OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT
41578/A/0001/UK/En
PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT Offshore Construction Specialists (OCS) 20 Toh Guan Road CJ GLS Building #07-02 Singapore 608839 Tel: +65 6567-9080 Fax: +65 6567-8082 Web: http://www.offshore-ocs.com/index.html Contact Information Contact
Company Position
Email Address.
Keith Jackson
Managing and Technical Director
[email protected]
Seto Jian William Wijaya Loke Kah Poh Rakul Remanan Henry Chuy Alastair Wong Fery Wijaya
Operations Manager Project Manager Project Manager Engineering Manager Subcontracts & Procurement Manager Senior Project Engineer Project Engineer
[email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected]
OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT TABLE OF CONTENTS 1.
INTRODUCTION .................................................................................................................................... 3
2.
OCS ORGANISATION CHART ............................................................................................................ 4
3.
TYPICAL PRECOMMISSIONING ORGANISATION CHART................................................................ 6
4.
PIPELINE PRECOMMISSIONING ACTIVITIES .................................................................................... 7
5.
SAFETY AND SAFE WORKING PRACTICES. ..................................................................................... 7
6.
ENGINEERING AND PROCEDURES. ..................................................................................................8
7.
PROCUREMENT. .................................................................................................................................. 8
8.
FABRICATION. ...................................................................................................................................... 8
9.
PIPELINE FLOODING, CLEANING AND GAUGING. .......................................................................... 8
10.
PIPELINE INTELLIGENT AND CALLIPER PIGGING. .......................................................................... 8
11.
PIPELINE HYDROTESTING ................................................................................................................. 8
12.
PIPELINE BULK DEWATERING ........................................................................................................... 8
13.
PIPELINE AIR DRYING. ........................................................................................................................ 8
14.
PIPELINE VACUUM DRYING ............................................................................................................... 8
15.
NITROGEN PACKING ........................................................................................................................... 8
16.
EXISTING AND PAST CLIENTS ........................................................................................................... 9
17.
COMPLETED PROJECTS ................................................................................................................... 10
18.
EQUIPMENT DATA SHEETS .............................................................................................................. 18
19.
ISO CERTIFICATION........................................................................................................................... 37
PRE QUALIFICATION
Offshore Construction Specialists Pte Ltd.
Page 2 of 37
OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT
1.
INTRODUCTION
Offshore Construction Specialists (OCS) was formed in 2007 from a core group of marine construction engineers to provide construction management, engineering and strategic support equipment services primarily to the offshore oil and gas sector. Our key personnel come from previous careers at J.Ray McDermott in the marine operations department. Our managing and technical director Mr Keith Jackson worked for 17 years in the group the last 5 years as the marine division manager. As a matter of policy under Mr Jackson J.Ray McDermott would execute work peripheral to that being undertaken by the major work vessel (normally executed using third party subcontractors) using in-house resources. Pipeline pre-commissioning, pre and post trenching, flexible flowline / umbilical lay are examples of work that was routinely carried out in-house and not subcontracted. One of the main reasons for doing this was that it prevented the activities of the subcontractor impinging on the work of the high cost marine spread. The work was always planned with maximum operational synergy in mind In JRM large pipeline pre-commissioning projects such as the 650 km West Natuna gas gathering pipeline network and many other major projects were planned and executed in-house. OCS has taken the model developed in JRM and applied it to our own activities. Our equipment is managed and operated by people who come from the same background as the main marine contractor. We help the marine contractor plan the work such that the pre-commissioning has the least impact on operations. We are proactive in highlighting potential issues and ensuring both parties win. Our engineering capabilities are very sophisticated and significantly more advanced than our competitors. OCS has now completed a range of pre-commissioning projects for many different customers with great success. OCS is certified by Nata for pipeline hydrotesting which is the preeminent qualification for pre-commissioning contractors. The OCS organisation has also been qualified to IS0 9001 since 2009. Our in-house equipment spread has grown significantly and is described in detail in this document. OCS is equipped to handle the full range of pre-commissioning activities including flooding, cleaning, gauging, hydrotesting, dewatering, drying and nitrogen packing. We work with established intelligent and caliper pig suppliers to complement our service. We have established long term relationships with key Singapore and overseas vendors. OCS is equipped to handle large projects or discrete project elements depending on the specific needs of the customer. The company has grown steadily since incorporation and now employs 60 personnel of whom 30 are civil/structural and mechanical engineers working with our pre-commissioning technicians. The company office in Toh Guan Rd, Singapore has been leased until 2014 and has room for additional expansion. The office can accommodate customer representatives for liaison as necessary.
PRE QUALIFICATION
Offshore Construction Specialists Pte Ltd.
Page 3 of 37
OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT 2.
OCS ORGANISATION CHART
KEY PERSONNEL CONTACTS
Keith Jackson
Managing and Technical Director
[email protected]
Seto Jian William Wijaya Loke Kah Poh Rakul Remanan Henry Chuy Alastair Wong Fery Wijaya
Operations Manager Project Manager Project Manager Engineering Manager Subcontracts & Procurement Manager Senior Project Engineer Project Engineer
[email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected]
PRE QUALIFICATION
Offshore Construction Specialists Pte Ltd.
Page 4 of 37
OCS ORGANISATION CHART
KEITH JACKSON MANAGING & TECHNICAL DIRECTOR
PROJECT & CONSTRUCTION MANAGEMENT
EQUIPMENT MANAGEMENT
WILLIAM WIJAYA EQUIPMENT MANAGER
KP LOKE PROJECT MANAGER
OPERATIONS
ADMINISTRATION
NG BEE KIM ACCOUNTS, HR & ADMIN LEAD
SETO JIAN OPERATIONS MANAGER
TOOLAYA R IT ENGINEER
*ADMINITRATION
FIELD CONSTRUCTION OPERATIONS PLANT & EQUIPMENT
JAW LE E&M COORDINATOR
STRATEGIC EQUIPMENT TEAM
SAYED DEDY PRE-COMM ENGINEER
RONI GROUTING SUPERVISOR
KRISBEL BUDIMAN ZACK INDRA IDHAM TECHNICIANS MECHANICS
REMARK:
FIELD CONSTRUCTION SUPERVISION TEAM
JAMES CARROLL FIELD SUPERINTENDENT
JAMIE JACOBSEN LEON COAD DAVID WOOD FIELD FOREMANS
OPERATIONS
ALASTAIR WONG SNR PROJECT ENGINEER/ PRE-COMM MANAGER FERY WIJAYA PROJECT MANAGER
CONSTRUCTION ENGINEERING
RAKULREMANAN ENGINEERING MANAGER
DRAFTING BODIE MALLET SETTHA Y. IVAN CHAI (OPERATIONS/ SNR. FIELD ENGINEER)
ADI CAHYA AARON LIAN TRACY EE ZHONG ZHIYUAN DAVID SHAW CHEAH WIN LOONG CHATCHAI W. SEAN SIA TIN WEI DANIEL CAO FIELD ENGINEERS
ENGINEERING
CHANIN SRIYAPORN SNR. DRAFTING
ARYO PRAKOSO SNR. DRAFTSMAN
RAMIL ZAPANTA VINOTH KUMAR DRAFTSMAN
JULIANNE OOI HR ADMINISTRATOR
LENI TALAVERA RECEPTIONIST CUM ADMIN CLERK
TRACY TEE URISA L DOCUMENT CONTROLLER
PROCUREMENT & SUBCONTRACTS
CHUY CHUN FEI SUBCONTRACTS & PROCUREMENT MANAGER MONICA ZHANG ACCOUNTANT
GILBERT GREJALDO ACCOUNT EXECUTIVE
JOYCE LIM SUBCONTRACT / PROCUREMENT ADMINISTRATOR
CHARLESTAN BUYER / EXPEDITOR
PRAVIN THORAT SENIOR STRUCTURAL ENGINEER SUDHAKAR ANDY K. PRIYA PANJIROSA ZIA AL AKBAR STRUCTURAL ENGINEERS
HERYANTHO Y L TAUFAN S. SAINUL ABID SAVOY AMITH PRASAD NAVAL ARCHITECT
UDAY SARATHY MOHAN CHAND SENIOR PIPELINE ENGINEER
*ADMINITRATION SUPPORT TEAM: TRACY & URISA
PRE QUALIFICATION
ACCOUNTS
Offshore Construction Specialists Pte Ltd.
Page 5 of 37
OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT
3.
TYPICAL PRECOMMISSIONING ORGANISATION CHART
OCS Pre-commissioning Team offshore CLIENT
KP LOKE WILLIAM WIJAYA PROJECT MANAGERS RAKUL REMANAN ENGINEERING MANAGER
ALASTAIR WONG
HENRY CHUY
FERY WIJAYA
SUBCONTRACTS & PROCUREMENT MANAGER
PROJECT ENGINEERS
PRAVIN THORAT
JOYCE LIM
HERY LEMBANG
EXPEDITOR/ BUYER
SUDHAKAR SUBRAMANIAM UDAYSARATHY MOHAN ZIA AKBAR TAUFAN SIREGAR PRIYA PANJIROSA AMITH PRASAD SAVOY SAINUL ABID CONSTRUCTION SUPPORT ENGINEERS
SAYED DEDY MAHDI ADI CAHYA
CHARLES TAN BUYER/ SUBCONTRACTS EXECUTIVE
BODIE MALLET SETTHA Y. IVAN CHAI CHONG CHIA YAN AARON LIAN DAVID SHAW CHEAH WIN LOONG CHATCHAI SEAN SIA
CHANIN SRIYAPORN
FIELD ENGINEERS
ARYO PAKOSO RAMIL ZAPANTA VINOTH DRAFTING
ONSHORE OFFSHORE Note* : Project Managers, Project Engineers & Pre-commissioning Engineers will be selected from the personnel pool shown for each categary.
PRE QUALIFICATION
Offshore Construction Specialists Pte Ltd.
Page 6 of 37
OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT 4.
PIPELINE PRECOMMISSIONING ACTIVITIES
OCS experience embraces the full range of pipeline pre-commissioning activities from the initial flooding, cleaning, gauging and hydrotesting to dewatering, drying and nitrogen purging and packing. Specific activities undertaken by OCS:
No.
Description
1
Flooding, Cleaning and Gauging.
2
Calliper and Intelligent Pigging.
2
Hydrotesting
3
Dewatering/ Swabbing
4
Air Drying
5
Vacuum Drying
6
Nitrogen Purging
7
Nitrogen Packing
OCS provides a cradle to grave pipeline pre-commissioning services including complete engineering, procurement, fabrication and execution services. Our in-house inventory is extensive and our personnel are well trained.
5.
SAFETY AND SAFE WORKING PRACTICES
OCS is acutely aware of the dangers involved in the marine construction industry in general and in
pipeline pre-commissioning particularly where high pressure water and air and heavy equipment, chemicals etc combine to create a range of potential hazards if not managed properly. All OCS activities on specific projects are the subject of hazids and risk assessments to ensure levels of risk are reduced to as low as reasonably practical. These risk assessments are ideally attended by the main contractor and the ultimate client. Other specific safety and operational measures that are taken: i) ii) iii) iv) v) vi)
All OCS personnel have appropriate Bosiet offshore sea survival training OCS technicians are Nata qualified and well trained for their specific duties All OCS equipment is provided with a specific safety passport. Offshore hazardous areas are barricaded as required and unauthorized personnel are excluded. All installation aids are properly engineered and subject to structural checks by the OCS CSE group. Appropriate Hazchem sheets are posted in areas where chemicals are in use.
PRE QUALIFICATION
Offshore Construction Specialists Pte Ltd.
Page 7 of 37
OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT 6.
ENGINEERING AND PROCEDURES
OCS prepares project specific engineering and procedures for each job undertaken. What sets OCS apart from other pre-commissioning contractors is our engineering skills base which means that all structural, mechanical, hydrodynamic and aerodynamic considerations are addressed inhouse. OCS procedures will address: i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii)
Project specific procurement requirements. Equipment specification requirements and preparations. Designs of Pig launchers and receivers for Flooding, Cleaning and Gauging. Designs of Hydrotest heads. Designs of Pig Launchers and Receivers for Dewatering and Drying. Pig Requirements and Designations. Intelligent and Calliper Pigging requirements. Chemical injection requirements. Hydrotesting pressurization, strength and leak tests. Bulk Dewatering. Drying Procedures using Air or Vacuum drying techniques. Nitrogen Packing.
7.
PIPELINE
PLEASE
PRE-COMMISSIONING
REFER
TO
APPENDIX
PROCEDURES 1
8.
FABRICATION
9.
PIPELINE FLOODING, CLEANING AND GAUGING
10. PIPELINE INTELLIGENT AND CALLIPER PIGGING 11. PIPELINE HYDROTESTING 12. PIPELINE BULK DEWATERING 13. PIPELINE AIR DRYING 14. PIPELINE VACUUM DRYING 15. NITROGEN PACKING
PRE QUALIFICATION
Offshore Construction Specialists Pte Ltd.
Page 8 of 37
OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT 8 EXISTING AND PAST CLIENTS OCS has built up a significant customer base during four (4) years of operations. OCS past and present clients are listed below. References can be provided on request.
No.
Client Name
1
Star Petroleum ( Indonesia)
2
HESS ( Indonesia)
3
Asia Petroleum Developments (Salamander) ( Indonesia)
4
Kangean Energy ( Indonesia)
5
NuCoastal ( Thailand)
6
Chevron (Thailand)
7
EMAS ( Singapore)
8
Larsen & Toubro ( Malaysia/ India)
9
SapurasAcergy ( Malaysia)
10
TLO SapuraCrest ( Malaysia)
11
Heerema (Holland)
12
NorCe ( Singapore)
13
Offshore Marine Contractors
14
Vietsovpetro (VSP) (Vietnam)
15
Timas Suplindo ( Indonesia)
16
Nippon Steel (Indonesia)
17
Newfield Peninsula Malaysia ( Malaysia)
18
Franklin Offshore ( Singapore)
19
M3 Energy ( Malaysia)
20
Sarku ( Malaysia)
21
Hako Offshore ( Singapore)
22
Global Industries ( Malaysia)
23
Sea Drill ( Singapore)
24
Origin Energy (Australia)
25
Swiber ( Singapore)
26
Galoc ( Philipines)
27
GFI ( Thailand)
PRE QUALIFICATION
Offshore Construction Specialists Pte Ltd.
Page 9 of 37
OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT 9. COMPLETED PROJECTS Pipeline Dia (“)
Length (km)
10”
0.8
6” Flexible
EOCP EMAS offshore Construction and Production
Scope Of Work
Location
0.1
Flood, Clean, Gauge and Hydrotest/Leak test
Gulf of Thailand
6 “ Spool 6” Flexible
0.7
Leak Test
65km off North West Coast of Palawan Island
Nexus
PLEM & Startup Heads
-
Leak Test
Singapore
Year
Project Title
Client
2007
GFI
EOCP EMAS offshore Construction and Production
2008
Galoc Development Project
2008 Nexus AustraliaBass Strait
2009
Asia Petroleum Development (APD) – Glagah Kambuna Field Development
PT Timas
14 “
42
Flood, Clean, Gauge and Hydrotest
From the Kambuna platform offshore North Sumatera to a landfall Northeast of Medan
2009
Star Petroleum Kakap Field Redevelopment
PT Timas
10”
11.2
6”
2
Flood, Clean, Gauge and Hydrotest
6”
2.3
Kakap Field located in the Indonesian West Natuna Sea
2009
M3nergy JDA Sdn Bhd/ CarigaliPTTEPI-JDA Block B-17
Franklin Offshore
11” Flexible
0.24
Leak Test
Offshore Malaysia
2010
HESS Ujung Pangkah Development
PT Timas
6”
5.5
12”
5.5
16”
5.5
Flood, Clean, Gauge, Hydrotest, Dewater, Air & Vacuum Dry and Nitrogen Packing
Ujung Pangkah, Gresik in Surabaya Indonesia
PRE QUALIFICATION
Offshore Construction Specialists Pte Ltd.
Page 10 of 37
OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT
Pipeline Dia (“)
Length (km)
PT Timas
18” 20” 20”
Kodeco Project
PT Timas
Chevron
EMAS
Year
Project Title
Client
2011
Kangean Energy Indonesia Limited – TSB Development
2011
2011
(Thailand)
2011
TSB Kangean
Scope Of Work
Location
25 5.5 5.5
Flood, Clean, Gauge and Hydrotest, Dewater, Dry and Nitrogen Packing
Bali Sea, approximately 120km from Pagerubgan Island
6”
7 km & 6km
Flood, Clean, Gauge and Hydrotest
Java Sea
10”
35 km & 35 km
Flood, Clean, Gauge and Hydrotest
Gulf Of Thailand
25.745 km & 5.2km
Flood, Clean, Gauge and Hydrotest, Dewater, Dry and Nitrogen Packing
Java Sea
16”
PT Timas
18” 20”
2012
Bawal
PT Timas
14”
40 km
Flood, Clean, Gauge and Hydrotest
Natuna Sea
2012
Bien Dong
DOF Subsea
6” flexible
400m
LeakTest
Vietnam
2013
Zawtika
L&T
18”
11.3 km & 9.7km
Flood, Clean, Gauge and Hydrotest
Myanmar
18” 2013
PTTEP Bongkot Riser Replacement
DOF Subsea
6”
80m
LeakTest
Gulf Of Thailand
2013
Pertamina EP MOL Project
Leighton Offshore
12”
28km
Flood, Clean, Gauge, Hydrotest and Dewater
Java Sea
2012
Pertamina UL Project
PT Timas
12”
12 km
Flood, Clean, Gauge and Hydrotest
Java Sea
PT Timas
20’ / 14”
500m/3.3 km
Flood, Clean, Gauge, Hydrotest
Java Sea
2012
Pertamina EP L-Parigi
PRE QUALIFICATION
Offshore Construction Specialists Pte Ltd.
Page 11 of 37
OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT
2014
Petronas Ketapang
PT Timas
12”
111 km
Flood, Clean, Gauge, Hydrotest, Dewater, Dry, N2 Pack.
2014
Petronas Ketapang
PT Timas
8/12”/16”
700 m each
Flood, Clean, Gauge, Hydrotest, .
PRE QUALIFICATION
Offshore Construction Specialists Pte Ltd.
Page 12 of 37
OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT GFI (Thailand) Pigging and Hydrotesting Photos (Nov 2007 to Jan 2008)
Flexible Riser Leak For M3nergy JDA Sdn Bhd / Carigali-PTTEPI - JDA Block B-17, Offshore Malaysia. ( Sep 2009) Photos
PRE QUALIFICATION
Offshore Construction Specialists Pte Ltd.
Page 13 of 37
OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT Star Energy (KAKAP) Pipeline Project– Pigging & Hydrotest (Oct 2009) Photos
Asia Petroleum Development (APD) Pigging and Hydrotesting. - Glagah Kambuna Field Development Project (Mar 2009) Photos
PRE QUALIFICATION
Offshore Construction Specialists Pte Ltd.
Page 14 of 37
OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT HESS (UJUNG PANGKAH) Pipeline Project– Pigging, Hydrotest, Dewatering, Drying & N2 Pack (Jan – Feb 2010) Photos
Chevron Thailand Project Pigging & Hydrotest (Jan – July 2010) Photos
PRE QUALIFICATION
Offshore Construction Specialists Pte Ltd.
Page 15 of 37
OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT Kangean Project Pigging, Hydrotest, Dewatering, Air drying and N2 packing (Aug- Nov 2011) Photos
Kodeco Project Pigging & Hydrotest (Oct - Dec 2011) Photos
PRE QUALIFICATION
Offshore Construction Specialists Pte Ltd.
Page 16 of 37
OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT Zawtika Project, 2013 Pigging & Hydrotest Photos
PRE QUALIFICATION
Offshore Construction Specialists Pte Ltd.
Page 17 of 37
OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT 18. EQUIPMENT DATA SHEETS OCS operates a comprehensive range of pre-commissioning equipment. Each piece of equipment has it own equipment passport which is maintained from project to project. This helps ensure that only appropriately maintained equipment is supplied to projects. A sample of our equipment passport is included below.
7.1.
FLOODING PUMP SERIES 1 FLOODING PUMP
- 03 Nos.
Capacity
320 Cu.m / Hr
Maximum Head
171 meters
Engine Make
Detroit Diesel 8V-92TA 450BHP
Pump Make
SLD 280-43 3
PRE QUALIFICATION
Offshore Construction Specialists Pte Ltd.
Page 18 of 37
OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT
PRE QUALIFICATION
Offshore Construction Specialists Pte Ltd.
Page 19 of 37
OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT
PRE QUALIFICATION
Offshore Construction Specialists Pte Ltd.
Page 20 of 37
OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT
7.2.
FEED PUMP FLOODING PUMP
- 02 Nos.
Capacity
1590 Cu.m / Hr
Maximum Head
25 meters
Engine Make
Detroit Diesel 8V-92TA 450BHP
Pump Make
SLOW350-380B
PRE QUALIFICATION
Offshore Construction Specialists Pte Ltd.
Page 21 of 37
OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT
PRE QUALIFICATION
Offshore Construction Specialists Pte Ltd.
Page 22 of 37
OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT
PRE QUALIFICATION
Offshore Construction Specialists Pte Ltd.
Page 23 of 37
OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT 7.3.
DIESEL DRIVEN FLOODING / JETTING PUMP SERIES 2 (HIGH PERFORMANCE) FLOODING PUMP
- 02 Nos.
Capacity
335 Cu.m / Hr
Maximum Head
260 meters
Engine Make
Detroit Diesel 12V-149TI 1130BHP
Pump Make
250SLD 450-60 4
PRE QUALIFICATION
Offshore Construction Specialists Pte Ltd.
Page 24 of 37
OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT
PRE QUALIFICATION
Offshore Construction Specialists Pte Ltd.
Page 25 of 37
OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT
PRE QUALIFICATION
Offshore Construction Specialists Pte Ltd.
Page 26 of 37
OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT 7.4.
DIESEL DRIVEN HIGH PRESSURE PUMP SERIES 2 (HIGH PERFORMANCE)
HIGH PRESSURE DISEL DRIVEN PUMP
- 01 Nos.
Capacity
180 liters / Minute
Maximum Pressure
7250 psig
Engine Make
Johndeere 160kw 6 cylinder diesel engine
Pump Make
Woma 2502 P40
PRE QUALIFICATION
Offshore Construction Specialists Pte Ltd.
Page 27 of 37
OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT
PRE QUALIFICATION
Offshore Construction Specialists Pte Ltd.
Page 28 of 37
OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT 7.5.
HIGH PRESSURE DISEL DRIVEN PUMP SERIES 1
HIGH PRESSURE DISEL DRIVEN PUMP
- 01 Nos.
Capacity
35-37 liters / Minute
Maximum Pressure
8000 psig
Engine Make
Isuzu 50 HP-4 cylinder (turbocharged & water cooled)
Pump Make
Den-Jet CD 40-550
7.6.
HIGH PRESSURE AIR DRIVEN PUMP
HIGH PRESSURE AIR DRIVEN PUMP
- 01 Nos.
Capacity
20 liters / Minute
Maximum Pressure
7,500 psig
Maximum Air Supply Pressure
125 psig
Pump Make
Haskel Model TP600-GSF-60
PRE QUALIFICATION
Offshore Construction Specialists Pte Ltd.
Page 29 of 37
OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT HIGH PRESSURE AIR DRIVEN PUMP
- 04 Nos.
Capacity
4 liters / Minute
Maximum Pressure
600 psig
Maximum Air Supply Pressure
120 psig
Pump Make
Hydraulics International HI Model 5L-SS-60
PRE QUALIFICATION
Offshore Construction Specialists Pte Ltd.
Page 30 of 37
OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT 7.7.
DEAD WEIGHT TESTER
DEAD WEIGHT TESTER + WEIGHT SET
- 02 Nos.
Make
DH –BUDENBERG MODEL 580 DX
Range
0-700 bar
Accuracy
0.025 %
Least Count
0.069 bar
PRE QUALIFICATION
Offshore Construction Specialists Pte Ltd.
Page 31 of 37
OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT 7.8.
PRESSURE/TEMPERATURE RECORDER PRESSURE RECORDER
- 03 Nos.
Make
BARTON
Range
0-5000 psi
Accuracy
± 1 % FS
TEMPERATURE RECORDER
- 02 Nos.
Make
SCOTECH
Range
0-50o C
Accuracy
± 1 % FS
PRESSURE-TEMPERATURE DUAL RECORDER
- 02 Nos.
Make
BARTON
Range
0-5000 psi/0-100o C
Accuracy
± 1 % FS
PRE QUALIFICATION
Offshore Construction Specialists Pte Ltd.
Page 32 of 37
OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT
7.9.
8 X 10 FT BREAK TANK (18 Cu.m Capacity) - 01 Nos
For storage and introducing freshwater slug during pigging/ dewatering of pipelines
PRE QUALIFICATION
Offshore Construction Specialists Pte Ltd.
Page 33 of 37
OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT 7.10.
VACUUM PUMP VACUUM PUMP Capacity Booster Make Pump Make
- 01 Nos. 1020 Cu.m / Hr Edwards mechanical booster Model EH1200, Hydrokinetic Drive Edwards high vacuum pump Serial 220. EIM 275
7.11. PRESSURE TRANSDUCER & READOUT) - 03 Nos. Type Make/ Range
750C, ABSOLUTE PRESSURE TRANSDUCER MKS 10 MILLIBAR , 100 MILLIBAR , 1000 MILLIBAR
Accuracy/ Input/ Output
1% OF FULL SCALE +13 TO +32 VDCINPUT, 0-10VDC O/P
- 02 Nos. Type
DIGITAL SUPPLY AND READOUT
Make/ Range
MKS
Input Power
PRE QUALIFICATION
220VAC
Offshore Construction Specialists Pte Ltd.
Page 34 of 37
OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT 7.12. HEATED REGENERATIVE DESICCANT AIR DRYER & AIR COOLED AFTER COOLER Regenerative compressed air dryer use desiccant to absorb water vapour from the compressed airstream. In the twin tower design, one tower dries the air from the After-cooler while the dessicant in the other tower is being regenerated to provide continuous operation. A heater is added to heat the purge air. It not only benefits the regeneration effect but also decreases regeneration purge loss. Desiccant: activated alumina + molecular sieve Purge air: <3 ~ 6% Working pressure: 24 barg Inlet oil content: < 0.1 mg/m3 Pressure dew point: - 40oC to - 50oC Inlet temperature: - 0oC to 45oC Capacity: 150 Nm3/min Heater: 50 kW Dimension: 2.9 x 2.2 x 3.5m Weight: 5.9 mT Lifting skid are mounted.
Air Cooled After Cooler is auxiliary equipment of air compressor, after which the high temperature and high pressure air is cooled. Most of the vapour is condensated and discharged out of compressor in order to meet the working conditions of downstream drying equipment. The medium of cooling is air. Capacity: 150 Nm3/min Power requirement: 2.5 kW Dimension: 2.9 x 2.2 x 3.5m Weight: 5.9 mT Lifting skid are mounted.
PRE QUALIFICATION
Offshore Construction Specialists Pte Ltd.
Page 35 of 37
OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT 7.13.
LIQUID N2 CONVERTER
1. Operating parameters: Design temperature load bearing/pressure retaining –20 Deg to + 50 Deg C. Design temperature machinery –20 Deg to + 50 Deg C. 2. Diesel Engine Detroit Diesel model 8V 71T Rated to produce 420 BHP @ 2100 RPM. (Continuous) 3.. Gearbox Marco 3 pad hydraulic pump drive gearbox Marco Gearbox will be enclosed coupled on engine flywheel 4. Start System Air starter 5 . Hydraulic System Twin Commercial hydraulic pumps for Low and High pumping rate, motors and relief valves. heat exchanger. 6. Cryogenic High Pressure System Paul triplex. Max. Pressure: 10,000 psi. Flow Rate: 3,000 SCFM. Discharge Temperature: 70oF. 7. Control Panel A stainless steel control panel 8. Skid/Frame
PRE QUALIFICATION
Offshore Construction Specialists Pte Ltd.
Page 36 of 37
OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT 19. ISO CERTIFICATION
PRE QUALIFICATION
Offshore Construction Specialists Pte Ltd.
Page 37 of 37
Page 11 of 12
ATTACHMENT # 5 OCS NATA Certification
Offshore Construction Specialists Pte. Ltd. 20 Toh Guan Road, CJ GLS Building, Singapore 608839 Tel: +65 6567 9080 Fax: +65 6567 8082
NATA Accredited Laboratory National Association of Testing Authorities, Australia (ABN 59 004 379 748)
has accredited
Offshore Construction Specialists Pte Ltd Singapore following demonstration of its technical competence to operate in accordance with
ISO/IEC 17025 This facility is accredited in the field of
MECHANICAL TESTING for the tests, calibrations and measurements shown on the Scope of Accreditation issued by NATA
Jennifer Evans Chief Executive Officer Date of accreditation:15 July 2013 Accreditation number:19122
NATA is Australia’s government-endorsed laboratory accreditor, and a leader in accreditation internationally. NATA is a signatory to the international mutual recognition arrangements of the International Laboratory Accreditation Cooperation (ILAC) and the Asia Pacific Laboratory Accreditation Cooperation (APLAC).
AP8-1-8 / Issue 1 / June 2011
Page 12 of 12
ATTACHMENT # 6 OCS Personnel CVs
Offshore Construction Specialists Pte. Ltd. 20 Toh Guan Road, CJ GLS Building, Singapore 608839 Tel: +65 6567 9080 Fax: +65 6567 8082
Sayed Dedy Mahdy Career Summary • • • •
4 Months University Field Practical, Tunu Field Development “Tunu Phase 8 EPSC 3 Project”- TotalFinaElf Indonesie. 9 Months as Field Engineer for PT. McConnell Dowell Indonesia. 1 year and 8 months working with PT McDermott Indonesia Currently working with Offshore Construction Specialists Pte. Ltd.
Experience Field Engineer June 2009 - January 2010 Amerada Hess Ujung Pangkah Phase 2, Indonesia
Offshore Construction Specialists Pte Ltd • •
Responsible for all Offshore Pigging Operation, Hydrotesting and Leak test of 3 subsea flowlines, 6”, 12” and 16” between WHP B and WHP A. Manage the offshore operation at site, together with the barge supt & the other field engineers. Work included the wellhead platform, WHP B installation, 6”, 12” and 16” flowline installation between WHP B and WHP A. Post trenching of 6”, 12” and 16” flowline.
Field Engineer Sept 2008 – May 2009 Asia Petroleum Development (APD) - Glagah Kambuna Project, Indonesia
Offshore Construction Specialists Pte Ltd • •
Responsible for all Offshore Pigging Operation, Hydrotesting and Leak test of 42 km 14” gas export pipeline from the Kambuna platform offshore North Sumatera to a landfall north east of Medan. Manage the offshore operation at site, together with the barge supt & the other field engineers. Work included 5 km beach approach, Pre and Post trenching of 13 km of the pipeline to a cover of 2.0 metres. Topsides installation and Hook up.
Offshore Construction Specialists Pte. Ltd. 20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839 Tel:+65 6567 9080 Fax: +65 6567 8082
Field Engineer November 2007 - January 2008 GFI Bualuang field development project, Bualuang Field, Thailand
Offshore Construction Specialists Pte Ltd • •
Responsible for all Offshore Pigging Operation, Hydrotesting and Leak test of 800mtr pipeline, Flexible risers and spools. Manage the offshore operation at site, together with the barge supt & the other field engineers. 1 jacket(sidelift & upend) + 1 deck + 2 pipeline (10 in) + 1 SPC + 1PLEM + 4 sp tie in (10 in) + 2 flexible riser (6 in) + 1 mooring hawser
Field Engineer November 2006 – October 2007 Project : Kerisi Field Development Phase II CPP Jacket and Deck Installation
PT. McDERMOTT INDONESIA Working with procedures and instruments preparation for 12”∅and 16”∅ spools hydrotesting. Responsible for almost all load out preparation for 3 material barges, 4 nos of Central Processing modules over 1000MT and 8 Legs Jacket load out for Central Processing Platform
Field Engineer November 2006 – October 2007 Project : Angel Project – Substructure Installation and Pipelay
PT. McDERMOTT INDONESIA Manage and supervise technical on field for fabrication of 5 sections Articulated Stinger and refurbishment 3 sections Articulated Stinger.
Field Engineer January 2007 – August 2007 Project : SSB T&I
PT. McDERMOTT INDONESIA Manage and supervise technical on field for structural modification 5 sections Articulated Gulf Of Mexico Stinger and refurbishment 3 sections Articulated Stinger and 1 section truss stinger.
Field Engineer August 2006 – September 2006 Project : Kerisi Field Development Phase I
PT. McDERMOTT INDONESIA Manage and supervise readiness of marine installation on field in subcontractor yard of 1420 MT Wellhead Platform and 1113 MT Jacket load out.
Field Engineer July 2006 – August 2006 Project : PM3 Camau – Gas Pipeline
PT. McDERMOTT INDONESIA As-built for survey for over 289 KM from Bunga Raya (Malaysian Area) to GDS (Vietnamese area) in Gulf Thailand. J. Ray McDermott Engineer representative on board to identification Offshore Construction Specialists Pte. Ltd. 20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839 Tel:+65 6567 9080 Fax: +65 6567 8082
free span and correction of the found free span. Over 45 days was spent offshore on board of Setouchi, Fugro Survey vessel
Field Engineer January 2006 – April 2006 Project : EMEPMI Seligi A- To Tapis Pump Pipeline Replacement
PT. McDERMOTT INDONESIA Prepared and manage of fabrication and refurbishment for engineering installation aid for 18”∅ crude pipeline installation, assisting in procedures and instruments preparation associated with pigging and hydrotesting. Over 60 days was spent offshore time on board DB30 to manage 21,2 KM 18”∅ crude pipeline installation, riser and two sub sea spool trough the commissioning stage.
Field Engineer December 2005 – January 2006 Contract Value USD 2.5m – PT. NewMont NTT. Batu Hijau-Scavenger Maintenance Phase I
PT. McCONNELL DOWELL INDONESIA Performance as Project Planner for Scavenger Shut Down Project on PT. NewMont NTT. Project Mobilization coordinator and controlling material take off.
Field Engineer April 2005 – December 2005 Contract Value USD 4.6m + USD 1,2m Variation – Kaltim Prima Coal Service Wharf and Shiploader Jetty Refurbishment.
PT. McCONNELL DOWELL INDONESIA Employed with PT McConnell Dowell Indonesia to manage the shiploader jetty and service wharf rehabilitation works contract. Contract involves the partial demolition and reinstatement of 15years old reinforced concrete service wharf at KPC and rehabilitation of Structural steel shiploader jetty paintwork.
Field Practical April 2002 - June 2002 Contract Value – USD 3.5m - Tunu Field Development Phase 8-EPSC 3, Aerial Pipe Installation
PT. CITRA PANJI MANUNGGAL • • • • • •
Preparing Pilling Equipment that Needed for Pilling Activities Responsible for daily Report Assisting Surveying Liaise with third Party Inspector Badan Kualifikasi Indonesia (BKI) Assisting with application of work Permit Assisting with safety procedures
Offshore Construction Specialists Pte. Ltd. 20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839 Tel:+65 6567 9080 Fax: +65 6567 8082
Education Bachelor of Engineering (Civil), Diponegoro University, 2004
On Job Training and Courses HUET – MSTS ASIA SDN. BHD, Johor Malaysia, 2006 Sea Survival – MSTS ASIA SDN. BHD, Johor Malaysia, 2006 Fire Fighting – MSTS ASIA SDN. BHD, Johor Malaysia, 2006 Wire Rope Inspector - Carl Stahl Evita Ltd, Batam Indonesia, February 2007 Field Engineer training 1st Module : General Topics, Singapore, 2007 Field Engineer training 2nd Module : Structural Installation, Singapore 2007 Incident Investigation training, Batam, Indonesia 2007 Task Risk Assessment training, Batam, Indonesia 2007
Firms Nov 2007 Jan 2006 to 8 Oct 2007 Apr 2005 to Dec 2005
Offshore Construction Specialist PT McDermott Indonesia PT Mc Connell Dowell Indonesia
Personal Details Date of Birth Age Nationality Languages Contacts
: : : :
November 29, 1979 34 Indonesian Citizenship Bahasa Indonesia – oral & written English – oral & written : Mobile +62-8127011155
Offshore Construction Specialists Pte. Ltd. 20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839 Tel:+65 6567 9080 Fax: +65 6567 8082
Offshore Construction Specialists Pte Ltd. 20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839 Tel: +65 6567-9080 / Fax: +65 6567-8082
CURRICULUM VITAE
PERSONAL DATA Name DOB Place / DOB Sex Marital Status Nationality Religion
: Roni : 20 August 1975 : Belawan : Male : Married : Indonesia : Moslem
DOCUMENT No 1
Document Passport
Number W 259674
Date Of Issued 30 Nov 2010
Date Of Expiry 30 Nov 2015
Place Of Issued Batam
CERTIFICATE OF COMPETENCY No
Certificate
Number
1.
BOSIET & Travel Safely by Boat
-
Date OF issued 24 Nov 2010
Date Of Expiry 23 Nov 2014
Place Of Issued Batam
WORK EXPERIENCES Pre-Comm Supervisor August 2013 to present Offshore Construction Specialists Pte Ltd Responsible for the maintaining High Pressure pumps and Flooding Pumps in good condition after project and prepare, function test of High Pressure pumps and Flooding Pumps before offshore work. Operate and ensure High Pressure Pumps and Flooding pump working in good condition for Precommissioning work. Page 1 of 2 Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressed permission is granted by Offshore Construction Specialists Pte Ltd.
Offshore Construction Specialists Pte Ltd. 20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839 Tel: +65 6567-9080 / Fax: +65 6567-8082
CURRICULUM VITAE Completed Project: No 1.
Company Neptune
Project SONSUB
2.
Neptune
SAIPEM
3.
Neptune
HYUNDAI
4.
Neptune
SWIBER
5.
Neptune
SWIBER
6.
Neptune
SUBSEA 7
7.
Neptune
SWIBER
8.
Neptune
SWIBER
9.
Neptune
HALLIN
10.
Neptune
CRUEZ
11.
Neptune
HALLIN
12.
Neptune
ALESTA
13.
Neptune
Seamat mattresses
position Grouting Tech Grouting Tech Grouting Tech Grouting Tech Grouting Tech
Location Thailand
Client PTT
Chinese
SAIPEM
Indonesia/ Kalimantan Brunei
TOTAL BSP SHELL
Brunei
BSP SHELL
Malaysia
Vessel Name BODO SUPLIER MERMAID OFFSHORE HYUNDAI OFFSHORE 1 SARKU 2000 SWIBER GLORIOUS
Grouting Tech Grouting Tech Grouting Tech Grouting Tech Grouting Tech Supervisor
Indonesia/ Aceh Indonesia/ Natuna Thailand
EXXON MOBIL CONOCO PHILLIPS PTT
CRUEZ SUPPOTER KENDAL
Grouting Tech Supervisor
Turkey/ Istanbul Brunei
DOGTAS
DEEP BLUE
BSP SHELL
ONSHORE
Brunei Myanmar
PETRONAS ROCK WATER 2 BSP SHELL SWIBER RESOLUTE SWIBER SWIBER PENRITH
Periode 10 Aug 2004 25 Sept 2004 18 Jun 2006 29 Jul 2006 09 Jul 2007 20 Aug 2007 06 Oct 2007 30 Dec 2007 07 May 2008 11 Jul 2008 15 Sept 2008 20 Oct 2008 05 Jan 2009 10 Mar 2009 05 Apr 2010 30 May 2010 27 Nov 2011 18 Jan 2012 08 Sep 2012 28 Oct 2012 31 Des 2012 29 Jan 2013 06 Feb 2013 04 Mar 2013 25 Mar 20013 16 May 2013
Page 2 of 2 Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressed permission is granted by Offshore Construction Specialists Pte Ltd.
Offshore Construction Specialists Pte Ltd. 20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839 Tel: +65 6567-9080 / Fax: +65 6567-8082
CURRICULUM VITAE
NAME: DATE OF BIRTH NATIONALITY MARITAL STATUS
KRISBEL SIMANJUNTAK 4 May 1963 Indonesian Married
EDUCATION/TRAINING
:
May 07, 2007. Basic Offshore Safety Induction & Emergency Training Including Additional OLF Modules (OPITO Approved) February 06, 2007. Confine Space Entry and Rescue.
LANGUAGES
Bahasa Indonesian (written and spoken) English (Fair Spoken)
Career Summary Over 26 years experience in maintain heavy equipment, engines, High Pressure pumps and flooding pumps, pipe fittings, operating related machinery. Work Experience
Mechanic Mar 2009 to present Offshore Construction Specialists Pte Ltd Responsible for the maintaining High Pressure pumps and Flooding Pumps in good condition after project and prepare, function test of High Pressure pumps and Flooding Pumps before offshore work. Operate and ensure High Pressure Pumps and Flooding pump working in good condition for Precommissioning work. Completed Projects Oct 2013 – Nov 2013 Offshore Construction Specialists Pte Ltd Project : Leighton Offshore Location : Jakarta - Cirebon S513 Main Oil Line from X-Ray Field to Balongan Plant Project Post Trenching, Free Span Correction, and Pre-commissiong Services Page 1 of 5 Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressed permission is granted by Offshore Construction Specialists Pte Ltd.
Offshore Construction Specialists Pte Ltd. 20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839 Tel: +65 6567-9080 / Fax: +65 6567-8082
CURRICULUM VITAE Task Description
Jetting Technician April 2013 – May 2013 Offshore Construction Specialists Pte Ltd Project : Brunei Shell Petroluem – Domgas Pipeline Installation Project Location : Bulan Bulan Field Development - Brunei Jetting services for the Pile Refusal Remedial Project Task Description Jetting Technician responsible for operating of jetting spread, monitoring the performance of equipment and troubleshooting the jetting equipment in the event of equipment breakdown.
Jetting Technician August 2012 – January 2013 Offshore Construction Specialists Pte Ltd Project : Chevron (Australia) – Domgas Pipeline Installation Project Location : Domgas Field Development, North West Coast of Australia Jetting services for the 6” & 20” pipeline 1.5 km and 5.9km CW-DW and PPP-DW installation Task Description Jetting Technician responsible for operating of jetting spread, monitoring the performance of equipment and troubleshooting the jetting equipment in the event of equipment breakdown.
Mechanic April 2012 to May 2012 Offshore Construction Specialists Pte Ltd Project : Conoco Philips Indonesia – Develop the Bawal Field Location : Bawal Field – Natuna Sea
Offshore Pigging and Hydrotesting work for 14” newly laid pipeline to connect the two Bawal wells (BW1 and BW2) to inline Tee and valve assemblies on the new pipeline, using rigid spools. Mechanic October 2011 – November 2011 Offshore Construction Specialists Pte Ltd Project : Korea Development Company LTD. – Gas Lift Compression Project. Location : Poleng Field – Gresik, West Java, Indonesia.
Offshore Pigging and Hydrotesting work for newly laid pipeline 6” Gas Lift Pipeline DW-PP and 6” Gas Lift DW-PP in total length 6.3 Km. Mechanic September 2011 – October 2011 Offshore Construction Specialists Pte Ltd Project : Kangean Energy Indonesia Ltd. –Pre-Commissioning Services for Subsea Facilities of TSB Field Development Page 2 of 5 Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressed permission is granted by Offshore Construction Specialists Pte Ltd.
Offshore Construction Specialists Pte Ltd. 20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839 Tel: +65 6567-9080 / Fax: +65 6567-8082
CURRICULUM VITAE Location : TSB Field, Kangean Block – Bali Sea Indonesia.
Offshore Pigging and Hydrotesting work on DSV.Crest Odyssey of 25.745km x 18” Rigid Pipeline and 2 nos of 5.2km x 20” Rigid Pipelines Mechanic February 2011 – July 2011 Offshore Construction Specialists Pte Ltd Project : CHEVRON 2011 INSTALLATION CAMPAIGN. PLATFORMS AND PIPELINES INSTALLATION Location : Chevron Thailand Oil and Gas Fields, Gulf of Thailand Flooding and gauging work of newly laid pipelines: 16” NPPLL, 5.4 Km Long Pipeline 10” FUPLP, 5.9 Km Long Pipeline 10” PDPLB, 6,7 Km Long Pipeline 10” KPPLG, 2.7 Km Long Pipeline 10” ERPLZC, 2.4 Km Long Pipeline As well leak testing of spools before subsea tie in of: NPWL Platform (3 ea x 16” Spools) FUWP Platform (2 ea x 10” Spools) PDWB Platform (5 ea x 10” Spools) KPWG Platform (2 ea x 10” Spools) ERWZC Platform (2 ea x 10” Spools) Mechanic January 2010 – March 2010 Offshore Construction Specialists Pte Ltd Project : Hess (Indonesia – Pangkah) Ltd. – Ujung Pangkah Development Project. Location : Ujung Pangkah oil & gas field, East Java. Indonesia Pigging, Hydrotesting and Leak test work of 3 subsea flowlines, 6”, 12” and 16” between WHP B and WHP A.
Mechanic August 2009 to November 2009 Offshore Construction Specialists Pte Ltd Project : Star Energy Ltd. – Kakap Gas Development Project. Location : Kakap Field West Natuna, Indonesia. Offshore Pigging and Hydrotesting work for newly laid pipeline: 6” gas flowline, 2.3 Km long, KG-West 1 subsea wellhead to KG Platform, 6” gas flowline, 2 Km long, Lukah-1X subsea wellhead to KG Platform 10” pipeline 11.2 Km long. KG Platform to KF Platform Mechanic and Project Leader Man March 2009 - June 2009 Offshore Construction Specialists Pte Ltd Project
: Serica Energy – Asia Petroleum Development Project Page 3 of 5
Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressed permission is granted by Offshore Construction Specialists Pte Ltd.
Offshore Construction Specialists Pte Ltd. 20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839 Tel: +65 6567-9080 / Fax: +65 6567-8082
CURRICULUM VITAE Location : Gelagah Kambua Field Development, Malacca Strait, North Sumatra, Indonesia Diameter 14” 42 Km long Pipeline installations from WHP Kambuna A to onshore receiving facilities, 5km beach pull preparation operation (trenching Work), 10km jetting operation, lowering pipeline 2mtr TOP. Pre-commissioning of laid pipeline Task Description Mechanic & Leader man on 5KM trenching work from near shore to shore for beach pull operation, ensure the generator, air compressor and 2 unit of excavator running in good condition for 24hrs trenching operation. Maintain 24hrs operation on 5 unit jetting pumps during jetting operation and precommissioning job including pigging operation and hydrotesting of Dia. 14”, 42 KM pipeline.
Mechanic 1 February 2002 – August 2008 J.Ray McDermott, Location : Batam, Indonesia Marine onshore facility maintenance and projects preparation. Task Description Maintain all running heavy equipments in marine onshore facilities to ensure working in best performance. Refurbish and prepare including function test of marine E&M equipment before send to offshore for project including forklift, loader, Skagit Winch, Hydraulic Hammer, Generators, Compressors. Special in preparing flooding pumps and high pressures pumps for offshore use.
Mechanic and Project Leader Man March 2006 – July 2006 J.Ray McDermott Project : PM3-Camau (Offshore Gas Pipeline Installation) Location : Vietnam Dia.16” 300KM long Pipeline installation. Beach pull preparation, 6KM trenching from near shore to shore operation to buried pipeline in various depth from 4mtr near shore to 6mtr at offshore Task Description Mechanic & Leader man on 6KM trenching work from near shore to shore for beach pull operation, ensure the generator, air compressor and 2 unit of excavators running in good condition for 24hrs trenching operation. Maintain 24hrs operation on 6 unit jetting pumps during jetting operation.
Mechanic 1 May 1990 – July 1999 PT. McDermott Indonesia Location : Batam, Indonesia Fabrication yard facility maintenance Task Description Maintain all running heavy equipments and engines in Batam fabrication yard including: fork lift, hydraulic crane, loader, generators and compressors.
Page 4 of 5 Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressed permission is granted by Offshore Construction Specialists Pte Ltd.
Offshore Construction Specialists Pte Ltd. 20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839 Tel: +65 6567-9080 / Fax: +65 6567-8082
CURRICULUM VITAE Mechanic Helper August 1987 – June 1989 PT. Barakaz Lumber Coy Location : Riau, Indonesia Logging Operation Task Description Helping mechanic in maintain heavy equipment including Bulldozer, Low Vehicle Trailer, Fork Lift, Compressors and Generators.
Page 5 of 5 Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressed permission is granted by Offshore Construction Specialists Pte Ltd.
Offshore Construction Specialists Pte Ltd. 20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839 Tel: +65 65679080 / Fax: +65 65678082
CURRICULUM VITAE Mohd Zakaria Bin Abdul Aziz
Mechanic / Technician Nationality: Malaysian Date of Birth: 11-March-1986 Marital Status: Single Languages: English and Bahasa Melayu
Education / Training
High School Graduate Basic Offshore Safety Induction & Emergency Training Including Additional OLF Modules and Travel Safety By Boat (OPITO Approved)-Validity 06-Jan-2015
Career Summary Eight years of experience in offshore construction and engineering as a technician commissioning team. Specialists in Pipeline Pigging, Flooding, Hydro Test, Dewatering, Drying, Nitrogen Purging, Commissioning & Decommissioning He start his career in November 2004 in Oil and Gas Pipeline Installation and commissioning and he’s project completion and work experience in Malaysia and Singapore.
During his time as a technician, he gained much experience in the offshore jobs for Cleaning, Hydro Testing, Dewatering, Drying and Nitrogen Packing. He is also familiar with the Blowing, Flushing and Leak Testing jobs.
Work Experience Mechanic Jan 2010 to present Offshore Construction Specialists Pte Ltd
Page 1 of 6 Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressed permission is granted by OCS
Offshore Construction Specialists Pte Ltd. 20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839 Tel: +65 65679080 / Fax: +65 65678082
CURRICULUM VITAE Responsible for the maintaining High Pressure pumps and Flooding Pumps in good condition after project and prepare, function test of High Pressure pumps and Flooding Pumps before offshore work. Operate and ensure High Pressure Pumps and Flooding pump working in good condition for Precommissioning work.
Completed Projects:
Mechanic July 2013 – August 2013 Offshore Construction Specialists Pte Ltd Project : TIMAS-EHMRS Location : Indonesia – South China Sea Provision of Engineering Services and Subcontract Equipment associated with the installation of Flexible flowlines for COPI Belanak Project Precom Technican July 2013 Project: Hess Exploration & Production Malaysia BV. FPSO for FPSO North Malay Basin – Grouting Project Location: North Malay Basin (Kota Bahru) Kamelia Field – precommissiong work for Flooding Production, Storage and offloading vessel Lewek Arunothai.
Mechanic January 2013 – April 2013 Offshore Construction Specialists Pte Ltd Project : Asian Energy Services – AES VSP Dangdo Thang Long Launch Location : Su Tu Vang Field, Thang Long-Dong Do Field, Vietnam The preparation, rig up and execution of the jacket launch. The jacket weighed 4100mT was loaded and launch off the launch engineering, procedure preparation, physical barge rig up and site supervision and management of the launch operation, while Asian Energy performed the launch and transportation engineering.
Mechanic August 2012 – January 2013 Offshore Construction Specialists Pte Ltd Project : Chevron (Australia) – Domgas Pipeline Installation Project Location : Domgas Field Development, North West Coast of Australia Jetting services for the 6” & 20” pipeline 1.5 km and 5.9km CW-DW and PPP-DW installation Task Description Jetting Technician responsible for operating of jetting spread, monitoring the performance of equipment and troubleshooting the jetting equipment in the event of equipment breakdown. Page 2 of 6 Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressed permission is granted by OCS
Offshore Construction Specialists Pte Ltd. 20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839 Tel: +65 65679080 / Fax: +65 65678082
CURRICULUM VITAE
Mechanic April 2012 to May 2012 Offshore Construction Specialists Pte Ltd Project : Conoco Philips Indonesia – Develop the Bawal Field Location : Bawal Field – Natuna Sea
Offshore Pigging and Hydrotesting work for 14” newly laid pipeline to connect the two Bawal wells (BW1 and BW2) to inline Tee and valve assemblies on the new pipeline, using rigid spools. Mechanic September 2011 – October 2011 Offshore Construction Specialists Pte Ltd Project : Kangean Energy Indonesia Ltd. –Pre-Commissioning Services for Subsea Facilities of TSB Field Development
Location : TSB Field, Kangean Block – Bali Sea Indonesia. Offshore Pigging and Hydrotesting work on DSV.Crest Odyssey of 25.745km x 18” Rigid Pipeline and 2 nos of 5.2km x 20” Rigid Pipelines Mac 2011 – May 2011 Offshore Construction Specialists Pte Ltd Project : Dai Hung Field Development VSP -WHP DH2 JACKET LAUNCH Project Location : VietsovPetro, Vung Tau, Vietnam Commence reeving of port side sheave blocks using a messenger to pull 56mm wire through 500T construction blocks back to 70t hydraulic winch. ‘Straight’ lace configuration. Launched with VSP-05 (WD ~100m)
EMAS - Chevron Offshore (Thailand) Ltd.
HESS (Indonesia-Pangkah) Ltd Phase II Transportation and Installation Location - Surabaya, East Java Sea, Indonesia Transport of CPP Deck, AUP Deck and LQ, Compression module, Bridges and flare boom CPP and AUP Jackets were installed during the first campaign in the 4th Quarter 2010 utilizing the DLB QP 2000. CPP and AUP jackets are 4 legged jackets with an approximate unit weight of 300 tonne and 48” diameter steel pile foundations. The piles were driven with a MHU270T to 95 meter penetration.
HESS Ujung Pangkah –Phase 1 Location - East Java Sea, Indonesia Transporation and Installation of one 8 legged Well Head platform (WHP-B) and 3 pipelines (6” Gas lift, 12” Oil and 16” Gas) x ~5.5km between WHP-B and WHP-A (existing) including precommissioning.
Page 3 of 6 Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressed permission is granted by OCS
Offshore Construction Specialists Pte Ltd. 20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839 Tel: +65 65679080 / Fax: +65 65678082
CURRICULUM VITAE
Kakap Field KG Gas Development Project – Provision of EPCI of KG Gas Development Project Services including pre-commissioning.
Project: Client: Year: Scope of work:
REINSTATEMENT TEST FOR CAKERAWALA TOP SIDE N2 HE LEAK TEST FOR BULAN A Pertonas Carigali (Dec) 2007 Leak testing.
Project: Client: Year: Scope of work:
EPCC of Segamat Compressor Station Expansion Project PETRONAS GAS (July) 2007 Blowing,Flushing,Hydrotesting and Nitrogen Packing
Project:
EPCC of Nutral Gas Disiribution to Semenyih FL stage 1/05 Jalan Persekutuan 1 Semenyih-Beranang Gas Malaysia (Mar) 2007
Client: Year:
SCOPE OF WORK: CLEANING, HYDRO TEST, DEWATERING, DRYING, NITROGEN PACKING.
Project: Client: Year: Scope of work:
Project: Client: Year: Scope of work:
Project: Client: Year: Scope of work:
EPCC of Nutral Gas Disiribution to Kundang FL DL stage 1/05 Kundang Sungai Buloh Selangor. Gas Malaysia (Jan) 2006 Cleaning,Hydro Test,Dewatering,Drying,Nitrogen Packing
EPCC of Nutral Gas Disiribution to Setiawan FL stage 2/05 Setiawan Perak. Gas Malaysia (Feb)2006 Cleaning,Hydro Test,Dewatering,Drying,Nitrogen Packing.
EPCC of Nutral Gas Disiribution to Kapar FL stage 1/05,Kapar Klang Selangor. Gas Malaysia (Jan) 2006 Cleaning,Hydro Test,Dewatering,Drying,Nitrogen Packing.
Page 4 of 6 Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressed permission is granted by OCS
Offshore Construction Specialists Pte Ltd. 20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839 Tel: +65 65679080 / Fax: +65 65678082
CURRICULUM VITAE Project: Client: Year: Scope of work:
Project: Client: Year: Scope of Work:
PROJECT: Client: Year: Scope of Work:
Project: Client: Year: Scope of work:
Project: Client: Year: Scope of work: Project: Client: Year: Scope of work:
Project: Client:
EPCC of Nutral Gas Distribution System to Sungai Buloh FL Stage 3/05, Sungai Buloh selango Gas Malaysia. (Dec)2005 Cleaning, Hydro Test, Dewatering, Drying and Nitrogen Packing.
EPCC of GPRW at Road B15 From SKVE to KVDT Precint 11, Putrajaya Selangor. Gas Malaysia. (Dec)2005 Cleaning, Hydro Test, Dewatering, Drying and Nitrogen Packing.
EPCC OF NUTRAL GAS DISTRIBUTION SYSTEM TO NORTH PORT FL DL STAGE 1/05, PORT KLANG SELANGOR. Gas Malaysia. (Nov)2005 Cleaning, Hydro Test, Dewatering, Drying and Nitrogen Packing.
EPCC of Nutral Gas Disiribution to Bukit Rambai FL DL Stage 1/05 Bukit Rambai Melaka Gas Malaysia (Oct) 2005 Cleaning,Hydro Test,Dewatering,Drying,Nitrogen Packing
EPCC of Nutral Gas Disiribution to Tangga Batu FL DL Stage 1/05 Tangga Batu Area Melaka. Gas Malaysia (Sept)2005 Cleaning, Hydro Test, Dewatering, Drying, Nitrogen Packing. EPCC of Nutral Gas Disiribution System to Ayer Keroh FL DL Stage 1/04, Industri Area Ayer Keroh Melaka. Gas Malaysia. (Sept)2005 Cleaning, Hydro Test, Dewatering, Drying and Nitrogen Packing.
EPCC of Nutral Gas Disiribution to Ijok FL Stage 1/05, Ijok, Kuala Selangor Gas Malaysia Year: (Jun) 2005
Page 5 of 6 Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressed permission is granted by OCS
Offshore Construction Specialists Pte Ltd. 20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839 Tel: +65 65679080 / Fax: +65 65678082
CURRICULUM VITAE SCOPE OF WORK: CLEANING, HYDRO TEST, DEWATERING, DRYING, NITROGEN PACKING.
Project: Client: Year: Scope of work:
Project: Client: Year: Scope of work:
EPCC of Nutral Gas Disiribution System to Pasir Gudang FL DL Stage 1/05, Pan Century Edible Oils Sdn Bhd. Gas Malaysia. (Sept)2005 Cleaning, Hydro Test, Dewatering, Drying and Nitrogen Packing.
EPCC of Nutral Gas Disiribution to Pulau Indah-Westport FL Stage 1/05, Pulau Indah Port Klang, Selangor. Gas Malaysia (May)2005 Cleaning, Hydro Test, Dewatering, Drying and Nitrogen Packing.
Page 6 of 6 Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressed permission is granted by OCS
Offshore Construction Specialists Pte Ltd. 20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839 Tel: +65 6567-9080 / Fax: +65 6567-8082
CURRICULUM VITAE
NAME:
INDRA JAYA
DATE OF BIRTH NATIONALITY MARITAL STATUS
24 February 1979 Indonesian Married
EDUCATION/TRAINING
:
• • • • • • • •
Technical High School, Dabo Singkep Alkon, “Pressure vessel training” JRM, In-house, “Confined Space Entry And Rescue Training” JRM, In-house, “PTW Performing Training” JRM, In-house, “Pressure Vessel Training” JRM, In-house, “Dead Weight Tester Operating Training” AST, “ Over Head Crane Training” JRM, In-house, “BBSM”
LANGUAGES
Bahasa Indonesian (written and spoken) English (Fair Spoken)
Career Summary Over 7 years experience in repair and maintain instrumentation for pressure, temperature and flow measurement device i.e. Dead Weight Tester, Pressure Recorder, Pressure Gauge, Temperature Gauge, Temperature Recorder, Turbine Flow Meter, Pinger Detector, Subsea Temperature device, for offshore pre-commissioning work including in-house calibration check, pipe fittings, familiar with rigging certification system and operating related machinery.
Instrument Technician March 2012 to present Offshore Construction Specialists Pte Ltd Responsible for the maintaining small flow High Pressure pumps, Pressure, Temperature and Flow measurement device for Pigging and hydrotesting operation and grouting for the following projects in Indonesia, Brunei and Myammar.
Page 1 of 3 Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressed permission is granted by Offshore Construction Specialists Pte Ltd.
Offshore Construction Specialists Pte Ltd. 20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839 Tel: +65 6567-9080 / Fax: +65 6567-8082
CURRICULUM VITAE Current Project: Work Experience
Technician/Mechanic Oct 2013 – Nov 2013 Offshore Construction Specialists Pte Ltd Project : Leighton Offshore Location : Jakarta - Cirebon S513 Main Oil Line from X-Ray Field to Balongan Plant Project Post Trenching, Free Span Correction, and Pre-commissiong Services Task Description Sep to Oct 2013 Offshore Construction Specialists Pte Ltd Project Location
: Su Tu Vang North East Development Project : Vietnam
Task Description Responsible for performing the cleaning, gauging, flooding, hydrostatic testing of pipelines Hydrotesting & Precommissioning.
April 2013 – May 2013 Offshore Construction Specialists Pte Ltd Project : Swiber Shell - Air Lift Jetting Location : Bulan Bulan Field Development - Brunei Jetting services for the Pile Refusal Remedial Project Task Description Jetting Technician responsible for operating of jetting spread, monitoring the performance of equipment and troubleshooting the jetting equipment in the event of equipment breakdown.
Mechanic January 2013 – April 2013 Offshore Construction Specialists Pte Ltd Project : PTTEPI – Installation of WP1, 2 and 3 well platforms and Intrafield Sealines Location : Zawtika Field Development Project Phase I - Myamar Offshore Pigging and Hydrotesting work on LTS 3000 for installation of WP1, 2, 3 Well Platforms including Jackets, Piles, jacket appurtenances and decks and WP2-ZPQ and WP3-ZPQ infield pipelines.
Page 2 of 3 Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressed permission is granted by Offshore Construction Specialists Pte Ltd.
Offshore Construction Specialists Pte Ltd. 20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839 Tel: +65 6567-9080 / Fax: +65 6567-8082
CURRICULUM VITAE Mechanic April 2012 to May 2012 Offshore Construction Specialists Pte Ltd Project : Conoco Philips Indonesia – Develop the Bawal Field Location : Bawal Field – Natuna Sea Offshore Pigging and Hydrotesting work for 14” newly laid pipeline to connect the two Bawal wells (BW1 and BW2) to inline Tee and valve assemblies on the new pipeline, using rigid spools.
Hydrotesting Instrument Technician 26 January 2006 to 28 Feb 2012 PT. McDermott Indonesia Responsible for good condition instrumentation Maintenance of condition.
the maintaining all hydrotesting instrumentations and related equipment and gears in for onshore and offshore pre-commissioning work. Preparation of all related and hydrotesting gears, work side by side with field engineer for offshore work. all JRM stinger for all air lines and water lines and tanks in good and water tight
Project Involved : • • • • • • • • • • • • • • •
Camau Project Kerisi Project Esso Project SUTUVANG Project Sutuden Project Rubi Project Guntong A Project Guntong B Project Dai Hung Project Bien Dong Project TGT Project Angel Project Chevron Project Sakhalin Project Macedon Project
Page 3 of 3 Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressed permission is granted by Offshore Construction Specialists Pte Ltd.
Offshore Construction Specialists Pte Ltd. 20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839 Tel: +65 6567-9080 / Fax: +65 6567-8082
CURRICULUM VITAE
NAME:
BUDIMAN SAGALA
DATE OF BIRTH NATIONALITY MARITAL STATUS MOBIL EDUCATION/TRAINING
16 Jul 1983 Indonesian Single :+6281370977227 :
• • • • • •
+6281372223565
May 03, 2008 (MSTS) Tropical Basic Offshore Safety Induction & Emergency with EBS May 18, 2007 (J.Ray McDermott) Permit To Work December 21, 2006 (J.Ray McDermott) Confined Space Entry And Rescue November 27, 2006 (Indonesia Labor Department) Hoist Crane Operator May 2006, (DH. Budenberg) Dead Weight Tester Usage and Maintenance April, 2004 (Carl Stahl Evita Ltd), Level 1, Wire Rope Inspector
LANGUAGES
Bahasa Indonesian (written & spoken) English (fair spoken)
Career Summary Over 12 years experience in repair and maintain instrumentation for pressure, temperature and flow measurement device i.e. Dead Weight Tester, Pressure Recorder, Pressure Gauge, Temperature Gauge, Temperature Recorder, Turbine Flow Meter, Pinger Detector, Subsea Temperature device, for offshore pre-commissioning work including in-house calibration check, pipe fittings, familiar with rigging certification system and operating related machinery. Work Experience
Instrument Technician March 2009 to present Offshore Construction Specialists Pte Ltd Responsible for the maintaining small flow High Pressure pumps, Pressure, Temperature and Flow measurement device for Pigging and hydrotesting operation for the following projects in Indonesia, Thailand and Myammar.
Page 1 of 5 Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressed permission is granted by Offshore Construction Specialists Pte Ltd.
Offshore Construction Specialists Pte Ltd. 20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839 Tel: +65 6567-9080 / Fax: +65 6567-8082
CURRICULUM VITAE Completd Project: Technician Jul 2013 – Sep 2013 Offshore Construction Specialists Pte Ltd Project : PERTAMINA EP - REROUTE GAS PL L-PARIGI-CILAMAYA Location : PT TIMAS SUPLINDO,INDONESIA Provision of Engineering Services associated with the Provision of Hot Tap and pipeline Lima complex by pass, perform the pipeline pre-commissioning on the assumption that the scope is as Flooding and gauging, hydrotesting, bulk dewatering and nitrogen packing to 5 psi pressure.
Technician Nov – Dec 2013 Offshore Construction Specialists Pte Ltd Project : PT Timas Suplindo Location : Jakarta UL Project Pre-commissiong Services
Task Description Oct 2013 – Nov 2013 Offshore Construction Specialists Pte Ltd Project : Leighton Offshore Location : Jakarta - Cirebon S513 Main Oil Line from X-Ray Field to Balongan Plant Project Post Trenching, Free Span Correction, and Pre-commissiong Services Task Description Jan 2013 – Apr 2013 Offshore Construction Specialists Pte Ltd Project : PTTEP MYANMAR – L&T-Zawtika Grouting Project Location : PTTEP INTERNTIONAL LIMITED, Gulf of Moattama, Myanmar Zawtika Field Development Project Phase 1A EPCI for WP1, WP2, WP3 and Intrafield Sealines – Flooding, Gauging and Hydrotesting of pipeline.
Technician November 2012 Offshore Construction Specialists Pte Ltd Project : Galoc Ph 2 Development – Leak Testing for 6” Flexible pipeline Project Location : Bien Dong Development Field - Vietnam Leak test for flexible riser and flowlines for 1 off 3” Fuel Gas Riser (347.5 m length, 76.2 mm ID) + 3” Fuel Gas Flowline (2060 m length, 76.2 mm ID)
Page 2 of 5 Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressed permission is granted by Offshore Construction Specialists Pte Ltd.
Offshore Construction Specialists Pte Ltd. 20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839 Tel: +65 6567-9080 / Fax: +65 6567-8082
CURRICULUM VITAE 2 off 7” condensate riser (355.7 m and 365.5 m length, 177.8 mm ID) + 7” condensate flowline (2060 m length, 177.8 mm ID). Task Description Leak test for flexible riser and flowlines for 1 off 3” Fuel Gas Riser (347.5 m length, 76.2 mm ID) + 3” Fuel Gas Flowline (2060 m length, 76.2 mm ID) and 2 off 7” condensate riser (355.7 m and 365.5 m length, 177.8 mm ID) + 7” condensate flowline (2060 m length, 177.8 mm ID).
Technician October 2011 – November 2011 Offshore Construction Specialists Pte Ltd Project : Korea Development Company LTD. – Gas Lift Compression Project. Location : Poleng Field – Gresik, West Java, Indonesia. Offshore Pigging and Hydrotesting work for newly laid pipeline 6” Gas Lift Pipeline DW-PP and 6” Gas Lift DW-PP in total length 6.3 Km.
Technician September 2011 – October 2011 Offshore Construction Specialists Pte Ltd Project : Kangean Energy Indonesia Ltd. –Pre-Commissioning Services for Subsea Facilities of TSB Field Development Location : TSB Field, Kangean Block – Bali Sea Indonesia. Offshore Pigging and Hydrotesting work on DSV.Crest Odyssey of 25.745km x 18” Rigid Pipeline and 2 nos of 5.2km x 20” Rigid Pipelines
Technician February 2011 – July 2011 Offshore Construction Specialists Pte Ltd Project : CHEVRON 2011 INSTALLATION CAMPAIGN. PLATFORMS AND PIPELINES INSTALLATION Location : Chevron Thailand Oil and Gas Fields, Gulf of Thailand Flooding and gauging work of newly laid pipelines: 16” NPPLL, 5.4 Km Long Pipeline 10” FUPLP, 5.9 Km Long Pipeline 10” PDPLB, 6,7 Km Long Pipeline 10” KPPLG, 2.7 Km Long Pipeline 10” ERPLZC, 2.4 Km Long Pipeline As well leak testing of spools before subsea tie in of: NPWL Platform (3 ea x 16” Spools) FUWP Platform (2 ea x 10” Spools) PDWB Platform (5 ea x 10” Spools) KPWG Platform (2 ea x 10” Spools) ERWZC Platform (2 ea x 10” Spools)
Technician January 2010 – March 2010 Page 3 of 5 Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressed permission is granted by Offshore Construction Specialists Pte Ltd.
Offshore Construction Specialists Pte Ltd. 20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839 Tel: +65 6567-9080 / Fax: +65 6567-8082
CURRICULUM VITAE Offshore Construction Specialists Pte Ltd Project : Hess (Indonesia – Pangkah) Ltd. – Ujung Pangkah Development Project. Location : Ujung Pangkah oil & gas field, East Java. Indonesia Pigging, Hydrotesting and Leak test work of 3 subsea flowlines, 6”, 12” and 16” between WHP B and WHP A.
Technician August 2009 to November 2009 Offshore Construction Specialists Pte Ltd Project : Star Energy Ltd. – Kakap Gas Development Project. Location : Kakap Field West Natuna, Indonesia. Offshore Pigging and Hydrotesting work for newly laid pipeline: • 6” gas flowline, 2.3 Km long, KG-West 1 subsea wellhead to KG Platform, • 6” gas flowline, 2 Km long, Lukah-1X subsea wellhead to KG Platform 10” pipeline 11.2 Km long. KG Platform to KF Platform
Technician November 2008 – June 2009 Offshore Construction Specialists Pte Ltd Project : Gelagah Kambuna Field Development Location : Malacca Strait, North Sumatra, Indonesia Diameter 14” 42 Km long Pipeline installations from WHP Kambuna A to onshore receiving facilities, 5km beach pull preparation operation (trenching Work), 10km jetting operation, lowering pipeline 2mtr TOP. Pre-commissioning of laid pipeline Task Description Preparation of pre-commissioning equipments for Pigging and Hydrotesting operation. Set up offshore flooding and pigging operation for Diameter 14” 42 Km long newly laid Pipeline ensure sea water chemical treatment composition against sea water as per company spec. Set up hydrotesting of Diameter 14” 42 Km long newly laid Pipeline, operating Dead weight tester, monitor pressure and volume indicator on hydrotesting operation on site under supervision of Pre-commissioning/Project Engineer.
Technician November, 2008 – June, 2009 J.Ray McDermott Project : Shell Malaysia Location : Terengganu, Malaysia Task Description Preparation of pre-commissioning equipments for Pigging and Hydrotesting operation. Ensure all required fittings to be complete for Pigging and hydrotesting set up. Set up offshore flooding and pigging operation for Diameter 14” 10km long pipeline and Diameter 28” 9km long pipeline, ensure sea water chemical treatment composition against sea water as per company spec. Set up hydrotesting of Diameter 14” 10km long pipeline and Diameter 28” 9km long pipeline, operating Dead
Page 4 of 5 Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressed permission is granted by Offshore Construction Specialists Pte Ltd.
Offshore Construction Specialists Pte Ltd. 20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839 Tel: +65 6567-9080 / Fax: +65 6567-8082
CURRICULUM VITAE weight tester, monitor pressure and volume indicator on hydrotesting operation on site under supervision of Pre-commissioning/Project Engineer.
Instrumentation Technician July 2001 – October 2008 J.Ray McDermott Marine Instrumentation and Rigging Certification Division Task Description Prepare of instrumentation for offshore pre-commissioning work. Ensure all pressure and temperature measurement device i.e. Dead Weight Tester, Pressure Gauges, Temperature Gauge, Pressure Recorder, Temperature Recorder, Holiday Detector, Pinger, Pinger Detector, Turbine Flowmeter and etc. in valid certificate and in-house checking all the mentioned instrumentation after project for maintenance. Responsible of Leak test for offshore project installation aid fabricated in marine workshop i.e. Pig Launcher, Pig Receiver, Spool Pipe and Test Header and etc. Function test all the J.Ray McDermott Asia Pacific Stinger after maintenance in Batam, Marine facility before attached to all J.Ray McDermott Pipe Lay Barge. Responsible as well for ensure all rigging and lifting gears to be color coded and ensure all rigging to be with valid certificate before send to offshore project.
Page 5 of 5 Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressed permission is granted by Offshore Construction Specialists Pte Ltd.
Offshore Construction Specialists Pte Ltd. 20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839 Tel: +65 6567-9080 / Fax: +65 6567-8082
CURRICULUM VITAE
NAME: DATE OF BIRTH NATIONALITY MARITAL STATUS LANGUAGES
IDHAM JAWAHIR 1 Jul 1972 Indonesian Married Bahasa Indonesian (written & spoken) English (fair spoken)
Career Summary Over 8 years’ of experience in offshore construction and engineering as a technician commissioning team. Specialists in Pipeline Pigging, Flooding, Hydro Test, Dewatering, Drying, Nitrogen Purging, Commissioning & Decommissioning. Work Experience
Grouting/Pre-com March 2012 to present Offshore Construction Specialists Pte Ltd Responsible for the maintaining High Pressure pumps and Flooding Pumps in good condition after project and prepare, function test of High Pressure pumps and Flooding Pumps before offshore work. Operate and ensure High Pressure Pumps and Flooding pump working in good condition for Precommissioning work. Completed Project: Precom Supervisor September to October 2013 Offshore Construction Specialists Pte Ltd Oct 2013 – Nov 2013 Offshore Construction Specialists Pte Ltd Project : Leighton Offshore Location : Jakarta - Cirebon S513 Main Oil Line from X-Ray Field to Balongan Plant Project Post Trenching, Free Span Correction, and Pre-commissiong Services
Task Description Project Location
: Su Tu Vang North East Development Project : Vietnam Page 1 of 3
Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressed permission is granted by Offshore Construction Specialists Pte Ltd.
Offshore Construction Specialists Pte Ltd. 20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839 Tel: +65 6567-9080 / Fax: +65 6567-8082
CURRICULUM VITAE Task Description Responsible for performing the cleaning, gauging, flooding, hydrostatic testing of pipelines the Hydrotesting & Precommissioning
Precom Supervisor July 2013 Project: Hess Exploration & Production Malaysia BV. FPSO for FPSO North Malay Basin – Grouting Project Location: North Malay Basin (Kota Bahru) Kamelia Field – precommissiong work for Flooding Production, Storage and offloading vessel Lewek Arunothai. Precom Supervisor January 2013 – April 2013 Project : PTTEP MYANMAR – L&T-Zawtika Grouting Project Location : PTTEP INTERNTIONAL LIMITED, Gulf of Moattama, Myanmar Zawtika Field Development Project Phase 1A EPCI for WP1, WP2, WP3 and Intrafield Sealines – Flooding, Gauging and Hydrotesting of pipeline.
Jetting Technician August 2012 – January 2013 Offshore Construction Specialists Pte Ltd Project : Chevron (Australia) – Domgas Pipeline Installation Project Location : Domgas Field Development, North West Coast of Australia Jetting services for the 6” & 20” pipeline 1.5 km and 5.9km CW-DW and PPP-DW installation Task Description Jetting Technician responsible for operating of jetting spread, monitoring the performance of equipment and troubleshooting the jetting equipment in the event of equipment breakdown.
Mechanic April 2012 to May 2012 Offshore Construction Specialists Pte Ltd Project : Conoco Philips Indonesia – Develop the Bawal Field Location : Bawal Field – Natuna Sea Offshore Pigging and Hydrotesting work for 14” newly laid pipeline to connect the two Bawal wells (BW1 and BW2) to inline Tee and valve assemblies on the new pipeline, using rigid spools.
Senior Mechanic May 2005 – Dec 2011 PT. Sea Struck Indonesia Page 2 of 3 Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressed permission is granted by Offshore Construction Specialists Pte Ltd.
Offshore Construction Specialists Pte Ltd. 20 Toh Guan Road, #07-02 CJ GLS Building, Singapore 608839 Tel: +65 6567-9080 / Fax: +65 6567-8082
CURRICULUM VITAE Location : Batam, Indonesia Fabrication yard facility maintenance Task Description Maintain all running heavy equipments and engines in Batam fabrication yard including: fork lift, hydraulic crane, loader, generators and compressors.
Page 3 of 3 Information herewith contains private & confidential information and may be used only for the purpose of this project unless expressed permission is granted by Offshore Construction Specialists Pte Ltd.