An article by Sifu Tim Tackett and Sifu Bob Bremer on the lead punch. Published in Bruce Lee Magazine, August 1998.
Expert Punch Reference Manual_EN
An article by Sifu Tim Tackett and Sifu Bob Bremer on the lead punch. Published in Bruce Lee Magazine, August 1998.Full description
Vessel-Inspection-Check-List
Descripción completa
Full description
Manga One Punch Man Capitulo 01
Punch Drunk Love Screenplay by Paul Thomas Anderson
An article by Sifu Tim Tackett and Sifu Bob Bremer on the lead punch. Published in Bruce Lee Magazine, August 1998.
Full description
Agriculture - Industry - Marine Control Inspection Group (AIM Control) Worldwide is an independent inspection group acting globally and providing a complete range of inspection, quality good…Full description
Punch List Items F-1013 Boiler Description Status Comments/Remarks Fix rip on expantion joint on Eastn side of Complete Economizer. Grout all supports Complete Pull the slip blind from the Fuel Gas Tie-in Complete Send Valves to Western to Get Tested Complete Adjust all Spring Cans Complete Insulation In Progress Missing Anchor Bolts Complete Hydro Boiler Trim Pipe and NDE Complete Fix hole in wall where drain pipe comes out Civil Crew Has been informed Fix 1 1/2" Flanged tie from blow-down pipe to Complete boiler. (Mis-Alignment) Pull all Blinds from the Boiler. Complete Missing bolts on Ladders. And missing Safety In Progress Ladder has been een bolted down Gates on Ladders as well. Missing U-Bolt on Cooling Water Line on the west Complete side of the boiler. Install Silencer Need Crane Missing Supports on Utility Air Lines Complete Pull out shims underneath BFW393 Complete Anchor down and grout support on BFW393 Complete Anchor down support on Ladder on North side of Complete Boiler Turn Check Valve on Blow Down Piping on North Complete East Side of Boiler Power Piping Paper Work In Progress Install TI on SH379 Iso 138 Complete Install TI on BFW391 Iso 57 Complete Install TI on SH455 Iso 163 Complete Install TI on SH379 Iso 145 Complete Missing 300# RF Ball Valve Tag# FV-165A on We have not received item yet Blow Down By Pass Iso # 044 Ping The Bolts on the East side of the Economizer Complete Blind Flanges Install Inserta seal on drain on North Side S ide of Boiler Complete Mud Drum Install Unions on drains on North Side of Boiler Complete Install Teflon pads undernesth all Stainless Pipe Complete and structure steel Blow a hole in the Fuel Gas Skid so that it can Waiting on instructions as what we drain. are going to do their. Install U-Bolt on st stainless pipe at loading rack. Complete Ping The Bolts on the on all stainless piping Complete Run Pipe down from the high point vents from the Complete BFW piping all the way to the ground. Fi t I 143 C l t
Item #
35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
Punch List Items F-1013 Boiler Description Status Comments/Remarks Cut anchors/stops off of 110# Steam Piping Iso 177 Complete Leave as is. item 14 Install Missing Guides and Supports on Stainless Complete Pipe Ping all bolts on Boiler Flanges Complete Weatherproof top of boiler at penetrations. Complete F-001 Missing Contriol valve Repeat Same as Item 25 F-019 Missing TI Repeat Same as Item 23 F-003 Two anchor bolts missing Repeat Same as Item 17 F-003 grout base plate Repeat Same as Item 17 Iso # 65 does not require a TI per F-003 TI missing Iso #065 ? the Drawing Ammonia piping- Need mechanical completion Complete sign off Check tightness on flanges of the round ducts Complete BFW Missing supports Complete Install missing covers on each end of mud drum Complete all insulation Repeat Same as Item 6 Ping/check manway covers on economizer &ducts. Complete Found loose fasteners. Finish with the Concrete Probably Friday or Monday