useful for calculating the landed cost of imported items
Oracle Project Costing EBSDescripción completa
akuntansi
BACKFLUSH COSTINGFull description
Cost accounting classes Links.Full description
Process Costing Test Bank
Hybrid Costing merupakan penggabungan antara Job order costing dengan Process Costing. Makalah ini sebagai tugas Seminar Akuntansi Manajemen
ManAcc
Material Costing
Full description
Full description
Full description
Hybrid Costing merupakan penggabungan antara Job order costing dengan Process Costing. Makalah ini sebagai tugas Seminar Akuntansi ManajemenDeskripsi lengkap
Full description
Costing sheet
Insulation works Cost of labour Total area to be insulated Production per day Total crew = 1fab+1 fitt+2 helpers Number of days required Total manhours required Cost of labour
800.00 40 6 20.0 1200.00 22800.00
Cost of materials Area of 75mm thick insulation Area of 40 mm thick insulation Area of 25mm thick insulation Total cost of materials
Rate of accessories Total cost of accessories Total material dry cost Overhead
M2 800.00 0.00 0.00
m2 m2 m2 no nos
Hours per day Rate per hour
ho hours AED
W astage Rate per m2 5% 42.00 AED 8% 0.00 AED 8% 0.00 AED
W astage Total 105% 35280.00 0% 0.00 0% 0.00 35280.00 AED
5.00 AED/m2 5.00 AED/m2 4000.00 AED 39280.00 10%
10 hrs 19 AED
Insulation works Labour Material
125%
Cladding works Total area to be cladded Production per day Total crew = 1fab+2 fitt+2 helpers Number of days required Total manhours required Cost of labour
Cost of materials Cladding works Total Total area including including Cost of sheet per m2 Cost of sheets Cost of accessories Total cost of materials Overhead
Total cost of project Cost of mobilisation Omanisation Contingency Transportation costs Total Rate Final rate
10000
(25% OH included) Including transportation Area
800.00
OMR
14589.47
64080.00 Rate per tank:
1823.6841
64080.00
64080.00
36480.00 36480.00
600
m2
Costing : Rockwool & GI sheet Cladding Al Ansari bitumen storage storage tank tank CLAD: 0.6mm Al cladding CLAD ACCS, Rockwool 75 mm thick, 100Kg/m3 IN S: INS ACCS: NA ADDI.NAL: per m2 Labor CLAD per m2 Labor INS: 10% Wastage : 20% O.H.P. on materials : 25% O.H.P. on Labor :