AGREEMENT OF CONSTRUCTION WORK CONTRACT
BUILDING CONSTRUCTION AT : SRI M. RAMESH KUMAR s/o B. Muddappa, Door no. 314, 5th A cross, Sanmarga, Siddartha Layout, Mysore- 570011 is FIRST PARTY/OWNER of the scheduled property. AND Mr. S. Ravikumar S/o C. Subramanyan, #9. 1st main road, New Bamboo Bazar, Medal Block, Mysore is SECOND PARTY/CIVIL LABOUR CONTRACTOR - Both have made this agreement for construction of residential house at above mentioned owner site. Terms and conditions are as follows: -
Building construction @ Rs. 15,000/- (Rs. Eighteen thousand only) per square built up area projected parts like balcony, pergola shall have 60% rate of scheduled rate for GF and FF. The construction items included are as under – 1. Excavation Excavation for for foundation foundation trenche trenchess up to 3’ depth. Above Above 3’ depth depth extra extra cost. cost. 2. Casting Casting P.C.C. for for column column footing/wal footing/walll foundations foundations and and for flooring flooring of rooms as per mix design. 3. Steel Reinfo Reinforceme rcement nt – cutting, cutting, bending bending binding, binding, erection/p erection/placing lacing in positi position on of reinforcement for column, beam, slab, staircase, lintels, chahajas, pe rgolas, etc, as per structural design. 4. Providing Providing and fixing fixing centering centering,, shuttering, shuttering, scaffol scaffolding ding etc to all all structur structuree mentioned at serial no.3 5. Casting Casting all RCC RCC structure structure as as per mix mix design design with with proper proper compaction compaction by rod, needle and vibrator. 6. Constructi Construction on size stone stone masonry masonry 5 courses courses only, only, if above above courses courses requiredrequired- extra extra cost. 7. Brick work work – Constr Constructio uction n of 9” and 4” 4” TK brick brick wall as per archite architect’s ct’s plan, plan, including RCC band to 4” TK wall. 8. Plaste asterringnga. Internal Internal Plaster Plaster – Neeru finish finish with with mouldi moulding ng to arches, arches, ceiling ceiling corners corners as per working plan, no extra payment for edges and corners. b. External External Plaster Plaster – Sand Sand face, any special special plaster plaster for elevatio elevation n purpose with with moulding, groove, patter, etc as per working drawing. 9. No extra extra payment for for fixing fixing door and window window frames, frames, safety safety grills grills,, M.S/S.S M.S/S.S railings, etc 10. No extra payment payment for parapet parapet wall. wall. 11. No extra payment for screening screening/siev /sieving ing sand 12. Owner shall shall bear watchman watchman salary and curing curing 13. The contractor shall use vibrator, vibrator, concrete, mixer, lift, etc etc at his own cost i.e., i.e., rent, transportation, diesel, etc. 14. The owner shall not have any other expenses for nails, coconut rope, etc. etc. 15. The contractor shall ensure quality and workmanship of the construction
16. Any loss or damage caused during the course of work of the laborers will be borne by the contractor. 17. The contractor shall complete all the work i.e., framed structure, brick work, plastering etc within 4 months, subject to the owner shall provide all construction material in time.
Order of Payment 1. 2. 3. 4. 5. 6. 7. 8. 9.
Plinth GF Slab FF Slab GF Brickwork FF Brickwork GF inside Plaster FF inside Plaster Outside plaster – East – North side Outside Plaster – West – South side
Both the parties have agreed to the above mentioned terms and conditions