Companies product(lubricant) comparison with grades.
Full description
This is a reserch on the topic of difference between Takaful and conventional Insurance. this will tell a reader that what is takaful and what is main difference between takaful and Conventional I...
Full description
English LiteratureFull description
Slab is one of the largest consuming concrete member to carrying a load. A slab being the essential part of the building and should be successfully intended and utilized. The slab requires more concrete, while constructing the co2 emission is high an
DESIGN AND COMPARISION OF FLAT SLAB USING IS 456-2000 AND ACI 318-08
Full description
Between Sea and Land is an artistic venture completed in 2008 and 2009. During four prolonged visits to the Doñana Reserva Biológica, the Nature Reserve and the Odiel Marshes in winter and s…Descripción completa
Full description
Descripción completa
staad pro and circular slabFull description
Slab
Ten (10) conventional, synthetic, and synthetic blend 10W-30 motor oils were subjected to a series of motor oil tests. The competing oils included petroleum-based Castrol GTX, Chevron Supreme, Havo...
Slab AS3600 Australian CodeFull description
If your sheet is macro disable then do it enable.This Excel Sheet is The Solution For Different Type of Slab Design.In this Excel Sheet Seen Yellow Cell is the Data that we have to Input Man…Full description
cantilever slabFull description
fsadasdasdaFull description
ASCON DESIGN DEPARTMENT DEPARTMENT Project:
2B+G+3+Duplex Residential Development / CENTRE COURT
Prepared by
Part: Part:
Cost Cost compar compariso ison n betwee between n conven conventio tional nal RCC RCC Flat Flat Slab Slab Syste System m & Post Post Tensio Tensioned ned Flat Flat Slab Slab Sys System tem
Typical Floor Comparision Based On Value Engineered Option Assumption
Sheik Mohamed
Date
18-08-09
Rev
0
Floor:
Purpose Imposed Load Span
Expenses incurred at Site due to PT Manpower to support PT related activities Grouting Tendons Pour strip concrete works Edge shuttering & other miscell works
Residential 2 kN/m 9 7.8 m
2
6.25 Dhs / m 2 2.25 Dhs / m 2 1.5 Dhs / m
= = =
10 Dhs / m
Total Slab Thickness SAVINGS PT Slab
(Value Engineered Slab Thickness)
210 mm Savings in Concrete
RCC Flat Slab
3
2
=
0.05 m / m
=
17.5 Dhs / m
=
24 kg/m
260 mm Concrete @ 350 Dhs / m
3
Untensioned Reinforcement PT Slab Basic Mesh at bottom Slab edge reinforcement Pour strip reinforcement Reinforcement over pier
Savings in Steel 35 7 3 14
kg/m 3 kg/m 3 kg/m kg/m
7 kg/m 6 kg/m
Reinforcement around anchorages Reinforcement for earth quake forces
2
3 2
Savings in Steel = (Steel Price including cut, bend bend & fix @ 3000 dhs /Tons)
72 Dhs/m
Total Savings
=
89 Dhs/m
PT Service charge
=
50 Dhs/m
Expenses incurred at site due to PT Works
=
10 Dhs/m
Total PT Related Expenses
=
60 Dhs/m
Net Savings
=
Assuming an average Floor area area
=
29 Dhs/m 2 3000 m
EXPENSES For an average slab thickness of 210mm
Total =
3
72 kg/m 2 15.12 kg/m
RCC Slab Reinforcement (Steel in RCC slab varies between between 140 140 - 160 kg /m ) For an average slab thickness of 260mm
=
2
2
150 kg/m
39 kg/m
2
2
Net Savings per floor
=
87,420.00 Dhs
ASCON DESIGN DEPARTMENT Project:
2B+G+3+Duplex Residential Development / CENTRE COURT
Prepared by
Part:
Cost comparison between conventional RCC Flat Slab System & Post Tensioned Flat Slab System
Floor:
Typical Floors (First - Roof) Comparision Based on Existing Detail
Sheik Mohamed
Date
18-08-09
Rev
0
Expenses incurred at Site due to PT
Assumption Purpose Imposed Load Span
Manpower to support PT related activities Grouting Tendons Pour strip concrete works Edge shuttering & other miscell works
Residential 2 kN/m 14 7.8 m
2
6.25 Dhs / m 2 2.25 Dhs / m 2 1.5 Dhs / m
= = =
10.00 Dhs / m
Total Slab Thickness SAVINGS PT Slab
(Thickness Proposed by Project Consultant)
250 mm Savings in Concrete
RCC Flat Slab
=
3
0.01 m / m
2
260 mm Concrete @ 350 Dhs / m
3
=
3.5 Dhs / m
=
22 kg/m
PT Slab Untensioned Reinforcement Bas ic Mesh at bottom & Top (Incl tem perature effec ts) Slab edge reinforcement Pour strip reinforcement Reinforcement over pier
Savings in Steel 35 7 3 14
7 kg/m 6 kg/m
Reinforcement around anchorages Reinforcement for earth quake forces
2
3
kg/m 3 kg/m 3 kg/m kg/m
2
Savings in Steel = 67 Dhs/m (Steel Price including Material, cut, bend & fix @ 3000 dhs /Tons) =
70.40 Dhs/m
PT Service charge
=
50 Dhs/m
Expenses incurred at site due to PT Works
=
10 Dhs/m
Total PT Related Expenses
=
60 Dhs/m
Net Savings
=
10.40 Dhs/m
Assuming average Floor area
=
3000 m
Net Savings per floor
=
Total Savings EXPENSES
For The Slab thickness of 250mm
Total =
3
72 kg/m 2 18 kg/m
RCC Slab Reinforcement (Steel in RCC slab varies between 140 - 160 kg /m ) For the slab thickness of 260mm
=
2
2
155 kg/m
40.3 kg/m
2
31,200.00 Dhs
2
2
Span To Depth Ratio For PT Slab RCC Slab
= =
38 33
ASCON DESIGN DEPARTMENT Project:
Value Analysis Exercise
Prepared by
Sheik Mohamed
Part:
Cost comparision between conventional RCC Flat Slab system & Post Tensioned Flat Slab System
Floor:
Mechanical Floor
Date
9/3/2009 Rev
0
Expenses incurred at Site due to PT Assumption Purpose Imposed Load Span
Manpower to support PT related activities Grouting Tendons Pour strip concrete works Edge shuttering & other miscell works
Mechanical Floor 2
14 kN/m m
8.5 - 9
2
6.25 Dhs / m 2 2.25 Dhs / m 2 1.5 Dhs / m
= = =
10 Dhs / m
Total
2
Slab Thickness SAVINGS PT Slab
250 mm
RCC Flat Slab
300 mm
3
2
Savings in Concrete = 0.05 m / m (Assuming average PT slab thickness as 230mm against RCC slab of 310mm thick) Concrete @ 350 Dhs / m
3
2
=
17.5 Dhs / m
=
29 kg/m
Untensioned Reinforcement PT Slab Basic Mesh at bottom & Top (Incl temperature effects) Slab edge reinforcement Pour strip reinforcement Reinforcement over pier
Savings in Steel 35 7 3 14
7 kg/m 6 kg/m
Reinforcement around anchorages Reinforcement for earth quake forces
2
3
kg/m 3 kg/m 3 kg/m kg/m
2
Savings in Steel = (Steel Price including cut, bend & fix @ 2500 dhs /Tons)
71 Dhs/m
Total Savings
=
89 Dhs/m
PT Service charge
=
60 Dhs/m
Expenses incurred at site due to PT Works
=
10 Dhs/m
Total PT Related Expenses
=
70 Dhs/m
Net Savings
=
19 Dhs/m
Assuming average Floor area
=
Net Savings per floor
=
EXPENSES For an average slab thickness of 250mm
Total =
3
72 kg/m 2 18 kg/m
RCC Slab Reinforcement (Steel in RCC slab varies between 140 - 160 kg /m ) For an average slab thickness of 300mm