120
T1C-C-AR-S-C10-0081 ST-01
LEVEL-9 CONNECTION DETAILS-2
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 69 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL SL. NO.
DRAWING NO.
DRAWING TITLE
121
T1C-C-AR-S-C10-0082 ST-01
LEVEL-9 CONNECTION DETAILS-3
122
T1C-C-AR-S-C10-0083 ST-01
LEVEL-9 CONNECTION DETAILS-4
123
T1C-C-AR-S-C10-0084 ST-01
LEVEL-9 CONNECTION DETAILS-5
124
T1C-C-AR-S-C10-0085 ST-01
LEVEL-9 CONNECTION DETAILS-6
125
TIC-C-AR-S-C10-08-D8001-01
LEVEL- 9 to 19 DECKING SECTIONS & DETAILS
126
TIC-C-AR-S-C10-08-GA006-01
LEVEL- 9 to 19 DECKING LAYOUT
127
T1C-C-AR-S-C10-0086 ST-01
LEVEL 10 GA PLAN
128
T1C-C-AR-S-C10-0087 ST-01
LEVEL-10 CONNECTION DETAILS-1
129
T1C-C-AR-S-C10-0088 ST-01
LEVEL-10 CONNECTION DETAILS-2
130
T1C-C-AR-S-C10-0089 ST-01
LEVEL-10 CONNECTION DETAILS-3
131
T1C-C-AR-S-C10-0090 ST-01
LEVEL-10 CONNECTION DETAILS-4
132
T1C-C-AR-S-C10-0091 ST-01
LEVEL-10 CONNECTION DETAILS-5
133
T1C-C-AR-S-C10-0092 ST-01
LEVEL-10 CONNECTION DETAILS-6
134
T1C-C-AR-S-C10-0093 ST-01
LEVEL 11 GA PLAN
135
T1C-C-AR-S-C10-0094 ST-01
LEVEL-11 CONNECTION DETAILS-1
136
T1C-C-AR-S-C10-0095 ST-01
LEVEL-11 CONNECTION DETAILS-2
137
T1C-C-AR-S-C10-0096 ST-01
LEVEL-11 CONNECTION DETAILS-3
138
T1C-C-AR-S-C10-0097 ST-01
LEVEL-11 CONNECTION DETAILS-4
139
T1C-C-AR-S-C10-0098 ST-01
LEVEL-11 CONNECTION DETAILS-5
140
T1C-C-AR-S-C10-0099 ST-01
LEVEL-11 CONNECTION DETAILS-6
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 70 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL SL. NO.
DRAWING NO.
DRAWING TITLE
141
T1C-C-AR-S-C10-0114 ST-01
LEVEL 12 GA PLAN
142
T1C-C-AR-S-C10-0115 ST-01
LEVEL-12 CONNECTION DETAILS-1
143
T1C-C-AR-S-C10-0116 ST-01
LEVEL-12 CONNECTION DETAILS-2
144
T1C-C-AR-S-C10-0117 ST-01
LEVEL-12 CONNECTION DETAILS-3
145
T1C-C-AR-S-C10-0118 ST-01
LEVEL-12 CONNECTION DETAILS-4
146
T1C-C-AR-S-C10-0119 ST-01
LEVEL-12 CONNECTION DETAILS-5
147
T1C-C-AR-S-C10-0120 ST-01
LEVEL-12 CONNECTION DETAILS-6
148
T1C-C-AR-S-C10-0121 ST-01
LEVEL-12 CONNECTION DETAILS-7
149
T1C-C-AR-S-C10-0122 ST-01
LEVEL 13 GA PLAN
150
T1C-C-AR-S-C10-0123 ST-01
LEVEL-13 CONNECTION DETAILS-1
151
T1C-C-AR-S-C10-0124 ST-01
LEVEL-13 CONNECTION DETAILS-2
152
T1C-C-AR-S-C10-0125 ST-01
LEVEL-13 CONNECTION DETAILS-3
153
T1C-C-AR-S-C10-0126 ST-01
LEVEL-13 CONNECTION DETAILS-4
154
T1C-C-AR-S-C10-0127 ST-01
LEVEL-13 CONNECTION DETAILS-5
155
T1C-C-AR-S-C10-0128 ST-01
LEVEL-13 CONNECTION DETAILS-6
156
T1C-C-AR-S-C10-0129 ST-01
LEVEL-13 CONNECTION DETAILS-7
157
T1C-C-AR-S-C10-0130 ST-01
LEVEL 14 GA PLAN
158
T1C-C-AR-S-C10-0131 ST-01
LEVEL-14 CONNECTION DETAILS-1
159
T1C-C-AR-S-C10-0132 ST-01
LEVEL-14 CONNECTION DETAILS-2
160
T1C-C-AR-S-C10-0133 ST-01
LEVEL-14 CONNECTION DETAILS-3
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 71 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL SL. NO.
DRAWING NO.
DRAWING TITLE
161
T1C-C-AR-S-C10-0134 ST-01
LEVEL-14 CONNECTION DETAILS-4
162
T1C-C-AR-S-C10-0135 ST-01
LEVEL-14 CONNECTION DETAILS-5
163
T1C-C-AR-S-C10-0136 ST-01
LEVEL-14 CONNECTION DETAILS-6
164
T1C-C-AR-S-C10-0137 ST-01
LEVEL-14 CONNECTION DETAILS-7
165
T1C-C-AR-S-C10-0138 ST-01
LEVEL 15 GA PLAN
166
T1C-C-AR-S-C10-0139 ST-01
LEVEL-15 CONNECTION DETAILS-1
167
T1C-C-AR-S-C10-0140 ST-01
LEVEL-15 CONNECTION DETAILS-2
168
T1C-C-AR-S-C10-0141 ST-01
LEVEL-15 CONNECTION DETAILS-3
169
T1C-C-AR-S-C10-0142 ST-01
LEVEL-15 CONNECTION DETAILS-4
170
T1C-C-AR-S-C10-0143 ST-01
LEVEL-15 CONNECTION DETAILS-5
171
T1C-C-AR-S-C10-0144 ST-01
LEVEL-15 CONNECTION DETAILS-6
172
T1C-C-AR-S-C10-0145 ST-01
LEVEL-15 CONNECTION DETAILS-7
173
T1C-C-AR-S-C10-0146 ST-01
LEVEL 16 GA PLAN
174
T1C-C-AR-S-C10-0147 ST-01
LEVEL-16 CONNECTION DETAILS-1
175
T1C-C-AR-S-C10-0148 ST-01
LEVEL-16 CONNECTION DETAILS-2
176
T1C-C-AR-S-C10-0149 ST-01
LEVEL-16 CONNECTION DETAILS-3
177
T1C-C-AR-S-C10-0150 ST-01
LEVEL-16 CONNECTION DETAILS-4
178
T1C-C-AR-S-C10-0151 ST-01
LEVEL-16 CONNECTION DETAILS-5
179
T1C-C-AR-S-C10-0152 ST-01
LEVEL-16 CONNECTION DETAILS-6
180
T1C-C-AR-S-C10-0153 ST-01
LEVEL-16 CONNECTION DETAILS-7
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 72 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL SL. NO.
DRAWING NO.
DRAWING TITLE
181
T1C-C-AR-S-C10-0154 ST-01
LEVEL 17 GA PLAN
182
T1C-C-AR-S-C10-0155 ST-01
LEVEL-17 CONNECTION DETAILS-1
183
T1C-C-AR-S-C10-0156 ST-01
LEVEL-17 CONNECTION DETAILS-2
184
T1C-C-AR-S-C10-0157 ST-01
LEVEL-17 CONNECTION DETAILS-3
185
T1C-C-AR-S-C10-0158 ST-01
LEVEL-17 CONNECTION DETAILS-4
186
T1C-C-AR-S-C10-0159 ST-01
LEVEL-17 CONNECTION DETAILS-5
187
T1C-C-AR-S-C10-0160 ST-01
LEVEL-17 CONNECTION DETAILS-6
188
T1C-C-AR-S-C10-0161 ST-01
LEVEL-17 CONNECTION DETAILS-7
189
T1C-C-AR-S-C10-0162 ST-01
LEVEL 18 GA PLAN
190
T1C-C-AR-S-C10-0163 ST-01
LEVEL-18 CONNECTION DETAILS-1
191
T1C-C-AR-S-C10-0164 ST-01
LEVEL-18 CONNECTION DETAILS-2
192
T1C-C-AR-S-C10-0165 ST-01
LEVEL-18 CONNECTION DETAILS-3
193
T1C-C-AR-S-C10-0166 ST-01
LEVEL-18 CONNECTION DETAILS-4
194
T1C-C-AR-S-C10-0167 ST-01
LEVEL-18 CONNECTION DETAILS-5
195
T1C-C-AR-S-C10-0168 ST-01
LEVEL-18 CONNECTION DETAILS-6
196
T1C-C-AR-S-C10-0169 ST-01
LEVEL-18 CONNECTION DETAILS-7
197
T1C-C-AR-S-C10-0170 ST-01
LEVEL 19 GA PLAN
198
T1C-C-AR-S-C10-0171 ST-01
LEVEL-19 CONNECTION DETAILS-1
199
T1C-C-AR-S-C10-0172 ST-01
LEVEL-19 CONNECTION DETAILS-2
200
T1C-C-AR-S-C10-0173 ST-01
LEVEL-19 CONNECTION DETAILS-3
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 73 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL SL. NO.
DRAWING NO.
DRAWING TITLE
201
T1C-C-AR-S-C10-0174 ST-01
LEVEL-19 CONNECTION DETAILS-4
202
T1C-C-AR-S-C10-0175 ST-01
LEVEL-19 CONNECTION DETAILS-5
203
T1C-C-AR-S-C10-0176 ST-01
LEVEL-19 CONNECTION DETAILS-6
204
T1C-C-AR-S-C10-0177 ST-01
LEVEL-19 CONNECTION DETAILS-7
205
T1C-C-AR-S-C10-0100 ST-01
LEVEL-20 GA PLAN
206
T1C-C-AR-S-C10-0101 ST-01
LEVEL-21 GA PLAN
207
T1C-C-AR-S-C10-0102 ST-01
LEVEL-20 & 21 SECTIONAL DETAILS-1
208
T1C-C-AR-S-C10-0103 ST-01
LEVEL-20 & 21 SECTIONAL DETAILS-2
209
T1C-C-AR-S-C10-0104 ST-01
LEVEL-20 & 21 SECTIONAL DETAILS-3
210
T1C-C-AR-S-C10-0105 ST-01
LEVEL-20 & 21 SECTIONAL DETAILS-4
211
T1C-C-AR-S-C10-0106 ST-01
LEVEL-20 & 21 SECTIONAL DETAILS-5
212
T1C-C-AR-S-C10-0107 ST-01
LEVEL-20 & 21 SECTIONAL DETAILS-6
213
T1C-C-AR-S-C10-0108 ST-01
LEVEL-20 & 21 SECTIONAL DETAILS-7
214
T1C-C-AR-S-C10-0109 ST-01
LEVEL-20 & 21 SECTIONAL DETAILS-8
215
T1C-C-AR-S-C10-0110 ST-01
LEVEL-20 & 21 SECTIONAL DETAILS-9
216
T1C-C-AR-S-C10-0111 ST-01
LEVEL-20 & 21 SECTIONAL DETAILS-10
217
T1C-C-AR-S-C10-0112 ST-01
LEVEL-20 & 21 SECTIONAL DETAILS-11
218
T1C-C-AR-S-C10-0113 ST-01
LEVEL-20 & 21 TYPICAL SKYPOD DETAILS
219
T1C-C-AR-S-C10-0178 ST-01
LEVEL-20 & 21 SECTIONAL DETAILS-12
220
T1C-C-AR-S-C10-0179 ST-01
LEVEL-20 & 21 SECTIONAL DETAILS-13
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 74 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL SL. NO.
DRAWING NO.
DRAWING TITLE
221
T1C-C-AR-S-C10-0180 ST-01
LEVEL-20 & 21 SECTIONAL DETAILS-14
222
T1C-C-AR-S-C10-0181 ST-01
LEVEL-20 & 21 SECTIONAL DETAILS-15
223
T1C-C-AR-S-C10-0182 ST-01
LEVEL-20 & 21 SECTIONAL DETAILS-16
224
T1C-C-AR-S-C10-0186 ST-01
LEVEL 22 GA PLAN
225
T1C-C-AR-S-C10-0187 ST-01
LEVEL-22 CONNECTION DETAILS-1
226
T1C-C-AR-S-C10-0188 ST-01
LEVEL-22 CONNECTION DETAILS-2
227
T1C-C-AR-S-C10-0189 ST-01
LEVEL-22 CONNECTION DETAILS-3
228
T1C-C-AR-S-C10-0190 ST-01
LEVEL-22 CONNECTION DETAILS-4
229
T1C-C-AR-S-C10-0191 ST-01
LEVEL-22 CONNECTION DETAILS-5
230
T1C-C-AR-S-C10-0192 ST-01
LEVEL-22 CONNECTION DETAILS-6
231
T1C-C-AR-S-C10-0193 ST-01
LEVEL-22 CONNECTION DETAILS-7
232
T1C-C-AR-S-C10-11-E9001
LEVEL-22 TO 30 EMBEDMENT detail -01
233
TIC-C-AR-S-C10-09-GA006-01
LEVEL- 22 & 23 DECKING LAYOUT
234
TIC-C-AR-S-C10-09-D8001-01
LEVEL- 22 & 23 DECKING SECTION AND DETAILS
235
T1C-C-AR-S-C10-11-GA002
LEVEL-22 TO 30 EMBEDMENT LAYOUT
236
T1C-C-AR-S-C10-0194 ST-01
LEVEL 23 GA PLAN
237
T1C-C-AR-S-C10-0195 ST-01
LEVEL-23 CONNECTION DETAILS-1
238
T1C-C-AR-S-C10-0196 ST-01
LEVEL-23 CONNECTION DETAILS-2
239
T1C-C-AR-S-C10-0197 ST-01
LEVEL-23 CONNECTION DETAILS-3
240
T1C-C-AR-S-C10-0198 ST-01
LEVEL-23 CONNECTION DETAILS-4
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 75 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL SL. NO.
DRAWING NO.
DRAWING TITLE
241
T1C-C-AR-S-C10-0199 ST-01
LEVEL-23 CONNECTION DETAILS-5
242
T1C-C-AR-S-C10-0200 ST-01
LEVEL-23 CONNECTION DETAILS-6
243
T1C-C-AR-S-C10-0201 ST-01
LEVEL-23 CONNECTION DETAILS-7
244
T1C-C-AR-S-C10-0202 ST-01
LEVEL 24 GA PLAN
245
T1C-C-AR-S-C10-0203 ST-01
LEVEL-24 CONNECTION DETAILS-1
246
T1C-C-AR-S-C10-0204 ST-01
LEVEL-24 CONNECTION DETAILS-2
247
T1C-C-AR-S-C10-0205 ST-01
LEVEL-24 CONNECTION DETAILS-3
248
T1C-C-AR-S-C10-0206 ST-01
LEVEL-24 CONNECTION DETAILS-4
249
T1C-C-AR-S-C10-0207 ST-01
LEVEL-24 CONNECTION DETAILS-5
250
T1C-C-AR-S-C10-0208 ST-01
LEVEL-24 CONNECTION DETAILS-6
251
T1C-C-AR-S-C10-0209 ST-01
LEVEL-24 CONNECTION DETAILS-7
252
TIC-C-AR-S-C10-10-GA006-01
LEVEL- 24 to 30 DECKING LAYOUT
253
TIC-C-AR-S-C10-10-D8001-01
LEVEL- 24 to 30 DECKING SECTION AND DETAILS
254
T1C-C-AR-S-C10-0210 ST-01
LEVEL 25 GA PLAN
255
T1C-C-AR-S-C10-0211 ST-01
LEVEL-25 CONNECTION DETAILS-1
256
T1C-C-AR-S-C10-0212 ST-01
LEVEL-25 CONNECTION DETAILS-2
257
T1C-C-AR-S-C10-0213 ST-01
LEVEL-25 CONNECTION DETAILS-3
258
T1C-C-AR-S-C10-0214 ST-01
LEVEL-25 CONNECTION DETAILS-4
259
T1C-C-AR-S-C10-0215 ST-01
LEVEL-25 CONNECTION DETAILS-5
260
T1C-C-AR-S-C10-0216 ST-01
LEVEL-25 CONNECTION DETAILS-6
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 76 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL SL. NO.
DRAWING NO.
DRAWING TITLE
261
T1C-C-AR-S-C10-0217 ST-01
LEVEL-25 CONNECTION DETAILS-7
262
T1C-C-AR-S-C10-0218 ST-01
LEVEL 26 GA PLAN
263
T1C-C-AR-S-C10-0219 ST-01
LEVEL-26 CONNECTION DETAILS-1
264
T1C-C-AR-S-C10-0220 ST-01
LEVEL-26 CONNECTION DETAILS-2
265
T1C-C-AR-S-C10-0221 ST-01
LEVEL-26 CONNECTION DETAILS-3
266
T1C-C-AR-S-C10-0222 ST-01
LEVEL-26 CONNECTION DETAILS-4
267
T1C-C-AR-S-C10-0223 ST-01
LEVEL-26 CONNECTION DETAILS-5
268
T1C-C-AR-S-C10-0224 ST-01
LEVEL-26 CONNECTION DETAILS-6
269
T1C-C-AR-S-C10-0225 ST-01
LEVEL-26 CONNECTION DETAILS-7
270
T1C-C-AR-S-C10-0226 ST-01
LEVEL 27 GA PLAN
271
T1C-C-AR-S-C10-0227 ST-01
LEVEL-27 CONNECTION DETAILS-1
272
T1C-C-AR-S-C10-0228 ST-01
LEVEL-27 CONNECTION DETAILS-2
273
T1C-C-AR-S-C10-0229 ST-01
LEVEL-27 CONNECTION DETAILS-3
274
T1C-C-AR-S-C10-0230 ST-01
LEVEL-27 CONNECTION DETAILS-4
275
T1C-C-AR-S-C10-0231 ST-01
LEVEL-27 CONNECTION DETAILS-5
276
T1C-C-AR-S-C10-0232 ST-01
LEVEL-27 CONNECTION DETAILS-6
277
T1C-C-AR-S-C10-0233 ST-01
LEVEL-27 CONNECTION DETAILS-7
278
T1C-C-AR-S-C10-0234 ST-01
LEVEL 28 GA PLAN
279
T1C-C-AR-S-C10-0235 ST-01
LEVEL-28 CONNECTION DETAILS-1
280
T1C-C-AR-S-C10-0236 ST-01
LEVEL-28 CONNECTION DETAILS-2
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 77 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL SL. NO.
DRAWING NO.
DRAWING TITLE
281
T1C-C-AR-S-C10-0237 ST-01
LEVEL-28 CONNECTION DETAILS-3
282
T1C-C-AR-S-C10-0238 ST-01
LEVEL-28 CONNECTION DETAILS-4
283
T1C-C-AR-S-C10-0239 ST-01
LEVEL-28 CONNECTION DETAILS-5
284
T1C-C-AR-S-C10-0240 ST-01
LEVEL-28 CONNECTION DETAILS-6
285
T1C-C-AR-S-C10-0241 ST-01
LEVEL-28 CONNECTION DETAILS-7
286
T1C-C-AR-S-C10-0242 ST-01
LEVEL 29 GA PLAN
287
T1C-C-AR-S-C10-0243 ST-01
LEVEL-29 CONNECTION DETAILS-1
288
T1C-C-AR-S-C10-0244 ST-01
LEVEL-29 CONNECTION DETAILS-2
289
T1C-C-AR-S-C10-0245 ST-01
LEVEL-29 CONNECTION DETAILS-3
290
T1C-C-AR-S-C10-0246 ST-01
LEVEL-29 CONNECTION DETAILS-4
291
T1C-C-AR-S-C10-0247 ST-01
LEVEL-29 CONNECTION DETAILS-5
292
T1C-C-AR-S-C10-0248 ST-01
LEVEL-29 CONNECTION DETAILS-6
293
T1C-C-AR-S-C10-0249 ST-01
LEVEL-29 CONNECTION DETAILS-7
294
T1C-C-AR-S-C10-0250 ST-01
LEVEL 30 GA PLAN
295
T1C-C-AR-S-C10-0251 ST-01
LEVEL-30 CONNECTION DETAILS-1
296
T1C-C-AR-S-C10-0252 ST-01
LEVEL-30 CONNECTION DETAILS-2
297
T1C-C-AR-S-C10-0253 ST-01
LEVEL-30 CONNECTION DETAILS-3
298
T1C-C-AR-S-C10-0254 ST-01
LEVEL-30 CONNECTION DETAILS-4
299
T1C-C-AR-S-C10-0255 ST-01
LEVEL-30 CONNECTION DETAILS-5
300
T1C-C-AR-S-C10-0256 ST-01
LEVEL-30 CONNECTION DETAILS-6
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 78 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL SL. NO.
DRAWING NO.
DRAWING TITLE
301
T1C-C-AR-S-C10-0257 ST-01
LEVEL-30 CONNECTION DETAILS-7
302
T1C-C-AR-S-C10-0258 ST-01
LEVEL 31 GA PLAN
303
T1C-C-AR-S-C10-0259 ST-01
LEVEL-31 CONNECTION DETAILS-1
304
T1C-C-AR-S-C10-0260 ST-01
LEVEL-31 CONNECTION DETAILS-2
305
T1C-C-AR-S-C10-0261 ST-01
LEVEL-31 CONNECTION DETAILS-3
306
T1C-C-AR-S-C10-0262 ST-01
LEVEL-31 CONNECTION DETAILS-4
307
T1C-C-AR-S-C10-0263 ST-01
LEVEL-31 CONNECTION DETAILS-5
308
T1C-C-AR-S-C10-0264 ST-01
LEVEL-31 CONNECTION DETAILS-6
309
T1C-C-AR-S-C10-0265 ST-01
LEVEL-31 CONNECTION DETAILS-7
310
TIC-C-AR-S-C10-11-D8001-01
LEVEL- 31 DECKING SECTIONS & DETAILS
311
TIC-C-AR-S-C10-11-GA006-01
LEVEL- 31 DECKING LAYOUT
312
T1C-C-AR-S-C10-0266 ST-01
LEVEL 32 GA PLAN
313
T1C-C-AR-S-C10-0267 ST-01
LEVEL-32 CONNECTION DETAILS-1
314
T1C-C-AR-S-C10-0268 ST-01
LEVEL-32 CONNECTION DETAILS-2
315
T1C-C-AR-S-C10-0269 ST-01
LEVEL-32 CONNECTION DETAILS-3
316
T1C-C-AR-S-C10-0270 ST-01
LEVEL-32 CONNECTION DETAILS-4
317
T1C-C-AR-S-C10-0271 ST-01
LEVEL-32 CONNECTION DETAILS-5
318
T1C-C-AR-S-C10-0272 ST-01
LEVEL-32 CONNECTION DETAILS-6
319
T1C-C-AR-S-C10-0273 ST-01
LEVEL-32 CONNECTION DETAILS-7
320
TIC-C-AR-S-C10-12-GA006-01
LEVEL- 32 to 39 DECKING LAYOUT
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 79 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL SL. NO.
DRAWING NO.
DRAWING TITLE
321
TIC-C-AR-S-C10-12-D8001-01
LEVEL- 32 to 39 DECKING SECTION AND DETAILS
322
T1C-C-AR-S-C10-0274 ST-01
LEVEL 33 GA PLAN
323
T1C-C-AR-S-C10-0275 ST-01
LEVEL-33 CONNECTION DETAILS-1
324
T1C-C-AR-S-C10-0276 ST-01
LEVEL-33 CONNECTION DETAILS-2
325
T1C-C-AR-S-C10-0277 ST-01
LEVEL-33 CONNECTION DETAILS-3
326
T1C-C-AR-S-C10-0278 ST-01
LEVEL-33 CONNECTION DETAILS-4
327
T1C-C-AR-S-C10-0279 ST-01
LEVEL-33 CONNECTION DETAILS-5
328
T1C-C-AR-S-C10-0280 ST-01
LEVEL-33 CONNECTION DETAILS-6
329
T1C-C-AR-S-C10-0281 ST-01
LEVEL-33 CONNECTION DETAILS-7
330
T1C-C-AR-S-C10-0282 ST-01
LEVEL 34 GA PLAN
331
T1C-C-AR-S-C10-0283 ST-01
LEVEL-34 CONNECTION DETAILS-1
332
T1C-C-AR-S-C10-0284 ST-01
LEVEL-34 CONNECTION DETAILS-2
333
T1C-C-AR-S-C10-0285 ST-01
LEVEL-34 CONNECTION DETAILS-3
334
T1C-C-AR-S-C10-0286 ST-01
LEVEL-34 CONNECTION DETAILS-4
335
T1C-C-AR-S-C10-0287 ST-01
LEVEL-34 CONNECTION DETAILS-5
336
T1C-C-AR-S-C10-0288 ST-01
LEVEL-34 CONNECTION DETAILS-6
337
T1C-C-AR-S-C10-0289 ST-01
LEVEL-34 CONNECTION DETAILS-7
338
T1C-C-AR-S-C10-0290 ST-01
LEVEL 35 GA PLAN
339
T1C-C-AR-S-C10-0291 ST-01
LEVEL-35 CONNECTION DETAILS-1
340
T1C-C-AR-S-C10-0292 ST-01
LEVEL-35 CONNECTION DETAILS-2
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 80 of 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL SL. NO.
DRA WING NO.
DRAWING TITL E
341
T1C-C-AR-S-C10-0293 ST-01
LEVEL-35 CONNECTION DETAILS-3
342
T1C-C-AR-S-C10-0294 ST-01
LEVEL-35 LEVEL-35 CONNECTION CONNECTION DETAILS-4
343
T1C-C-AR-S-C10-0295 ST-01
LEVEL-35 CONNECTION DETAILS-5
344
T1C-C-AR-S-C10-0296 ST-01
LEVEL-35 CONNECTION DETAILS-6
345
T1C-C-AR-S-C10-0297 ST-01
LEVEL-35 CONNECTION DETAILS-7
346
T1C-C-AR-S-C10-0298 ST-01
LEVEL 36 GA PLAN
347
T1C-C-AR-S-C10-0299 ST-01
LEVEL-36 CONNECTION DETAILS-1
348
T1C-C-AR-S-C10-0300 ST-01
LEVEL-36 CONNECTION DETAILS-2
349
T1C-C-AR-S-C10-0301 ST-01
LEVEL-36 CONNECTION DETAILS-3
350
T1C-C-AR-S-C10-0302 ST-01
LEVEL-36 CONNECTION DETAILS-4
351
T1C-C-AR-S-C10-0303 ST-01
LEVEL-36 CONNECTION DETAILS-5
352
T1C-C-AR-S-C10-0304 ST-01
LEVEL-36 CONNECTION DETAILS-6
353
T1C-C-AR-S-C10-0305 ST-01
LEVEL-36 CONNECTION DETAILS-7
354
T1C-C-AR-S-C10-0306 ST-01
LEVEL 37 GA PLAN
355
T1C-C-AR-S-C10-0307 ST-01
LEVEL-37 CONNECTION DETAILS-1
356
T1C-C-AR-S-C10-0308 ST-01
LEVEL-37 CONNECTION DETAILS-2
357
T1C-C-AR-S-C10-0309 ST-01
LEVEL-37 CONNECTION DETAILS-3
358
T1C-C-AR-S-C10-0310 ST-01
LEVEL-37 CONNECTION DETAILS-4
359
T1C-C-AR-S-C10-0311 ST-01
LEVEL-37 CONNECTION DETAILS-5
360
T1C-C-AR-S-C10-0312 ST-01
LEVEL-37 CONNECTION DETAILS-6
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page Page 81 of 86 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL SL. NO.
DRA WING NO.
DRAWING TITL E
361
T1C-C-AR-S-C10-0313 ST-01
LEVEL-37 CONNECTION DETAILS-7
362
T1C-C-AR-S-C10-0314 ST-01
LEVEL 38 GA PLAN
363
T1C-C-AR-S-C10-0315 ST-01
LEVEL-38 CONNECTION DETAILS-1
364
T1C-C-AR-S-C10-0316 ST-01
LEVEL-38 CONNECTION DETAILS-2
365
T1C-C-AR-S-C10-0317 ST-01
LEVEL-38 CONNECTION DETAILS-3
366
T1C-C-AR-S-C10-0318 ST-01
LEVEL-38 CONNECTION DETAILS-4
367
T1C-C-AR-S-C10-0319 ST-01
LEVEL-38 CONNECTION DETAILS-5
368
T1C-C-AR-S-C10-0320 ST-01
LEVEL-38 CONNECTION DETAILS-6
369
T1C-C-AR-S-C10-0321 ST-01
LEVEL-38 CONNECTION DETAILS-7
370
T1C-C-AR-S-C10-0330 ST-01
LEVEL-39 G A PLAN
371
T1C-C-AR-S-C10-0331 ST-01
LEVEL-39 CONNECTION DETAILS-1
372
T1C-C-AR-S-C10-0332 ST-01
LEVEL-39 CONNECTION DETAILS-2
373
T1C-C-AR-S-C10-0333 ST-01
LEVEL-39 CONNECTION DETAILS-3
374
T1C-C-AR-S-C10-0334 ST-01
LEVEL-39 CONNECTION DETAILS-4
375
T1C-C-AR-S-C10-0335 ST-01
LEVEL-39 CONNECTION DETAILS-5
376
T1C-C-AR-S-C10-0336 ST-01
LEVEL-39 CONNECTION DETAILS-6
377
T1C-C-AR-S-C10-0337 ST-01
LEVEL-39 CONNECTION DETAILS-7
378
T1C-C-AR-S-C10-39-E9001
LEVEL-39 EMBEDMENT DETAIL-01
379
T1C-C-AR-S-C10-39-GA002
LEVEL-39 EMBEDMENT LAYOUT
380
T1C-C-AR-S-C10-0338 ST-01
LEVEL-40 GA PLAN
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page Page 82 of 86 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL SL. NO.
DRA WING NO.
DRAWING TITL E
381
T1C-C-AR-S-C10-0339 ST-01
LEVEL-41 GA PLAN
382
T1C-C-AR-S-C10-0340 ST-01
LEVEL-40 & 41 SECTIONAL DETAILS-1
383
T1C-C-AR-S-C10-0341 ST-01
LEVEL-40 & 41 SECTIONAL DETAILS-2
384
T1C-C-AR-S-C10-0342 ST-01
LEVEL-40 LEVEL-40 & 41 SECTIONAL SECTIONAL DETAILS-3
385
T1C-C-AR-S-C10-0343 ST-01
LEVEL-40 & 41 SECTIONAL DETAILS-4
386
T1C-C-AR-S-C10-0344 ST-01
LEVEL-40 & 41 SECTIONAL DETAILS-5
387
T1C-C-AR-S-C10-0345 ST-01
LEVEL-40 & 41 SECTIONAL DETAILS-6
388
T1C-C-AR-S-C10-0346 ST-01
LEVEL-40 & 41 SECTIONAL DETAILS-7
389
T1C-C-AR-S-C10-0347 ST-01
LEVEL-40 & 41 SECTIONAL DETAILS-8
390
T1C-C-AR-S-C10-0348 ST-01
LEVEL-40 & 41 SECTIONAL DETAILS-9
391
T1C-C-AR-S-C10-0349 ST-01
LEVEL-40 & 41 SECTIONAL DETAILS-10
392
T1C-C-AR-S-C10-0350 ST-01
LEVEL-40 & 41 SECTIONAL DETAILS-11
393
T1C-C-AR-S-C10-0351 ST-01
LEVEL-40 & 41 TYPICAL SKYPOD DETAILS
394
T1C-C-AR-S-C10-0352 ST-01
LEVEL-40 & 41 SECTIONAL DETAILS-12
395
T1C-C-AR-S-C10-0353 ST-01
LEVEL-40 & 41 SECTIONAL DETAILS-13
396
T1C-C-AR-S-C10-0354 ST-01
LEVEL-40 & 41 SECTIONAL DETAILS-14
397
T1C-C-AR-S-C10-0355 ST-01
LEVEL-40M GA PLAN
398
T1C-C-AR-S-C10-0355 ST-01
LEVEL-40M GA PLAN
399
T1C-C-AR-S-C10-0356 ST-01
LEVEL-40M SECTIONAL DETAILS-1
400
T1C-C-AR-S-C10-0356 ST-01
LEVEL-40M SECTIONAL DETAILS-1
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page Page 83 of 86 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL SL. NO.
DRA WING NO.
DRAWING TITL E
401
T1C-C-AR-S-C10-0359 ST-01
LEVEL-40M SECTIONAL DETAILS-2
402
T1C-C-AR-S-C10-0359 ST-01
LEVEL-40M SECTIONAL DETAILS-2
403
T1C-C-AR-S-C10-0360 ST-02
LEVEL-40 & 41 SECTIONAL DETAILS-15
404
T1C-C-AR-S-C10-0361 ST-02
LEVEL-40 & 41 SECTIONAL DETAILS-16
405
T1C-C-AR-S-C10-0362 ST-02
LEVEL-40 & 41 SECTIONAL DETAILS-17
406
T1C-C-AR-S-C10-0370 ST-01
LEVEL-42 GA PLAN
407
T1C-C-AR-S-C10-0425 ST-01
LEVEL 42-49 DECKING LAYOUT
408
T1C-C-AR-S-C10-0371 ST-01
LEVEL-43 GA PLAN
409
T1C-C-AR-S-C10-0372 ST-01
LEVEL-44 TO 49 GA PLAN
410
T1C-C-AR-S-C10-0373 ST-01
LEVEL-44 TO 49 CONNECTION DETAILS-1
411
T1C-C-AR-S-C10-0374 ST-01
LEVEL-50 GA PLAN
412
T1C-C-AR-S-C10-0424 ST-01
LEVEL- 50-72 DECKING DECKING LAYOUT
413
T1C-C-AR-S-C10 T1C-C-AR-S-C10-0375 -0375 ST-01
LEVEL-51 TO 55 GA PLAN
414
T1C-C-AR-S-C10-0376 ST-01
LEVEL-51 TO 55 CONNECTION DETAILS-1
415
T1C-C-AR-S-C10-0377 ST-01
LEVEL-56 GA PLAN
416
T1C-C-AR-S-C10-0378 ST-01
LEVEL-57 TO 65 GA PLAN
417
T1C-C-AR-S-C10-0379 ST-01
LEVEL-57 TO 65 CONNECTION DETAILS-1
418
T1C-C-AR-S-C10-0380 ST-01
LEVEL-66 GA PLAN
419
T1C-C-AR-S-C10-0381 ST-01
LEVEL-67 GA PLAN
420
T1C-C-AR-S-C10-0382 ST-01
LEVEL-68 GA PLAN
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page Page 84 of 86 86
Shams Abu Dhabi Project Sky Tower, Sun Tower & Podium STRUCTURAL STEEL OPERATION AND MAINTENANCE MANUAL SL. NO.
DRAWING NO.
DRAWING TITLE
421
T1C-C-AR-S-C10-0406 ST-01
LEVEL-68A (ATTIC FLOOR) GENERAL ARRANGEMENT PLAN
422
T1C-C-AR-S-C10-0407 ST-01
LEVEL-68A (ATTIC FLOOR) GENERAL ARRANGEMENT PARTIAL PLAN-1
423
T1C-C-AR-S-C10-0408 ST-01
LEVEL-68A (ATTIC FLOOR) GENERAL ARRANGEMENT PARTIAL PLAN-2
424
T1C-C-AR-S-C10-0412 ST-01
LEVEL-68A & 70A (ATTIC FLOOR) SECTION DETAILS-1
425
T1C-C-AR-S-C10-0413 ST-01
LEVEL-68A & 70A (ATTIC FLOOR) CONNECTION DETAIL-1
426
T1C-C-AR-S-C10-0414 ST-01
LEVEL-68A & 70A (ATTIC FLOOR) CONNECTION DETAIL-2
427
T1C-C-AR-S-C10-0426 ST-01
LEVEL-68A & 70A (ATTIC FLOOR) CONNECTION DETAIL-3
428
T1C-C-AR-S-C10-0402 ST-01
LEVEL 69 & 70 GENERAL ARRANGEMENT PLAN
429
T1C-C-AR-S-C10-0402 ST-01
LEVEL 69 & 70 GENERAL ARRANGEMENT PLAN
430
T1C-C-AR-S-C10-0402 ST-01
LEVEL 69 & 70 GENERAL ARRANGEMENT PLAN
431
T1C-C-AR-S-C10-0403 ST-01
LEVEL 69 & 70 CONNECTION DETAILS 1
432
T1C-C-AR-S-C10-0403 ST-01
LEVEL 69 & 70 CONNECTION DETAILS 1
433
T1C-C-AR-S-C10-0403 ST-01
LEVEL 69 & 70 CONNECTION DETAILS 1
434
T1C-C-AR-S-C10-0409 ST-01
LEVEL-70A (ATTIC FLOOR) GENERAL ARRANGEMENT PLAN
435
T1C-C-AR-S-C10-0410 ST-01
LEVEL-70A (ATTIC FLOOR) GENERAL ARRANGEMENT PARTIAL PLAN-1
436
T1C-C-AR-S-C10-0411 ST-01
LEVEL-70A (ATTIC FLOOR) GENERAL ARRANGEMENT PARTIAL PLAN-2
437
T1C-C-AR-S-C10-0404 ST-01
LEVEL-71 GENERAL ARRANGEMENT PLAN
438
T1C-C-AR-S-C10-0404 ST-01
LEVEL-71 GENERAL ARRANGEMENT PLAN
439
T1C-C-AR-S-C10-0404 ST-01
LEVEL-71 GENERAL ARRANGEMENT PLAN
440
T1C-C-AR-S-C10-0405 ST-01
LEVEL-72 GENERAL ARRANGEMENT PLAN
MAIN CONTRACTOR
ARABIAN CONSTRUCTION CO. STRUCTURAL STEEL CONTRACTOR
EVERSENDAI ENGINEERING L.L.C Page 85 of 86