Home
Add Document
Sign In
Register
Method Statement Coring
Home
Method Statement Coring
This is the Typical Method statement for coringFull description...
Author:
kkk
35 downloads
517 Views
177KB Size
Report
DOWNLOAD .PDF
Recommend Documents
Method Statement for Coring & Cutting
Sample Method StatementFull description
Method Statement
Full description
Method Statement
Full description
Method Statement
Full description
Method Statement
Full description
Method Statement
Full description
Method Statement
Full description
Method Statement
Full description
Method Statement
Full description
Method Statement
Method Statement
sharjah method statementFull description
Method Statement
Full description
METHOD STATEMENT
Full description
162509339 Coring Dan Coring Analys
CORINGDeskripsi lengkap
Coring
Descripción: coring guidelines
Blinding Concrete- Method Statement
Method
BOX CULVERTS-Method Statement
MethodFull description
Outline Construction Method Statement
Method Statement Outline, construction
Pekerjaan STP - Method Statement
Full description
Electrical Panels Method Statement
MS for Testing and commissioning of electrical panelFull description
Method of Statement Firefighting
Method of statement Fire FightingFull description
Construction Method Statement
ConstructionFull description
Method Statement (RC Slab)
Method statement (RC Slab)
Method Statement (RC Slab)
Method statement (RC Slab)Full description
Method Statement Diamond Concrete Coring Work Sequence A)
Mark out the position to be cored.
B)
Ensure that there is no services infront and behind the location to be cored.
C)
Move away or protect thing that is directly underneath the area to be cored.
D)
Drill and install wall anchor.
E)
Mount coring machine stand.
F)
Fix the core bit to the machine.
G)
Adjust and center the corebit to the marked position.
H)
Setup water protection system at front and behind of wall if require.
I)
Start the coring machine.
J)
Turn on the water system and start coring.
K)
Once cored through, stop the motor and water.
L)
Remove drill motor and diamond bit.
M)
Remove cored concrete core.
N)
Clean up area and move to the next location.
Note: For coring thru slab, ensure that all protection at floor below is done. (See attach sketch)
×
Report "Method Statement Coring"
Your name
Email
Reason
-Select Reason-
Pornographic
Defamatory
Illegal/Unlawful
Spam
Other Terms Of Service Violation
File a copyright complaint
Description
×
Sign In
Email
Password
Remember me
Forgot password?
Sign In
Our partners will collect data and use cookies for ad personalization and measurement.
Learn how we and our ad partner Google, collect and use data
.
Agree & close