NAVANEETHAN SHANMUGA SUNDARAM SENIOR.INSPECTION ENGINEER / TURN-AROUND INSPECTION -QC COORDINATOR CSWIP 3.2.2/BGAS Gr2/ASNT-NDT-Level-III/PCN L2 TOFD/PAUT E-Mail Id:
[email protected] ; Mobile.No : +91-9578144916 Graduated in Mechanical Engineering, having more than 19 years of comprehensive experience in Plant Maintenance Inspection of Process Pressure vessel,PSV/PRV’s,Heat Exchangers,Reboilers, Boilers, Incinerators, Reactors, Regenerators, Reformers, Heaters, Piping,Tanks/ QC/ Welding/Coating-Painting/ NDT/TOFD/PAUT activities and Quality control inspection in various companies those involved in fabrication of plant equipment’s, piping, pipeline and structures for Oil & Gas industries, with functional areas as Plant Maintenance Inspection Engineer, Inspection & QC supervisor, Coordinator, Vendor quality Inspection Engineer,API-6D Valves Inspections, NDT Level-III, Welding & Coating inspections etc. Performing the inspection activities w.r.to various Plant Inspection strategies and focus on Integrity and Quality, Supervising, coordinating the maintenance inspection tasks,onsite piping spool fabrication, maintenance Welding/Painting/NDT Inspection & QA/QC activities for the enhancement of Plant maintenance inspection. Supervising, coordinating a team of plant inspectors, NDT ,UTG, Technicians, Welding/Painting inspectors unit viz with respect to turn around inspection schedule. Responsible for the effective Maintenance Inspection supervision, coordination of inspection systems and services to the allocated installation to ensure that plant and equipment is certified in accordance with owner Client codes of practice. Develop inspection plans in line with plant maintenance requirements. Conversant with Inspection & QC procedures,standards KNPC,EQUATE Petrochemicals, Saudi Aramco, QP, QG, Rasgas & ADMA-OPCO,Conversant plant inservice codes and standards such as API 510,API 653,API 570,API 577,API 580 ,API-610 DB5 & ASME Sec.VIII Div-1,Div-2,ASME Sec-II A,B,C,D,UKAS Worked as Plant Inspection engineer for Major/Grand Refinery Turn arounds, in India, Bahrain, Saudi Arabia, Kuwait & Qatar for Refinery,Petrochemical Plant, Fertilizer plants, Power Plants & LPG Storage & Bottling plants etc. Worked as Subsea Lay Barge QC-Supervisor for S-Lay Rigid Subsea Pipeline construction & Installation for QP & VIETSOV-PETRO,Vietnam & Qatar waters. Lay barges worked (Regina-250-VMGL-OXY-Qatar) & LEWEK CHAMPION (EMAS & Premier Oil-Singapore). Worked as Vendor/Supplier Quality Inspection & Expediting engineer for Major EPIC –Subsea/Wellhead Platform construction /Installation projects such as ADMA-OPCO,RASGAS-BARZAN,PAPPA TERRA FLOA TECH TLWP,ALKHAFJI-RATAWI,ONGC 7-Cluster Well,PREMIER OIL,PETRO BRASS,NOV-VARCO Pedestal Crane Fabrication Inspector at Vendor site(Norway& Estonia) around India,UAE,Qatar,Europe (Italy, Swiss, Germany, Poland, Estonia, Netherlands, Norway) & United Kingdom(Manchester, Glasgow, Piccadilly & Barnsley).
S.NAVANEETHAN – Sr.Plant Inspection Coordinator
Page 1
TECHNICAL EDUCATION:
B.E( Mechanical Engineering)-REC- Nov 2001 Passed Out. D.M.E (Mechanical Engineering) –C.I.T- Oct 1995 Passed Out.
PROFESSIONAL CERTIFICATIONS CSWIP 3.2.2 Cert No: 37177
BGAS GR-II Cert.No:38699
ASNT-NDT –Level-III in RT,UT,VT (ASNT ID #173433)
PCN Level-II 3.1/TOFD/PAUT
ASNT-NDT –Level-II in MT,PT. ISO 9001:2008 QMS LEAD AUDITOR PRIMEVERA P6 (Turn-Around Planning)
API-510 Degree Appeared twice but not yet Cleared. (API # CORROSION CERTIFICATION: Central Electro-chemical Research Institute (CECRI-INDIA) Corrosion Control in Heat Exchangers & Boilers Cathodic Protection & Anodic Devices. Corrosion Control in Underground Oil Pipelines. Paints for Corrosion Protection.
MAJOR DUTIES & RESPONSIBILITIES Conduct off-stream and on-stream inspection on the off-shore top side facilities and Plant static equipments including pressure vessels, heat exchangers, KO-drums, tanks, top side structures, and piping systems according to Company established policies and procedures and issues inspection reports. Implement the computerized inspection program through Validation of the asset registry, equipment details and the inspection results. Conduct fitness for service assessment for the different equipment, set the scope of corrective action, set and implement the quality control scope and testing. Inspects plant stationary equipment by entering into vessels, boilers and towers, during shutdowns, to check condition of equipment. Includes noting observations on cracks, pits, thinning and any other pattern of erosion, corrosion and other interior failure. Makes interpretations of findings, analyses for failure, prepares report and issues recommendation. Coordinates with the Operations Planning and Maintenance supervisors such activities as the scheduling and planning of inspections, obtaining the requisite permits and performing any required special audits of equipment. Checks the condition of PSV,PRV’ssafety relief valves, and reports findings to supervisor. Witnesses pressure setting before and after repair and during any re-calibration campaign, as assigned. Prepares report, schedules testing frequency as per policy, enters inspection data in Meridium based (RBISoftware) computerized system, raises recommendation based on valve condition and follow up.
S.NAVANEETHAN – Sr.Plant Inspection Coordinator
Page 2
Liaise with Project Engineers, Discipline Engineers, Vendor representatives and Company Technical focal points, on PurchaseOrder details, to plan inspection visits. Review detailed quality and manufacturing plans for each job order. Confirming key quality control items and hold points including NDT and fabrication procedures.Monitoring contractor’s quality plans, inspection plans, procedures.
Witness hydrostatic tests and pneumatic tests on pressure equipment,(Heat exchangers valves and pipelines,Tanks) as per Company policy. Upon failures of equipment such as pumps and vessels, inspect material and assist in the preliminary failure assessments; prepare report and issue recommendations, where applicable, via supervisor for action by relevant departments. Inspects maintenance and capital project works being carried out in the plant, to ensure that specified maintenance practices and procedures are followed for welding, installation and fabrication as per policy and in compliance with international fabrication codes and standard. Liase and assists during Third Party recertification of statutory equipment like boilers. Carries out NDT tests on mechanical equipment and piping. Tests include Penetrant examination (PT), magnetic particle inspection (MPI), ultrasonic testing (UT), radiography (RT), PMI, Metallographic, hardness tests, boroscopy and use of special equipment like elcometer to determine DFT of paint and ferrometer for stainless steel welding tests and other tests and inspections as required. Follows all required safety procedures while carrying out the work. Prepares preliminary reports on inspections and NDT tests, highlighting any abnormalities and issue recommendations via supervisor for action by relevant departments. Ensures proper maintenance of inspection reports and records. Maintains various records in the computerized systems, updating inspection test results and other data in specialized inspection software system (Meridium-RBI Software). Responsible for the support of Company safety, environment and Quality policies and programs, carrying out specific duties and responsibilities related to his job as spelled out in Management system documentation, policies, procedures, local documentation, Management System Manual, Safety Manual and other related documents. Assist in corrosion monitoring work by retrieving corrosion probe data and online / offline renewal of corrosion coupons and probes. Monitors regularly CPR current and voltage readings and supply data to Corrosion. Supervises and co-ordinates contracted Painting team, witnesses and inspect all coating painting (external paint and internal lining), Wrapping, insulation activities, and carry out all required inspections and tests (DFT, WFT, profile, and holiday test). Inspection of Heat Exchangers, Air coolers,Process vessels,Scrubb Column Bottom.Integrity Inspection Activities,HydroTesting of Water Tube Utility Boiler- STORK ENERGY BOILERS. Random NDT and Inspection of Coil Buckling,Stuctural Stability of Economiser coils. Inspection of materials, consumables, and welding process. Review & approve WPS & PQR, witness WQT & monitor welder. Inspection during fabrication and construction of piping, structures, Manifolds, and offshore structures (PLET, UTA, Suction Piles TSB and Jumpers). Review test packages, making punch and outstanding lists, witness and approve pre-commissioning cleaning, hydrostatic tests, flushing, and reinstatement. Supervision and preparation for leak test, Nitrogen purging and Pneumatic test for equipment and piping. Performing and witness vendor inspection of Valves, material and equipment. S.NAVANEETHAN – Sr.Plant Inspection Coordinator
Page 3
Performing and witnessing for static equipment inspection activities. . Monitor performance of subcontractors by carrying out surveillance inspection of piping, tanks, vessels, structure, Tie inn and pipeline onshore and offshore. Witness MFL,IRIS,ET,RFET for Tube inspection & MFL Tank floor scanning for tank bottom floors. EXPERIENCE SUMMARY From APRIL’2014 to AUG’2014…..
AL -DARWISH INSPECTION SERVICES-DOHA,QATAR
Designation
:
SR. INSPECTION COORDINATOR-PLANT INSPECTION.
Client
:
M/S QAFAC & QATAR GAS
Project
:
Plant Maintenance Inspection-Turn Around Inspection.
Maintenance Contractors : QCON,ANABEEB FOSTER-WHEELER METHANOL REFORMER MODIFICATION (H1201)-QAFAC,Mesieed Qatar Inspection activities at construction, erection and commissioning activities, i.e. mainly in welding, NDE, testing, coating &painting, welding procedures and welder qualifications, independent quality integrity verification and documentation (testpacks & quality plans) reviews & approval. Liaise with Project Engineers, Discipline Engineers, Vendor representatives and Company Technical focal points, on Purchase Order details, to plan inspection visits. Review detailed quality and manufacturing plans for each job order.Confirming key quality control items and hold points including NDT,Welding and fabrication procedures. Monitoring implementation of contractor’s quality plans, inspection plans, procedures and work instructions.RLA of Reformer Tubes (Condition Monitoring)
Verify contractor’s records of calibration, inspection & test equipment. Ensure that the welding activities carried out by construction and maintenance contractors are performed to the Company’s standards, specifications and PO requirements.
Monitoring & Controlling the Welding & NDT of Reformer tubes to Bottom Headers. Collecting the data and submitting to Inspection METHANOL REACTOR VESSEL MODIFICATION (V1201)-QAFAC,MESIEED QATAR Maintenance Contractors : DESCON,ANABEEB & Italian,Netherland Vendors.
Develop, review and execute area inspection plans to ensure integrity and reliability of the Methanol Reactor.
Develop, monitor implementation and review inspection input into plant equipment maintenance plans for Maintenance ,Vendor Reprentatives to ensure equipment integrity and reliability.
Provide the shutdown / turnaround scope of work for discipline to ensure continuing availability and integrity of plant and equipment.
Plan, prepare and execute inspection scope of work to ensure safe and reliable operation of the plant.
S.NAVANEETHAN – Sr.Plant Inspection Coordinator
Page 4
Conduct quality check audits for the maintenance and workshop mechanical activities to insure the work quality is maintained and hence the plants integrity and reliability. Provide relevant information and advice to support the development of a sound departmental business plan.
Flame cut all the internals without affecting the internal wall surface and apply PT & MT (Fluorescent) for investigate thermal cracks.
Implement a proper safety plan for inspection team with a proper communication channel.
Witness PAUT & TOFD of Circumfrential weldments and nozzle weldments and review the report and images.
Verify the Fitup inspection and provide the clearance to welding supervisor to proceed further activities.
HEATER TUBE-SHEET CRACK REPAIR REMOVAL WELDING (H1201)-QATAR GAS-Qatar
Verify the Fitup inspection and provide the clearance to welding supervisor to proceed HK-40 Alloy Welding activities.
Visual Inspection,PT Applied and Find out the Crack due to ThermalFatigue.
Drill holes both ends of crack to arrest Crack propagation and carried out Maintenance Welding.
Piping Hydrostatic test,Test pack review.
Participate Shutdowm meeting and discuss the day to day activites,completion,back-logs etc.,
FROM OCT’2012 TO MARCH’2014…..
VALENTINE MARITIME GULF- ABUDHABI UAE
Designation
: Sr. QA/QC ENGINEER –SUBSEA CONSTRUCTIONS
Client
:
Project
: Sub Sea OIL EXPORT Pipeline System & Installation of Calm Buoy and
M/s Occidental Petroleum of Qatar Ltd (OPQL) OXY-QATAR Water Disposal Pipeline Project, HALUL Island Doha-QATAR (3.5Km)
Lay Barge
: REGINA-250 S-LAY
Responsible in performing daily inspection,Pipe Tally Records,Main Deck or Cargo Barge Pipeline Tally sheet,updating in the excel sheet for Pipeline continuity and reporting as per approved inspection test plan. Witnessing the procedure qualification record (PQR) as per pWPS.welder qualification test (WQT) as per approved WPS. Ensure that API-1104 Auto-GMAW VERMAT PIPELINE welding carryout as per company approved WPS/PQR/WPQT.Fit-up inspection ,cutting, misalignment, groove angle, root face, root opening, tack weld and preheat temperature, line and joint number, joint surface cleanness. Visual and Dimensional inspection of weld profile surface, weld defects, alignment, dimensioning arcstrike, interpass and post weld cleaning, and dimensional tolerance.NDE inspection carried out as per ASME Sec V/API 1104& Company Spec, ITP.
S.NAVANEETHAN – Sr.Plant Inspection Coordinator
Page 5
Tie-In & Riser spool fabrication,external & internal coating.NDT& Radiographic film interpretation and evaluation. Witnessing the repair removal. Subsea Installations of SBM-Calmbuoy, Oil export Pipeline,of 2.5 km from AL-morjan Oil Platform to Calm buoy & 2.5 km Subsea pipeline from Halul island shore to Water Disposal Platform (WDP).Ensure timely communication of project quality requirements to all concerned personnel and vendors to ensure they are made aware of the requirements. Carry out QA audit, inspection surveillance, witness testing and report failure investigation on welding, mechanical equipment, electrical/instrument equipment, various piping and structural materials. Review / Approval of Method Statements, Work Instructions, ITP(Inspection and Test Plan), WPS, PQR,WQT Welder Qualification Documents, Review of Raw material test certificate of welding consumables like filler wire, electrode,flux,shielding/purging gases etc. as per standards or client specification Review of Radiographic Films (RTFI)of welds and of Ultrasonic Testing of Welds, Plates, Pipes, Forgings, MT/PT of welds and Destructive Testing (Tensile, Nick-Break, Fracture, Bend, Notch Toughness, HardnessReview of NDT procedure, PWHT procedure, hydro test procedure etc.Witnessed the destructive testing like charpy impact test, hardness test, bend test, tensile testhydro test ,pneumatic test, monitoring of PWHT, location of thermocouple, review of calibration certificate of PWHT instruments etc. Monitoring coating material storage conditions thinning, mixing, induction time and pot life of paint to be applied coating application parameters during application wet film thickness Witnessing DFT of paint by means of Non-destructive instrument holiday test for integrity of coating. HDPE Liner insertion about 2.5 km by Electro Fusion welding carried out by APS-UAE. Monitoring Production Quality Test,Tensile Test, HDPE Flange Welding& String Welding, insertion.Coating of Chemflake Glass flake epoxy, PU-Protegol 32-55L , Two pack (Interzinc-52& Interzone Epoxy 954.) ZINC Rich Epoxy, Foam coating,Servi wrap & Rockguard Servi shield.Witnessing the Automated NDT, RTFI, MPI& PT, TOFD,Crawler Inspection.
FEB’2010-JULY’2012 Designation
:
McDermott Middle East Inc., – Jebal Ali,Dubai-UAE (EPIC)
Supplier Quality Surveillance QC/NDT-Inspector EUROPE ,INDIA,Middle East & UK Regions
Client
:
M/s ADMA-OPCO-UAE.
Projects Worked
: ADMA-OPCO Zakum Water injection Platform (Pressure /capacity Up gradation) RasGas -BARZANOffshore Expansion Project – Phase 1 WH4/WH9 Platforms. PAPA TERRA- Floa Tec TLWP/P-61-Brazil Al-Khafji-Ratawi JV,KJO Water injection Project- Italy ONGC-Cluster 7 Well -India NOV-105 Metal Ship Hull Project 100MT & 400 MT Pedestal Cranes.-Norway FRAMES BV-Nederland.
S.NAVANEETHAN – Sr.Plant Inspection Coordinator
Page 6
Reporting to the Project Quality Manager (PQM) and responsible for supporting the effective delivery of day-to-day Project Quality Management System (PQMS) activities . Supporting the PQM with the development and effective implementation of the PQMS by the Project Team and supplier. Carry out Pre-inspection Meeting with the client at vendor sites or through tele-conference to ensure the requirements are understood by the vendor, discuss inspection coordination, verify status of vendor documents and verify preparedness of the vendor prior to start of manufacturing. Attend Kick-off meetings to discuss technical issues. Inspection & Testing of trunnion mounted ball valves,Floating Ballvalves, double block and bleed valves,control valves,gate valves. Hydro static Shell,seat,DBB,leak testing of,Floating ball valves,Trunion Mounted ball valves,3&2 piece Split Flange Ball valve,Swing Check Ball valve,Butterfly Valve,FAT of Control valves Casting Inspection, NDT- Level-III Services, QA/QC inspection of valves Functional test.Casting Inspection as per MSS-SP55. Review of MTC, Pressure test reports, valve components certificates, liase with TPIinspectors,coordination with Vendor to complete the project in time as per project quality requirements.
OEM VALVE-Vendor works visited in India Flowserve Control Valves,Whitefiled,Bangalore,India PK Steel castings,Nallalam, Calicut,Kerela CHW-Hammer Forgings, Ghaziabd INDCON Projects & Equipments,Faridabad,Newdelhi.
OEM VALVE-Vendor works visited in UAE Emirates Techno castings, Humriyah FZE JC Fluid controls,Humriyah FZE FITECH Valve testing centre.
OEM VALVES & CRANE Vendor works visited in Europe
O.M.S- SALERI S.p.A , Brescia, Italy
Bonney Forge (B.F.E)-Bergamo,Italy
Galli-Casina Plug Valves,Milano,Italy
Breda Testing Lab, Milano, Italy
Donaly-Alexo coatings,Italy.
Techno forge,Italy
Ufficine Santa fede, Primaluna,Italy
Lucchini integerated Foundry,Lovere,Italy
S.NAVANEETHAN – Sr.Plant Inspection Coordinator
Page 7
Biffi Italia, Piacenza Italy ( Valve actuators)
Leser Safety valves, Hamburg,Germany.
Eisen Bau Kraemmer Line Pipes,Krystal,Germany
Arcelor-Mittal, Duisburg,Germany
Schluz Exports,Duisburg Germany
NOV-Varco, Stavanger,Norway
Eltos-Kristiansand,Norway
Gafako Heavy Fab, Gydansk,Poland
Hydro-Naval,Ustka,Poland.
E-profil Crane Telescopic Boom ,Tallin,Estonia.
OEM-PUMP Vendor works visited in UK
WEIR (SPX Clyde union) PUMPS Foundry Ltd,Newton Heath,Manchester
Linacc NDT X-ray services, Barnsley,Manchester
Clyde-Union, Pumps,Glasgow
William-Cook Castings, Sheffield.
FROM DEC’2009 TO JAN’2010 …..
GPIC-SITRA ISLAND , STATE OF BAHRAIN
Designation
:
Inspection-Engineer
Client
:
M/s GPIC
Project
:
Plant Maintenance Inspection-MRTA.’2010
Inspection & Testing of Sea Water Pipiline system,Trapoggie Filter System, Coating suyvey in Underground Burried Pipilines., Inspection & testing of Valves,Inspection & Testingof Utility Steam Boilers Boiler No 1,2, (FW ),Boiler No:3 (Stork Energy).Inspection, UTG measurement of Econo,izer, Desuperheater, safety Valve welding PWHT.-Coordinating NDT Technicians for allocationg variour location of plant area. Hydrostatic teting of Boiler and Vertical Storage tanks.Witnessing of UT Shear wave Examination of Reformer Tube Weldings.Reporting to Inspection cell and Maintenance Team for Corrective Actions.
S.NAVANEETHAN – Sr.Plant Inspection Coordinator
Page 8
FROM NOV’2009 TO DEC’2009 ….. R.I.LPETROCHEMICAL INDUSTRIES LTD, HAZIRA- INDIA Designation
:
Inspection-Engineer
Client
:
M/s RELIANCE PETRO CHEMICALS-PUNE
Project
:
Plant Maintenance Inspection-MRTA.’2010
Agency
: QUALITY SITE SERVICES, Mumbai
Maintenance Inspection Activities of Hydrostatic Testing of Heat Exchangers,Condensors,Plated Heat exchangers,Vertical , Storage tanks.-Witnessing of UT Shear wave Examination -RT- Film Interprettation.Inspection & Testing of Heat-Exchangers and Pressure vessels,Molecuar Sieve vessels,KO Pots.Inspecting and testing valves (gate, globe, ball, plug, check and butterfly) in accordance with API 598. Inspection & certification of safety relief valves, prescribes repairs, as required. Witnessing Relief valve setting, testing and maintaining records. Supervise NDT contractors, verify and endorse NDT reports generated by contracted personnel and provide technical support as necessary.Identify the type of corrosion/deterioration to the equipment or piping & initiate appropriate monitoring methods in consultation with Process & Corrosion Groups. Witnessing of hydro test, pneumatic test Vacuum box test.
FROM JULY’09 to NOV’2009 ….. EPIC-GSVC,QATAR PETROLEUM-QATAR Designation
:
QC-Inspector / FABRICARTION at DOPET YARD.-DOHA
Client
:
M/s LARSEN & TOUBRO ENC Division,-DOHA,Qatar
Project
:
STATIONARY PIPING FOR GAS TRANSMISSION PIPELINES.
Preparation, review and verify Quality Control Procedures, Method of Statement, Inspection and Test Plan as per client specification and ensure all are duly approved before the commencement of the job Verify Inspection, Measuring, Testing instruments used in the project including sub-contractor are calibrated Identify and raise NCR for non conformities and verify corrective and preventive action taken for the non conformance. Preparation of Audit check list and Conduct Project Quality Auditing for sub-contractor Handle the Internal Audits QMS/ISO 9001,ISO14001 & OSHAS 18001 Audit conducted by External body. Witnessing of Destructive Testing of PQR & WQT test coupons. Review of WPS, PQR, WQT and other QA/QC related documents. Welding inspection of Pipeline field joints. Inspection of Process Piping during fabrication, Steel Structures during fabrication.Review of RT films and witnessing other NDE. Shear wave UT witnessing of Full Penetration butt welds. Witnessing of Hydrostatic Testing of Pipeline and Station Piping Spools. S.NAVANEETHAN – Sr.Plant Inspection Coordinator
Page 9
QA/QC of PAINTING: Conversant with (i) BS codes and specification for coating (TRANSCO), (ii) BG P.A.9 and P.A.10 requirements, Material standard such as BS 5493 and ASTM standards. Inspection and Quality assurance of surface preparation of metallic substrate following BS 7079 and SIS-055900, different surface preparation methods, grade of cleanliness (Sa1, Sa2, Sa2 1/2, Sa3), hand and power tool cleaning (St2, St3), preparation of weld areas and other surface preparation standard such as SSPC-SP-10, SSPC-SP-12, RP287 and ISO8503-01. Good surveillance in specific painting application (SPAS) of ferrous surfaces (long term & short term protection), damp ferrous surfaces, low pressure gas holders and non ferrous surfaces, observance of in service environmental conditions (RH, DP), Cathodic protection by Sacrifical anode methos, on seawater pipelines, safety requirements on site by following HASWA (1974), COSHH regulations (1988), EPA and IGESR-21. Inspection of External FBE coating & repairs of field welded joints includes equipment Inspection & performance verification, pre-cleaning & surface preparation Inspection, chloride content testing & contamination prevention, In-process Inspection of FBE coating application, Curing testing, Adhesion testing, Final coating inspection visual & DFT (dry film thickness), Holiday testing Inspection of Internal FBE coating of field girth welds & repairs includes equipment Inspection & performance verification, pre-cleaning & surface preparation Inspection, chloride content testing& contamination prevention, In-process Inspection of internal FBE coating application, Final coating inspection visual & DFT (dry film thickness). FROM FEB’09 to JUNE’2009 ….. DAR-AL-RIYADH,JUBAIL SAUDI ARABIA Designation
:
PLANT INSPECTOR
Client
:
IBN-SINA., IBN-RUSHD Plants., Jubail,Kingdom of Saudi Arabia.
Agency
:
DAR-AL-RIYADH –DAMMAM,SAUDI ARABIA
Project
:
MODIFICATION & REVAMP SHUT DOWN GRTA’2009 .
MAINTENANCE INSPECTION ACTIVITIES OF CATOFIN REACTOR Inspection & Investigation of Cracks in Liner welding of Catofin Reactor for CACTUS portion.Equipment Inspection of Air, Hydro-Carbon Inlets, Air-HC Mixture Inlets. Inspection of Sparger Assemblies, Air -Outlet , Hydrocarbon Outlets, Evacuation Nozzles etc.,Walkthrough Inspection of HC, AIR INLET & OUTLET Headers,
S.NAVANEETHAN – Sr.Plant Inspection Coordinator
Page 10
Evacuation Header lines. Refurbishment & Inspection of Expansion Bellows, Leak Test of Expansion Bellows. Catofin Reactor Air Regeneration System, Hydraulic Flexible Hoses, Pressure Testing Of Hoses (AFI-Hoses), Valves. Inspection and Carried out Maintenance Welding Activities on Evacuation Ejector-Silencer Assembly.Monitoring Hydraulic Actuated KUBOTA Valves and reviewing the Calibration certificates. MAINTENANCE COATING INSPECTION ACTIVITIES : Co-ordinate with Maintenance support services by planning and Inspection of protective coating. Inspection of protective coating such as Fusion Bonded Epoxy Coating on GIRTH WELDS, GRP- Coating, Heat-Resistant Painting systems of Duct Internals, Column internals for corrosion protection. Conduct comprehensive coating surveys of all plant equipment to determine actual coating conditions and recommend corrective actions in accordance with company protective coating procedure. Assess condition of internal lining and provide recommendation for repair work. Monitor application of GRP Coating and ensure that the Contractor meet requirement of company procedures. Assessing the extent and depth of corrosion, deciding the type and quality of Epoxy and other corrosion material to be used. Determination of climatic conditions (Relative Humidity, Dew point substrate temperature) etc. Testing and quality check of various surface like checking of blast profiles, wet film thickness, Ambient condition, Dry film thickness, Holiday detection, Adhesion test etc. Holiday Testing of Tank internal walls for detection of Coating dis-bondment for polyurethane coating systems.Inspection of Coal tar epoxy coating of Heat exchangers bonnet internals. Vibration Analysis, Infra-Red Video And Thermograph Enhancements, Planning for Vessel Maintenance Repair works.Calculating Rate of Corrosion, Inspection Intervals, Next Inspection Due date ,Fixing Corrosion Coupons inside Vessels Etc., FROM DEC’08 to JUNE’2009 ….. PETRO-SPECT INSPECTION SERVICES, SAUDI ARABIA Designation
:
PLANT INSPECTOR
Client
:
TASNEE POLY OLEFINS CO., JUBAIL, Saudi Arabia.
Agency
:
PETRO-SPECT INSPECTION SERVICES
Project
:
REVAMP SHUT DOWN GRTA’2009 .
MAINTENANCE INSPECTION OF CATOFIN REACTOR
S.NAVANEETHAN – Sr.Plant Inspection Coordinator
Page 11
Inspection &Investigation of Cracks in Liner welding of CACTUS (Air, Hydro Carbon Inlets, Air-HC Mixture Inlets).Inspection of Sparger Assemblies, Air – Outlet, Hydrocarbon Outlets, Evacuation Nozzles etc. Walkthrough Inspection of HC, AIR INLET & OUTLET Headers, Evacuation Header lines.Refurbishment & Inspection of Expansion Bellows, Leak Test of Expansion Bellows. Catofin Reactor Air Regeneration System, Hydraulic Flexible Hoses, Pressure Testing Of Hoses (AFI-Hoses), Valves Inspection and Carried out Maintenance Welding Activities on Evacuation Ejector-Silencer Assembly. QA/QC OF WELDING: FOR FABRICATION ACTIVITIES FOR MAINTENANCE CONTRACTORS Execution of various QC activities of heavy fabrication shop with a team of QC engineers and NDT technicians Ensuring Quality requirements of running projects in accordance with applicable codes and client specifications. Resolution of NCR’s and other technical issues, Organizing NDT activities and providing necessary technical support while interpretation of NDT results. Ensuring calibration status of various testing instruments, organizing in-house calibration and by external agencies. Structural Fabrication & Inspection. Inspection & production of machined components.Evaluation of Radiography films(RTFI) as per codes of construction.Painting inspections of completed components in accordance with specified requirements.Offering for Third Party Inspection and obtaining clearance. FROM SEP’08 to NOV’08 ….. TATA FERTILIZERS & CHEMICALS-INDIA. Designation
:
PLANT INSPECTION ENGINEER
Client
:
TATA FERTILIZERS & CHEMICALS –BABRALA -,INDIA.
Agency
:
IMPARTIAL TESTING & INSPECTION SERVICES,LUKNOW,INDIA.
Project
:
UREA & AMMONIA REACTOR REVAMP SHUT DOWN MRTA’2008 .
INSPECTION WORK CARRIED OUT IN UREA & AMMONIA REACTORS REVAMP Liner Inspection and Maintenance welding of Urea &Ammonia Reactor (Austenite Welding ) Stainless Steel patch welding and Refurbishment on Urea Reactor internal wall liner welding as per Snamprogetti Procedures Retubing of Heat Exchangers, Carbonate Condensers, Coolers, T/Ts Welding.Post weld Heat treatment of Carbon and Low Alloy steel shells. Process Piping Inspection by UT Thickness measurement, Welding ,PWHT, Hydro testing. Execution & Monitoring of Maintenance Inspection & Quality Assurance Activities of Static Equipments Pressure Vessels, Reformer, Heat Exchangers, & Hydro testing of Steam Drums, Exchangers, Fin fan cooler Tubes during Major Refinery Turn –Around. MRTA. S.NAVANEETHAN – Sr.Plant Inspection Coordinator
Page 12
NDT USED : PT- TYPE-1 Method-A Water Washable Penetrant System on Liner Weldings & Tube/Tube sheet Welding of Heat exchangers.Ultrasonic Shear wave inspection of Girth Welds, Nozzle .(Set-in and set –On) Welding. ( UT Equipment used : USM -35 DAC,PANAMETRICS EPOCH 4B ) Helium Leak Test (HLT-Hood method) on Heat exchanger Bundles after completion of welding. Radiographic Film Interpretation RTFI( Both Gamma & X-ray )Ferrite content measurement using Elcometer Ferritescope.at Reactor internal liner weldments. FROM JUNE’08 to AUG’08 ….. AL-BAYRONI FERTILIZER-JUBAI,SAUDI ARABIA. Designation
:
PLANT INSPECTION ENGINEER
Client
:
AL-BAYRONI FERTILIZER- JUBAIL , SAUDI ARABIA .
Agency
:
PETRO-SPECT INSPECTION SERVICES-JUBAIL,SAUDI ARABIA.
Project
:
TANK BOTTOM FLOOR MODIFICATION MRTA’2008 .
QA/QC OF TANK BOTTOM FLOOR MODIFICATION (API-653,API-650 & API-620) Visual inspection, Monitor ongoing repair activities like fit-up and welding of insert plate, patch plate, Replacement shell plate, Bottom replacement, annular replacement as per requirement of API 653. Witnessed activities like MFL for bottom plate, UT thickness survey, Vacuum box testing, Diesel testing, MPI/LPI, Peaking, Banding, Roundness, Plumbness and Hydro testing & settlement survey Review of all initial NDT reports and recommend repair activities for tank according to API 653 requirements. Witnessed MFL for bottom plate, UT thickness measurement, MPI/LPI, Fit up of insert plate and patch plate and welding as per API 653 for Rehabilitation of Tanks.Review of all initial NDT activities carried on Out of Service tank and recommend repair activities as per API 653 requirements. Witnessed inspection activities like Peaking, Banding, Roundness and Plumbness.Witnessed tank diesel testing, Vacuum Box testing, hydro testing and settlement survey. Planning, organizing and implementation of Internal & External Inspection for Tanks (floating and fixed roof), Vessels, Valves, Exchangers, Pipeline and piping systems during in-service inspection and shutdown inspection of Oil and Gas plant facilities.QA/QC of all maintenance activities to ensure safe and reliable operations. Collecting background data (review design data, operation & inspection history, and corrosion monitoring results), making inspection checklist & determining failure mode, evaluating service induced defects and recommendations to prevent reoccurrence.Prepare and endorse Inspection notifications with recommendations and rectification measures to ensure they comply with the relevant standards.
S.NAVANEETHAN – Sr.Plant Inspection Coordinator
Page 13
Ensures co-ordination between various divisions, sections and disciplines during execution of inspection test plan established for static equipment’s, to ensure that all act in harmony for smooth execution of shutdown. Prepare scope of work, duties and work instructions for service contracts.Review sub-contractor procedure to meet as per the company specification.Prepare an inspection points listing for further NDT. Prepare inspection plan and identify the type and appropriate NDT method applicable to assess the equipment condition.Establish inspection intervals for susceptible inspection points. Reviewing and updating of the Risk Based Inspection (RBI) methodology to enhance Plants Integrity and Reliability in order to minimize inspection frequencies, maintenance cost and Plants availability. Inspecting and testing valves (gate, globe, ball, plug, check and butterfly) in accordance with API 598. Inspection & certification of safety relief valves, prescribes repairs, as required. Witnessing Relief valve setting, testing and maintaining records.Supervise NDT contractors, verify and endorse NDT reports generated by contracted personnel and provide technical support as necessary.Identify the type of corrosion/deterioration to the equipment or piping & initiate appropriate monitoring methods in consultation with Process & Corrosion Groups. Witnessing of hydro test, pneumatic test Vacuum box test. FROM MARCH’08 to MAY’08 ….. N.T.P.C –THALCHER,ODISSA,-INDIA. Designation
:
NDT-COORDINATOR / PLANT INSPECTOR
Client
:
NATIONAL THERMAL POWER COORPERATION-TTPS-ODISSA,INDIA .
Agency
:
ESCON-TECH & NDT SERVICES,SINGAPORE.
Project
:
IRIS,MFL & RFET FOR POWER BOILER TUBES(9CR-1MO) INSPECTION .
NDT- COORDINATOR : IRIS,MFL,RFET ( OLYMPUS-MS 5800)- Boiler # 1 Inspection of Boiler Internals Steam and Mud drum, Inspection of maintenance welding. Condition Monitoring of Boiler Tubes by IRIS-UT using RD-Tech Olympus MS-5800Condition Monitoring of 3 No’s of Fin fan cooler Tubes by RFET using RD-Tech Olympus MS-5800 Organize the NDT- Inspectors & Coordinate the Jobs with NTPC Inspectors. Witnessing and Monitoring during the Collection of the Data Acquisitions and the Inspection of Tubes. Reviewing of NDT report for the Tube Inspection. Validating NDT Personnel’s certification.Qualifying the NDT & Inspection Procedures. FIN FAN COOLERS & CONDENSERS- ( RFET,MFL) Inspection of Fin fan coolers inspection of maintenance Condition Monitoring of Boiler Tubes by IRIS-UT using RD-Tech Olympus MS-5800.
S.NAVANEETHAN – Sr.Plant Inspection Coordinator
Page 14
Condition Monitoring of 3 No’s of Fin fan cooler Tubes by MFL &RFET using RD-Tech Olympus MS-5800 .Organize the NDT- Inspectors & Coordinate the JOBS with NTPC Inspectors. Witnessing and Monitoring during the Collection of the Data Acquisitions and the Inspection of Tubes Reviewing of NDT report for the Tube Inspection. Validating NDT Personnel’s certification. FROM JAN’08 to FEB’08 ….. MAGALORE REFINERY & PETRO-CHEMICALS LTD., Designation
:
PLANT INSPECTOR-COATING/PAINTING.
Client
:
M.R.P.L (R) , -MANGALORE-INDIA .
Agency
:
QUALITY SITE SERVICES,MUMBAI- INDIA
Project
:
MAINTENANCE COATING& CATHODIC PROTECTION WORKS .
JOBS CARRIED OUT ON HEAT EXCHANGERS ,CONDENSERS & TANKS Surveillance inspection of implementation of Quality Plan, Specifications and Procedures for that Project. Monitoring and witnessing field joint coating (FJC)for both aboveground and underground Pipeline. Inspection of calibration validity for all measuring devices and daily log for weather condition.Assessing pre-blast and post blast condition of substrate prior to painting application. Review documentation and report on a weekly basis.Inspection of field joint coating (FBE) complies to the specification requirement such that DFT and Free from holiday, run, tear, sags, wrinkles & other coating defects. Witnessing Surface preparation complies with visual standard and coating complies to the project specification. Witnessing daily log for weather condition and calibration of measuring devices.Maintaining QC-coating report log and reported on daily basis Elcometer Holiday detection for Tank Bottom Plates. Fixing Circular Sacrificial Zinc Anodes inside Heat exchangers & Condenser, 64” underground Seawater lines.) FROM DEC’07 to JAN’08 ….. CHENNAI PETROLEUM CORPRATION LTD-CHENNAI-INDIA Designation
:
MECHANICAL MAINTENANCE ENGINEER.
Client
:
C.P.C.L (R) , -CHENNAI-INDIA .
Agency
:
AARVI-ENCON ,CHENNAI-INDIA
Project
:
MAINTENANCE ENGINEER –HEAT EXCHANGERS & REACTOR WORKS .
CHENNAI PETROLEUM CORPORATION LIMITED-REFINERY. REFINERY-III (CPCL-REFINERY) , Executing & Supervising of Maintenance Activities of Static Equipments, Columns, Reactor vessel Pressure S.NAVANEETHAN – Sr.Plant Inspection Coordinator
Page 15
vessels.Executing & Supervising Maintenance contractors to complete the mechanical Completion works.Ensure Mechanical completion certificate has been validated. FROM SEP’07 to DEC’07 ….. R.I.L-GLYCOL SEPERATION UNIT,KURKUMBH,PUNE,INDIA . Designation
:
INSPECTION ENGINEER.
Client
:
RELIANCE PETRO-CHEMICALS .
Agency
:
QUALITY SITE SERVICES-VIKHROLI-MUMBAI
Project
:
ECONOMISER-MODIFICATION WORKS.
Entire Modification Economizer 1st and 3rd Bank Economizer Coils,- QA/QC ,Inspection of welded jointsRadiography Film Interpretation.- Hydro Testing of Economizer Welded Joints.-Inspection of High Temperature Heat Resistant Paints applied inside surface of the Economizer Duct. Nitrogen Leak Test (BLT) of Compressor After Coolers, Hydortesting of Lube Oil Coolers/TS Inspection. Witnessing and Monitoring UT Shear wave weld Inspection of welded joints ,Corrosion pit detection on Swage Block valves in Feed water cooler.Valve testing (Hydro testing of GTV) in Cooling water towers, POPUP Testing ,Calibrating the PSV,PRV Valves. Visual Inspection of All Welding Activities, Radiography Film Interpretation, Piping Inspection during Fabrication Inspection of installation and related mechanical works of pipeline. Inspection of incoming materials and review of certificates.Witness of welding procedure and welder qualifications. Witnessing of Destructive Testing of PQR & WQT test coupons. Review of WPS, PQR, WQT and other QA/QC related documents.Welding inspection of Pipeline field joints. Holiday Testing of DC 10-15 KV . Inspection of Inhibitor Dosing Tapping (EcoBIK) for Pickling ,Passivation works. FROM JAN’07 to AUG’07 - M/S BUREAU-VERITAS (ENERGY & PROCESS DIVISION), BVQI-QATAR Designation
:
INSPECTION ENGINEER.
Client
:
RASGAS,QP-OFFSHORE, NGL & QAFAC .
Agency
:
BUREAU-VERITAS –DOHA,QATAR
Project
:
ASSET INTEGERITY MANAGEMENT & S/D PLANT INSPECTION WORKS
ASSET INTEGERITY MANAGEMENT SOFTWARE IMPLEMENTATION for QP Refinery & NGL (API RBI-580) –MERIDIUM SOFTWARE IMPLEMENTATION Technical Data Base Entry operator of Extraction for Asset Integrity Management Data System.Risk Based Inspection(RBI),. QP (OFFSHORE),QP-Refinery as per API- RBI-580 S.NAVANEETHAN – Sr.Plant Inspection Coordinator
Page 16
Analyzing all Inspection reports, Process Characteristics and pushing and roll back into the software.Fixing and analyzing inspection intervals etc., MAINTENANCE INSPECTION ACTIVITIES IN RASGAS TRAIN 1& 2 (JUNE-JULY’07) Integerity Inspection of Sea Water Pipelines, Coating Survey of Pipelines Photographic Enhancement of Coating Damages. Inspection of abrasive blasting cleanliness level and surface profile and ensure the results are satisfying client requirement Check Abrasive used/reused is free from oil, grease, moisture and other contaminationPerform and witness the field test(WFT, DFT, Dust level, Holiday detection, salt test, Adhesion test ) as applicable and interpret result accurately Inspection of Ø 2”(approx 50mm) hole was plugged onsite welding Activities.( SIGMA COATINGS) Sacrificial Aluminum-Zinc Trapezoidal Anode Installation of Under ground Sea water Pipelines at Rasgas plant – QA/QC Activities, Inspection of Stir and Friction Welding of CP-ANODES at 4’o’ Clock and 8’O’ Clock Positions. Installation of Zn Sacrificial Anode of 30Nos at Manholes of Seawater Laying of 80m GRP SeawaterPipelinesandInspectionofUndergroundGRP–PipelineLaying,QA/QCofCompaction, Lamination, Barcol Hardness values. Inspection of Heat Exchangers, Air coolers,Process vessels,Scrubb Column Bottom.Integrity Inspection Activities,HydroTesting of Water Tube Utility Boiler- STORK ENERGY BOILERS. Random NDT and Inspection of Coil Buckling,Stuctural Stability of Economiser coils. Reformer tubes, Convection, Super-Heater zone, Refractory inspection. as per API-510,571,572Inspection of Heat Exchangers, Incinerators.Witnessing & reporting the Hydro testing of Steam Drums, Exchangers. QATAR FUELS & ADDITIVES CO. - QAFAC, QATAR MARCH-APRIL ‘2007 Modification of Heavy Ends Column Internals, Distributor, Mellapak installation Worked with Sulzer Chem Tech UK.Modification of Furnace Coils for Increasing the Furnace Efficiency –Foster Wheeler JobFurnace Coil,PWHT of welded joints, Inspection, Reviewed Engineering Package, contract Document, materials and specific requirements pertaining to concern unit (EN-10204 3.1,3.2)Reviewed mechanical catalogues of equipment and third party inspection certificates ( EN10204-3.1,3.2) Reviewed welding and NDT records and prepared check-list for deviationsReview of Hydrotest Pack and witnessed hydro-test of piping loopsInspection of Refractory lining,Pyrologs in the Reformers and Heaters S.NAVANEETHAN – Sr.Plant Inspection Coordinator
Page 17
FROM NOV’06 to DEC’06 - M/S KUWAIT NATIONAL PETROLEUM CORPORATION-KUWAIT Designation
:
INSPECTION ENGINEER.
Client
:
K.N.P.C-MINA-ABDULLA REFINERY .
Agency
:
KHARAFI-NATIONAL CO,KUWAIT
Project
:
SHUT DOWN JOB GRTA’06-PLANT INSPECCTION
KHARAFI NATIONAL CO,KUWAIT- MINA ABDULLA REFINERY-MAB,KNPC,KUWAIT-GRTA’06 Maintenance Inspection Activities of Process Equipments, Heat Exchanger Hydrotesting. Inspecting the Integerity of the Plant Equipments, Monitoring and Controlling QA/QC Activities of Welding Activities. Radiography Film Interprettation of Maintenance Welded Joints.(RTFI) TANK INSPECTION/ FLOOR MODIFICATION (API-650,652,653) Modification and Conversion of Kerosene and Naptha Storage Bottom Plates Lap Welding of tanks, Bottom plate leak detection and repair of Bitumen Product , Internal epoxy painting of storage Tanks. Inspection of (fixed roof) to Naphtha tanks (floating roof).Pontoon Inspection,weather shield,Breather valves,vents,flame arresters. etc., Inspection of FRP-Coating and Holiday testing of Sulfuric Acid FRP tank. Holiday Testing Done by DC 64.5 V Elcometer Holiday Tester.External Shell Inspection and halon system inspection of Benzene tanks.,Floor coating by Poly urethane systems. FROM MAY’06 to OCT’06 - M/S EQUATE PETROC-CHEMICALS-KUWAIT Designation
:
INSPECTION ENGINEER.
Client
:
EQUATE PETRO-CHEMICALS -KUWAIT .
Agency
:
KHARAFI-NATIONAL CO,KUWAIT
Project
:
SHUT DOWN JOB GRTA’06-PLANT INSPECCTION
EQUATE PETROCHEMICAL CO. DOW CHEMICAL CO,KUWAIT ,MRTA’ Jan-March 2006. Monitoring and Controlling QA/QC Activities of Welding ActivitiesRadiography Film Interpretation of Maintenance Welded Joints.Bubble Leak Testing of T/TS Nitrogen Leak Testing. Tube expansion and repair of Tube-Tubesheet of Heat exchangerShell and Tube Replacement of ejector condensate cooler,ID-GaugingPassivation of Austenitic Stainless steel tubes
S.NAVANEETHAN – Sr.Plant Inspection Coordinator
Page 18
Blanking-off the redundant nozzles of towersBottom plate leak detection by Vaccum Box pneumatic test. Procedure for grit blast cleaning and Epoxy painting and inspection of tanks. FROM JULY’03 to APRIL’06 - M/S CLEVELAND BRIDGE ENGINEERS-JEBAL ALI., DUBAI Designation
:
QC-INSPECTOR
Client
:
C.B.E.M.E,AL-ZADAF,DUBAL, .
Agency
:
EMIRATES INDUSTRIAL LABORATORY- E.I.L DUBAI-UAE.
Project
:
DUBAI AIRPORT STRUCTURAL FABRICATION.
Controlling all quality control activities on day-to-day basis and directly involving in all inspection activities and ensuring various projects to meet quality requirements. Inspection and acceptance to customer supplied materials, contractor supplied materials such as Plates, Pipes, Fittings, Fasteners Tubes as per requirements of the Client Specifications. Review of material test certificates, as per Codes, Standards and Client specification Test plan (ITP) per QCProcedure, Client Specifications. Review of WPS as per ASME-IX, BSEN.287, AWS D1.1 and Client Specifications Responsible for fabrication, welding inspection as per NSSS, AISC, API 650, BS 5950-Part-2, AWS. D1.1,BS.-5135, ASME B31.3 and client specification. Review of Procedure Qualification records and Welding Procedure specification of sub-contractors. ( PQR , WPS ) Review and maintaining of Calibration certificates of Instruments, Personnel Certifications, Batch test Certificates for Consumables etc. Preparation and maintenance of Non-Conformance reports ( NCR) Welding Inspection & NDT inspection of Heavy Structural, Pressure Vessels, Tank & Tank Nozzles, Pipe fit up & alignment. Preparation ,compiling of Q.C-documentation as QC-Procedure, Client Specifications for End of Manufacturing Documents ( MDO ) MATERIAL INSPECTION ( EN-10204 3.1,3.2) Reviewing vendor’s drawing, manufacturer’s data sheet and quality inspection plan Lamination Checking of Plates, Plate formed Pipes By Ultrasonic Testing Verifying all incoming and Vendor Inspection for Plates, Pipes,Tubes, gaskets,Flanges,Bushes as per standards and contact document requirement
S.NAVANEETHAN – Sr.Plant Inspection Coordinator
Page 19
FROM MAY’02 to JUNE’03 - M/S B.P.C.L –REFINERY,MAHUL MUMBAI-INDIA Designation
:
JUNIOR PLANT-INSPECTOR
Client
:
B.P.C.L-REFINERY MAHUL,-CHEMBUR,MUMBAI -INDIA
Agency
:
EQUALITY SITE SERVICES-MUMBAI.
Project
:
SHUTDOWN-CDU & VDU Plant.
Inspection of Heat exchanger, Refinery Process piping’s both inside Battery limits and Outside battery limits, Vessels, Process Crude Columns, and Investigation Of Various Forms of Corrosion Such as Erosion – Corrosion. Galvanic Corrosion etc, Graphite Corrosion, Impingement Attack, Dezincification.Cellular Attacks On Flanges, Valve Internal Parts, Stress Corrosion Attacks. PMI- Measurements- Insitu-Metellograhy, Corrosion survey by Thickness Gauging.Ferrite Content Measurements-Inspection of Heat Exchanger Internal Parts, Supports,Steam Condensate Corrosion Etc-, Modification of Corroded Parts – Frp Coatings. Holiday Testing Of Coatings, Reviewing of MFL TestReports For Tank Floor Scanning, NDT Reports,Photography Enhancement of corrosion forms.Remote Field Visual Inspection By Olympus Fiberscope and Borescopes and recording the Image in video tape and handover to Inspection department. FROM : JAN 1996 TO APRIL 2002 Designation : Asst QC-Engineer B.H.E.L- HIGH PRESUURE BOILER MFG.PLANT-INDIA Carried out daily jobs and coordinating, supervising NDT/QC jobs for BOILER Thermal Pressure retaining part, documentation etc.,UT-Shear wave testing for Boiler Drums, Feed Nozzles, DC Nozzles, safety nozzles. UT of Weld Inspection. Manual Painting of Boiler Drums, Economizer coils, Dish Ends etc, Boiler Mega Support Structures.Reviewing vendor’s drawing, manufacturer’s data sheet and quality inspection plan Identification and Inspection of Procured Material, Test Certificate Verification, Chemical Analysis, BARCOL Hardness Test on GRP Coated pipelines. NDT Inspector for casting, forged and formed fittings, dimension inspection and verification as per drawings. Hardness testing, UT-lamination testing of Plate.
S.NAVANEETHAN – Sr.Plant Inspection Coordinator
Page 20
REACTORS & REGENERATORS External Visual Inspection of Reactor & Regenerators includes Primary cyclones, Secondary cyclones, and Lift line, RCSP, SCSP, Stripper, Flue Gas Duct, Orifice chamber and Withdrawal well for its hot spot areas, all nozzles, and welding portions. Internal Visual Inspections to find out its Refractory damage, internal damage of Steam Rings, Air Rings, Thermo couples and Remote Visual Inspection with the help of Fiberscope camera to detect remote area damages and Technical advises/suggestions for the damaged Refractory and its internals during shut down works and Thermographs for hot spot areas. COLUMNS & VESSELS External Visual Inspection includes Foundation bolts, Skirts, Platform & Structural, Nozzle and Reinforcement Pads, Telltale hole checking (Pneumatic), External Corrosion and Weld Joints of nozzles, Manholes, Skirt joints. Internal Inspection includes Demister Pads, Feed pipes, Supports, Chimney tray,
Different Packing,
Nozzle Points, Shell includes Top zone, Feed zone (Middle zone) & Bottom zone due to Corrosion, Erosion, Hydrogen Blistering, Cracking and Mechanical damage HEAT EXCHANGERS External Visual Inspection includes Foundation bolts, Shell, Shell Cover, Channel head Cover, Floating head cover, Split ring, Tube bundle, Baffle plates, impingement plates, Tie rods and all Welding joints including nozzle points. Internal Visual Inspection of Shell, External Visual inspection of Air Cooler includes Outer Assembly body, Header, Fins, Tube sheets, Tube ends thinning and Plugs, Witnessing Vacuum test (air test), Baroscopic Inspection and Witnessing Hydro test. CO BOILER Insulation removal fixing, Seal Box plates degutting and re-fitment, Economizer Tube bend visual inspection repairs if any, and cleaning and painting. External & Internal Visual Inspection for Baffle wall refractory, CO incinerator refractory, Duct opening Refractory, Expansion joints packing and its Repairs final Inspection
S.NAVANEETHAN – Sr.Plant Inspection Coordinator
Page 21
INSPECTION ACTIVITIES OF STORAGE TANKS, PIPING, AND PIPELINES: Stage wise Inspection of Fabrication, Erection, Hydro testing, Painting, Insulation of floating and fixed roof tanks.Inspection of Fabrication, Erection, Hydro testing, Radiography of CS & MS pipesHoliday testing of various wrapping /CoatingAdherence to Construction Specification and Standards. Inspection of cleaning process such as Sand Blasting, Grit Blasting, water Blasting, Hydro jet cleaning, Shot blasting of Tanks, Pipe lines up to the grade Sa2and half, manual and Mechanical Cleaning & Painting Vacuum box testing, Chalk test, at the joints of Plates & Shell to Bottom Plates respectively of Floating Roof Tanks as well as Fixed Roof Tanks.Water Fill up test of Storage tanks and Pad test of nozzles Hydro test of Roof drain line (Swivel joints)Removal of Sludge from storage tanks and dismantling of old storage tanksWitnessing of Ultrasonic thickness gauging, UT, MT, DP, Metallographic tests (Electrolyte etching to detect metal degradation), Radiography Film interpretation. Hardness testing for welds and stress Relieving Witness for weldsPMI test to detect material properties CO Boiler Economizer coils Inspection from bottom drum to top drum and repairs.CO Boiler Incinerator Internal Visual Inspection, Recommendations to repair internal Refractory and Inlet Expansion joints packing repair with ceramic film . Reformer External Visual Inspection and Internal Visual Inspection and its weld repair.Witnessing Passivation, and nitrogen purging.Visual Inspection of Equipments and pipelinesPreparation of contingency plans, participation in technical discussion and process of action plans as per requirement. External and Internal Inspection of Shells, Roofs (Floating & Fixed), Base plate, all nozzles, Heating coils, Surface preparation, Painting, Leak test of Base plate. INSPECTION EQUIPMENTS HANDLED UFD: OLYMPUS NDT EPOCH-XT
Krautkramer USM 35, 25 DAC, USK – 7, USK – 7SPanametrics Epoch 4b,Sonatest Site Scan SS – 140.
Tube Scanning Equipment : MFL & IRIS: RD Tech-Multiscan 5800,Software : Multiview Olympus NDT
S.NAVANEETHAN – Sr.Plant Inspection Coordinator
Page 22
PASSPORT DETAILS Passport Number
: Z-1774604
Place of Issue
: R.P.O -COIMBATORE, INDIA
Date of Issue
: 20-11-2008
Date of Expiry
: 19-11-2018
BASIC SEA SURVIVAL CERTIFICATIONS
CDC SEA MEN BOOK.NO: MT 15331 BASIC SEA SURVIVAL FIRE FIGHTING H2S- Handling Methods.
PERSONAL DETAILS Nationality
: Indian
Date of Birth
: 12 December 1974
Languages
: Tamil, Malayalam,English & Hindhi,
Languages
: Deutch, Italiano, Norwegian& Polish ( Very few )
Mobile.No
: 0091-95781 44916 ( India)
Email
:
[email protected]
th
S.NAVANEETHAN – Sr.Plant Inspection Coordinator
Page 23