What state of mind/body do you need to be in to really experience astral projection/"out of body" phenomena? Focus 10 is an useful state that will allow you to discover for yourself if it'…Full description
Respuestas libro Focus GDescripción completa
Descripción completa
Word linksFull description
Hemi-Sync...Focus 10 instructionsFull description
What state of mind/body do you need to be in to really experience astral projection/"out of body" phenomena? Focus 10 is an useful state that will allow you to discover for yourself if it's possi...
Word links
Leadership is the focus that determines the reality and it is the ability of a company's management to set or achieve challenging goals, take correct decisions and inspire others to perform well.
5th Edition of Focus Groups: A practical guide for applied researchFull description
Description : 112 adventure hooks for Legend of the Five Rings.
- The RATIO controller must be equipped with the RS 485 BUS Interface - The machines need to be connected from controller to controller - Connection sequence in any direction is possible - the Bus address defines the Compressor - At great cable length a resistor (120
BLS (Priority change based on hours) by only RS485 connection with FOCUS Requirements: - 4 Machines connected (2x FOCUS and 2x RATIO) - all machines on the same or similar size - 7 hours changeover - Pressure range of installation 8bar - 9bar
BLS (Clock switch based priority change) by combination of contact and RS485 with FOCUS - Pressure range of installation 10.5bar - 11.5bar - The 55 kW machine is frequency controlled - The 55 kW compressor is base load machine - Both 37 kW compressors are peak load machines - The 22 kW compressor is a reserve machine
Focus Controller Leak Detection (v1.15 Only) Starting a Test: 1. Navigate to the Leak Detection Screen 2. Hold Enter for 2 secs, until “Le” starts flashing, then release Enter 3. Hold Enter for another 2 secs to initiate a 6hr test 4. After 6 hours, values will appear showing calculated wasted run hours 5. The system will monitor in 6hr intervals, and will update the values if a lower load period is detected