2.2.4 Construction Schedule for Mechanical WorkDescrição completa
Construction Schedule
Building Construction ScheduleFull description
Sample Construction ScheduleFull description
Work Pack Review Guide
Full description
Full description
Full description
Full description
Ini adalah WI untuk seorang S?I
Enterprise Work Process for Construction Work Package Planning
This Procedure is developed to define a Stepwise Method of Control For Construction ActivitiesFull description
Descripción completa
English for Mechanical EngineeringDescripción completa
Descripción completa
P6 File
Hydroponic Feed Schedule for Tomatoes
Full description
MS for painting worksFull description
Job Hazard Analysis for Earth WorkFull description
Steel structure Ground Floor
Mezzanine Floor
Operation Floor
Roof Floor CW Discharge Lubrication & Control Oil Extracting Condensate & Feed Water Chemical Dosing Aux. Cooling Water Compress Air Gas System Hoist Beam Chipping & Sole Plate Set. MSV/GV & RSV/ICV Removal Temp. Strainer & Bearing Inspection
Nozzle Casing Assembly DE/CE Assembly Piping Work Final Adjustment & Test
Other System
Absorber
FGD Steel Structure
Flue Gas Duct Absorber Recirculation Pump Absorbing Slurry Tank Piping Work GGH Booster Fan Expansion Joint & Damper
Filter Feed Tank Filter Feed Tank Reclaim Water Tank
Limestone Storage Silo Reagent Feed Tank
Condensate Storage Tank Condensate Storage Tank Condensate Tranfer Pump
Flue Gas Piping Flue Gas Reducing Station Flue Gas Heater Flue Gas Filter
Fuel Oil Pump Diesel Oil Pump Fuel Oil Service Tank
Chlorination Unit
Piping Intake to Condenser
CW Pump Pit
Gas Station Commissioning FGD Plant Commissioning Preparation for Initial Firing (Boiler Interlock & Initial Firing Test) Chemical Cleaning Restoration of Chemical Cleaning Boiler Pressure Rising Blowing Out & Steam Flushing Restoration of Blowing Out Turbine Control Appratus Adjustment Turbine Interlock Test Safety Valve Test Electrical Interlock Test Unit Interlock Test Condenser Vacuum Up Test Turbine Initial Start-up Steam Admission to Turbine Turbine Generator No Load Test Ash Hopper Blind Plate Removal Synchronization Turbine Overspeed Test Load Rejection Test Unit Shutdown Work Unit Start-up FCB & House Load Operation Test MSV/RSV Temporary Strainer Removal Combustion Tuning (Oil Firing) Load Swing Test Special Test Combustion Tuning (Gas Firing) Reliability Run Performance Test (Gas & Oil)