Descripción: Caesar II mainly used for pipe stress analysis and water hammer is one of the frequent cases to be analysed as per this document
Edição nº 17 do livro do CebolinhaFull description
Descripción: engleza
what is concrete? its constitution, stages, properties, different test etcFull description
Descripción completa
Descripción completa
UPAYA PENCEGAHAN PENCEMARAN LAUT Dl KAPAL MT.OIGAWAFull description
Edição nº 17 do livro do Cebolinha
Full description
Full description
Description complète
Full description
Form No. JI 2027-FORM-HSE-002
Petrofac
Job Safety Analysis Activity: Project:
JSA No: JI 2027-JSA-017 Project No: EF-1901 KOC Permit No & Date:
Chipping of Concrete using Pneumatic Jack Jack Hammer NEW GATHERING CENTRE, GC-29 IN NORTH KUWAIT
Work Area:
Site/Facility: In Case of Emergency, contact KOC @ 160
PPE & Tools: SEQUENCE OF JOB STEPS
Hard Hat, Safety Shoes, Safety Goggles/ Glasses, Hand Gloves, Overall, Dust Mask, Total Station & GPS, Hand Tools & Measuring tapes POTENTIAL HAZARDS
RISK RATING
Non-compliance procedures
of
KOC
HSEMS
4 (D) HIGH
Pre - work
Poor task planning
3 (C) MEDIUM
Mis-use of equipment equipment
Not wearing appropriate PPE Personal Injury
3 (C) MEDIUM
3 (C) MEDIUM
Chipping of Concrete using Portable Jack Hammer
Lack of Guarding Improper tool usage
3 (C) MEDIUM
Eye & Hearing protection
Poor access & Egress
3 (C) MEDIUM
Untrained Personnel
3 (C) MEDIUM
Poor housekeeping
3 (C) MEDIUM
RESIDUAL RISK RATING
MITIGATION MEASURES
Obtain required Permit to Work in compliance with KOC SA.004 ( Permit to Work Procedure) Ensure to comply with KOC HSEMS, Portable Battery and Electrically Operated Tools & Equipment (KOC.SA.014), mobile equipment procedure (KOC.SA.013) Ensure all personnel have undergone Project HSE Induction and EOD training and attended craft wise training. Tool box talk Ensure to deploy trained person to do the task. Keep the power supply cable secured and Cable management implemented Ensure all electrical power sources are properly earthed and dead man switch of the Portable Jack Hammer is functional. Wear appropriate additional PPE i.e. face shield, working gloves, ear defender ,etc.
personnel
2 (B) LOW
2 (B) LOW
2 (B) LOW
Ensure to provide adequate access and egress and clear from any obstruction as required trained
LOW
2 (B) LOW
Perform regular maintenance Ensure all hoses connections are properly secure as per recommended safe work practices Use right tool for the job Inspect all tools before use Use the right personal protective equipment (PPE)