Leveraging Cloud for Non-Production Environments Moving to the cloud not only enables application development and testing organizations to reduce capital outlays; it can also reduce IT cycle times while improving quality.
cognizant reports | January 2014
Executive Summary Organizations are operating in a tough business environment marked by stiff competition, increasing regulations and dynamic consumer behavior. Given the escalating dependence on IT for competitive advantage, technology projects are growing in number, scope and complexity, even while cycle times are narrowing. This puts pressure on development and testing teams, many of which are struggling with insufcient
in-house infrastructures and budget constraints. The cloud addresses the traditional limitations of in-house IT environments, including the huge costs associated with buying, building, running and maintaining IT infrastructure, as well as the time delays in provisioning IT services.
•
Carefully evaluating evaluating vendors vendors and their terms terms and conditions. Organizations would do well to partner with providers capable of assessing their cloud needs and delivering managed services to leverage the true power of the cloud.
Forces Driving Cloud Testing Because of the growing reliance on software to enhance productivity and gain competitive advantage, development and testing (or “non-production”) teams are now required to quickly and nimbly deliver a greater number of core run-the-business applications. applications. The truth is, IT departments are challenged to keep up. Roughly 94% of IT executives surveyed by IDG Research for Delphix, a provider of agile data management services, said it is difcult to deliver projects on
Cloud architectures also provide immediate and cost-effective access to a vast pool of computing resources, resulting in reduced cycle times. Cloud facilitates real-time collaboration among developers, testing teams and other stakeholders, who can more readily test and share feedback to positively impact application behavior at the enduser level. Additionally, the cloud’s pay-per-use model provides nancial exibility by reducing Op-Ex and eliminating the need for upfront Cap-Ex,
allowing teams to create sophisticated labs, which are not always feasible in-house. While there are many success stories of early adopters, several factors have caused some IT organizations to tread cautiously or avoid cloud altogether. These issues include security, lack of control over data and infrastructure, the complexity of seamless integration of internal legacy systems and cloud management. However, most challenges can be overcome by:
•
Basing your evaluation of moving to the cloud on clearly identied business requirements.
•
Understanding the cultural and process changes that must be overcome to effectively embrace cloud computing. • Utilizing IT and non-production teams to ascertain the overall organization’s preparedness to move to the cloud, manage legacy systems, and ensure that development and test environments environmen ts match m atch business requirement requirements. s. Establishing Establishin g processes and proper administra • tion to manage cloud utilization and costs.
cognizant reports
time and budget, with 76% saying the level of difculty is either increasingly aggravated or staying the same. The level of difculty is greater
during development (48%), followed by testing (38%), according to the 108 executives surveyed. 1 We believe the time has come to think beyond the manual creation of in-house testing environments and utilize cloud computing for testing, especially with the following pressures pressures that IT organizations face: Time-to-Market Pressure
Due to stiff competition, businesses are increasingly releasing and updating customer-facing and internal applications to retain existing customers and attract new ones. This places enormous pressure on non-production teams to quickly turn around projects. However, procuring computing and storage resources for application development and testing is no easy task. It involves seeking permission and budget sanctions from IT teams, which typically takes several weeks. Improper scheduling of projects and sharing of resources among multiple teams sometimes lead to non-availability of resources, resulting in unwarranted delays. Further, this approach is not suitable for handling sudden spikes in demand for non-production activity. Challenges with In-house Environments
Software applications are becoming large and complex as IT touches more business functions and grows in importance, particularly in the consumer products and services industry. For instance, a hundred million lines of software code
2
are built into today’s high-end cars; meanwhile, the U.S. government’s healthcare Web site (www.healthcare.gov ) has 500 million lines of code, and Facebook runs on more than 60 million lines of code. 2 Many times, the infrastructure provided for non-production environments is obsolete and does not scale. Poorly built environments cannot support the rigorous needs of application development and do not facilitate full test coverage, resulting in defects creeping into production. Unscheduled infrastructure maintenance that causes environment unavailability unavailabi lity and downtime at inopportune times is not uncommon. With development projects becoming increasingly distributed, traditional approaches can no longer guarantee continuous communication and high-level collaboration among geographically dispersed non-production teams. Moreover, in addition to their core activities, non-production teams are sometimes required to manage environments due to a lack of resources.
application development and testing tools, hardware, etc. and maintain them. Working with limited budgets may prohibit teams from fully and reliably executing projects that meet business objectives. This increases project risk and may require organizations to incur additional expenditures to deploy resources in order to purge software of defects, contend with application rollout delays and manage customer frustration. Demand Variations
Demand for non-production activity is sporadic, typically involving crests and prolonged troughs. Hence, computing resources procured to meet demand often remain underutilized when demand recedes. Teams also tend to retain non-production environments environmen ts created for a particular assignment in the event they are needed again due to setup complexity, thus locking up computing resources. It is, therefore, not surprising that 70% of the IT budget is allocated to keeping idle servers turned on, according to CloudTimes.org. 4
Moving to the Cloud Nearly half (47%) of 542 organizations in the
Cost Pressure
U.S. and Europe already use the cloud for
Despite the economic rebound, IT budgets have
application development and testing, with another 43% planning to move (see Figure 1), according to a survey by Luth Research and Vanson Bourne, sponsored by CA Technologies. 5
been at to negative since the dot-com bust of
2002 and were projected to be slightly down this year, with a weighted global average decline of 0.5%, according to the Gartner Executive
Programs survey of 2,053 global CIOs in the fourth quarter of 2012. 3 Non-production projects require large Cap-Ex budgets to purchase
Existing IT environments in many organiza-
tions do not support the growing infrastructural needs and other business requirements
Applications Moving to Cloud Back-office (HR/CRM)
5555
38
6
Consumer-facing
5757
37
6
Core LOB
5151
48
10
Test/Development
47 47
43
10
Communication/VOIP
5151
Workforce Productivity
40
5252
Web Infrastructure
40
5454
IT Security
12 18
34
20%
Are Ar e cur curre rent ntly ly in cl clou oud d
7
37
4848 0%
8
39
52 52
IT Management
9
40%
60 %
Are Ar e pla plann nnin ing g to to mov move e to to clo cloud ud
Source: “TechInsights Report: Cloud Succeeds. Now What?” CA Technologies, May 2013.
Figure 1
cognizant reports
3
8 0%
100 %
Will Wi ll ne neve verr mov move e to to clo cloud ud
of non-production teams, as well as quick turnaround objectives. Developers and testers require
the core IT organization. This reduces wait times and tightens the overall development cycle. As infrastructure is not owned by the company, teams can focus on coding and innovation without worrying about infrastructure maintenance issues.
more exible and streamlined workow processes
and on-demand access to computing resources to accelerate delivery. Moving non-production activities to the cloud delivers much-needed operational agility, as well as cost advantages, in addition to the following benets
•
Streamlined
application
delivery: Cloud-
based environments provide on-demand access to a vast array of computing resources, such as the browsers, servers, operating systems, application builds, etc. required to build and operate sophisticated environments. The self-service model allows teams to easily build, change and scale up and down environments almost instantly, without the involvement of
•
As infrastructure is not owned by the company, teams can focus on coding and innovation without worrying about infrastructure maintenance.
It is not always an option to reproduce and resolve bugs with limited in-house resources, and when it is, these tasks are often time-consuming and challenging to complete. The cloud allows rapid reproduction of bugs without worrying about scale. Moreover,
Quick Take Panasonic’s Venture into the Cloud With the amount of software software embedded in automobiles growing rapidly and delivery cycles halved over a three-year timeframe, Panasonic Automotive Systems Company of America (PASA) was hard-pressed to deliver software systems quickly. PASA, which manufactures in-vehicle infotainment (IVI) systems, employed distributed teams across the globe and procured more bandwidth and other resources to meet the tight deadlines. But the company was encountering encountering long build times (running from 10 to 30 minutes and even 117 minutes for one project, due to rapidly increasing source code) and unreliable builds, which slowed delivery and reduced the time for testing. Collaboration was another issue, as development teams in Europe, India and Japan
were unable to use the same toolsets in the same ways and operate on the same processes as their counterparts in the Atlanta-based data center even though they were linked. 6 These integration and coordination issues prolonged the development lifecycle and boosted expenditures on hardware and human resources, which increased project costs; meanwhile, existing IT infrastructure was insufcient to meet demand peaks.7 These issues promoted PASA to move development to the cloud. The company used Electric
Cloud’s build acceleration acceleration and optimization software as a service (SaaS) and CloudOne PaaS. Moving to the cloud helped PASA cut build time across many projects by about 400%, enhancing the overall development velocity velocity by 200%.8 The waiting period for developers submitting concurrent build requests was reduced from one hour to 10 minutes. Reduced process cycle times provided more testing opportunities. With development consolidated on the cloud, global teams could share and collaborate, as they had the same experience for authentication, access to the same version and conguration of the development environment.9
The pay-per-use option, quick and easy access to tools and simpler resource consumption tracking allowed PASA to handle growing IVI requirements without increasing its infrastructure spending or development costs. Further, PASA was able to realize its ROI within two months of deploying the solution.
cognizant reports
4
the cloud also facilitates secured real-time collaboration among distributed teams through shared access to virtual machines that run test code. Developers and testers can
with
allowing the dispersed team to deliver quality output more quickly.
•
•
Financial fexibility: Pay-per-use is perhaps
the most attractive feature drawing more companies toward the cloud. Using the cloud’s platform-as-a-service (Paas) model, organizations can quickly spin up environments based on requirements and scale down environments when demand ebbs, paying only for what they consume. With cloud computing, teams will have access to the latest development and testing tools, while organizations are liberated from incurring Cap-Ex to buy infrastructure to
meet demand peaks and computing resources resources that often remain idle during periods of low demand.
to
Innovation: Moving to the cloud frees teams
from maintenance and troubleshooting activities, enabling them to focus more on IT strategies to drive business. Rapid prototyping allows organizations to quickly identify whether a project is worth pursuing so that it can decide early on whether to terminate it or invest further, thus saving time and resources, as well as increasing the pace of innovation.
As with any new technology, the cloud presents new challenges, even while addressing the limitations of a traditional non-production development. Among these challenges are:
•
teams, which reduces Op-Ex. Additional cost benets stem from factors such as optimal
compute, storage and software utilization through virtualization; reduction in support costs through standardization; and reduced manual intervention through automation. Testing in the cloud can initially be more costly than in-house testing, as organizations must design their systems to work with the cloud’s underlying architecture, which can consume both time and money. However, over the long term, this approach can save 30% to 40% of total expenditures, according to IDC. 11
Security and control: Safeguarding data
and the lack of control over infrastructure are perhaps the biggest reasons many organizations move cautiously when it comes to cloud adoption. Since all services are hosted remotely, the organization often does not know where the data is stored and the servers are located. There is no clarity on what happens to the data if a vendor suddenly exits from the cloud business or the contract expires. Organizations must keep track of all the data stored in the cloud; otherwise, sensitive business data might be left in the public cloud forever. Recent cloud outages 12 at major cloud vendors have fueled doubts about cloud’s efciency. However, over time, cloud vendors
have experienced fewer outages, and they often provide better uptime and use the latest security systems compared with in-house data centers. Organizations must perform due diligence to evaluate security and contingency aspects while choosing a vendor (see sidebar, next page).
Quality: The cloud allows teams to cre-
ate production-like environments that were previously not feasible with in-house resources. This allows extensive testing of applications
cognizant reports
congurations
Operational Challenges
By not owning the IT infrastructure, organizations also cut infrastructure maintenance and support costs, as well as the number of human resources resourc es required to support non-production
•
network
simulate how they will behave with real end users so that there are no surprises once the application is put into production. Teams can develop prototypes faster, evaluate their performance and gain feedback from users, designers and other stakeholders iteratively. This ensures that the application aligns with user requirements, reduces the need for changes in the development phase, and improves the reliability of the applications.
discuss and x bugs iteratively in real-time,
Cloud platforms reduce overall development time by about 15%, on average, according to a recent survey of more than 400 developers conducted in December 2012. (See sidebar, previous page, for Panasonic’s venture into the cloud).10
different
5
Quick Take A Cloud Suitor Checklist Attributes Attribut es of an effectiv effective e cloud partner include: •
Availability of of a vast pool of computing resources with the latest skills.
•
Ability to complement the non-production team’s team’s skill set and support requirements.
•
Demonstrated level level of security and regulatory compliance.
•
Documented cloud reliability and high service availability. availability.
•
Transparency Tr ansparency in pricing and provision of cost calculators.
•
Range of technical support provided.
•
Integrating legacy systems: Many organiza-
tions still depend on legacy applications and platforms for critical business processes. The complex interdependency of these systems often does not allow for seamless integration with the cloud and creates interoperability
•
issues. More than half (58%) of 300 European
IT leaders cited complexity of their IT environments as the biggest impediment to large-scale adoption of the cloud, according to a recent
Cloud management: The key to realizing cloud
computing’s true advantages is to manage its usage through prudent capacity planning and monitoring. Non-production teams must carefully plan infrastructure requirements in advance and turn off cloud resources as soon as the job is complete; otherwise, costs will escalate, making the cloud much more expensive than on-premises labs. One way to overcome this is to employ software tools such as Cloudyn, Cloudability
NTT Europe survey.13
Significant Challenges by Cloud Maturity 50% s t n e d n o p s e R f o %
25%
0%
Cloud Beginners Security
Cloud Explorers
Governance/Control
Integration wi with pr private cloud
Compliance Lack of ex expertise
Cloud-Focused Integration with internal systems Managing multiple clouds
Source: “RightScale State of the Cloud Report,” 2013 Note: “Cloud Beginners” are new to cloud computing and seek experience to determine its use in future projects. “Cloud Explorers” already have multiple projects and applications in the cloud and are focused on expanding their cloud usage. “Cloud-Focused” are heavy users of cloud infrastructure “Cloud-Focused” infrastructure and are looking to optimize cloud operations operations and cloud costs. Response base: 625 business executives
Figure 2
cognizant reports
6
and Newvem to monitor and manage costs. The tools provide usage and cost analytics and allow custom report creation based on metrics such as time, project, application, etc. They provide daily updates and alerts on possible budget overruns to reduce unwanted surprises late in the process. Fear of vendor lock-in is another worrisome issue. Moving to a new cloud vendor is not an easy process, as a lack of standardization results in poor interoperability among cloud vendors.14
Embracing Cloud The aforementioned challenges, however, should not deter organizations from exploring cloud. That’s because in many cases, existing IT environments have outlived their useful life. As organizations spend more time using cloud computing, they will better understand and experience
the
benets
and
report
fewer
challenges, according to a recent RightScale survey 15 (see Figure 2, previous page). Organizations can overcome all of these challenges through proper capacity planning,
carefully choosing vendors and working closely with them, while establishing processes and controls to monitor and manage cloud usage. Those fearing security and other risks associated with the public cloud can build a private cloud and gain more control, but that requires huge capital expendituress and large-scale adoption to provide expenditure a cost advantage.16 Many organizations have started their journey by moving non-production projects to the cloud to reap immediate benets while giving themselves time to explore other cloud capabilities. Public cloud provides immediate benets to orga nizations. Working with an experienced partner that thoroughly understands the business and technological challenges and has an established industry track record offering managed services can provide a smooth transition to the cloud. As cloud computing matures and standards are established, more organizations will consider using it for non-production activities. By then, smart organizations will have progressed to utilizing the cloud to enable more cost-effective and innovative ways of working.
Footnotes 1
“Enterprise “Enterpris e Application Development MarketPulse,” IDG for Delphix, October 2012,
http://www.delphix.com/2012/10/cio-survey-reveals-it-leaders-struggle-to-meet-big-demand-for- enterprise-app-testing-development-and-rollouts-next-year/ .. enterprise-app-testing-development-and-rollouts-next-year/ 2
“Codebases,” Information Is Beautiful, October 30, 2013, http://www.informationisbeautiful.net/visualizations/million-lines-of-code/ .. http://www.informationisbeautiful.net/visualizations/million-lines-of-code/
3
“Gartner Executive Program Survey of More Than 2,000 CIOs Shows Digital Technologies Are
Top Priorities in 2013,” Gartner, January 16, 2013, http://www.gartner.com/newsroom/id/2304615 . 4
“Getting Private Cloud? Better Change Your Funding Model,” By the Bell, September 25, 2012, http://bythebell.com/2012/09/getting-private-cloud-better-change-your-funding-model.html .
5
“TechInsights Report: Cloud Succeeds. Now What?” CA Technologies, May 2013, http://www.ca.com/us/~/media/Files/whitepapers/techinsights-report-cloud-succeeds.pdf .. http://www.ca.com/us/~/media/Files/whitepapers/techinsights-report-cloud-succeeds.pdf
6
“How Cloud Accelerates Development and Delivery of In-car Software,” ZDnet, Sept. 5, 2013, http://www.electric-cloud.com/pdf/EC-CS_panasonic.pdf .. http://www.electric-cloud.com/pdf/EC-CS_panasonic.pdf
7
“The Cloud Behind the Connected Car: A Case Study on Cloud-Based Software Development,” Development,” Electric Cloud, 2012,
http://www.zdnet.com/how-cloud-accelerates-development-and-delivery-of-in-car-soft- ware-7000020263/ .
cognizant reports
7
8
Ibid.
9
“How Cloud Accelerates Development and Delivery of In-car Software,” ZDnet, Sept. 5, 2013, http://www.electric-cloud.com/pdf/EC-CS_panasonic.pdf .. http://www.electric-cloud.com/pdf/EC-CS_panasonic.pdf
10
“By Using Cloud Platforms, Developers Reduce Development Time by Nearly 15%,” Evans Data Corp.,
January 9, 2013, http://www.evansdata.com/press/viewRelease.php?pressID=196 . 11
“Testing in the Cloud,” Software Magazine , July 2013, http://www.softwaremag.com/content/ContentCT.asp?P=3516 .
12
“Downtime Report: Top Ten Outages in 2013,” Neverfail, Dec. 19, 2013, http://www.neverfailgroup.com/blog/announcements/downtime-report-top-ten-outages-in-2013/ .. http://www.neverfailgroup.com/blog/announcements/downtime-report-top-ten-outages-in-2013/
13
“Growing Pains In The Cloud,” NTT Communicatio Communications, ns, 2013, http://www.eu.ntt.com/leadmin/NTT-Europe/media/PDF/Research_Reports/NTT_Research_Report_ Growing_Pains_In_The_Cloud_FINAL.pdf .. Growing_Pains_In_The_Cloud_FINAL.pdf
14
“The Big Lesson Cloud Computing Needs To Learn From The History Of The Web,” ZDNet.com, June 27, 2013, http://www.zdnet.com/the-big-lesson-cloud-computing-needs-to-learn-from-the-history-of-the- web-7000017343/ .
15
“RightScale State Of The Cloud Report 2013,” RightScale, March 2013, http://www.rightscale.com/pdf/rightscale-state-of-the-cloud-report-2013.pdf .. http://www.rightscale.com/pdf/rightscale-state-of-the-cloud-report-2013.pdf
16
“Put Your Test Lab In Cloud,” InformationWeek , 2012, http://www.informationweek.com/services/hosted-applications/put-your-test-lab-in-the- cloud/232700441?ct=1022&pgno=1 .
References
•
“The Cloud Behind the Connected Connected Car: Cloud-Based Cloud-Based Software Software Development Development at Panasonic Panasonic Automotive,” BrightTalk, Aug. 29, 2013, https://www.brighttalk.com/webcast/7695/83777 .
•
“Three Ways to Move Application Development to the Cloud,” Oracle Corp., 2013, http://www.oracle.com/us/solutions/cloud/application-development-cloud-1945542.pdf .
•
“Building Your Your Dev & Test Cloud,” Microland & Eucalyptus, 2013,
http://www.eucalyptus.com/sites/all/les/wp-eucalyptus-microland-build-dev-test-cloud.pdf .. http://www.eucalyptus.com/sites/all/les/wp-eucalyptus-microland-build-dev-test-cloud.pdf
•
“Cloud Computing: The Good, Good, the Bad – and the Beautiful,” Beautiful,” PhoenixNap, PhoenixNap, 2013, http://www.valleytalk.org/wp-content/uploads/2013/ http://www. valleytalk.org/wp-content/uploads/2013/03/ 03/AST AST-0079699_PNAP_Cloud_W -0079699_PNAP_Cloud_WP_1.22.13.pdf P_1.22.13.pdf .
•
“Deliveri ng Large-Scale IT Projects on Time, on Budget and on Value,” McKinsey, 2012, “Delivering http://www.mckinsey.com/insights/business_technology/delivering_large-scale_it_projects_on_ time_on_budget_and_on_value .. time_on_budget_and_on_value
•
“A Modernized Software Software Environment for Developing, Deploying and Operating Cloud Applications,”
VMware, 2012, http://www.vmware.com/les/pdf/Modernizing_App_Develpment_Whitepaper.pdf .
cognizant reports
8
Credits Author and Analyst Vinaya Kumar Mylavarapu, Cognizant Research Center
Subject Matter Experts Saravanan Kumar, Associate Director, Integrated Services Leader
Design Harleen Bhatia, Creative Director Suresh Satyavarapu, Designer
About Cognizant Cognizant (NASDAQ: CTSH) is a leading provider of information technology, consulting, and business process outsourcing services, dedicated to helping the world’s leading companies build stronger businesses. Headquartered in Teaneck, New Jersey (U.S.), Cognizant combines a passion for client satisfaction, technology innovation, deep industry and business process expertise, and a global, collaborative workforce that embodies the future of work. With over 50 delivery centers worldwide and approximately 166,400 employees as of September 30, 2013, Cognizant is a member of the NASDAQ-100, the S&P 500, the Forbes Global 2000, and the Fortune 500 and is ranked among the top performing an d fastest growing companies in the world. Visit us online at www.cognizant.com www.cognizant.com or or follow us on Twitter: Cognizant.
World Headquarters
European Headquarters
India Operations Headquarters
500 Frank W. Burr Blvd. Teaneck, NJ 07666 USA Phone: +1 201 801 0233 Fax: +1 201 801 0243 Toll Free: +1 888 937 3277 Email:
[email protected]
1 Kingdom Street Paddington Central London W2 6BD Phone: +44 (0) 207 297 7600 Fax: +44 (0) 207 121 0102 Email:
[email protected]
#5/535, Old Mahabalipuram Road Okkiyam Pettai, Thoraipakkam Chennai, 600 096 India Phone: +91 (0) 44 4209 6000 Fax: +91 (0) 44 4209 6060 Email:
[email protected]
© Copyright 2014, Cognizant. All rights reserved. No part of this document may be reproduced, stored in a retrieval system, transmitted in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without the express written permission from Cognizant. The information contained herein is subject to change without notice. All other trademarks mentioned herein are the property of their respective owners.