The Development of Shamkha South Infrastructure Works – Lot 4 Operation/Task:
Hazard / Impact Risk Assessment
Use of Access Scaffolding
HIRA No:
02
Method Statement Title: Location/Area: Item
South Shamkha – Lot 4
Activity
Use of Access Scaffolding
SBD SMS SMSP09/F02
Hazards/Risks Identified
Method Statement No: Risk Rating S
L
RR
Falls of Persons
4
5
20
Falls of Materials
4
5
20
Collapse of Structure
4
5
20
Residual Risk
Control Measures
Only Only author authorise ised d person personnel nel will will erect, erect, modi modify fy or dism disman antl tlee scaf scaffo fold ldin ing. g. Competence Competence and certifica certification tion of erectors erectors will will be requir required ed and checke checked. d. Design Design drawings will be produced for load-bearing scaffolds and non-standard structures. Lighting Lighting arrangements arrangements will be referred referred to local authority for structures on the public highway highway or right of way. Guardrails Guardrails and toe-bo toe-board ardss remove removed d for access access will will be replac replaced ed after after access access has been been gained gained.. Unused ladder gaps will have boards fitted to close them them off. Ties removed removed for for any purpose will be replaced or alternative ties fitted, at once. Debris guards, debris netting and fans will be considere considered d for high-rise high-rise scaffolds scaffolds and those close to public public areas. areas. Traffic movements will be restricted around scaffold scaffold bases. bases. Excavation Excavationss adjacent adjacent to scaffold bases will be monitored to ensure the stability of the structure is not affected. All All scaf scaffo fold ldin ing g will will be insp inspec ecte ted d on handov handover er to or from from other other contra contracto ctors. rs. Afte Afterr alte altera rati tion on or adve advers rsee weat weathe her r conditions scaffolds must be inspected by management. Working platforms over over 2m in height will be inspected every seven days and the result resultss recorded recorded.. All scaffo scaffold ld insp inspec ecti tion onss will will be carr carrie ied d out out by a comp compet eten entt pers person on.. Scaf Scaffo fold ldss will will be checked regularly to ensure their correct use and that unauthoris unauthorised ed adoptions have not been made. Revision: Date Issued:
S
L
RR
4
2
8
Operator
Monitoring Responsibility Supervisor
4
2
8
Operator
Supervisor
4
2
8
02 Nov 10
Responsibility
The Development of Shamkha South Infrastructure Works – Lot 4 Operation/Task:
Hazard / Impact Risk Assessment
Use of Access Scaffolding
02
HIRA No: Method Statement Title:
Location/Area: Item
South Shamkha – Lot 4
Activity
Hazards/Risks Identified
Use of Access Scaffolding (cont’d.)
KEY:
Method Statement No:
S = Severity Rating 1. Negligible 2. Minor Injury / Minor Spill / Leak 3. Major Injury (RIDDOR) / Major Spill / Contamination 4. Fatality / Serious Hazardous Release 5. Multiple Fatality / Multiple Catastrophe
Risk Rating S
L
RR
4
4
16
Residual Risk
Control Measures
Persons erecting scaffolding must be adequately trained. This will normally be verified by production of a Scaffolder Certificate from a recognised training body. Inspections of scaffolding will be carried out only by those trained competent to do so.
L = Likelihood of Occurrence 1. Improbable 2. Remote 1 – 10% 3. Possible 10 – 50% 4. Probable 50 – 90% 5. Almost certain 90%+
Unacceptable risk, plan out or add further controls Acceptable only if no other method viable and with high level controls in place Acceptable with suitable controls Acceptable, no further action required