FOUNDATION CALCULATION SHEET
One-Stop Solution for Foundation
TITLE
DESCRIPTION
PROJECT/JOB NO. PROJECT/JOB NAME
WEST SUMBAWA CFSPP PROJECT 2X7 MW PLTU SUMBAWA BARAT 2X7 MW
CLIENTNAME
PTPLN(Persero)UIPKITRINGNUSRA
SITE NAME
TALIWANG
DOCUMENT NO. REFERENCE NO. STRUCTURENAME
CHIMNEYSTRUCTUREKSB
LOAD COMBINATION GROUP NAME REV
DATE
Copyright (c) GS E&C. All Rights Reserved
DESCRIPTION
PREP'D
CHK'D
APPR'D
APPR'D
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016 Project Na. : PLTU SUMBAWA BARAT 2X7
Calculation Sheet of Foundation
..
Project No. : WEST SUMBAWA CFSPP PR.. Client : PT PLN (Persero)... Page 1
FOUNDATION LISTS G r o u pN a me
No.
CHIMNEYKSB
1
Descr i pt io n F1
Copyright (c) GS E&C. All Rights Reserved
N o.
Descr i pt io n
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016
Calculation Sheet of Foundation
..
CONTENTS 1. GENERAL 1.1 CODE & STANDARD 1.2 MATERIALS & UNIT WEIGHT 1.3 SUBSOIL CONDITION & SAFETY FACTORS 1.4 LOAD COMBINATION
2. DRAWING 2.1 LOCATION PLAN 2.2 DETAIL SKETCH
3. FOUNDATION DATA 3.1 FOOTING DATA 3.2 PIER DATA 3.3 SECTION DATA 3.4 LOAD CASE 3.5 LOAD COMBINATION
4. CHECK OF STABILITY 4.1 CHECK OF PILE REACTION
5. DESIGN OF FOOTING 5.1 DESIGN MOMENT AND SHEAR FORCE 5.2 REQUIRED REINFORCEMENT 5.3 ONE WAY SHEAR FORCE 5.4 TWO WAY SHEAR FORCE 5.5 PILE PUNCHING SHEAR FORCE
Copyright (c) GS E&C. All Rights Reserved
Project Na. : PLTU SUMBAWA BARAT 2X7 Project No. : WEST SUMBAWA CFSPP PR.. Client : PT PLN (Persero)... Page 2
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016 Project Na. : PLTU SUMBAWA BARAT 2X7
Calculation Sheet of Foundation
..
Project No. : WEST SUMBAWA CFSPP PR.. Client : PT PLN (Persero)... Page 3
1. GENERAL 1.1 CODE & STANDARD I t e ms
Descr i pt io n
DesignCode
American ConcreteInstitute(ACI318)[Metric]
Horizontal Force for Wind
AMERICAN SOCIETY OF CIVIL ENGINEERS [ASCE 7-02]
Horizontal Force for Seismic
AMERICAN SOCIETY CIVIL ENGINEERS [ASCE 7-02]
UnitSystem
Input:MKS,
Output:MKS,
Calculation Unit:IMPERIAL
1.2 MATERIALS & UNIT WEIGHT I t e ms
Val u e 2
Concrete (fck : compressive strength)
250.000 kgf/cm
Lean Concrete (Lfck : compressive strength)
150.000 kgf/cm
Reinforcement (10M ~ 16M , yield strength)
2400.000 kgf/cm
Reinforcement (19M ~ , yield strength)
3900.000 kgf/cm
Rs (Soil unit weight)
1.800 ton/m
Rc (Concrete unit weight)
2.400 ton/m
2 2 2
3 3
6
2
Es (Steel Modulus of Elasticity)
2.000 10 kgf/cm
Ec (Concrete Modulus of Elasticity)
235000.000 kgf/cm
2
- Pile Capacity I t e ms
Val u e
Pile Name
CHIMNEY KSB
Footing List
F1
Diameter
mm 350
Length
m
Thick
20 mm350
Shape
Square
Capacity Ha ( Ua , Va ,)
17 5,70 , tonf
1.3 SUBSOIL CONDITION & SAFETY FACTORS I t e ms
Descri p t io n
Allowable Increase of Soil (Wind)
0%
Allowable Increase of Soil (Seismic)
0%
Allowable Increase of Soil (Test)
0%
Allowable Increase of Pile Horizontal (Wind)
0%
Allowable Increase of Pile Horizontal (Seismic)
0%
Allowable Increase of Pile Horizontal (Test)
0%
Allowable Increase of Pile Vertical (Wind)
0%
Allowable Increase of Pile Vertical (Seismic)
0%
Allowable Increase of Pile Vertical (Test)
0%
Copyright (c) GS E&C. All Rights Reserved
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016
Calculation Sheet of Foundation
..
Allowable Increase of Pile Uplift (Wind)
0%
Allowable Increase of Pile Uplift (Seismic)
0%
Allowable Increase of Pile Uplift (Test)
Project Na. : PLTU SUMBAWA BARAT 2X7 Project No. : WEST SUMBAWA CFSPP PR.. Client : PT PLN (Persero)... Page 4
0%
Safety factor against overturning for OVM1(FO1)
2
Safety factor against overturning for OVM2(FO2)
2
Safety factor against overturning for OVM3(FO3) Safety factor against overturning for OVM4(FO4)
2 2
SafetyfactoragainstslidingfortheSL1(FS1)
2
SafetyfactoragainstslidingfortheSL2(FS2)
2
SafetyfactoragainstslidingfortheSL3(FS3)
2
SafetyfactoragainstslidingfortheSL4(FS4)
2
Friction factor (m )
0.35
1.4 LOAD COMBINATION Comb . ID
L o a d C o mb i n a t i o n f o r s t a b i l i t y
1000
1.0 SW + .75 DL + .75 Loadtype None Title Ll
2000
1.0 SW + .75 DL + .75 Loadtype Seismic Title Slx + .75 Loadtype None Title Ll
210
1.0 SW
220
1.0 SW + .75 Loadtype Dead Title Dl + .75 Loadtype Live Title Ll + .75 Loadtype Wind Title Wlx
230
1.0 SW + .75 Loadtype Dead Title Dl + .75 Loadtype Live Title Ll + .75 Loadtype Wind Title Wlz
240
1.0 SW + .75 Loadtype Dead Title Dl + .75 Loadtype Live Title Ll + -.75 Loadtype Wind Title Wlx
250
1.0 SW + .75 Loadtype Dead Title Dl + .75 Loadtype Live Title Ll + -.75 Loadtype Wind Title Wlz
260
1.0 SW + .75 Loadtype Dead Ti tle Dl + .75 Loadtype Live Ti tle Ll + .75 Loadtype Seismic Title Slx + .22 Loadtype Seismic Title Slz
270
1.0 SW + .75 Loadtype Dead Ti tle Dl + .75 Loadtype Live Ti tle Ll + .75 Loadtype Seismic Title Slx + -.225 Loadtype Seismic Title Slz
280
1.0 SW + .75 Loadtype Dead Ti tle Dl + .75 Loadtype Live Ti tle Ll + -.75 Loadtype Seismic Title Slx + -.225 Loadtype Seismic Title Slz
290
1.0 SW + .75 Loadtype Dead Ti tle Dl + .75 Loadtype Live Ti tle Ll + -.75 Loadtype Seismic Title Slx + .225 Loadtype Seismic Title Slz
300
1.0 SW + .75 Loadtype Dead Ti tle Dl + .75 Loadtype Live Ti tle Ll + .75 Loadtype Seismic Title Slx + .225 Loadtype Seismic Title Slz + .75 Loadtype None T itle Cl6
3000
1.0 SW + .75 DL + -.75 Loadtype Seismic Title Slx
4000
1.0 SW + .75 DL + 1.0 Loadtype Seismic Title Slx
5000
1.0 SW + .75 DL + .75 Loadtype None Title Ll + .3 Loadtype None Title Slz
Comb . ID
L o a d C o mb i n a t i o n f o r R e i n f o r c e me n t
100
1.0 SW + 1.2 Loadtype Dead Title Dl + .5 Loadtype Live Title Ll + 1.3 Loadtype Wind Title Wx
110
1.0 SW + 1.2 Loadtype Dead Title Dl + .5 Loadtype Live Title Ll + 1.3 Loadtype Wind Title Wz
120
1.0 SW + 1.2 Loadtype Dead Title Dl + .5 Loadtype Live Title Ll + 1.0 Loadtype Seismic Title Ex
130
1.0 SW + 1.2 Loadtype Dead Title Dl + .5 Loadtype Live Title Ll + -1.0 Loadtype Seismic Title Ex
140
1.0 SW + 1.2 Loadtype Dead Title Dl + .5 Loadtype Live Title Ll + 1.0 Loadtype Seismic Title Ez
150
1.0 SW + 1.2 Loadtype Dead Title Dl + .5 Loadtype Live Title Ll + -1.0 Loadtype Seismic Title Ez
160
1.0 SW + .9 Loadtype Dead Title Dl + 1.3 Loadtype Wind Title Wx
Copyright (c) GS E&C. All Rights Reserved
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016
Calculation Sheet of Foundation
..
Project Na. : PLTU SUMBAWA BARAT 2X7 Project No. : WEST SUMBAWA CFSPP PR.. Client : PT PLN (Persero)... Page 5
170
1.0 SW + .9 Loadtype Dead Title Dl + -1.3 Loadtype Wind Title Wx
180
1.0 SW + 1.0 Loadtype Dead Title Dl + 1.3 Loadtype Wind Title Wz
190
1.0 SW + .9 Loadtype Dead Title Dl + -1.3 Loadtype Wind Title Wz
60
1.0 SW + 1.4 Loadtype Dead Title Dl
70
1.0 SW + 1.2 Loadtype Dead Title Dl + 1.6 Loadtype Live Title Ll
80 90
1.0 SW + 1.2 Loadtype Dead Title Dl + 1.6 Loadtype Live Title Ll + .8 Loadtype Wind Title Wx 1.0 SW + 1.2 Loadtype Dead Title Dl + 1.6 Loadtype Live Title Ll + .8 Loadtype Wind Title Wz
Copyright (c) GS E&C. All Rights Reserved
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016
Calculation Sheet of Foundation
..
2. DRAWING 2.1 LOCATION PLAN 2.2 DETAIL SKETCH
Copyright (c) GS E&C. All Rights Reserved
Project Na. : PLTU SUMBAWA BARAT 2X7 Project No. : WEST SUMBAWA CFSPP PR.. Client : PT PLN (Persero)... Page 6
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016
Page 7
REFERENCE DWGS A01
N O.
1
D WGN O.
D WGTI T LE
395
NOTES * OUTPUT UNIT : mm
01 PLTU SUMBAWA BARAT 2X7 MW PROJECT
397
FOUNDATION LOCATION PLAN CHIMNEY STRUCTURE KSB
K C E
2
Y
H C D A U Q S
396
PROCESS PIPING VESSELS STRUCT.
ELEC.
INST.
F1
Z
X
SCALE
JOB NO.
MICROFILM NO.
WEST AS SHOWN SUMBAWA CFSPP PROJECT 2X7 MW
Copyright (c) GS E&C. All Rights Reserved
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016
Page 8
2.2 DETAIL SKETCH
OUTPUT UNIT : mm Copyright (c) GS E&C. All Rights Reserved
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016
Page 9
REFERENCE DWGS N O.
D WGN O.
D WGTI T LE
CL FOOTING
11000 1000
1000 4500x2
0 0 0 1
0 0 0 1 1 1
395
NOTES * PILE 16-¡à350 CHIMNEY KSB * OUTPUT UNIT : mm
G N I T O O F CL
2 x 0 0 5 4
0 0 0 1 1
3 x 0 0 0 3
397
PLTU SUMBAWA BARAT 2X7 MW PROJECT
0 0 0 1
2
396
1000
0 0 0 1
FOUNDATION DETAIL FOR F1
1000 3000x3 K C E H C D A U Q S
FOUNDATION PLAN
PROCESS PIPING VESSELS STRUCT.
SCALE R E V. D A T E
Copyright (c) GS E&C. All Rights Reserved
DE S CR I P T I O N
DRWNCHKDAPPDAPPDAPPD
JOB NO.
ELEC.
INST.
MICROFILM NO.
WEST AS SHOWN SUMBAWA CFSPP PROJECT 2X7 MW
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016
Page 10
REFERENCE DWGS N O.
D WGN O.
D WGTI T LE
CL FOOTING
TO P
. P 0 Y 5 T
BO T TO M
NOTES * PILE 16-¡à350 CHIMNEY KSB * OUTPUT UNIT : mm
0 0 2 @ M 6 1
0 0 2 @ M 6 1
PLTU SUMBAWA BARAT 2X7 MW PROJECT
FOUNDATION DETAIL FOR F1
16M@200 16M@200 K C E H C D A U Q S
REINFORCEMENT PLAN
PROCESS PIPING VESSELS STRUCT.
SCALE R E V. D A T E
Copyright (c) GS E&C. All Rights Reserved
DE S CR I P T I O N
DRWNCHKDAPPDAPPDAPPD
JOB NO.
ELEC.
INST.
MICROFILM NO.
WEST AS SHOWN SUMBAWA CFSPP PROJECT 2X7 MW
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016
Page 11
2 1
397
39 6
395
0 0 5
0 0 8 397
LEAN CONC. 50 THK
2
396
ELEVATION S1
-X
OUTPUT UNIT : mm Copyright (c) GS E&C. All Rights Reserved
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016 Project Na. : PLTU SUMBAWA BARAT 2X7
Calculation Sheet of Foundation
..
Project No. : WEST SUMBAWA CFSPP PR.. Client : PT PLN (Persero)... Page 13
3. FOUNDATION DATA 3.1 FOOTING DATA Unit : mmF tN. a m e
11000
F1
Ft. Type
MAT
Area
121.000 m
2
Ft.Thickness
800.00mm 3
Ft. Volume 1
395
96.800 m
Ft.Weight
232.320tonf
SoilHeight
500.00mm 3
Soil Volume
55.124 m
SoilWeight
0 0 0 1 1
397
2
99.223tonf
Buoyancy
NotConsider
Self Weight (except Pr.SW)
331.543 tonf
0 0 5
396
0 0 8
0 0 8
The Origin coordinate The Center of Gravity & Pile (0,0) mm
3.2 PIER DATA Off X , Off Y is offset position from the Center of the footing If Pier Shape is Circle or Circle wall, Pl is a Diameter. and Pw is a Inner Diameter Area is pier concrete area Weight is pier and inner soil weight in case circle wall except Tank1 Type(Circle Ring Footing Shape) 2
Unit( Length : mm , Weight : tonf , Area : m )
Ft .Name
F1
P r . N a me
Pl
Pw
Ph
1
Circle
Sh a p e
600.000
600.000
800.000
Area 0.283
W ei gh t 0.543
-4500.000
OfX f
4500.000
O f fY -4500.000
2
Circle
600.000
600.000
800.000
0.283
0.543
-4500.000
395
Circle
600.000
600.000
800.000
0.283
0.543
4500.000
4500.000
396
Circle
600.000
600.000
800.000
0.283
0.543
4500.000
-4500.000
397
Circle
3500.000
3500.000
800.000
9.621
18.473
0.000
0.000
Copyright (c) GS E&C. All Rights Reserved
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016
Calculation Sheet of Foundation
..
Project Na. : PLTU SUMBAWA BARAT 2X7 Project No. : WEST SUMBAWA CFSPP PR.. Client : PT PLN (Persero)... Page 14
3.3 SECTION DATA F t . N a me / Se c . N a me
F 1 / S1 Unit : mm
11000
0 0 0 1 1
Direction
All Direct
2
Section Area
121.000 m
3
F.Weight
232.320 tonf
3
S.Weight
F.Volume
96.800 m
S.Volume
55.124 m
PierWt
20.644tonf
TotalWeight
99.223 tonf 352.187tonf
3.4 LOAD CASE Fz Fy
Mz
Input the point loads in the global coordinate system direction. Positive directions of moments (shown in the sketch) are based on the right hand rule.
My Fx Mx
In dex
L o a d C a s e N a me
1
SW
2
Loadtype Seismic Title Slx
3
Loadtype None Title Dl
4
Loadtype None Title Ll
5
Loadtype None Title Wlx
6
Loadtype None Title Slz
7
DL
Unit( tonf , tonf-m )
F t . N a me
P r . N a me
1 F1
2
L o aC da s e
Fx
Fy
Fz
Mx
My
1 2
0.000 12.500
0.000 -3.137
-0.543 89.625
0.000 0.000
0.000 0.000
3
-0.687
0.592
-11.436
0.000
0.000
4
-0.338
0.261
-7.435
0.000
0.000
5
5.767
-1.416
40.465
0.000
0.000
6
0.862
-2.567
19.141
0.000
0.000
7
0.000
0.000
0.000
0.000
0.000
1
0.000
0.000
-0.543
0.000
0.000
2
12.506
3.140
89.653
0.000
0.000
3
-0.687
-0.592
-11.436
0.000
0.000
4
-0.338
-0.261
-7.435
0.000
0.000
Copyright (c) GS E&C. All Rights Reserved
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016
Calculation Sheet of Foundation
..
395
396
397
Project Na. : PLTU SUMBAWA BARAT 2X7 Project No. : WEST SUMBAWA CFSPP PR.. Client : PT PLN (Persero)... Page 15
5
5.770
1.418
40.480
0.000
0.000
6
-0.862
-2.567
-19.141
0.000
0.000
7
0.000
0.000
0.000
0.000
0.000
1
0.000
0.000
-0.543
0.000
0.000
2
12.500
3.137
-89.625
0.000
0.000
3
0.687
0.592
-11.436
0.000
0.000
4
0.338
0.261
-7.435
0.000
0.000
5
5.767
1.416
-40.465
0.000
0.000
6
-0.862
-2.567
19.141
0.000
0.000
7
0.000
0.000
0.000
0.000
0.000
1
0.000
0.000
-0.543
0.000
0.000
2
12.506
-3.140
-89.653
0.000
0.000
3
0.687
-0.592
-11.436
0.000
0.000
4
0.338
-0.261
-7.435
0.000
0.000
5
5.770
-1.418
-40.480
0.000
0.000
6
0.862
-2.567
-19.141
0.000
0.000
7
0.000
0.000
0.000
0.000
0.000
1
0.000
0.000
-18.473
0.000
0.000
7
0.000
0.000
-90.000
0.000
Footing SW
0.000
0.000
-331.543
0.000
0.000 0.000
3.5 LOAD COMBINATION In Pier Top without Self Weight
In Footing Bottom with Pier Self Weight,
In Footing Bottom Center with Pier & Footing Self Weight & Soil Weight,
But without Footing Self Weight,
Case PileType in centroid of Pile Group Case NonPileType in centroid of Footing
3.5.1 Load Combination in Pier Top (Without SW) F t . N a me
P r . N a me
F1
1
L . C o mb .
Unit( tonf , tonf-m )
Fx
Fy
Fz
Mx
My
1000
-0.253
0.196
-5.576
0.000
0.000
2000 210
9.122 0.000
-2.157 0.000
61.643 0.000
0.000 0.000
0.000 0.000
220
0.000
0.000
0.000
0.000
0.000
230
0.000
0.000
0.000
0.000
0.000
240
0.000
0.000
0.000
0.000
0.000
250
0.000
0.000
0.000
0.000
0.000
260
9.375
-2.353
67.219
0.000
0.000
270
9.375
-2.353
67.219
0.000
0.000
280
-9.375
2.353
-67.219
0.000
0.000
290
-9.375
2.353
-67.219
0.000
0.000
300
9.375
-2.353
67.219
0.000
0.000
Copyright (c) GS E&C. All Rights Reserved
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016
Calculation Sheet of Foundation
..
2
395
Project Na. : PLTU SUMBAWA BARAT 2X7 Project No. : WEST SUMBAWA CFSPP PR.. Client : PT PLN (Persero)... Page 16
3000
-9.375
2.353
-67.219
0.000
0.000
4000
12.500
-3.137
89.625
0.000
0.000
5000
0.005
-0.574
0.166
0.000
0.000
100
0.000
0.000
0.000
0.000
0.000
110
0.000
0.000
0.000
0.000
0.000
120
0.000
0.000
0.000
0.000
0.000
130
0.000
0.000
0.000
0.000
0.000
140
0.000
0.000
0.000
0.000
0.000
150
0.000
0.000
0.000
0.000
0.000
160
0.000
0.000
0.000
0.000
0.000
170
0.000
0.000
0.000
0.000
0.000
180
0.000
0.000
0.000
0.000
0.000
190
0.000
0.000
0.000
0.000
0.000
60
0.000
0.000
0.000
0.000
0.000
70
0.000
0.000
0.000
0.000
0.000
80
0.000
0.000
0.000
0.000
0.000
90
0.000
0.000
0.000
0.000
0.000
1000
-0.253
-0.196
-5.576
0.000
0.000
2000
9.126
2.159
61.663
0.000
0.000
210
0.000
0.000
0.000
0.000
0.000
220
0.000
0.000
0.000
0.000
0.000
230
0.000
0.000
0.000
0.000
0.000
240
0.000
0.000
0.000
0.000
0.000
250
0.000
0.000
0.000
0.000
0.000
260
9.379
2.355
67.240
0.000
0.000
270
9.379
2.355
67.240
0.000
0.000
280
-9.379
-2.355
-67.240
0.000
0.000
290
-9.379
-2.355
-67.240
0.000
0.000
300
9.379
2.355
67.240
0.000
0.000
3000
-9.379
-2.355
-67.240
0.000
0.000
4000
12.506
3.140
89.653
0.000
0.000
5000
-0.512
-0.966
-11.319
0.000
0.000
100
0.000
0.000
0.000
0.000
0.000
110
0.000
0.000
0.000
0.000
0.000
120
0.000
0.000
0.000
0.000
0.000
130
0.000
0.000
0.000
0.000
0.000
140
0.000
0.000
0.000
0.000
0.000
150
0.000
0.000
0.000
0.000
0.000
160
0.000
0.000
0.000
0.000
0.000
170 180
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
190
0.000
0.000
0.000
0.000
0.000
60
0.000
0.000
0.000
0.000
0.000
70
0.000
0.000
0.000
0.000
0.000
80
0.000
0.000
0.000
0.000
0.000
90
0.000
0.000
0.000
0.000
0.000
1000
0.253
0.196
-5.576
0.000
0.000
2000
9.628
2.549
-72.795
0.000
0.000
210
0.000
0.000
0.000
0.000
0.000
220
0.000
0.000
0.000
0.000
0.000
Copyright (c) GS E&C. All Rights Reserved
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016
Calculation Sheet of Foundation
..
396
Project Na. : PLTU SUMBAWA BARAT 2X7 Project No. : WEST SUMBAWA CFSPP PR.. Client : PT PLN (Persero)... Page 17
230
0.000
0.000
0.000
0.000
0.000
240
0.000
0.000
0.000
0.000
0.000
250
0.000
0.000
0.000
0.000
0.000
260
9.375
2.353
-67.219
0.000
0.000
270
9.375
2.353
-67.219
0.000
0.000
280
-9.375
-2.353
67.219
0.000
0.000
290
-9.375
-2.353
67.219
0.000
0.000
300
9.375
2.353
-67.219
0.000
0.000
3000
-9.375
-2.353
67.219
0.000
0.000
4000
12.500
3.137
-89.625
0.000
0.000
5000
-0.005
-0.574
0.166
0.000
0.000
100
0.000
0.000
0.000
0.000
0.000
110
0.000
0.000
0.000
0.000
0.000
120
0.000
0.000
0.000
0.000
0.000
130
0.000
0.000
0.000
0.000
0.000
140
0.000
0.000
0.000
0.000
0.000
150
0.000
0.000
0.000
0.000
0.000
160
0.000
0.000
0.000
0.000
0.000
170
0.000
0.000
0.000
0.000
0.000
180
0.000
0.000
0.000
0.000
0.000
190
0.000
0.000
0.000
0.000
0.000
60
0.000
0.000
0.000
0.000
0.000
70
0.000
0.000
0.000
0.000
0.000
80
0.000
0.000
0.000
0.000
0.000
90
0.000
0.000
0.000
0.000
0.000
1000
0.253
-0.196
-5.576
0.000
0.000
2000
9.633
-2.551
-72.816
0.000
0.000
210
0.000
0.000
0.000
0.000
0.000
220
0.000
0.000
0.000
0.000
0.000
230
0.000
0.000
0.000
0.000
0.000
240
0.000
0.000
0.000
0.000
0.000
250
0.000
0.000
0.000
0.000
0.000
260
9.379
-2.355
-67.240
0.000
0.000
270
9.379
-2.355
-67.240
0.000
0.000
280
-9.379
2.355
67.240
0.000
0.000
290
-9.379
2.355
67.240
0.000
0.000
300
9.379
-2.355
-67.240
0.000
0.000
3000
-9.379
2.355
67.240
0.000
0.000
4000
12.506
-3.140
-89.653
0.000
0.000
5000 100
0.512 0.000
-0.966 0.000
-11.319 0.000
0.000 0.000
0.000 0.000
110
0.000
0.000
0.000
0.000
0.000
120
0.000
0.000
0.000
0.000
0.000
130
0.000
0.000
0.000
0.000
0.000
140
0.000
0.000
0.000
0.000
0.000
150
0.000
0.000
0.000
0.000
0.000
160
0.000
0.000
0.000
0.000
0.000
170
0.000
0.000
0.000
0.000
0.000
180
0.000
0.000
0.000
0.000
0.000
190
0.000
0.000
0.000
0.000
0.000
Copyright (c) GS E&C. All Rights Reserved
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016
Calculation Sheet of Foundation
..
397
Project Na. : PLTU SUMBAWA BARAT 2X7 Project No. : WEST SUMBAWA CFSPP PR.. Client : PT PLN (Persero)... Page 18
60
0.000
0.000
0.000
0.000
0.000
70
0.000
0.000
0.000
0.000
0.000
80
0.000
0.000
0.000
0.000
0.000
90
0.000
0.000
0.000
0.000
0.000
1000
0.000
0.000
-67.500
0.000
0.000
2000
0.000
0.000
-67.500
0.000
0.000
210
0.000
0.000
0.000
0.000
0.000
220
0.000
0.000
0.000
0.000
0.000
230
0.000
0.000
0.000
0.000
0.000
240
0.000
0.000
0.000
0.000
0.000
250
0.000
0.000
0.000
0.000
0.000
260
0.000
0.000
0.000
0.000
0.000
270
0.000
0.000
0.000
0.000
0.000
280
0.000
0.000
0.000
0.000
0.000
290
0.000
0.000
0.000
0.000
0.000
300
0.000
0.000
0.000
0.000
0.000
3000
0.000
0.000
-67.500
0.000
0.000
4000
0.000
0.000
-67.500
0.000
0.000
5000
0.000
0.000
-67.500
0.000
0.000
100
0.000
0.000
0.000
0.000
0.000
110
0.000
0.000
0.000
0.000
0.000
120
0.000
0.000
0.000
0.000
0.000
130
0.000
0.000
0.000
0.000
0.000
140
0.000
0.000
0.000
0.000
0.000
150
0.000
0.000
0.000
0.000
0.000
160
0.000
0.000
0.000
0.000
0.000
170
0.000
0.000
0.000
0.000
0.000
180
0.000
0.000
0.000
0.000
0.000
190
0.000
0.000
0.000
0.000
0.000
60
0.000
0.000
0.000
0.000
0.000
70
0.000
0.000
0.000
0.000
0.000
80
0.000
0.000
0.000
0.000
0.000
90
0.000
0.000
0.000
0.000
0.000
3.5.2 Load Combination in Footing Bottom (With Pier SW) F t . N a me
P r . N a me
F1
1
L . C o mb .
Unit( tonf , tonf-m )
Fx
Fy
Fz
Mx
My
1000
-0.253
0.196
-6.119
-0.313
-0.406
2000
9.122
-2.157
61.100
3.451
14.594
210 220
0.000 0.000
0.000 0.000
-0.543 -0.543
0.000 0.000
0.000 0.000
230
0.000
0.000
-0.543
0.000
0.000
240
0.000
0.000
-0.543
0.000
0.000
250
0.000
0.000
-0.543
0.000
0.000
260
9.375
-2.353
66.676
3.764
15.000
270
9.375
-2.353
66.676
3.764
15.000
280
-9.375
2.353
-67.762
-3.764
-15.000
290
-9.375
2.353
-67.762
-3.764
-15.000
300
9.375
-2.353
66.676
3.764
15.000
Copyright (c) GS E&C. All Rights Reserved
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016
Calculation Sheet of Foundation
..
2
395
Project Na. : PLTU SUMBAWA BARAT 2X7 Project No. : WEST SUMBAWA CFSPP PR.. Client : PT PLN (Persero)... Page 19
3000
-9.375
2.353
-67.762
-3.764
-15.000
4000
12.500
-3.137
89.082
5.019
20.000
5000
0.005
-0.574
-0.377
0.919
0.008
100
0.000
0.000
-0.543
0.000
0.000
110
0.000
0.000
-0.543
0.000
0.000
120
0.000
0.000
-0.543
0.000
0.000
130
0.000
0.000
-0.543
0.000
0.000
140
0.000
0.000
-0.543
0.000
0.000
150
0.000
0.000
-0.543
0.000
0.000
160
0.000
0.000
-0.543
0.000
0.000
170
0.000
0.000
-0.543
0.000
0.000
180
0.000
0.000
-0.543
0.000
0.000
190
0.000
0.000
-0.543
0.000
0.000
60
0.000
0.000
-0.543
0.000
0.000
70
0.000
0.000
-0.543
0.000
0.000
80
0.000
0.000
-0.543
0.000
0.000
90
0.000
0.000
-0.543
0.000
0.000
1000
-0.253
-0.196
-6.119
0.313
-0.406
2000
9.126
2.159
61.121
-3.455
14.602
210
0.000
0.000
-0.543
0.000
0.000
220
0.000
0.000
-0.543
0.000
0.000
230
0.000
0.000
-0.543
0.000
0.000
240
0.000
0.000
-0.543
0.000
0.000
250
0.000
0.000
-0.543
0.000
0.000
260
9.379
2.355
66.697
-3.768
15.007
270
9.379
2.355
66.697
-3.768
15.007
280
-9.379
-2.355
-67.783
3.768
-15.007
290
-9.379
-2.355
-67.783
3.768
-15.007
300
9.379
2.355
66.697
-3.768
15.007
3000
-9.379
-2.355
-67.783
3.768
-15.007
4000
12.506
3.140
89.110
-5.024
20.010
5000
-0.512
-0.966
-11.861
1.545
-0.819
100
0.000
0.000
-0.543
0.000
0.000
110
0.000
0.000
-0.543
0.000
0.000
120
0.000
0.000
-0.543
0.000
0.000
130
0.000
0.000
-0.543
0.000
0.000
140
0.000
0.000
-0.543
0.000
0.000
150
0.000
0.000
-0.543
0.000
0.000
160
0.000
0.000
-0.543
0.000
0.000
170 180
0.000 0.000
0.000 0.000
-0.543 -0.543
0.000 0.000
0.000 0.000
190
0.000
0.000
-0.543
0.000
0.000
60
0.000
0.000
-0.543
0.000
0.000
70
0.000
0.000
-0.543
0.000
0.000
80
0.000
0.000
-0.543
0.000
0.000
90
0.000
0.000
-0.543
0.000
0.000
1000
0.253
0.196
-6.119
-0.313
0.406
2000
9.628
2.549
-73.338
-4.078
15.406
210
0.000
0.000
-0.543
0.000
0.000
220
0.000
0.000
-0.543
0.000
0.000
Copyright (c) GS E&C. All Rights Reserved
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016
Calculation Sheet of Foundation
..
396
Project Na. : PLTU SUMBAWA BARAT 2X7 Project No. : WEST SUMBAWA CFSPP PR.. Client : PT PLN (Persero)... Page 20
230
0.000
0.000
-0.543
0.000
0.000
240
0.000
0.000
-0.543
0.000
0.000
250
0.000
0.000
-0.543
0.000
0.000
260
9.375
2.353
-67.762
-3.764
15.000
270
9.375
2.353
-67.762
-3.764
15.000
280
-9.375
-2.353
66.676
3.764
-15.000
290
-9.375
-2.353
66.676
3.764
-15.000
300
9.375
2.353
-67.762
-3.764
15.000
3000
-9.375
-2.353
66.676
3.764
-15.000
4000
12.500
3.137
-90.168
-5.019
20.000
5000
-0.005
-0.574
-0.377
0.919
-0.008
100
0.000
0.000
-0.543
0.000
0.000
110
0.000
0.000
-0.543
0.000
0.000
120
0.000
0.000
-0.543
0.000
0.000
130
0.000
0.000
-0.543
0.000
0.000
140
0.000
0.000
-0.543
0.000
0.000
150
0.000
0.000
-0.543
0.000
0.000
160
0.000
0.000
-0.543
0.000
0.000
170
0.000
0.000
-0.543
0.000
0.000
180
0.000
0.000
-0.543
0.000
0.000
190
0.000
0.000
-0.543
0.000
0.000
60
0.000
0.000
-0.543
0.000
0.000
70
0.000
0.000
-0.543
0.000
0.000
80
0.000
0.000
-0.543
0.000
0.000
90
0.000
0.000
-0.543
0.000
0.000
1000
0.253
-0.196
-6.119
0.313
0.406
2000
9.633
-2.551
-73.359
4.081
15.413
210
0.000
0.000
-0.543
0.000
0.000
220
0.000
0.000
-0.543
0.000
0.000
230
0.000
0.000
-0.543
0.000
0.000
240
0.000
0.000
-0.543
0.000
0.000
250
0.000
0.000
-0.543
0.000
0.000
260
9.379
-2.355
-67.783
3.768
15.007
270
9.379
-2.355
-67.783
3.768
15.007
280
-9.379
2.355
66.697
-3.768
-15.007
290
-9.379
2.355
66.697
-3.768
-15.007
300
9.379
-2.355
-67.783
3.768
15.007
3000
-9.379
2.355
66.697
-3.768
-15.007
4000
12.506
-3.140
-90.196
5.024
20.010
5000 100
0.512 0.000
-0.966 0.000
-11.861 -0.543
1.545 0.000
0.819 0.000
110
0.000
0.000
-0.543
0.000
0.000
120
0.000
0.000
-0.543
0.000
0.000
130
0.000
0.000
-0.543
0.000
0.000
140
0.000
0.000
-0.543
0.000
0.000
150
0.000
0.000
-0.543
0.000
0.000
160
0.000
0.000
-0.543
0.000
0.000
170
0.000
0.000
-0.543
0.000
0.000
180
0.000
0.000
-0.543
0.000
0.000
190
0.000
0.000
-0.543
0.000
0.000
Copyright (c) GS E&C. All Rights Reserved
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016 Project Na. : PLTU SUMBAWA BARAT 2X7
Calculation Sheet of Foundation
..
397
Project No. : WEST SUMBAWA CFSPP PR.. Client : PT PLN (Persero)... Page 21
60
0.000
0.000
-0.543
0.000
0.000
70
0.000
0.000
-0.543
0.000
0.000
80
0.000
0.000
-0.543
0.000
0.000
90
0.000
0.000
-0.543
0.000
0.000
1000
0.000
0.000
-85.973
0.000
0.000
2000
0.000
0.000
-85.973
0.000
0.000
210
0.000
0.000
-18.473
0.000
0.000
220
0.000
0.000
-18.473
0.000
0.000
230
0.000
0.000
-18.473
0.000
0.000
240
0.000
0.000
-18.473
0.000
0.000
250
0.000
0.000
-18.473
0.000
0.000
260
0.000
0.000
-18.473
0.000
0.000
270
0.000
0.000
-18.473
0.000
0.000
280
0.000
0.000
-18.473
0.000
0.000
290
0.000
0.000
-18.473
0.000
0.000
300
0.000
0.000
-18.473
0.000
0.000
3000
0.000
0.000
-85.973
0.000
0.000
4000
0.000
0.000
-85.973
0.000
0.000
5000
0.000
0.000
-85.973
0.000
0.000
100
0.000
0.000
-18.473
0.000
0.000
110
0.000
0.000
-18.473
0.000
0.000
120
0.000
0.000
-18.473
0.000
0.000
130
0.000
0.000
-18.473
0.000
0.000
140
0.000
0.000
-18.473
0.000
0.000
150
0.000
0.000
-18.473
0.000
0.000
160
0.000
0.000
-18.473
0.000
0.000
170
0.000
0.000
-18.473
0.000
0.000
180
0.000
0.000
-18.473
0.000
0.000
190
0.000
0.000
-18.473
0.000
0.000
60
0.000
0.000
-18.473
0.000
0.000
70
0.000
0.000
-18.473
0.000
0.000
80
0.000
0.000
-18.473
0.000
0.000
90
0.000
0.000
-18.473
0.000
0.000
3.5.3 Load Combination in Footing Bottom Center (With Pier & Footing SW) Load Combination of Elastic Condition p
: PileType
- C.G. of Load is coordinate from left bottom. Unit : mm
F t . N a me F1 p
L . C o mb .
Fx
Unit( tonf , tonf-m )
Fy
Fz
Mx
CL.oo Gfa. d s
My
1000
0.000
0.000
-441.992
0.000
0.000
5500.0,5500.0
2000
37.509
0.000
-441.992
0.000
1270.141
8237.9,5500.0
210
0.000
0.000
-352.187
0.000
0.000
5500.0 ,5500.0
220
0.000
0.000
-352.187
0.000
0.000
5500.0 ,5500.0
230
0.000
0.000
-352.187
0.000
0.000
5500.0 ,5500.0
240
0.000
0.000
-352.187
0.000
0.000
5500.0 ,5500.0
250
0.000
0.000
-352.187
0.000
0.000
5500.0 ,5500.0
Copyright (c) GS E&C. All Rights Reserved
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016
Calculation Sheet of Foundation
..
Project Na. : PLTU SUMBAWA BARAT 2X7 Project No. : WEST SUMBAWA CFSPP PR.. Client : PT PLN (Persero)... Page 22
260
37.509
0.000
-352.187
0.000
1270.141
8936.0,5500.0
270
37.509
0.000
-352.187
0.000
1270.141
8936.0,5500.0
280
-37.509
0.000
-352.187
0.000
-1270.141
2064.0,5500.0
290
-37.509
0.000
-352.187
0.000
-1270.141
2064.0,5500.0
300
37.509
0.000
-352.187
0.000
1270.141
8936.0,5500.0
3000 4000
-37.509 50.012
0.000 0.000
-419.687 -419.687
0.000 0.000
-1270.141 1693.521
2616.6,5500.0 9344.5,5500.0
5000
0.000
-3.080
-441.992
108.290
0.000
5500.0,5266.1
Load Combination of Ultimate Condition p
: PileType
- C.G. of Load is coordinate from left bottom. Unit : mm
Ft.Name Sec.Nam L . C o mb .
F1 p
S1
Fx
Unit( tonf , tonf-m )
Fy
Fz
Mx
My
LCo.a G f d. s
100
0.000
0.000
-20.644
0.000
0.000
5500.0,5500.0
110
0.000
0.000
-20.644
0.000
0.000
5500.0,5500.0
120
0.000
0.000
-20.644
0.000
0.000
5500.0,5500.0
130
0.000
0.000
-20.644
0.000
0.000
5500.0,5500.0
140
0.000
0.000
-20.644
0.000
0.000
5500.0,5500.0
150
0.000
0.000
-20.644
0.000
0.000
5500.0,5500.0
160 170
0.000 0.000
0.000 0.000
-20.644 -20.644
0.000 0.000
0.000 0.000
5500.0,5500.0 5500.0,5500.0
180
0.000
0.000
-20.644
0.000
0.000
5500.0,5500.0
190
0.000
0.000
-20.644
0.000
0.000
5500.0,5500.0
60
0.000
0.000
-20.644
0.000
0.000
5500.0,5500.0
70
0.000
0.000
-20.644
0.000
0.000
5500.0,5500.0
80
0.000
0.000
-20.644
0.000
0.000
5500.0,5500.0
90
0.000
0.000
-20.644
0.000
0.000
5500.0,5500.0
Copyright (c) GS E&C. All Rights Reserved
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016 Project Na. : PLTU SUMBAWA BARAT 2X7
Calculation Sheet of Foundation
..
Project No. : WEST SUMBAWA CFSPP PR.. Client : PT PLN (Persero)... Page 23
4. CHECK OF STABILITY 4.1 CHECK OF PILE REACTION (Bi-Axial) 4.1.1 Formula if footing is checked in Buoyancy Fz means Fz - Fb Fz My X Mx Y a. Vertical - Bi Axial : R = 2 2 Np Xi Yi - Ru = Rmax - Uf = Min[ 0 , R
min
]
- Ru < Va => OK 2
b. Horizontal - Hmax =
2
( Hxi + Hyi ) < Ha => OK Np
c. Uplift - Uf < Ua => OK Ver. / Uf. = Vertical / Uplift
4.1.2 Check of Vertical & Uplift Reaction Ft .Name F1
Np(EA)
F l( mm)
16
2
F w( mm )
11000
2
2
Xi (m )
11000
2
Yi (m )
180
180
Unit( tonf )
Ft .Name F1
L . C o mb . 4000
Pi le CHIMNEY
R
Max
68.568
R
Min
-16.108
Ru
Uf
68.568
-16.108
Ra 70
Resu lt
Ua 17
OK
4.1.3 Check Of Horizontal Reaction Ft .Name F1
L . C o mb . 4000
Pi le CHIMNEY KSB
Copyright (c) GS E&C. All Rights Reserved
H m a x( t o n f ) 3.126
H a( t o n f ) 5
Resu lt OK
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016
Calculation Sheet of Foundation
..
Project Na. : PLTU SUMBAWA BARAT 2X7 Project No. : WEST SUMBAWA CFSPP PR.. Client : PT PLN (Persero)... Page 24
5. DESIGN OF FOOTING 5.1 DESIGN MOMENT AND SHEAR FORCE Footing design is in accordance with unltimate strength method at footing bottom. Calculated total pier load as Q = Fz - Self Weight Factor (Soil Weight + Footing Weight) Ft.Name : Footing Name , Sec.Name : Strip Name for Footing Reinforcement Design Dir. : Direction , L.Comb. : Load Combination Index , Sl or Sw : Strip X or Y width
5.1.1 Data
Unit( mm , tonf , tonf-m )
Ft.Name Sec.Nam
Dir.
L . C o mb .
F1 p
S1
S1
X
Y
Copyright (c) GS E&C. All Rights Reserved
F lo rF w
Slo rSw
Fz
M
Q
100
11000.00
11000.00
20.644
0.00
20.644
110
11000.00
11000.00
20.644
0.00
20.644
120
11000.00
11000.00
20.644
0.00
20.644
130
11000.00
11000.00
20.644
0.00
20.644
140
11000.00
11000.00
20.644
0.00
20.644
150
11000.00
11000.00
20.644
0.00
20.644
160
11000.00
11000.00
20.644
0.00
20.644
170
11000.00
11000.00
20.644
0.00
20.644
180
11000.00
11000.00
20.644
0.00
20.644
190
11000.00
11000.00
20.644
0.00
20.644
60
11000.00
11000.00
20.644
0.00
20.644
70
11000.00
11000.00
20.644
0.00
20.644
80
11000.00
11000.00
20.644
0.00
20.644
90
11000.00
11000.00
20.644
0.00
20.644
100
11000.00
11000.00
20.644
0.000
20.644
110
11000.00
11000.00
20.644
0.000
20.644
120
11000.00
11000.00
20.644
0.000
20.644
130
11000.00
11000.00
20.644
0.000
20.644
140
11000.00
11000.00
20.644
0.000
20.644
150
11000.00
11000.00
20.644
0.000
20.644
160
11000.00
11000.00
20.644
0.000
20.644
170
11000.00
11000.00
20.644
0.000
20.644
180
11000.00
11000.00
20.644
0.000
20.644
190
11000.00
11000.00
20.644
0.000
20.644
60
11000.00
11000.00
20.644
0.000
20.644
70
11000.00
11000.00
20.644
0.000
20.644
80
11000.00
11000.00
20.644
0.000
20.644
90
11000.00
11000.00
20.644
0.000
20.644
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016
Calculation Sheet of Foundation
..
Project Na. : PLTU SUMBAWA BARAT 2X7 Project No. : WEST SUMBAWA CFSPP PR.. Client : PT PLN (Persero)... Page 25
5.1.2 Design Parameters Yield Strength - 10M ~ 16M : fy1 , 19M ~ : fy2 f_cl : Clear Cover for edge of footing reinforcement f_clt : Clear Cover for top of footing reinforcement fp_clb : Clear Cover for bottom of footing reinforcement (Pile Foundation) Loc. : Location of Critical Point from left side of footing 2
Unit(kgf/cm ,mm)
f(Flexure)
f(Shear)
0.9
0.75
fck
fy1
250.00
fy2
2400.00
3900.00
f_ cl 50.0
f_ clt 50.0
5.2 REQUIRED REINFORCEMENT 5.2.1 Reinforcement Formula - Shrinkage And Temperature Reinforcement As
As
1=
fac b h
---- ACI CODE 7.12.2
, fac = following
Area of shrinkage and temperature reinforcement shall provide at least the following ratio of reinforcement area to gross concrete area, but not less than 0.0014 (a) Slabs where Grade 40 or 50 deformed bars are used ........................................................................0.0020 (b) Slabs where Grade 60 deformed bars or welded wire reinforcement are used....................................0.0018 (c) Slabs where reinforcement with yield stress exceeding 60,000 psi measured at a yield strain of 0.35 percent is used .......................................................................................................
0.0018 60,000 fy
- Required Reinforcement by Analysis As
As2 = r .req b d
- At every section of flexural members where tensile reinforcement is required 3 fck 200 As (As 5 = bw d) (As4 = b d) ---- ACI Eq (10-3) fy fy - The requirements of Eq (10-3) need not be applied, if every section As provided is at least one -third greater then that required by analysis
---- ACI CODE 10.5.3
As3 = 1.333 r .req b d Asmax = 0.75 r
r b = 0.85 b
1
bd fck 0.003 Es fy 0.003 Es + f y
b
Selected As = Max ( As1 , As2 , Min ( As3 , Max ( As4 , As5 ) ) ) If Selected As < Using As < As max , then OK!! Note : The reinforcement is calculated bases on the maximum moment under the foundation in each direction. But, the 'ISO' , 'OCT' , 'HEX' , 'COMB' , 'TANK1' foundations are calaulated as face pier Where, Rn = Mu 2 , f = 0.9 , r .req = 0.85 fck f bd fy
Copyright (c) GS E&C. All Rights Reserved
( 1-
1-
2Rn 0.85fck
)
f p_ cl b 150.0
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016 Project Na. : PLTU SUMBAWA BARAT 2X7
Calculation Sheet of Foundation
..
Project No. : WEST SUMBAWA CFSPP PR.. Client : PT PLN (Persero)... Page 26
5.2.2 Check of Footing Reinforcement Footing Name : F1
GroupType : Mat_Foundation
- X direction (Unit Width)
Se c . N a me S1
L . C o mb . 90 90
Se c . N a me S1
5 - 16M @ 200
7.150
botom
5 - 16M @ 200
5.500
74.200
1.000
64.200
Mu (tonf-m)
Rn
top
0.198
0.040
90
bottom
-
-
L . C o mb .
2
2
d( c m )
1.000
90
2
(Acsm
)
10.053 10.053
r .Req 0.0000 -
2
2
2
2
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
90
top
8.000
0.124
0.165
43.473
38.885
299.160
90
bottom
8.000
-
-
37.614
33.644
258.842
Se c . N a me S1
W i d t hb( m)
Lo (m c .)
top
L . C o mb .
Se c . N a me S1
U s i n gB a r( m m)
2
L . C o mb .
2
Resu lt
Using As(cm)
Select As(cm)
90
top
10.053
8.000
OK
90
bottom
10.053
8.000
OK
- Y direction (Unit Width)
Se c . N a me S1
L . C o mb .
d( c m )
2
(Acsm
top
5 - 16M @ 200
7.150
1.000
72.600
10.053
90
botom
5 - 16M @ 200
5.500
1.000
62.600
10.053
L . C o mb . 90 90
Se c . N a me S1
W i d t hb( m)
Lo (m c .)
90
Se c . N a me S1
U s i n gB a r( m m)
Mu (tonf-m)
Rn
0.198
0.042
top bottom
L . C o mb .
r .Req 0.0000
-
2
2
2
)
2
2
2
As1(cm )
As2(cm )
As3(cm )
As4(cm )
As5(cm )
Asmax(cm )
90
top
8.000
0.126
0.168
42.536
38.047
292.709
90
bottom
8.000
-
-
36.677
32.806
252.391
Se c . N a me
L . C o mb .
2
2
Resu lt
Using As(cm)
Select As(cm)
90
top
10.053
8.000
OK
90
bottom
10.053
8.000
OK
S1
Copyright (c) GS E&C. All Rights Reserved
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016
Calculation Sheet of Foundation
..
Project Na. : PLTU SUMBAWA BARAT 2X7 Project No. : WEST SUMBAWA CFSPP PR.. Client : PT PLN (Persero)... Page 27
5.3 ONE WAY SHEAR FORCE 5.3.1 One-Way Shear Formula ACI 318-05 CODE 11.3.1.1 - For members subject to shear and flexure only. - f Vc= 0.75 2
f
ck
B'wd
(eq 11-3)
- Vu <= f Vc , then OK!!
5.3.2 Check of One-Way Shear FootingName : F1
GroupType : Mat_Foundation
PileType : True
Unit : mm 11000
1
395
0 0 0 1 1
2 9 0 9
397
2
396
9092
- X direction One-Way Shear (Unit Width)
Se c . N a me L . C o mb . S1
100
Loc. (mm)
d (mm)
Bw (mm)
9092
642
1000
Loc. (mm)
d (mm)
Bw (mm)
9092
626
1000
fVc (tonf) 40.373
Vu (tonf) 0.07
Resu lt OK
- Y direction One-Way Shear (Unit Width)
Se c . N a me L . C o mb . S1
100
Copyright (c) GS E&C. All Rights Reserved
fVc (tonf) 39.367
Vu (tonf) 0.07
Resu lt OK
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016 Project Na. : PLTU SUMBAWA BARAT 2X7
Calculation Sheet of Foundation
..
Project No. : WEST SUMBAWA CFSPP PR.. Client : PT PLN (Persero)... Page 28
5.4 TWO WAY SHEAR FORCE 5.4.1 Two-Way Shear Formula Vu = Fz Shade Ratio (a) f Vc1 = 0.75 2 (1 + 2/ b c) (b) f Vc2 = 0.75 2 (1 + (c) f Vc3= 0.75 4
f
ck
s
fck bod
d / 2 bo)
(eq 11-33)
fck bo d (eq 11-34)
bdo
(eq 11-35)
f Vc = Min(f Vc1 , f Vc2 , f Vc3) Vu f Vc , then OK
<- Vc1 <- Vc2
<- Vc3
ACI 318-05 CODE 11.12.2.1
where
b
= ratio of long side to short side of the column, concentrated load or reaction area s
= 40 for interior colimns
= 30 for edge columns = 20 for corner columns bo = perimeter of critical section Footing Area - Punching Area Shade Ratio = Footing Area
5.4.2 Check of Two-WayShear Ft.Name 11000
F1 Punching Area
Pr.Name
1
397 Pile effect
1575.416 tonf
Pl
3500 mm f Vc3
1050.278 tonf
Pw
3500 mm f Vc
1043.525 tonf
L.Comb. 0 0 0 1 1
397
2
396
bo / d
13007.25 / 642 mm Vu
bc / s
5.5 PILE PUNCHING SHEAR FORCE 5.5.1 Pile Punching Shear Formula Vu = Fz Shade Ratio (a) f Vc1 = 0.75 2 (1 + 2/ b c) (b) f Vc2 = 0.75 2 (1 + (c) f Vc3= 0.75 4
f
ck
s
fck bo d
d / 2 b o)
bdo
f Vc = Min( f Vc1 , f Vc2 , f Vc3 ) Vu f Vc , then OK
(eq 11-33)
fck bo d (eq 11-34) (eq 11-35)
<- Vc1 <- Vc2
<- Vc3
ACI 318-05 CODE 11.12.2.1
where
b
= ratio of long side to short side of the column, concentrated load or reaction area s
= 40 for interior colimns
= 30 for edge columns = 20 for corner columns b o = perimeter of critical section Footing Area - Punching Area Shade Ratio = Footing Area
Copyright (c) GS E&C. All Rights Reserved
14.941 / 16
Circle f Vc1 90 f Vc2
Shape
395
2
134527.800 cm
1 / 40 Result
1043.525 tonf
17.250 tonf
OK
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016 Project Na. : PLTU SUMBAWA BARAT 2X7
Calculation Sheet of Foundation
..
Project No. : WEST SUMBAWA CFSPP PR.. Client : PT PLN (Persero)... Page 29
5.5.2 Check of Pile Punching Shear Ft.Name 11000
Pile No.
13
14
15
16
9
10
11
12
Shape L.Comb.
0 0 0 1 1
PileName 5678
1234
Diameter bo d
Copyright (c) GS E&C. All Rights Reserved
2
F1 Punching Area 1 bc /
s
9840.641 cm 40
/
1
Square f Vc1
480.598 tonf
100 f Vc2
678.586 tonf
f Vc3
320.398 tonf
CHIMNEY KSB
350mm f Vc 3968mm Vu 642mm Result
320.398 tonf 22.012 tonf
OK
COLUMN CALCULATION SHEET
One-Stop Solution for Column
TITLE
DESCRIPTION
PROJECT/JOB NO. PROJECT/JOB NAME
WEST SUMBAWA CFSPP PROJECT 2X7 MW PLTU SUMBAWA BARAT 2X7 MW
CLIENTNAME
PTPLN(Persero)UIPKITRINGNUSRA
SITE NAME
TALIWANG
DOCUMENT NO. REFERENCE NO. STRUCTURENAME
CHIMNEYSTRUCTUREKSB
GROUP NAME LOADCOMBINATION GROUP NAME REV
DATE
Copyright (c) GS E&C. All Rights Reserved
DESCRIPTION
PREP'D
CHK'D
APPR'D
APPR'D
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016
Calculation Sheet of Pier
..
CONTENTS 1. INPUT DATA 1.1 GENERAL 1.2 PIER DATA 1.3 LOADING DATA
2. PM DIAGRAM 2.1 FORMULA 2.2 PM DIAGRAM & ANALYSIS 2.3 ANALYSIS & RESULT 2.4 DETAIL PM DIAGRAM
3. ONE-WAY SHEAR 3.1 FORMULA 3.2 ONE-WAY SHEAR
Copyright (c) GS E&C. All Rights Reserved
Project Na. : PLTU SUMBAWA BARAT 2X7 Project No. : WEST SUMBAWA CFSPP PR.. Client : PT PLN (Persero)... Page 1
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016 Project Na. : PLTU SUMBAWA BARAT 2X7
Calculation Sheet of Pier
..
Project No. : WEST SUMBAWA CFSPP PR.. Client : PT PLN (Persero)... Page 2
1. INPUT DATA 1.1 General Design Code
American Concrete Institute (ACI 318) [Metric]
Input Unit
MKS
f Bending
f Axial
0.9
fck
Output Unit
f Sprial reinf. 0.9
f y (10M ~ 1 6M) 2
250 kgf/cm
2
2400 kgf/cm
MKS
f Tied reinf.
0.7
f y (19M ~) 2
3900 kgf/cm
f Shear
0.65
Ec
0.75
Es 2
235000 kgf/cm
SD t ebe l 2
2000000 kgf/cm
Cover 50 mm
ASTM A615 (M)
1.2 Pier Data 600
50
Pier Name
1
Ver Bar
19M, 10 EA
Pier Shape
Circle
Tie Bar
-
Width
600 mm
Fck
250 kgf/cm
Length
600 mm
fy
3900 kgf/cm
Height
800 mm
Using As
28.35 cm
dy
-
2
Ver Bar
19M, 10 EA
Pier Shape
Circle
Tie Bar
-
Width
600 mm
Fck
250 kgf/cm
Length
600 mm
fy
3900 kgf/cm
dx
2
Main Bar Bar Check 600
Main Bar Bar Check 600
2
Bar Check
2
2
2
3 EA , Area = 28.353cm , Amin (1%) = 28.3cm , Amax (5%) = 141.4cm Reinforcrment Area is OK 50
Pier Name
2
2
2
Height
800 mm
Using As
28.35 cm
dx
-
dy
-
2
2
2
3 EA , Area = 28.353cm , Amin (1%) = 28.3cm , Amax (5%) = 141.4cm Reinforcrment Area is OK 50
Pier Name
395
Ver Bar
19M, 10 EA
Pier Shape
Circle
Tie Bar
-
Width
600 mm
Fck
250 kgf/cm
Length
600 mm
fy
3900 kgf/cm
Height
800 mm
Using As
28.35 cm
dy
-
dx Main Bar
2
2
2
2
3 EA , Area = 28.353cm , Amin (1%) = 28.3cm , Amax (5%) = 141.4cm Reinforcrment Area is OK
Copyright (c) GS E&C. All Rights Reserved
2
2
2
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016 Project Na. : PLTU SUMBAWA BARAT 2X7
Calculation Sheet of Pier
..
600
50
Client : PT PLN (Persero)... Page 3
Pier Name
396
Ver Bar
Pier Shape
Circle
Tie Bar
-
Width
600 mm
Fck
250 kgf/cm
Length
600 mm
fy
3900 kgf/cm
19M, 10 EA
2
2
2
Height
800 mm
Using As
28.35 cm
dx
-
dy
-
2
2
2
Main Bar
Project No. : WEST SUMBAWA CFSPP PR..
3 EA , Area = 28.353cm , Amin (1%) = 28.3cm , Amax (5%) = 141.4cm
Bar Check
Reinforcrment Area is OK
3500
50
Pier Name
397
Ver Bar
19M, 70 EA
Pier Shape
Circle
Tie Bar
-
Width
3500 mm
Fck
250 kgf/cm
Length
3500 mm
fy
3900 kgf/cm
Height
800 mm
Using As
198.47 cm
dx
-
dy
-
2
Main Bar
2
2
2
2
2
18 EA , Area = 198.47cm , Amin (1%) = 962.1cm , Amax (5%) = 4810.6cm
Bar Check
Reinforcrment Area is too small
1.3 Loading Data 1.3.1 Load Case PN i earme
Unit( tonf , tonf-m )
Name
Fx
Fy
SW Loadtype Seismic
1
2
395
396
Fz
Mx
My
0
0
-0.543
0
0
12.5
-3.137
89.625
0
0
Loadtype None Title Dl
-0.687
0.592
-11.436
0
0
Loadtype None Title Ll Loadtype None Title
-0.338
0.261
-7.435
0
0
5.767
-1.416
40.465
0
0
Loadtype None Title
0.862
-2.567
19.141
0
0
DL
0
0
0
0
0
SW Loadtype Seismic
0
0
-0.543
0
0
12.506
Loadtype None Title Dl
-0.687
Loadtype None Title Ll Loadtype None Title
-0.338
3.14 -0.592
89.653 -11.436
-0.261
0 0
-7.435
0 0
0
0
5.77
1.418
40.48
0
0
Loadtype None Title
-0.862
-2.567
-19.141
0
0
DL
0
0
0
0
0
SW Loadtype Seismic
0
0
-0.543
0
0
12.5
Loadtype None Title Dl
0.687
Loadtype None Title Ll Loadtype None Title
0.338
3.137 0.592 0.261
-89.625
0
-11.436
0
-7.435
0
0 0 0
5.767
1.416
-40.465
0
0
Loadtype None Title
-0.862
-2.567
19.141
0
0
DL
0
0
0
0
0
SW
0
0
-0.543
0
0
Copyright (c) GS E&C. All Rights Reserved
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016 Project Na. : PLTU SUMBAWA BARAT 2X7
Calculation Sheet of Pier
..
Loadtype Seismic
12.506
Loadtype None Title Dl
0.687
Loadtype None Title Ll Loadtype None Title
0.338
Project No. : WEST SUMBAWA CFSPP PR.. Client : PT PLN (Persero)... Page 4
-3.14 -0.592
-89.653
0
-11.436
-0.261
0
0
-7.435
0
0
0
5.77
-1.418
-40.48
0
0
Loadtype None Title
0.862
-2.567
-19.141
0
0
DL
0
0
0
0
0
SW
0
0
-18.473
0
0
DL
0
0
-90
0
0
397
1.3.2 Load Combination List Comb . ID
L o a d C o mb i n a t i o n f o r R e i n f o r c e me n t
100
1.0 SW + 1.2 Loadtype Dead Title Dl + .5 Loadtype Live Title Ll + 1.3 Loadtype Wind Title Wx
110
1.0 SW + 1.2 Loadtype Dead Title Dl + .5 Loadtype Live Title Ll + 1.3 Loadtype Wind Title Wz
120
1.0 SW + 1.2 Loadtype Dead Title Dl + .5 Loadtype Live Title Ll + 1.0 Loadtype Seismic Title Ex
130
1.0 SW + 1.2 Loadtype Dead Title Dl + .5 Loadtype Live Title Ll + -1.0 Loadtype Seismic Title Ex
140
1.0 SW + 1.2 Loadtype Dead Title Dl + .5 Loadtype Live Title Ll + 1.0 Loadtype Seismic Title Ez
150
1.0 SW + 1.2 Loadtype Dead Title Dl + .5 Loadtype Live Title Ll + -1.0 Loadtype Seismic Title Ez
160
1.0 SW + .9 Loadtype Dead Title Dl + 1.3 Loadtype Wind Title Wx
170
1.0 SW + .9 Loadtype Dead Title Dl + -1.3 Loadtype Wind Title Wx
180
1.0 SW + 1.0 Loadtype Dead Title Dl + 1.3 Loadtype Wind Title Wz
190
1.0 SW + .9 Loadtype Dead Title Dl + -1.3 Loadtype Wind Title Wz
60
1.0 SW + 1.4 Loadtype Dead Title Dl
70
1.0 SW + 1.2 Loadtype Dead Title Dl + 1.6 Loadtype Live Title Ll
80
1.0 SW + 1.2 Loadtype Dead Title Dl + 1.6 Loadtype Live Title Ll + .8 Loadtype Wind Title Wx
90
1.0 SW + 1.2 Loadtype Dead Title Dl + 1.6 Loadtype Live Title Ll + .8 Loadtype Wind Title Wz
1.3.3 In Pier Top P .N a me
1
2
Unit( tonf , tonf-m )
LC#
Fx
Fy
Fz
Mx
My
100
0
0
0
0
0
110
0
0
0
0
0
120
0
0
0
0
0
130
0
0
0
0
0
140
0
0
0
0
0
150
0
0
0
0
0
160
0
0
0
0
0
170
0
0
0
0
0
180
0
0
0
0
0
190
0
0
0
0
0
60
0
0
0
0
0
70
0
0
0
0
0
80
0
0
0
0
0
90
0
0
0
0
0
100
0
0
0
0
0
Copyright (c) GS E&C. All Rights Reserved
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016 Project Na. : PLTU SUMBAWA BARAT 2X7
Calculation Sheet of Pier
..
395
396
Project No. : WEST SUMBAWA CFSPP PR.. Client : PT PLN (Persero)... Page 5
110
0
0
0
0
0
120
0
0
0
0
0
130
0
0
0
0
0
140
0
0
0
0
0
150
0
0
0
0
0
160 170
0 0
0 0
0 0
0 0
0 0
180
0
0
0
0
0
190
0
0
0
0
0
60
0
0
0
0
0
70
0
0
0
0
0
80
0
0
0
0
0
90
0
0
0
0
0
100
0
0
0
0
0
110
0
0
0
0
0
120
0
0
0
0
0
130
0
0
0
0
0
140
0
0
0
0
0
150
0
0
0
0
0
160
0
0
0
0
0
170
0
0
0
0
0
180
0
0
0
0
0
190
0
0
0
0
0
60
0
0
0
0
0
70
0
0
0
0
0
80
0
0
0
0
0
90
0
0
0
0
0
100
0
0
0
0
0
110
0
0
0
0
0
120
0
0
0
0
0
130
0
0
0
0
0
140
0
0
0
0
0
150
0
0
0
0
0
160
0
0
0
0
0
170
0
0
0
0
0
180
0
0
0
0
0
190
0
0
0
0
0
60
0
0
0
0
0
70
0
0
0
0
0
80
0
0
0
0
0
90
0
0
0
0
0
Copyright (c) GS E&C. All Rights Reserved
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016 Project Na. : PLTU SUMBAWA BARAT 2X7
Calculation Sheet of Pier
..
397
Project No. : WEST SUMBAWA CFSPP PR.. Client : PT PLN (Persero)... Page 6
100
0
0
0
0
0
110
0
0
0
0
0
120
0
0
0
0
0
130
0
0
0
0
0
140
0
0
0
0
0
150 160
0 0
0 0
0 0
0 0
0 0
170
0
0
0
0
0
180
0
0
0
0
0
190
0
0
0
0
0
60
0
0
0
0
0
70
0
0
0
0
0
80
0
0
0
0
0
90
0
0
0
0
0
Fx
Fy
Fz
Mx
My
100
0
0
0.543
0
0
110
0
0
0.543
0
0
120
0
0
0.543
0
0
130
0
0
0.543
0
0
140
0
0
0.543
0
0
150
0
0
0.543
0
0
160
0
0
0.543
0
0
170
0
0
0.543
0
0
180
0
0
0.543
0
0
190
0
0
0.543
0
0
60
0
0
0.543
0
0
70
0
0
0.543
0
0
80
0
0
0.543
0
0
90
0
0
0.543
0
0
100
0
0
0.543
0
0
110 120
0 0
0 0
0.543 0.543
0 0
0 0
130
0
0
0.543
0
0
140
0
0
0.543
0
0
150
0
0
0.543
0
0
160
0
0
0.543
0
0
170
0
0
0.543
0
0
180
0
0
0.543
0
0
190
0
0
0.543
0
0
1.3.4 In Pier Bottom P .N a me
1
2
LC#
Unit( tonf , tonf-m )
Copyright (c) GS E&C. All Rights Reserved
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016
Calculation Sheet of Pier
..
395
396
397
Project Na. : PLTU SUMBAWA BARAT 2X7 Project No. : WEST SUMBAWA CFSPP PR.. Client : PT PLN (Persero)... Page 7
60
0
0
0.543
0
0
70
0
0
0.543
0
0
80
0
0
0.543
0
0
90
0
0
0.543
0
0
100
0
0
0.543
0
0
110 120
0 0
0 0
0.543 0.543
0 0
0 0
130
0
0
0.543
0
0
140
0
0
0.543
0
0
150
0
0
0.543
0
0
160
0
0
0.543
0
0
170
0
0
0.543
0
0
180
0
0
0.543
0
0
190
0
0
0.543
0
0
60
0
0
0.543
0
0
70
0
0
0.543
0
0
80
0
0
0.543
0
0
90
0
0
0.543
0
0
100
0
0
0.543
0
0
110
0
0
0.543
0
0
120
0
0
0.543
0
0
130
0
0
0.543
0
0
140
0
0
0.543
0
0
150
0
0
0.543
0
0
160
0
0
0.543
0
0
170
0
0
0.543
0
0
180
0
0
0.543
0
0
190
0
0
0.543
0
0
60
0
0
0.543
0
0
70
0
0
0.543
0
0
80
0
0
0.543
0
0
90
0
0
0.543
0
0
100
0
0
18.473
0
0
110
0
0
18.473
0
0
120
0
0
18.473
0
0
130
0
0
18.473
0
0
140
0
0
18.473
0
0
150
0
0
18.473
0
0
160
0
0
18.473
0
0
170
0
0
18.473
0
0
180
0
0
18.473
0
0
Copyright (c) GS E&C. All Rights Reserved
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016
Calculation Sheet of Pier
..
Project Na. : PLTU SUMBAWA BARAT 2X7 Project No. : WEST SUMBAWA CFSPP PR.. Client : PT PLN (Persero)... Page 8
190
0
0
18.473
0
0
60
0
0
18.473
0
0
70
0
0
18.473
0
0
80
0
0
18.473
0
0
90
0
0
18.473
0
0
Copyright (c) GS E&C. All Rights Reserved
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016
Calculation Sheet of Pier
..
2. ONE-WAY SHEAR 2.1 FORMULA 1) Maximum Axial Load Strength - Po = 0.85 fck (Ag-Ast) + - Pnmax = f 1Po
f y Ast
( f 1 = Axial Strenth Resuction Factiors)
- Mnmax = The Value of diagram, When P is Pn. - Pumax = f 2 Pnmax
f 2 = Sprial or Tied Reinforcement Reduction Factor
2) Balanced Strain Condition A balanced Strain condition exists at a cross-setion when the maximum strain at the extreme compression fiber just reaches e u = 0.003 simultaneously with the first yield strain of e s = fy/Es in the tension reinforcement. The ratio of neutral axis depth cb is shown below Cb eu = d eu + ey
e u = 0.003 fc = 0.85 f ck
3) Strength for Combined Flexure and Axial Load Maximum usable strain at extreme concrete compression fiber shall be assumed equal to e u = 0.003 if c that is neutral axis is supposed, Pn and Mn can be calculated as below
f Pn = f 0.85 fck ( Acomp f Mn = f 0.85 fck ( Acomp +
(1 to 28) fs
fs(i) = e (i) Es
, - fy
(1 to 11)
Ast ) +
(1 to 11)
Ast ) ( h/2 - c + y c )
(1 to 28) fs
Ast
Ast ( h/2 - c + y s )
fs(i)
fy
Sprial or Tied Reinforcement Reduction Factor
f = 0.9 - 0.2
Pn Pa
0.9
Pa = 0.1 f ck Ag Acomp is Area from top to a ( 1c
1c)
= 0.85 - 0.05 ( f ck - 4000 ) / 1000
0.65
(psi)
4) Slenderness Effects d ns =
1
Pc =
5) Shear f Vc = f 2 fck b
p EI 2 (klu) 2
Cm 1-Pu/0.75Pc
w
d
, f Vs =
f Vsmax = f 8 fck b w d (psi) f Vn = f Vc + f Vs
Copyright (c) GS E&C. All Rights Reserved
f fy Av d s
EI =
(psi)
0.2EcIg + EsIse 1+ d
Project Na. : PLTU SUMBAWA BARAT 2X7 Project No. : WEST SUMBAWA CFSPP PR.. Client : PT PLN (Persero)... Page 9
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016 Project Na. : PLTU SUMBAWA BARAT 2X7
Calculation Sheet of Pier
..
Project No. : WEST SUMBAWA CFSPP PR.. Client : PT PLN (Persero)... Page 10
2.2 PM DIAGRAM & ANALYSIS 2.2.1 Pier Name : 1 (tonf , tonf-m )
P
Axis
X-A x i s ( A l lc o mb . )
700
Po
662.841 tonf
Pn / fPn
596.557 tonf / 417.590 tonf
Mn / fMn
16.04 tonf-m / 11.23 tonf-m
Pb / fPb
329.529 tonf / 230.670 tonf
200
Mb / fM
46.25 tonf-m / 32.38 tonf-m
100
c(Balanced)
376.79 mm
emin
33.24 mm
klu / rx
10.67
Slender
Neglect
Axis
Y-A x i s ( A l lc o mb . )
Pnmax
600 500
f Pnmax
400
Balanced
300
0
Mx
-100 10
20
30
40
50
60
(tonf , tonf-m )
P 700
Po
662.841 tonf
Pn / fPn
596.557 tonf / 417.590 tonf
Mn / fMn
16.11 tonf-m / 11.23 tonf-m
Pb / fPb
341.918 tonf / 230.670 tonf
200
Mb / fM
45.87 tonf-m / 32.38 tonf-m
100
c(Balanced)
376.79 mm
emin
33.24 mm
klu / rx
10.67
Slender
Neglect
Pnmax
600 500
f Pnmax
400
Balanced
300
0
My
-100 10
20
30
40
Copyright (c) GS E&C. All Rights Reserved
50
60
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016 Project Na. : PLTU SUMBAWA BARAT 2X7
Calculation Sheet of Pier
..
Project No. : WEST SUMBAWA CFSPP PR.. Client : PT PLN (Persero)... Page 11
2.2.2 Pier Name : 2 (tonf , tonf-m )
Axis
X-A x i s ( A l lc o mb . )
Po
662.841 tonf
Pn / fPn
596.557 tonf / 417.590 tonf
Mn / fMn
16.04 tonf-m / 11.23 tonf-m
Pb / fPb
329.529 tonf / 230.670 tonf
200
Mb / fM
46.25 tonf-m / 32.38 tonf-m
100
c(Balanced)
376.79 mm
emin
33.24 mm
klu / rx
10.67
Slender
Neglect
Axis
Y-A x i s ( A l lc o mb . )
Po
662.841 tonf
Pn / fPn
596.557 tonf / 417.590 tonf
Mn / fMn
16.11 tonf-m / 11.23 tonf-m
Pb / fPb
341.918 tonf / 230.670 tonf
200
Mb / fM
45.87 tonf-m / 32.38 tonf-m
100
c(Balanced)
376.79 mm
emin
33.24 mm
klu / rx
10.67
Slender
Neglect
P 700 Pnmax
600 500
f Pnmax
400
Balanced
300
0
Mx
-100 10
20
30
40
50
60
(tonf , tonf-m )
P 700 Pnmax
600 500
f Pnmax
400
Balanced
300
0
My
-100 10
20
30
40
Copyright (c) GS E&C. All Rights Reserved
50
60
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016 Project Na. : PLTU SUMBAWA BARAT 2X7
Calculation Sheet of Pier
..
Project No. : WEST SUMBAWA CFSPP PR.. Client : PT PLN (Persero)... Page 12
2.2.3 Pier Name : 395 (tonf , tonf-m )
Axis
X-A x i s ( A l lc o mb . )
Po
662.841 tonf
Pn / fPn
596.557 tonf / 417.590 tonf
Mn / fMn
16.04 tonf-m / 11.23 tonf-m
Pb / fPb
329.529 tonf / 230.670 tonf
200
Mb / fM
46.25 tonf-m / 32.38 tonf-m
100
c(Balanced)
376.79 mm
emin
33.24 mm
klu / rx
10.67
Slender
Neglect
Axis
Y-A x i s ( A l lc o mb . )
Po
662.841 tonf
Pn / fPn
596.557 tonf / 417.590 tonf
Mn / fMn
16.11 tonf-m / 11.23 tonf-m
Pb / fPb
341.918 tonf / 230.670 tonf
200
Mb / fM
45.87 tonf-m / 32.38 tonf-m
100
c(Balanced)
376.79 mm
emin
33.24 mm
klu / rx
10.67
Slender
Neglect
P 700 Pnmax
600 500
f Pnmax
400
Balanced
300
0
Mx
-100 10
20
30
40
50
60
(tonf , tonf-m )
P 700 Pnmax
600 500
f Pnmax
400
Balanced
300
0
My
-100 10
20
30
40
Copyright (c) GS E&C. All Rights Reserved
50
60
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016 Project Na. : PLTU SUMBAWA BARAT 2X7
Calculation Sheet of Pier
..
Project No. : WEST SUMBAWA CFSPP PR.. Client : PT PLN (Persero)... Page 13
2.2.4 Pier Name : 396 (tonf , tonf-m )
Axis
X-A x i s ( A l lc o mb . )
Po
662.841 tonf
Pn / fPn
596.557 tonf / 417.590 tonf
Mn / fMn
16.04 tonf-m / 11.23 tonf-m
Pb / fPb
329.529 tonf / 230.670 tonf
200
Mb / fM
46.25 tonf-m / 32.38 tonf-m
100
c(Balanced)
376.79 mm
emin
33.24 mm
klu / rx
10.67
Slender
Neglect
Axis
Y-A x i s ( A l lc o mb . )
Po
662.841 tonf
Pn / fPn
596.557 tonf / 417.590 tonf
Mn / fMn
16.11 tonf-m / 11.23 tonf-m
Pb / fPb
341.918 tonf / 230.670 tonf
200
Mb / fM
45.87 tonf-m / 32.38 tonf-m
100
c(Balanced)
376.79 mm
emin
33.24 mm
klu / rx
10.67
Slender
Neglect
P 700 Pnmax
600 500
f Pnmax
400
Balanced
300
0
Mx
-100 10
20
30
40
50
60
(tonf , tonf-m )
P 700 Pnmax
600 500
f Pnmax
400
Balanced
300
0
My
-100 10
20
30
40
Copyright (c) GS E&C. All Rights Reserved
50
60
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016 Project Na. : PLTU SUMBAWA BARAT 2X7
Calculation Sheet of Pier
..
Project No. : WEST SUMBAWA CFSPP PR.. Client : PT PLN (Persero)... Page 14
2.2.5 Pier Name : 397 (tonf , tonf-m )
P
20000
15000
Pnmax
f Pnmax
Balanced
10000
5000
X-A x i s ( A l lc o mb . )
Po
20878.720 tonf
Pn / fPn
18790.850 tonf / 13153.590 tonf
Mn / fMn
2863.27 tonf-m / 2004.29 tonf-m
Pb / fPb
12732.190 tonf / 8912.532 tonf
Mb / fM
7535.05 tonf-m / 5274.54 tonf-m
c(Balanced)
2448.21 mm
emin
120.24 mm
klu / rx
1.83
Slender
Neglect
Axis
Y-A x i s ( A l lc o mb . )
Po
20878.720 tonf
Pn / fPn
18790.850 tonf / 13153.590 tonf
Mn / fMn
2863.29 tonf-m / 2004.29 tonf-m
Pb / fPb
12739.900 tonf / 8912.532 tonf
Mb / fM
7532.15 tonf-m / 5274.54 tonf-m
c(Balanced)
2448.21 mm
emin
120.24 mm
klu / rx
1.83
Slender
Neglect
Mx
0 2000
4000
6000
8000
10000
(tonf , tonf-m )
P
20000
15000
Axis
Pnmax
f Pnmax
Balanced
10000
5000
My
0 2000
4000
6000
8000
10000
2.3 ANALYSIS & RESULT 2.3.1 Moment Check Pie r
1
unit (tonf-m )
fMnx
fMny
0.02
10.41
10.55
OK
0.02
0.02
10.41
10.55
OK
1
0.02
0.02
10.41
10.55
OK
1
1
0.02
0.02
10.41
10.55
OK
140
1
1
0.02
0.02
10.41
10.55
OK
150
1
1
0.02
0.02
10.41
10.55
OK
160
1
1
0.02
0.02
10.41
10.55
OK
170
1
1
0.02
0.02
10.41
10.55
OK
180
1
1
0.02
0.02
10.41
10.55
OK
L/C#
x
y
100
1
1
0.02
110
1
1
120
1
130
Copyright (c) GS E&C. All Rights Reserved
Mux
Muy
Re sult
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016
Calculation Sheet of Pier
..
2
395
396
Project Na. : PLTU SUMBAWA BARAT 2X7 Project No. : WEST SUMBAWA CFSPP PR.. Client : PT PLN (Persero)... Page 15
190
1
1
0.02
0.02
10.41
10.55
OK
60
1
1
0.02
0.02
10.41
10.55
OK
70
1
1
0.02
0.02
10.41
10.55
OK
80
1
1
0.02
0.02
10.41
10.55
OK
90
1
1
0.02
0.02
10.41
10.55
OK
100 110
1 1
1 1
0.02 0.02
0.02 0.02
10.41 10.41
10.55 10.55
OK OK
120
1
1
0.02
0.02
10.41
10.55
OK
130
1
1
0.02
0.02
10.41
10.55
OK
140
1
1
0.02
0.02
10.41
10.55
OK
150
1
1
0.02
0.02
10.41
10.55
OK
160
1
1
0.02
0.02
10.41
10.55
OK
170
1
1
0.02
0.02
10.41
10.55
OK
180
1
1
0.02
0.02
10.41
10.55
OK
190
1
1
0.02
0.02
10.41
10.55
OK
60
1
1
0.02
0.02
10.41
10.55
OK
70
1
1
0.02
0.02
10.41
10.55
OK
80
1
1
0.02
0.02
10.41
10.55
OK
90
1
1
0.02
0.02
10.41
10.55
OK
100
1
1
0.02
0.02
10.41
10.55
OK
110
1
1
0.02
0.02
10.41
10.55
OK
120
1
1
0.02
0.02
10.41
10.55
OK
130
1
1
0.02
0.02
10.41
10.55
OK
140
1
1
0.02
0.02
10.41
10.55
OK
150
1
1
0.02
0.02
10.41
10.55
OK
160
1
1
0.02
0.02
10.41
10.55
OK
170
1
1
0.02
0.02
10.41
10.55
OK
180
1
1
0.02
0.02
10.41
10.55
OK
190
1
1
0.02
0.02
10.41
10.55
OK
60
1
1
0.02
0.02
10.41
10.55
OK
70
1
1
0.02
0.02
10.41
10.55
OK
80
1
1
0.02
0.02
10.41
10.55
OK
90
1
1
0.02
0.02
10.41
10.55
OK
100
1
1
0.02
0.02
10.41
10.55
OK
110
1
1
0.02
0.02
10.41
10.55
OK
120
1
1
0.02
0.02
10.41
10.55
OK
130
1
1
0.02
0.02
10.41
10.55
OK
140
1
1
0.02
0.02
10.41
10.55
OK
150
1
1
0.02
0.02
10.41
10.55
OK
160
1
1
0.02
0.02
10.41
10.55
OK
170
1
1
0.02
0.02
10.41
10.55
OK
Copyright (c) GS E&C. All Rights Reserved
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016
Calculation Sheet of Pier
..
397
Project Na. : PLTU SUMBAWA BARAT 2X7 Project No. : WEST SUMBAWA CFSPP PR.. Client : PT PLN (Persero)... Page 16
180
1
1
0.02
0.02
10.41
10.55
OK
190
1
1
0.02
0.02
10.41
10.55
OK
60
1
1
0.02
0.02
10.41
10.55
OK
70
1
1
0.02
0.02
10.41
10.55
OK
80
1
1
0.02
0.02
10.41
10.55
OK
90 100
1 1
1 1
0.02 2.22
0.02 2.22
10.41 517.26
10.55 516.74
OK OK
110
1
1
2.22
2.22
517.26
516.74
OK
120
1
1
2.22
2.22
517.26
516.74
OK
130
1
1
2.22
2.22
517.26
516.74
OK
140
1
1
2.22
2.22
517.26
516.74
OK
150
1
1
2.22
2.22
517.26
516.74
OK
160
1
1
2.22
2.22
517.26
516.74
OK
170
1
1
2.22
2.22
517.26
516.74
OK
180
1
1
2.22
2.22
517.26
516.74
OK
190
1
1
2.22
2.22
517.26
516.74
OK
60
1
1
2.22
2.22
517.26
516.74
OK
70
1
1
2.22
2.22
517.26
516.74
OK
80
1
1
2.22
2.22
517.26
516.74
OK
90
1
1
2.22
2.22
517.26
516.74
OK
2.3.2 Force Check Pie r
1
L/C#
unit (tonf )
Fz
fPs
fPnmax
Resu lt
100
-61.14
417.59
0.54
OK
110
-61.14
417.59
0.54
OK
120
-61.14
417.59
0.54
OK
130
-61.14
417.59
0.54
OK
140
-61.14
417.59
0.54
OK
150
-61.14
417.59
0.54
OK
160
-61.14
417.59
0.54
OK
170
-61.14
417.59
0.54
OK
180
-61.14
417.59
0.54
OK
190 60
-61.14 -61.14
417.59 417.59
0.54 0.54
OK OK
70
-61.14
417.59
0.54
OK
80
-61.14
417.59
0.54
OK
90
-61.14
417.59
0.54
OK
100
-61.14
417.59
0.54
OK
110
-61.14
417.59
0.54
OK
120
-61.14
417.59
0.54
OK
130
-61.14
417.59
0.54
OK
2
Copyright (c) GS E&C. All Rights Reserved
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016
Calculation Sheet of Pier
..
395
396
397
Project Na. : PLTU SUMBAWA BARAT 2X7 Project No. : WEST SUMBAWA CFSPP PR.. Client : PT PLN (Persero)... Page 17
140
-61.14
417.59
0.54
OK
150
-61.14
417.59
0.54
OK
160
-61.14
417.59
0.54
OK
170
-61.14
417.59
0.54
OK
180
-61.14
417.59
0.54
OK
190 60
-61.14 -61.14
417.59 417.59
0.54 0.54
OK OK
70
-61.14
417.59
0.54
OK
80
-61.14
417.59
0.54
OK
90
-61.14
417.59
0.54
OK
100
-61.14
417.59
0.54
OK
110
-61.14
417.59
0.54
OK
120
-61.14
417.59
0.54
OK
130
-61.14
417.59
0.54
OK
140
-61.14
417.59
0.54
OK
150
-61.14
417.59
0.54
OK
160
-61.14
417.59
0.54
OK
170
-61.14
417.59
0.54
OK
180
-61.14
417.59
0.54
OK
190
-61.14
417.59
0.54
OK
60
-61.14
417.59
0.54
OK
70
-61.14
417.59
0.54
OK
80
-61.14
417.59
0.54
OK
90
-61.14
417.59
0.54
OK
100
-61.14
417.59
0.54
OK
110
-61.14
417.59
0.54
OK
120
-61.14
417.59
0.54
OK
130
-61.14
417.59
0.54
OK
140
-61.14
417.59
0.54
OK
150
-61.14
417.59
0.54
OK
160
-61.14
417.59
0.54
OK
170
-61.14
417.59
0.54
OK
180
-61.14
417.59
0.54
OK
190
-61.14
417.59
0.54
OK
60
-61.14
417.59
0.54
OK
70
-61.14
417.59
0.54
OK
80
-61.14
417.59
0.54
OK
90
-61.14
417.59
0.54
OK
100
-427.96
13153.59
18.47
OK
110
-427.96
13153.59
18.47
OK
120
-427.96
13153.59
18.47
OK
Copyright (c) GS E&C. All Rights Reserved
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016
Calculation Sheet of Pier
..
Project Na. : PLTU SUMBAWA BARAT 2X7 Project No. : WEST SUMBAWA CFSPP PR.. Client : PT PLN (Persero)... Page 18
130
-427.96
13153.59
18.47
OK
140
-427.96
13153.59
18.47
OK
150
-427.96
13153.59
18.47
OK
160
-427.96
13153.59
18.47
OK
170
-427.96
13153.59
18.47
OK
180 190
-427.96 -427.96
13153.59 13153.59
18.47 18.47
OK OK
60
-427.96
13153.59
18.47
OK
70
-427.96
13153.59
18.47
OK
80
-427.96
13153.59
18.47
OK
90
-427.96
13153.59
18.47
OK
3. ONE-WAY SHEAR 3.1 FORMULA ACI 318-05 CODE 11.3.1.1 - For members subject to shear and flexure only. - Vc = 2 f ck Bwd A v fy d - Vs = s - Vu <= f Vc + f Vs - When, Value of
(eq 11-3) (eq 11-15)
, f = 0.75 (eq 11-1) f Vs shall not exceed f 8 fck Bw d (Vs max)
3.2 ONE-WAY SHEAR Na Pm . e
Dir.
Unit(tonf)
fVc
fVs
fVs max
100
17.945
8.402
71.781
0
OK
110
17.945
8.402
71.781
0
OK
120
17.945
8.402
71.781
0
OK
130
17.945
8.402
71.781
0
OK
140
17.945
8.402
71.781
0
OK
150
17.945
8.402
71.781
0
OK
160
17.945
8.402
71.781
0
OK
170
17.945
8.402
71.781
0
OK
180
17.945
8.402
71.781
0
OK
190
17.945
8.402
71.781
0
OK
60
17.945
8.402
71.781
0
OK
70
17.945
8.402
71.781
0
OK
80
17.945
8.402
71.781
0
OK
90
17.945
8.402
71.781
0
OK
100
17.945
8.402
71.781
0
OK
110
17.945
8.402
71.781
0
OK
120
17.945
8.402
71.781
0
OK
LC#
X 1
Y
Copyright (c) GS E&C. All Rights Reserved
Vu
R esult
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016
Calculation Sheet of Pier
..
Y
X
2
Y
395
X
Project Na. : PLTU SUMBAWA BARAT 2X7 Project No. : WEST SUMBAWA CFSPP PR.. Client : PT PLN (Persero)... Page 19
130
17.945
8.402
71.781
0
OK
140
17.945
8.402
71.781
0
OK
150
17.945
8.402
71.781
0
OK
160
17.945
8.402
71.781
0
OK
170
17.945
8.402
71.781
0
OK
180 190
17.945 17.945
8.402 8.402
71.781 71.781
0 0
OK OK
60
17.945
8.402
71.781
0
OK
70
17.945
8.402
71.781
0
OK
80
17.945
8.402
71.781
0
OK
90
17.945
8.402
71.781
0
OK
100
17.945
8.402
71.781
0
OK
110
17.945
8.402
71.781
0
OK
120
17.945
8.402
71.781
0
OK
130
17.945
8.402
71.781
0
OK
140
17.945
8.402
71.781
0
OK
150
17.945
8.402
71.781
0
OK
160
17.945
8.402
71.781
0
OK
170
17.945
8.402
71.781
0
OK
180
17.945
8.402
71.781
0
OK
190
17.945
8.402
71.781
0
OK
60
17.945
8.402
71.781
0
OK
70
17.945
8.402
71.781
0
OK
80
17.945
8.402
71.781
0
OK
90
17.945
8.402
71.781
0
OK
100
17.945
8.402
71.781
0
OK
110
17.945
8.402
71.781
0
OK
120
17.945
8.402
71.781
0
OK
130
17.945
8.402
71.781
0
OK
140
17.945
8.402
71.781
0
OK
150
17.945
8.402
71.781
0
OK
160
17.945
8.402
71.781
0
OK
170
17.945
8.402
71.781
0
OK
180
17.945
8.402
71.781
0
OK
190
17.945
8.402
71.781
0
OK
60
17.945
8.402
71.781
0
OK
70
17.945
8.402
71.781
0
OK
80
17.945
8.402
71.781
0
OK
90
17.945
8.402
71.781
0
OK
100
17.945
8.402
71.781
0
OK
110
17.945
8.402
71.781
0
OK
Copyright (c) GS E&C. All Rights Reserved
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016
Calculation Sheet of Pier
..
X
Y
396
X
Y
Project Na. : PLTU SUMBAWA BARAT 2X7 Project No. : WEST SUMBAWA CFSPP PR.. Client : PT PLN (Persero)... Page 20
120
17.945
8.402
71.781
0
OK
130
17.945
8.402
71.781
0
OK
140
17.945
8.402
71.781
0
OK
150
17.945
8.402
71.781
0
OK
160
17.945
8.402
71.781
0
OK
170 180
17.945 17.945
8.402 8.402
71.781 71.781
0 0
OK OK
190
17.945
8.402
71.781
0
OK
60
17.945
8.402
71.781
0
OK
70
17.945
8.402
71.781
0
OK
80
17.945
8.402
71.781
0
OK
90
17.945
8.402
71.781
0
OK
100
17.945
8.402
71.781
0
OK
110
17.945
8.402
71.781
0
OK
120
17.945
8.402
71.781
0
OK
130
17.945
8.402
71.781
0
OK
140
17.945
8.402
71.781
0
OK
150
17.945
8.402
71.781
0
OK
160
17.945
8.402
71.781
0
OK
170
17.945
8.402
71.781
0
OK
180
17.945
8.402
71.781
0
OK
190
17.945
8.402
71.781
0
OK
60
17.945
8.402
71.781
0
OK
70
17.945
8.402
71.781
0
OK
80
17.945
8.402
71.781
0
OK
90
17.945
8.402
71.781
0
OK
100
17.945
8.402
71.781
0
OK
110
17.945
8.402
71.781
0
OK
120
17.945
8.402
71.781
0
OK
130
17.945
8.402
71.781
0
OK
140
17.945
8.402
71.781
0
OK
150
17.945
8.402
71.781
0
OK
160
17.945
8.402
71.781
0
OK
170
17.945
8.402
71.781
0
OK
180
17.945
8.402
71.781
0
OK
190
17.945
8.402
71.781
0
OK
60
17.945
8.402
71.781
0
OK
70
17.945
8.402
71.781
0
OK
80
17.945
8.402
71.781
0
OK
90
17.945
8.402
71.781
0
OK
100
17.945
8.402
71.781
0
OK
Copyright (c) GS E&C. All Rights Reserved
TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016
Calculation Sheet of Pier
..
Y
X
397
Y
Project Na. : PLTU SUMBAWA BARAT 2X7 Project No. : WEST SUMBAWA CFSPP PR.. Client : PT PLN (Persero)... Page 21
110
17.945
8.402
71.781
0
OK
120
17.945
8.402
71.781
0
OK
130
17.945
8.402
71.781
0
OK
140
17.945
8.402
71.781
0
OK
150
17.945
8.402
71.781
0
OK
160 170
17.945 17.945
8.402 8.402
71.781 71.781
0 0
OK OK
180
17.945
8.402
71.781
0
OK
190
17.945
8.402
71.781
0
OK
60
17.945
8.402
71.781
0
OK
70
17.945
8.402
71.781
0
OK
80
17.945
8.402
71.781
0
OK
90
17.945
8.402
71.781
0
OK
100
605.419
54.592
2421.675
0
OK
110
605.419
54.592
2421.675
0
OK
120
605.419
54.592
2421.675
0
OK
130
605.419
54.592
2421.675
0
OK
140
605.419
54.592
2421.675
0
OK
150
605.419
54.592
2421.675
0
OK
160
605.419
54.592
2421.675
0
OK
170
605.419
54.592
2421.675
0
OK
180
605.419
54.592
2421.675
0
OK
190
605.419
54.592
2421.675
0
OK
60
605.419
54.592
2421.675
0
OK
70
605.419
54.592
2421.675
0
OK
80
605.419
54.592
2421.675
0
OK
90
605.419
54.592
2421.675
0
OK
100
605.419
54.592
2421.675
0
OK
110
605.419
54.592
2421.675
0
OK
120
605.419
54.592
2421.675
0
OK
130
605.419
54.592
2421.675
0
OK
140
605.419
54.592
2421.675
0
OK
150
605.419
54.592
2421.675
0
OK
160
605.419
54.592
2421.675
0
OK
170
605.419
54.592
2421.675
0
OK
180
605.419
54.592
2421.675
0
OK
190
605.419
54.592
2421.675
0
OK
60
605.419
54.592
2421.675
0
OK
70
605.419
54.592
2421.675
0
OK
80
605.419
54.592
2421.675
0
OK
90
605.419
54.592
2421.675
0
OK
Copyright (c) GS E&C. All Rights Reserved