ARRIVAL & MEETING TIME- ASTONISHING RESULT OF KP HORARY CHART [1]Arrival and meeting time with stranger may be calculated with the help of RULING planets when KP or KP New Ayanamsa is appli…Full description
andrea bocelli
Compiled by Prof. M.M.Ninan
Time Line - Safety Induction Untuk SopirDeskripsi lengkap
excelente catalgo de distribucionDescripción completa
Full description
Delay & Extension of TimeFull description
D&D!Descrição completa
bansal classesFull description
adco specFull description
Deluge valve system -pilot line design
about the lineweights in autocad
Line balancingFull description
E KIT ANNEXURE WITH TIMELINE
KIT DETAILS 1
Students are free choose to kit supplier as long as it satisfy rulebook conditions
2
MREVA will be supplying two kits this year
3
Kit 1 will have powertrain components
Lit 2 will be having accessories
2
KIT 1 Powertrain Components 1 2 3 4 5 6 7 8 9 10
Part Number SP9100038 SP9340030 SP9420130 9210021 4120089 9270021 9020057 9370025 9090009 9400111
Part Part Description Number 9120052 BATTERY CABLE SET POWER PACK LI-ION TS 9120073 CABLE ASSY - CHARGER 48V TO BI STABLE RELAY 9120089 CABLE ASSY - CHARGER BI STABLE RELAY TO MAIN CONTACTOR 4111104 DRIVE SHAFT LH 8430004 IP CLUSTER 4111014 REAR AXLE WELDMENT NON ABS - LH [small] Total
subsidiary for kits are in progress shown cost is without that. Expected subsidiary from government will be 1.25 (Aprox). Subjected to approval of government of India.
4
eBAJA 2016 Timeline 01/10/2015
Last date for payment of kit advance 1.5laks.
Delayed in payment will hamper kit delivery.
eBAJA Workshop At Hyderabad
Teams Have to attend this workshop as its totally related to Kit & EV making 15/10/2015
Last date for design report submission After Diwali
Kit will be delivered to all the teams
Two delivery options available November END
Workshop at MREVA for all the eBAJA 2016 teams 5
eBAJA 2016 Kit Delivery Options OPTION 1 : •In this option all the kit components will be delivered except for the Batteries •Transportation cost to be bared by participating teams. •In this option, any reluctant team can take available components before Diwali
OPTION 2 : •In this option all the kit components will be delivered with the battery as a single package •Transportation cost to be bared by participating teams. •In this option , components can be taken by teams only as a single pack after Diwali