LABOR PRODUCTION TABLE ITEM NO.
A.
WORK DESCRIPTION
MANHOU NHOUR R LOW
FORM WORKS INSTALLATION WALL ON THE GROUND WALL ABOVER GROUND BEAMS COLUMN SUSPENDED SLAB 0 TO 18' 18' TO 36' UP ELEVATED AND SHORED SLAB FORMING FORMING ONL FORMING AND SHORING W OOD WALL AND PARTITION
B.
FORMWORKS FA FABRICATION
C.
STRIPPING OF FORMS WALL ON GROUND WALL ABOVE 10' BEAMS COLUMNS SUSPENDED SLAB 0 TO 18' 18' TO 36' UP ELEVATED AND SHORED SLAB FORMING STRIP OF FORMS FLOOR SLAB AT GRADE STRIP OF FORMS
TINSMITHING WO WORK CORR GI SHEETS, LIFTING INSTALLATION INSTALLATION OF ASBESTOS ROOFING INSTALLATION OF ALUMINUM GI SHEET COPPER CLADDING ROOF DEC/ FAB GI GUTTER GI SHEET ROOFING FAB OF GI GUTTER FAB. GI DOW NSPOUT GUTTER CUT # SHAPE INST. OF GUTTER DOW NSPOUT CUT AND SHAPE DOW NSPOUT INSTALLATION CORR. GI ROOFING CORR ALUMINUM ROOFING BUILT UP ROOFING 4 PL PROTECTED METAL CORR. ASBESTOS INST. LIFTING # HAULING LEADERS # GUTTERS
CONCRETE AND REBAR WORKS PLACING CONCRETE: SLAB ON FILL SLIP FORM FLR FINISH UNHARDENED CONC. FINISH HARDENED REBAR WORKS: GROUND FLR. INSTALLATION UPPER FLR. INSTALLATION FABRICATION MIING MANUAL MIING MACHINE MORE THAN 1.80 CU.M. POUR: CHUTE FROM TRUC/ CRANE AND BUC/ET W HEELING FINISHING CONCRETE POUR ON ELEATED ELEATED AND SHORED SLAB FORMING CHUTE # BUC/ET PLACEMENT OF REBARS ON FOOTING FIELD FABRICATION OF REBARS EARTH WORKS MACHINE EXCAVATION:
SAND
SAND AND MARL MARL GRANULAR BAC/FILL GRANULAR SOIL BAC/FILL
SAND ECAVATION OF SAND #MARL ECAVATION OF MARL BAC/FILL OF SAND BAC/FILL OF SAND #MARL BAC/FILL OF MARL FLOOR SLAB # GRADE, GRADING MANUAL ECAVATION AND BAC/FILL FINE GRADING # FINISHING GRADING MANUAL FINISHING SOIL SURFACE DI/ES ROAD WORKS BASE COURSE CURBS # GUTTER 4& TH/ ROAD 6& TH/ ROAD 8& TH/ ROAD TROWEL FINISH SPECIAL TOPPING 4& STONE OR SHELL ROAD 6& STONE OR SHELL ROAD 8& STONE OR SHELL ROAD ACID PROOFING ASPHALT PAVING, FINE GRADING # FINISHING PLACE BASE COURSE ASPHALT ACID BLOC/ OR PAVING BLOC/, FIND GRADING INSTALL BRIC/ CRUSH STONE OR SHELL SURFACING FINE GRADING PLACE SPREAD AND COMPACT STONE TO 4& OVER $& TH/ TAN/ CUSHION SAND CUSHION APHALT RETAINER RING NON GRANULAR BAC/FILL ECAVATION MANUAL, COMMON EARTH LOAN OF SAND CLA OR HEAV SOIL ROC/ ROC/
.
MECHANICAL ECAVATION COMMON EARTH ROC/ W% AC/HAMMER BAC/FILLING COMMON MANUAL GRAVEL FILL MANUAL TRENCHING AND BAC/FILLING OF UNDERGROUND PIPING USING ECAVATION MATERIALS MANUAL FROM 0 TO ! MTRS. DEPTH ! TO 3 3 TO 4 4 TO " PLACING BINDER GRAVEL ESCOMBRO BAC/FILLING SPREADING TAMPING AND GRADING MECHANICAL COMPACTION PLATE COMPACTION MANUAL CLEARING AND GRUBBING CLEARING UNDERGROWTH AND TREES 1!& CLEARING UNDERGROWTH AND SHRUBS DISPOSAL OF SOIL MAULING OF SOIL GRAVEL FILL ECAVATION CRANE AND CLAMPSHELL WITH 8-MEN AND ! CARPENTERS
FIELD FABRICATION INSULATION FIELD FABRICATION SHEET METAL COVER APPL INSULATION APPL SHEET METAL COVER PUMPS COMPRESSORS # TURBINES FABRICATE APPL PIPINGS AND COMPONENT INSULATION FIELD FABRICATE FIELD FABRICATESHEET METAL COVER APPL INSULATION APPL SHEET METAL COVER OR METAL COVER FABRICATE INSTRUMENT COVER INSTALL INSTRUMENT COVER INSULATE PIPE HANGERS FOR STREAM TRACED LINES
REMOVAL OF OLD OR EISTING INSTALLATION M.
N.
O.
P.
TRADE:FIRE PROOFING INSTALL STUDS INSTALL MESH POURED FORMING STRIP FORMS POUR CONCRETE CURING%PATCHING FINISHING TROWEL PLASTERED PNEUMATIC APPLICATION GUNITE APPL FINEBRIC/ OR BLOC/ REMOVAL OF EISTING OR OLD FIREPROOFING APPL FIREPROOFING PAINT FIRE PROTERCTION, FIRE PROTECTION EQUIPMENT INSTALLATION, MONITOR HOSE REELS AND CARTS FIRE ETINGUISHERS PERSONAL EQUIPMENT, EE WASH SAFET SHOWERS BREATHING APPARATUS SPRIN/LER SSTEM SPRA NO55LES WATER CANNONS TRADE:PERMANENT FENCING INSTALL FENCE INSTALL GATES TO RAIL BARBE WIRE 3 STRANDS TRADE:PAINTING WORKS NEW STRUCTURAL STEEL OLD STRUCTURAL STEEL NEW FLAT FLAT PLATES SURFACE PREPARATION, IN TERMS OF WEIGHT IN TERMS OF AREA SAND PREPARATION TRADE:HEATING ENTILATING AND CONDITIONING HEAV PIPING DUCT WOR/ INSTALL DUCT WOR/ FAB. PAC/AGE UNIT AIR CONDITIONER
L.M.
3.00
EACH S.M.
1.00 !.40
S.M. S.M. S.M. S.M. S.M. S.M.
!8.00 1!.00 140.00 1.!0 1.40 ".40
S.M. PC. S.M. S.M.
!.40 1.60 ".00 6.00
EACH EACH EACH
10.00 30.00 10.00
EACH EACH EACH
!0.00 !0.00 10.00
EACH EACH
!.00 10.00
L.M. L.M. L.M. L.M.
!.40 6.00 0.60 0.60
TON S.M. S.M.
!0.00 1.10 0.64
TON S.M. TON
16.00 0.86 60.00
L.M. S.M. S.M. EACH
7.00 1!.00 36.00 48.00
UNIT HEATER FINNED CONVERTER EHAUST FAN PROPELLER GRAVIT ROOF PAINT POWER ROOF VENT ROUND ROOF VENT PLUMBING PIPING Q.
MISCELLANEOUS WATER STOP INSTALLATION CAUL/ING SLAB OINT ASPHALTING GROUTNG AND TOOL PLASTERING WATER PROOFING RUBBERI5ED COPPER CLADDING ROOF DEC/ WATER PROOFING FLIN/OTE DEMOLITION OF ADOBE WALL PAINTING COPPER WATER STOP CUT AND SHAPE COPPER WATER STOP CUT AND INSTALLATION SETTING ANCHOR BOLT SETTING ANCHOR BOES