MS-M-063 Rev. 1
METHOD STATEMENT
FOR
AIR FIN COOLER / STRUCTURAL SUPPORT INSTALLATION WORK
Contract No. BA- 0612 UNITED ETHYLENE OXIDE / ETHYLENE GLYCOL PROJECT
UNITED OLEFINS COMPLEX PROJECT Al-Jubail, Al-Sinaiyah, Saudi Arabia
Signature 1 Rev.
23 Sept. 03 DATE
Print Name
R. R. Bautista Prepared by MMG Page 1 of 5
E. V. Lucero Checked by MMG
N. A. Jabbour Approved by MMG
MS-M-063 Rev. 1
I.
SCOPE OF WORK : This Method Statement highlights the MMG work sequence intended for the assembly and instal installat lation ion of prefab prefabric ricate ated d struct structura urall suppor supportt and and modu modular lar Air Air Fin Cool Cooler. er. Execution Execution of the work shall be carried out safely, and in accordance accordance with good working practice, as per SATEC/UNITED Job Specifications .
II.
REFERENCES: SES SES 0000-BB-00 0004 04 MS-M-0 MS-M-031 31 Rev. Rev.0 0 MS-C-03 MS-C-032 2 Rev.2 Rev.2 PRJ-4-006 PRJ-4-007 PRJ-4-022 PRJ-4-027
III.
: Ere Erect ctio ion n of of Str Struc uctu tura rall Ste Stee el : Metho Method d Statem Statemen entt for Equi Equipm pment ent Instal Installat lation ion : Metho Method d State Statemen mentt for for Erect Erection ion of Structur Structural al Steel Steel for for PR PR 81 81 : Bolting ( Structural ) : Structural Steel Fabrication and Erection : Erection of Scaffolding : Rigging : Project QA Manual & Quality Inspection Plan : MMG Standard Operating Instruction : Project Safety Manual
RESPONSIBILITIES: Mechanical Superintendent / Supervisor: Ensure full compliance by all millwrights, mechanical foremen and labour regarding execution of the work in accordance with SATEC/UNITED project requirements and specifications. Confirm the availability of all materials, tools, equipment, and required personnel who will carry out the work. Quality Control Inspector: Condu Conduct ct inspec inspectio tion n in acco accorda rdanc nce e with with this this proc procedu edure re and and QCIP QCIP.. Monito Monitors rs daily daily mecha mechanic nical al activi activitie ties s and and verify verify compli complianc ance e to SATE SATEC/ C/UN UNIT ITED ED Speci Specific ficati ation ons. s. Prepares quality records and final acceptance documentation where required. Safety Supervisor: Check the work areas for any unsafe conditions. Ensure that all safety requirements have have been been adequ adequate ately ly addr address essed ed and and the the work work is carri carried ed out in accor accorda dance nce with with SATEC/UNITED project safety procedures. Engineering Department: Prepar Prepare e and and subm submit it meth method od statem statemen entt toge togethe therr with with all all relat related ed docu docume ments nts for engineered lift, such as crane capacity chart, spreader beam calculation, etc (which are specified in United specification & safety requirement for SATEC/UNITED review and approval. Provide latest revision of IFC drawings and technical support to MMG site operation group.
Page 2 of 5
MS-M-063 Rev. 1
IV.
WOR WORK SE SEQUENCE / PROCEDURES RES: A. Require Required d Tools Tools and Equip Equipment ment:: -
20-250 Ton Capacity Crane / Trailer 40 Ton Capacity Welding Machine (for welding of column base plate) Wire Slings / Guy Wires / Aluminum Ladders Scaffolding Tubes / Clamps / Connectors Chain Blocks / Wrenches / Drift pin
B. Pre-Ins Pre-Install tallatio ation n Activiti Activities: es: Ensure that erection personnel have read and understand work instructions, Method Statements, Job Specifications, and drawings prior to commencement of the work. •
Prior to installation, all mechanical parts, pre-fabricated structural support, louver operation system, tube bundles, setting plates and modular air cooler shall be checked for any shipping damage.
•
Cond Conduct uct site site inspec inspecti tion on to confi confirm rm that that barri barricad cades es tapes tapes and and other other safety safety precautionary boards / safety equipment / facilities such as scaffold have been installed / posted at strategic locations prior to commencement of the work.
•
Prior to installation, ensure to erect, where required, the necessary scaffolding for erection personnel access platform for adjustment and bolt tightening activities. Erected scaffold shall be in accordance with MMG Standard Operating Instruction No. PRJ-4-022. •
Prior to lifting and erection of the structural support and modular air cooler, ensure that SATEC/UNITED have been notified to witness the execution of the work. •
C. Proc Proced edur ures es:: The installation of the pre-fabricated structural support and modular air cooler will be carried out in strict adherence with SATEC/UNITED furnished approved for Construction drawings, specifications, and all other relevant Contract documents.
•
When received at site, the modular air cooler shall be placed on temporary support besides the MMG mess hall (see JUEG-MMG-LP-17 sheet.2 rev.A) wherein the temporary support and shipping beam shall be removed.
•
Prior Prior to erect erectio ion n of pre-f pre-fab abric ricat ated ed struc structu tural ral supp support ort and modul modular ar air cooler, ensure to install properly the setting plate with full threaded bolts to the column base plate of Piperack 81 by tack welding.
•
Page 3 of 5
MS-M-063 Rev. 1
Once the shipping beam has been removed, and the four (4) support legs and braces of modular air cooler have been installed, lifting and erection of the modu modula larr air air coo coolers lers shal shalll com commenc mence. e. SATE SATEC C Heav Heavy y Lift ift Subc Subco ontra ntract ctor or (MAMMOET) will do the lifting and rigging works of the modular air cooler. •
As soon as the modular air cooler has been lifted / placed on its final position, proper alignment, alignment, plumbness plumbness and bolt tightening shall be carried out in accordance accordance with SATEC/UNITED Job Specification and MS-M-031 Rev.0, Method Statement for Equip Equipme ment nt Insta Installa llatio tion n respe respecti ctive vely. ly. Upon Upon comple completio tion n of align alignme ment nt and bolt bolt tightening, the column base plate and setting plate shall be seal welded. •
While preparing the modular air cooler for erection , assembly and erection of pre-fabricated structural support shall be carried out in accordance with good working practice & SATEC/UNITED Specifications as well as an Approved Safety Action Plan. •
-
DoubleDouble-che check ck the pre-fab pre-fabric ricated ated structu structural ral support support material materials s lists lists as per IFC Erection Drawings & Member Piece Mark Numbers of E-2311 A-J as provided by SATEC/UNITED. Any deviation against the issued drawings or defects on the members encountered during the sorting/checking shall be immediately reported to SATEC/UNITED for their information and appropriate action.
-
Use a 20-50 ton crane for loading and unloading of pre-fabricated structural support to a 40-ton trailer, which shall transport the frames from temporary yard within the site or from materials lay-down area to the erection site.
-
Ensure that all lifting and rigging works are executed in accordance with MMG Stand Standar ard d Oper Operat ating ing Instr Instruct uction ion No. PRJPRJ-4-0 4-027 27 and and SATE SATEC/U C/UNI NITE TED D Job Job Specification respectively. Steel members of more than 500 kg in weight shall be lifted with the wire slings, i.e. nylon rope shall not be used.
-
The ground assembly of the structural support shall be carried out at the backfilled area beside the pump foundation P-2310 A/B. A dedicated group shall be assigned for the assembly of frames only. All bolts shall only be “Finger Tight” to enable easy adjustment and alignment during installation of frames.
-
Assem Assembli bling ng of the struc structur tural al supp support ort shall shall be in acco accorda rdanc nce e with with MMG’s MMG’s Standard Operating Instructions Nos.: PRJ-4-006 and PRJ-4-007, Fabrication / Erection and Bolting of Structural Steel. A 20-50 ton capacity crane will be utilised for the assembly of the structural support.
-
As for E-2311 A-J, the structural support shall be assembled into three (3) framing sections. One section shall consist of four (4) columns, beams and bracing to form a complete assembled framing section weighing approximately Page 4 of 5
MS-M-063 Rev. 1
4.0 ton (see attached drawing JUEG-MMG-LP-17 Rev.0). The assembly shall include the preliminary tightening of bolts. Once Once the structur structural al support support is assemb assembled, led, erection erection sequenc sequence e will start from Northerly most framing column line 117, Section A and move towards South going to Section C. See attached drawing JUEG-MMG-LP-17 Rev.0. Then, install the connecting beams, girder and braces between Section A , B and C.
•
Prior to adjustment, alignment, plumbness and bolt tightening activities, ensure that the assembled structure is fully supported by guy wires connected to a chain block, which is attached to column foundation.
•
Alignment, adjustment, plumbness and bolt tightening shall be carried out in accord accordanc ance e with with SATE SATEC/ C/UNI UNITE TED D Job Job Spec Specifi ificat cation ions s and and MS-C-0 MS-C-032 32 Rev. Rev. 02, 02, Method Statement for Erection of Structural Steel for Piperack 81 respectively. •
The same methodology shall be applied for the erection of all of the Air Fin Coolers, E-2311 A-J / E-2221 A-D (see JUEG-MMG-LPA-17 Rev.0) until the last equipment is completely installed to complete the system. •
Conduct touch up to all damaged galvanizing with organic zinc paint material as per Steel Fabricator recommendation or per approved material submittal. All surface prep prepar arat atio ion n and and appl applic icat atio ion n shal shalll be in acco accord rdan ance ce with with SATE SATEC/ C/UN UNIT ITED ED Specification No. 00-N-0017 and manufacturer’s recommendation. •
V.
QUALITY CONTROL & ASSURANCE: All stages of work shall be inspected and recorded in accordance with the Approved Project Quality Control Inspection and Test Plan.
•
VI.
SAFETY PR PRECAUTIONS: Check all lifting equipment prior to commencing lifting activities. Stay away from any suspended load / falling bodies. Wear full body harness when working at elevated platform. Ensure that barricade tapes and warning signs are properly installed. Ensure that there are no hazardous or combustible gases present in the work area. Safety Action Plan shall be submitted prior to commencement of the work. • • • • •
•
VII.
ATTACHMENT: JUEG JUEG-M -MMG MG-L -LPP-17 17 1/2 1/2 JUEG JUEG-M -MMG MG-L -LPP-17 17 2/2 2/2 JUEG JUEG-M -MMG MG-L -LP P-17A -17A
: Lift Liftin ing g Deta Detail il for for E-2 E-231 311 1 A-J A-J Stru Struct ctur ural al Fra Frame me.. : Lift Liftin ing g Deta Detail il for for E-2 E-231 311 1 A-J A-J Stru Struct ctur ural al Fra Frame me.. : Lif Lifti ting ng Detai etaill for for E-22 E-2221 21 A-D A-D Str Struc uctu tura rall Fra Fram me Page 5 of 5
MS-M-063 Rev. 1
NOTE :
Items tems on Bold lette etterrs are rev revisio sion / additio tion. ---------------------
END