Change Control Process Template
design
Descripción completa
sadadFull description
TechExcel ServiceWise is a flexible issue tracking and helpdesk software solution that may be configured for a number of IT business processes including, but not limited to: incident managem…Full description
Process Safety Management requires Management of Change. This MOC document provides checklist for the different stage in life cycle of a new engineering project - Design basis, Detailed engi…Full description
Full description
ENGINEERING CHANGE REQUEST CREATION
T.Code – T.Code – CC01
or
Menu Path- Logistics -- Central Function – Function – Engineering Engineering – – Engineering Engineering change management
Select ECR Box
Select change type-310
ENTER
5. Select object type
1. Enter description
2. Vali Validit dit from from date date Either Either Toda ’s or Future Future Date, Date, no Past date date 3. Reason
4. Change no. status
5. Select object type
1. Enter description
2. Vali Validit dit from from date date Either Either Toda ’s or Future Future Date, Date, no Past date date 3. Reason
4. Change no. status
2. Select Object 1. Select required object type only and press Enter
1. Fill the relevant data i.e. Mater ial code, plant, BOM usage and Description. Press Enter.
2. Tick Change Header
Tick Change Header Long Text
Mention the Exact Change with proper clarity and press Back Button
Press Yes
Save
Change no. created
Use T Code CC02, select change no. (New created) & ENTER
Select status management object
Select Check Request icon, click on Continue &
save it
Change number changed appears
Use T Code CC22, – Change Object management record screen appears, Select change no. & ENTER
Select line (object to be changed) and Execute by selecting Details View button
Select status management BOX to enable the change possible
Select change possible box
Click on continue & save
Change number changed appears after change possible Okayed
Use T.Code CC02 – ECR checked Approved and convert. Select change number
Select status management box to check, approve and convert ECR
Click on ECR checked, approve ECR and convert ECR one by one, select continue & save
Change number changed appears after ECR checked, approved and convert
Use T Code CS02 to make the required changes in master data - BOM
Enter material code, plant and BOM usage
Enter the change number
Warning signal appears that date is copied from change number (date is diff. as per requirement).
Enter
Original BOM information appears
Make the required changes i.e. Qty. changed from 1 to 2 and SAVE
To check change in BOM wef 19.11.2011, enter ECR valid from date in Display BOM (T.Code-CS03)
We can check the change in BOM (qty. and corresponding change number)
Use T. Code CC22 to complete change and release change after change in master data
Select object button to execute
Select line object to be chan ed
Select status management box to complete and release change after change in relevant master data
Select complete change, and release change one by one based on authorization
Click on continue and save
Status of Changes in master data is complete and release appears
Use T.Code CC02 to close and release ECO after changes incorporated in master data & released by user
Select status management box
Select Close ECO & Release ECO one by one based on authorization
Select continue and SAVE
Change number changed status appears after ECO Close