ILF-SPC-AOT-CI-002-B
THE HASHEMITE KINGDOM OF JORDAN MINISTRY OF ENERGY AND MINERAL RESOURCES
Aqaba Oil Storage Terminal Project Project AQABA OIL TERMINAL GEOTECHNICAL GEOTECHNICAL INVESTIGATION INVESTIGATION SPECIFICATION SPECIFICATION AND SCOPE OF WORK
ILF-SPC-AOT-CI-002-B 25. 10. 2013
REVISION
B
25.10.2013
Issue for IFR
F. Jiricny
D.Hoz
S. Buchegger
A
23.10.2013 Issue for IDC
F. Jiricny
S. Zanon
S. Buchegger
Prepared
Checked
Approved
Rev.
Date
Issue, Modification
Aqaba Oil Storage Terminal Project Project AQABA OIL TERMINAL GEOTECHNICAL GEOTECHNICAL INVESTIGATION INVESTIGATION SPECIFICATION SPECIFICATION AND SCOPE OF WORK
ILF-SPC-AOT-CI-002-B 25. 10. 2013
TABLE OF CONTENTS 1
2
GENERAL
7
1.1
Purpose of the Document Document
7
1.2
Scope of Work
7
ABBREVIATIONS AND DEFINITIONS
7
2.1
Definitions
7
2.2
Abbreviation
8
3
PARTICULAR CONDITIONS FOR THE EXECUTION OF THE SERVICES
9
4
PROJECT DESCRIPTION DESCRIPTION
9
5
EXTENT OF INVESTIGATION WORKS
10
5.1
General
10
5.2
Field Investigations Investigations
11
5.2.1
Drilling
11
5.2.2
Standard penetration test
12
Aqaba Oil Storage Terminal Project Project AQABA OIL TERMINAL GEOTECHNICAL GEOTECHNICAL INVESTIGATION INVESTIGATION SPECIFICATION SPECIFICATION AND SCOPE OF WORK
6.3
ILF-SPC-AOT-CI-002-B 25. 10. 2013
6.2.5
Sampling
23
6.2.6
Soil/Rock Samples
23
6.2.7
Groundwater Samples
24
6.2.8
Logging
24
6.2.9
Photo Documentation
24
6.2.10 Standard Penetration Test (SPT)
24
6.2.11 Dynamic Probing Super-Heavy (DPSH)
24
6.2.12 Screw Plate Load Test
24
6.2.13 Soil Resistivity Measurements Measurements
25
Specification of Laboratory Tests
25
6.3.1
Unit Weight
25
6.3.2
Natural Natura l Moisture Content
25
6.3.3
Particle Size Distribution
25
6.3.4
Atterberg Limits
25
6.3.5
Organic Matter Content
25
Aqaba Oil Storage Terminal Project Project AQABA OIL TERMINAL GEOTECHNICAL GEOTECHNICAL INVESTIGATION INVESTIGATION SPECIFICATION SPECIFICATION AND SCOPE OF WORK
6.4.6 7
8
Final Report
ILF-SPC-AOT-CI-002-B 25. 10. 2013
30
SCHEDULE
32
7.1
General
32
7.2
Investigation in the Tank Area
32
BILL OF QUANTITIES
33
8.1
33
Bill of Quantities / Unit Prices
Aqaba Oil Storage Terminal Project Project AQABA OIL TERMINAL GEOTECHNICAL GEOTECHNICAL INVESTIGATION INVESTIGATION SPECIFICATION SPECIFICATION AND SCOPE OF WORK
TABLES Table 1: List of definitions Table 2: List of abbreviations abbreviations Table 3: List of samples Table 4: List of laboratory test Table 5: Coordinates of boreholes boreholes Table 6: Coordinates of dynamic probing super heavy Table 7: Coordinates of trial pits Table 8: Coordinates of screw plate load test
APPENDICES Appendix 1:
Plot Plan - Investigation Investigation Locations
ILF-SPC-AOT-CI-002-B 25. 10. 2013
Aqaba Oil Storage Terminal Project Project AQABA OIL TERMINAL GEOTECHNICAL GEOTECHNICAL INVESTIGATION INVESTIGATION SPECIFICATION SPECIFICATION AND SCOPE OF WORK
1
GENERAL
1.1
Purpose of the Document
ILF-SPC-AOT-CI-002-B 25. 10. 2013
The purpose of this document is to define the scope of work for the detail geotechnical investigation for the construction of the Aqaba Oil Storage Terminal. 1.2
Scope of Work The aim of the geotechnical investigations is to obtain the geological and geotechnical data basis for the detail design works and construction activities of the Aqaba Oil Storage Terminal including the following items: •
Geological underground underground built up
•
Characteristic geotechnical parameters for the detail design of the tank foundations and all other buildings and structures st ructures
•
Hydraulic properties of the relevant geotechnical section
Aqaba Oil Storage Terminal Project Project AQABA OIL TERMINAL GEOTECHNICAL GEOTECHNICAL INVESTIGATION INVESTIGATION SPECIFICATION SPECIFICATION AND SCOPE OF WORK
Definition
Explanation
Client
China
Dalian
ILF-SPC-AOT-CI-002-B 25. 10. 2013
International
Economic
&
Technical
Cooperation Group Co., Ltd (EPC contractor) Consultant
ILF – MEMR’s MEMR’s engineering contractor
Contractor
Contractor for ground investigation works
Terminal Termina l
The whole Aqaba Storage Terminal
Third Party
Any legal entity except the Client and Contractor for ground investigation works.
Table 1: List of definitions 2.2
Abbreviation In the present document the following abbreviations were used. Their meaning is explained in the table below. Abbreviation
Explanation
AASHTO
American
Association
of
State
Highway
and
Aqaba Oil Storage Terminal Project Project AQABA OIL TERMINAL GEOTECHNICAL GEOTECHNICAL INVESTIGATION INVESTIGATION SPECIFICATION SPECIFICATION AND SCOPE OF WORK
Abbreviation
Explanation
S
South
SPLT
Screw Plate Load Test
SPT
Standard Penetration Test
TP
Trial Pit
W
West
ILF-SPC-AOT-CI-002-B 25. 10. 2013
Table 2: List of abbreviations
3
PARTICULAR CONDITIONS FOR THE EXECUTION OF THE SERVICES The investigation works shall be performed by an experienced company appointed by the Client, which is familiar with the execution of the works mentioned below. The results of the geotechnical investigation will be used by CDIG, MEMR and/or contracted consultants for the preparation of the construction design and the authority permit applications (construction, operation or others).
Aqaba Oil Storage Terminal Project Project AQABA OIL TERMINAL GEOTECHNICAL GEOTECHNICAL INVESTIGATION INVESTIGATION SPECIFICATION SPECIFICATION AND SCOPE OF WORK •
Metering shelter
•
Evaporation Evaporat ion ponds with total volume of 3000 m³
•
Vapour recovery unit shelter
•
Truck loading shelter
•
Gate house
•
2 Weighbridges
•
Roads and parking areas.
5
EXTENT OF INVESTIGATION INVESTIGATION WORKS
5.1
General
ILF-SPC-AOT-CI-002-B 25. 10. 2013
It is expected that the underground is built up of loose to medium dense alluvium deposits. Prior to the commencement of any investigation works the Contractor shall visit the in-
Aqaba Oil Storage Terminal Project Project AQABA OIL TERMINAL GEOTECHNICAL GEOTECHNICAL INVESTIGATION INVESTIGATION SPECIFICATION SPECIFICATION AND SCOPE OF WORK
ILF-SPC-AOT-CI-002-B 25. 10. 2013
the fieldwork, prevailing geotechnical conditions indicate to the Contractor that the proposed work requires modification, he shall recommend work necessary to provide the data required for construction. The Contractor shall submit such recommendations recommendations to the t he Client. Should the Client agree, the scope shall be altered accordingly accordingly and price agreed, prior to the commencement of the revised scope. Particular emphasis shall be placed by the Contractor on: •
The number of drillings, depths and locations
•
The number and types of samples, tests etc. taken in boreholes and trial pits
•
An estimate of the time and costs required to complete the Site Investigation.
Any change of the t he investigation program requires prior written approval by the Client. All investigation works shall be carried out with modern and fully functional equipment. The Contractor shall keep oil binders at every investigation site in case of damage. Leaking oil-, fuel and hydraulic pipes have to be repaired immediately immediately in order to prevent p revent environmental pollution. The Client reserves the right to intervene if the Contractor is performing to the Client’s dissatisfaction or in an unsafe manner. The Client can refuse the deployment of equipment if it does not meet the requested technical standards. The Contractor shall replace
Aqaba Oil Storage Terminal Project Project AQABA OIL TERMINAL GEOTECHNICAL GEOTECHNICAL INVESTIGATION INVESTIGATION SPECIFICATION SPECIFICATION AND SCOPE OF WORK
5.2.2
ILF-SPC-AOT-CI-002-B 25. 10. 2013
Standard penetration test Standard Penetration Tests (SPT) shall be performed every 2 m in the borehole, borehole, from top to the final depth of the t he borehole. In solid rock, SPTs shall not be performed. A total number of 450 SPT shall be carried out.
5.2.3
Dynamic Probing Super-Heavy A total number of 44 Dynamic Probing Super-Heavy (DPSH) with a total length of about 825 m shall be carried out:
5.2.4
•
24 DPSH of 25 m depth
•
5 DPSH of 15 m depth
•
15 DPSH of 10 m depth.
Screw Plate Load Test A total number of 14 Screw Plate Load Tests (SPLT) to depth of 4 m below the existing ground surface shall be carried out.
Aqaba Oil Storage Terminal Project Project AQABA OIL TERMINAL GEOTECHNICAL GEOTECHNICAL INVESTIGATION INVESTIGATION SPECIFICATION SPECIFICATION AND SCOPE OF WORK
Sample Type
Location
ILF-SPC-AOT-CI-002-B 25. 10. 2013
Proposed no. of samples
•
Disturbed Samples
BH/TP/SPLT
200
•
Undisturbed Samples
BH
100
•
Water Samples (if encountered)
BH
30
Table 3: List of samples Disturbed soil samples (non-cohesive soils) shall be taken from borehole cores, trial pits and from the SPT split-spoon sampler. Undisturbed samples shall be taken in the boreholes by means of a thin-walled sampling tube from cohesive soil (if encountered). encountered). Sampling shall cover all ground layers/types encountered encountered in the course of the field investigation. The Contractor shall verify whether the proposed amount of samples is sufficient to execute all proposed laboratory tests. If the proposed amount of samples is not sufficient the contractor shall propose an increase of the samples. The change of amount of the samples shall be approved by the Client.
Aqaba Oil Storage Terminal Project Project AQABA OIL TERMINAL GEOTECHNICAL GEOTECHNICAL INVESTIGATION INVESTIGATION SPECIFICATION SPECIFICATION AND SCOPE OF WORK
ILF-SPC-AOT-CI-002-B 25. 10. 2013
Laboratory Test cohesive soil including determination of Poisson ratio Unconfined Compression Test on rock Unconfined Compressive Strength of Cohesive Soil Optional: Water Chemical Analysis (standard parameters pa rameters according to national standards valid in the Hashemite Kingdom of Jordan), only if groundwater encountered Optional: Water Chemical Analysis on Steel and Concrete Aggressiveness, only if groundwater encountered Soil Chemical Analysis on Steel and Concrete Aggressiveness. Table 4: List of laboratory test In case of heterogeneous heterogeneous geotechnical conditions the laboratory tests can differ. 5.3
Deliverables
Aqaba Oil Storage Terminal Project Project AQABA OIL TERMINAL GEOTECHNICAL GEOTECHNICAL INVESTIGATION INVESTIGATION SPECIFICATION SPECIFICATION AND SCOPE OF WORK •
logistics
•
health and safety plan
•
risk assessment
•
protection of environment
ILF-SPC-AOT-CI-002-B 25. 10. 2013
•
interfaces
•
human-resource allocation plan which shall list key personnel, personnel, responsibiliresponsibilities, qualifications, and experience
•
all major items of equipment and operating procedures
•
work method statement for all investigation activities.
The work plan shall comply with all pertinent local laws, regulations, and codes. The Contractor shall keep daily records of all activities on site. Furthermore the Contractor shall provide weekly reports including investigation progress and status of the work relative to the planned time schedule. He shall identify reasons if progress in the field work is slower than originally planned, and steps taken to make up the lost time. The laboratory performing the laboratory tests has to be authorised by the state authority
Aqaba Oil Storage Terminal Project Project AQABA OIL TERMINAL GEOTECHNICAL GEOTECHNICAL INVESTIGATION INVESTIGATION SPECIFICATION SPECIFICATION AND SCOPE OF WORK
Borehole BH6 BH7 BH8 BH9 BH10 BH11 BH12 BH13 BH14 BH15 BH16 BH17 BH18 BH19 BH20 BH21 BH22 BH23 BH24 BH25 BH26 BH27 BH28
Location Tank AOT-T5, Centre Tank AOT-T5, Rand N Tank AOT-T5, Rand E Tank AOT-T5, Rand S Tank AOT-T5, Rand W Tank AOT-T6, Centre Tank AOT-T6, Rand N Tank AOT-T6, Rand E Tank AOT-T6, Rand S Tank AOT-T6, Rand W Tank AOT-T3, Centre Tank AOT-T3, Rand N Tank AOT-T3, Rand E Tank AOT-T3, Rand S Tank AOT-T3, Rand W Tank AOT-T1, Centre Tank AOT-T1, Rand N Tank AOT-T1, Rand E Tank AOT-T1, Rand S Tank AOT-T1, Rand W Tank AOT-T2, Centre Tank AOT-T2, Rand N Tank AOT-T2, Rand E
East 303 343.91 303 344.39 303 363.91 303 343.44 303 323.94 303 342.26 303 342.73 303 362.25 303 341.79 303 322.26 303 271.56 303 272.03 303 291.56 303 271.09 303 251.58 303 253.52 303 253.99 303 273.51 303 252.20 303 233.52 303 203.97 303 204.44 303 223.96
ILF-SPC-AOT-CI-002-B
North 252 536.43 252 556.43 252 535.96 252 516.44 252 536.90 252 466.45 252 486.44 252 465.98 252 446.46 252 466.92 252 638.85 252 658.85 252 638.38 252 618.86 252 639.32 252 571.22 252 591.21 252 570.74 252 551.22 252 571.69 252 620.66 252 640.65 252 620.19
25. 10. 2013
Depth [m] 35 25 25 25 25 35 25 25 25 25 35 25 25 25 25 35 25 25 25 25 35 25 25
Aqaba Oil Storage Terminal Project Project AQABA OIL TERMINAL GEOTECHNICAL GEOTECHNICAL INVESTIGATION INVESTIGATION SPECIFICATION SPECIFICATION AND SCOPE OF WORK
DPSH DPSH14 DPSH15 DPSH16 DPSH17 DPSH18 DPSH19 DPSH20 DPSH21 DPSH22 DPSH23 DPSH24 DPSH25 DPSH26 DPSH27 DPSH28 DPSH29 DPSH30 DPSH31 DPSH32 DPSH33 DPSH34
Location Tank AOT-T3, NE Tank AOT-T3, SE Tank AOT-T3, SW Tank AOT-T1, NW Tank AOT-T1, NE Tank AOT-T1, SE Tank AOT-T1, SW Tank AOT-T2, NW Tank AOT-T2, NE Tank AOT-T2, SE Tank AOT-T2, SW Loading and Transfer Pump House Loading and Transfer Pump House Office Offic e Building Office Offic e Building Workshop Workshop Slop Tanks Pump Shelter Slop Tanks Evaporation Evaporati on Pond Evaporation Evaporati on Pond
ILF-SPC-AOT-CI-002-B 25. 10. 2013
East 303 282.42 303 260.71 303 281.91 303 243.16 303 264.37 303 263.87 303 242.66 303 193.61 303 214.82 303 214.32 303 193.11
North 252 649.20 252 628.50 252 628.00 252 582.07 252 581.57 252 560.36 252 560.86 252 631.51 252 631.01 252 609.81 252 610.31
Depth [m] 25 25 25 25 25 25 25 25 25 25 25
303 161.14
252 567.50
10
303 186.63 303 107.21 303 111.92 303 120.48 303 117.90
252 542.13 252 624.81 252 600.26 252 592.71 252 550.73
10 10 10 10 10
303 131.67 303 138.29 303 136.82 303 178.54
252 515.85 252 490.01 252 416.75 252 415.80
10 10 10 10
Aqaba Oil Storage Terminal Project Project AQABA OIL TERMINAL GEOTECHNICAL GEOTECHNICAL INVESTIGATION INVESTIGATION SPECIFICATION SPECIFICATION AND SCOPE OF WORK
SPLT SPLT1 SPLT2 SPLT3 SPLT4 SPLT5 SPLT6 SPLT7 SPLT8 SPLT9 SPLT10 SPLT11 SPLT12 SPLT13 SPLT14
East 303 141.66 303 158.77 303 069.23 303 302.84 303 230.76 303 172.66 303 131.90 303 140.29 303 153.83 303 083.57 303 097.17 303 106.13 303 034.42 303 053.05
North 252 611.46 252 432.78 252 570.62 252 534.01 252 536.79 252 593.24 252 576.33 252 533.70 252 464.88 252 590.10 252 540.45 252 494.80 252 579.56 252 484.88
ILF-SPC-AOT-CI-002-B 25. 10. 2013
Depth [m] 4 4 4 4 4 4 4 4 4 4 4 4 4 4
Table 8: Coordinates of screw plate load test Detailed locations and depth may only be varied as the work proceeds after written instruction by the Client representative. The Contractor shall study all the above information before visiting the site to t o determine that sufficient information has been presented to enable him to submit an economical and professional report.
Aqaba Oil Storage Terminal Project Project AQABA OIL TERMINAL GEOTECHNICAL GEOTECHNICAL INVESTIGATION INVESTIGATION SPECIFICATION SPECIFICATION AND SCOPE OF WORK
ILF-SPC-AOT-CI-002-B 25. 10. 2013
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFI- CIALS (AASHTO) AASHTO T267
Determination of Organic Content of Soils by Loss on Ignition
AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM) ASTM D420
Standard Guide to Site Characterization Characterization for Engineering Design and Construction Purposes
ASTM D422
Standard Test Method for Particle-Size Analysis of Soils
ASTM D1557
Standard Test Methods for Laboratory Compaction Characteristics Characteristics of Soil Using Modified Effort
ASTM D1140
Standard Test for Amount of Material in Soils finer than the No. 200 Sieve
ASTM D1586
Standard Penetration Test and Split-Barrel Sampling of Soils
ASTM D1587
Standard Method for Thin-walled Thin-walled Tube Sampling of Soils for Ge-
Aqaba Oil Storage Terminal Project Project AQABA OIL TERMINAL GEOTECHNICAL GEOTECHNICAL INVESTIGATION INVESTIGATION SPECIFICATION SPECIFICATION AND SCOPE OF WORK
ASTM D4318
ILF-SPC-AOT-CI-002-B 25. 10. 2013
Standard Test Methods for Liquid Limit, Plastic Limit and Plasticity Index of Soils
ASTM D4767
Standard
Test
Method
for
Consolidated Consolidated
Undrained Undrained
Triaxial
Compression Test for Cohesive Soils ASTM D5434
Standard Guide for Field Logging of Subsurface Explorations of Soil and Rock
ASTM D6528
Standard Test Method for Consolidated Consolidated Undrained Undrained Direct Simple Shear Testing of Cohesive Soils
ASTM D3080
Standard Test Method for Direct Shear Test of Soils under ConsoliConsolidated Drained Conditions
ASTM D7012
Compressive Strength and Elastic Moduli of Intact Rock Core Specimens under Varying States of Stress S tress and Temperatures
ASTM D2166
Standard Test Method for Unconfined Compressive Compressive Strength of Cohesive Soil
ASTM D4546
One-dimensional One-dimensional Swell or Settlement Potential of Cohesive Soils
ASTM G57 – 95a
Standard Test Method for Field Measurement Measurement of Soil Resistivity Us-
Aqaba Oil Storage Terminal Project Project AQABA OIL TERMINAL GEOTECHNICAL GEOTECHNICAL INVESTIGATION INVESTIGATION SPECIFICATION SPECIFICATION AND SCOPE OF WORK
ILF-SPC-AOT-CI-002-B 25. 10. 2013
Units of Measurement The SI units of measurement shall be used exclusively.
6.2
Specification of Field Works
6.2.1
Building site equipment This item includes as follows: •
Mobilization to the building site, the installation and preparation for commencement of construction works of all devices, tools, drilling rigs and other equipment necessary to fulfil all construction works according to contract
•
Mobilization, installation installation and operation of supply and disposal facilities. The cost of preparation, maintenance and operation of devices and plants including hire charges and fees have to be included in the unit prices (drillings, probings, etc.)
•
Demobilization of all construction devices, equipment, plants
Aqaba Oil Storage Terminal Project Project AQABA OIL TERMINAL GEOTECHNICAL GEOTECHNICAL INVESTIGATION INVESTIGATION SPECIFICATION SPECIFICATION AND SCOPE OF WORK
ILF-SPC-AOT-CI-002-B 25. 10. 2013
A minimum sample diameter of 100 mm at any drilling depth has to be guaranteed In case of technical difficulties during production of the borehole which hinder reaching the minimum diameter. The required minimum diameter may be undershot with approval by the Client. Water flushing may not be used for drilling in soil and weathered rock in order to preserve the natural moisture content and the sample quality. If massive rock or huge boulders are encountered the use of water flushing is allowed. Drilling rig, drilling method and drilling diameter have to be chosen in a way that all requirements specified in this document and the standards are guaranteed. All boreholes have to be backfilled immediately after all drilling works and in-situ testing is completed. Backfill works have to be carried out carefully to avoid settlements. The backfill material shall be adequate soil material available in the vicinity of the site. The Contractor is responsible for the provision and transport of the material. As an option, some boreholes may require backfill using cement based grout or Bentonite pellets (Compactonit). The Contractor is responsible for the provision and transport of the material. Due to the amount of drillings, Contractor shall be ready to employ more than one o ne drill rig for simultaneous simultaneous drilling.
Aqaba Oil Storage Terminal Project Project AQABA OIL TERMINAL GEOTECHNICAL GEOTECHNICAL INVESTIGATION INVESTIGATION SPECIFICATION SPECIFICATION AND SCOPE OF WORK
ILF-SPC-AOT-CI-002-B 25. 10. 2013
The measurements shall be carried out with an adequate measuring device allowing for an accuracy of ±0,01 m (reference (reference point is ground elevation). Groundwater observations shall be documented in the daily logs with indication of the depth d epth below ground elevation (see also chapter 6.4.2 daily logs). The initial and final groundwater elevation, if significantly different, as well as any additional groundwater horizons identified shall be presented in the borehole logs. 6.2.5
Sampling Sampling of soil, rock and water shall be carried out according to ASTM D213 and ASTM D4220. Contractor has to make sure that sufficient soil sampling material is taken from trial pits and boreholes to carry out all laboratory laboratory tests specified in this document according according to the t he applicable standards. Size of samples shall be large enough so that retain samples will be still available after completion of laboratory testing. In case cohesive soils will be encountered special emphasis shall be placed on taking undisturbed samples which are necessary for soil mechanical tests such as triaxial tests
Aqaba Oil Storage Terminal Project Project AQABA OIL TERMINAL GEOTECHNICAL GEOTECHNICAL INVESTIGATION INVESTIGATION SPECIFICATION SPECIFICATION AND SCOPE OF WORK
6.2.7
ILF-SPC-AOT-CI-002-B 25. 10. 2013
Groundwater Samples Samples of groundwater shall be taken if groundwater is encountered within the boreholes. Samples from boreholes shall be taken after the th e groundwater has been cleared by pumping to avoid a negative influence from drilling works. Water samples shall be filled into clean containers that shall be provided by the analysing laboratory. Inappropriate sample containers will be rejected.
6.2.8
Logging Logs of drillings have to be made according to ASTM D5434.
6.2.9
Photo Documentation Coloured photos shall be taken from all recovered core samples. Each photo (minimum camera resolution 6 megapixel – photos in best quality) shall include a label indicating the title of the drilling and sample, a scale, a colour bar, and depth of the sample at each side of the core box. The photos shall be taken vertically down on the samples to avoid distortion. The light conditions shall be carefully chosen to avoid over- / underexposure or shadow. The photos shall be submitted in hard copy and digital format (.jpg) on CD. Photos of poor quality will not be accepted.
Aqaba Oil Storage Terminal Project Project AQABA OIL TERMINAL GEOTECHNICAL GEOTECHNICAL INVESTIGATION INVESTIGATION SPECIFICATION SPECIFICATION AND SCOPE OF WORK
ILF-SPC-AOT-CI-002-B 25. 10. 2013
The boreholes produced by the screw shall be backfilled immediately after performance of the tests. For backfilling, the natural soil furthered furthered by the screw shall be used. The tests shall be carried out according to American Standard STP 38477S 6.2.13
Soil Resistivity Measurements Measurements Soil resistivity measurements shall be carried out with the Wenner 4-electrode method. The tests shall be carried out according to ASTM G57 – 95a.
6.3
Specification of Laboratory Tests
6.3.1
Unit Weight Tests shall cover the total depth of the investigations. Tests shall be applied to all characteristic soil layers. The tests shall be carried out according to ASTM D4254.
6.3.2
Natural Moisture Content Tests shall cover the total depth of the investigations. Tests shall be applied to all char-
Aqaba Oil Storage Terminal Project Project AQABA OIL TERMINAL GEOTECHNICAL GEOTECHNICAL INVESTIGATION INVESTIGATION SPECIFICATION SPECIFICATION AND SCOPE OF WORK
6.3.6
ILF-SPC-AOT-CI-002-B 25. 10. 2013
Clay Mineral Analysis If clay is encountered, clay mineral analyses have to be carried out at representative samples. Tests shall cover the total depth of the investigations. Tests shall be applied to all characteristic soil layers and an assessment of potentially swelling clay minerals shall be made. The clay mineral analyses shall be carried out by means of X-ray diffractometry.
6.3.7
Swelling Tests If clay is encountered, swelling tests have to be carried out at representative representative samples. Tests shall cover the total depth of the investigations. Tests shall be applied to all characteristic soil layers containing cohesive material. The tests shall be carried out according to ASTM D4546.
6.3.8
Consolidation Tests Depth of samples shall be distributed lower than foundation level of the planned con-
Aqaba Oil Storage Terminal Project Project AQABA OIL TERMINAL GEOTECHNICAL GEOTECHNICAL INVESTIGATION INVESTIGATION SPECIFICATION SPECIFICATION AND SCOPE OF WORK
6.3.11
ILF-SPC-AOT-CI-002-B 25. 10. 2013
Triaxial Compression Compression Tests Depth of samples shall cover the total depth of the investigations. Tests shall be applied to all cohesive soil types. The tests shall be carried out according to ASTM AS TM D4767 (consolidated-undrained). (consolidated-undrained).
6.3.12
Unconfined Unconfine d Compression Tests If soils of high cohesion and/or rock are encountered unconfined compression compression tests shall be carried out. The tests shall be carried out in a way that the Poisson ratio is also determined with the test. Depth of samples shall cover the total depth of the investigations. Tests shall be applied to all characteristic rock types and soils of high cohesion. The test shall be carried out according to ASTM D2166 for cohesive soils and according to ASTM D7012 for rock.
6.3.13
Poisson Ratio Poisson ratio shall be determined by means of: of : •
Unconfined compression tests (rock)
Aqaba Oil Storage Terminal Project Project AQABA OIL TERMINAL GEOTECHNICAL GEOTECHNICAL INVESTIGATION INVESTIGATION SPECIFICATION SPECIFICATION AND SCOPE OF WORK
6.4
Report and Recommendation Recommendation
6.4.1
General
ILF-SPC-AOT-CI-002-B 25. 10. 2013
All submitted reports shall be in English language. The SI units of measurement system shall be used exclusively. 6.4.2
Daily Logs The Contractor shall keep daily records of the activities on site. One log shall be kept per drilling / screw plate load test / sounding and other field exploration / testing activity per day. The logs shall be available on site and shall be submitted on a weekly basis to the Client (see chapter 6.4.3). The log shall contain in minimum the following information but must not be limited to: 1.
Project, title and location of drilling, sounding or any other exploration / test
2.
Date, time of start and time of closure
3.
Weather conditions
4.
Drilling rig, sounding rig and any other exploration/testing exploration/testing equipment
Aqaba Oil Storage Terminal Project Project AQABA OIL TERMINAL GEOTECHNICAL GEOTECHNICAL INVESTIGATION INVESTIGATION SPECIFICATION SPECIFICATION AND SCOPE OF WORK
ILF-SPC-AOT-CI-002-B 25. 10. 2013
•
Complete daily reports of each BH, DPSH, SPLT of the previous week
•
Borehole logs in accordance with ASTM D5434
•
Written progress reports including summary of work completed, description of un-usual or unanticipated conditions encountered, assessment of adequacy of work scope and any recommended modifications, and statement of progress related to the planned schedule. This shall also include all laboratory works.
•
Reasons if progress in the field and laboratory work is slower than originally planned, and steps taken to make up the lost time.
A blue print of the weekly report shall be submitted to the Client for review prior to the commencement of the soil investigations. The Contractor shall submit a soft copy in .pdf format of the draft report. All coloured drawings and photos shall be submitted as coloured copy. 6.4.4
Draft Factual Report The draft factual report summarizing all field works and preliminary results shall be submitted 1 week after finalization of the field works. The draft factual report shall include in
Aqaba Oil Storage Terminal Project Project AQABA OIL TERMINAL GEOTECHNICAL GEOTECHNICAL INVESTIGATION INVESTIGATION SPECIFICATION SPECIFICATION AND SCOPE OF WORK •
ILF-SPC-AOT-CI-002-B 25. 10. 2013
Presentation of the test results in tables and graphs including soil classification (according to ASTM D2487)
•
Geological cross sections below the tanks including including spatial distribution of soil / rock layers, groundwater groundwater table, boreholes, boreholes, geotechnical geotechnical parameters etc.
•
Characteristic geotechnical soil parameters (strength and stiffness properties) for each soil / rock layer encountered encountered at the tank area.
6.4.6
Final Report The final report shall consist of two parts and shall include in minimum the following content but is not limited to: Part one: Geotechnical Data Section: •
Brief description of the applied methodology
•
Summary of all conducted field work and laboratory laboratory testing
•
Presentation of the test results in tables and graphs including soil classification (according to ASTM D2487), grading curves, water levels
•
Test results shall be grouped according to the geotechnical relevant soil lay-
Aqaba Oil Storage Terminal Project Project AQABA OIL TERMINAL GEOTECHNICAL GEOTECHNICAL INVESTIGATION INVESTIGATION SPECIFICATION SPECIFICATION AND SCOPE OF WORK •
ILF-SPC-AOT-CI-002-B 25. 10. 2013
Comprehensive description of the geological / geotechnical / hydrogeological hydrogeological conditions
•
Comprehensive description interpretations interpretations / conclusions and recommendations
•
Geological / geotechnical / hydrogeological hydrogeological cross sections.
On the basis of a comprehensive description of the geological / geotechnical / hydrogeological conditions, engineering recommendations recommendations have to be developed. In order to guide the geotechnical design for the foundations and earth works of the proposed facilities the interpretative part of the draft d raft / final f inal report shall comprise of the following results: •
Characteristic geotechnical soil parameters for each soil / rock layer
•
Estimation of load bearing capacity of soils
•
Estimation of settlement behaviour of soils
•
Evaluation of chemical aggressiveness aggressiveness of soil/groundwater soil/groundwater to concrete and buried constructions
•
Coefficient of sliding – concrete to soil
Aqaba Oil Storage Terminal Project Project AQABA OIL TERMINAL GEOTECHNICAL GEOTECHNICAL INVESTIGATION INVESTIGATION SPECIFICATION SPECIFICATION AND SCOPE OF WORK
7
SCHEDULE
7.1
General
ILF-SPC-AOT-CI-002-B 25. 10. 2013
The Contractor shall prepare a detailed schedule for performing the work on site and in the laboratory. The plan shall be reviewed and approved by the Client. The field works shall be performed and finalized within a time span of 6 weeks. A Draft Factual Report summarizing all field works and preliminary results shall be submitted 1 week after finalization of the field works. All deliverables including the Final Report shall be submitted 2 weeks after submittal of the Draft Factual Report. 7.2
Investigation in the Tank Area The design of the storage tanks foundation is on the critical time path. Therefore it is necessary get information needed for the design de sign of the tanks foundation f oundation as quick as possible. For this reason the sequence of works shall be as follows:
Aqaba Oil Storage Terminal Project Project AQABA OIL TERMINAL GEOTECHNICAL GEOTECHNICAL INVESTIGATION INVESTIGATION SPECIFICATION SPECIFICATION AND SCOPE OF WORK
8
BILL OF QUANTITIES QUANTITIES
8.1
Bill of Quantities / Unit Prices
Item
Description
Unit
Unit Price
ILF-SPC-AOT-CI-002-B 25. 10. 2013
Quantity
in JD 0.0
in JD
Installation of Construction Site
0.1
Installation of building site as pointed out in chapter 6.2.1
1.0
Field Work
1.1
Drilling in soil and weathered rock
pcs.
Total Price
1
Aqaba Oil Storage Terminal Project Project AQABA OIL TERMINAL GEOTECHNICAL GEOTECHNICAL INVESTIGATION INVESTIGATION SPECIFICATION SPECIFICATION AND SCOPE OF WORK
Item
Description
Unit
Unit Price
ILF-SPC-AOT-CI-002-B 25. 10. 2013
Quantity
in JD 1.2
Storage of borehole cores
in JD
m
900
m
900
m³
1
m³
1
pcs.
450
in wooden core boxes 1.3
Borehole backfill
1.3.1
Borehole backfill and sealing with earth material
1.3.2
Borehole backfill and sealing with concrete grout (optional)
1.3.3
Borehole backfill and sealing with bentonite pellets (Compactonite) (optional)
1.4
SPT
Total Price
Aqaba Oil Storage Terminal Project Project AQABA OIL TERMINAL GEOTECHNICAL GEOTECHNICAL INVESTIGATION INVESTIGATION SPECIFICATION SPECIFICATION AND SCOPE OF WORK
Item
Description
Unit
Unit Price
ILF-SPC-AOT-CI-002-B 25. 10. 2013
Quantity
in JD 1.8.1
Survey of drillings and
in JD
pcs.
81
Survey of trial pits and pcs. screw plate load tests by
17
DPSH, accuracy +/ 0,01 m in position and elevation respectively 1.8.2
means of handheld GPS 1.9
Sampling
1.9.1
Disturbed Disturb ed samples
pcs.
200
1.9.2
Undisturbed Undisturb ed samples
pcs.
100
1.9.3
Water samples
pcs.
30
1.10
Soil resistivity measure-
pcs.
11
ments
Total Price
Aqaba Oil Storage Terminal Project Project AQABA OIL TERMINAL GEOTECHNICAL GEOTECHNICAL INVESTIGATION INVESTIGATION SPECIFICATION SPECIFICATION AND SCOPE OF WORK
Item
Description
Unit
Unit Price
ILF-SPC-AOT-CI-002-B 25. 10. 2013
Quantity
in JD 2.10
Consolidated Undrained
in JD
pcs.
40
Direct Shear test of Soils pcs. under Consolidated
40
Direct Shear test on Cohesive Soils 2.11
Drained Conditions 2.12
Triaxial Compression test
pcs.
30
pcs.
30
pcs.
30
pcs.
15
(consolidated, undrained) undrained) on Cohesive Soil 2.13
Unconfined compressive strength on Cohesive Soil
2.14
Unconfined compressive strength on Rock
2.15
Water chemical analysis
Total Price
Aqaba Oil Storage Terminal Project Project AQABA OIL TERMINAL GEOTECHNICAL GEOTECHNICAL INVESTIGATION INVESTIGATION SPECIFICATION SPECIFICATION AND SCOPE OF WORK
Item
Description
Unit
Unit Price
ILF-SPC-AOT-CI-002-B 25. 10. 2013
Quantity
in JD 3.3
Draft Factual Geotechnical Geotechnical pcs.
in JD 1
Investigation Report 3.4
Final report
4.0
Costs on hourly base
4.1
pcs.
1
Site geologist
h
1
4.2
drilling operator
h
1
4.3
labourer
h
1
4.4
Laydown time of drilling / sounding / excavator oper-
h
1
ator including staff
Total Price
Aqaba Oil Storage Terminal Project Project AQABA OIL TERMINAL GEOTECHNICAL GEOTECHNICAL INVESTIGATION INVESTIGATION SPECIFICATION SPECIFICATION AND SCOPE OF WORK
Appendix 1: Plot Plan - Investigation Investigation Locations
ILF-SPC-AOT-CI-002-B 25. 10. 2013