Sr.No.
Sub Total
Remark
Rs. A
Material cost dia. (m) SHELL BOTTOM TOP Total plate(m3) Total plate(MT) ROUND UP (MT) INCLUSIVE OF 10% FABRICATION LOSS (MT)
B
C
ht. (m) 6.1 6.2 6.2
6.7
Thickness (M) VO V OLUME (M3) 0.008 1.03 0.01 0.30 0.008 0.24 1.57 12.24 12.50
ROUND UP (MT) COST OF THE PLATE PER MT Total cost of the body flanges, Fastners & other material Total (A) fabr fabric icat atio ion n & erec erecti tion on cos costt manpower (Rs) 600 per man hour with consumable Nos 7 per day hours 8 per day Nos of days 40 cost (Rs) 1344000 Overhead in fabrication 10% Total (B) Total cost (A + B) Rubber Lining Cost Total (A + B + C) Profit margin 10% Total Transportation (2%)