JOB SAFETY ANALYSIS Manual Lifting of Materials WORK ACTIVITY: ___________________________________ Each piece of equipment and crew are associated with known specific hazards that cause accidents to reoccur on one project after another. P123456
Mhd. Abdul Rahman ARAB -D SITE SUPERVISOR:___________________ LOCATION ;____________________ PERMIT #:____________ Probability factors.
Unfamiliar with plant situation and with site regulation
Unauthorized commencement of works may result in exposing workers and or potential to harm or danger
Who/ What Might Be Harmed Personnel & Client’s Property
Risk E.P. SxP=T 4x2=8
Injury to IMCO Personnel and or client property.
2x3=6
LD : Lost Workdays
Control/ Recovery Measures
Ensure all personnel are fully briefed on tasks and responsibilities responsibilities Ensure all workers that already inducted prior to mobilization to site. Ensure, prior to work inside the plant, all workers are having a valid H2S card. Authorized PTW holder shall ensure obtaining and maintaining valid work permit. The worksite supervisor responsible for this activity has to check the PPE of his staff to ensure that all required items are available and properly used.
Target E.P. SxP=T 2x1=2
2x1=2
Responsible/ Action By Worksite supervisor and Site Safety Officer.
Site supervisor and Site Safety Officer.
No
Activity ( Job Steps )
Potential Hazard
Who/ What Might Be Harmed
Risk E.P. SxP=T
Control/ Recovery Measures
Inform all workers regarding permit condition before work starts. Worksite supervisor shall conduct toolbox talks about nature of works and associated potential hazards and their essential precautionary measure. Ensure that the pre task briefing is given out in a l anguage understood by the work force, have it translated. Ask question regarding the briefing to get feedback from the staff, this ensures full comprehension. Issue required appropriate PPE and replace PPE that has signs of defect. PPE must include both hearing protection as well as dust inhalation protection. Designing and organizing tasks to avoid manual handling completely, or at least restrict it. • Using automation and lifting equipment. • Organizing manual handling tasks in a safe way, with loads split into smaller ones, and proper rest periods provided. Providing information and training to workers on tasks, and the use of equipment and correct handling techniques. Ensure taking the appropriate
Target E.P. SxP=T
Responsible/ Action By
3
Pre-task briefing toolbox talks.
4
Manual lifting of materials
The work force does not understand the pre task briefing therefore does not understand the potential dangers and control measures to be implemented. Some of the workers could be lacking PPE or using defective PPE.
Personnel
Cumulative disorders due to gradual and cumulative deterioration of the musculoskeletal system through continuous lifting / handling activities
IMCO personnel
2x4=8
4 x 3 = 12
2x1=2
Site supervisor and Site Safety Officer.
2x1=2
Site supervisor and Site Safety Officer.
No
Activity ( Job Steps )
Potential Hazard
Signs of noise distracting people, interfering with their ability to communicate warnings, or having the potential to cause permanent hearing loss.
Who/ What Might Be Harmed
IMCO personnel
Risk E.P. SxP=T
4x2=8
organizational measures to reduce the risk if manual handling cannot be avoided To ensure that workers receive adequate information on the weight of a load, the centre of gravity, or the heaviest side when a package is unevenly loaded To provide proper training and precise information on how to handle loads correctly. Ensure that personnel are wearing appropriate hearing protection.