CPA REVIEW SCHOOL OF THE PHILIPPINES
Manila
MANAGEMENT ADVISORY SERVICES
STANDARD COSTING & VARIANCE ANALYSIS
THEORY
1. Which one of the following terms best describes the rate of output
which qualified workers can achieve as an average over the working day or
shift, without over-exertion, provided they adhere to the specified
method of working and are well motivated in their work?
A. Standard time B. Standard hours C. Standard unit D.
Standard performance
2. The best characteristics of a standard cost system is
A. standard can pinpoint responsibility and help motivation
B. all variances from standard should be reviewed
C. all significant unfavorable variances should be reviewed
D. standard cost involves cost control which is cost reduction
3. Standard costs are used for all of the following except:
A. income determination C. measuring efficiencies
B. controlling costs D. forming a basis for price setting
4. Standard costs are least useful for
A. Measuring production efficiency C. Job order production systems
B. Simplifying costing procedures D. Determining minimum inventory
levels
5. To which of the following is a standard cost nearly like?
A. Estimated cost. B. Budgeted cost. C. Product cost. D.
Period cost.
6. A difference between standard costs used for cost control and
budgeted costs
A. Can exist because standard costs must be determined after the
budget is completed.
B. Can exist because standard costs represent what costs should be
while budgeted costs represent expected actual costs.
C. Can exist because budgeted costs are historical costs while
standard costs are based on engineering studies.
D. Can exist because establishing budgeted costs involves employee
participation and standard costs do not.
7. Normal costing and standard costing differ in that
A. the two systems can show different overhead budget variances.
B. only normal costing can be used with absorption costing.
C. the two systems show different volume variances if standard
hours do not equal actual hours.
D. normal costing is less appropriate for multiproduct firms
8. When standard costs are used in a process-costing system, how, if at
all, are equivalent units of production (EUP) involved or used in the
cost report at standard?
A. Equivalent units are not used.
B. Equivalent units are computed using a special approach.
C. The actual equivalent units are multiplied by the standard cost per
unit.
D. The standard equivalent units are multiplied by the actual cost per
unit.
9. The type of standard that is intended to represent challenging yet
attainable results is:
A. theoretical standard D. normal standard
B. flexible budget standard E. expected actual standard
C. controllable cost standard
10. A company using very tight standards in a standard cost system
should expect that
A. Most variances will be unfavorable
B. No incentive bonus will be paid
C. Costs will be controlled better than if lower standards were used
D. Employees will be strongly motivated to attain the standard
11. A predetermined overhead rate for fixed costs is unlike a standard
fixed cost per unit in that a predetermined overhead rate is
A. based on an input factor like direct labor hours and a standard
cost per unit is based on a unit of output.
B. based on practical capacity and a standard fixed cost can be
based on any level of activity.
C. used with variable costing while a standard fixed cost is used
with absorption costing.
D. likely to be higher than a standard fixed cost per unit.
12. If a company wishes to establish factory overhead budget system in
which estimated costs can be derived directly from estimates of activity
levels, it should prepare a
A. Flexible budget. B. Fixed budget. C. Capital budget. D.
Discretionary budget.
13. Lanta Restaurant compares monthly operating results with a static
budget. When actual sales are less than budget, would Lanta usually
report favorable variances on variable food costs and fixed supervisory
salaries.
" "A. "B. "C. "D. "
"Variable food costs "Yes "Yes "No "No "
"Fixed supervisory "Yes "No "Yes "No "
"salaries " " " " "
14. The primary difference between a fixed (static) budget and a variable
(flexible) budget is that a fixed budget:
A. cannot be changed after the period begins; while a variable budget can
be changed after the period begins
B. is a plan for a single level of sales (or other measure of activity);
while a variable budget consists of several plans, one for each of
several levels of sales (or other measure of activity)
C. includes only fixed costs; while variable budget includes only
variable costs
D. is concerned only with future acquisitions of fixed assets; while a
variable budget is concerned with expenses that vary with sales
15. Which of the following term is best identified with a system of
standard cost?
A. Contribution approach. C. Marginal costing.
B. Management by exception. D. Standard accounting system.
16. Which department is typically responsible for a materials price
variance?
A. Engineering. B. Production. C. Purchasing. D.
Sales.
17. Under a standard cost system, the materials efficiency variance are
the responsibility of
A. Production and industrial engineering. C. Purchasing and sales.
B. Purchasing and industrial engineering. D. Sales and industrial
engineering.
18. Which of the following people is most likely responsible for an
unfavorable variable overhead efficiency variance?
A. production supervisor C. supplier
B. accountant D. purchasing agent
19. Which variance is LEAST likely to be affected by hiring workers with
less skill than those already working?
A. Material use variance. C. Material price variance.
B. Labor rate variance. D. Variable overhead efficiency variance.
20. Which of the following standard costing variances would be least
controllable by a production supervisor?
A. Overhead volume. B. Materials usage. C. Labor efficiency. D.
Overhead efficiency.
21. The variance resulting from obtaining an output different from the
one expected on the basis of input is the:
A. mix variance B. usage variance C. yield variance D.
efficiency variance
22. For the doughnuts of McDonut Co. the Purchasing Manager decided to
buy 65,000 bags of flour with a quality rating two grades below that
which the company normally purchased. This purchase covered about 90% of
the flour requirement for the period. As to the material variances, what
will be the likely effect?
" "A. "B. "C. "D. "
"Price "Unfavorable "Favorable "No effect "Favorable "
"variance " " " " "
"Usage "Favorable "Unfavorable "Unfavorable "Favorable "
"variance " " " " "
23. Using the two-variance method for analyzing overhead, which of the
following variances contains both variable and fixed overhead elements?
" "A. "B. "C. "D. "
"Controllable (Budget) "Yes "Yes "Yes "No "
"Variance " " " " "
"Volume Variance "Yes "Yes "No "No "
"Efficiency Variance "Yes "No "No "No "
24. Which of the following unfavorable variances is directly affected by
the relative position of a production process on a learning curve?
A. Materials mix. B. Materials price. C. Labor rate. D. Labor
efficiency.
25. A manager prepared the following table by which to analyze labor
costs for the month:
"Actual Hours at "Actual Hours at "Standard Hours at "
"Actual Rate "Standard Rate "Standard Rate "
"$10,000 "$9,800 "$8,820 "
What variance was $980?
A. Labor efficiency variance. C. Volume variance.
B. Labor rate variance. D. Labor spending variance.
26. A credit balance in the labor efficiency variance indicates that:
A. standard hours exceed actual hours
B. actual hours exceed standard hours
C. standard rate and standard hours exceed actual rate and actual hours
D. actual rate and actual hours exceed standard rate and standard hours
27. If the actual labor rate exceeds the standard labor rate and the
actual labor hours exceed the number of hours allowed, the labor rate
variance and labor efficiency variance will be
" "A. "B. "C. "D. "
"Labor Rate Variance "Favorable "Favorable "Unfavorable "Unfavorable "
"Labor Efficiency "Favorable "Unfavorable "Favorable "Unfavorable "
"Variance " " " " "
28. In the analysis of standard cost variances, the item which receives
the most diverse treatment in accounting is
A. Direct labor cost C. Direct material cost
B. Factory overhead cost D. Variable cost.
29. When expenses estimated for the capacity attained differ from the
actual expenses incurred, the resulting balance is termed the
A. Activity variance. C. Unfavorable variance.
B. Budget variance. D. Volume variance.
30. The total overhead variance is
A. The difference between actual overhead costs and budgeted overhead.
B. Based on actual hours worked for the units produced.
C. The difference between actual overhead costs and applied overhead.
D. The difference between budgeted overhead and applied overhead.
31. Management scrutinizes variances because
A. Management desires to detect such variances to be able to plan for
promotions.
B. Management needs to determine the benefits foregone by such variances.
C. It is desirable under conventional knowledge on good management.
D. Management recognizes the need to know why variances happen to be able
to make corrective actions and fairly reward good performers.
32. If a company uses a predetermined rate for absorption of
manufacturing overhead, the volume variance is
A. The under- or over-applied fixed cost element of overhead.
B. The under- or over-applied variable cost element of overhead.
C. The difference between budgeted cost and actual cost of fixed overhead
items.
D. The difference between budgeted cost and actual cost of variable
overhead items.
33. The production volume variance occurs when using the
A. Absorption costing approach because of production exceeding the sales.
B. Absorption costing approach because production differs from that used
in setting the fixed overhead rate used in applying fixed overhead to
production.
C. Variable costing approach because of sales exceeding the production
for the period.
D. Variable costing approach because of production exceeding the sales
for the period.
34. Henley Company uses a standard cost system in which it applies
manufacturing overhead to units of product on the basis of direct labor
hours. For the month of January, the fixed manufacturing overhead volume
variance was $2,220 favorable. The company uses a fixed manufacturing
overhead rate of $1.85 per direct labor hour. During January, the
standard direct labor hours allowed for the month's output:
A. exceeded denominator hours by 1,000. C. exceeded
denominator hours by 1,200.
B. fell short of denominator hours by 1,000. D. fell short of
denominator hour by 1,200.
35. A spending variance for variable factory O/H based on direct labor
hours is the difference between actual variable factory O/H and the
variable factory O/H that should have been incurred for the actual hours
worked. This variance results from
A. Price and quantity differences for overhead costs.
B. Price differences for overhead costs
C. Quantity differences for overhead costs
D. Differences caused by production volume variation
36. Which of the following is the most probable reason a company would
experience an unfavorable labor rate variance and a favorable efficiency
variance?
A. The mix of workers assigned to the particular job was heavily weighted
toward the use of higher-paid, experienced individuals.
B. The mix of workers assigned to the particular job was heavily weighted
toward the use of new, relatively low-paid unskilled workers.
C. Because of the production schedule, workers from other production
areas were assigned to assist in this particular process.
D. Defective materials caused more labor to be used to product a standard
unit.
37. The variable factory overhead rate under the normal volume, practical
capacity, and expected activity levels would be the
A. Same except for practical capacity C. Same except for normal
volume
B. Same except for expected capacity D. Same for all three activity
levels
38. A company reported a significant materials efficiency variance
for the month of January. All of the following are possible explanations
for this variance except
A. Cutting back preventive maintenance.
B. Inadequately training and supervising the labor force.
C. Processing a large number of rush orders.
D. Producing more units than planned for in the master budget.
39. A debit balance in the labor efficiency variance indicates that
A. Standard hours exceed actual hours. C. Standard rate exceeds
actual rate.
B. Actual hours exceed standard hours. D. Actual rate exceeds
standard rate.
40. What type of direct material variances for price and usage will arise
if the actual number of pounds of materials used was less than standard
pounds allowed but actual cost exceeds standard cost?
" "A. "B. "C. "D. "
"Usage "Unfavorable "Favorable "Favorable "Unfavorable "
"Price "Favorable "Favorable "Unfavorable "Unfavorable "
41. Which one of the following would not explain an adverse direct labor
efficiency variance?
A. Poor scheduling of direct labor hours
B. Setting standard efficiency at a level that is too low
C. Unusually lengthy machine breakdowns
D. A reduction in direct labor training
42. You used predetermined overhead rates and the resulting variances
when compared with the results using the actual rates were substantial.
Production data indicated that volumes were lower than the plan by a
large difference. This situation can be due to
A. Overhead being substantially composed of fixed costs.
B. Overhead being substantially composed of variable costs.
C. Overhead costs being recorded as planned.
D. Products being simultaneously manufactured in single runs.
43. During 1990, a department's three-variance factory O/H standard
costing system reported unfavorable spending and volume variances. The
activity level selected for allocating factory O/H to the product was
based on 80% of practical capacity. If 100% of practical capacity had
been selected instead, how would the reported unfavorable spending and
volume variances have been affected?
" "A. "B. "C. "D. "
"Spending "Increased "Increased "Unchanged "Unchanged "
"Variance " " " " "
"Volume Variance"Unchanged "Increased "Increased "Unchanged "
44. The journal entry to record the direct materials quantity variance
may be recorded
A. Only when direct materials are purchased
B. Only when direct materials are issued to production
C. Either (a) or (b)
D. When inventory is taken at the end of the year.
45. Overapplied factory overhead results when
A. A plant is operated at less than its normal capacity.
B. Factory overhead costs incurred are greater than the costs charged to
production.
C. Factory overhead costs incurred are less than the costs charged to
production.
D. Factory overhead costs incurred are unreasonably large in relation to
the number of units produced.
46. Standard costing will produce the same results as actual or
conventional costing when standard cost variances are distributed to
A. Cost of goods sold and inventories C. An income or expense
account
B. A balance sheet account D. Cost of goods sold
PROBLEMS
1. KNOTTY, Inc. estimated the cost of a project it started in October
19x4 as follows: Direct materials, P495,000; direct labor, 6,000 hours
at P30 per hour; variable overhead, P24 per direct labor hour. By the
end of the month, all the required materials have been used at P491,900;
labor was 80% complete at 4,650 hours at P30 per hour; and, the variable
overhead amounted to P113,700. The total variance for the project as at
the end of the month was
A. P7,500 U B. P8,400 U C. P9,000 F D. P9,00 F
2. SUPER Co. at normal capacity, operates at 600,000 labor hours with
standard labor rate of P20 per hour. Variable factory overhead is
applied at the rate of P12 per labor hour. Four units should be
completed in an hour.
Last year, 1,350,000 units were produced using 300,000 labor hours. All
labor hours were paid at the standard rate, and actual overhead cost
consisted of P3,738,000 for variable items and P3,000,000 fixed items.
The total labor and overhead costs saved, by producing at more than
standard, amounted to
A. P450,000 B. P500,000 C. P750,000 D. P1,200,000
3. A defense contractor for a government space project has incurred
$2,500,000 in actual design costs to date for a guidance system whose
total budgeted design cost is $3,000,000. If the design phase of the
project is 60% complete, what is the amount of the contractor's current
overrun or savings on this design work?
A. $300,000 savings. C. $500,000 savings.
B. $500,000 overrun. D. $700,000 overrun.
4. Hankies Unlimited has a signature scarf for ladies that is very
popular. Certain production and marketing data are indicated below:
Cost per yard of cloth P36.00
Allowance for rejected scarf 5% of production
Yards of cloth needed per scarf 0.475 yard
Airfreight from supplier P0.60/yard
Motor freight to customers P0.90 /scarf
Purchase discounts from supplier 3%
Sales discount to customers 2%
The allowance for rejected scarf is not part of the 0.475 yard of cloth
per scarf. Rejects have no market value. Materials are used at the
start of production.
Calculate the standard cost of cloth per scarf that Hankies Unlimited
should use in its cost sheets.
A. P16.87 B. P17.76 C. P18.21 D. P17.30
5. ALPHA Co. uses a standard cost system. Direct materials statistics
for the month of May, 19x7 are summarize below:
"Standard unit price "P90.00 "
"Actual units purchased "40,000 "
"Standard units allowed for actual "36,250 "
"production " "
"Materials price variance- "P6,000 "
"favorable " "
What was the actual purchase price per unit?
A. P75.00 B. P85.89 C. P88.50 D. P89.85
6. ChemKing uses a standard costing system in the manufacture of its
single product. The 35,000 units of raw material in inventory were
purchased for $105,000, and two units of raw material are required to
produce one unit of final product. In November, the company produced
12,000 units of product. The standard allowed for material was $60,000,
and there was an unfavorable quantity variance of $2,500. The materials
price variance for the units used in November was
A. $2,500 U B. $11,000 U C. $12,500 U D. $3,500 F
7. The Porter Company has a standard cost system. In July the company
purchased and used 22,500 pounds of direct material at an actual cost of
$53,000; the materials quantity variance was $1,875 Unfavorable; and the
standard quantity of materials allowed for July production was 21,750
pounds. The materials price variance for July was:
A. $2,725 F. B. $2,725 U. C. $3,250 F. D. $3,250 U.
8. Cox Company's direct material costs for the month of January were as
follows:
"Actual quantity purchased "18,000 kilograms "
"Actual unit purchase price "$ 3.60 per "
" "kilogram "
"Materials price variance – unfavorable (based "$ 3,600 "
"on purchases) " "
"Standard quantity allowed for actual "16,000 kilograms "
"production " "
"Actual quantity used "15,000 kilograms "
For January there was a favorable direct material quantity variance of
A. $3,360. B. $3,375. C. $3,400. D. $3,800.
9. JKL Company has a standard of 15 parts of component X costing P1.50
each. JKL purchased 14,910 units of component X for P22,145. JKL
generated a P220 favorable price variance and a P3,735 favorable quantity
variance. If there were no changes in the component inventory, how many
units of finished product were produced?
A. 994 units. B. 1,090 units. C. 1,000 units D. 1,160
units
10. The following direct labor information pertains to the manufacture of
product Glu:
Time required to make one unit 2 direct labor hours
Number of direct workers 50
Number of productive hours per week, per worker 40
Weekly wages per worker $500
Workers' benefits treated as direct labor costs 20% of wages
What is the standard direct labor cost per unit of product Glu?
A. $30. B. $24. C. $15. D. $12.
11. ACE Company's operations for the month just ended originally set up a
60,000 direct labor hour level, with budgeted direct labor of P960,000
and budgeted variable overhead of P240,000. The actual results revealed
that direct labor incurred amounted to P1,148,000 and that the
unfavorable variable overhead variance was P40,000. Labor trouble caused
an unfavorable labor efficiency variance of P120,000, and new employees
hired at higher rates resulted in an actual average wage rate of P16.40
per hour. The total number of standard direct labor hours allowed for
the actual units produced is
A. P52,500 B. P60,000 C. P62,500 D. P70,000
12. Pane Company's direct labor costs for April are as follows:
Standard direct labor hours 42,000
Actual direct labor hours 41,200
Total direct labor payroll $247,200
Direct labor efficiency variance – favorable $3,840
What is Pane's direct labor rate variance?
A. $44,496 U B. $49,440 U C. $49,440 F D. $50,400 F
13. TAMARAW, Inc. has a maintenance shop where repairs to its motor
vehicles are done. During last month's labor strike, certain recorded
were lost. The actual input of direct labor hours was 1,000, and the
resulting direct labor budget variance was a favorable P3,400. The
standard direct labor rate was P28.00 per hour, but an unexpected labor
shortage necessitated the hiring of higher-paid workers for some jobs and
had resulted in a rate variance of P800. The actual direct labor rate
was
A. P27.20 per hour B. P28.80 per hour C. P30.25 per hour D.
P31.40 per hour
14. To improve productivity, ST. MICHAEL Corp. instituted a bonus plan
where employees are paid 75% of the time saved when production
performance exceeds the standard level of production. The company
computes the bonus on the basis of four-week periods. The standard
production is set at 3 units per hour. Each employee works 37 hours per
week, and the wage rate is P24 per hour. Below are data for one 4-week
period:
" "Weekly Production (Units) "
"Employee "1st "2nd "3rd "4th "Total "
"ALAN "107 "100 "110 "108 "425 "
"JOEL "104 "110 "115 "115 "444 "
"ROMY "108 "112 "112 "133 "465 "
"TONY "123 "120 "119 "124 "486 "
The employee who had the inconsistent performance (sometimes performing
below standard) but got a bonus is
A. Alan = P36 bonus. C. Romy = P126 bonus.
B. Joel = P54 bonus. D. Tony = P252 bonus.
15. PALOS Manufacturing Co. has an expected production level of 175,000
product units for 19x7. Fixed factory overhead is P450,000 and the
company applies factory overhead on the basis of expected production
level at the rate of P5.20 per unit. The variable overhead cost per unit
is
A. P2.57 B. P2.63 C. P2.93 D. P3.02
16. The following were among Gage Co.'s 2000 costs:
Normal spoilage $ 5,000
Freight out 10,000
Excess of actual manufacturing costs over standard costs 20,000
Standard manufacturing costs 100,000
Actual prime manufacturing costs 80,000
Gage's 2000 actual manufacturing overhead was
A. $40,000 B. $45,000 C. $55,000 D. $120,000
17. Nil Co. uses a predetermined factory O/H application rate based on
direct labor cost. For the year ended December 31, Nil's budgeted
factory O/H was $600,000, based on a budgeted volume of 50,000 direct
labor hours, at a standard direct labor rate of $6 per hour. Actual
factory O/H amounted to $620,000, with actual direct labor cost of
$325,000. For the year, over-applied factory O/H was
A. $20,000 B. $25,000 C. $30,000 D. $50,000
18. Peters Company uses a flexible budget system and prepared the
following information for the year
" "Percentage of total capacity "
" "80% "90% "
"Direct labor hours "24,000 "27,000 "
"Variable factory O/H "$48,000 "$54,000 "
"Fixed factory O/H "$108,000 "$108,000 "
"Total factory O/H rate per DLH "$6.50 "$6.00 "
Peters operated at 80% capacity during the year but applied factory
overhead based on the 90% capacity level. Assuming that actual factory
O/H was equal to the budgeted amount for the attained capacity, what is
the amount of O/H variance for the year?
A. $6,000 over-absorbed. C. $12,000 over-absorbed.
B. $6,000 under-absorbed. D. $12,000 under-absorbed.
19. MNO Company applies overhead at P5 per direct labor hour. In March
2001, MNO incurred overhead of P120,000. Under applied overhead was
P5,000. How many direct labor hours did MNO work?
A. 25,000 B. 22,000 C. 24,000 D. 23,000
20. At the beginning of the year, Smith Inc. budgeted the following:
Units 10,000
Sales $100,000
Minus:
Total variable expenses 60,000
Total fixed expenses 20,000
Net income $ 20,000
Factory overhead:
Variable $ 30,000
Fixed 10,000
There were no beginning inventories. At the end of the year, no work was
in process, total factory overhead incurred was $39,500, and underapplied
factory overhead was $1,500. Factory overhead was applied on the basis of
budgeted unit production. How many units were produced this year?
A. 10,250. B. 10,000. C. 9,875. D. 9,500.
21. Premised on past experience, Mayo Corp. adopted the following
budgeted formula for estimating shipping expenses. The company's
shipments average 12 kilos per shipment.
Shipping costs = P8,000 + (0.25 x kgs. shipped)
" "Planned "Actual "
"Sales order "800 "780 "
"Shipments "800 "820 "
"Units shipped "8,000 "9,000 "
"Sales "240,000 "288,000 "
"Total kilograms shipped"9,600 "12,300 "
The actual shipping costs for the month amounted to P10,500. The
appropriate monthly flexible budget allowance for shipping costs for
purposes of performance evaluation would be
A. P10,250 B. P11,075 C. P10,340 D. P10,400
22. Universal Company uses a standard cost system and prepared the
following budget at normal capacity for the month of January:
Direct labor hours 24,000
Variable factory O/H $48,000
Fixed factory O/H $108,000
Total factory O/H per DLH $6.50
Actual data for January were as follows:
Direct labor hours worked 22,000
Total factory O/H $147,000
Standard DLH allowed for capacity attained 21,000
Using the two-way analysis of O/H variances, what is the budget
(controllable) variance for January?
A. $3,000 F. B. $13,500 U. C. $9,000 F. D. $10,500 U.
23. ABC Company uses the equation P300,000 + P1.75 per direct labor hour
to budget manufacturing overhead. ABC has budgeted 125,000 direct labor
hours for the year. Actual results were 110,000 direct labor hours,
P297,000 fixed overhead, and P194,500 variable overhead. What is the
fixed overhead volume variance for the year?
A. P35,000 U. B. P36,000 U. C. P2,000 F D. P3,000 F
24. JKL Co. has total budgeted fixed costs of P75,000. Actual production
of 19,500 units resulted in a $3,000 favorable volume variance. What
normal capacity was used to determine the fixed overhead rate?
A. 18,750 B. 20,313 C. 17,590 D. 16,500
25. TYD, Inc. reported the following data for 1996:
Actual hours 120,000
Denominator hours 150,000
Standard hours allowed for output 140,000
Fixed predetermined overhead rate P6 per hour
Variable predetermined overhead rate P4 per hour
TYD's 1996 volume variance was
a. P60,000 which is neither favorable nor under-applied.
b. P60,000 favorable.
c. No volume variance.
d. P60,000 under-applied.
26. Patridge Company uses a standard cost system in which it applies
manufacturing overhead to units of product on the basis of direct labor
hours. The information below is taken from the company's flexible budget
for manufacturing overhead:
"Percent of capacity "70% "80% "90% "
"Direct labor hours "21,000 "24,000 "27,000 "
"Variable overhead "$ 42,000 "$ 48,000 "$ 54,000 "
"Fixed overhead "108,000 "108,000 "108,000 "
"Total overhead "$150,000 "$156,000 "$162,000 "
During the year, the company operated at exactly 80% of capacity, but
applied manufacturing overhead to products based on the 90% level. The
company's fixed overhead volume variance for the year was:
A. $6,000 U. B. $6,000 F. C. $12,000 U D. $12,000 F.
27. Margolos, Inc. ends the month with a volume variance of $6,360
unfavorable. If budgeted fixed factory O/H was $480,000, O/H was applied
on the basis of 32,000 budgeted machine hours, and budgeted variable
factory O/H was $170,000, what were the actual machine hours (AH) for the
month?
A. 32,424 B. 32,000 C. 31,687 D. 31,576
28. Web Company uses a standard cost system in which manufacturing
overhead is applied to units of product on the basis of machine hours.
During February, the company used a denominator activity of 80,000
machine hours in computing its predetermined overhead rate. However, only
75,000 standard machine hours were allowed for the month's actual
production. If the fixed overhead volume variance for February was $6,400
unfavorable, then the total budgeted fixed overhead cost for the month
was:
A. $96,000. B. $102,400. C. $100,000. D. $98,600.
29. The following information is available from the Tyro Company:
Actual factory O/H $15,000
Fixed O/H expenses, actual $7,200
Fixed O/H expenses, budgeted $7,000
Actual hours 3,500
Standard hours 3,800
Variable O/H rate per DLH $2.50
Assuming that Tyro uses a three-way analysis of O/H variances, what is
the spending variance?
A. $750 F. B. $750 U. C. $950 F D. $200 U
30. At Overland Company, maintenance cost is exclusively a variable cost
that varies directly with machine-hours. The performance report for July
showed that actual maintenance costs totaled $9,800 and that the
associated spending variance was $200 unfavorable. If 8,000 machine-hours
were actually worked during July, the budgeted maintenance cost per
machine-hour was:
A. $1.20. B. $1.25. C. $1.275. D. $1.225.
31. Given for the variable factory overhead of GHI Products, Inc.:
P39,500 actual input at budgeted rate, P41,500 flexible budget based on
standard input allowed for actual output, P2,500 favorable flexible
budget variance. Compute the spending variance.
A. P500 unfavorable. C. P500 favorable.
B. P2,000 favorable. D. P2,000 unfavorable.
32. Daly had a $18,000 favorable volume variance, a $15,000 unfavorable
variable overhead spending variance, and $12,000 total over-applied
overhead. The fixed overhead budget variance was
A. $9,000 F. B. $16,000 F. C. 49,000 U. D. $16,000 U.
Problems 33 and 34 are based on the following information.
The MABINI CANDY FACTORY has the following budgeted factory overhead costs:
"Budgeted fixed monthly factory "P85,000 "
"overhead costs " "
"Variable factory overhead "P4.00 per direct labor hour "
For the month of January, the standard direct labor hours allowed were
25,000. An analysis of the factory overhead shows that in January, the
factory had an unfavorable budget (controllable) variance of P3,500 and a
favorable volume variance of P1,200. The factory uses a two-way analysis
of factory overhead variances.
33. The actual factory overhead incurred in January was
A. P186,200 B. P188,500 C. P181,500 D. P103,500
34. The applied factory overhead in January was
A. P188,500 B. P183,800 C. P186,200 D. P103,500
Questions 35 & 36 are based on the following information.
Raff Co. has a standard cost system in which manufacturing overhead is
applied to units of product on the basis of direct labor hours (DLHs). The
following standards are based on 100,000 direct labor hours:
Variable overhead 2 DLHs @ $3 per DLH = $6 per unit
Fixed overhead 2 DLHs @ $4 per DLH = $8 per unit
The following information pertains operations during March:
Units actually produced 38,000
Actual direct labor hours worked 80,000
Actual manufacturing overhead incurred:
Variable overhead $250,000
Fixed overhead $384,000
35. For March, the variable overhead spending variance was:
A. $6,000 F. B. $10,000 U. C. $12,000 U. D. $22,000 F.
36. For March, the fixed overhead volume variance was:
A. $96,000 U. B. $96,000 F. C. $80,000 U. D. $80,000 F.
Questions 37 thru 39 are based on the following information.
The Murray Company makes and sells a single product. The company recorded
the following activity and cost data for May:
Number of units completed 45,000 units
Standard direct labor-hours allowed per unit of product 1.5 DLHS
Budgeted direct labor-hours (denominator activity) 72,000 DLHS
Actual fixed overhead costs incurred $66,000
Volume variance $4,275 U
The fixed portion of the predetermined overhead rate is $0.95 per direct
labor-hour.
37. The amount of fixed overhead contained in the company's overhead
flexible budget for May was:
A. $64,125. B. $67,500. C. $68,400. D. $70,275.
38. The amount of fixed manufacturing overhead cost applied to work in
process during May was:
A. $61,725. B. $62,700. C. $42,750. D. $64,125.
39. The fixed overhead budget variance for May was:
A. $2,400 U. B. $2,400 F. C. $6,000 U. D. $6,000 F.
Questions 40 and 41 are based on the following information.
Valenzuela Plastics Inc. has set a standard cost, P5.25 per unit for
Material D and P12.25 per unit for Material E. In June, Valenzuela bought
17,500 units of Material D and 8,750 units of Material E. All Material D,
except 1,400 units were bought at the standard unit cost. The 1,400 units
had a unit cost of P6.15. Valenzuela bought 7,875 units of Material E at
standard cost and 875 units at a unit cost of P14.
In accordance with the standard two units of Material D and one unit of
Material E should be used to make each unit of Product F. In January,
7,000 units of Product F were made and 15,050 units of Material D were used
and 7,175 units of Material E were used.
40. The total materials price variance is
A. P2,791.25 F B. P2,791,25 U C. P13,781.25 F D.
P13,781.25 U
41. The total materials quantity variance is
A. P7,656.25 F B. P7,656.25 U C. P13,781.25 F D.
P13,781.25 U
Questions 42 and 43 are based on the following information.
Based on normal capacity operations, Sta. Ana Company employs 25 workers in
its Refining Department, working 8 hours a day, 20 days per month at a wage
rate of P6 per hour. At normal capacity, production in the department is
5,000 units per month. Indirect materials average P0.25 per direct labor
hour; indirect labor cost is 12½% of direct labor cost; and other overhead
are P0.15 per direct labor hour.
The flexible budget at the normal capacity activity level follows:
"Direct materials "P 4,000 "
"Direct labor "24,000 "
"Fixed factory overhead "1,200 "
"Indirect materials "1,000 "
"Indirect labor "3,000 "
"Other overhead "600 "
"Total "P 33,800 "
"Cost per unit "P 6.76 "
42. The cost per unit at 60% capacity is
A. P6.00 B. P6.50 C. P6.82 D. P6.92
43. The total production cost for one month at 80% capacity is
A. P20,760 B. P21,500 C. P27,280 D. P30,160
ANSWER KEY
"Theory " "Problem " "
"1. D "26. A "1. D "26. C "
"2. A "27. D "2. D "27. D "
"3. A "28. B "3. D "28. B "
"4. D "29. B "4. B "29. A "
"5. B "30. C "5. D "30. A "
"6. B "31. D "6. C "31. C "
"7. C "32. A "7. C "32. A "
"8. C "33. B "8. C "33. B "
"9. D "34. C "9. D "34. C "
"10. A "35. A "10. A "35. B "
"11. A "36. A "11. C "36. A "
"12. A "37. D "12. B "37. C "
"13. B "38. D "13. B "38. D "
"14. B "39. B "14. C "39. B "
"15. B "40. C "15. B "40. B "
"16. C "41. B "16. A "41. B "
"17. A "42. A "17. C "42. D "
"18. A "43. C "18. D "43. C "
"19. C "44. B "19. D " "
"20. A "45. C "20. D " "
"21. C "46. A "21. B " "
"22. B " "22. A " "
"23. C " "23. B " "
"24. D " "24. A " "
"25. A " "25. D " "