Descripción: Lama Thubten Yeshe explains Tsongkhapa's "Three Principal Aspects of the Path"
the main aspects of the Victorian novelDescripción completa
This report is the study of Indian commercial vehicles industry. This report has helped us togetting some very useful insight of the commercial vehicles industry. Tata Motor, Eicher Motor, Mahindra...
dDescripción completa
Droit Commercial S4
Descripción: Aspects Of Britain And The USA.pdf.Aspects of Britain and the USA. Britain.USA
According to the teachings of the Vilna Gaon
commercial law cases
Cours de droit commercial L3 droitDescription complète
SimDescrição completa
Business plan on Commercial starch production for pharmaceutical industry.Full description
Droit CommercialDescription complète
Mike Holt Ampacity
Full description
6.3 COMMERCIAL ASPECTS 6.3.1 The importance of commercial personnel.
Must involve commercial personnel early in the project to allow the necessary systems and procedures to be implemented. This will allow issues to be detected and dealt with at an early stage.
Construction and engineering problems will require commercial solutions.
Allow for an adequate number of commercial personnel on a project, this is not an area to cut costs on.
In any event, it is likely that a good commercial team will pay for itself.
6.3.2 Initial tender The initial tender must be compiled using a limited number of personnel which lead to various oversights culminating in the project being underquoted by around an estimated 10%. A low tender or contract price will take place a contractor in dangerous territory bringing about an even greater need to closely manage and monitor costs and commercial issues in the project. Propose a small management team will often result in less monitoring and problem detecting at project site.
6.3.3 Construction and Engineering issues This project was late in progress with common issues experienced such as:
Incomplete design
Late design
Late delivery of equipment and materials
Incorrect component delivery requiring rework
Work scope not accounted for in original tender
Construction of the project was originally programmed to be carried out over an 18 month period; this has been extended and will continue to push out to around two years.
6.3.4 Commercial Solutions The issues listed above are common within construction and engineering projects for the Pura Kencana Mall. The contractor should be able to quickly identify and put into a strategy to deal with them. Construction and engineering issues will often require significant commercial input in order to recover additional costs incurred. It is a commercial function to gather and record the relevant raw data and subsequently present it in a suitable way to maximise chances of the construction project recovery.
6.3.5 Subcontractor Management In the Civil Engineering project commercial aspects are an important addition to any project management team to carry out day to day tasks such as managing subcontractor’s claims for payment, variations, additional time, prolongation costs and to assess the validity of any assertions made within meetings or correspondence in general. Time consuming task and inadequate numbers of commercial aspects will in many instances lead to some of these responsibilities. The commercial team will deal with claims and commercial issues. In this case, if the project had run smoothly the effective project commercial was insufficiently staffed to effectively manage the commercial aspects of the project. The further issues which arose regarding engineering and construction progress on site. Commercial personnel should not be viewed as an unnecessary cost or even as a necessary thing. A good commercial team is an important part of the overall project team. Through the effective management of cost and the maximising of value, the commercial team can pay according to work progress in the construction site.