JOB SAFETY ANALYSIS FOR CONVENTIONAL INSTRUMENTS, MOVs AND FCVS
Job Safety Analysis
Sabic services Terminal Co. ( Sabtank)
Name Of Organization Organization Completing The Work: INDUSTRIAL INSTRUMENTATION AND CONTROL SYSTEM LTD. Task: Installation of Conventional Instruments, MOVs and FCVs
Job name: name: JPE 2 AND IBB FIELD INTRUMENTATION UPGRADATION PROJECT.
Principal contractor: Job Executed by IICS
Job location: Tank farms of Sharq, United, Sadaf, IBB, Shipping Berths are 41, 42, 43, 36, 52, and 53.
Date the JSA was prepared:
Number of pages in this JSA: 04.
This JSA has been reviewed by: SABTANK & IICS. Principal contractor or representative (signature). JSA PREPARED BY TAHIR A KHAN POSITION: HSE ENGINEER. Item No.
Work Activity (Break the job down into steps)
Job number : 4501312281 AND 4501318796.
This JSA has been discussed with: Employee (Permit Issuer) (signature). Position :
Date :
Date :
Hazard (What could harm someone?)
Hazard Consequence (Assuming consequences of Hazard)
Risk Control (What can be done to make the jobs safe?)
1
Mobilization of Equipment, Material and Manpower.
Damage to the plant facility or equipment by vehicles/ mobile equipment. Aggressive driving Human negligence Mishandling of material
Accidents/collision/ impact resulting to physical injuries, permanent disability or death. Damage to property Delay in schedules
Driver must have a valid Saudi Driving license and properly oriented about defensive driving. Ensure all Vehicles and mobile equipments are in good condition. Driver has to follow speed limit according to SABTANK procedure. Competent knowledge of road signs and regulations.
Person responsible (Who will make sure it happens?)
Site supervisor/ safety officer.
Completion (Date and Sign off)
JOB SAFETY ANALYSIS FOR CONVENTIONAL INSTRUMENTS, MOVs AND FCVS
2
Slipping Tripping Cuts Back pain Physical injury
Preparation of site and installation of barricade.
Cuts Back Pain Physically injury
3
Installation of Conventional Instruments, MOVs & FCVs
Equipment damage human negligence Mishandling of material Permanent disability or death. Physically injury Falling of objects Cut and injury while carrying and fitting works.
Failure of Testing. Loss of Additional Man Hours. Unintended Operation. Delay on schedule.
Good housekeeping must be maintain and observed before and during and after the day’s work, and completion of the project. Proper procedures in either manual handling or lifting should be considered to avoid back pain Barricades must be installed properly. Excess bar must be removed and appropriate precautions must put in place (standard size, color codes) Mandatory personal protective equipment (PPE) must be provided to all the workers. All lifting tools are to be certified with competent third party and ensured by SABTANK maintains supervisor. Proper access/egress must be provided. Use correct tools for the job to be inspected prior to use. Barricade, warning sign board will be provided. Qualified person shall be available to perform the job. Employee using hand
Site supervisor/foremen/safety officer.
Site supervisor/foremen/safety officer/Maintains supervisor.
JOB SAFETY ANALYSIS FOR CONVENTIONAL INSTRUMENTS, MOVs AND FCVS
4
Request for work permit.
To be explosion or fire
Working without authorization will lead to accident.
5
Scaffolding.
Falling of objects. Tripping and falling of person.
Fall, slipping & Tripping Hands & Body injury May cause misunderstanding
tools, power tools will be trained to use them Certified operator and Rigger required for installation works. Joint inspection must be done by work permit receiver and issuer, At the instant of time if the work permit receivers or the safety officer needs to go out of the working area, they must inform the Work Permit Issuer for the same. A delegate must be available otherwise the work should be stopped. Work Permit receiver delegate should be certified. Use certified scaffolding. Use recommended PPE. Full body harness must be worn. Barricade the area to which objects can fall. Use scaffolding which are inspected and with green card scaffolding card. Scaffolding shall be inspected and certified by scaffolding inspector.
Site supervisor/foremen/safety officer
Site supervisor/foremen/safety officer/scaffolding inspector.
JOB SAFETY ANALYSIS FOR CONVENTIONAL INSTRUMENTS, MOVs AND FCVS Trained supervisor/Foreman will supervise.
6
Health and welfare
Body injuries
Body injuries
Minor injuries on site
7
Housekeeping
slip, trip and fall hazard Body Injuries
8
In case of emergency
Fire explosion. Gas leak. injury
To be fire
First Aid kit will all accessories and first aider should be available every time on site. Collect and stock the waste in a designated area for disposal in proper and safe way to avoid hazards. In case of emergency IICS follow the emergency reporting procedure of SABTANK by using the following telephone line EXT:3333
Site supervisor/foremen.
ALL OF THEM.