Karnataka Power Corporation Limited
INTRODUCTION
Organization study is a part of MBA programme which a student has to undergo during their course of study. It narrows the gap between theoretical knowledge and practical situations. Training makes a knowledge man into an experienced one. The principal objective of the study is to inter-r inter-rela elate te the theore theoretic tical al aspects aspects with practi practical cal things things that that are moving moving in indust industry, ry, and studying the organization as a whole. No doubt that the necessary training will be imparted at the work place, but having a brief knowledge before entering an organization will certainly help the individual in learning about the orga organi niza zatio tion n quic quickl kly y and and to impr improv ovee his his perfo perform rman ance ce for for the the bett better ermen ment, t, as well well as the the betterment of the organization for the organization for which he is working
Objectives of the study
To get the practical exposure in the corporate world.
To have a proper balance between the theory and practical knowledge.
To study origin, growth, vision, mission and status of the organization.
To study the functional departments exist in the organization.
To evaluate the effectiveness of the organization.
To study the problem areas in the organization.
To prov provid idee some some valu valuab able le sugg sugges esti tion on to impr improv ovee the the effi effici cien ency cy in the the organization.
VVN.I VV N.INST NST OF OF MGT MGT ,TECH ,TECH & RESE RESEAR ARCH CH B’LOR B’LORE E Page Page 1
Karnataka Power Corporation Limited
COMPANY PROFILE History of the Karnataka power sector
The gears of enterprise enterprise in Karnataka Karnataka powered nascent industrial industrial activity activity as early as the year 1800, when the first sugar unit was set up. In 1902, Karnataka recorded another “mega watt sized project first” - Asia’s first Hydro Electric Power Station in Shivanasamudram, on the banks of river Cauvery. In fact, Karnataka’s pioneering spirit in the field of power has been translated into several major milestones. Karnataka was the first to embark on Alternating current, when Bangalore City’s lighting scheme was completed.
Karnataka had the longest transmission line in the world in 1902, from Shivanasamudram to KGF, covering a distance of 147 km. and Karnataka was the first state in the country to conceive and set up a professionally managed Corporation to plan, construct, operate and maintain power generation projects in the state. That’s the legacy that KPCL started with and built on. KPCL – an overview
For over three decades, the Karnataka Power Corporation has been a prime mover and catalyst behind key power sector reforms in the state - measures that have spiraled steady growth witnessed in both industrial and economic areas. Right from the year of inception, in 1970, KPCL set its sights on “growth from within” meeting growing industry needs and reaching out to touch the lives of the common man, in more ways
than
one.
KPCL today has an installed capacity of 5509.82 MW of hydel, thermal and wind energy, with 4000 MW in the pipeline. The 1470 MW Raichur Thermal Power Station located in Raichur dist is accredited with ISO 14001-2004 certification for its environment protection measures. From an indust industry ry vantag vantagee point, point, KPCL has raised raised the bar on the quality quality of delive deliverab rables les and is constantly working at lowering the cost per megawatt - a commendable cost-value equation that has become a benchmark benchmark on the national national grid. KPCL’s stock in trade is industry proven proven - well-
VVN.I VV N.INST NST OF OF MGT MGT ,TECH ,TECH & RESE RESEAR ARCH CH B’LOR B’LORE E Page Page 2
Karnataka Power Corporation Limited
COMPANY PROFILE History of the Karnataka power sector
The gears of enterprise enterprise in Karnataka Karnataka powered nascent industrial industrial activity activity as early as the year 1800, when the first sugar unit was set up. In 1902, Karnataka recorded another “mega watt sized project first” - Asia’s first Hydro Electric Power Station in Shivanasamudram, on the banks of river Cauvery. In fact, Karnataka’s pioneering spirit in the field of power has been translated into several major milestones. Karnataka was the first to embark on Alternating current, when Bangalore City’s lighting scheme was completed.
Karnataka had the longest transmission line in the world in 1902, from Shivanasamudram to KGF, covering a distance of 147 km. and Karnataka was the first state in the country to conceive and set up a professionally managed Corporation to plan, construct, operate and maintain power generation projects in the state. That’s the legacy that KPCL started with and built on. KPCL – an overview
For over three decades, the Karnataka Power Corporation has been a prime mover and catalyst behind key power sector reforms in the state - measures that have spiraled steady growth witnessed in both industrial and economic areas. Right from the year of inception, in 1970, KPCL set its sights on “growth from within” meeting growing industry needs and reaching out to touch the lives of the common man, in more ways
than
one.
KPCL today has an installed capacity of 5509.82 MW of hydel, thermal and wind energy, with 4000 MW in the pipeline. The 1470 MW Raichur Thermal Power Station located in Raichur dist is accredited with ISO 14001-2004 certification for its environment protection measures. From an indust industry ry vantag vantagee point, point, KPCL has raised raised the bar on the quality quality of delive deliverab rables les and is constantly working at lowering the cost per megawatt - a commendable cost-value equation that has become a benchmark benchmark on the national national grid. KPCL’s stock in trade is industry proven proven - well-
VVN.I VV N.INST NST OF OF MGT MGT ,TECH ,TECH & RESE RESEAR ARCH CH B’LOR B’LORE E Page Page 2
Karnataka Power Corporation Limited
established infrastructure & modern, progressive management concepts and a commitment to excel, helping it meet the challenges of the rising energy demands of Karnataka. The leverage point of KPCL initiatives are its resource management strengths – right across planning, financing and project engineering. KPCL also has a high rating in terms of project completion and commissioning within the implementation calendar.
KPCL Mission & Objectives
KPCL seeks to touch higher vantage points in the world of power engineering. Our formula for achieving this - start with a world class organization, build-in efficiency and cost control and ensure that progress is in harmony with the environment. •
Exploring, identifying and developing opportunities in power generation.
•
Devising innovative ways of setting up and a nd operating power plants.
•
Investing in a resource base of technical competence, systems, processes and capability.
•
Empowering people, work teams and the support network to achieve these objectives.
KPCL Vision
“Ensuring energy security for Karnataka through diversified energy portfolio”.
VVN.I VV N.INST NST OF OF MGT MGT ,TECH ,TECH & RESE RESEAR ARCH CH B’LOR B’LORE E Page Page 3
Karnataka Power Corporation Limited
KPCL's record achievements: •
Highest generation of 26635 million units (2006-2007).
•
Highest thermal generation of 11484 Million Units 2006-07.
•
Highest Plant Load Factor (PLF) of 90.39 % at Raichur Thermal Power Station (20022003).
•
Highest capacity addition of 600 MW, in 1999.
•
Highest Annual Turnover of Rs.3387 Crores (2006-2007). Commissioning of Unit - 7 at RTPS in 25 Months - A National record
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 4
Karnataka Power Corporation Limited
ACHIEVEMENTS OF RTPS
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 5
2003-04 – GOLD SHIELD & CERTIFICATE Karnataka Power Corporation Limited FOR OUTSTANDING PERFORMANCE - 88.23% PLF 2002-03 – GOLD SHIELD & CERTIFICATE FOR OUTSTANDING PERFORMANCE -90.39% PLF 2000-01 and 2001-02 - CERTIFICATE & SILVER SHIELD FOR GOOD PERFORMANCE. 2000,2002 - CERTIFICATE FOR REDUCTION IN AUXILIARY COMSUMPTION. 2001,2002,2003 - CERTIFICATE FOR REDUCTION IN SECONDARY FUEL OIL. 1999-2000 Rs 22.82 LAKHS FOR REDUCTION IN SECONDARY FUEL,OIL,AUXILLARY CONSUMPTION & HIGH PLF OF 81.52% 1998-99 Rs 6.65 LAKHS FOR CASH AWARD & BRONZE MEDAL FOR ACHIEVING HIGH PLF OF 81.65% 1998 - Rs 9.94 LAKHS FOR REDUCTION IN SECONDARY FUEL OIL & AUXILLARY CONSUMPTION. 1997-98 Rs 9.22 LAKHS FOR REDUCTION IN SECONDARY FUEL OIL & AUXILLARY CONSUMPTION. 1996-97 Rs 16.75 LAKHS CASH AWARD AND SHIELD FOR ACHIEVING HIGH PLF OF 70 % &REDUCTION IN SECONDARY FUEL OIL CONSUMPTION. 1995 - Rs 6.10 LAKHS FOR REDUCTION IN SECONDARY FUEL OIL & AUXILLARY CONSUMPTION 1994 - Rs 6.10 LAKHS FOR REDUCTION IN SECONDARY FUEL OIL CONSUMPTION. 1993 - Rs 12.5 LAKHS FOR REDUCTION IN SECONDARY FUEL OIL & AUXILLARY CONSUMPTION. 1992 - Rs 16.88 LAKHS FOR REDUCTION IN SECONDARY FUEL OIL & AUXILLARY CONSUMPTION. 1991 - Rs 9.26 LAKHS FOR REDUCTION IN SECONDARY FUEL OIL CONSUMPTION. 1990 - Rs 14.48 LAKHS CHSH AWARD & A GOLD MEDAL FOR ACHIEVING HIGH PLF OF 78.59% 1989 – Rs 10.00 LAKHS FOR ACHIEVING HIGH PLF OF 72.99%. VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 6 1988 – Rs 8.00 LAKHS FOR ACHIEVING HIGH PLF OF 66.3%. For Renewable Energy
Karnataka Power Corporation Limited
Social Responsibility •
The corporation made a total contribution of Rs. 1.5 Crs to chief Minister’s Relies fund during the year 2004-2005.
•
Enhancement of knowledge and skill of employees through training.
•
Voluntary implementation of best practices having regard to the regulatory tariff regime.
•
High priority in compliance to environment laws, regulation and norms.
Passing on the benefit of cost cutting in construction, finance and operations to the customers.
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 7
Karnataka Power Corporation Limited
INDUSTRY PROFILE
The power sector has registered significant progress since process of planned development of the economy began in 1950. Hydro-power and cost based thermal power has been the main sources of generating electricity. Nuclear power development is at slower pace, which was introduced, in late sixties. The concept of operating power systems on a regional basis crossing the political boundaries of state was introduced in the early sixties. In spite of the overall development that has taken place, the power supply industry has been under constant pressure to bridge the gap between supply and demand.
HISTORY
Although electricity had been known to be produced as a result of the chemical reactions that take place in an electrolytic cell since Alessandro Volta developed the voltaic pile in 1800, its production by this means was, and still is, expensive. In 1831, Michael Faraday devised a machine that generated electricity from rotary motion, but it took almost 50 years for the technology to reach a commercially viable stage. In 1878, in the US, Thomas Edison developed and sold a commercially viable replacement for gas lighting and heating using locally generated and distributed direct current electricity.
The world's first public electricity supply was provided in late 1881, when the streets of the Surrey town of Godalming in the UK were lit with electric light. This system was powered from a water wheel on the River Way, which drove a Siemens alternatr that supplied a number of arc lamps within the town. This supply scheme also provided electricity to a number of shops and premises.
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 8
Karnataka Power Corporation Limited
Coinciding with this, in early 1882, Edison opened the world’s first steam-powered electricity generating station at Holborn Viaduct in London, where he had entered into an agreement with the City Corporation for a period of three months to provide street lighting. In time he had supplied a number of local consumers with electric light. The method of supply was direct current (DC). It was later on in the year in September 1882 that Edison opened the Pearl Street Power Station in New York City and again it was a DC supply. It was for this reason that the generation was close to or on the consumer's premises as Edison had no means of voltage conversion. The voltage chosen for any electrical system is a compromise. Increasing the voltage reduces the current and therefore reduces resistive losses in the cable. Unfortunately it increases the danger from direct contact and also increases the required insulation thickness. Furthermore some load types were difficult or impossible to make for higher voltages. Additionally, Robert Hammond, in December 1881, demonstrated the new electric light in the Sussex town of Brighton in the UK for a trial period. The ensuing success of this installation enabled Hammond to put this venture on both a commercial and legal footing, as a number of shop owners wanted to use the new electric light. Thus the Hammond Electricity Supply Co. was launched. Whilst the Godalming and Holborn Viaduct Schemes closed after a few years the Brighton Scheme continued on, and supply was in 1887 made available for 24 hours per day. Nikola Tesla, who had worked for Edison for a short time and appreciated the electrical theory in a way that Edison did not, devised an alternative system using alternating current. Tesla realised that while doubling the voltage would halve the current and reduce losses by threequarters, only an alternating current system allowed the transformation between voltage levels in different parts of the system. This allowed efficient high voltages for distribution where their risks could easily be mitigated by good design while still allowing fairly safe voltages to be supplied to the loads. He went on to develop the overall theory of his system, devising theoretical and practical alternatives for all of the direct current appliances then in use, and patented his novel ideas in 1887, in thirty separate patents.
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 9
Karnataka Power Corporation Limited
In 1888, Tesla's work came to the attention of George Westinghouse, who owned a patent for a type of transformer that could deal with high power and was easy to make. Westinghouse had been operating an alternating current lighting plant in Grea Barrington, Massachusetts since 1886. While Westinghouse's system could use Edison's lights and had heaters, it did not have a motor. With Tesla and his patents, Westinghouse built a power system for a gold mine in Telluride, Colorado in 1891, with a water driven 100 horsepower (75 kW) generator powering a 100 horsepower (75 kW) motor over a 2.5-mile (4 km) power line. Almarian Decker finally invented the whole system of three-phase power generating in Redlands, California in 1893. Then, in a deal with General Electric, which Edison had been forced to sell, Westinghouse's company went on to construct a power station at the Niagara Falls, with three 5,000 horsepower (3.7 MW) Tesla generators supplying electricity to an aluminium smelter at Niagara and the town of Buffalo 22 miles (35 km) away. The Niagara power station commenced operation on April 20, 1895. Tesla's alternating current system remains the primary means of delivering electrical energy to consumers throughout the world. While high-voltage direct current (HVDC) is increasingly being used to transmit large quantities of electricity over long distances or to connect adjacent asynchronous power systems, the bulk of electricity generation, transmission, distribution and retailing takes place using alternating current
Growth of Indian power sector
Power development is the key to the economic development. The power sector has been receiving adequate priority ever since the process of planned development began in 1959. The power sector has been getting 18-20% of the total public sector outlay in initial plan periods. Remarkable growth and progress have led to extensive use of electricity in all the sectors of economy in the successive five years plans. Over the years (since 1950) the installed capacity of power plants (utilities) has increased to 109092 MW (2004-05) from 1713 MW in 1959, registering a 63 fold increase in 54 years. Similarly, the electricity generation increased from
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 10
Karnataka Power Corporation Limited
about 5.1 billion to 440 billion units –86 fold increases. The per capita consumption of electricity in the county also increased from 15 KWH in 1950 to about 395 KWH in 2004-05, which is about 26 times. In the field of rural electrification and pump set energization, country has made a tremendous progress, 88% of the village have been electrified except far flung areas in North Easter states, where it is difficult to extend the grid supply.
Generation mix
The share if hydel generation in the total generating capacity of the country has declined from 34% at the end of the sixth plan to 29% at the end of the seventh plan and further to 25.5 percent at the end of eighth plan. The share is likely to decline ever further unless suitable corrective measures are initiated immediately. Hydel power projects, with storage facilities, provide peak time support to the power system. Inadequate hydel support in some of the regions is adversely affecting the performance of the thermal power plants. In western and Eastern regions, peaking power provided by thermal plants, some of which have to back down during off peak hours.
Emergence regional power systems
In order to optimally utilise the dispersed sources for power generation it was decided right at the beginning of the 1960’s that the country would be divided into 5 regions and the planning process would aim at achieving regional self sufficiency. The planning was so far based on a region as a unit for planning and accordingly the power systems have been developed and operated on regional basis, strong integrated grids exist in all the five regions of the country and the energy resources developed are widely utilised within the regional grids. Presently, the Eastern and North-Eastern regions are operating in parallel. With the proposed inter-regional links being developed it is estimated that it would be possible for power to flow any where in the country with the concept of National Grid becoming a reality during 12 th plan period.
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 11
Karnataka Power Corporation Limited
Private Sectors
The initial response of the domestic and foreign investors to the policy of private participation in power sector has been extremely encouraging. However, many projects have encountered unforeseen delays. There have been delays relating to finalisation of power purchase agreements,
guarantees
and
counter
guarantees,
Environmental
clearances,
matching
transmission networks and legally enforceable contracts for fuel supplies. The shortfall in the private sector was due to the emergence of a number of constraints, which were not anticipated at the time the policy was formulated. The most important is that leaders are not willing to finance large independent power projects, selling power to a monopoly buyer such as SEB’s do not pay for electricity. Uncertainties about fuel supply arrangements and the difficulty in negotiating arrangements with public sector fuel suppliers, which concern penalties for non performance, is another area of potential difficulty. This important to resolve these difficulties and revolve a framework of policy which can ensure a reasonable distribution of risks which make power sector projects financially attractive. The capacity addition programmed for the 9th plan envisaged around 17588MW to be added by private generating companies. In order to achieve the targeted private sector capacity addition during the 9th plan, the following additional facilitating measures have recently been suggested by the promoters. Most of these have been accepted while some of them are under the consideration of the government.
Objectives of the power sector
To provide reliable and quality power at a economic price.
To make the sector commercially sound and self-sustaining.
To achieve environmentally sustainable power development.
High performance levels to reduce cost and ensure reliable power supply.
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 12
Karnataka Power Corporation Limited
PRODUCT/SERVICE PROFILE:
The study is conducted in “Karnataka Power Corporation limited”, which has generating the power as its product. The firm is providing the service of power with out which lightening is not possible. Now a day’s power is very essential in all the activity of life of human beings.
KPCL is a monopoly producer of power in Karnataka state. The corporation is generating the power by Hydro, wind and coal. It is really very expensive to generate power. Because it needs constructed dam for Hydal power generation, generators, plants, which incur huge investment, it also costly in the case of wind and coal. At present KPCL producing at 70% through hydro, 20% by coal and 10% by wind. The power generated by KPCL is sold KPTCL (Karnataka Power Transmission Corporation Limited). As per data collected the corporations is generating power capacity is 19713 million units. The generated power can not be saved and sold some days later , it should be sold out while generating. Power is sold with the help of the gridlines, transforms and other power supply tools. At present KPCL is using modern techniques of power generation. In addition to this the corporation is training their employees regarding the power generation techniques. The KPCL has more than 20 projects.
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 13
Karnataka Power Corporation Limited
HYDRO ELECTRIC POWER GENERATION
This is one of the cheapest ways to electricity, the kinetic and potential energy of running water being harnessed to drive generators. However, it is limited to mountainous region where fast rivers flow. A fairly large difference in height is required to produce enough force in he flowing water to turn the water wheels to which the generators are connected. Early installation had vertical water turning the machinery. Modern plants use vertical generators mounted on horizontal water wheels. These generators of the synchronous salient pose type are of very large diameter (30 to 40) feet and have a large number of poles (up to 60) depending on the speed of rotation (usually from 100 to 600rpm). The required head of water obtained by constructing a dam across the river, usually at its steepest point to make maximum use of height. A reservoir forms behind the dam, so that a constant head of water is obtained. This water form the reservoir is carried through underground ducts and they directed against the generators are usually mounted in the range 6.6 to 15 KV. The exciter set on top of the main generator provides the low voltage, high current D.C re quired to set up the magnitude field in the min generator. Transformers situated just outside the powerhouse raise the voltage to the long distance transmission level of 275 to 400KV. These plants are cheap to run, for this only a small staffs is required. However, the initial capital is enormous since dam construction is a major civil engineering feat. Suitable sites for
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 14
Karnataka Power Corporation Limited
hydro electricity transmission lines must be added. However, these stations have a long life up to 5 years.
THERMAL POWER STATION
Thermal power stations were the best energy, which is converted in to electric energy and provide the majority power generation at present. The main is advantage is that they can be sited where needed thus saving on the cost of the transmission lines. However, high cost of fuel (coal, oil or gas) is incurred. In operation, fuel is burnt to heat the water in the boiler, which then produces steam at very high pressure (up to 5000 Ib/sqare Inc) and temperature (1100 f). This steam is directed on to blades of high-speed turban, which is connected to the generator. The steam is condensed then the water is return to the boiler, thus forming a closed cycle. This condensed is required large cooling tower of external water (15 million gales/hour for a 300 MW station) or large cooling tower. These sites must be chosen near the river or where the unsightly cooling tower will not detract from the surrounding. The generation are of 2 cycles pole construction rotating at 3000 rph again the voltage output varies between 6.6 to 33KV, the machine rating the higher the voltage used. The excited set is again amounted on the shaft. Large amounts of heat are produced
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 15
Karnataka Power Corporation Limited
is important fans mounted each end of he rotor circulate air or hydrogen gas. Hydrogen is better cooling medium then air and also only and fourteenth is its densities. Thus less power is required to circulate. Recently liquid cooling is using oil or water as being adopted. Liquid are far superior to gases for cooling, water being 50 times better then the air. Thermal stations are not particularly efficient, the overall figure about 38% of the thermal power being put into plant from the fuel is available as electric energy. The main limitation is the boiler design, the generators being up to 90% efficient.
WIND POWER STATION
It is also one type of power generation where KPCL produce power by using the wind. This form of power generation contributes only 1% of total power generation. Ex:- Kappatagudda wind farm
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 16
Karnataka Power Corporation Limited
DIESEL POWER STATION
A diesel generator is the combination of a diesel engine with an electrical generator (often called an alternator) to generate electric energy. Diesel generating sets are used in places without connection to the power grid or as emergency power-supply if the grid fails. KPCL has 6 units and 21.32 capacity in MW, total installed capacity is 127.92. this type of power generation is very costly, it costs nearly Rs.10 per unit and used only for emergency purpose. KPCL’s Diesel power station is situated in Yelahanka. Ex:- Yelahanka Diesel Generating station
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 17
Karnataka Power Corporation Limited
ORGANIZATIONAL STRUCTURE
Grouping of activities is an essential step in designing an organizational structure. Grouping of activities into departments or other homogeneous units is known as departmentation. Departmentation is the process of grouping tasks into job’s the combining of jobs into effective work groups into identifiable segment or departments.
In Prateeks activities are grouped into different functional units. Each major function of the enterprise is grouped into different department. This can also be studied as a separate function. Departmentation based on functions is a simple form of organizing the activities. Specialization of department promotes the excellence in performance. It lead to improve planning and control of key functions and ensure economy.
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 18
Karnataka Power Corporation Limited
ORGANISATION CHART
Board of Directors
Managing Director
Technical Director
Executive Chief Engineer Superintend Assistant Engineer Director Engineer
Junior Engineer
Finance Director
Accounts General DGM Asst GM Asst Officer Manager (A/C’s) (Accounts) Accounts (accounts) Officer
Senior
Accounts General DGM Asst GM Asst Officer Manager (Finance) (Accounts) Accounts (Finance) Officer
Senior Asst
Asst
H R Director
Personal General (HR) DGM ManagerPersonal DGM AGM AGM Junior Junior Officer Officer (HRD-1) (HRD-2) (HRD) (HRD) Personnel Personnel workers corporate Officer Officer
Senior Asst
Senior Asst
Administrator
Administrator
Board consists of: •
Chairman is chief minister of the state
•
Managing Director
•
Technical Director
•
Financial Director
•
Human Resource Director
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 19
Karnataka Power Corporation Limited
•
Principal secretary
•
Principal secretary to chief minister
Board of Directors:
The corporation has at its apex board of directors duly constituted under the 11th provision of Articles of association of the corporation and the Companies Act of 1956. Board of Director’s will be appointed by the government on such remuneration, as it may fit and shall be entitled to remove the directors from office at any time. But subject to provision of section 252 of the Act. The number of directors of the company shall not be less than 3 and not more than 17. The govt may free from time to time appoint one or more of the directors as Chairmen, Vice Chairmen or Managing Director of the corporation. Usually Chairmen will be Chief Minister or the Minister of Power & Energy or Member of Parliament or state Legislature. Shri.Veerendra
Patil
was
the
first
chairmen
of
the
corporation
and
at
present
Shri.B.S.Yeddyurappa Chief Minister is the Chairmen of KPCL. Managing Director
Managing director of the corporation is the chief executive having substantial powers of management delegated to him by the board. He will be the supreme authority of the corporation. Under him there will be three types of directors namely Finance director, Technical director, HR director. Shri.R.Nayak was the first MD and Shri.Dr. S.M.Jaamdar an IAS officer is the present MD of the corporation.
Board of Directors As on 20-10-2008
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 20
Karnataka Power Corporation Limited
Shri B.S. Yeddyurappa
Shri K.S. Eshwarappa
Hon’ble CM of Karnataka
Hon’ble Minister of Energy,
& Chairman, KPCL
GOK & Vice Chairman KPCL
Dr. S.M.Jaamdar, IAS,
Managing Director.
Murlidhar Rao
D.C.Sreedhar, IRS
K.Jairaj, IAS
IAS
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 21
M.R.Kamble,
Karnataka Power Corporation Limited
Technical Director.
Finance Director.
Principal Secretary, Energy Department,
Secretary, Water ResourcesDept.
Powers of the Board •
To authorize the corporation for undertaking of work of a capital nature.
•
To pay and change to the capital amount of the company and any interest law full payable.
•
To act on behalf of the company in all matters relating to bankrupts and insolvents.
•
To open any account or accounts with such banks as the board of directors may select or appoint.
•
To appoint or remove or suspend such managers, secretaries, supervisors, clerks, agents and servants or permanent or temporary as they fit.
•
To establish any board or agency for managing any of the affairs of the company in any locality in India or elsewhere.
•
•
To appoint any person to be the attorney’s of the company. No member shall be entitled to visit or inspect works of the company without permission of directors in the nature of trade secrets, trade mystery and secret process.
Introduction
The functional areas of Karnataka power Corporation Ltd are divided into categories. They are Production department, Human Resource department, Finance department ,Marketing department, Environment department and, Computer department Finance is the main source of every business. Finance department of Karnataka Power Corporation ltd involves managerial
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 22
Karnataka Power Corporation Limited
activities concerned with procurement at low cost and utilization of funds for business purposes the financial manager deals with planning, organizing, directing and controlling financial activities of the enterprise Production is also an important work in every manufacturing unit. Karnataka Power Corporation ltd have latest technological machineries so that the production process can be done easily. The HRD department of the company is well structured and employees are getting good benefits and this is one strategy of the company to increase the productivity. Lastly, Marketing department of the company is helping the organization in increasing the dealers and customers through their marketing strategies and campaigns and promotional activities. This is all about functional departments. Let us know each department in depth.
To know the all the Departments detailed information.
To carry out the easy work.
To know how the company process is taken place.
To forecast the future needs of the each Department.
To provide timely services to each department.
FINANCE DEPARTMENT FINANCE CHART
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 23
Karnataka Power Corporation Limited
Managing Director
Finance Director
General Manager
General Manager
(accounts)
(Finance)
DGM (A/C’s)
DGM (Finance)
Asst GM
Asst GM
(Accounts)
(Accounts)
Accounts Officer
Accounts Officer
Asst Accounts
Asst Accounts
Officer
Officer
Senior Asst
Senior Asst
Finance department is very essential for any organisation to be set up. It is the backbone of any organisation. Similarly the finance department plays a vital role in the set up and running of KPCL.
VVN.I VV N.INST NST OF OF MGT MGT ,TECH ,TECH & RESE RESEAR ARCH CH B’LOR B’LORE E Page Page 24
Karnataka Power Corporation Limited
Chief accountant manager and chief finance manager works under the direct control of fina financ ncee Dire Directo ctorr at KPCL KPCL.. Othe Otherr top top exec execut utiv ivee in the the finan finance ce depa depart rtme ment nt are exec execut utiv ivee (Finan (Finance), ce), divisi divisiona onall office officerr (Finan (Finance), ce), account accountss officer officer,, assist assistant ant office officer, r, senior senior assist assistant ant (Accounts) and assistant (Accounts). The chief finance manager and accounts manager handle various activities in the finance department. Each of them has their tasks cut out systematically in these areas.
In KPCL, finance and accounting department is subdivided into 11 sub departments. departments. •
Salary department
•
Cash department
•
Bills department
•
Budget and costing department
•
Consultancy department
•
Provident fund department
•
Monthly and annual accounts department
•
Debt servicing department
•
On going project department
•
Taxation department
•
Pension department
Its brief explanation as follows:
VVN.I VV N.INST NST OF OF MGT MGT ,TECH ,TECH & RESE RESEAR ARCH CH B’LOR B’LORE E Page Page 25
Karnataka Power Corporation Limited
Salary Department
In KPCL salary department looks after the advances to employee’s salary payable to the employees. Salary department calculates the salary of employees, on the basis of information given by the Human Human Resour Resource ce depart departmen mentt regard regarding ing the employ employee’s ee’s attenda attendance nce,, leave, leave, leave leave not sanc sancti tion oned ed,, unde underr salar salary y amou amount nt dedu deduct ctio ion n made made in resp respect ect of prov provid iden entt fund fund,, tax, tax, and and remittance charges, recoveries for advance. Salary department credit net salary amount and reimbur reimbursem sement ent of Medica Medicall and Electri Electricit city y charge chargess amount amount to employ employee’ ee’ss bank bank accoun accountt by issuing cheques. Cash department
The cash section is responsible for all receipts and payments of cash, cheques, etc., and accounting the same in the books of accounts. KPCL provided 150 corers as working capital to cash department, to carryout its transactions. If need arises beyond 150 corers, it requires to get permission from senior executive of finance. The functions of Cash department are:•
Operation of Bank accounts.
•
Withdrawal of cash from bank, to cater for daily needs.
•
Payment of voucher by cheques / cash
•
Cash Cash disbur disbursem sement ent to salary salary departm department ent for paymen paymentt of salari salaries, es, wages wages and other other payments.
•
Writing of cash / bank books.
•
Preparation of Bank reconciliation statement.
•
Safe Safe cust custod ody y of cash cash,, cheq cheque ue book book,, reven revenue ue stam stamp p & othe otherr docu docume ment ntss like like bank bank guarantees, fixed deposit receipts and investment etc.
•
Reconciliation of inter transfer of funds transaction.
VVN.I VV N.INST NST OF OF MGT MGT ,TECH ,TECH & RESE RESEAR ARCH CH B’LOR B’LORE E Page Page 26
Karnataka Power Corporation Limited
Bills department
Bills department concerned with the verification of bills relating to expenses after verification, the bills will be sent to cash section for payment. Bills department ensure that the bills amount are not exceeds the budgeted amount. If bills amount exceeds the budgeted amount, the bill department is not having power to process the bill, in that case managing director has power to process the bill. In the department bills are divided in to two types. 1. Major bills. 2. Minor bills.
Major Bills
Major bills stands for amount payable for suppliers to supply goods to the power generating units according to the predetermined agreements. Agreement is made on Rs. 100/stamp papers. In case of delay in supply of goods, penalty of 10% on the purchase work is demanded. 80% of the payment will be made during the agreement, if the goods are being transported by railways. In case, goods are transported roadways, payment will be made only on receiving the goods, at the site, the quality and quantity of goods are verified and inspection report will be sent to the bills section. In bills section the terms and conditions based on the agreement are verified and if they are found to coincide with inspection report, then the bills will sent to cash section for payment. If C-form is producing or submitted the right of royalty and exercise duty would be 4%, otherwise 12%. C-form is issued only after receiving the goods.
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 27
Karnataka Power Corporation Limited
Minor Bills
The minor bills include:•
Payment of interest of loan, debenture, repayment of loan amount and debenture.
•
Payment of rent, telephone bill, office expenses printing and stationary, computer maintenance expenses.
•
Payment of director’s fee and remuneration.
•
Reconciliation of balance of head offices with Banks.
Budget department
Budgeting is nothing but the blue print of the future needs of the company. Budget refers to forecast of future need. KPCL involves two types of Budget.
BUDGETING
REVENUE BUDGET
CASH BUDGET
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 28
Karnataka Power Corporation Limited
Revenue Budget
The revenue budget mainly focuses on the sales revenue and the associated costs to generate the power. The power generation is budgeted on the basis of average of last ten years sales and expenses on the basis of previous year actual and estimation received from different departments. •
Establishment and general expenses.
•
Operation and maintenance.
•
Fuel and chemicals.
•
Royalty paid for water use.
•
Financial charges the outstanding loans.
•
Depreciation. Cash budget
It is helpful in estimating each requirement, planning short term financing and scheduling payments in connection with capital expenditure project, planning purchase of materials.
Consultancy Department
KPCL today has the capability to undertake large scale power projects from concept to commissioning. It can also operate the plant on an EPC basis, with a host of exclusive auxiliary services. KPCLs Consultancy and Engineering Services Division, an offshoot of its core competency, offers its clients a wide spectrum of consultancy inputs across the complete cycle of power project development. It has the expertise in analysis and design of structures using STADPRO – 2006, NISA – Finite Element package, AUTOCAD – 2006, micro station and in house developed software packages for reservoir operation, Stability of Dams etc.
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 29
Karnataka Power Corporation Limited
These include •
Feasibility studies / evaluation and the compilation of detailed project reports
•
Design, Engineering, procurement and construction services
•
Consultancy on both Thermal and Hydel Power Stations, including handling of international competitive bids
•
Project Management from project scheduling to preparation of final invoice and certification.
•
Supervision
of
erection,
commissioning
and
operation
of
civil,
electrical,
mechanical systems and equipment. •
Operation and maintenance services,
•
Rehabilitation of dams in distress
•
Renovation, modernization and updating of hydro stations
•
Overall project and performance management.
Provident Fund department
Karnataka power corporation Ltd employee’s contributory provident rules. These rules shall come in to force from 20 th July 1970. The fund shall be deemed to have been established on and from 20 th July 1970. The regional provident fund commissioner decision is final regarding interpretation of any rule and it must be carried out by both the trustees and the member of the fund. Pension department
The employee pension scheme 1995 (statutory). The central Govt established “THE EMPOLYEES PENSION SCHEME 1995” through the employee’s provident fund and miscellaneous provision Act 1952. This scheme shall come into force on 16 th day of November 1995.
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 30
Karnataka Power Corporation Limited
Internal Audit Department
Internal Audit in KPCL a statutory requirement as per GOI order of 1975 was established in KPCL in 1977 was earlier under the charge of financial adviser for a quite long, but now not exist separate wing since 1986 is headed by chief manager (internal audit) and report to M.D KPCL has 5 audit units.
Insurance department
Insurance is a service of an undertaking taken in order to over come or setoff the losses or damages while operating the business. In order to cover the risk and maintenance KPCL has taken out insurance policy with many companies. The risky projects among all power generating project are RTPS in order to cover all those risks while operating all those insurance policies covered under RTPS can be classified: 1. Maintenance •
Standard fire and special perils.
•
Boiler explosion policy.
•
Terrorism.
2. Construction.
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 31
Karnataka Power Corporation Limited
HUMAN RESOURCE DEPARTMENT
CHART OF HRD
Managing Director
H R Director
General Manager HR
DGM (HRD-1)
DGM (HRD-1)
Workers
Workers
AGM (HRD)
AGM (HRD)
Personnel Officer
Personnel Officer
Junior Personnel
Junior Personnel
Officer/ Office
Officer/ Office
Manager
Manager
Senior Asst
Senior Asst
Administrator
Administrator
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 32
Karnataka Power Corporation Limited
KPCL believes that its true investment lies in its workforce, and their happiness lies in
the future of KPCL, it therefore strives to make every effort to promote a work culture that enable an employee to give his very best.
Employee participation in decision making negotiations has enabled the employee to develop a sense of belongingness and in turn contributes to the progress of the organisation. A high professional approach to recruitment, induction, on the job training appraisals and proper channels of promotion help KPCL get personnel of the finest quality.
Human resource department concerned with managing/developing people. As the organisation is made up of people, they should be managed/developed to attain higher level of performance this can be done by developing their skills and motivating them. This helps the organisation to achieve its objective.
KPCL has a dedicated of 2287 professionals, which share the vision of the KPCL technocrats, administrators and supporting staff of KPCL joining hands to give more power to Karnataka.
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 33
Karnataka Power Corporation Limited
STAFF OF KPCL
Particular
% of manpower
No. of manpower
Corporate:
37.64%
2287
Workmen:
62.36%
3788
Total:
100%
6075
HRD MISSION A congenial work environment supportive of high performance leading to attainment of HRD in KPCL. Maintaining optimum staff level nurturing and developing talents, trust, empowerment, concern for people and reward and key elements of congenial work environment which is dynamic. KPCL’s strength is its people. In its journey to achieve excellence, KPCL is focusing on every aspect and area of work with the trust area being the development of its human resource.
Functions of the Human Resource Department:
RECRUITMENT:
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 34
Karnataka Power Corporation Limited
It is the process of finding and attracting capable applicants for employment. It is the process of searching for and obtaining applicants for jobs, from among whom the right people can be selected. Online Recruitment: •
200 Engineers recruited in 2005
•
Website notification.
•
About 4500 applications received online.
•
Written test through IIsc.
•
Interview/selection finalized in about 3 months.
TRAINING
Every year the corporation the training program for the benefit of the employees and the company. During the year 2008-09 in house and external training 92 programs were conducted totally 1151 employees consisting of 1031 corporate and 120 non-corporate cards benefited from the training was Rs.41.07 lakhs. IN-HOUSE TRAINING PROGRAMMES •
Corporate excellence through co-operation and collaboration.
•
Company a/c’s and accounting standards.
•
Performance management.
•
Managing conflict for organisation excellence.
•
Total quality management.
•
Motivating and goal setting.
•
BPR and bench marking.
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 35
Karnataka Power Corporation Limited
•
Attitudinal shift through self development.
EXTERNAL TRAINING PROGRAMMES •
National seminars on utilization of fly ash.
•
Earthquake resistance design of dams.
•
Renewable energy source and energy audit.
•
National seminar views of the future civil engineering in 21 st century.
•
Role of energy efficiency in the Indian energy sector.
•
Seminar on instrumentation engineering practice, team and research.
•
Conference on the condition monitoring of plant and equipment.
•
International conference on civil engineering.
PERFORMANCE APPRAISAL
To ensure greater objectivity in appraising the performance of employees and also taking in to account the present day practices in professionally managed organisation, KPCL decided to introduce a new system called performance appraisal and development system in the corporation. The PADS will apply to all the employees in the corporation cards. In KPCL once in year the performance appraisal will be sent to the entire department in order to know the appraisal of employees. It will be measured by immediate supervision, reviewing authority and accepting authority.
TRANSFER
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 36
Karnataka Power Corporation Limited
Transfer of an employee from one place of work to another place of work or one job to another job is ordered primarily in the interest of the service of the corporation. Request of an employee for transfer is given consideration and acted upon if it is in consonance with the interest of the service of the corporation. Transfer also aims at rotation of employees among relate jobs of the discipline to which the employee belongs, thereby enabling the employee to acquire wider knowledge and experience in the discipline. Transfer and non-transfer, however is not a matter of right for any employee.
KPCL has right to transfer any employee from one place to another place with in the country. Transfer may arise due to: •
Administrative grounds
•
suitability
•
Higher studies
•
Medical grounds
•
Joining spouse
RETIREMENT
The corporation has multiple schemes of retirement benefits of its employees, majority of employees retiring under the pension and allied schemes, few employees retiring under contributory provident fund schemes prevailing them, a scheme exempted.
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 37
Karnataka Power Corporation Limited
WELFARE ACTIVITIES
The HR Department is in charge of all the welfare activities in the organisation. The welfare activities under taken by KPCL are:•
School recreation, club.
•
House journal.
•
Libraries and reading rooms.
•
Sports and games.
•
Consumer co-operative society.
•
Literacy programmes.
•
Canteen.
•
Medical facilities.
•
Cultural activity.
LOANS
House building / purchase / repairs improvement and extension advance may be granted to the employees of KPCL for his bonafide, residential purpose only. •
Vehicle advance to the employers and employees.
•
Festival advance to the employees of the corporation.
•
Loan assistance for the personal computer..
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 38
Karnataka Power Corporation Limited
SAFETY MEASURES
Providing conveyance and other facilities to the employees involved in the accident while on duty or service. •
Accidents resulting in minor injuries / service injuries.
•
Fatal accidents while on duty.
•
Death of employee while on service.
•
Lost homage.
•
Free conveyance.
•
Retention.
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 39
Karnataka Power Corporation Limited
PRODUCTION DEPARTMENT
For a power Generation Company a good production team is necessary. KPCL is having a very good production department with highly skilled labour. They recruit experience professionals. They upgrade technology on a continuous basis. KPCL gives them adequate training in order to update them with latest techniques and with new skills. These production teams are placed at project sites with adequate facilities. Today KPCL owns and operates 34 Dams and nearly 25 Power houses. These are four type of power generation by KPCL and they are:1. THERMAL: In this type of power generation KPCL produces the power by using coal
and fuel as raw material. At present RTPS’s (Raichur Thermal Power Station) 8 th unit, BTPS (Bellary Thermal Power Station) thermal plants are under construction. KPCL has many track records in Thermal power production. In these case KPCL is well known in Asia and world this form power generation contributes 31% of total power generation. Ex: RTPS which have 7 units. 2. HYDEL: In this case KPCL produce the power by using the water as raw material it has
constructed 34 Dams for Hydel power generation. This form of power generation contributes 68% of total power generation Ex: sharavathi valley project, kalinadi hydro electric project 3. WIND: It is also one type of power generation where KPCL produce power by using the
wind. This form of power generation contributes only 1% of total power generation Ex:Kappatagudda wind farm. 4. DIESEL POWER STATION: - A diesel generator is the combination of a diesel
engine with an electrical generator (often called an alternator) to generate electric energy. Diesel generating sets are used in places without connection to the power grid or as emergency power-supply if the grid fails.
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 40
Karnataka Power Corporation Limited
KPCL has 6 units and 21.32 capacities in MW, total installed capacity is 127.92. this type of power generation is very costly, it costs nearly Rs.10 per unit and used only for emergency purpose. KPCL’s Diesel power station is situated in Yelahanka. Ex: - Yelahanka Diesel generating station
KPCL currently has 34 dams & 25 power stations across the State with profiles that range from 0.35 MW to 1035 MW. The total installed capacity logged by KPCL is 55739.83 MW across a project canvas that covers expansions, renovations and upgrading of existing plants. .
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 41
Karnataka Power Corporation Limited
Generation performance Generation Thermal Diesel + Hydro + Wind Total Thermal Details Generation(MU) Aux.Consumption (%) Plant Load Factor (%) Specific Coal Consumption
(KG/KWH) Specific Oil Consumption
2008-09 11717 13363 25080
2007-08 10876 14737 25613
2006-07 11484 15151 26635
2005-06 9165 10724 19889
2004-05 10730 8260 18990
11717 8.55 67.90 0.646
10875 8.66 84.45 0.643
11484 8.22 89.18 0.658
9165 8.62 71.17 0.660
10730 8.68 83.33 0.647
1.770
0.741
0.445
0.736
0.599
(ML/KWH) Performance of Major Hydro Stations (2008 - 2009) Power Stations
%Age Availability
%Age Auxiliary Consumption
Sharavathi
96.39
1.10
Nagjhari
85.10
2.21
Varahi
95.77
2.72
POWER HOUSES Power Station
No of Units
MW
Total
Thermal
Raichur
7
210
1470
Bellary
1
500
500
Diesel - Yelahanka
6
21.32
127.92
Hydel
Sharavathi
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 42
Karnataka Power Corporation Limited
Linganamakki
2
27.5
55
Sharavathi
10
103.5
1035
Gerusoppa
4
60
240
MGHE Jog
4
21.60
139.20
4 13.20 Bhadra Right Bank
1
7.2
13.20
1 6 Bhadra Left Bank
2
12
26
1 2 Kalinadi
Supa
2
50
100
Nagjhari
2
135
870
4
150
Kadra
3
50
150
Kodasalli
3
40
120
Varahi
2
115
230
Mani
2
4.5
9
Ghataprabha
2
16
32
Almatti
1
15
290
5
55
Varahi
Other
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 43
Karnataka Power Corporation Limited
Munirabad
2
9
28
Shivanasamudram
4
6
42
6
3
Shishma
2
8.6
17.20
Mallapur
2
4.5
9
Sirwar
1
1
1
Kalmala
1
0.40
0.40
Wind
1
10
Ganekal
NO
Kappadagudda
PROJECT
9
0.225 CAPACITY
4.55
(MW) 0.230
11
1
Bellary Thermal Power Station Stage – I
500
2
Bellary Thermal Power Station Stage – II
500
3
Bidadi Combined Cycle P
1400
4
Raichur Thermal Power Station Unit – 8
250
5
Varahi Hydel Projects 3 & 4
230
6
Nagjhair Power House- R & M
45
7
Gundia High Lead Scheme
400
8
Yermars Thermal PowerStation
2x500
KPCL’S ONGOING AND NEW PROJECT
9
Yadgir Thermal Power Station
2x500
10
Annehakanahalli Thermal Powe Station
3x500
11
Kalguriki thermal Power Station
3x500
12
Edlapur Thermal Power Station
1x500
13
BTPS unit 3
1x500
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 44
14
Kudathini Thermal Power Station
3x500
Karnataka Power Corporation Limited
MARKETING DEPARTMENT
KPCL directly sells power to the particular customer that is KPTCL, it is a sub part of the KPCL. KPCL generates power directly sells to the KPTCL (Karnataka Power Transmission Corporation Ltd). Its carries out transmission of power, thus KPCL no need to carry out marketing its power generated.
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 45
Karnataka Power Corporation Limited
It’s producing ¾ of the demand offered by the KPCL, it fulfilling market demand by joining hands with central government, Private organisation and other companies. Within the KPTCL zone power is supplied to the households, commercial establishment, industries etc, and other government under takes namely: BESCOM- Bangalore Electricity Supply Company (HQ in Bangalore) MESCOM- Mangalore Electricity Supply company (HQ in Mangalore) GESCOM- Gulbarga Electricity Supply Company (HQ in Gulbarga) HESCOM- Hubli Electricity Supply Company (HQ in hubli) CESCOM- Chamundeshwari Electricity Supply Company (HQ in
COMPUTER DEPARTMENT (TECHNICAL)
CHART OF TECHNICAL DEPARTMENT
Managing Director
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 46
Chamundeshwari)
Karnataka Power Corporation Limited
Technical Director
Executive Director
Chief Engineer
Superintend Engineer
Executive Engineer
Assistant Engineer
Junior Engineer
In KPCL, whole organisation is computerised. It is the first state utility in the power section to have established computerised satellite communication network, through V-SAT. LAN is established at office in Bangalore and at all project sites. LAN is used for E-mail, file sharing, and printing of document, internet, and application software. The computerisation
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 47
Karnataka Power Corporation Limited
includes latest software like Auto-CAD, Oracle, developed 2000, Windows NT, Server etc. The software developed with in KPCL deals with –Finance, Administration, Design, MIS, Public Deposit, and Provident Fund.
MIS plays a vital role in KPCL, as information is required for any company to set up and also to work. In 1996, KPCL started a full-fledged computer services department, there are 18 projects at Bangalore carried on by KPCL employees; so, in order to cater to all of them system department was organised. There 13 system engineers and 8 computer engineers catering according to KPCL. Wide Area Network (WAN) has been installed connecting 9 projects with use of V-SAT at Bangalore. LAN is also been installed at all project locations at Bangalore. There are around 750 computers in the organisation at Bangalore. The whole organisation is computerised. All the projects are automated and they go online to rectify the problems in the project. They train their staff whenever required, i.e. when the technology is being updated.
The Hi-Tech V-SAT network apply called “SHAKTHINET” was commissioned during June 1997.
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 48
Karnataka Power Corporation Limited
KPCL is a highly IT Savvy company among the public sector units in the state at large and power sector in particular and has the distinction of being the first state owned company in the power sector to have established SHAKTINET- a satellite based communication network through V-SATs among all its power stations and Bangalore. Local Area Networks have been established at all Project locations and about 800 officials have been wired to corporate office with reliable VSAT back bone. All the activities of the corporation are computerized and KPCL has the unique distinction among power utilities of establishing voice and data communication between its projects and Bangalore through the new generation DAMA V-SATS on KPTCL’s "VIDYUTNET". The computer services department of KPCL with fully dedicated engineers and software professionals has developed and implemented all the software required for its business activities and is geared to offer consultancy services in the field of software development and networking.
Some of the software developed in-house are:
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 49
Karnataka Power Corporation Limited
•
Fuel Management system
•
Human resource Information System
•
Cash and Compilation Management system
•
Establishment
•
Integrated Inventory Management System
•
Public Deposit System
•
Generation Management System
•
Billing software for Bellary Thermal power station
•
Medicine Procurement system
New Initiatives •
Established 2 MBPS MPLS circuits between Bangalore and two of its major projects via Raichur Thermal Power Station and Bellary Thermal power station for speedy communication.
•
Extension of the above facility to other project locations in the near future.
•
Established Video Conferencing facility at Major project locations.
•
Exploring possibilities of establishing SCADA facility at corporate office, Bangalore for real time data monitoring.
•
Providing reliable communication facility at major project locations through Fiber Optic Cabling using state of the art technology.
The computer services department has set for itself very high standards and firmly believes that "It is not the IT Infrastructure of a few crores that needs to be managed but the business that gets transacted over the network that needs to be managed".
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 50
Karnataka Power Corporation Limited
ENVIRONMENT DEPARTMENT
“We have not inherited the earth from our parents. We have borrowed it from out children”. Believing in this credo and translating this belief into action, KPCL is constantly and consciously striving to return to the environment whatever the organisation borrows from it. While carrying out its primary task of power generation, KPCL has also adopted a definite policy that blends and harmonizes ecological balance even as it upholds human rights. The modern civilization is looking for sustainable development, which in real sense means improving quality of human life, and much depends on healthy environment development can not be achieved at the cost of environmental destruction, ecological imbalance and human health, at any time. Sustainable development has little value with out environmental protections. Keeping this in mind, KPCL is stringently adhering to its comprehensive environment action plan that covers systematic strengthening of environment management, pollution monitoring at power stations and implementation of specific environment projects. Every time KPCL implements a power project, it undertakes a comprehensive environmental impact study, to examine the impact of the proposed project on the environment.
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 51
Karnataka Power Corporation Limited
KPCL also undertakes eco-friendly techniques like controlled blasting, constructing colonies with least destruction to ecology, provision of fish ladder, installation of electro static precipitators in thermal plants, etc. particular care is also taken to minimise pollution. Environment Management Measure
KPCL’s power generation blueprint has a clear-cut policy on environment management. Building in green-mapping concepts such as sustainable development, which creates the framework for improving the quality of life. Sustainable development goes hand-in-hand with 'environment protection' KPCL has a comprehensive action plan in place that enables environment management, pollution monitoring and the implementation of specific environment projects.
All KPCL projects have the assurance of a comprehensive Environmental Impact Study to evaluate the impact of the project on the environment. It also prepares an Environmental Management Plan complying with all the conditions stipulated by KSPCB/MOEF. KPCL's Raichur Thermal Power Station has been accredited with ISO 14001 -2004 for its efforts towards environment protection management. The following innovative and new measures to aid the process of environment control have been put in place: •
A unique Ayurvedic greenhouse has been developed at Kadra Project.
•
Fish fingerlings in power generation reservoirs to maintain aqua-balance.
•
Eco-friendly control measures adopted such as controlled blasting.
•
Construction of colonies with least destruction to ecology.
•
Installation of Electro Static Precipitators in Thermal Plants.
•
Measures across the board to minimize pollution.
•
Fuel supply agreement with collieries to ensure high grade coal supplies.
•
Monitoring measures for ash minimization, ash emission control, ash utilization and ash disposal.
•
Recycling of water from ash ponds for alternative use.
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 52
Karnataka Power Corporation Limited
•
Modernization of sewerage treatment plant.
•
Continuous monitoring of air quality in work environments & environment management measures.
Evacuation of Fly Ash from RTPS
KPCL has taken several steps to promote fly ash utilization as per MoEF notification. Fly ash is being issued free of cost to SSI units. Leading cement manufacturers in the country have tied up with KPCL for lifting fly ash to an extent of about 2500 metric tones per day. Besides several small- scale industries, brick manufacturing Units & Government construction buildings are also utilizing about 450 metric tones per day. The operation and maintenance of silos and issue of fly ash to users from units 3,4,5,& 6 has been entrusted to M/s. ARV Cement society. In respect of Units 1,2 & 7 M/s ACC has installed the necessary equipment for fly ash collection at their cost . Fly ash utilization at RTPS is rapidly increasing and present utilization is 80% of the fly ash production. Further, the users have proposed transport of ash through rail by having a dedicated siding & this work is under progress. Total production of fly ash during 2006-07 was 17.5 lakh MT and 12.14 lakh MT of fly ash was lifted. KPCL has established a “Centre of Fly Ash Utilization Technology and Environment Conservation” at Raichur Thermal Power Station in consultation with Central Power Research Institute as consultant under Indo Norwegian Environmental Programme at a cost of Rs 58 million. Presently, in the above centre is manufacturing various Fly Ash products and are being utilized by them for housing. This centre will demonstrate various process, technologies for the manufacture of construction materials like brick, hollow concrete blocks, mosaic tiles etc. Fly ash Initiatives •
MOEF/GOI has stipulated utilization of 100% Fly Ash generated at Thermal power stations for
manufacturing ash based products like Bricks, Asbestos sheets,
Embankments, Dams and Dykes. Fly Ash is issued free of cost •
The approximate quantity of Fly Ash generated at Raichur Thermal Power Station from 7 units for the year 2004-05 is 16.0 lakh MT
•
RTPS has the distinction of utilizing approx. 60 to 65% of Fly Ash in a year
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 53
Karnataka Power Corporation Limited
•
Total coal consumed during 2004 – 2005 69.10 lakh tones
•
Ash content - 22.02 lakh tones
•
(Weighted ash content 31.73 %)
•
Fly ash (80%) 16.0 lakh tones
•
Bottom ash (20%) 4.40 lakh tones
Initiatives to utilize maximum Fly Ash from RTPS :
* Agreement signed with major cement manufacturers like ACC and ARV society for production of puzzalona cement using Fly ash * The Fly ash is being transported through specially designed closed tankers by road * MOU between KPCL and major cement companies like ACC and ARV is under finalization for transportation of fly ash by rail in closed railway wagons to enhance the utilization * Fly ash has been issued to many SSI units for manufacture of Fly ash bricks, asbestos sheets etc. * Established an R&D centre in 2002 with Norwegian aid for the utilization of Fly ash in the manufacture of ash based products. * Associated with the University of Agricultural Sciences, Raichur by extending financial aid for carrying out R&D on utilization of Fly ash in the agricultural sector. * Pond ash is being used for construction of roads. * Fly ash bricks utilized for construction of houses and station building
ASH UTILISATION:
2004 – 2005
64.82 %
2003 – 2004
56.00 %
2002 – 2003
31.00 %
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 54
Karnataka Power Corporation Limited
CORPORATE COMMUNICATION
Corporate communication is playing a vital role in KPCL. The main aim of corporate communication is image building. Functions of Corporate communication •
Various publications have been brought out
•
Media Relations – maintaining good rapport with Print &
•
Electronic Media.
•
Sports meet were organized
•
House magazine “Shakthi Vahini” being published regularly to maintain internal relation and motivating the hidden talents of employees.
•
Organised various meetings, functions and Seminars.
•
Corporate film produced and screened.
•
Corporate Image building in news-paper and magazines released on important occasions.
•
Develops relevant literature and documents of the Company.
•
Enhance the image of KPCL through various sponsorships and financial assistance to temples, educational institutions and hospitals, district festivals, sports personnel and blind Association/orphanages as Community service measures.
•
Constant upgrading the image of the company and maintain cordial relations with opinion makers and pressure group etc.
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 55
Karnataka Power Corporation Limited
SWOT ANALYSIS STRENGTHS:
Availability of resources:
Generally the power generation in India is based on natural resources. Availability of abundant coal reserves and water resource are boon to power sector.
High potential:
Indian power sector have the vast hydro electric potential of producing 150,000 MW. Emergence of strong and globally comparable central utilities (NTPC, Power Grid) has helped the growth of power sector.
Effective planning and implementation:
Indian power sector have expertise in integrated and co-ordinated (CEA and Planning Commission). Availability of highly skilled technical personnel in large numbers has helped to implement these plans effectively.
Growing demand for the power;
Indian power sector has responded positively to the increasing demand for the power throughout the country from all sectors due to industrialisation and irrigation facilities
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 56
Karnataka Power Corporation Limited
WEAKNESS
Inadequate infrastructure:
Inadequate infrastructure has lead to inadequate power generation and thus under utilisation of available resource.
Under utilisation of capacity:
Under utilisation of the existing generation capacity in present projects has decreased the profitability.
Interstate disputes:
Improper water management and interstate water disputes are wasting valuable water resource there by reducing the production efficiency.
Fluctuating monsoon:
Untimely monsoon causes water scarcity in the country affecting the generation of power and leads to power cuts and load shedding.
Ineffective power administration:
Ineffective power administration leading to power thefts and inefficient use of electricity by the end consumer decreases the revenue.
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 57
Karnataka Power Corporation Limited
OPPORTUNITIES
Investment opportunities:
Investment opportunities for private people are increasing because of increasing demand for the power. This contributes to growth of power sector.
Subsidies given by government:
Subsidies are given by government for the generating companies to encourage power generation and supply.
Largest power markets:
Potentially, Indian power sector is one of the largest power markets in the world. Growing demand for the power from all sectors of economy like agriculture, manufacturing, service.
Monopoly in power sector:
KPCL being the state monopolist in power generation holds tremendous growth opportunities in the field of investigation, design, construction, generation and maintenance of power projects.
Consultancy business:
As KPCL is venturing into consultancy business which is still at growing phase, company can look for bright future.
Explore other source of energy:
KPCL has opportunity to explore other source of energy like wind based and solar power projects.
Rural electrification:
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 58
Karnataka Power Corporation Limited
Government has shown concern rural electrification. Schemes like Bhagya jyothi scheme, which aims to power to the poor families at cheaper rate.
THREATS
Uncertain government policies:
Changes in political environment affect the government policies. Excess involvement of government in decision making affects the industry.
Bad debts:
Increasing bad debts due to non payment of electricity bills by poor people and power thefts.
Interstate water disputes:
The interstate water sharing disputes have halted the smooth functioning of many projects.
Entry of private players:
With the advent of economic reforms and liberalization, there is an open gate policies for private participants like TATA Power, Reliance Energy, GMR, etc, in the field of power.
Rise in prices:
Increase in political of coal due to increase in demand and transportation cost leads to increase cost of production of Thermal power.
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 59
Karnataka Power Corporation Limited
FINDINGS
The organisation is reimbursing the medical bills on time.
The organisation is providing good leave facility to its employees.
The promotion scheme in KPCL is mostly based on seniority.
The training given in KPCL is serving the purpose that is employees are improving the performance on the job.
The canteen facility provided should be improved so that the employees work efficiency and their by to improve the productivity of the organisation.
Since the employees felt that there is disturbance at work place due to noise necessary steps should be taken to remove it.
The financial performance of the company is good compare to previous financial year
The investors are getting good returns.
The employees are satisfied very much with good benefits.
The co-ordination between management and workers is good.
More training and development is required.
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 60
Karnataka Power Corporation Limited
SUGGESTION
KPCL has both expertise and experience in power generation. Hence, the organisation can focus on research and development activities leading to innovative methods of power generation.
Generation of more power from natural sources which again depends on research and development.
By generating more and more wind power, cost can be minimised.
More awareness program and other such events at places where power project are to be constructed. The co has scope to improve on layout facility.
The company has to improve number of power station.
The factory should make the arrangement of pay to the middle men at the proper time.
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 61
Karnataka Power Corporation Limited
CONCLUSION
The organizational study helps to analyze the functioning of the overall organization and to check out the strengths and weakness of the company. The study gives details about the departments, its operation, coordination and functioning in detail. The company is giving major preference to quality in its operation The company is having a very narrow distribution channel.
It has been a long and rewarding journey for KPCL ever since its establishment in the year 1970. Today, KPCL takes great pride in the experience it has gathered, the expertise it has developed and the skills it has honed. Especially in planning, investigation, design, execution and effective operation and large power projects. KPCL has completed power projects in record time by compromising on quality of infrastructure and power generation, these by meeting the challenges of the rising energy demands of Karnataka. An excellent HR department coupled with innovation in technology and motivated staff further have led to the uplift the organisation.
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 62
Karnataka Power Corporation Limited
MY LEARNING EXPERIENCE
It was great opportunity to do the In-plant training /Organization study in one of the Manufacturing company- KARNATAKA POWER CORPORATION LTD
As part of this program, acquired good knowledge about the Karnataka Power Corporation limited. During my study I have visited almost all the department like Research and Development, Human resource, marketing, Finance and Agriculture, Technical technology. I have come to know that the theoretical concept which I have studied in my MBA has been implemented in practice in the industry. However I would see a greated mismatch from the theory and practice.
I thank the university and the college for providing this kind of an exposure. Where I had a chance to see what I have learnt in my theory classes.
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 63
Karnataka Power Corporation Limited
BIBLOGRAPHY
Web sites: www.powermin.nic.in-Official- website of Indian Ministry of power. www.karnatakapower.com – KPCL Company website.
BOOKS REFERRED: •
Human Resource Management – By Ashwathappa.k
•
Financial Management – By Prasanna Chandra.
•
Magazines in KPCL.
•
KPCL’s 38th Annual Report 2007-2008
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 64
Karnataka Power Corporation Limited
Appendix
FINANCIAL PERFORMANCE
Financial result
For the year ended
For the year ended
March 31, 2008
March 31, 2007
(Rs. in crores)
(Rs. in crores)
Gross income from Sale of 3345
3434
energy Other income Total Income Operating expenditure Operating profit Finance Charges, Depn,&
306 3651 2624 1027 777
316 3750 2751 999 628
Profit before tax Provision for Tax
250 29
371 77
Deferred tax
15
-28
Profit after tax
206
322
prior period adjustments
VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 65