SENDIAN TOWER (2B+G+27F+PH) AT LUSAIL (MARINA COM/49) FOR SENDIAN GROUP MONTHLY PROGRESS REPORT‐13 Dec‐16
SENDIAN TOWER (2B+G+27F+PH) AT LUSAIL (MARINA COM/49) FOR SENDIAN GROUP MONTHLY PROGRESS REPORT‐13
CONTENTS 1.0 1.0
PROG PROGRE RESS SS REPO REPORT RT 1.1 DASHBOARD 1.2 PROGRESS HIGHLIGHTS 1.3 AREA OF CONCERN
2.0 2.0
ENGI ENGINE NEER ERIN ING G 2.1 SHOP DRAWINGS DRAWINGS 2.2 BUILDER WORKS DRAWINGS 2.3 COORDINATION DRAWINGS 2.4 AS‐BUILT DRAWINGS 2.5 OPERATION & MAINTENANCE MANUALS
3.0 3.0
PROC PROCUR UREM EMEN ENT T 3.1 MATERIAL SUBMITTAL & PROCUREMENT LOG 3.2 MATERIAL INSPECTION LOG 3.3 SITE INSPECTION LOG
4.0
OTHERS 4.1 QA/QC REPORT (NCR, ETC.) 4.2 REQUEST FOR INFORMATION LOG 4.3 METHODE STATEMENTS, INSPECTION & TEST PLANS
5.0 5.0
CONS CONSTR TRUC UCTI TION ON 5.1 OVERALL 5.2 ELECTRICAL ELECTRICAL
SENDIAN TOWER (2B+G+27F+PH) AT LUSAIL (MARINA COM/49) FOR SENDIAN GROUP MONTHLY PROGRESS REPORT‐13
CONTENTS 1.0 1.0
PROG PROGRE RESS SS REPO REPORT RT 1.1 DASHBOARD
2.0 2. 0
ENGINE ENGI NEER ERIN ING G 2.1 SHOP DRAWINGS DRAWINGS 2.2 BUILDER WORKS DRAWINGS 2.3 COORDINATION DRAWINGS
3.0 3. 0
PROC PR OCUR UREM EMEN ENT T 3.1 PROCUREMENT LOG 3.2 MATERIAL INSPECTION LOG 3.3 SITE INSPECTION LOG
4.0
OTHERS 4.1 QA/QC REPORT (NCR, ETC.) 4.2 REQUEST FOR INFORMATION LOG 4.3 REQUEST FOR INSPECTION LOG METHODE STATEMENTS, INSPECTION & TEST PLANS
5.0 5. 0
CONSTR CONS TRUC UCTI TION ON 5.1 OVERALL 5.2 ELECT ELECTRICAL RICAL 5.3 HVAC 5.4 PLUMBING 5.5 DRAINAGE
Dated : 07-01-17 Page No. : 4 of 18
WEEKLY DASHBOARD REPORT
OVERALLFOR PROGRESS SENDIAN TOWER PROJECT COM49
100.00% 91.62%
100.00% 90.00% 80.00% 70.00% 60.00%
41.61%
50.00%
37.224%
40.00% 30.00% 20.00%
33.00% 31.476%
18.12% 16.709% 7.27% 6.209%
10.00% 0.00%
Preliminaries
Air Conditioning
Electrical Overall Overa ll Weigh Weightages tages (%age (%ages) s)
Plumbing, Drainage & Fire Fighting Overall Overa ll Progr Progress ess Achie Achieved ved
OVERALL PROGRESS (ELECTRICAL)
OVERALL PROGRESS (HVAC) 97.05% 89.39%
100.00% 90.00%
96.81%
100.00%
91.64%
90.00% 80.00%
80.00% ) e g a % ( s s e r g o r P
TOTAL
) e g a % ( s s e r g o r P
70.00% 60.00% 50.00% 40.00% 30.00%
70.00% 60.00% 50.00% 40.00% 30.00%
20.00%
20.00%
10.00%
0.10% 0.05%
0.00%
10.00%
2.85% 0.01%
1.09% 0.55%
0.00%
2.10% 0.00%
Engineering
Testing & commissioning
Engineering
Testing & commissioning
System Wise Overall Weightage (%age)
0.10%
2.85%
9 7.05%
System Wise Overall Weightage (%age)
1 .0 9 %
2.10 %
9 6 .8 1 %
Overall Progress (%age)
0.05%
0.01%
8 9.39%
Overall Progress (%age)
0 .5 5 %
0.00 %
9 1 .6 4 %
Construction
OVERALL PROGRESS (PLUMBING, DRAINAGE & FIRE FIGHTING) 98.64%
100.00%
94.95%
90.00% 80.00% ) e g a % ( s s e r g o r P
70.00% 60.00% 50.00% 40.00% 30.00% 20.00% 10.00%
0.17%
0.00% System Wise Overall Weightage (%age) Overall Progress (%age)
0.08%
1.19%
0.36%
Engineering
Testing & commissioning
Construction
0.17%
1.19%
98.64%
0 .08% 0.
0.36%
94.95%
Construction
Dated : 07-01-17 Page No. : 5 of 18
WEEKLY DASHBOARD REPORT FOR SENDIAN TOWER PROJECT COM49
MATERIAL SUBMITTALS
PROCUREMENT (ISSUANCE OF LPOS) 80
SNG
77
74
70 Fire Fighting 60
56 55
Drainage 50
Plumbing
40
26 26
30
HVAC
22 22 20 Electrical
9 9 0
10
20
30
40
50
60
70
80
90
Electrical
HVAC
Plumbing
Drainage
Fire Fighting
Total Material Submittals Approved
77
56
26
9
22
1
Total Material Submittals To Be Submitted
0
0
0
0
0
0
Total Material Submittals Submitted
79
56
26
9
22
1
Total Material Submittals
79
56
26
9
22
1
10
SNG
0
0
0
0
0
1 1 0
0 Electrical
HVAC
Plumbing
Drainage
Total Total Materi Material al Submit Submittal talss Approv Approved ed
MAN HOURS S‐CURVE
Fire Fighting
LPO Issued Issued
SNG
LPO to be issue issue
SHOP DRAWINGS
600000 556624 Under Review 500000
494622 448410 Pending
400000
395154 353370 Revise & Resubmit
300000
297810 261804 Approved 229630
200000
188368 153428
Submitted
120892 100000
0
96854 73196 53686 41606 2657632548 1391419460 3246 4338 6322 8408 10268 2208 3246 1200 2208 448 1200
Total No.
‐
50
1 00
15 0 Mechan Mec hanica icall
2 00 Electr Ele ctrica icall
2 50
3 00
3 50
4 00
Dated : 07-01-17 Page No. : 6 of 18
WEEKLY DASHBOARD REPORT FOR SENDIAN TOWER PROJECT COM49
SITE INSPECTIONS
MATERIAL ARRIVAL INSPECTIONS
Builder Works
Air Conditioning
Chilled Water
Fire Fighting
Air Conditioning
Drainage
Fire Fighting
Plumbing
Mechanical
Mechanical
Electrical
Electrical 0
20 0
400
600
800
1000
1 2 00
1400
1600
0
E le le ct ct ri ri ca ca l
M ec ech an an ic al al
F ir ir e F ig ig ht ht in in g
A ir ir C on on di di titi on on in in g
C hi hi lllle d Wa te te r
B ui ui ld lde r W or or ks ks
SUBMITTED
736
332
226
275
0
51
APPROVED
652
305
197
244
0
51
NOT APPROVED
49
6
2
1
0
UNDER REVIEW
35
21
27
30
0
20
40
60
80
100
120
140
Electrical
Mechanical
Plumbing
Drainage
Fire Fighting
Air Conditioning
SUBMITTED
69
6
21
10
23
43
APPROVED
62
6
19
10
20
38
0
NOT APPROVED
6
0
1
0
3
2
0
UNDER REVIEW
1
0
1
0
0
3
REQUEST FOR INFORMATION
NON‐CONFORMITY REPORT (NCR)
LPG Irrigation
Fire Fighting
Fire Fighting Drainage Drainage
Plumbing HVAC ICT
Plumbing
Electrical Artecture HVAC
General ‐
10
20
30
40
50
60
G en en er er al al
A rt rt ec ec tu tu re re
E le le ct ct ri ri ca cal
IC T
H VA VAC
P lu lu mb mbi ng ng
D ra rai na nag e
Fi re Fi re F ig ig ht hti ng ng
Ir riri ga Ir gat io io n
L PG PG
‐
‐
15
‐
26
7
2
2
‐
‐
Closed
‐
‐
13
‐
21
6
2
2
‐
‐
Under Review/Open
‐
‐
2
‐
5
1
‐
‐
‐
‐
Total Submitted
Electrical
‐
0
0
1
NCR Tot Total al Iss Issued ued
METHOD STATEMENTS
1
2
2
2
NCR Ope Open n
C
R r e d n U
B Rev. 0 D
d e v o r p p A
1
NCR Awa Awaiti iting ng App Approv roval al
D
w e i v e
C
n U
1
INSPECTION & TEST PLANS
D
w e i v e R r e d
1 NCR Tot Total al Clo Closed sed
B Rev. 0 D
d e v o r p p
C B
C B
A
A
A Total Method Statements Submitted
Total Method Statements Submitted
Total Method Statements
Total Method Statements ‐ ‐
5
10
15
20
25
30
35
40
5
10
15
20
Approved Approved Total Method Total Method Statements Statements Submitted 1 Electrical
Under Review
A
B
C
D
Rev. 0
B
C
D
Total Total Method Method Statements Statements Submitted
A
B
C
15
15
‐
10
‐
‐
1
‐
1
‐
1 Electrical
11
‐
10
‐
‐
‐
‐
‐
‐
2 HVAC
3 Plumbing
8
5
‐
7
‐
‐
‐
‐
‐
‐
3 Plumbing
5
5
‐
5
‐
4 Drainage
5
5
‐
5
‐
‐
‐
‐
‐
‐
4 Drainage
3
3
‐
3
‐
5 Fire Fighting
4
4
‐
3
‐
‐
‐
‐
‐
‐
5 Fire Fighting
3
3
‐
3
‐
6 SNG
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
6 SNG
‐
‐
‐
‐
‐
30
Under Review
11 11
2 HVAC
25
45
D
Rev. 0
B
C
D
10
10 10
‐
8
‐
‐
2
‐
‐
‐
8
8
‐
8
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
SENDIAN TOWER (2B+G+27F+PH) AT LUSAIL (MARINA COM/49) FOR SENDIAN GROUP MONTHLY PROGRESS REPORT‐13
CONTENTS 1.0 1.0
PROG PROGRE RESS SS REPO REPORT RT 1.2 PROGRESS HIGHLIGHTS
2.0 2. 0
ENGINE ENGI NEER ERIN ING G 2.1 SHOP DRAWINGS DRAWINGS 2.2 BUILDER WORKS DRAWINGS 2.3 COORDINATION DRAWINGS
3.0 3. 0
PROC PR OCUR UREM EMEN ENT T 3.1 PROCUREMENT LOG 3.2 MATERIAL INSPECTION LOG 3.3 SITE INSPECTION LOG
4.0
OTHERS 4.1 QA/QC REPORT (NCR, ETC.) 4.2 REQUEST FOR INFORMATION LOG 4.3 REQUEST FOR INSPECTION LOG METHODE STATEMENTS, INSPECTION & TEST PLANS
5.0 5. 0
CONSTR CONS TRUC UCTI TION ON 5.1 OVERALL 5.2 ELECT ELECTRICAL RICAL 5.3 HVAC 5.4 PLUMBING 5.5 DRAINAGE
SENDIAN TOWER (2B+G+27F+PH) AT LUSAIL (MARINA COM/49) FOR SENDIAN GROUP MONTHLY PROGRESS REPORT‐13
Progress Report 1.0 ELECTRICAL
1.1 Installation of light fitting & exit li ghts at ground floor metal ceiling area. 1.2 Installation of wall lights base & lights f rom B2 to 27th floors main lift lobbies. 1.3 Cable laying from HV switch gear to tunnel, termination of cable at HV switch gear side, etc. 1.4 Installation & termination of bus bar pieces at LV panel, generator & transformer sides. 1.5 Bus bar alignment from 2nd to 27th floor. 1.6 Shifting, installation & assembling of MCC panels at pent house roof 1.7 Cables glanding & ermination of MCC panels at pent house roof 1.8 Cable termination of LV panels, etc. for uploading documents for installation inspection of 1.9 LV panel from Kahramaa. 1.10 Installation of light fitting, smoke detectors, sensors, etc. at stair case, etc. 1.11 Cable laying & termination of LV room at ground floor 1.12 SMB cables glanding, termination at electrical room basement-1 1.13 Installation of cable tray, cable laying, isolators & termination of ventilation fans at B1 & B2 1.14 MCC panel cable glanding & termination at ETS room. 1.15 Installation of cable trunking for BMS at B2 1.16 Installation of light fitting at 2nd, basement-2 & basement-1 floors. 1.17 Installation of smoke detectors base at basement-2 1.18 Installation of smoke detectors, fire alarm speakers etc. from 14th to 23rd floors (tenant area) 1.19 Installation of light fitting, switch sockets, etc. from 1.20 G.I. conduiting, trunking, wiring wiring of NOVEC system, etc. from 8th to 21st floors 1.21 Installation of sump pump control panels, trunking, cabling at basement-1 & basement-2 1.22 Installation of G.I. piping, box fixing from 2nd to 27th floor garbage chute 1.23 Installation of G.I. piping, wiring, lighting fixing at lift shaft. 1.24 Installation of PV cells solar panels at 6th f loor. 1.25 Installation of canopy lights at main entrace side. 1.26 Installation of facade lights 1.27 Installation of pole lights at 6th floor external area.
SENDIAN TOWER (2B+G+27F+PH) AT LUSAIL (MARINA COM/49) FOR SENDIAN GROUP MONTHLY PROGRESS REPORT‐13
Progress Report 4.0 PLUMBING 4.1 Installation of copper piping & brazing, etc. at pent house roof. 4.2 Installation of hose bib piping from basement-2, basement-1, 2nd to 5th floors 4.3 Installation of balance sanitary wares from 7th to 27th floor (excluding 9th & 10th floor) 4.4 Installation of copper piping, etc. from 2nd to 27th floor at garbage chute. 4.5 Installation of sub-water meters & connections from 7th to 27th floor at service lobby. 4.6 Installation of water meters & connections at ground & 1st floor
5.0 FIREFIGHTING 5.1 Installation of balance sprinklers at basement-2, Basement1, ground, ground, 1st to 5th floors 5.2 Touchup painting at basement-2 & basement-1 5.3 Fire pump alignment at fire pump room. 5.4 Installation of fuel piping for fire pump room basement-1 5.5 Installation of fuel piping for W aqood tank at basement-1 5.6 Reinstallation of breeching inlet at ground floor
SENDIAN TOWER (2B+G+27F+PH) AT LUSAIL (MARINA COM/49) FOR SENDIAN GROUP MONTHLY PROGRESS REPORT‐13
CONTENTS 1.0 1.0
PROG PROGRE RESS SS REPO REPORT RT 1.3 AREA OF CONCERN
2.0 2. 0
ENGINE ENGI NEER ERIN ING G 2.1 SHOP DRAWINGS DRAWINGS 2.2 BUILDER WORKS DRAWINGS 2.3 COORDINATION DRAWINGS
3.0 3. 0
PROC PR OCUR UREM EMEN ENT T 3.1 PROCUREMENT LOG 3.2 MATERIAL INSPECTION LOG 3.3 SITE INSPECTION LOG
4.0
OTHERS 4.1 QA/QC REPORT (NCR, ETC.) 4.2 REQUEST FOR INFORMATION LOG 4.3 REQUEST FOR INSPECTION LOG METHODE STATEMENTS, INSPECTION & TEST PLANS
5.0 5. 0
CONSTR CONS TRUC UCTI TION ON 5.1 OVERALL 5.2 ELECT ELECTRICAL RICAL 5.3 HVAC 5.4 PLUMBING 5.5 DRAINAGE
SENDIAN TOWER (2B+G+27F+PH) AT LUSAIL (MARINA COM/49) FOR SENDIAN GROUP MONTHLY PROGRESS REPORT‐13
Area of Concern 1.0 ELECTRICAL
1.1 Required civil inspection approval by Kahramaa for uploading documents for LV Panel installation inspection by Kahramaa 1.2 Required access for PV cell control room 1.3 Required full access for installation of cable tray/trunking at open area of pent house roof.
2.0 PLUMBING
2.1 Installation of sanitaryware at 6th floor
SENDIAN TOWER (2B+G+27F+PH) AT LUSAIL (MARINA COM/49) FOR SENDIAN GROUP MONTHLY PROGRESS REPORT‐13
CONTENTS 1.0 1. 0
PROGRE PROG RESS SS RE REPO PORT RT 1.1 DASHBOARD
2.0 2.0
ENGI ENGINE NEER ERIN ING G 2.1 SHOP DRAWINGS DRAWINGS 2.2 BUILDER WORKS DRAWINGS 2.3 COORDINATION DRAWINGS 2.4 AS‐BUILT DRAWINGS 2.5 OPERATION & MAINTENANCE MANUALS 3.1 PROCUREMENT LOG 3.2 MATERIAL INSPECTION LOG 3.3 SITE INSPECTION LOG
4.0
OTHERS 4.1 QA/QC REPORT (NCR, ETC.) 4.2 REQUEST FOR INFORMATION LOG 4.3 REQUEST FOR INSPECTION LOG METHODE STATEMENTS, INSPECTION & TEST PLANS
5.0 5. 0
CONSTR CONS TRUC UCTI TION ON 5.1 OVERALL 5.2 ELECT ELECTRICAL RICAL 5.3 HVAC 5.4 PLUMBING 5.5 DRAINAGE
Date:
31-Dec-16
TRAGS ENGINEERING SENDIAN TOWER COM/49 OVERALL SUMMARY : SHOP DRAWINGS (ELECTRICAL & MECHANICAL)
Shop Drawings S. No. 1 2 3 4 5 6 7 8
Category
El Electrical HVAC Plumbing Drainage Fire Fighting NOVEC Gas Coordination
TOTAL
Total (Nos.)
Submitted (Nos.)
Approved (Nos.)
276 26 20 13 15 18 11 14
275 26 20 13 14 18 11 14
247 22 17 13 14 18 10 9
393
391
350
Approved
To Be Submitted (Nos.)
To Be Submitted With Revise & Resubmit (Nos.)
A
25 1 1 4
-
247 22 17 13 14 18 10 9
31
-
350
1 1 -
2
NOTE : NOVEC System Shop Drawings Submitted Separately in Electrical & Mechanical As Per Consultant Requirement
B
Under Review
C
D
24
4
-
29
-
1 -
Rev. 0
4 4 2 1 1
12
Dated :05‐01‐17Page No. : 6 of 17
DRAWINGS SUBMITTAL LOGFORSENDIAN TOWER COM49 PROJECT
Drawing
S. No. Category 194 Electrical Electrical
Sub Category
Floor
Telecom
2nd
No.
AEB‐ALB‐SD‐EL‐TC‐02‐1107
Submission
Title 2nd Floor Telecom System Layout
Sheet No.
Rev.
1
0
Ref. No. SD‐EL‐0147
Date
04‐Feb‐16
Approval Code B
Reply Overall Approval Date Code B 25‐Feb‐16
Cycle
Remarks
Dated :05‐01‐17Page No. : 13 of 17
DRAWINGS SUBMITTAL LOGFORSENDIAN TOWER COM49 PROJECT
Drawing S. No.
95
96
97
98
99
100
Category
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Sub Category
Fl Floor
GA S
AEB‐ALB‐SD‐ME‐SNG‐GF‐001‐0
GA S
AEB‐ALB‐SD‐ME‐SNG‐1F‐002‐0
GAS
AEB‐ALB‐SD‐ME‐SNG‐2‐4F‐003‐0
GAS
AEB‐ALB‐SD‐ME‐SNG‐5F‐004‐0
GAS
AEB‐ALB‐SD‐ME‐SNG‐6F‐004‐0
GAS
101
Me Mechanical
GAS
102
Mechanical
GA S
103
Mechanical
GAS
No.
AEB‐ALB‐SD‐ME‐SNG‐DET‐0A AEB‐ALB‐SD‐ME‐SNG‐GEN‐PRS‐0 SCH
AEB‐ALB‐SD‐ME‐SNG‐GEN‐SCH‐0
AEB‐ALB‐SD‐AER‐B1‐200‐05A
Submission Title
Ground floor Level Gas piping Layout
First floor Level Gas piping Layout
Typical 2nd -4th floor Gaspiping Layout
5th floor level Gas piping Layout
Reply Overall Approval
Sheet No.
Rev.
1 1
0 1
SD-ME-SNG-005 SD-ME-SNG-005
26-Apr-16 09-Jun-16
B
02‐Jun‐16
C
B
1
2
SD-ME-SNG-005
15-Aug-16
B
16‐Jul‐16 04‐Sep‐16
1
0
SD-ME-SNG-006
26-Apr-16
B
1
1
SD-ME-SNG-006
09-Jun-16
1 1
2 0
SD-ME-SNG-006 SD-ME-SNG-007
09-Jun-16 26-Apr-16
C B
1
1
SD-ME-SNG-007
09-Jun-16
C
1
2
SD-ME-SNG-007
15-Aug-16
1 1
0 1
SD-ME-SNG-008 SD-ME-SNG-008
26-Apr-16 09-Jun-16
B B C
B
02‐Jun‐16 16‐Jul‐16
1
1
SD-ME-SNG-008
16-Aug-16
B
04‐Sep‐16
02‐Jun‐16
Ref. No.
Date
Approval Code
Date
Code
B
02‐Jun‐16 B
16‐Jul‐16
04‐Sep‐16
B
02‐Jun‐16 16‐Jul‐16 04‐Sep‐16
1
0
SD-ME-SNG-009
26-Apr-16
B
6th floor Gas piping Layout
1
1
SD-ME-SNG-009
09-Jun-16
B
16‐Jul‐16
2 0
SD-ME-SNG-009 SD-ME-SNG-012
08-Dec-16 15-Aug-16
28‐Dec‐16
SNG System Front page
1 1
C B
1
0
SD-ME-SNG-011
09-Jun-16
B C
1
1
SD-ME-SNG-011
15-Aug-16
1 1
0 1
SD-ME-SNG-010 SD-ME-SNG-010
09-Jun-16 15-Aug-16
1
0
SD-ME-FF-016
01-Sep-16
UR
2
0
SD-ME-FF-016
01-Sep-16
UR
PRS Installation Details Schematic Diagram For SNG System
B
B C
B
B B
UR
Ground floor Generator Room AEROSOL fire extingushing system
09‐Apr‐16 16‐Jul‐16 04‐Sep‐16 16‐Jul‐16 09‐Apr‐16
Cycle
Remarks
Dated :05‐01‐17Page No. : 16 of 17
DRAWINGS SUBMITTAL LOGFORSENDIAN TOWER COM49 PROJECT
Drawing S. No.
Category
Sub Category
Fl oor
No.
Submission Ti tle
1 2 3
Mechanica hanicall Mechanica hanicall M ec ec ha ha ni ni ca ca l
Draina Drainage ge Draina Drainage ge D ra ra in in ag ag e
Basement‐ ement‐2 2 Basement‐ ement‐1 1 G r ou nd nd
AEB‐AL AEB‐ALB‐SKET B‐SKETCH‐CDP CH‐CDP‐00 ‐001 1 AEB‐AL AEB‐ALB‐SKET B‐SKETCH‐CDP CH‐CDP‐00 ‐002 2 A EB EB ‐A ‐A LB LB ‐S ‐S KE KE TC TC H H‐‐ CD CD P‐ P‐ 00 00 3
4 5
M ec ec ha ha ni ni ca ca l M ec ec ha ha ni ni ca ca l
D ra ra in ag ag e D ra ra in in ag ag e
1 st st 2 nd nd t o 4 th th
A EB EB ‐A ‐A LB LB ‐S ‐S KE KE TC TC H‐ H‐ CD CD P‐ P‐ 00 00 4 A EB EB ‐A ‐A LB LB ‐S ‐S KE KE TC TC H H‐‐ CD CD P‐ P‐ 00 00 5
Basement 2‐ Floor CDP drain Pipe layout Basement 1‐ Floor CDP drain Pipe layout Ground‐ Floor CDP drain Pipe layout 1st ‐ Floor CDP drain Pipe layout 2 nd nd t o 4 th th ‐ F lo lo or or C DP DP d ra ra in in P ip ip e l ay ay ou ou t
6 7
M ec ec ha ha ni ni ca ca l M ec ec ha ha ni ni ca ca l
D ra ra in ag ag e D ra ra in ag ag e
5 th th 6 th th
A EB EB ‐A ‐A LB LB ‐S ‐S KE KE TC TC H‐ H‐ CD CD P‐ P‐ 00 00 6 A EB EB ‐A ‐A LB LB ‐S ‐S KE KE TC TC H‐ H‐ CD CD P‐ P‐ 00 00 7
8 9
M ec ec ha ha ni ni ca ca l Me Me ch ch an an ic ic al al
D ra ra in in ag ag e D ra ra in ag ag e
7 th th t o 2 7t 7t h P en en th th
A EB EB ‐A ‐A LB LB ‐S ‐S KE KE TC TC H H‐‐ CD CD P‐ P‐ 00 00 8 A EB EB ‐A ‐A LB LB ‐S ‐S KE KE TC TC H‐ H‐ CD CD P‐ P‐ 00 00 9
Sheet No.
Rev.
1
0
1
Ref. No.
Reply Date
Appr oval Code
SD-ME-DR-013
06-Feb-16
UR
0
SD-ME-DR-014
06-Feb-16
UR
1
0
SD-ME-DR-015
06-Feb-16
UR
1
0
SD-ME-DR-016
06-Feb-16
UR
1
0
SD-ME-DR-017
06-Feb-16
UR
5th ‐ Floor CDP drain Pipe layout 6th ‐ Floor CDP drain Pipe layout
1
0
SD-ME-DR-018
06-Feb-16
UR
1
0
SD-ME-DR-019
06-Feb-16
UR
7th to 27 ‐ Floor CDP drain Pipe layout Penthours‐ Floor CDP drain Pipe layout
1
0
SD-ME-DR-020
06-Feb-16
UR
1
0
SD-ME-DR-021
06-Feb-16
UR
Overall Approval Code UR UR UR UR UR UR UR UR UR
Date
Cycle
Remarks
Date:
31-Dec-16
TRAGS ENGINEERING SENDIAN TOWER COM/49 OVERALL SUMMARY : REDLINE MARKUP / AS-BUILT DRAWINGS (ELECTRICAL & MECHANICAL
Shop Drawings S. No.
Category
1 2 3 4 5 6
El Electrical HVAC Plumbing Drainage Fire Fighting NOVEC AEROSOL 7 Gas
TOTAL
Total (Nos.)
Submitted (Nos.)
Approved
Approved (Nos.)
To Be Submitted (Nos.)
To Be Submitted With Revise & Resubmit (Nos.)
A
B
236 24 17 14 15 18 2 10
16 7 1 2 1 -
-
220 17 16 12 14 18 2 10
236 18 17 14 15 18 2 10
-
-
336
27
-
309
330
-
-
NOTE : NOVEC System Shop Drawings Submitted Separately in Electrical & Mechanical As Per Consultant Requirement
Under Review
C
D
16 1 1 2 1
-
21
-
-
Rev. 0
6 -
6
Dated :05‐01‐17Page No. : 5 of 7
AS BUILT DRAWINGS SUBMITTAL LOG FORSENDIAN TOWER COM49 PROJECT
Dra wi ng
S. No. Category
Sub Category
Floor
No .
ER
ER
22 23 3 E le le ct ct ri ri ca ca l
ER
13th 13th
AEB‐AL AEB‐ALB‐A B‐AB‐E B‐EL‐E L‐ER‐ R‐035 0350 0
13th Floor‐ Electrical Room Details
224 Electrical
ER ER
PH
AE A EB‐ALB‐AB‐EL‐E R‐0351
Penthouse floor‐ Electrical Room Details
22 25 5 E le le ct ct ri ri ca ca l
S CH CH
226 Electrical
SCH
LV LV
228 Electrical Electrical
AEB‐AL AEB‐ALB‐A B‐AB‐E B‐EL‐L L‐LV‐0 V‐0241 241
LV Panel Schematic Digram‐1
AE AEB‐ALB‐AB‐EL‐LV‐0242
LV Panel Schematic Digram‐2
AEB‐ALB‐AB‐EL‐KPS‐0243
11 KV Kharamaa Protection Scheme
AEB‐ALB‐AB‐EL‐MV‐0244
MV Panel Single Line Diagram
3rd F
AEB‐AL AEB‐ALB‐A B‐AB‐E B‐EL‐E L‐ER‐ R‐034 0346 6
Third Floor ‐ Electrical Room Details
230 Electrical
ER
4th F
A EB‐ALB‐AB‐EL‐ER‐0347
F ourth Floor ‐ Electrical Room Details
23 31 1 E le le ct ct ri ri ca ca l
ER
5th F
232 Electrical
BD
233 Electrical
ER
234 Electrical
ER
235 Electrical 236 Electrical
Sheet Rev. No.
6th Floor ‐ Electrical Room Details
ER
22 29 9 E le le ct ct ri ri ca ca l
Submission
Title
22 22 2 E le le ct ct ri ri ca ca l
227 Electrical Electrical
AEB‐AL AEB‐ALB‐A B‐AB‐E B‐EL‐E L‐ER‐ R‐034 0349 9
New Drawing Nos.
A EB EB‐ALB‐AB‐EL‐ER‐0348
Fifth Floor ‐ Electrical Room Details
AEB‐ALB‐AB‐EL‐BD‐0355
Generator, MV Panel & Transformer Room Bus Duct Detail
SP
AEB‐ALB‐AB‐EL‐SP‐06‐1311
6th Floor Photovoltaic System Structural Support Layout
SP
AEB‐ALB‐AB‐EL‐SP‐06‐1312
6th Floor Photovoltaic System Electrical Layout
ER
SP
AEB‐ALB‐AB‐EL‐SP‐06‐1313
6th Floor Photovoltaic System Inverter Layout
ER
SP
AEB‐ALB‐AB‐EL‐SP‐06‐1314
Photovoltaic System Single Line Diagram
Plan Submission Forecast Date
15‐Jan‐17 15‐Jan‐17 15‐Jan‐17 24‐Jan‐17 24‐Jan‐17 24‐Jan‐17 24‐Jan‐17 25‐Jan‐17 25‐Jan‐17 25‐Jan‐17 31‐Dec‐16 10‐Jan‐17 10‐Jan‐17 10‐Jan‐17 10‐Jan‐17
Ref. No.
Reply
Date
Approval Code
Overall Approval Code
Date
Cycle
Remarks
scope of sub con Scope of Sub con Scope of Sub con Scope of Sub con Scope of Sub con
SENDIAN TOWER (2B+G+27F+PH) AT LUSAIL (MARINA COM/49) FOR SENDIAN GROUP MONTHLY PROGRESS REPORT‐13
CONTENTS 1.0 1. 0
PROGRE PROG RESS SS RE REPO PORT RT 1.1 DASHBOARD
2.0 2. 0
ENGINE ENGI NEER ERIN ING G 2.1 SHOP DRAWINGS DRAWINGS 2.2 BUILDER WORKS DRAWINGS 2.3 COORDINATION DRAWINGS
3.0 3.0
PROC PROCUR UREM EMEN ENT T 3.1 MATERIAL SUBMITTAL & PROCUREMENT LOG 3.2 MATERIAL INSPECTION LOG 3.3 SITE INSPECTION LOG
4.0
OTHERS 4.1 QA/QC REPORT (NCR, ETC.) 4.2 REQUEST FOR INFORMATION LOG 4.3 REQUEST FOR INSPECTION LOG METHODE STATEMENTS, INSPECTION & TEST PLANS
5.0 5. 0
CONSTR CONS TRUC UCTI TION ON 5.1 OVERALL 5.2 ELECT ELECTRICAL RICAL 5.3 HVAC 5.4 PLUMBING 5.5 DRAINAGE
Ref: no.: MEP-MT-SUB-0001: MEP-MT-SUB-0001: R0 Date:
31-Dec-16
TRAGS ENGINEERING SENDIAN TOWER COM/49 OVERALL SUMMARY : MATERIAL SUBMITTAL CONTROL REGISTER / LOG
Material Submittals S. No.
Category
Priority
1 2 3 4 5 6 7 8 9 10 11 12 13
Electrical Electrical HV H VAC HVAC Plumbing Plumbing Dr D rainage Drainage Fire Fighting Fire Fighting SNG SN SNG General
Long Lead Non-Long Lead Long Lead Non-Long Lead Long Lead Non-Long Lead Long Lead Non-Long Lead Lo Long Lead Non-Long Lead Long Lead Non-Long Lead Non-Long Lead
TOTAL
Total (Nos.) 57 22 10 46 5 21 3 6 3 19 1 0 2 195
Submitted Approved (Nos.) (Nos.) 57 22 10 46 5 21 3 6 3 19 1 0 2 195
Approved
To Be Submitted (Nos.)
56 21 10 46 5 21 3 6 3 19 1 191
0 0 0 0 0 0 0 0 0 0 0 0 0 -
To Be Submitted With Revise & Resubmit (Nos.) 1 1
A
B
-
56 21 10 46 5 21 3 6 3 19 1 -
-
191
Under Review
C
D
Rev. 0
B
C
1 1
-
-
-
-
2
-
-
-
-
Purchase Orders
D
1
1
-
LPO Issued
LPO to be issue
55 55 19 19 10 10 45 45 5 21 21 3 6 3 19 19 1 0 1 188
LPOs Under Preparation/ Signature
0 0 0 0 0 0 0 0 0 0 0 0 0 -
0 0 0 0 0 0 0 0 0 0 0 0 0 -
TRAGS ENGINEERING
A: Approved
C: Revise & Resubmit
SENDIAN TOWER COM/49
B: Approved with comment s
D: Not Approved
ELECTRICAL : MATERIAL SUBMITTAL CONTROL REGISTER / LOG
Ref: no.:
M EP-M T-SUB-0001: R0
Date:
31-Dec-16
Sr. No
SUBMITTAL NO.
CATEGORY
PRIORITY
DESCRIPTION
PLAN/FORE SUB. DATE
13-Feb-16
1s t Subm is si sion - Rev is ion 0 SUBMITTED BY CONTR.
13-Feb-16
R E TU RN E DB Y E N G. RE P .
22-J un-16
2nd S ub ub mis si sion - Rev isi on 1 A CT I ON
43 M AR-EL-082
El ectri cal
Non-Long Lead
Fi bre Opti c Cabl e
44 MAR-EL-104
El ectri cal
Non-Long Lead
Electri cal Smart Meter
23-Mar-16
23-Mar-16
02-Apr-16
C
45 MA M AR-EL-105
El ectri cal
Non-Long Lead B MS Cabl e
10-May-16
10-May-16
29-May-16
B
46 MAR-EL-107
Electri cal
Non-Long Lead
Car Park Venti lati on system
18-Jun-16
18-Jun-16
47 MAR-EL-108
El ectri cal
Ground Fl oor
LO9 Li ght DL 200 I P65 TC-DEL 18W Ground Fl oor (Metal Ceil i ng Area)
25-Jul -16
25-Jul -16
28-J ul-16
B
48 MAR-EL-109
El ectri cal
Long Lead
Interan Li ght Fi xtures- L05 Type
06-Oc t-16
06-Oc t-16
22-Oct-16
B
47 MAR-EL-110
El ectri cal
Non-Long Lead
Grey W ater Treatemtn Syetm
23-Oc t-16
22-Oc t-16
03-Nov-16
B
48 MAR-EL-112
El ectri cal
Non-Long Lead
Li ght Fi xtures Type L12
06-Nov-16
06-Nov-16
13-Nov-16
B
16-J ul-16
SUBMITTED BY CONTR.
RETURNED BY ENG. REP.
3 rd S ub ubm is si sion - Rev isi on 2
ACTION
SUBMITTED BYCONTR.
4t h Su Submi ss ion - Rev is ion 3
RETURNEDBYENG. ACTION REP.
B
C
49 MAR-EL-114
El ectri cal
Non-Long Lead
BMS Graphi cs Snap Shot
17-Nov-16
17-Nov-16
17-Nov-16
C
48 MAR-EL-GEN-001
El ectri cal
GEN
Elect ri cal Servi ce Identi ficat ion Label
26-Jul -16
26-Jul -16
28-J ul-16
C
13-Apr-16
21-J un-16
C
19-Jul -16
07-Aug-16
B
14-Dec-16
24-Dec-16
B
20-Jun-16
22-Jun-16
B
SUBMITTEDBY CONTR.
RETURNED BYENG. REP.
5th Submission - Revision 4 ACTION
SUBMITTED BYCONTR.
RETURNEDBY ENG. REP.
ACTION
REMARKS
TRAGS ENGINEERING
A: Approved
SENDIAN TOWER COM/49
B: Ap proved with comm ents
MECHANICAL : MATERIAL SUBMITTAL CONTROL REGISTER / LOG
Re f: no.:
C: Revise & Resubmit
Date:
1st Submission - Revision 0
Sr. No
SUB MITTAL NO NO.
CATE GORY
P RIORITY
DE SCRIPTION
S UB MIT TE DB YC YC ON TR .
A CT O I N
Non -Lo ng L ead
Fi re Fi gh ti ng P i pes
15-S e p-14
2 2-No v-1 4
B
07 -Ma r-15
1 6-A pr-15
B
10 MA R-ME -FF-002
Fire Fi ghti ng
Non -Lo ng L ead
Fi re fi ghti ng P ip e Fi tti ng s
16 -Se p-14
2 2-No v-1 4
B
11 -Ap r-15
2 8-A pr-15
B
11 MA R-ME -FF-007
Fire Fi Fi ghti ng
Non -Lo ng Le Lead
Zone Control Valve Assembly, Test Valve, Water Flow Alarm Switch, Flushing Valve, Butterfly Valve
12 M A R-ME -FF-005
Fire Fi ghti ng
Non -Lo ng L ead
Ch eck V al v e
27 -Oct-14
20 -Dec-1 4
C
15 -Ap r-15
12 -Au g-1 5
B
13 MA R-ME -FF-003
Fire Fi ghti ng
Non -Lo ng L ead
Ha ng ers & S up po rts
02 -Oct-14
2 2-No v-1 4
C
17-De c-14
1 1-Mar-15
B
14 M A R-ME -FF-014
Fire Fi ghti ng
Non -Lo ng L ead
Fi re Bl an ket
19-No v -14
2 9-No v-1 4
B
15 MA R-ME -FF-010
Fire Fi ghti ng
Non -Lo ng L ead
Al arm che ck v alv e a sse mbl y wi th tri m set
22 -Oct-14
11 -Jan -15
C
1 5-Ja n-15
2 8-Ma r-15
B
16 MA R-ME -FF-004
Fire Fi ghti ng
Non -Lo ng L ead
OS & Y Ga te Va lv e & Ta mpe r S witch
22 -Oct-14
20 -Dec-1 4
C
15 -Ap r-15
0 9-Ju l-1 5
B
17 MA R-ME -FF-009
Fire Fi ghti ng
Non -Lo ng L ead
A i r Re lea se V al ve
22 -Oct-14
20 -Dec-1 4
C
22 -Ap r-15
0 7-Ju l-15
B
18 MA R-ME -FF-0 15
Fire Fi ghti ng
Non -Lo ng L ead
Fi re Fi gh ti ng S ys te m Pa in t
0 4-Ja n-1 5
1 1-Mar-15
C
14 -Ap r-15
0 1-Ju l-1 5
B
19 MA R-ME -FF-018
Fire Fi ghti ng
Non -Lo ng L ead
A E ROSOL Cle an A ge nt Fi re E xti ng ui she r S ys te m
02 -Ma r-15
2 1-Ju l-1 5
B
01-A ug -15
25 -Au g-1 5
C
20 MA R-ME -FF-020
Fire Fi ghti ng
Non -Lo ng L ead
Fi re Figh ti ng Fl ang es
31 -Ma r-15
0 9-Ju l-1 5
B
21 MA R-ME -FF-021
Fire Fi ghti ng
Non -Lo ng L ead
P res sure Re li ef V al ve
1 6-Ju n-1 5
0 7-Ju l-1 5
B
22 MA R-ME -FF-022
Fire Fi ghti ng
Non -Lo ng L ead
Pre ssure Gaug es
0 6-Ja n-1 6
23 -Jan -16
B
1 6-Ju n-16
1 4-Ju l-1 6
B
10 -Dec-1 4
A CT O I N
3rd Su Sub mission - Revision 2
R ET UR NE DB YE YE NG. R EP .
Fire Fi ghti ng
22 -Oct-14
R ET UR NE DB YE YE NG .R .R EP .
2nd Su Subm issio n - Revision 1 S UB MIT TE DB YC YC ON TR .
MA R-ME -FF-0 01
9
C
15 -Ap r-15
0 7-Ju l-1 5
MA R-ME -GE N-00 1
Ge ne ral
Non -Lo ng Le Lead
Mec han ica l Se Serv ice Id Id enti fic atio n la la bl e
3 1-Ma y-1 6
15 -Jun -16
C
2
MA R-ME -GE N-00 2
Ge ne ral
Non -Lo ng L ea d
Mec han ica l S erv ice Ta ggi ng S ystem
19 -Se p-1 6
19 -Jun -16
C
R ET UR NE DB YE YE NG .R .R EP .
08 -Se p-1 5
2 4-Oct-1 5
4th Su Sub mission - Re vision 3 SUBMITTED BY A CT O I N CONTR.
B
GEN
1
S UB MIT TE DB YC YC ON TR .
B
RETURNED BYENG. ACTION REP.
4th Su Sub mission - Revision 3 SUBMITTED BY CONTR.
RETURNED BYENG. ACTION REP.
D: Not Approved MEP-MT-S UB-00 01 : R0 31-Dec-16
5th Submission - Revision on 4 SUBMITTED BYCONTR.
RETURNED BYENG. ACTION REP.
REMARKS
R ef ef : n o. o. :
ME PP- MI MI -S -S UB UB -0 -0 00 00 1: 1: R0 R0
Date:
31-Dec-16
TRAGS ENGINEERING SENDIAN TOWER COM/49 OVERALL SUMMARY : MATERIAL ARRIVAL INSPECTION (ELECTRICAL & MECHANICAL)
Approved S. No. 1 2 3 4 5 6
Category Electrical Mechanical Plumbing Drainage Fire Fighting Air Conditio tioning TOTAL
Total Inspections Total Inspection Submitted Approved (Nos.) (Nos.) (Nos.) 69 62 6 6 21 19 10 10 23 20 43 38 172 155
A
B 4 4
58 6 19 10 20 38 151
Under Review
C
D 6 1 3 1 11
UR -
1 1 1 1
3 5
TRAGS ENGINEERING
A: Approved
SENDIAN TOWER
C: Revise & Resubmit Resubmit
B: Appr Approve oved d with with commen comments ts
D: Not Not Appro Approved ved
UR: Under Review
MATERIAL INSPECTI ON LOG (MECHANICAL) DATE:
REVISION 1
Sr. No
Document No
Category
Description
Issued date
Inspected date
REVISION 2 Stat Status us
Issu Issued ed date date
Inspected date
10-Apr-15
19-Apr-15
1
MIR-ME-001
Mechanical
UPVC PIPES A ND FITTINGS
05-Mar-15
14-Mar-15
C
2
MIR-ME-004
Mechanical
UPVC PUDDLE FLANGE-2
13-May-15
13-May-15
B
3
MIR-ME-004
Mechanical
GI PUDDLE FLANGE
08-Jul-15
11-Jul-15
B
4
MIR-ME-005
Mechanical
GI PUDDLE FLANGE
29-Jul-15
29-Jul-15
B
5
MIR-ME-006
Mechanical
VOLUME CONTROL DAMPER
04-Feb-16
11-Feb-16
B
6
MIR-ME-007
Mechanical
Gray Water treatment System -Equipment
10-Mar-16
14-Apr-16
B
S ta ta tu tu s
B
7 8 9 PLUMBING 1
MIR-ME-PL-001
Plumbing
HANGERS FOR PLUMBING SYSTEM
05-Sep-15
08-Sep-15
B
2
MIR-ME-PL-003
Plumbing
Gray Water treatment System
01-Nov-15
21-Feb-16
B
3
MIR-ME-PL-004
Plumbing
Copper Pipes
14-Dec-15
15-Dec-15
B
4
MIR-ME-PL-005
Plumbing
PPR pipe & fittings
13-Jan-16
18-Jan-16
B
5
MIR-ME-PL-006
Plumbing
PPR pipe & fittings
14-Feb-16
21-Feb-16
B
6
MIR-ME-PL-009
Plumbing
Plumbing Valve
28-Mar-16
01-Sep-16
B
7
MIR-ME-PL-010
Plumbing
Plumbing water pump (booster pump, lift pump &circulation pumps)
21-May-16
18-Aug-16
B
8
MIR-ME-PL-011
Plumbing
Thermostatic Balancing valve
22-May-16
24-May-16
C
9
MIR-ME-PL-012
Plumbing
Pressure Reducing Valve
25-Jun-16
15-Jun-16
B
10
MIR-ME-PL-013
Plumbing
Sectional GRP Tanks
30-May-16
16-Jul-16
B
11
MIR-ME-PL-014
Plumbing
Main Water Meter Cabinet
20-Aug-16
24-Aug-16
B
12
MIR-ME-PL-015
Plumbing
UV Filter
04-Sep-16
26-Sep-16
D
13
MIR-ME-PL-016
Plumbing
Water Hammer Arrestor
04-Feb-16
22-Sep-16
B
14
MIR-ME-PL-017
Plumbing
Solar System (panels, Tanks, control panel & accessories)
17-Sep-16
30-Oct-16
B
15
MIR-ME-PL-018
Plumbing
Basin Mixers, paper holder, soap holder & robe hook
01-Nov-16
06-Nov-16
B
16
MIR-ME-PL-019
Plumbing
Water meter cabinets
27-Oct-16
06-Nov-16
B
17
MIR-ME-PL-020
Plumbing
Solar Water circulation & Delivery skid pumps
15-Oct-16
28-Nov-16
B
18
MIR-ME-PL-021
Plumbing
Pressure Reducing Valves
24-Nov-16
08-Dec-16
B
19
MIR-ME-PL-022
Plumbing
Sub water Metes
28-Nov-16
05-Dec-16
B
20
MIR-ME-PL-023
Plumbing
Bulk Water Meter
28-Nov-16
05-Dec-16
B
11-Dec-16
29-Dec-16
31-Dec-16
REVISION 3
B
I ss ssu ed ed d at at e
Inspected date
Status
Remarks
TRAGS ENGINEERING
A: Approved
SENDIAN TOWER
C: Revise & Resubmit Resubmit
B: Appr Approve oved d with with commen comments ts
D: Not Not Appro Approved ved
UR: Under Review
MATERIAL INSPECTI ON LOG (MECHANICAL) DATE:
REVISION 1
Sr. No
Document No
Category
Description
REVISION 2
Issued date
Inspected date
Stat Status us
1
MIR-ME-DR-001
Drainage
HANGERS FOR DRAINAGE SYSTEM
08-Sep-15
08-Sep-15
B
2
MIR-ME-DR-003
Drainage
HANGERS FOR DRAINAGE SYSTEM
08-Sep-15
08-Sep-15
B
3
MIR-ME-DR-004
Drainage
UPVC PIPES A ND FITTINGS
04-Nov-15
09-Nov-15
B
4
MIR-ME-DR-004
Drainage
UPVC PIPES A ND FITTINGS
07-Dec-15
15-Dec-15
B
5
MIR-ME-DR-005
Drainage
Drainage Accessories (floor drain, floor cleanout, roof drain & road gully)
17-Jan-16
28-Jan-16
B
6
MIR-ME-DR-006
Drainage
Sump pit pumps and submersible lift pump
31-Mar-16
24-May-16
B
7
MIR-ME-DR-007
Drainage
Media Filter
29-May-16
16-Jul-16
B
8
MIR-ME-DR-008
Drainage
Sanitary wares & fixtures
16-Jul-16
08-Aug-16
B
9
MIR-ME-DR-009
Drainage
Sludge Transfer pump
25-Jul-16
09-Aug-16
B
10
MIR-ME-DR-011
Drainage
Water closet flush tanks
03-Nov-16
11-Oct-16
B
10
AC 1
MIR-ME-AC-001
Air Co Conditioning
U-STRAP CLAMP & RUBBER INSERTS FOR CHILLED WATER SYSTEM
05-Sep-15
08-Sep-15
B
2
MIR-ME-AC-002
Air Co Conditioning
HVAC Insulation
02-Dec-15
16-Dec-15
B
3
MIR-ME-AC-003
Air Co Conditioning
Chilled Water Pipes
14-Dec-15
16-Dec-15
B
4
MIR-ME-AC-004
Air Co Conditioning
Chilled Water Fittings
14-Dec-15
15-Dec-15
B
5
MIR-ME-AC-004
Air Co Conditioning
Flexible Duct
25-Jan-16
30-Jan-16
B
6
MIR-ME-AC-005
Air Co Conditioning
Fan coil unit
30-Dec-15
18-Feb-16
B
7
MIR-ME-AC-008
Air Co Conditioning
Vibration Isolator for FCU
14-Feb-16
21-Feb-16
B
8
MIR-ME-AC-009
Air Co Conditioning
Fire Damper
17-Feb-16
21-Feb-16
B
9
MIR-ME-AC-011
Air Co Conditioning
17-Feb-16
21-Feb-16
B
10
MIR-ME-AC-013
Air Conditioning
Chilled Water System- Double regulation Valves
24-Apr-16
25-Apr-16
B
11
MIR-ME-AC-014
Air Conditioning
Chilled Water - Non return valves
17-Apr-16
17-Apr-16
B
12
MIR-ME-AC-015
Air Conditioning
Chilled Water - Strainer & Drain taps
17-Apr-16
17-Apr-16
B
13
MIR-ME-AC-016
Air Conditioning
Plate Heat Exchanger
28-Mar-16
06-Apr-16
B
Air Handling Unit
31-Dec-16
REVISION 3
Issu Issued ed date date
Inspected date
S ta ta tu tu s
I ss ssu ed ed d at at e
Inspected date
Status
15-Nov-16
28-Nov-16
B
03-Dec-16
08-Dec-16
B
Remarks
TRAGS ENGINEERING
A: Approved
SENDIAN TOWER
C: Revise & Resubmit Resubmit
B: Appr Approve oved d with with commen comments ts
D: Not Not Appro Approved ved
UR: Under Review
MATERIAL INSPECTI ON LOG (MECHANICAL) DATE:
REVISION 1
Sr. No
Document No
Category
Description
Issued date
41
MIR-ME-AC-045
Air Conditioning
Pressure Independent Control Valve (PICV)
17-Dec-16
42
MIR-ME-AC-046
Air Conditioning
Y Strainers for primary Chilled water network
17-Dec-16
43
MIR-ME-AC-047
Air Conditioning
Lourvers
01-May-17
Inspected date
REVISION 2 Stat Status us
Issu Issued ed date date
Inspected date
S ta ta tu tu s
UR
21-Dec-16
B
UR
SNG 1
MIR-ME-SNG-001
SNG
Conduits & Cables for SNG System
14-May-16
21-Jun-16
B
2
MIR-ME-SNG-002
SNG
Pipes & Fittings for SNG SYSTEM
11-Aug-16
23-Aug-16
B
3
MIR-ME-SNG-003
SNG
GAS METER (G6 & G16)
09-Nov-16
14-Nov-16
B
4
MIR-ME-SNG-004
SNG
Gas detectors, sounder, relief valve, gas filter, active regulator, push button & gas detector panel
11-Dec-16
1
MIR-ME-FU-1
FU
Woqood Tank
24-Aug-16
28-Aug-16
B
2
MIR-ME-FU-2
FU
Diesel transfer pump
19-Oct-16
27-Oct-16
B
2
MIR-ME-FU-3
FU
Fuel System control panel
27-Oct-16
03-Nov-16
C
01-Nov-16
09-Nov-16
B
01-Nov-16
06-Nov-16
B
UR
FU
2
MIR-ME-FU-4
FU
Ultrasonic level transmitter & magnetic tracking level switch with accessories
2
MIR-ME-FU-5
FU
Filling point cabinet with nozzle hanger
20-Nov-16
31-Dec-16
REVISION 3
UR
I ss ssu ed ed d at at e
Inspected date
Status
Remarks
R ef ef : n o. o. :
ME PP- MI MI -S -S UB UB -0 -0 00 00 1: 1: R0 R0
Date:
31-Dec-16
TRAGS ENGINEERING SENDIAN TOWER COM/49 OVERALL SUMMARY : SITE INSPECTION (ELECTRICAL & MECHANICAL)
Approved S. No. 1 2 3 4 5 6
Category Electrical Mechanical Fire Fighting Air Conditio tioning Chilled W at ater Builder W or orks TOTAL
Total Inspections Total Inspection Submitted Approved (Nos.) (Nos.) (Nos.) 736 652 332 305 226 197 275 244 51 51
1,620
1,449
A
B
C
D
UR
1
651 305 197 244 51
49 6 2 1 -
-
35 21 27 30 -
1
1,448
58
-
113
Under Review
TRAGS ENGINEERING SENDIAN TOWER
A: Approved Approved B: App Appro rove ved d with t h com comme ment nts s
A: Approved Approved
A: Approved Approved
C: Revise & Resub
B: App Appro rove ved d with t h com comme ment nts s
B: App Appro rove ved d with t h com comme ment nts s
D: Not Not App Appro rove ved d
INSPECTION REQUEST (MEP) DATE: Sr. No
1
REVISION 0 Do cu me nt No
AEB-ALB-MEP-IR-001 - CC
Cate gory
MEP
De scrip tio n
Final inspection of MEP for Prior to Gypsum closing at 7th Floor
REVISION 1
Issu ed date
Inspected date
S ta ta tu tu s
I ss ss ue ue d d a te
Inspected date
28 -Jun-16
03-Jul-1 6
C
1 1-Jul-16
16 -Jul-16
REVISION 2 S ta ta tu tu s
C
I ss ss ue ue d d at at e
21-Jul-1 6
Inspected date
30-Jul -16
REVISION 3 S ta ta tu tu s
B
I ss ss ue ue d d a te te
Inspected date
REVISION 4 S ta ta tu tu s
I ss ss ue ue d d a te te
Inspected date
Status
Remarks
it
TRAGS ENGINEERING SENDIAN TOWER INSPECTION REQUEST LOG ( BW)
A: Approved
A: Approved
A: Approved
C: Revise & Resubmit
B: App Appro rove ved with t h com comme ment nts s
B: App Appro rove ved with t h com comme ment nts s
B: App Appro rove ved with t h com comme ments nts
D: Not Appro Approved
DATE: Sr. No
REVISION 0 Doc ument No
Cat egory
Des cription
REVISION 1
Issued date
Inspected date
Status
49
AEB-ALB-ME-BW -IR -063
Builder W orks
Inspection for mechanical openings in penthouse slab
10-Apr-16
12-Apr-16
B
50
AEB-ALB-ME-BW -IR -064
Builder W orks
Inspection for mechanical openings in upper roof
18-Apr-16
21-Apr-16
B
Issued Issued date date
Inspected date
REVISI ON 2 S ta ta tu tu s
I ss ss ue ue d d at e
Inspected date
REVISION 3 Status Status
Issue Issued d date
Inspected date
UR: Under Review
31-Dec-16
REVISION 4 Statu Status s
Issue Issued d date
Inspected date
Status
Remarks
SENDIAN TOWER (2B+G+27F+PH) AT LUSAIL (MARINA COM/49) FOR SENDIAN GROUP MONTHLY PROGRESS REPORT‐13
CONTENTS 1.0 1. 0
PROGRE PROG RESS SS RE REPO PORT RT 1.1 DASHBOARD
2.0 2. 0
ENGINE ENGI NEER ERIN ING G 2.1 SHOP DRAWINGS DRAWINGS 2.2 BUILDER WORKS DRAWINGS 2.3 COORDINATION DRAWINGS
3.0 3. 0
PROC PR OCUR UREM EMEN ENT T 3.1 PROCUREMENT LOG 3.2 MATERIAL INSPECTION LOG 3.3 SITE INSPECTION LOG
4.0
OTHERS 4.1 QA/QC REPORT (NCR, ETC.) 4.2 REQUEST FOR INFORMATION LOG 4.3 METHODE STATEMENTS, INSPECTION & TEST PLANS
5.0 5. 0
CONSTR CONS TRUC UCTI TION ON 5.1 OVERALL 5.2 ELECT ELECTRICAL RICAL 5.3 HVAC 5.4 PLUMBING 5.5 DRAINAGE
Summary of NCRs For Sendian Tower Project COM49
Dated :
31‐12‐16
NCRs S. No.
Category
Total Issued
1
Electrical
‐
2 3 4 5
HVAC Plumbing Drainage Fire Fighting
‐ ‐ ‐ 1 1
TOTAL
Awaiting Total Closed Approval ‐ ‐ ‐ ‐ ‐ 1 1
Open ‐
‐ ‐ ‐ ‐
‐
‐ ‐ ‐ ‐
‐
NCR Details Status Report For Sendian Tower Project COM49
Dated : Subc ontractor:
TRAGS E ngineering
Scope of Work:
MEP Works (NCRs)
SL AEB/AB NCR NO. REV. NO:
1
NCR‐0 27
0
DISCIPLINE
Fire Fighting
NON CONFORMANCE
Fire fighting painting w orks
ISSUER NAME
NCR ISSUED DATE
NCR RE RECE CEIV IVED ED DATE DATE
NCR NCR STAT STATUS US
18 ‐Apr ‐1 6
19‐Apr‐16
C losed
NCR CLOSE DATE
31‐12‐16
PREVENT ACTION PROPOSED
DETAILED STATUS REPORT OF RFIS FOR SENDIAN TOWER COM/49
Dated:
S. No. 1 2 3 4 5 6 7 8 9 10
Category General Artecture Electrical ICT HVAC Plumbing Drainage Fire Fighting Irrigation LPG TOTAL
Total Submitted
Closed
31-Dec-16
Under Review/Open
17 26 7 2 2 -
15 22 6 2 2 -
54
47
2 4 1 7
SENDIAN TOWER (2B+G+27F+PH) AT LUSAIL (MARINA COM/49) FOR SENDIAN GROUP MONTHLY PROGRESS REPORT‐13
CONTENTS 1.0 1. 0
PROGRE PROG RESS SS RE REPO PORT RT 1.1 DASHBOARD
2.0 2. 0
ENGINE ENGI NEER ERIN ING G 2.1 SHOP DRAWINGS DRAWINGS 2.2 BUILDER WORKS DRAWINGS 2.3 COORDINATION DRAWINGS
3.0 3. 0
PROC PR OCUR UREM EMEN ENT T 3.1 PROCUREMENT LOG 3.2 MATERIAL INSPECTION LOG 3.3 SITE INSPECTION LOG
4.0
OTHERS 4.1 QA/QC REPORT (NCR, ETC.) 4.2 REQUEST FOR INFORMATION LOG 4.3 REQUEST FOR INSPECTION LOG METHODE STATEMENTS, INSPECTION & TEST PLANS
5.0 5.0
CONS CONSTR TRUC UCTI TION ON 5.1 OVERALL 5.2 ELECTRICAL ELECTRICAL 5.3 HVAC 5.4 PLUMBING 5.5 DRAINAGE
OVERALL PROGRESS SUMMARY FOR
Dated : 07‐01‐17 Page No. : 1 of 1
SENDIAN TOWER COM49
S . No . 1 2 3 4
Categories Preliminaries Air Conditioning Electrical Plumbing, Drainage & Fire Fighting
TOTAL
Overall Overall Progress Weightages Achieved (%ages) 7.27% 6.209% 18.12% 16.709% 41.61% 37.224% 33.00% 31.476%
100.00%
91.62%
Dated : 07‐01‐17 Page No. : 1 of 33
OVERALL PROGRESS SUMMARY HVAC FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
Weightage (%age) Item Wise Breakup
S. No.
System Wise Overall Weightage (%age)
Progress (%age) System Wise Individual Progress (%age)
Overall Progress (%age)
1
Engineering
1 .0 9%
50.35%
0.549%
2
Testing & commissioning
2 .1 0%
0.00%
0.000%
3
Construction
96.81%
97.28%
94.176%
OVERALL HVAC
100.00%
94.73%
Dated : 07‐01‐17 Page No. : 2 of 33
OVERALL PROGRESS SUMMARY HVAC (ENGINEERING, TESTING AND COMMISSIONING) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
Weightage (%age) S. No.
S M E T S Y S
1
G N I R E E N I G N E
Item Wise Breakup
System Wise Overall Weightage (%age)
Progress (%age) System Wise Individual Progress (%age)
Overall Progress (%age)
Shop Drawings
1.0360%
98.70%
1.023%
As‐Built Drawings
0.0542%
2%
0.001%
G N I & NAir Balancing/Testing & commissioning O G I S N I 2 T S I S M E Spare Parts T M O C OVERALL HVAC
1.0600%
0.000%
1.0400%
0.000%
3.190%
1.024%
Dated : 07‐01‐17 Page No. : 3 of 33
OVERALL PROGRESS SUMMARY OF HVAC WORKS (CONSTRUCTION) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
S. No.
S M E T S Y S
Item Wise Breakup
Weightage (%age)
System Wise Individual Weightage (%age)
System Wise Overall Weightage (%age)
Progress (%age) System Wise Individual Progress (%age)
Overall Progress (%age)
FAHU/AHU
9.99%
93.10%
9.30%
FCU
4.42%
99.98%
4.42%
Split
1.26%
86.00%
1.09%
Pressurization Fans
2.73%
99.50%
2.71%
Exhaust & Fresh Air Fans
3.44%
100.00%
3.44%
Pressurization Unit
0.46%
100.00%
0.46%
Expansion Tank
1.03%
100.00%
1.03%
Chemical Dosing System
0.85%
100.00%
0.85%
Plate Type Heat exchanger
7.11%
100.00%
7.11%
10.93%
99.68%
10.89%
1.32%
98.00%
1.29%
100.00%
5.00%
Chilled Water Piping Chilled water piping (external)
3
Weightage (%age)
C A Chilled Water Pump V H
5.00%
96.81%
Cladding
0.23%
0.00%
0.00%
Condensate drainage
2 41%
99 74%
2 40%
Dated : 07‐01‐17 Page No. : 4 of 33
PROGRESS REPORT OF HVAC WORKS (FAHUS AND AHUS) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
S. No.
1
Item
Weightage (%age)
FAHUs/AHUs
OVERALL TOTAL
Lifting, Placement & Installation 60%
9.99%
60%
9.99%
60.00%
Connection with Ducting 20%
Insulation, etc. 10%
20%
20.00%
Installation of Material Pressure guages, valves, etc. 2%
10%
10.00%
Overall Progress Cladding, etc. 6%
Testing & Inspection 2%
1.85%
1.85%
Percentage 100%
1%
0.00%
1.25%
93.10%
93.10%
Dated : 07‐01‐17 Page No. : 5 of 33
PROGRESS REPORT OF HVAC WORKS (FCUS) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
Installation Installation of Supports
S. No.
Floors
5%
70%
15%
8%
2%
4.42%
5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00%
70.00% 70.00% 70.00% 70.00% 70.00% 70.00% 70.00% 70.00% 70.00% 70.00% 70.00% 70.00% 70.00% 70.00% 70.00% 70.00% 70.00% 70.00% 70.00% 70.00% 70.00% 70.00% 70.00% 70.00% 70.00% 70.00% 70.00% 70.00% 70.00% 70.00% 70%
15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15%
8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8%
2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2%
4.42%
5%
70%
15%
8%
2%
2 Basement‐1 3 Ground
1st
5
2nd
6
3rd
7 8
4th 5th
9
6th
10
7th
11
8th 9th
12
13 10th 14 11th 15 12th 16 13th 17 14th 18 15th 19 16th 20 17th 21 18th 22 19th 23 20th 24 21st 25 22nd 26 23rd 27 24th 28 25th 29 26th 30 27th 31
Pent House
TOTAL
Testing & Inspection
Weightage (%age)
1 Basement‐2
4
Installation of FCUs, Etc.
Overall Progress
Chilled water Installation of piping connections, condensate insulation, valves, drainage piping, etc. insulation, etc.
Percentage
100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100%
Dated : 07‐01‐17 Page No. : 6 of 33
PROGRESS REPORT OF HVAC WORKS (SPLIT UNITS) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
S. No.
Floors
1 Ground
TOTAL
Weightage (%age)
Installation Copper piping, Installation of indoor/ outdoor refrigrant filling, units insulation, drain piping, etc. 85% 13%
1.26%
85%
1.26%
85%
Overall Progress Testing & Inspection 2%
1%
Percentage 100%
1%
0%
86.00%
86%
Dated : 07‐01‐17 Page No. : 7 of 33
PROGRESS REPORT OF HVAC WORKS (PRESSURIZATION FANS) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL Installation
Weightage (%age)
8%
75%
3.26%
8% 8% 8% 8%
75% 75% 75% 75%
15% 15% 15% 15%
2% 2% 2% 2%
3.26%
8%
75%
15%
2%
Installation of Supports
S. No. 1
Floors
5th
2
6th
3
Pent House
4 Roof
TOTAL
Overall Progress Ducting connections, etc. 15%
Installation of Fans, etc.
Testing & Inspection 2%
Percentage 100%
100% 100% 100% 100%
100%
Dated : 07‐01‐17 Page No. : 8 of 33
PROGRESS REPORT OF HVAC WORKS (EXHAUST FANS) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL Installation
Weightage (%age)
8%
75%
3.26%
8% 8%
75% 75%
15% 15%
2% 2%
3.26%
8%
75%
15%
2%
Installation of Supports
S. No.
Floors
1 Basement‐2 2 Basement‐1
TOTAL
Overall Progress Ducting connections, etc. 15%
Installation of Fans, etc.
Testing & Inspection 2%
Percentage 100%
100% 100%
100%
Dated : 07‐01‐17 Page No. : 9 of 33
PROGRESS REPORT OF HVAC WORKS (CHILLED WATER PUMPS) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
Installation
S. No.
1
Item
OVERALL TOTAL
Lifting/ Placement & Installation
Connection with piping & valves, etc.
Testing & Inspection
78%
20%
2%
0.46%
78%
20%
0.46%
78.00%
20.00%
Weightage (%age)
Pressurization units
Overall Progress
Percentage 100%
2%
2.00%
100%
100.00%
Dated : 07‐01‐17 Page No. : 10 of 33
PROGRESS REPORT OF HVAC WORKS (CHILLED WATER PUMPS) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
Installation
S. No.
1
Item
OVERALL TOTAL
Lifting/ Placement & Installation
Connection with piping & valves, etc.
Testing & Inspection
78%
20%
2%
1.03%
78%
20%
1.03%
78.00%
20.00%
Weightage (%age)
Expansion Tank, etc.
Overall Progress
Percentage 100%
2%
2.00%
100%
100.00%
Dated : 07‐01‐17 Page No. : 11 of 33
PROGRESS REPORT OF HVAC WORKS (CHEMICAL DOSING SYSTEM) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
Installation
S. No. 1
Weightage (%age)
Floors
Chemical dosing system
TOTAL
85%
85%
0.85%
0.85%
Installation Connection with HVAC System 5%
85%
5%
5%
Overall Progress Testing & Inspection 10%
Percentage 100%
10%
10%
100%
100%
Dated : 07‐01‐17 Page No. : 12 of 33
PROGRESS REPORT OF HVAC WORKS (PLATE HEAT EXCHANGERS) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
S. No.
1
Item
Weightage (%age)
Plate Heat Exchange
OVERALL TOTAL
Lifting/ Placement & Installation 85%
7.11%
85.00%
7.11%
85.00%
Installation of Material Connection with Testing & system Inspection 5% 10% 5.0%
5.00%
Overall Progress
Percentage 100%
10%
10.00%
100%
100.00%
Dated : 07‐01‐17 Page No. : 14 of 33
PROGRESS REPORT OF HVAC WORKS (CHILLED WATER PIPING‐EXTERNAL) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
Installation
S. No.
1
Item
OVERALL TOTAL
75% 1.32%
75.00%
11.50%
0.75%
2%
1.32%
75.00%
11.50%
0.75%
2.00%
Weightage (%age)
Chilled water piping (external)
Overall Progress
Welding / Connection with HVAC Equipments/Network Connection 12%
Installation of supports & pipes
Inspection
Pressure testing
Insulation
Testing & Inspection
1%
2% 2%
8%
2% 7%
7.00%
Percentage 100%
2%
1.75%
98%
98.00%
Dated : 07‐01‐17 Page No. : 15 of 33
PROGRESS REPORT OF HVAC WORKS (CHILLED WATER PUMPS) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
Installation
S. No.
1
Item
OVERALL TOTAL
Lifting/ Placement, alignment & Installation
Installation valves, etc.
78%
15%
5.00%
78%
15%
5%
5.00%
78.00%
15.00%
5.00%
Weightage (%age)
Chilled water pumps
Overall Progress Joint with HVAC System 5%
Testing & Inspection
2%
Percentage 100%
2%
2.00%
100%
100.00%
Dated : 07‐01‐17 Page No. : 16 of 33
PROGRESS REPORT OF HVAC WORKS (CLADDING FOR CHILLED WATER PIPING AND DUCTING) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
S. No.
1
Item
Weightage (%age)
Cladding (Chilled Water Piping & Ducting)
OVERALL TOTAL
Installation of cladding (chilled water piping) 28%
Installation Installation of cladding (ducting) 70%
Overall Progress Testing & Inspection 2%
Percentage 100%
0.23%
0.23%
0%
0.00%
0.00%
0.00%
0.00%
PROGRESS REPORT OF HVAC WORKS (CONDENSATE DRAINAGE PIPING) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
Dated : 07‐01‐17 Page No. : 17 of 33
Installation Installation of Supports
S. No.
Floors
Weightage (%age)
1 Basement‐2 2 Basement‐1 3 Ground 4
1st
5
2nd
6
3rd
7
4th
8
5th
9
6th
10
7th
11
8th
12
9th
13 10th 14 11th 15 12th 16 13th 17 14th 18 15th 19 16th 20 17th 21 18th 22 19th 23 20th 24 21st 25 22nd 26 23rd
2.41%
Installation of Pipes, etc.
Overall Progress Pipe Insulation, etc.
Testing & Inspection
15%
75%
8%
2%
15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15%
75% 75% 75 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75%
8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8%
2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2%
Percentage 100%
100% 100% 100% 10 1 00% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
PROGRESS REPORT OF HVAC WORKS (CONDENSATE DRAINAGE PIPING) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL Installation Installation of Supports
S. No.
Floors
Weightage (%age)
27 24th 28 25th 29 26th 30 27th 31
Pent House
TOTAL
2.41%
Installation of Pipes, etc.
Pipe Insulation, etc.
Dated : 07‐01‐17 Page No. : 18 of 33
Overall Progress Testing & Inspection
15%
75%
8%
2%
15% 15% 15% 15% 15%
75% 75% 75% 75% 70 70%
8% 8% 8% 8% 6%
2% 2% 2% 2% 1%
15%
75%
8%
2%
Percentage 100%
100% 100% 100% 100% 92%
100%
Dated : 07‐01‐17
PROGRESS REPORT OF HVAC WORKS (INLET AND OUTLET GRILLS) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL Installation
S. No.
Floors
Weightage (%age)
1 Basement‐2 2 Basement‐1 3 Ground 4
1st
5
2nd
6
3rd
7
4th
8
5th
9
6th
10
7th
11
8th
12
9th
13 10th 14 11th 15 12th 16 13th 17 14th 18 15th 19 16th 20 17th 21 18th 22 19th 23 20th 24 21st 25 22nd
1.61%
Page No. : 20 of 33
Overall Progress
Inst Instal alla lati tion on
Insp Inspec ecti tion on
Perce Percent ntag age e
98 98%
2%
100%
98% 98% 95% 98% 98% 98% 98% 98% 5% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98%
2% 2% 1.8% 2% 2% 2% 2% 2% 0.1% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2%
100% 100% 97% 100% 100% 100% 100% 100% 5% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Dated : 07‐01‐17 PROGRESS REPORT OF HVAC WORKS (INLET AND OUTLET GRILLS) Page No. : 21 of 33 FOR SENDIAN TOWER PROJECT COM49‐LUSAIL Installation Overall Progress
S. No.
Floors
Weightage (%age)
26 23rd 27 24th 28 25th 29 26th 30 27th 31
Pent House
TOTAL
1.61%
Inst Instal alla lati tion on
Insp Inspec ecti tion on
Perce Percent ntag age e
98 98%
2%
100%
98% 98% 98% 98% 98% 98%
2% 2% 2% 2% 2% 2%
95%
2%
100% 100% 100% 100% 100% 100% 97%
Dated : 07‐01‐17 Page No. : 22 of 33
PROGRESS REPORT OF HVAC WORKS (SOUND ATTENUATORS) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
Installation
S. No.
Item
Weightage (%age)
Installation 98%
1
Sound attenuators
OVERALL TOTAL
0.20%
98.00%
0.20%
98.00%
Overall Progress Testing & Inspection 2%
Percentage 100%
2%
2.00%
100%
100.00%
Dated : 07‐01‐17 Page No. : 23 of 33
PROGRESS REPORT OF HVAC WORKS (FIRE DAMPERS) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL Installation
S. No.
Floors
Weightage (%age)
1 Basement‐2 2 Basement‐1 3 Ground 4
1st
5
2nd
6
3rd
7
4th
8
5th
9
6th
10
7th
11
8th
12
9th
13 10th 14 11th 15 12th 16 13th 17 14th 18 15th 19 16th 20 17th 21 18th 22 19th 23 20th 24 21st 25 22nd
0.74%
Overall Progress
Inst Instal alla latio tion n
Insp Inspec ectio tion n
Perc Percen enta tage ge
98 98%
2%
100%
98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98%
2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
PROGRESS REPORT OF HVAC WORKS (FIRE DAMPERS) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL Installation S. No.
Floors
Weightage (%age)
26 23rd 27 24th 28 25th 29 26th 30 27th 31
Pent House
TOTAL
0.74%
Dated : 07‐01‐17 Page No. : 24 of 33
Overall Progress
Inst Instal alla latio tion n
Insp Inspec ectio tion n
Perc Percen enta tage ge
98 98%
2%
100%
98% 98% 98% 98% 98% 98%
2% 2% 2% 2% 2% 2%
98%
2%
100% 100% 100% 100% 100% 100%
100%
Dated : 07‐01‐17 Page No. : 25 of 33
PROGRESS REPORT OF HVAC WORKS (VOLUME CONTROL DAMPERS) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL Installation
S. No.
Floors
Weightage (%age)
1 Basement‐2 2 Basement‐1 3 Ground 4
1st
5
2nd
6
3rd
7
4th
8
5th
9
6th
10
7th
11
8th
12
9th
13 10th 14 11th 15 12th 16 13th 17 14th 18 15th 19 16th 20 17th 21 18th 22 19th 23 20th 24 21st 25 22nd
1.13%
Overall Progress
Inst Instal alla latio tion n
Insp Inspec ectio tion n
Perc Percen enta tage ge
98 98%
2%
100%
98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98%
2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Dated : 07‐01‐17 PROGRESS REPORT OF HVAC WORKS (VOLUME CONTROL DAMPERS) Page No. : 26 of 33 FOR SENDIAN TOWER PROJECT COM49‐LUSAIL Installation Overall Progress
S. No.
Floors
Weightage (%age)
26 23rd 27 24th 28 25th 29 26th 30 27th 31
Pent House
TOTAL
1.13%
Inst Instal alla latio tion n
Insp Inspec ectio tion n
Perc Percen enta tage ge
98 98%
2%
100%
98% 98% 98% 98% 98% 98%
2% 2% 2% 2% 2% 2%
98%
2%
100% 100% 100% 100% 100% 100%
100%
Dated : 07‐01‐17 Page No. : 27 of 33
PROGRESS REPORT OF HVAC WORKS (MOTORIZED FIRE DAMPERS) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL Installation
S. No.
Floors
Weightage (%age)
1 Basement‐2 2 Basement‐1 3 Ground 4
1st
5
2nd
6
3rd
7
4th
8
5th
9
6th
10
7th
11
8th
12
9th
13 10th 14 11th 15 12th 16 13th 17 14th 18 15th 19 16th 20 17th 21 18th 22 19th 23 20th 24 21st 25 22nd
1.16%
Overall Progress
Inst Instal alla latio tion n
Insp Inspec ectio tion n
Perc Percen enta tage ge
98 98%
2%
100%
98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98%
2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Dated : 07‐01‐17 PROGRESS REPORT OF HVAC WORKS (MOTORIZED FIRE DAMPERS) Page No. : 28 of 33 FOR SENDIAN TOWER PROJECT COM49‐LUSAIL Installation Overall Progress
S. No.
Floors
Weightage (%age)
26 23rd 27 24th 28 25th 29 26th 30 27th 31
Pent House
TOTAL
1.16%
Inst Instal alla latio tion n
Insp Inspec ectio tion n
Perc Percen enta tage ge
98 98%
2%
100%
98% 98% 98% 98% 98% 98%
2% 2% 2% 2% 2% 2%
98%
2%
100% 100% 100% 100% 100% 100%
100%
Dated : 07‐01‐17 Page No. : 29 of 33
PROGRESS REPORT OF HVAC WORKS (CHILLED WATER PIPING VALVES) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL Installation
S. No.
Floors
Weightage (%age)
1 Basement‐2 2 Basement‐1 3 Ground 4
1st
5
2nd
6
3rd
7
4th
8
5th
9
6th
10
7th
11
8th
12
9th
13 10th 14 11th 15 12th 16 13th 17 14th 18 15th 19 16th 20 17th 21 18th 22 19th 23 20th 24 21st 25 22nd
0.70%
Overall Progress
Inst Instal alla latio tion n
Insp Inspec ectio tion n
Perc Percen enta tage ge
98 98%
2%
100%
98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98% 98%
2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Dated : 07‐01‐17 PROGRESS REPORT OF HVAC WORKS (CHILLED WATER PIPING VALVES) Page No. : 30 of 33 FOR SENDIAN TOWER PROJECT COM49‐LUSAIL Installation Overall Progress
S. No.
Floors
Weightage (%age)
26 23rd 27 24th 28 25th 29 26th 30 27th 31
Pent House
TOTAL
0.70%
Inst Instal alla latio tion n
Insp Inspec ectio tion n
Perc Percen enta tage ge
98 98%
2%
100%
98% 98% 98% 98% 98% 98%
2% 2% 2% 2% 2% 2%
98%
2%
100% 100% 100% 100% 100% 100%
100%
Dated : 07‐01‐17 Page No. : 31 of 33
PROGRESS REPORT OF HVAC WORKS (BUILDING MANAGEMENT SYSTEM) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
I ns nst al al la la ti ti on on ( Co Con du dui t/ t/ Wi Wi ri ri ng ng ) Cond Condui uitt (PVC (PVC/G /G.I. .I.))
S. No.
Floors
Weightage (%age)
1 Basement‐2 2 Basement‐1 3 Ground 4
1st
5
2nd
6
3rd
7
4th
8
5th
9
6th
10
7th
11
8th
12
9th
13 10th 14 11th 15 12th 16 13th 17 14th 18 15th 19 16th 20 17th 21 18th 22 19th 23 20th 24 21st 25 22nd 26 23rd 27 24th 28 25th 29 26th 30 27th 31
Pent House
9.70%
Insp Inspec ecti tion on
Wiri Wiring ng
I ns ns ta tal la lat io ion/ Te Ter mi mi na nat io io n ( De De vi vi ce ce s) s) Testing & Inspection
Installation/ Termination (HVAC Equipment)
Software Integration
Testing & Inspection
30 30%
1%
35%
2%
25%
5%
2%
30% 30% 29% 29% 29% 29% 29% 29% 15% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30%
1% 1% 1% 1% 1% 1% 1% 1%
35.00% 35.00% 33.50% 33.50% 33.50% 33.50% 33.50% 33.50%
2.0% 2.0% 1.8% 1.8% 1.8% 1.8% 1.8% 1.8%
25 25% 25 25% 23% 23% 23% 23% 23% 23%
1% 1%
1% 1% 1% 1% 1% 1% 1% 1% 1% 1%
1% 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% 1%
35.00% 35.00% 35.00% 35.00% 35.00% 35.00% 35.00% 35.00% 35.00% 35.00% 35.00% 35.00% 35.00% 35.00% 35.00% 35.00% 35.00% 35.00% 35.00% 35.00% 35.00%
2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0%
25% 25% 25% 25% 25% 25% 25% 25% 24% 24% 24% 24% 24% 24% 24% 24% 24% 24% 24%
1% 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% 1%
2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2%
Overall Progress
Percentage 100%
95% 95% 90% 90% 90% 90% 90% 90% 15% 96% 96% 96% 96% 96% 96% 96% 96% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 68% 68% 0%
Dated : 07‐01‐17 Page No. : 32 of 33
PROGRESS REPORT OF HVAC WORKS (BUILDING MANAGEMENT SYSTEM) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
I ns nst al al la la ti ti on on ( Co Con du dui t/ t/ Wi Wi ri ri ng ng ) Cond Condui uitt (PVC (PVC/G /G.I. .I.))
S. No.
Floors
Weightage (%age)
TOTAL
9.70%
Insp Inspec ecti tion on
Wiri Wiring ng
I ns ns ta tal la lat io ion/ Te Ter mi mi na nat io io n ( De De vi vi ce ce s) s) Testing & Inspection
Installation/ Termination (HVAC Equipment)
Software Integration
Testing & Inspection
Overall Progress
Percentage
30 30%
1%
35%
2%
25%
5%
2%
100%
28%
1%
32%
2%
21%
1%
1%
87%
Dated : 07‐01‐17 Page No. : 33 of 33
PROGRESS REPORT OF HVAC WORKS (CARBONDIOXIDE DETECTION SYSTEM) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL Installation
Weightage (%age)
30%
1%
35%
2%
0.70%
30% 30%
1% 1%
35.00% 35.00%
2% 2%
28% 28%
1% 1%
0.70%
30%
1%
35%
2%
28%
1%
Conduit (PVC/G.I.)
S. No.
Floors
1 Basement‐2 2 Basement‐1
TOTAL
Overall Progress Installation/ Termination of Panels, Co Sensors 30%
Insp Inspec ecti tion on
Wiri Wiring ng
Testing & Inspection
Testing & Inspection 2%
Percentage 100%
97% 97%
97%
Dated : 07‐01‐17 Page No. : 1 of 19
OVERALL PROGRESS SUMMARY ELECTRICAL WORKS FOR SENDIAN TOWER PROJECT COM49‐LUSAIL Weightage (%age) Item Wise Breakup
S. No.
System Wise Overall Weightage (%age)
Progress (%age) System Wise Individual Progress (%age)
Overall Progress (%age)
1
Engineering
0 .1 0%
50.00%
0.05%
2
Testing & commissioning
2 .8 5%
0%
0.01%
3
Construction
97.05%
96.20%
9 3 . 3 7%
OVERALL ELECTRICAL
100.00%
93.43%
Dated : 07‐01‐17 Page No. : 2 of 19
OVERALL PROGRESS SUMMARY ELECTRICAL (ENGINEERING AND TESTING COMMISSIONING) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL Weightage (%age) S. No.
S M E T S Y S
Item Wise Breakup
G N I Shop Drawings R E 1 E N I G As‐Built Drawings N E G N I Electricity connections N O I S S I Telephone connections M 2 M O C Testing & commissioning & G N I T S Spare Parts E T OVERALL ELECTRICAL
System Wise Overall Weightage (%age)
Progress (%age) System Wise Individual Progress (%age)
Overall Progress (%age)
0.0649%
100.00%
0.0649%
0.0381%
0.002%
0 .0 0 0 0 0 1 %
1.2531%
0.93%
0.0116%
0.9532%
0.55%
0.0052%
0.6404%
0.0000%
0.0006%
0.0000%
2.950%
0.082%
Dated : 07‐01‐17 Page No. : 3 of 19
OVERALL PROGRESS SUMMARY OF ELECTRICAL WORKS (CONSTRUCTION) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
Progress (%age)
Weightage (%age) S. No.
1
S M E T S Y S
Item Wise Breakup
System Wise Overall Weightage (%age)
System Wise Individual Progress (%age)
Overall Progress (%age)
Small Power System
17.97%
96.83%
17.40%
Heavy Electrical Equipments & LV/HV Cables,
31.19%
96.65%
30.15%
Earthing & Lighning Protection
1.09%
92.90%
1.01%
Fire Alarm
4.88%
96.99%
4.73%
Voice Evacuation System
2.96%
96.71%
2.86%
Containment (Cable Tray, Trunking, Ladder)
3.51%
98.53%
3.46%
2.09%
93.85%
1.96%
5.28%
100.00%
5.28%
Security System (Access Control, Gate Barriers, etc.)
4.14%
100.00%
4.14%
SMATV System
1.02%
100.00%
1.02%
Emergency Lighting System
7 60%
96 13%
7 31%
L A C I Lighting Control System R T C Security System (CCTV)‐Not under TRAGS scope (so we E consume overall %age) L E
Dated : 07‐01‐17 Page No. : 4 of 19
PROGRESS REPORT OF ELECTRICAL (SMALL POWER) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
Description
Installation (Conduit/Wiring)
Installation/Termination (Devices) DB Installation/ Termination Testing & & Final Devices Inspection 15% 1% 14.75% 0.75%
Overall Progress
Cond Condui uitt (PVC (PVC/G /G.I .I.) .)
Wiri Wiring ng
1 Basement‐2
40% 40.00%
43% 43 4 3.00%
Testing & Inspection 1% 1.00%
2 Basement‐1
40.00%
43 4 3.00%
1.00%
14.75%
0.75%
3 Ground
40.00%
40.85%
0.30%
13.50%
0.25%
94.90%
40.00%
40.85%
0.95%
9.00%
0.50%
91.30%
40.00%
40.85%
0.95%
13.50%
0.50%
95.80%
40.00%
40.85%
0.95%
13.50%
0.50%
95.80%
40.00%
40.85%
0.95%
13.50%
0.50%
95.80%
40.00%
40.85%
0.95%
13.50%
0.50%
40.00%
40.85%
0.95%
1 5.00% 15
1.00%
97.80%
40.00%
43.00%
1.00%
1 5.00% 15
1.00%
100.00%
40.00%
43.00%
1.00%
14.75%
0.75%
40.00%
43.00%
1.00%
1 5.00% 15
1.00%
100.00%
40.00%
43.00%
1.00%
1 5.00% 15
1.00%
100.00%
40.00%
43.00%
1.00%
14.75%
0.75%
40.00%
43.00%
1.00%
1 5.00% 15
1.00%
100.00%
40.00%
43.00%
1.00%
1 5.00% 15
1.00%
100.00%
40.00%
43.00%
1.00%
14.75%
0.75%
40.00%
43.00%
1.00%
1 5.00% 15
1.00%
100.00%
40.00%
43.00%
1.00%
1 5.00% 15
1.00%
100.00%
40.00%
43.00%
1.00%
14.75%
0.75%
40.00%
43.00%
0.95%
1 5.00% 15
1.00%
40.00%
40.85%
0.95%
1 5.00% 15
1.00%
40.00%
40.85%
0.95%
14.25%
0.50%
40.00%
40.85%
0.95%
1 5.00% 15
1.00%
40.00%
40.85%
0.95%
1 5.00% 15
1.00%
40.00%
40.85%
0.95%
14.25%
0.50%
40.00%
40.85%
0.95%
1 5.00% 15
1.00%
40.00%
40.85%
0.95%
1 5.00% 15
1.00%
40.00%
40.85%
0.95%
13.50%
0.50%
40.00% 36.00%
40.85%
0.95%
15 1 5.00% 25.00%
1.00% 1.00%
39.87%
40.50%
0.92%
14.74%
0.80%
S. No.
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Item Description
1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th 13th 14th 15th 16th 17th 18th 19th 20th 21st 22nd 23rd 24th 25th 26th 27th Pent House
OVERALL TOTAL
Weightage (%age)
17.97%
17.97%
Percentage
100% 99.50% 99.50%
95.80%
99.50%
99.50%
99.50%
99.50% 99.95% 97.80% 96.55% 97.80% 97.80% 96.55% 97.80% 97.80% 95.80%
97.80% 62.00%
96.83%
Dated : 07‐01‐17 Page No. : 5 of 19
DETAILED PROGRESS REPORT OF ELECTRICAL (HEAVY EQUIPMENTS) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
S. No. 1 2
Weightage (%age)
Equipment
HV Cables LV Cables
HV Switch Gear
3 Transformer
4 Generator 5
LV Panel, ATS, etc.
6
Bus Bar
7 SMDBs 8
MCC
9
DBs
10 Isolators 11
Central Battery System
12
Uninterrupted power supply
TOTAL
31.19%
Installation/Termination (Devices) Lifting/ Placement & Testing & Termination Installation Inspection Inspection 88% 1% 10%
6.63%
88.00%
1.00%
4.44% 2.32% 2.72% 3.94% 2.75% 2.03% 1.31% 1.52% 1.02% 1.41% 1.09%
88.00% 88.00%
Overall Progress Testing & Inspection 1%
Percentage
100%
10.00%
1%
100.00%
1.00%
9.50%
0.50%
99.00%
1.00%
10.00%
1.00%
100.00%
88.00%
1.00%
10.00%
1.00%
100.00%
88.00%
1.00%
10.00%
1.00%
100.00%
88.00%
1.00%
10.00%
1.00%
100.00%
88.00%
1.00%
9.50%
0.50%
99.00%
88.00%
1.00%
9.00%
0.50%
98.50%
88.00%
1.00%
9.50%
0.50%
99.00%
88.00%
1.00%
8.50%
0.80%
80.00%
0.50%
5.00%
80.00%
0.50%
87%
1%
98.30% 85.50% 80.50%
8%
1%
96.65%
PROGRESS SUMMARY REPORT OF ELECTRICAL (EARTHING AND BONDING) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
Description
Dated : 07‐01‐17 Page No. : 6 of 19
Installation
Overall Progress
Earth Bore, Installation of earth rod & laying of wire
Testing & Inspection
Connection with network
Testing & Inspection
1 Basement‐2
68% 68.00%
1% 1.00%
30% 30.00%
1% 1.00%
2 Basement‐1
68.00%
1.00%
30.00%
1.00%
100.00%
68.00%
1.00%
30.00%
1.00%
100.00%
60.00%
1.00%
21.00%
0.40%
82.40%
60.00%
0.70%
21.00%
0.40%
82.10%
64.80%
0.94%
26.40%
0.76%
92.90%
S. No.
Floor / Area
3 Ground
Overall Weightage (%age)
1.09%
Pent House 5 Roof 4
OVERALL TOTAL
1.09%
Percentage
100% 100.00%
Dated : 07‐01‐17
PROGRESS REPORT OF ELECTRICAL (FIRE ALARM SYSTEM) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
Description S. No.
Item Description
Installation (Conduit/Wiring)
Weightage (%age)
1 Basement‐2 2 Basement‐1 3 Ground
Cond Condui uitt (PVC (PVC/G /G.I .I.) .)
Wirin Wiring g
40% 40.00%
53% 53.00%
Testing & Inspection 1% 1.00%
40.00%
53.00%
1.00%
40.00%
50.35%
0.95%
Page No. : 7 of 19
Installation/Termination (Devices) Mimic Panels Installation/ Testing & Termination & Final Devices Inspection 5% 1% 5 .00% 5. 1.00%
5 .00% 5.
1.00%
2.50%
0.50%
Overall Progress
Percentage
100% 100.00%
100.00% 94.30%
4
1st
40.00%
50.35%
0.95%
5 .00% 5.
1.00%
97.30%
5
2nd
40.00%
50.35%
0.95%
5 .00% 5.
1.00%
97.30%
6
3rd
40.00%
50.35%
0.95%
5 .00% 5.
1.00%
97.30%
7
4th
40.00%
50.35%
0.95%
5 .00% 5.
1.00%
97.30%
8
5th
40.00%
50.35%
0.95%
5 .00% 5.
1.00%
97.30%
9
6th
40.00%
50.35%
0.95%
5 .00% 5.
1.00%
97.30%
10
7th
40.00%
53.00%
1.00%
5 .00% 5.
1.00%
100.00%
11
8th
40.00%
53.00%
1.00%
5 .00% 5.
1.00%
100.00%
12
9th
40.00%
53.00%
1.00%
5 .00% 5.
1.00%
100.00%
40.00%
53.00%
1.00%
5 .00% 5.
1.00%
100.00%
40.00%
53.00%
1.00%
5 .00% 5.
1.00%
100.00%
40.00%
53.00%
1.00%
5 .00% 5.
1.00%
100.00%
40.00%
53.00%
1.00%
5 .00% 5.
1.00%
100.00%
40.00%
53.00%
1.00%
5 .00% 5.
1.00%
100.00%
40.00%
53.00%
1.00%
5 .00% 5.
1.00%
100.00%
19 16th 20 17th 21 18th
40.00%
53.00%
1.00%
5 .00% 5.
1.00%
100.00%
40.00%
53.00%
1.00%
5 .00% 5.
1.00%
100.00%
40.00%
53.00%
1.00%
5 .00% 5.
1.00%
100.00%
22 19th 23 20th 24 21st
40.00%
53.00%
1.00%
5 .00% 5.
1.00%
100.00%
40.00%
53.00%
1.00%
5 .00% 5.
1.00%
100.00%
40.00%
53.00%
1.00%
5 .00% 5.
1.00%
100.00%
25 22nd 26 23rd 27 24th 28 25th
40.00%
53.00%
1.00%
5 .00% 5.
1.00%
100.00%
40.00%
50.35%
0.95%
5 .00% 5.
1.00%
97.30%
40.00%
50.35%
0.95%
5 .00% 5.
1.00%
97.30%
40.00%
50.35%
0.95%
5 .00% 5.
1.00%
97.30%
29 26th 30 27th Pent House 31
40.00%
50.35%
0.95%
5 .00% 5.
1.00%
97.30%
40.00% 36.00%
50.35%
0.95%
5..00% 5 5.00%
1.00% 1.00%
97.30% 42.00%
39.87%
50.26%
0. 0.95%
4.92%
0.98%
13 10th 14 11th 15 12th
4.88%
16 13th 17 14th 18 15th
OVERALL TOTAL
4.88%
96.99%
Dated : 07‐01‐17 Page No. : 8 of 19
PROGRESS REPORT OF ELECTRICAL (VOICE EVACUATION SYSTEM) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
Description
Installation (Conduit/Wiring)
Installation/Termination (Devices) Speakers/Panels Installation/ Testing & Termination & Final Devices Inspection 5% 1% 5.00% 1.00%
Cond Condui uitt (PVC (PVC/G /G.I .I.) .)
Wiri Wiring ng
1 Basement‐2
40% 40.00%
53% 53.00%
Testing & Inspection 1% 1.0%
2 Basement‐1
40.00%
53.00%
1.0%
5.00%
3 Ground
40.00%
50.35%
1.0%
2.50%
40.00%
50.35%
1.0%
40.00%
50.35%
40.00%
S. No.
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Item Description
1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th 13th 14th 15th 16th 17th 18th 19th 20th 21st 22nd 23rd 24th 25th 26th 27th Pent House
OVERALL TOTAL
Weightage (%age)
2.96%
2.96%
Overall Progress
Percentage
100% 100.00%
1.00%
100.00%
5.00%
1.00%
97.30%
1.0%
5.00%
1.00%
97.30%
50.35%
1.0%
5.00%
1.00%
97.30%
40.00%
50.35%
1.0%
5.00%
1.00%
97.30%
40.00%
50.35%
1.0%
5.00%
1.00%
97.30%
38.00%
50.35%
1.0%
5.00%
1.00%
95.30%
40.00%
53.00%
1.0%
5.00%
1.00%
100.00%
40.00%
53.00%
1.0%
5.00%
1.00%
100.00%
40.00%
53.00%
1.0%
5.00%
1.00%
100.00%
40.00%
53.00%
1.0%
5.00%
1.00%
100.00%
40.00%
53.00%
1.0%
5.00%
1.00%
100.00%
40.00%
53.00%
1.0%
5.00%
1.00%
100.00%
40.00%
53.00%
1.0%
5.00%
1.00%
100.00%
40.00%
53.00%
1.0%
5.00%
1.00%
100.00%
40.00%
53.00%
1.0%
5.00%
1.00%
100.00%
40.00%
53.00%
1.0%
5.00%
1.00%
100.00%
40.00%
53.00%
1.0%
5.00%
1.00%
100.00%
40.00%
53.00%
1.0%
5.00%
1.00%
100.00%
40.00%
53.00%
1.00%
5 .00% 5.
1.00%
100.00%
40.00%
53.00%
1.00%
5 .00% 5.
1.00%
100.00%
40.00%
53.00%
1.00%
5 .00% 5.
1.00%
100.00%
40.00%
53.00%
1.00%
5 .00% 5.
1.00%
100.00%
40.00%
50.35%
0.95%
5 .00% 5.
1.00%
97.30%
40.00%
50.35%
0.95%
5 .00% 5.
1.00%
97.30%
40.00%
50.35%
0.95%
5 .00% 5.
1.00%
97.30%
40.00%
50.35%
0.95%
5 .00% 5.
1.00%
97.30%
40.00% 30.00%
50.35%
0.95%
5..00% 5 5.00%
1.00% 1.00%
97.30% 36.00%
39.61%
50 50.26%
0. 0.95%
4.92%
0.97%
93.80%
96.71%
Dated : 07‐01‐17 Page No. : 9 of 19
PROGRESS REPORT OF ELECTRICAL (CONTAINMENT, ETC.) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
Description S. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 GT
Item Description
Basement‐2 Basement‐1 Ground 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th 13th 14th 15th 16th 17th 18th 19th 20th 21st 22nd 23rd 24th 25th 26th 27th Pent House
Overall Weightage (%age)
3.51%
OVERAL OVERALLL TOTAL TOTAL 3.51% 3.51%
Installation
Overall Progress
Mark Markin ing g
Inst Instal alla lati tion on of supp suppor orts ts
9% 9.00% 9.00% 9.00% 9.00% 9.00%
30% 30.00% 30.00% 30.00% 30.00% 30.00%
Installation of cable tray / ladder / trunking 60% 60.00% 60.00% 60.00% 60.00% 60.00%
9.00% 9.00% 9.00% 9.00% 9.00% 9.00% 9.00% 9.00% 9.00% 9.00% 9.00% 9.00% 9.00% 9.00% 9.00% 9.00% 9.00% 9.00% 9.00% 9.00% 9.00% 9.00% 9.00% 9.00%
30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 20.00%
60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 60.00% 30.00%
0. 0.80% 0. 0.80% 1. 1.00% 1. 1.00% 1. 1.00% 1. 1 .00% 1. 1 .00% 1. 1 .00% 1. 1 .00% 1. 1 .00% 1. 1 .00% 1. 1 .00% 1. 1 .00% 1. 1 .00% 1. 1 .00% 1. 1 .00% 1. 1 .00% 0. 0.90% 0. 0.90% 0. 0.90% 0. 0.90% 0. 0.90% 0. 0.90%
99.80% 99.80% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 99.90% 99.90% 99.90% 99.90% 99.90% 99.90% 59.00%
9.00%
29.66%
58.97%
0.91%
98.53%
Testing & Inspection 1% 1.00% 1.00% 0.80% 0.80% 0. 0.80%
Percentage
100% 100.00% 100.00% 99.80% 99.80% 99.80%
Dated : 07‐01‐17 Page No. : 10 of 19
PROGRESS REPORT OF ELECTRICAL (LIGHTING CONTROL SYSTEM) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
Description
Installation (Conduit/Wiring)
Installation/Termination (Devices) Panel Installation/ Testing & Software Integration Termination Inspection 30% 3% 1% 30.00% 0.50%
Overall Progress
Cond Condui uitt (PVC (PVC/G /G.I .I.) .)
Wiri Wiring ng
1 Basement‐2
35% 35.00%
30% 30.00%
Testing & Inspection 1% 1.00%
2 Basement‐1
35.00%
30.00%
1.00%
30.00%
0.50%
96 9 6.50%
3 Ground
35.00%
30.00%
1.00%
30.00%
0.50%
96.50%
34.75%
28.00%
0.50%
30.00%
0.50%
93.75%
34.75%
28.00%
0.50%
30.00%
0.50%
93.75%
34.75%
28.00%
0.50%
30.00%
0.50%
93.75%
34.75%
28.00%
0.50%
30.00%
0.50%
93.75%
34.75%
28.00%
0.50%
30.00%
0.50%
93.75%
34.75%
25.00%
0.50%
30.00%
0.50%
90.75%
35.00%
30.00%
1.00%
30.00%
0.50%
96.50%
35.00%
30.00%
1.00%
30.00%
0.50%
96.50%
35.00%
30.00%
1.00%
30.00%
0.50%
96.50%
35.00%
30.00%
1.00%
30.00%
0.50%
96.50%
35.00%
30.00%
1.00%
30.00%
0.50%
96.50%
35.00%
30.00%
1.00%
30.00%
0.50%
96.50%
35.00%
30.00%
1.00%
30.00%
0.50%
96.50%
35.00%
30.00%
1.00%
30.00%
0.50%
96.50%
35.00%
30.00%
1.00%
30.00%
0.50%
96.50%
35.00%
30.00%
1.00%
30.00%
0.50%
96.50%
35.00%
30.00%
1.00%
30.00%
0.50%
96.50%
35.00%
30.00%
1.00%
30.00%
0.50%
96.50%
35.00%
30.00%
1.00%
30.00%
0.50%
96.50%
35.00%
30.00%
1.00%
30.00%
0.50%
96.50%
35.00%
30.00%
1.00%
30.00%
0.50%
96.50%
35.00%
30.00%
1.00%
30.00%
0.50%
96.50%
35.00%
28.50%
0.80%
30.00%
0.50%
94.80%
35.00%
28.50%
0.80%
30.00%
0.50%
94.80%
35.00%
28.50%
0.80%
30.00%
0.50%
94.80%
35.00%
28.50%
0.80%
30.00%
0.50%
94.80%
35.00% 28.00%
28.50% 14.20%
0.80%
30.00%
0.50%
94.80% 42.20%
28 28.76%
0.84%
29.03%
S. No.
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Item Description
1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th 13th 14th 15th 16th 17th 18th 19th 20th 21st 22nd 23rd 24th 25th 26th 27th Pent House
OVERALL TOTAL
Weightage (%age)
2.09%
34.73% 2.09% 34
0.00%
0.48%
Percentage
100% 96 9 6.50%
93.85%
Dated : 07‐01‐17 Page No. : 11 of 19
PROGRESS REPORT OF ELECTRICAL (SECURITY SYSTEM‐CCTV) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
Description S. No.
Item Description
Weightage (%age)
1 Basement‐2
Installation/Termination (Devices) Cameras Installation/ Testing & Termination Inspection 98% 2% 98.00% 2.00%
Overall Progress
Percentage
100% 100.00%
2 Basement‐1
98.00%
2.00%
100.00%
3 Ground
98.00%
2.00%
100.00%
98.00%
2.00%
100.00%
98.00%
2.00%
100.00%
98.00%
2.00%
100.00%
98.00%
2.00%
100.00%
98.00%
2.00%
100.00%
98.00%
2.00%
100.00%
98.00%
2.00%
100.00%
98.00%
2.00%
100.00%
98.00%
2.00%
100.00%
98.00%
2.00%
100.00%
98.00%
2.00%
100.00%
98.00%
2.00%
100.00%
98.00%
2.00%
100.00%
98.00%
2.00%
100.00%
98.00%
2.00%
100.00%
98.00%
2.00%
100.00%
98.00%
2.00%
100.00%
98.00%
2.00%
100.00%
98.00%
2.00%
100.00%
98.00%
2.00%
100.00%
98.00%
2.00%
100.00%
98.00%
2.00%
100.00%
98.00%
2.00%
100.00%
98.00%
2.00%
100.00%
98.00%
2.00%
100.00%
98.00%
2.00%
100.00%
98.00% 98.00%
2.00% 2.00%
100.00% 100.00%
98.00%
2.00%
100.00%
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th 13th 14th 15th 16th 17th 18th 19th 20th 21st 22nd 23rd 24th 25th 26th 27th Pent House
OVERALL TOTAL
5.28%
5.28%
Dated : 07‐01‐17 Page No. : 12 of 19
PROGRESS REPORT OF SECURITY (GATE BARRIERS) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
Install Installatio ation n (Condu (Conduit/W it/Wiri iring) ng) Material Description S. No.
1 OT
Item Description
Bollards OVERALL
Install Installatio ation/T n/Term ermina ination tion (Device (Devices) s) Installation of Gate Barriers/ Testing & Wiring Wiring Termination Inspection 28% 30% 2%
100%
40.0%
28%
30%
2%
100.00%
40%
28%
30%
2%
Condui Conduitt (PVC/G. (PVC/G.I.) I.)
Weightage (%age)
4.14%
40%
Overall Progress
Percentage
100.00%
Dated : 07‐01‐17 Page No. : 13 of 19
PROGRESS REPORT OF ELECTRICAL (SMATV SYSTEM) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
Description
Installatio n (Condu it it/Wiring )
In st stallatio n/ n/Termination (Devices) Equipment Installation/ Testing & Termination Inspection 30% 1% 30.00% 1.00%
Overall Progress
Cond Condui uitt (PVC (PVC/G /G.I .I.) .)
Wiri Wiring ng
1 Basement‐2
35% 35.00%
33% 33.00%
Testing & Inspection 1% 1. 1 .00%
2 Basement‐1
35.00%
33.00%
1. 1 .00%
30.00%
1.00%
100.00%
3 Ground
35.00%
33 3 3.00%
1.00%
30.00%
1.00%
100.00%
35.00%
33.00%
1.00%
30.00%
1.00%
100.00%
35.00%
33 33.00%
1.00%
30.00%
1.00%
100.00%
35.00%
33.00%
1.00%
30.00%
1.00%
100.00%
35.00%
33.00%
1.00%
30.00%
1.00%
100.00%
35.00%
33.00%
1.00%
30.00%
1.00%
100.00%
35.00%
33.00%
1.00%
30.00%
1.00%
100.00%
35.00%
33.00%
1.00%
30.00%
1.00%
100.00%
35.00%
33.00%
1.00%
30.00%
1.00%
100.00%
35.00%
33.00%
1.00%
30.00%
1.00%
100.00%
35.00%
33 33.00%
1.00%
30.00%
1.00%
100.00%
35.00%
33 33.00%
1.00%
30.00%
1.00%
100.00%
35.00%
33 33.00%
1.00%
30.00%
1.00%
100.00%
35.00%
33 33.00%
1.00%
30.00%
1.00%
100.00%
35.00%
33 33.00%
1.00%
30.00%
1.00%
100.00%
35.00%
33 33.00%
1.00%
30.00%
1.00%
100.00%
35.00%
33 33.00%
1.00%
30.00%
1.00%
100.00%
35.00%
33 33.00%
1.00%
30.00%
1.00%
100.00%
35.00%
33 33.00%
1.00%
30.00%
1.00%
100.00%
35.00%
33 33.00%
1.00%
30.00%
1.00%
100.00%
35.00%
33 33.00%
1.00%
30.00%
1.00%
100.00%
35.00%
33 33.00%
1.00%
30.00%
1.00%
100.00%
35.00%
33 33.00%
1.00%
30.00%
1.00%
100.00%
35.00%
33 33.00%
1.00%
30.00%
1.00%
100.00%
35.00%
33 33.00%
1.00%
30.00%
1.00%
100.00%
35.00%
33 33.00%
1.00%
30.00%
1.00%
100.00%
35.00%
33 33.00%
1.00%
30.00%
1.00%
100.00%
35.00% 35.00%
33 33.00% 33.00%
1.00% 1. 1.00%
30.00% 30.00%
1.00% 1.00%
100.00% 100.00%
35.00%
33.00%
1.00%
30.00%
1.00%
100.00%
S. No.
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Item Description
1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th 13th 14th 15th 16th 17th 18th 19th 20th 21st 22nd 23rd 24th 25th 26th 27th Pent House
OVERALL TOTAL
Weightage (%age)
1.02%
1.02%
Percentage
100% 100.00%
Dated : 07‐01‐17
PROGRESS REPORT OF ELECTRICAL (EMERGENCY LIGHTING SYSTEM) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
Description S. No.
Item Description
Installation (Conduit/Wiring)
Weightage (%age)
1 Basement‐2 2 Basement‐1 3 Ground
Page No. : 14 of 19
Installation/Termination (Devices) Panels Installation/ Testing & Termination & Final Devices Inspection 3% 1% 3.00% 1.00%
Overall Progress
Cond Condui uitt (PVC (PVC/G /G.I .I.) .)
Wirin Wiring g
40% 40.00%
55% 55 55.00%
Testing & Inspection 1% 1.00%
40.00%
55.00%
1.00%
96.00%
40.00%
53.90%
0.98%
94.88%
Percentage
100% 100.00%
4
1st
40.00%
53.90%
0.98%
94.88%
5
2nd
40.00%
53.90%
0.98%
94.88%
6
3rd
40.00%
53.90%
0.98%
94.88%
7
4th
40.00%
53.90%
0.98%
94.88%
8
5th
40.00%
53.90%
0.98%
9
6th
40.00%
52.25%
0.95%
3 .00% 3.
10
7th
40.00%
55.00%
1.00%
11
8th
40.00%
55.00%
1.00%
12
9th
40.00%
55.00%
1.00%
40.00%
55.00%
1.00%
40.00%
55.00%
1.00%
40.00%
55.00%
1.00%
40.00%
55.00%
1.00%
40.00%
55.00%
1.00%
40.00%
55.00%
1.00%
19 16th 20 17th 21 18th
40.00%
55.00%
1.00%
40.00%
55.00%
1.00%
40.00%
55.00%
1.00%
22 19th 23 20th 24 21st
40.00%
55.00%
1.00%
40.00%
55.00%
1.00%
40.00%
55.00%
1.00%
25 22nd 26 23rd 27 24th 28 25th
40.00%
55.00%
1.00%
40.00%
52.25%
0.95%
40.00%
52.25%
0.95%
40.00%
52.25%
0.95%
29 26th 30 27th Pent House 31
40.00%
52.25%
0.95%
40.00% 36.00%
52.25%
0.95%
39.87%
52.48%
0. 0.95%
13 10th 14 11th 15 12th
7.60%
16 13th 17 14th 18 15th
OVERALL TOTAL
7.60%
94.88% 1.00%
97.20%
3 .00% 3.
1.00%
100.00%
3.00%
1.00%
3 .00% 3.
1.00%
100.00%
3 .00% 3.
1.00%
100.00%
3.00%
1.00%
3 .00% 3.
1.00%
100.00%
3 .00% 3.
1.00%
100.00%
3.00%
1.00%
3 .00% 3.
1.00%
100.00%
3 .00% 3.
1.00%
100.00%
3.00%
1.00%
3 .00% 3.
1.00%
100.00%
3 .00% 3.
1.00%
100.00%
2.00%
0.50%
3 .00% 3.
1.00%
100.00%
3 .00% 3.
1.00%
100.00%
2.00%
0.50%
3 .00% 3.
1.00%
97.20%
3 .00% 3.
1.00%
97.20%
2.00%
0.50%
3 .00% 3.
1.00%
97.20% 36.00%
2.13%
0.69%
100.00%
100.00%
100.00%
100.00%
98.50%
95.70%
95.70%
96.13%
Dated : 07‐01‐17 Page No. : 15 of 19
PROGRESS REPORT OF ELECTRICAL (VOICE AND DATA) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
Installation (Conduit/Wiring)
Installation/Termination (Devices) Installation/Termination Installation of Testing & Racks/Termination Inspection 30% 1%
Overall Progress
40%
28%
Testing & Inspection 1%
1 Basement‐2
40.00%
26.60%
0.50%
10.00%
77.10%
2 Basement‐1
40.00%
26.60%
0.50%
10.00%
77.10%
3 Ground
40.00%
26.00%
0.50%
10.00%
76.50%
4
1st
39.20%
26.00%
0.50%
10.00%
75.70%
5
2nd
39.20%
26.00%
0.50%
10.00%
75.70%
6
3rd
39.20%
26.00%
0.50%
10.00%
75.70%
7
4th
39.20%
26.00%
0.50%
10.00%
75.70%
8
5th
39.20%
26.00%
0.50%
10.00%
75.70%
26.00%
Cond Condu uit (PV (PVC/G C/G.I. .I.) Floor
9
W eightage (%age)
Wiri Wiring ng
Percentage 100%
6th
36.00%
10
7th
40.00%
27.00%
0.50%
28.50%
1.00%
97.00%
11
8th
40.00%
26.60%
0.50%
28.50%
1.00%
96.60%
12
9th
40.00%
26.60%
0.50%
28.50%
1.00%
96.60%
13 10th
40.00%
26.60%
0.50%
28.50%
1.00%
96.60%
14 11th
40.00%
26.60%
0.50%
28.50%
1.00%
96.60%
15 12th
40.00%
26.60%
0.50%
28.50%
1.00%
96.60%
40.00%
26.60%
0.50%
28.50%
1.00%
96.60%
17 14th
40.00%
26.60%
0.50%
28.50%
1.00%
96.60%
18 15th
40.00%
26.60%
0.50%
28.50%
1.00%
96.60%
19 16th
40.00%
26.60%
0.50%
28.50%
1.00%
96.60%
20 17th
40.00%
26.60%
0.50%
28.50%
1.00%
96.60%
21 18th
40.00%
26.60%
0.50%
28.50%
1.00%
96.60%
22 19th
40.00%
26.60%
0.50%
28.50%
1.00%
96.60%
23 20th
40.00%
26.60%
0.50%
28.50%
1.00%
96.60%
24 21st
40.00%
26.60%
0.50%
28.50%
1.00%
96.60%
25 22nd
40.00%
26.60%
0.50%
28.50%
1.00%
96.60%
26 23rd
40.00%
26.60%
0.50%
28.50%
1.00%
96.60%
27 24th
40.00%
26.60%
0.50%
28.50%
1.00%
96.60%
28 25th
40.00%
26.60%
0.50%
28.50%
1.00%
96.60%
29 26th
40.00%
26.60%
0.50%
28.50%
1.00%
96.60%
16 13th
8.06%
62.00%
Dated : 07‐01‐17 Page No. : 16 of 19
PROGRESS REPORT OF ELECTRICAL (VOICE AND DATA) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL Installation (Conduit/Wiring)
40%
28%
Testing & Inspection 1%
40.00%
26.60%
0.50%
Cond Condu uit (PV (PVC/G C/G.I. .I.) Floor
W eightage (%age)
30 27th 31
Pent House
OVERALL
Wiri Wiring ng
Installation/Termination (Devices) Installation/Termination Installation of Testing & Racks/Termination Inspection 30% 1% 28.50%
1.00%
39.20%
TOTAL
40%
Overall Progress
Percentage 100% 96.60% 39.20%
26%
0%
22%
1%
88%
Dated : 07‐01‐17 Page No. : 17 of 19
PROGRESS REPORT OF ELECTRICAL (LIGHT FIXTURES) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
Installation (Conduit/Wiring)
Installation/Termination (Devices) Installation of Testing & Lights/Termination Inspection 20% 1%
Overall Progress
40%
38%
Testing & Inspection 1%
1 Basement‐2
40.00%
38.00%
1.00%
19.00%
0.90%
98.90%
2 Basement‐1
40.00%
38.00%
1.00%
19.00%
0.90%
98.90%
3 Ground
40.00%
37.00%
0.80%
19.00%
0.90%
97.70%
4
1st
40.00%
37.00%
0.80%
19.00%
0.90%
97.70%
5
2nd
40.00%
37.00%
0.80%
19.00%
0.90%
97.70%
6
3rd
40.00%
37.00%
0.80%
19.00%
0.90%
97.70%
7
4th
40.00%
37.00%
0.80%
19.00%
0.90%
97.70%
8
5th
40.00%
37.00%
0.80%
19.00%
0.90%
97.70%
9
6th
40.00%
37.00%
0.80%
10.00%
10
7th
40.00%
38.00%
1.00%
19.50%
0.90%
99.40%
11
8th
40.00%
38.00%
1.00%
19.50%
0.90%
99.40%
12
9th
40.00%
38.00%
1.00%
19.50%
0.90%
99.40%
13 10th
40.00%
38.00%
1.00%
19.50%
0.90%
99.40%
14 11th
40.00%
38.00%
1.00%
19.50%
0.90%
99.40%
15 12th
40.00%
38.00%
1.00%
19.50%
0.90%
99.40%
40.00%
38.00%
1.00%
19.50%
0.90%
99.40%
17 14th
40.00%
38.00%
1.00%
19.50%
0.90%
99.40%
18 15th
40.00%
38.00%
1.00%
19.50%
0.90%
99.40%
19 16th
40.00%
38.00%
1.00%
19.50%
0.90%
99.40%
20 17th
40.00%
38.00%
1.00%
19.50%
0.90%
99.40%
21 18th
40.00%
38.00%
1.00%
19.50%
0.90%
99.40%
22 19th
40.00%
38.00%
1.00%
19.50%
0.90%
99.40%
23 20th
40.00%
38.00%
1.00%
19.50%
0.90%
99.40%
24 21st
40.00%
38.00%
1.00%
19.50%
0.90%
99.40%
25 22nd
40.00%
38.00%
1.00%
19.50%
0.90%
99.40%
26 23rd
40.00%
38.00%
1.00%
19.50%
0.90%
99.40%
27 24th
40.00%
38.00%
1.00%
19.50%
0.90%
99.40%
28 25th
40.00%
38.00%
1.00%
19.50%
0.90%
99.40%
29 26th
40.00%
38.00%
1.00%
19.50%
0.90%
99.40%
Cond Condui uitt (PV (PVC/G C/G.I. .I.) Floor
16 13th
Weightage (%age)
6.74%
Wiri Wirin ng
Percentage 100%
87.80%
Dated : 07‐01‐17 Page No. : 18 of 19
PROGRESS REPORT OF ELECTRICAL (LIGHT FIXTURES) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL Installation (Conduit/Wiring)
40%
38%
Testing & Inspection 1%
40.00%
38.00%
1.00%
Cond Condui uitt (PV (PVC/G C/G.I. .I.) Floor
Weightage (%age)
30 27th 31
Pent House
OVERALL
Wiri Wirin ng
Installation/Termination (Devices) Installation of Testing & Lights/Termination Inspection 20% 1% 19.50%
0.90%
36.00%
TOTAL
40%
Overall Progress
Percentage 100% 99.40% 36.00%
37%
1%
18%
1%
97%
Dated : 07‐01‐17 Page No. : 19 of 19
PROGRESS REPORT OF PHOTO VOLATIC SYSTEM FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
Material Description
S. No.
1 OT
Item Description
Photo Volatic System OVERALL
Weightage (%age)
0.53%
Installation (Conduit/Wiring) Cable Testing & Installation of Photo Volatic Tray/Trunking/Condui Wiring Inspection Panels/Termination t (PVC/G.I.) 20% 35% 1% 30%
19.0%
32%
19%
32%
1%
Installation/Termination (Devices) Installation of Installation of Battery Invertor/Isolators/Meter Bank/Termination Termination 8% 5%
28% 28%
Overall Progress Testing & Inspection
Percentage
1%
100%
0%
79.50%
0%
0%
79.50%
Dated : 07‐01‐17 Page No. : 1 of 31
OVERALL PROGRESS SUMMARY PLUMBING, DRAINAGE, FIRE FIGHTING AND MISC. WORKS FOR SENDIAN TOWER PROJECT COM49‐LUSAIL Weightage (%age) S. No.
Item Wise Breakup
System Wise Overall Weightage (%age)
Progress (%age) System Wise Individual Progress (%age)
Overall Progress (%age)
1
Engineering
0 .1 7%
50.35%
0.08%
2
Testing & commissioning
1 .1 9%
30.00%
0.36%
3
Construction
98.64%
96.26%
9 4 . 9 5%
OVERALL PLUMBING, DRAINAGE & FIRE FIGHTING
100.00%
95.39%
Dated : 07‐01‐17 Page No. : 2 of 31
OVERALL PROGRESS SUMMARY PLUMBING, DRAINAGE, FIRE FIGHTING AND MISC. (ENGINEERING AND TESTING COMMISSIONING) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL Weightage (%age) S. No.
S M E T S Y S
Item Wise Breakup
G N I Shop Drawings R E 1 E N I GAs‐Built Drawings N E
2
System Wise Overall Weightage (%age)
Progress (%age) System Wise Individual Progress (%age)
Overall Progress (%age)
0 . 0 9 9 7%
98.70%
0.0984%
0 . 0 6 8 9%
2%
0.0014%
QGEWC Network Connection
0 . 1 5 0 0%
90.000%
0.1350%
Testing & commissioning
0 .3 6 8 8 %
0.0000%
Spare Parts
0 . 6 6 8 3%
0.0000%
OVERALL PLUMBING, DRAINAGE & FIRE FIGHTING
1.356%
0.235%
Dated : 07‐01‐17 Page No. : 3 of 31
OVERALL PROGRESS SUMMARY OF PLUMBING, DRAINAGE, FIRE FIGHTING AND MISC. WORKS (CONSTRUCTION) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
S. No.
S M E T S Y S
Item Wise Breakup
Progress (%age)
Weightage (%age)
Weightage (%age)
System Wise Individual Weightage (%age)
System Wise Overall Weightage (%age)
System Wise Individual Progress (%age)
Overall Progress (%age)
Portable Water Supply Pump
2.00%
98.50%
1.97%
UPVC piping, valves. etc.
9.54%
99.99%
9.54%
Sanitary wares, etc.
5.67%
97.87%
5.55%
3.26%
100.00%
3.26%
0.05%
99.77%
0.05%
GRP Water Tank
1.84%
99.00%
1.82%
Gray water treatment plant
1.98%
100.00%
1.98%
Media Filter
5.06%
100.00%
5.06%
Oil Interceptor
0.29%
100.00%
0.29%
0.34%
100.00%
0.34%
5.52%
99.95%
5.52%
Outlets
0.07%
100.00%
0.07%
Fire Pump
6.29%
100.00%
6.29%
10 39%
99 927%
10 3825%
G N I PPR Piping, valves. etc. B 1 M UCopper Piping, valves. etc. L P
E GSubmersible Pumps A 2 N I A UPVC Pipe, valves & fittings R D
G I Pipes & Fittings
29.41%
6.22%
Dated : 07‐01‐17 Page No. : 4 of 31
PROGRESS REPORT OF PLUMBING, DRAINAGE, FIRE FIGHTING AND MISC. WORKS (PLUMBING‐DOMESTIC PUMPS) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
S. No.
Item
Weightage (%age)
Lifting & Placement 80%
1
Domestic Pumps
OVERALL TOTAL
2.00%
80%
2.00%
80.00%
Installation of Material Connection with Testing & Piping system Inspection 18% 2% 18%
17.50%
Overall Progress
Percentage 100%
1%
1.00%
98.50%
98.50%
Dated : 07‐01‐17 Page No. : 5 of 31
PROGRESS REPORT OF PLUMBING, DRAINAGE, FIRE FIGHTING AND MISC. WORKS (PLUMBING‐UPVC PIPING) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
Installation (Floor) Installation of Supports
S. No.
Floors
Weightage (%age)
1st 2nd
6
3rd
7
4th
8
5th
9
6th
10
7th
11
8th
12
9th
2%
10%
50%
2%
9.54%
2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 1.98%
10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00%
50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00%
2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00%
9.54%
6.00%
29.99%
2.00%
10.00%
50.00%
2.00%
14 11th 15 12th 17 14th 18 15th 19 16th 20 17th 21 18th 22 19th 23 20th 24 21st 25 22nd 26 23rd 27 24th 28 25th 29 26th 30 27th 31
Pent House
TOTAL
Overall Progress Gravity Testing & Inspection
30%
13 10th
16 13th
Installation of pipes, Etc.
30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 29.70%
3 Ground 5
Installation of Supports
6% 6%
2 Basement‐1 4
Gravity Testing & Inspection
6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00%
1 Basement‐2
Installation of pipes, Etc.
Installation (Risers)
Percentage 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
99.99%
Dated : 07‐01‐17 Page No. : 6 of 31
PROGRESS REPORT OF PLUMBING, DRAINAGE, FIRE FIGHTING AND MISC. WORKS (PLUMBING‐SANITARY WARES) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
Installation Concealed material Installation
S. No.
Floors
Weightage (%age)
1 Basement‐2 2 Basement‐1 3 Ground 4 5 6 7 8 9 10 11
1st 2nd 3rd 4th 5th 6th 7th 8th
9th 13 10th 12
14 11th 15 12th 16 13th 17 14th 18 15th 19 16th 20 17th 21 18th 22 19th 23 20th 24 21st 25 22nd
5.67%
Overall Progress
Placement, Leak Testing Installation & & Inspection connection with piping
8%
90%
2%
8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8%
90% 90% 81% 81% 90% 90% 90% 90% 45% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90%
2% 2% 1% 1% 2% 2% 2% 2% 1% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2%
Percentage 100%
100.00% 100.00% 90.00% 90.00% 100.00% 100.00% 100.00% 100.00% 54.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
Dated : 07‐01‐17 Page No. : 7 of 31
PROGRESS REPORT OF PLUMBING, DRAINAGE, FIRE FIGHTING AND MISC. WORKS (PLUMBING‐SANITARY WARES) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL Installation Concealed material Installation
S. No.
Floors
Weightage (%age)
26 23rd 27 24th 28 25th 29 26th 30 27th 31
Pent House
TOTAL
5.67%
Overall Progress
Placement, Leak Testing Installation & & Inspection connection with piping
8%
90%
2%
8% 8% 8% 8% 8% 8%
90% 90% 90% 90% 90% 90%
2% 2% 2% 2% 2% 2%
8%
88%
2%
Percentage 100%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
98%
Dated : 07‐01‐17 Page No. : 8 of 31
PROGRESS REPORT OF PLUMBING, DRAINAGE, FIRE FIGHTING AND MISC. WORKS (PLUMBING‐PPR PIPING) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
Installation (Floor)
S. No.
Floors
Weightage (%age)
Installation (Risers) Installation Installation of Pressure Installation of pipes, jointing, Testing & Supports Etc. Inspection
Overall Progress
Installation of Supports
Installation of pipes, jointing, Etc.
26%
70%
Pressure Testing & Inspection 4%
26.00% 26.00% 26.00%
70.00% 70.00% 70.00%
4.00% 4.00% 4.00%
100% 100% 100%
26.00% 26.00% 26.00% 26.00% 26.00% 26.00% 26.00% 26.00% 26.00% 26.00% 26.00% 26.00% 26.00% 26.00% 26.00% 26.00% 26.00% 26.00% 26.00% 26.00% 26.00% 26.00% 26.00%
70.00% 70.00% 70.00% 70.00% 70.00% 70.00% 70.00% 70.00% 70.00% 70.00% 70.00% 70.00% 70.00% 70.00% 70.00% 70.00% 70.00% 70.00% 70.00% 70.00% 70.00% 70.00% 70.00%
4.00% 4.00% 4.00% 4.00% 4.00% 4.00% 4.00% 4.00% 4.00% 4.00% 4.00% 4.00% 4.00% 4.00% 4.00% 4.00% 4.00% 4.00% 4.00% 4.00% 4.00% 4.00% 4.00%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
26.00%
70.00%
4.00%
Percentage 100%
1 Basement‐2 2 Basement‐1 3 Ground 4
1st
5
2nd
6
3rd
7
4th
8
5th
9
6th
10
7th
11
8th
12
9th
13 10th 14 11th 15 12th
3.26%
16 13th 17 14th 18 15th 19 16th 20 17th 21 18th 22 19th 23 20th 24 21st 25 22nd 26 23rd 27 24th 28 25th 29 26th 30 27th 31
Pent House
TOTAL
3.26%
100.00%
Dated : 07‐01‐17 Page No. : 9 of 31
PROGRESS REPORT OF PLUMBING, DRAINAGE, FIRE FIGHTING AND MISC. WORKS (PLUMBING‐COPPER PIPING) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
Installation (Floor) Installation, Pressure Soldering, Testing & Etc. Inspection 25% 2%
Installation of Supports
S. No.
Floors
Weightage (%age)
1 Basement‐2 2 Basement‐1 3 Ground 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th 13th 14th 15th
19 16th 20 17th 21 18th 22 19th 23 20th 24 21st 25 22nd 26 23rd 27 24th 28 25th
0.50%
16%
16.00% 16.00% 16.00% 16.00% 16.00% 16.00% 16.00% 16.00% 16.00% 16.00% 16.00% 16.00% 16.00% 16.00% 16.00% 16.00% 16.00% 16.00% 16.00% 16.00% 16.00% 16.00% 16.00% 16.00% 16.00% 16.00% 16.00% 16.00%
25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00%
2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00%
Installation (Riser)
Overall Progress
15%
40%
Pressure Testing & Inspection 2%
15.00% 15.00% 15.00% 15.00% 15.00% 15.00% 15.00% 15.00% 15.00% 15.00% 15.00% 15.00% 15.00% 15.00% 15.00% 15.00% 15.00% 15.00% 15.00% 15.00% 15.00% 15.00% 15.00% 15.00% 15.00% 15.00% 15.00% 15.00%
40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00%
2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00%
Installation of Supports
Installation, Soldering, Etc.
Percentage 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Dated : 07‐01‐17 Page No. : 10 of 31
PROGRESS REPORT OF PLUMBING, DRAINAGE, FIRE FIGHTING AND MISC. WORKS (PLUMBING‐COPPER PIPING) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
S. No.
Floors
Weightage (%age)
29 26th 30 27th 31
Pent House
TOTAL
0.50%
Installation (Floor) Installation, Pressure Installation of Soldering, Testing & Supports Etc. Inspection 16% 25% 2%
Installation (Riser)
Overall Progress
15%
40%
Pressure Testing & Inspection 2%
16.00% 16.00% 16.00%
25.00% 25.00% 20.00%
2.00% 2.00%
15.00% 15.00% 15.00%
40.00% 40.00% 40.00%
2.00% 2.00% 2.00%
16%
25%
2%
15%
40%
2%
Installation of Supports
Installation, Soldering, Etc.
Percentage 100%
100% 100% 93%
100%
Dated : 07‐01‐17 Page No. : 11 of 31
PROGRESS REPORT OF PLUMBING, DRAINAGE, FIRE FIGHTING AND MISC. WORKS (PLUMBING‐GRP TANK PIPING) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
S. No.
Item
Weightage (%age)
Assembling of of sectional parts 68%
1
GRP sectional tank, etc.
OVERALL TOTAL
1.84%
68.00%
1.84%
68.00%
Installation of Material Connections with Leak Testing & piping, accessories, Inspection etc. 30% 2% 30%
29.50%
Overall Progress
Percentage 100%
2%
1.50%
99%
99.00%
Dated : 07‐01‐17 Page No. : 12 of 31
PROGRESS REPORT OF PLUMBING, DRAINAGE, FIRE FIGHTING AND MISC. WORKS (PLUMBING‐GREY WATER TREATMENT SYSTEM) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
Floor Installation of Grey System S. No. 1 Basement‐2 2 Basement‐1 3 Ground 4 1st 5 2nd 6 3rd 7 4th 8 5th 9 6th 10 7th 11 8th 12 9th 13 10th 14 11th 15 12th 16 13th 17 14th 18 15th 19 16th 20 17th 21 18th 22 19th 23 20th 24 21st 25 22nd 26 23rd 27 24th 28 25th 29 26th 30 27th Pent House 31
Floors
Weightage (%age)
13%
1.98%
13.00% 13.00% 13.00% 13.00% 13.00% 13.00% 13.00% 13.00% 13.00% 13.00% 13.00% 13.00% 13.00% 13.00% 13.00% 13.00% 13.00% 13.00% 13.00% 13.00% 13.00% 13.00% 13.00% 13.00% 13.00% 13.00% 13.00% 13.00% 13.00% 13.00% 13.00%
1.98%
13%
TOTAL
5%
Installation of UPVC pipes, jointing, etc. 25%
5%
Riser Installation of Copper pipes, jointing, etc. 50%
5. 5.00% 5. 5.00% 5. 5.00% 5. 5.00% 5. 5.00% 5. 5.00% 5. 5.00% 5. 5.00% 5. 5.00% 5. 5.00% 5. 5.00% 5. 5.00% 5. 5.00% 5. 5.00% 5. 5.00% 5. 5.00% 5. 5.00% 5. 5.00% 5. 5.00% 5. 5.00% 5. 5.00% 5. 5.00% 5. 5.00% 5. 5.00% 5. 5.00% 5. 5.00% 5. 5.00% 5. 5.00% 5. 5.00% 5. 5.00% 5. 5.00%
25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00% 25.00%
5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00%
50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00%
2.0000% 2.0000% 2.0000% 2.0000% 2.0000% 2.0000% 2.0000% 2.0000% 2.0000% 2.0000% 2.0000% 2.0000% 2.0000% 2.0000% 2.0000% 2.0000% 2.0000% 2.0000% 2.0000% 2.0000% 2.0000% 2.0000% 2.0000% 2.0000% 2.0000% 2.0000% 2.0000% 2.0000% 2.0000% 2.0000% 2.0000%
5%
25%
5%
50%
2%
Installation of Supports
Installation of Supports
Overall Progress Pressure Testing & Inspection 2%
Percentage 100%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100.00%
Dated : 07‐01‐17 Page No. : 13 of 31
PROGRESS REPORT OF PLUMBING, DRAINAGE, FIRE FIGHTING AND MISC. WORKS (PLUMBING‐MEDIA FILTER) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL Installation Installation of Installation of pipes, jointing, Media filtter etc. 58% 35%
Installation of Supports
S. No.
Floors
1 Basement‐2 2 Basement‐1
TOTAL
Weightage (%age)
5%
5.06%
5% 5%
5.06%
5%
Overall Progress Pressure Testing & Inspection 2%
58 5 8% 58 5 8%
35% 35%
2% 2%
58%
35%
2%
Percentage 100%
100.00% 100.00%
100%
Dated : 07‐01‐17 Page No. : 14 of 31
PROGRESS REPORT OF PLUMBING, DRAINAGE, FIRE FIGHTING AND MISC. WORKS (DRAINAGE‐OIL INTERCEPTOR) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
S. No.
Item
Weightage (%age)
Lifting & Placement 80%
Oil Interceptor
OVERALL TOTAL
0.29%
0.29%
80%
Installation of Material Connection with Testing & Piping system Inspection 18% 2% 18%
80.00%
2%
18.00%
Overall Progress
Percentage 100% 100%
2.00%
100.00%
Dated : 07‐01‐17 Page No. : 15 of 31
PROGRESS REPORT OF PLUMBING, DRAINAGE, FIRE FIGHTING AND MISC. WORKS (DRAINAGE‐SUBMERSIBLE PUMPS) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
S. No.
Item
Weightage (%age)
Lifting & Placement 80%
Submersible Pumps
OVERALL TOTAL
Installation of Material Connection with Testing & Piping system Inspection 18% 2%
0.34%
80%
18%
0.34%
80.00%
18.00%
Overall Progress
Percentage 100%
2%
2.00%
100%
100.00%
Dated : 07‐01‐17
PROGRESS REPORT OF PLUMBING, DRAINAGE, FIRE FIGHTING AND MISC. WORKS (DRAINAGE‐UPVC PIPING) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
Page No. : 16 of 31
Installation (Floor)
S. No.
Floors
Weightage (%age)
6%
30%
10%
50%
5.52%
6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00% 6.00%
30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 30.00% 28.50%
2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2%
10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00%
50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00%
2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2%
5.52%
6%
30%
2%
10%
50%
2%
2 Basement‐1 3 Ground 1st
5
2nd
6
3rd
7
4th
8
5th
9
6th
10
7th
11
8th
12
9th
13 10th 14 11th 15 12th 16 13th 17 14th 18 15th 19 16th 20 17th 21 18th 22 19th 23 20th 24 21st 25 22nd 26 23rd 27 24th 28 25th 29 26th 30 27th 31
Pent House
TOTAL
Overall Progress Pressure Testing & Inspection 2%
1 Basement‐2
4
Installation (Risers) Pressure Testing & Inspection 2%
Installation of Supports
Installation of pipes, Etc.
Installation of Supports
Installation Installation of pipes, Etc.
Percentage 100%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 98.45%
100%
Dated : 07‐01‐17 Page No. : 17 of 31
PROGRESS REPORT OF PLUMBING, DRAINAGE, FIRE FIGHTING AND MISC. WORKS (DRAINAGE‐OUTLETS / FLOOR DRAINS) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
S. No.
Floors
Weightage (%age)
1 Basement‐2 2 Basement‐1 3 Ground 4
1st
5
2nd
6
3rd
7
4th
8
5th
9
6th
10
7th
11
8th
12
9th
13 10th 14 11th 15 12th 16 13th 17 14th 18 15th 19 16th 20 17th 21 18th 22 19th
0.07%
Installation Piping Installation of Floor Connections, Drains Etc. 18% 80%
18.00% 18.00% 18.00% 18.00% 18.00% 18.00% 18.00% 18.00% 18.00% 18.00% 18.00% 18.00% 18.00% 18.00% 18.00% 18.00% 18.00% 18.00% 18.00% 18.00% 18.00% 18.00%
80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80%
Overall Progress Testing & Inspection 2%
2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2%
Percentage 100%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
Dated : 07‐01‐17 Page No. : 18 of 31
PROGRESS REPORT OF PLUMBING, DRAINAGE, FIRE FIGHTING AND MISC. WORKS (DRAINAGE‐OUTLETS / FLOOR DRAINS) FOR SENDIAN TOWER PROJECT COM49‐LUSAILInstallation
18%
18.00% 18.00% 18.00% 18.00% 18.00% 18.00% 18.00% 18.00% 18%
80% 80% 80% 80% 80% 80% 80% 80% 80%
2% 2% 2% 2% 2% 2% 2% 2% 2%
18%
80%
2%
Installation of Floor Drains
S. No.
Floors
Weightage (%age)
23 20th 24 21st 25 22nd 26 23rd 27 24th 28 25th 29 26th 30 27th 31
Pent House
TOTAL
0.07%
Overall Progress
Piping Connections, Etc. 80%
Testing & Inspection 2%
Percentage 100%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100%
Dated : 07‐01‐17 Page No. : 19 of 31
PROGRESS REPORT OF PLUMBING, DRAINAGE, FIRE FIGHTING AND MISC. WORKS (FIRE FIGHTING‐PUMPS) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
S. No.
Item
Weightage (%age)
Lifting & Placement 80%
Fire Fighting Pumps
OVERALL TOTAL
6.29%
80%
6.29%
80.00%
Installation of Material Connection with Testing & Piping system Inspection 18% 2% 18.00%
18.00%
Overall Progress
Percentage 100%
2%
2.00%
100%
100.00%
Dated : 07‐01‐17
PROGRESS REPORT OF PLUMBING, DRAINAGE, FIRE FIGHTING AND MISC. WORKS (FIRE FIGHTING‐PIPING) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
Page No. : 20 of 31
Installation (Floor) Installation of Supports
S. No.
Floors
1st
6
3rd
7
4th
8
5th
9
6th
10
7th
11
8th
12
9th
40%
10%
8%
2%
2%
5%
18%
8%
2%
10.39%
10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 9.95% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00%
8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00%
2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 1.90%
2% 2% 2% 2% 2% 2% 2% 2% 1% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 1%
5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00%
18.00% 18.00% 18.00% 18.00% 18.00% 18.00% 18.00% 18.00% 18 18.00% 18.00% 18.00% 18.00% 18.00% 18.00% 18.00% 18.00% 18.00% 18.00% 18.00% 18.00% 18.00% 18.00% 18.00% 18.00% 18.00% 18.00% 18.00% 18.00% 18.00% 18.00% 18.00%
8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8. 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00% 8.00%
2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 1.90%
10.39%
5%
40%
10%
8%
2%
2%
5%
18%
8%
2%
14 11th 15 12th 17 14th 18 15th 19 16th 20 17th 21 18th 22 19th 23 20th 24 21st 25 22nd 26 23rd 27 24th 28 25th 29 26th 30 27th 31
Pent House
TOTAL
Overall Progress
Pressure Ins Inspec pectio tion n Testing
40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00%
13 10th
16 13th
Installation (Riser) Sprinkler Installation Installation Inspection Installation of Supports of Pipes
5%
3 Ground 2nd
Pressure Testing
5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00%
2 Basement‐1
5
Sprinkler droppers
Weightage (%age)
1 Basement‐2
4
Installation of Pipes
Perce Percenta ntage ge 100%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 98.95% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 98.80%
99.927%
PROGRESS REPORT OF PLUMBING, DRAINAGE, FIRE FIGHTING AND MISC. WORKS (FIRE FIGHTING‐FIRE HOSE REEL/CABINET) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
Installation of cabinet
S. No.
Floors
Weightage (%age)
1 Basement‐2 2 Basement‐1 3 Ground 4
1st
5
2nd
6
3rd
7
4th
8
5th
9
6th
10
7th
11
8th
12
9th
13 10th 14 11th 15 12th 16 13th 17 14th 18 15th 19 16th 20 17th 21 18th
4.40%
50%
50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 50.00% 40% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50%
Installation Installation of Hose Reel, Valves, Pressure Pressure Gauges, Testing Piping, Etc. 40% 8%
40% 40% 40% 40% 40% 40% 40% 40% 30% 40% 40% 40% 40% 40% 40% 40% 40% 40% 40% 40% 40%
8% 8% 8% 8% 8% 8% 8% 8% 4% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8%
Dated : 07‐01‐17 Page No. : 21 of 31
Overall Progress Insp Inspec ectio tion n
Perc Percen entag tage e
2%
100%
2% 2% 2% 2% 2% 2% 2% 2% 1% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 75.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
PROGRESS REPORT OF PLUMBING, DRAINAGE, FIRE FIGHTING AND MISC. WORKS (FIRE FIGHTING‐FIRE HOSE REEL/CABINET) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
Installation of cabinet
S. No.
Floors
Weightage (%age)
22 19th 23 20th 24 21st 25 22nd 26 23rd 27 24th 28 25th 29 26th 30 27th 31
Pent House
TOTAL
4.40%
50%
Installation Installation of Hose Reel, Valves, Pressure Pressure Gauges, Testing Piping, Etc. 40% 8%
Dated : 07‐01‐17 Page No. : 22 of 31
Overall Progress Insp Inspec ectio tion n
Perc Percen entag tage e
2%
100%
50% 50% 50% 50% 50% 50% 50% 50% 50% 50%
40% 40% 40% 40% 40% 40% 40% 40% 40% 40%
8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8%
2% 2% 2% 2% 2% 2% 2% 2% 2% 2%
50%
40%
8%
2%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
99%
PROGRESS REPORT OF PLUMBING, DRAINAGE, FIRE FIGHTING AND MISC. WORKS (FIRE FIGHTING‐FIRE EXTINGUISHERS) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
S. No.
Floors
Weightage (%age)
1 Basement‐2 2 Basement‐1 3 Ground 4
1st
5
2nd
6
3rd
7
4th
8
5th
9
6th
10
7th
11
8th
12
9th
13 10th 14 11th 15 12th 16 13th 17 14th 18 15th 19 16th 20 17th 21 18th 22 19th 23 20th
0.98%
Installation Placement/Installation of Fire Extinguishers/Blankets 98%
Dated : 07‐01‐17 Page No. : 23 of 31
Overall Progress Insp Inspec ecti tion on
Perc Percen enta tage ge
2%
100%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
PROGRESS REPORT OF PLUMBING, DRAINAGE, FIRE FIGHTING AND MISC. WORKS (FIRE FIGHTING‐FIRE EXTINGUISHERS) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL Installation S. No.
Floors
Weightage (%age)
Placement/Installation of Fire Extinguishers/Blankets 98%
Dated : 07‐01‐17 Page No. : 24 of 31
Overall Progress
Insp Inspec ecti tion on
Perc Percen enta tage ge
2%
100%
0% 0% 0% 0% 0% 0% 0% 0%
24 21st 25 22nd 26 23rd 27 24th 28 25th 29 26th 30 27th 31
Pent House
TOTAL
0.98%
0%
0%
0%
Dated : 07‐01‐17 Page No. : 25 of 31
PROGRESS REPORT OF PLUMBING, DRAINAGE, FIRE FIGHTING AND MISC. WORKS (FIRE FIGHTING‐VALVES) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
S. No.
Floors
Weightage (%age)
1 Basement‐2 2 Basement‐1 3 Ground 4
1st
5
2nd
6
3rd
7
4th
8
5th
9
6th
10
7th
11
8th
12
9th
13 10th 14 11th 15 12th 16 13th 17 14th 18 15th 19 16th 20 17th 21 18th 22 19th
2.68%
Installation Installation of Fire Inspe Inspec ction tion Fighting Valves 98% 2%
98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00%
2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00%
Overall Progress Perc Percen enta tage ge 100%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
Dated : 07‐01‐17 Page No. : 26 of 31
PROGRESS REPORT OF PLUMBING, DRAINAGE, FIRE FIGHTING AND MISC. WORKS (FIRE FIGHTING‐VALVES) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
S. No.
Floors
Weightage (%age)
23 20th 24 21st 25 22nd 26 23rd 27 24th 28 25th 29 26th 30 27th 31
Pent House
TOTAL
2.68%
Installation Installation of Fire Inspe Inspec ction tion Fighting Valves 98% 2%
98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00% 98.00%
2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00%
98%
2%
Overall Progress Perc Percen enta tage ge 100%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100%
Dated : 07‐01‐17 Page No. : 27 of 31
PROGRESS REPORT OF PLUMBING, DRAINAGE, FIRE FIGHTING AND MISC. WORKS (FIRE FIGHTING‐GRP TANK) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
S. No.
Item
Weightage (%age)
Installation of pipe supports, etc. 5%
1
GRP Tank pipe fittings, etc.
OVERALL TOTAL
Installation of Material Connections with Leak Testing & piping, accessories, Inspection etc. 93% 2%
0.43%
5%
92.00%
0.43%
5%
92%
Overall Progress
Percentage 100%
2%
2%
99%
99%
Dated : 07‐01‐17 Page No. : 28 of 31
PROGRESS REPORT OF PLUMBING, DRAINAGE, FIRE FIGHTING AND MISC. WORKS (FIRE FIGHTING‐AEROSOL SUPPRESSION SYSTEM) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
Installation, etc.
S. No.
1
Item
Weightage (%age)
Installation of electrical wiring, connections, etc. 43%
Installation of Installation of heat Aerosol Generator, detectors, etc. etc. 15% 40%
AEROSOL Suppression System
0.56%
43.00%
15%
39%
OVERALL TOTAL
0.56%
43.00%
15.00%
39.00%
Overall Progress Testing & Inspection
2%
Percentage 100%
2%
1.50%
98.50%
98.50%
Dated : 07‐01‐17 Page No. : 29 of 31
PROGRESS REPORT OF PLUMBING, DRAINAGE, FIRE FIGHTING AND MISC. WORKS (FIRE FIGHTING‐NOVEC SYSTEM) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
Installation of Material
S. No.
1
Item
Weightage (%age)
8%
Installation of piping, nozzles, etc. 70%
Installation of Cylinders/Panels/E uipments, etc. 12%
Installation of Supports
Overall Progress Pressure Testing
Inspection
Percentage
8%
2%
100%
NOVEC Fire Protection System
28.69%
8.00%
70.00%
11%
2%
OVERALL TOTAL
28.69%
8.00%
70.00%
11.00%
2.00%
1%
1.00%
92%
92.00%
Dated : 07‐01‐17 Page No. : 30 of 31
PROGRESS REPORT OF PLUMBING, DRAINAGE, FIRE FIGHTING AND MISC. WORKS (FIRE FIGHTING‐SNG SYSTEM) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL Installation (Floor)
S. No.
Floors
Weightage (%age)
Installation (Riser)
Overall Progress
Installation of SNG System
Installation of Supports
Installation of carbon steel pipes, jointing, Etc.
Pressure Testing & Inspection
Installation of Supports
Installation of pipes, jointing, Etc.
Pressure Testing & Inspection
Percentage
13%
5%
40%
2%
5%
33%
2%
100%
13% 13% 13% 13% 13% 13% 13% 13% 13% 13% 13% 13% 13% 13% 13% 13% 13% 13% 13% 13% 13% 13% 13% 13% 13% 13% 13% 13%
5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00%
39% 39% 40% 40% 40% 40% 39% 40% 40% 40% 40% 40% 40% 40% 40% 40% 40% 40% 40% 40% 40% 40% 40% 40% 40% 40% 40% 40%
2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2%
5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00%
32 32.34% 32 32.34% 33.00% 33.00% 33.00% 33.00% 32 32.34% 33.00% 33.00% 33.00% 33.00% 33.00% 33.00% 33.00% 33.00% 33.00% 33.00% 33.00% 33.00% 33.00% 33.00% 33.00% 33.00% 33.00% 33.00% 33.00% 33.00% 33.00%
2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2%
13%
5%
40%
2%
5%
33%
2%
1 Basement‐2 2 Basement‐1 3 Ground 4 5 6 7 8
1st 2nd 3rd 4th 5th
11
6th 7th 8th
12
9th
9 10
13 10th 14 11th 15 12th
5.53%
16 13th 17 14th 18 15th 19 16th 20 17th 21 18th 22 19th 23 20th 24 21st 25 22nd 26 23rd 27 24th 28 25th 29 26th 30 27th 31
98.54% 98.54% 100.00% 100.00% 100.00% 100.00% 98.54% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
Pent House
TOTAL
5.53%
100%
Dated : 07‐01‐17 Page No. : 31 of 31
PROGRESS REPORT OF PLUMBING, DRAINAGE, FIRE FIGHTING AND MISC. WORKS (FIRE FIGHTING‐SNG SYSTEM) FOR SENDIAN TOWER PROJECT COM49‐LUSAIL
S. No.
Floors
Weightage (%age)
3.06%
40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 40.00% 32.00%
3.06%
20%
5%
40%
3 Ground
1st 2nd
6
3rd
7
4th
8
5th
9
6th
10
7th
11
8th
12
9th
13 10th 14 11th 15 12th 16 13th 17 14th 18 15th 19 16th 20 17th 21 18th 22 19th 23 20th 24 21st 25 22nd 26 23rd 27 24th 28 25th 29 26th 30 27th 31
Pent House
TOTAL
5%
5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00%
2 Basement‐1
5
Installation (Floor) Installation of copper pipes, jointing, jointing, Etc. 40%
Installation of Supports
20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 5%
1 Basement‐2
4
Shifting, placement & Installation of Storage Tank 24%
Insulation, etc. 1%
0%
Pressure Testing & Inspection 2%
Installation of Supports 5%
Installation (Riser) Installation of Insulation, copper pipes, etc. jointing, jointing, Etc. 20% 1%
Overall Progress Pressure Testing & Inspection 2%
2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 1%
5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00% 5.00%
20.00% 20.00% 20.00% 20.00% 20.00% 20.00% 20.00% 20.00% 20.00% 20.00% 20.00% 20.00% 20.00% 20.00% 20.00% 20.00% 20.00% 20.00% 20.00% 20.00% 20.00% 20.00% 20.00% 20.00% 20.00% 20.00% 20.00% 20.00% 20.00% 20.00% 20.00%
1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00%
2. 2.00% 2. 2.00% 2. 2.00% 2. 2.00% 2. 2.00% 2. 2.00% 2. 2.00% 2. 2.00% 2. 2.00% 2. 2.00% 2. 2.00% 2. 2.00% 2. 2.00% 2. 2.00% 2. 2.00% 2. 2.00% 2. 2.00% 2. 2.00% 2. 2.00% 2. 2.00% 2. 2.00% 2. 2.00% 2. 2.00% 2. 2.00% 2. 2.00% 2. 2.00% 2. 2.00% 2. 2.00% 2. 2.00% 2. 2.00% 2.00%
2%
5%
20%
1%
2%
Percentage 100%
95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 95.00% 71.00%
94%