1. Create a project in CME: Open CME from M2000
Open current area.
Create planed
Create personal area and Select target NE
2. Configure the sites Open BTS topology
Select GEIUT board
Add site
Configure BTS property,and select the BTS template.
Configure BTS hardware
Set alarm port of EMU ( If you the BTS template already configured the alarms, then ignore this step.)
Configure BBU port and DRFU
Configure coupling system
Configure cells
Configure frequency for each cell
Configure TRX for each cell ( binding cells and TRX)
Configure the Main BCCH for each cell
Assign frequency for each TRX
Binding frequency for other cells
Configure MA group
3. Configure the cell and TRX parameters I suggest that we configure these parameters after we complete all the sites configuration, then we can use bulk modify function to configure all the required data at one whack to save the time. Configure cell parameters (you can also bulk configure the cell parameters)
Configure GPRS and EDGE
Configure TRX property
Configure channel status (you can also consider below step to bulk configure the channel status)
Configure TRX parameters(bulk modify both channel type and Power parameters)
Change 1 TRX parameters, and select it as template( you can select “select columns” to get more TRX information), then select bulk modify
Select mode should be “TRX”, then add “tree”
Select the target TRXs, and shift it to right frame
After select the target TRX, PLS press ok, then select “next”
From below snap, PLS select the parameters which you want
Then select next
Then you have bulk modified the TRX parameters Configure TMU auto active
4. Load and active your configuration on current system. Check data integrity Select the target site and press right
Active the site.
After active the sites, the system will generate the MML script. Export the data to your laptop
Save path (PLS export the site configuration 1 by 1)
Select System- Script Management
Load the project( your data configuration for each site)
Select the script
Select below button to establish the CME active project
Select your script and press right to active it.
After CME active this script, you have completed the sites configuration except EDGE and alarm setting. ( For EDGE and Alarm setting, you can load the scripts from LMT directly) If you have any issue during configure the sites through CME, PLS fell free to contact me: louis.liu 0334-5164775.