PT PERTA ARUN GAS DEVELOPING INDONESIA’S LNG INFRASTRUCTURE & MAINTAINING MAINT AINING LNG BUSINESS COMPETENCY
INDONESIA’S FIRST IN-LAND IN-LAND LNG RECEIVING AND REGASIFICATION TERMINAL
29 OCTOBER 2015
PERTAMINA PERTA ARUN GAS
AGENDA
HISTORICAL AND REVITALIZE OF ARUN ASSETS
LAST LNG CARGO
THE PROJECT OF LNG LN G RECEIVING AND REGASIFICATION REGASIFICATION TERMINAL
COMMISIONING AND OPERATION OPERATION
NEXT STEP OF PERTA ARUN GAS
HISTORICAL – ARUN LNG PLANT DATA ASSETS :
1ST build : Train 1, 2, 3 - 1974
1982 : Train 4 & 5 Capacity Expansion Project
Train 6 : Capacity Expansion Project 1986 1990 : Capacity Expansion Project into 12,5 MTPA
Since 2012 Single Train Ops.
Location: Blang Lancang, Lhokseumawe, Aceh 6 LNG Plant, total capacity 12.5 MTPA with 5 LNG Storage Tank, total capacity 636,000 m3 and 2 LNG Jetty @80,000 DWT LPG Extraction Facility, capacity 1.4 MTPA with 4 LPG Storage Tank, total capacity 302,000 m3 and 1 LPG Jetty 65,000 DWT Condensate Treating, max. capacity 120,000 barrel/day with 4 Condensate Storage Tank, total capacity 2.12 mill. Barrel and SBM-MBM for Condensate Lifting 11 Power Plant, total output capacity 220 MW (Ownership Of The Asset is Gov. of Indonesia)
ARUN LNG PLANT ENDED on OCT.14 (Last Cargo)
Expiry of LNG Sales Contract in 2014
Declining of Gas Deliverability From Upstream Gas Field
No New Prospected Gas Reserve Year : 1977 – 2012 (Number of CARGOES )
LNG : 4251 Condensate : 1880 LPG Propane : 355 LPG Butane : 359 Sulphur : 211
LNG PLANT STOP OPERATION :
OCT 2014
ASSETS OF ARUN LNG PLANT 6 LNG Plant, total capacity 12.5 MTPA with 5 LNG Storage Tank, total capacity
636,000 m3 and 2 LNG Jetty @80,000 DWT LPG Extraction Facility, capacity 1.4 MTPA with 4 LPG Storage Tank, total
capacity 302,000 m3 and 1 LPG Jetty 65,000 DWT Condensate Treating, max. capacity 120,000 barrel/day with 4 Condensate
Storage Tank, total capacity 2.12 mill. Barrel and SBM-MBM for Condensate Lifting 11 Power Plant, total output capacity 220 MW 2 LNG jetty, @80,000 DWT 1 65,000 DWT LPG jetty
AGENDA
HISTORICAL AND REVITALIZE OF ARUN ASSETS
LAST LNG CARGO
THE PROJECT OF LNG RECEIVING AND REGASIFICATION TERMINAL
COMMISIONING AND OPERATION
NEXT STEP OF PERTA ARUN GAS
LAST LNG CARGO
LNG PLANT STOP OPERATION IN 2014
AGENDA
HISTORICAL AND REVITALIZE OF ARUN ASSETS
LAST LNG CARGO
THE PROJECT OF LNG RECEIVING AND REGASIFICATION TERMINAL
COMMISIONING AND OPERATION
NEXT STEP OF PERTA ARUN GAS
THE PROJECTS & CONVERTED TERMINAL Export Terminal LNG & LPG Facilities
Export/Import Terminal Regasification Plant
Liquefaction Plant Fac. DATA ASSETS : Location: Blang Lancang, Lhokseumawe, Aceh 6 LNG Plant, total capacity 12.5 MTPA with 5 LNG Storage Tank, total capacity 636,000 m3 and 2 LNG Jetty @80,000 DWT LPG Extraction Facility, capacity 1.4 MTPA with 4 LPG Storage Tank, total capacity 302,000 m3 and 1 LPG Jetty 65,000 DWT Condensate Treating, max. capacity 120,000 barrel/day with 4 Condensate Storage Tank, total capacity 2.12 mill. Barrel and SBM-MBM for Condensate Lifting 11 Power Plant, total output capacity 220 MW (Ownership Of The Asset is Gov. of Indonesia)
LNG & LPG Trading
THE PROJECTS R E C E I V IN G & R E G A S I F I C AT I O N - H U B T E R M I N A L A N D A R U N – B E L A W A N G A S T R A N S M I S S IO N P I P E L I N E
MILESTONEs – ARUN LNG RECEIVING, HUB & REGASIFICATION TERMINAL Juli.2012: Conceptual Study, FEED,PreAmdal etc
2011
21.01.13 : Persetujuan HOA PTM & PLN
2012
26.07.11 Asset Utilization Plan Workshop Arun LNG
02.08.2013 : Novasi EPC Contract : PERTAMINA Persero to PT. Perta Arun Gas 2013
23.02.2013 : FID
2014
04.04.2013 : Endorsement PT Perta Arun Gas by Ministry of Law
06.03.2013 : EPC Contract Arun Regas (PNA Persero & REKIND)
2015
27.01.2015 : Mechanical Completion 19.02.2015 : 1st Cargo LNG From Tangguh
09.03.2015 : The inauguration of the operation of PAG by the President 14.03.2015 : 1st Gas Production 14.03.2015 : 1st Gas Receiving PLN Belawan
Pre Project Phase
PERTAMINA PERTA ARUN GAS
EPC Phase
Production Phase
AGENDA
HISTORICAL AND REVITALIZE OF ARUN ASSETS
LAST LNG CARGO
THE PROJECT OF LNG RECEIVING AND REGASIFICATION TERMINAL
COMMISIONING AND OPERATION
NEXT STEP OF PERTA ARUN GAS
REGASIFICATION BUSINESS SCHEME LNG SPA : BP (PSC TANGGUH) & PT. PLN
LNG CARRIER
LNG Cargo 2015 to Regas Plant (ADP) No
ETA Arun
LNG Source
Gas Alocation
1
19Feb
Tangguh
PLN Belawan
2
16March
Tangguh
PLN Belawan
3
22April
Tangguh
PLN Belawan
4
18May
Tangguh
PLN Belawan
5
19Juni
Tangguh
PLN Belawan
6
22Jul
Tangguh
PLN Belawan
7
24Aug
Tangguh
PLN Belawan
8
20Sept
Tangguh
PLN Belawan
9
19Oct
Tangguh
PLN Belawan
10
6 Nov
Tangguh
PLN Belawan
11
3Dec
Tangguh
PLN Belawan
12
15 Dec
Tangguh
Industri Medan
Regas Agreement (PLN & PAG)
REGAS PLANT (DESIGN. 400 MMSCFD)
POWER PLANT PLN Arun Aceh Utara
GAS PIPELINE ARUN – BELAWAN ( 24” x 350 KM ) >>>Invested & Operated by : PT. Pertamina Gas
GAS DELIVERY TO PLN, 40 MMSCFD OTHERS : INDUSTRIAL ACEH & NORTH SUMATRA
COMMITED VOL (CONTRACT W/ PLN) : 95 MMSCFD POWER PLANT PLN Belawan
REGASIFICATION PLANT LOCATION
GAS PIPELINE ARUN – BELAWAN
PAG BEGAN PRODUCTION AND SUPPLY OF GAS IN ACEH AND MEDAN BEGAN TO BE FULFILLED NEWS :
AGENDA
HISTORICAL AND REVITALIZE OF ARUN ASSETS
LAST LNG CARGO
THE PROJECT OF LNG RECEIVING AND REGASIFICATION TERMINAL
COMMISIONING AND OPERATION
NEXT STEP OF PERTA ARUN GAS
17
TANK HUB FACILITIES PAG Provides A Hub Facility With The Tank Capacity Of 2 X 127500 M3
2 Unit LNG Tank
LNG TRUCKING LNG TRUCKING WOULD COMPLEMENT THE BUSINESS OF PT PAG