DMCC ALMAS TOWER (JAP016) JUMEIRAH LAKE TOWERS
DESCRIPTION
TOTAL AMOUNT
AMOUNT CERTIFIED
PERCENT CERTIFIED
OUTSTANDING AMOUNT
PERCENT OUTSTANDING
EFFECTIVE CONTRACT AMOUNT
261,161,000.00
259,509,675.51
99.37%
1,651,324.49
0.63%
OUTSTANDING CLAIMS WITH ERI
104,323,764.37
60,740,469.59
58.22%
43,583,294.78
41.78%
0.00%
5,482,732.44
100.00%
50,717,351.70
13.67%
OUTSTANDING CLAIMS WITHOUT ERI
GRAND TOTAL
5,482,732.44
370,967,496.80
320,250,145.10
86.33%
REMARKS
DMCC- AL MAS TOWER PROJECT JUMEIRAH LAKE TOWERS JAP016 : PACKAGE NO. 3 - MAIN BUILDING WORKS
VARIATION CLAIMS STATUS TO-DATE as at CLAIM NOTICE LETTER
NOC NO.
SUB NO.
ERI NO.
V.O. TO
13
001
04
JV
14
001
06
14 14
002 004
06 06
Site Establishment - Offices (Supply of ETA Temporary Site Office Purchased form Seidco Gen. Cont. Co. NSC ETA Site Offices (New Offices at Site) JV ETA/F&G Site Offices - Rubbish Removal
15
001R1
07
NSC ETA Site Offices Provision of Power Supply
16
001
08
JV
17
001
09
JV
14
003
10
20
001
11
28
001R1
12
NSC Cast Resin Bus Bars
OM-1
001
13
32
001
14
JV Omit Wall Plaster from Car Parking Areas in all 5 Basement Floors NSC Stainless Steel Members to Diamond Exchange Area
35
001a
15
35
001b
15
21 7
001
15.1
21 7
002
15.1
31
001
16
41
001R1
16/ 39
41
41
41
002R1
003R1
004R1
CLAIM ENTITLEMENT APPLICATION
DESCRIPTION
Additional Telephone Lines
JV
COST (AED)
TIME (Days)
13-May-06
0.00
13-May-06
278,155.63
501,971.39 56,840.00
0
REFERENCE
DATE
DXB/AMT-01/0500/JLy/429 DXB/AMT-01/0500/JLy/430
ER / F&G / JV AGREED VALUES COST (AED)
TIME (Days)
0
0.00
0
0
218,400.00
0
OUTSTANDING CLAIMS
CERTIFIED AS AT
October 15, 2013
November 30, 2008 REMARKS / COMMENTS
COST (AED)
TIME (Days)
CLOSED
CLOSED
0.00
0.00
CLOSED
CLOSED
218,400.00
59,755.63
501,971.39
CLOSED
501,971.39
ETA cost + 12% OH&P + 3% Attendances
56,840.00
0
56,840.00
1 ,1 9 3 , 2 3 5 .5 4
CLOSED
765,834.58
427,400.96
JV scope of works; verbally agreed with F&G to be 5050 as at Se -08 -08 ETA costs + 7% JV OH&P
JAP016/ALM/TCAC/04893 dated 30-Oct-06
CLOSED
CLOSED
128,324.82
30,846.96
Costs agreed by JV under letter ref. DXB/AMT01/0500/Jly/1065 dated 7-Nov-06.
JAP016/ALM/TCAC/08151 dated 09-Apr-07
CLOSED
ur
107,738.59
73,652.74
ERI No. 09; Internal Preliminary Assessment Assessment is equal to 10 days, but works has yet to be carried out to consider the EOT; cost evaluated by F&G accepted thru letter ref. DXB/AMT-01/0500/Jly/1072 dated 8Nov-06 but subject to add'l revisions and prolongat
LETTER REF. JAP016/ALM/TCAC/21287 dated 5-Oct-08 JAP016/ALM/TCAC/05508 dated 29-Nov-06
CERTIFIED TO-DATE
BALANCE TO-DATE to confirm if this is still needed; No need for additional tele hone lines lines F&G evaluation is based on a +12% OH&Pro, and prelims omitted and to be dealt with in EOT's
DXB/AMT-01/0600/MIC/____
13-Dec-08
DXB/AMT-01/0600/DAN/5012
26-Oct-08
DXB/AMT-01/0500/JLy/431 / DXB/AMT-01/0600/DAN/3648
13-May-06 / 12-Feb-08
1,193,235.54
0
Provision of Starter Bars to Podium within the Landscape Package Core Wall Thickening
DXB/AMT-01/0500/JLy/432
13-May-06
159,171.78
0
128,324.82
DXB/AMT-01/0500/JLy/501
26-Jun-06
181,391.33
ur
107,738.59
NSC Site Establishment - Offices (Supply and Installation of AC Units within the New Offices being established b Nakh Nakhee eell JV Supply of Potable Water to DMCC and F&G's Site Offices
DXB/AMT-01/0500/JLy/430
13-May-06
80,097.04
0
64,574.50
0
JAP016/ALM/TCAC/06385 dated 21-Jan-07
CLOSED
CLOSED
64,574.50
15,522.54
ETA cost of 60,350.00 + 7% JV OH&P
DXB/AMT-01/0500/JLy/655
16-Jul-06
23,551.60
0
25,076.80
0
CLOSED
CLOSED
10,841.60
12,710.00
Period from June 2006 - September 2007, and October-2007 - November 2008
DXB/AMT-01/0600/EDM/2402, DXB/AMT-01/0600/DAN/3172
24-Jun-07 , 14-Nov-07
2,071,622.24
ur
1,049,300.70
JAP016/ALM/TCAC/22075 dated 4-Nov-08, JAP016/ALM/TCAC/23417 dated 6-Jan-08 JAP016/ALM/TCAC/14871 dated 13-Jan-08
CLOSED
ur
1,049,300.70
1,022,321.54
NSC Provision of DB's in lieu of Isolators in the Offices & Retail Units at 3rd to 49th Floors (MEP Works) JV
Provision of DB's in lieu of Isolators in the Offices & Retail Units at 3rd to 49th Floors (Builders Work)
NSC SMDB's in lieu of Isolators at Level 52-63 and Retail Mall and Splitting of Landlord DB's for Ground Floor and First Floor as per DEWA Requirement (MEP Works JV SMDB's in lieu of Isolators at Level 52-63 and Retail Mall and Splitting of Landlord DB's for Ground Floor and First Floor as per DEWA Requirement (Builders Work JV Drawing Revisions to t he Diamond Exchange Centre; due to revised Openings. JV
Interior Design Works (JV Internal Subcontractors) Subcontractors)
0
0 0
0
ETA Cost + 7%; Time Effect shall be by NSC, if any; potential additional builders works, and attendance in reference to the Time. Confirmed by ETA under their letter ref. DIV.092/AM/TS/1342 dated 31-Jan-08
JAP016/ALM/TCAC/05257
16-Nov-06
(383,650.51)
0
(383,650.51)
CLOSED
(315,883.28)
(67,767.23)
cost implication sent under JV letter ref.DXB/AMT01/0800/Jly/1175 dated 29-Nov-06
DXB/AMT-01/0500/JLy/844
11-Sep-06
333,540.00
ur
317,914.82
0
JAP016/ALM/TCAC/05673 dated 11-Dec-06
CLOSED
CLOSED
317,914.82
15,625.18
DXB/AMT-01/0500/JLy/926
03-Oct-06
2,072,029.32
ur
1,220,076.06
ur
CLOSED
CLOSED
1,408,720.27
663,309.05
DXB/AMT-01/0500/JLy/926
03-Oct-06
102,131.48
ur
55,692.82
ur
JAP016/ALM/TCAC/18730 dated 8-Jun-08 JAP016/ALM/TCAC/22415 dated 18-Nov-08 JAP016/ALM/TCAC/18730 dated 8-Jun-08
EVSCost Effect is NSC Cost + 7% O&H + 2% Attendance, as this is an additional work; Time Effect shall be by NSC, if any; potential additional builders works. ETA costs + 7% JV OH&P; F&G revised assessment from their letter ref.JAP016/ALM/TCAC/18730 dtd 8Jun-08
CLOSED
CLOSED
102,131.44
0.04
DXB/AMT-01/0600/EDM/4512
06-Jul-08
538,459.90
ur
5 3 8 ,4 5 9 .9 0
ur
5 3 8 ,4 5 9 .9 0
DXB/AMT-01/0600/EDM/4512
06-Jul-08
7,538.64
ur
7,538.64
ur
7 ,5 3 8 .6 4
builders works
DXB/AMT-01/0500/JLy/842
11-Sep-06
82,672.78
0
8 2 ,6 7 2 . 7 8
CLOSED
82,672.78
rejected by Nakheel due to relation with coordination issues with MEP requirements; awaiting response from NSC (Eversendai) on the rejection.
DXB/AMT-01/0500/JLy/877
24-Sep-06
28,894,792.49
see NOC#127
22,785,939.94
see NOC#127
3,879,153.39
see NOC#127
8,117,552.86
see NOC#127
3,107,564.82
28,365.12
16/ 39
NSC Interior Design Works (Other ID Works being done by Bond Interiors)
DXB/AMT-01/0500/JLy/877
16/ 39
NSC Interior Design Works (MEP Works by ETA)
DXB/AMT-01/0500/JLy/877
16/ 39
NSC Interior Design Works (Lift Finishes by Kone Middle East)
DXB/AMT-01/0500/JLy/877
24-Sep-06
24-Sep-06
24-Sep-06
5,064,844.41
8,423,604.53
3,111,331.22
69
001
16
JV
ID Works Package - Changes to CT-01 & CT-02
DXB/AMT-01/0600/EDM/1785
14-Mar-07
28,616.00
see NOC#127
79
001
16
JV
Raised Access Flooring System at the Diamond Exchnage Centre to Screeding Works
DXB/AMT-01/0500/JLy/2030
16-Apr-07
282,635.67
see NOC#127
0
0
JAP016/GEN/ABS/0010 dated 17-Oct-06
JV Cost; Note : the cost for OCP is omitted and will be dealt with separately; F&G revised assessment from their letter ref.JAP016/ALM/TCAC/18730 dtd 8-Jun-08
ETA's cost + 12% OH&P + 3% Attendan ces
agreed values is partial and see NOC#127 deemed to change
CLOSED
28,304,706.24
590,086.25
agreed values is partial and see NOC#127 deemed to change
CLOSED
4,062,428.29
1,002,416.12
updated cost and rates approval summary status being sent regularly.
agreed values is partial and see NOC#127 deemed to change
CLOSED
7,573,568.93
850,035.60
updated cost and rates approval summary status being sent regularly.
agreed values is partial and see NOC#127 deemed to change
CLOSED
2,774,842.92
336,488.30
updated cost and rates approval summary status being sent regularly.
progressively, as it is based on the agreed rates only (+12%)
updated cost and rates approval summary status being sent regularly; regularly; cost submitted is the final applied claim
progressively, as it is based on the agreed rates only (+7%)
progressively, as it is based on the agreed rates only (+7%)
progressively, as it is based on the agreed rates only (+7%)
JAP016/ALM/TCAC/20228 see NOC#127 dated 12-Aug-08
see NOC#127
CLOSED
CLOSED
2 8 ,6 1 6 .0 0
abortive materials only
2 8 2 ,6 3 5 .6 7
CLOSED
2 8 2 ,6 3 5 .6 7
Floor Screeding works; valued under the ERI No. 16 as per the F&G letter ref. JAP016/ALM/TCAC/21388 dated 7-Oct-08 and confirmed under our letter ref. DXB/…/4963 dtd 16-Oct-08
VARIATION CLAIMS STATUS TO-DATE as at NOC NO.
SUB NO.
ERI NO.
V.O. TO
33
006
21
JV
33
007
21
JV
33
008
21
33
009
21
CLAIM NOTICE LETTER
CLAIM ENTITLEMENT APPLICATION
DESCRIPTION
ER / F&G / JV AGREED VALUES
REFERENCE
DATE
COST (AED)
TIME (Days)
COST (AED)
TIME (Days)
Missing Spanmark as PB434 (RFI No. 029)
DXB/AMT-01/0500/JLy/881
24-Sep-06
3,223.52
0
(1,351.84)
0
Additional Reinforcement due to the Missing Details (RFI No. 042) First Floor Slab Details (RFI No. 072)
DXB/AMT-01/0500/JLy/881
24-Sep-06
1,894.77
0
JV
DXB/AMT-01/0500/JLy/881
24-Sep-06
657.99
0
530.47
0
JV
Second Basement Floor Beam - PB205A (RFI No. 075)
DXB/AMT-01/0500/JLy/881
24-Sep-06
427.04
0
343.82
0
DXB/AMT-01/0500/JLy/881
24-Sep-06
425.15
0
344.60
0
0
33
010
21
JV
Fourth Basement Beam - PB451A (RFI No. 078)
33
011
21
JV
Fourth Basement Beam - PB434 (RFI No. 144)
DXB/AMT-01/0500/JLy/881
24-Sep-06
1,150.44
0
1,063.46
0
33
012
21
JV
DXB/AMT-01/0500/JLy/881
24-Sep-06
13,820.28
0
12,180.62
0
33
013
21
JV
Tower Structural Drawings - Additional TB29 Beam RFI No. 146 Door Opening Height - First Floor (RFI No. 157)
DXB/AMT-01/0500/JLy/881
24-Sep-06
499.04
0
0.00
0
33
014
21
JV
Basement 2 Beams (RFI No. 162)
DXB/AMT-01/0500/JLy/881
24-Sep-06
3,461.71
0
548.61
0
33
015
21
JV
Lift F4 - Structural Details (RFI No. 171)
DXB/AMT-01/0500/JLy/881
24-Sep-06
1,556.34
0
1,233.74
0
33
016
21
JV
Reinforced Concrete Partition Wall @ the Basement 2 (RFI No. 182)
DXB/AMT-01/0500/JLy/881
24-Sep-06
41,554.32
0
33
017
21
JV
Increase in Beam Depths at First Floor - Section N1 RFI No. 192 Increase in Beam Depths to PB149 and PB150A (RFI No. 223) Additional Outrigger Walls at Service Floor Areas Structural Works
DXB/AMT-01/0500/JLy/881
24-Sep-06
4,353.86
0
DXB/AMT-01/0500/JLy/881
24-Sep-06
693.97
0
DXB/AMT-01/0500/JLy/881
24-Sep-06
956,279.08
0
OUTSTANDING CLAIMS
CERTIFIED AS AT
REMARKS / COMMENTS
COST (AED)
TIME (Days)
CERTIFIED TO-DATE
BALANCE TO-DATE
JAP016/GEN/ABS/1011 dtd 19Jun06; JAP016/ALM/TCAC/18884 dtd 12-Jun-08 JAP016/GEN/ABS/1011 dated 19-Jun-06
CLOSED
CLOSED
(1,351.84)
4,575.36
agreed with Consultant (F&G)
1,894.77
CLOSED
1 , 8 9 4 .7 7
awaiting response from Client.
JAP016/ALM/TCAC/20933 dated dated 14-Se 14-Se -07 JAP016/ALM/TCAC/09528 dated 12-Jun-07
CLOSED
CLOSED
530.47
127.52
agreed with Consultant (F&G)
CLOSED
CLOSED
343.82
83.22
agreed with Consultant (F&G)
JAP016/ALM/TCAC/09528 dated 12-Jun-07 JAP016/ALM/TCAC/14300 dated 12-Dec-06 JAP016/ALM/TCAC/14300 dated 12-Dec-06
CLOSED
CLOSED
344.60
80.55
agreed with Consultant (F&G)
CLOSED
CLOSED
1,063.46
86.98
agreed with Consultant (F&G)
CLOSED
CLOSED
12,180.62
1,639.66
agreed with Consultant (F&G)
JAP016/ALM/TCAC/17248 dated dated 16-A 16-A rr-08 08 JAP016/ALM/TCAC/14300 dated 12-Dec-06 JAP016/ALM/TCAC/18352 dated dated 26-Ma 26-Ma -08 JAP016/ALM/TCAC/18118 dated 18-May-08
CLOSED
CLOSED
0.00
499.04
agreed with Consultant (F&G)
CLOSED
CLOSED
548.61
2,913.10
agreed with Consultant (F&G)
CLOSED
CLOSED
1,233.74
322.60
agreed with Consultant (F&G)
41,554.32
CLOSED
CLOSED
CLOSED
3,510.09
843.77
agreed with Consultant (F&G)
356.68
agreed with Consultant (F&G)
314,272.57
LETTER REF.
4 1 ,5 5 4 .3 2
0
JAP016/ALM/TCAC/09528 dated 12-Jun-07
337.29
0
JAP016/ALM/TCAC/09528 dated 12-Jun-07
CLOSED
CLOSED
337.29
ur
642,006.51
0
JAP016/ALM/TCAC/20290 dated 13-August-08
CLOSED
CLOSED
642,006.51
3,510.09
October 15, 2013
November 30, 2008
rejected F&G assessment in their letter JAP016/ALM/TCAC/18118 dated 18-May-08 thru our letter ref.DXB/…./EDM/4262 dtd 22May08;F&G assessment under review by JV
33
018
21
JV
33
019
21
JV
OM-2
001
21
JV
Omission of Rebars in Core Walls
JAP/ALM/TCAC/11435
21-Aug-07
(693,815.82)
0
(676,513.69)
0
JAP016/ALM/TCAC/20290 dated 13-Aug-08
CLOSED
CLOSED
(693,815.82)
0.00
33
020
21
JV
DXB/AMT-01/0500/JLy/881
24-Sep-06
40,503.44
0
171.19
0
JAP016/ALM/TCAC/181187 dated 18-May-08
CLOSED
CLOSED
171.19
40,332.25
agreed with Consultant (F&G)
33
021
21
JV
Additional Mass Concrete at 2nd Level, and Revisions to the Stairs leading to the Vault at 2nd Level Additional Column Posts at 50th to 51st Level and Additional Core Walls, i.e., 400mm and 500mm thick
DXB/AMT-01/0500/JLy/881
24-Sep-06
43,839.53
0
33,011.38
0
JAP016/ALM/TCAC/20933 dated 14-Sep-07
CLOSED
CLOSED
33,011.38
10,828.15
agreed with Consultant (F&G)
33
022
21
JV
Additional Lifting Beams to the 64th Level Machine Rooms (@Level 288.650m and 285.350m)
DXB/AMT-01/0500/JLy/881
24-Sep-06
5,525.90
0
4,252.50
0
JAP016/ALM/TCAC/18884 dated 12-Jun-08
CLOSED
CLOSED
4,252.50
1,273.40
agreed with Consultant (F&G)
33
023
21
JV
Changes to Slab Steel Reinforcement to S11 to S12
DXB/AMT-01/0600/EDM/1868
26-Mar-07
36,827.93
0
35,529.29
0
JAP016/ALM/TCAC/08133 dated 09-Apr-07
CLOSED
CLOSED
35,529.29
1,298.64
agreed with Consultant (F&G)
33
024
21
JV
DXB/AMT-01/0600/DAN/1878
26-Mar-07
25,336.02
0
26,354.14
0
JAP016/ALM/TCAC/17248 dated 16-Apr-08
CLOSED
CLOSED
26,354.14
(1,018.12)
agreed with Consultant (F&G)
33
025
21
JV
33
026
21
JV
Additional Steel Reinforcement to Beams Located Around Tower Building and Connected to Precast Slab Additional rebars to basement retaining wall @ staircase and changes of rebar to wall Changes in Shear Wall in Zone 4 Associated in Lift and Vault Wall Additional Rebar in First Basement Slab Additional Top Steel Reinforcement in Ground Floor Slab Additional Bottom Steel Reinforcement in Ground Floor Slab Additional Building Maintenance Units at Diamond Exch Exchan an e Cent Centre re Revisions to Contract Drawings in First Floor Levels
33
027R1
21
JV
33
028R1
21
JV
33
029R1
21
JV
33
030
21
JV
33
031R1
21
JV
33
032
21
33
033
21
50
001
21
54 59 13 5
001 001 001
21 21 21
51
001
22
55
001
23
46
001
24
JV
Revisions to Structural Contract Drawings in Second Floor JV Changes in Beam Steel Reinforcement at 29th to 34th Level JV Various Requirements under the F&G Transmittal Ref. F+G/ALMAS/TAISEI/ 01463 dated 12th December 2006 JV Provision of Additional Lift Pit Ladders JV Additional Coring Requirement JV Opening in Block Wall between Offices A & B at Level 29 (CVI No. 067) NSC Revision of Fire Protection System as per JAFZA EHS Fire & Rescue Rescue Re uirements uirements NSC Category II Drawing Revisions for Office Floors -Air Conditioning NSC Fire Policy Layout (MEP Works)
revised cost impact submitted under ref. DXB/AMT01/0500/Jly/1080 dated 9-Nov-06 based on the approved Methodology; agreed with Consultant (F&G) joint measurement done and agreed; in conne ction with 33-019
DXB/AMT-01/0600/DAN/1883
26-Mar-07
7,878.22
0
7,878.22
0
JAP016/ALM/TCAC/08287 ated 16-Apr-07
CLOSED
CLOSED
7,878.22
0.00
agreed with Consultant (F&G)
DXB/AMT-01/0600/DAN/1888
24-Sep-06
17,649.58
0
14,661.14
0
JAP016/ALM/TCAC/08713 ated 7-May-07
CLOSED
CLOSED
14,661.14
2,988.44
agreed with Consultant (F&G)
DXB/AMT-01/0600/DAN/1990
10-Apr-07
101,960.65
0
97,675.24
0
CLOSED
CLOSED
97,675.24
4,285.41
agreed with Consultant (F&G)
DXB/AMT-01/0600/DAN/2020
15-Apr-07
140,340.33
0
137,782.64
0
JAP016/ALM/TCAC/20933 dated dated 14-Se 14-Se -07 JAP016/ALM/TCAC/10244 ated 9-Jul-07
CLOSED
CLOSED
137,782.62
2,557.71
agreed with Consultant (F&G)
DXB/AMT-01/0600/DAN/2047
19-Apr-07
316,516.91
0
317,721.58
0
JAP016/ALM/TCAC/10549 ated 23-Jul-07
CLOSED
CLOSED
317,721.58
(1,204.67)
DXB/AMT-01/0600/EDM/2066
24-Apr-07
1,175,875.00
ur
1 ,1 7 5 ,8 7 5 . 0 0
ur
DXB/AMT-01/0600/EDM/2160
15-May-07
56,950.59
0
DXB/AMT-01/0600/EDM/2383
23-Jun-07
130,015.64
0
DXB/AMT-01/0600/EDM/2548
18-Jul-07
9,356.12
0
DXB/AMT-01/0600/EDM/1301
21-Dec-06
28,025.73
1,175,875.00
agreed with Consultant (F&G)
under review
50,995.22
0
JAP016/ALM/TCAC/11392 ated 20-Aug-07
CLOSED
CLOSED
50,995.22
5,955.37
agreed with Consultant (F&G)
55,259.32
0
JAP016/ALM/TCAC/14299 ated 12-Dec-07
CLOSED
CLOSED
55,259.32
74,756.32
agreed with Consultant (F&G)
0
JAP016/ALM/TCAC/10848 ated 1-Aug-07
CLOSED
CLOSED
7,928.10
1,428.02
agreed with Consultant (F&G)
ur
28,025.73
ur
28,025.73
JV to submit entitlements; note that the DVR's is valued in Claim No. 77; items to be valued under this Claim is only the Lifting Beams
ur
66,895.36
ur
66,895.36
await for final drawings.
ur
30,965.32
ur
30,965.32
based on the ETA letter request
ur
1,484.00
ur
1 ,4 8 4 .0 0
demolition works
7,928.10
DXB/AMT-01/0500/JLy/1358
04-Jan-07
DXB/AMT-01/0600/EDM/1567
10-Feb-07
DXB/AMT-01/0600/EDM/3071
27-Oct-07
66,895.36 30,965.32 1,484.00
DXB/AMT-01/0600/EDM/1312
23-Dec-06
4,929,761.78
ur
4 ,9 2 9 ,7 6 1 . 7 8
ur
DXB/AMT-01/0500/JLy/1444
21-Jan-07
ur
ur
ur
ur
DXB/AMT-01/0600/EDM/1236
11-Dec-06
24,107.45
ur
CLOSED
ur
5,600.38
JAP016/TS/ABS/22577 dated 24-Nov-08
1,564,665.69
3,365,096.09
ETA costs of AED 4,607,254 + 7% OH&P
ETA to respond.
24,107.45
ETA costs + 7%OH&P
VARIATION VARIAT ION CLAIMS STAT STATUS US TO-DAT TO-DATE E as at NOC NO.
SUB NO.
ERI NO.
V.O. TO
18
002
37
JV
CLAIM NOTICE LETTER
DESCRIPTION REFERENCE
0
(valued in OM8-001)
(valued in OM8-001)
0
JAP016/ALM/TCAC/22416
18-Nov-08
(1,988.48)
0
(1,988.48)
0
JAP016/ALM/TCAC/22416 dated 18-ov-08
DXB/AMT-01/0600/EDM/2312
09-Jun-07
1,771.88
ur
1,587.60
0
JAP016/ALM/TCAC/21082 dated 21-Sep-08
DXB/AMT-01/0600/EDM/2313
09-Jun-07
0
(valued in Series 41)
0
DXB/AMT-01/0600/EDM/2111
02-May-07
(valued in Series 41) 7,275.43
0
6,205.97
0
25,999.57
Modification to Lift Opening at 36th and 48th Floor
87
001
41
JV
88 81
001 001
42 43
JV JV
10 3
001R1
44
Modification of Lift Openings at 36th Floor Low Rise Lift Machine Room and 48th Floor High Rise Lift Machine Rooms (Omission of Concrete Works due to the increa increase se of Lift Lift O enin enin Sizes Sizes Revised Drawing for Lift Machine Room on 3rd Service Floor Revised Drawing for Interior Design Works Changes of Levels to Room Nos. B1-073 (Corridor) and B1-074 (Mechanical Plant Room) Additional Wall in Security Room at Basement 2
13 9
001
44.1
70 OM-5
001 001
45 45
97
001
45.1
10 1
001
45.2
14 6
001
001
47
DXB/AMT-01/0600/EDM/2540
17-Jul-07
26,634.44
see NOC#127
NSC Basement 2 Security Room - Revised Drawings for the Ventil Ventilati ation on and and Li Li htin htin Detai Details ls JV Level 30 Partition Layouts JV Omission of Partition Walls in Level 30 for Single Tenancy Arrangements NSC Various Changes due to the revised MEP "For Construction" Drawings due to Modification at Level 30 NSC Various Revisions to the Electrical Works "For Construct Construction" ion" Drawin Drawin s NSC Relocation of Cameras at 30th Floor (RFI No. 859)
DXB/AMT-01/0600/EDM/3134
08-Nov-07
172,273.32
ur
DXB/AMT-01/0500/JLy/1781
14-Mar-07
0
JAP016/ALM/TCAC/19244
26-Jun-08
(valued in OM-5) (66,453.77)
DXB/AMT-01/0600/EDM/2438
30-Jun-07
ur
ur
DXB/AMT-01/0600/EDM/2475
07-Jul-07
ur
DXB/AMT-01/0500/JLy/3207
20-Nov-07
ur
NSC Revision to the Lighting Layout at GF, L1, & L2
DXB/AMT-01/0600/EDM/2309
09-Jun-07
NSC Lighting Requirements to the Function Room / Ballroom JV Additional 40’ Container Storage, Office Chairs, and Computer for F+G Office NSC Telephone IDF/MDF Room Drawings
DXB/AMT-01/0600/EDM/2499
10-Jul-07
DXB/AMT-01/0600/EDM/2551
18-Jul-07
DXB/AMT-01/0600/EDM/2222
27-May-07
34,309.10
ur
DXB/AMT-01/0600/EDM/2315
09-Jun-07
(valued in OM9-001)
0
DXB/AMT-01/1100/WAE/3965
08-Apr-08
58,651.66
82
001
48
89
001
49
JV
18 6
001R1
49
JV
OM-9
001
49
92
001
49.2
16 3
006a
49.3
16 3
006b
49.3
16 3
009
49.4
20 8
001
49.5
10 9
001
50
94
001R2
51
95
001
52
95
002
11 4 93
001 001
Modification to the Structural Drawings at Levels 49, 50, and 51 Notification of Entittlements (CVI-089) - Doors to new washrooms at L49 and L50 (Lift Lobby Area)
JV Modification to the Structural Drawings at Levels 49, 50, and 51 NSC Various Revisions due to the revised For Construction Drawings (MEP Works) at Levels 49, 50, & 51 NSC Fire Fighting Systems at Levels 49, 50, & 51 (Abortive Work JV Fire Fighting Systems at Levels 49, 50, & 51 (Builders Work and Abortive Work) NSC Revised "For Construction" Security Drawings at Levels 49, 50, & 51 under the DMCC Transmittal Transmittal Ref. JAP016/TRNS JAP016/TRNS /JV/00044 dated 5th May 2008 (Security Works NSC Modification of Raised Floor Heights at Server Rooms at Level 49, 50, & 51 NSC Amendment to District Cooling Piping and Control Works (Heat Echangers and Strainers) JV Changes to Suspended Ceiling (ID Works Package)
106,370.21 0.00
CLOSED
CLOSED
CLOSED
CLOSED
1,587.60
CLOSED
CLOSED
0.00
CLOSED
CLOSED
6,205.97
valued under th ERI No. 37
under omission.
(1,988.48)
BI to confirm cost by F&G
184.28
Subcon Cost + 12% OH&P
considered in Claim Series 41 / ERI No. 16
1,069.46
25,999.57
634.87
74,900.00
97,373.32
Light weight Concrete and chipping works
architectural works only.
CLOSED
(66,453.77)
ur
ur
ETA to submit entitlements
ur
ur
ur
ETA to submit entitlements
ur
ur
ur
JCI to submit entitlements
ur
ur
ur
ur
ETA to submit entitlements; Note this pertains to the electrical works, fixtures to be Claim No. 105; to be valued under ERI16 ref. JAP016/ALM/TCAC/09512 dtd 12Jun07
ur
ur
40,174.50
0
0 0
JAP016/ALM/TCAC/19244 dated 26-Jun-08
0
JAP016/ALM/TCAC/11909 dated 9-Sept-2007
13,517.00
0
JAP016/ALM/TCAC/21322 dated 5-Oct-08
(valued in OM9-001)
0
40,074.53
40,074.53
99.97
10,951.45
23,357.65
ur
58,651.66
ur
JAP016/ALM/TCAC/19245
26-Jun-08
(85,688.89)
0
(85,688.89)
0.00
DXB/AMT-01/0600/EDM/2375
21-Jun-07
218,960.00
ur
218,960.00
ur
DXB/AMT-01/0600/EDM/4034
20-Apr-08
ur
ur
ur
ur
DXB/AMT-01/0600/EDM/4034
20-Apr-08
1,903.78
ur
1,903.78
ur
DXB/AMT-01/0600/EDM/4162
10-May-08
ur
ur
ur
ur
DXB/AMT-01/0600/EDM/4335
02-Jun-08
17,250.00
ur
17,250.00
ur
30-Jun-07
653,624.24
0
653,624.24
52
NSC Variation Works due to Lift and Escalator Finishes (Adjustment to the Provisional Sums)
DXB/AMT-01/0600/EDM/2433
30-Jun-07
544,678.47
0
544,678.47
53 54
NSC Changes of Wallpaper in Typical Floor Corridors JV Changes to Mock-up Areas (ID Works)
DXB/AMT-01/0600/EDM/2802
01-Sep-07
DXB/AMT-01/0600/EDM/2400
24-Jun-07
ur 612,662.92
DXB/AMT-01/0600/EDM/2804
02-Sep-07
DXB/AMT-01/0600/EDM/2803
01-Sep-07
ETA cost + 7% OH&P
58,651.66
(85,688.89)
0.00
20,544.00
198,416.00
24,824.00
under review; to be under ERI #49 as per Nakheel letter ref. JAP016/TS/GT/0205 dated 15-Apr-08; SC cost +12%OH&P + 3% Attendances Omission of Office Partitions at Level 49
ETA cost + 12% OH&P + 3% Attendances
ETA to submit entitlements
1,903.78
builders works
JCI to submit entitlements
17,250.00
MDS cost + 12% OH&P + 3% Attendances; valued at ERI No. 49.5 as per Nakheel letter ref. JAP016/TS/GT/0271 dtd 9Jun08 ETA to submit entitlements
597,081.20
ur
393,521.39
203,559.81
JAP016/ALM/TCAC/21731 see NOC#127 dated 21-Oct-08
CLOSED
CLOSED
85,383.20
0.00
0
JAP016/ALM/TCAC/17360 dated 20-Apr-08
CLOSED
CLOSED
579,717.22
73,907.03
KONE costs + 7% JV OH&P
0
JAP016/TS/GT/0083 dated 9 Aug-2007
CLOSED
CLOSED
544,678.47
KONE costs + 7% JV OH&P; NOTE : Not considered as a variation by Consultant but adjsutment to the KONE Provisional Sums from AED500K to 1,009,045.30, and agreed amount s the nett costs.
ur see NOC#127
see NOC#127
4,044.20
0
0
764,729.70
ur
3,315.73
actual cost transmitted to F&G based on dayworks rates; agreed with F&G
valued under the omissions
0.00
JV Scope of Works - Omission of Office Partitions at the Level 30 due to the single tenancy arrangements
ETA to submit entitlements; Note this pertains to the electrical works, fixtures to be Claim No.107
ur
CLOSED
DXB/AMT-01/0600/EDM/2433
0.00
CLOSED
CLOSED
ETA costs + 7% JV OH&P
see OM-5 below (omitted works)
ur
CLOSED
NSC Variation Works due to Lift and Escalator Finishes (Direct Variation to the Nominated S/C Works)
CLOSED
CLOSED
85,383.20
JV
CLOSED CLOSED
CLOSED
0
ur
57
0.00
CLOSED CLOSED
0.00
see NOC#127
001R1
BALANCE TO-DATE
CLOSED
85,383.20
11 6
CERTIFIED TO-DATE
CLOSED
(valued in OM-5) (66,453.77)
597,081.20
Change of Pressurization Duct Opening at 51st Floor Lift Lobb Additional Aluminum Flashing
REMARKS / COMMENTS
TIME (Days)
ur
05-Aug-07
JV
October 15, 2013
November 30, 2008
CLOSED
30-Jun-07 / 22-Dec-07
55
JAP016/ALM/TCAC/17848 see NOC#127 dated 8-May-2008
COST (AED)
CERTIFIED AS AT
CLOSED
DXB/AMT-01/0600/EDM/2655
001
JAP016/ALM/TCAC/21270 dated 29-Sep-08
OUTSTANDING CLAIMS
172,273.32
DXB/AMT-01/0600/EDM/2432 / DXB/AMT-01/0500/JLy/3369
11 5
JAP016/ALM/TCAC/90791 dated 19-Jun-08
106,370.21
ur
JV
10 4
LETTER REF.
ur
JV
46
TIME (Days)
106,370.21
38
001
COST (AED)
31-Oct-07
38
10 2
TIME (Days)
09-Jun-07
001
001
COST (AED)
DXB/AMT-01/0600/EDM/2311
001
84
DATE
DXB/AMT-01/0600/EDM/3098
86
JV
ER / F&G / JV AGREED VALUES
Landscaping works - Screed for the Planter Boxes
OM-8
45 / 45.1 46
CLAIM ENTITLEMENT APPLICATION
JAP016/ALM/TCAC/20893 dated 11-Sep-08
ur
ur
(50,825.00)
612,662.92
CLOSED
400,000.00
212,662.92
CLOSED
CLOSED
3,315.73
728.47
764,729.70
ur
subcon costs plus 12% (revised cost from 182,960.40 due to the meeting between FBI and DMCC)
BI to submit entitlements
764,729.70
Bond Interiors cost + 12% JV Mark-up Mark-up + 7% OH&P (Prov. Sums) agreed withConsultants (F&G)
Subcon Cost + 12%OH&P + 3% Attendances
VARIATION CLAIMS STATUS TO-DATE October 15, 2013
as at NOC NO.
CLAIM NOTICE LETTER
SUB NO.
ERI NO.
V.O. TO
DESCRIPTION
16 4
001
72
JV
12 3
001R2
73
JV
16 6
001
73
JV
16 6
002
73
JV
20 2
001
74
19 7
001a
74.1
19 7
001b
74.1
19 7
002
74.1
19 7
003
74.1
23 8
001
74.1
20 1 15 8
001 001R1
75 76
20 5
001
76.1
20 5
002
76.1
CLAIM ENTITLEMENT APPLICATION
REFERENCE
DATE
COST (AED)
BMS Room Furniture Requirements
DXB/AMT-01/0600/EDM/3589
02-Feb-08
Potential Delay due to Late Issuance of Revised Design Information in Sky Lobby Meeting Room at Level 48 ID Works Package - Lighting Requirements at Level 48 Meeting Room (MEP Works Scope)
DXB/AMT-01/1100/WAE/2955
01-Oct-07
DXB/AMT-01/0600/EDM/3609
ID Works Package - Lighting Requirements at L48 Meeting Room (JV Scope - Lever to Supply)
ER / F&G / JV AGREED VALUES
TIME (Days)
COST (AED)
TIME (Days)
40,216.65
0
39,167.52
0
12,637.06
ur
04-Feb-08
11,783.12
ur
DXB/AMT-01/0600/EDM/3609
04-Feb-08
2,254.00
DXB/AMT-01/0600/EDM/4137
06-May-08
DXB/AMT-01/0600/EDM/4053
Provision of Pantry Area in Ground and First Floor as per revised " For Construction" Drawings under DMCC transmittal JAP016/TRNS/JV/00040 JAP016/TRNS/JV/00040 (JV Scope ID works NSC Provision of Pantry Area in Ground and First Floor as per revised " For Construction" Drawings under DMCC transmittal JAP016/TRNS/JV/00040 (ID Scope of Works NSC Provision of Pantry Area in Ground and First Floor as per revised " For Construction" Drawings under DMCC transmittal JAP016/TRNS/JV/00040 (MEP Works NSC Revised " For Construction" drawings under the DMCC transmittal ref. JAP016/TRNS/JV/00040 dated 16-Apr-08 (Additional Voice/Data Points in GF & 1L)
OUTSTANDING CLAIMS
CERTIFIED AS AT
November 30, 2008 REMARKS / COMMENTS
COST (AED)
TIME (Days)
CERTIFIED TO-DATE
CLOSED
CLOSED
39,167.52
1,049.13
BF cost AED 34,971.00 + 12% JV OH&P
12,637.06
ur
12,637.06
confirmed to be valued under ERI No. 73 according to the Nakheel letter ref. JAP16/TS/GT/0267 dtd 8Jun08
11,783.12
ur
11,783.12
ETA cost + 12%OH&P + 3% Attend ances; confirmed to be valued in ERI No. 73 according to Nakheel letter ref. JAP16/TS/GT/0267 dtd 8Jun08
ur
2 ,2 5 4 .0 0
ur
2,254.00
73,986.40
ur
73,986.40
ur
22-Apr-08
18,228.31
ur
CLOSED
ur
DXB/AMT-01/0600/EDM/4053
22-Apr-08
57,459.68
ur
57,459.68
ur
DXB/AMT-01/0600/EDM/4053
22-Apr-08
ur
ur
ur
ur
DXB/AMT-01/0600/EDM/4127
05-May-08
50,319.40
ur
50,319.40
ur
50,319.40
ETA to submit entitlements
DXB/AMT-01/0500/JLy/5009
26-Oct-08
26,919.09
ur
26,919.09
ur
26,919.09
BC Cost + 7% OH&P; BC V O#9; BC time claim = 186 days
NSC ID Tiling Works-Attic Stock (ERI No. 75) JV Doors at DEWA Water Meter Rooms
DXB/AMT-01/0600/EDM/4135
06-May-08
DXB/AMT-01/0500/JLy/3401/ DXB/AMT-01/0500/JLy/3416
27 & 31Dec-07
ur 21,502.11
ur
NSC DEWA Water Meter Connection (MEP Works)
DXB/AMT-01/0600/EDM/4274
24-May-08
10,637.50
ur
7,908.70
DXB/AMT-01/0600/EDM/4274
24-May-08
5,263.09
ur
3,941.91
DXB/AMT-01/0600/EDM/4323
31-May-08
150,193.45
ur
MDF & IDF Rooms – DU’s Requirements as per the Mock-u Sna List JV Sco e NSC MDF & IDF Rooms – DU’s Requirements as per the Mock-up Snag List (ETA Scope) NSC MDF & IDF Rooms – DU’s Requirements as per the Mock-up Snag List (Bond Communication ScopeKrone Modules)
DXB/AMT-01/0600/EDM/4046
22-Apr-08
2,070.00
DXB/AMT-01/0600/EDM/4046
22-Apr-08
76,094.35
DXB/AMT-01/0600/EDM/4046
22-Apr-08
NSC Revised Domestic Water Layout at Ground and First Floor due to the Revised "For Construction" Drawings under the DMCC Transmittal JAP016/TRNS/JV/00042 JV Provision of Pantry Area in Ground and First Floor as per revised " For Construction" Drawings under DMCC transmittal JAP016/TRNS/JV/00040 JAP016/TRNS/JV/00040 (JV Scope masonry works, abortive works and coring works) JV
JV
DEWA Water Meter Connection (Builders Work)
0
JAP016/TS/GT/20686 dated 28 Au -08 JAP016/TS/GT/20686 dated 28 Aug-08
BALANCE TO-DATE
19,688.00
54,298.40
JV to submit entitlements; confirmed to be valued in ERI No. 73 according to Nakheel letter ref. JAP16/TS/GT/0267 dtd 8Jun08; Lever cost + 12% OH&P + 3% Attendance ETA cost + 12% OH&P + 3% Attendances
27,042.36
(8,814.05)
Masonry Works, Abortive Works and Coring Works
57,459.68
Doors and Frames incl Ironmongery, and Ceiling Works
Bond Interiors to submit entitlements
BI to submit entitlements
ur
CLOSED
21,502.11
ur
21,502.11
JV Costs
CLOSED
ur
10,637.50
ETA cost + 7% OH&P
CLOSED
ur
3,941.91
1,321.18 150,193.45
JV works clsoing of opening and provision of new opening with waterproofing and sealing works Al Abbar cost + 12% OH&P + 3% Attendances
150,193.45
ur
ur
2 ,0 7 0 .0 0
ur
2,070.00
valued in ERI#78 as per Nakheel lett er ref. JAP016/TS/GT/0304 dtd 5Aug08
ur
76,094.35
ur
76,094.35
62,002.57
ur
62,002.57
ur
62,002.57
ETA cost + 12% OH&P + 3% Attendances; valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/0304 dtd dtd 5Au 5Au 08 BC to submit entitlements; valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/ 0304 dtd 5Aug08; BC Cost + 7% (BC VO#03); BC time claim = 147 days
20 7
001
77
19 6
001
78
19 6
002
78
19 6
003a
78
19 6
003b
78
NSC MDF & IDF Rooms – DU’s Requirements as per the Mock-up Snag List (Bond Communication ScopeVertical Cable Manager)
DXB/AMT-01/0600/EDM/4046
22-Apr-08
127,698.42
ur
127,698.42
ur
127,698.42
BC to submit entitlements; valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/ 0304 dtd 5Aug08; BC Cost + 7% (BC VO#05); BC time claim = 233 days
19 6
003c
78
NSC MDF & IDF Rooms – DU’s Requirements as per the Mock-up Snag List (Bond Communication ScopeHorizontal Cable Manager)
DXB/AMT-01/0600/EDM/4046
22-Apr-08
19,821.34
ur
19,821.34
ur
19,821.34
BC to submit entitlements; valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/ 0304 dtd 5Aug08; BC Cost + 7% (BC VO#11); bc time claim = 201 days
19 6
003d
78
NSC MDF & IDF Rooms – DU’s Requirements as per the Mock-up Snag List (Bond Communication ScopeCAT 3 Cables Installations)
DXB/AMT-01/0600/EDM/4046
22-Apr-08
336,915.53
ur
336,915.53
ur
336,915.53
BC to submit entitlements; valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/ 0304 dtd 5Aug08; BC Cost + 7% (BC VO#01); bc time claim = 275 days
19 6
003e
78
NSC MDF & IDF Rooms – DU’s Requirements as per the Mock-up Snag List (Bond Communication ScopeOM3 Fibre Optic Cable Installations)
DXB/AMT-01/0600/EDM/4046
22-Apr-08
321,379.43
ur
321,379.43
ur
321,379.43
BC to submit entitlements; valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/ 0304 dtd 5Aug08; BC Cost + 7% (BC VO#02); bc time claim = 273 days
19 6
004
78
MDF & IDF Rooms – DU’s Requirements as per the Mock-up Snag List (Lateral Systems Scope) MDF & IDF Rooms – DU’s Additional Requirements, i.e., Stand for the UPS & Batteries in MDF Room & UPS Room at Basement 1
DXB/AMT-01/0600/EDM/4046
22-Apr-08
117,875.00
ur
117,875.00
ur
117,875.00
DXB/AMT-01/0600/EDM/4797
02-Sep-08
5,689.44
ur
5 ,6 8 9 .4 4
ur
5,689.44
JV Internal Works
NSC MDF & IDF Rooms – DU’s Additional Requirements, i.e., DU's Requirements for the UPS
DXB/AMT-01/0600/MIC/5017
27-Oct-08
93,918.75
ur
93,918.75
ur
93,918.75
ETA cost + 12% OH&P + 3% Attend
19 6
005
78
19 6
006
78
NSC Tower Secondary Roof Clamping Section
JAP016/ALM/TCAC/21106 dated dated 22-Se 22-Se -08
JAP016/ALM/TCAC/22447 dated 19-Nov-08
14,232.82
0
LETTER REF.
JV
JV JV
valued in ERI#78 as per Nakheel lett er ref. JAP016/TS/GT/0304 dtd 5Aug08
VARIATION CLAIMS STATUS TO-DATE October 15, 2013
as at NOC NO.
SUB NO.
35
002a
ERI NO.
V.O. TO
CLAIM NOTICE LETTER
DESCRIPTION
36
001
NSC Additional OCP's conduits to the Offices and Retail Units MEP Works JV Additional OCP's conduits to the Offices and Retail Unts (Builders Work) NSC Fire Alarm Shop Drawing
39 40
001 001
JV Nomination of Landscaping Subcontractor NSC Revised "For Construction" Drawings for ETA
42
001
NSC Fire Sprinkler Riser Pipes in Garbage Chute Shaft
43
001
44
001
45
001
47
001
48
001
49
001
JV
53
001
JV
58 60 61
001 001 001
62
001
63 66
001 001
71
001
72
001
73
001
74 75 83
001 001 001
90
001
35
002b
91
001
96
001
98 10 5
001 001
10 7
006
10 8 11 1
001 001
11 3
001
11 3
002
11 3
003
11 7
001
11 8
001
11 9
001
JV
CLAIM ENTITLEMENT APPLICATION
CTU 3rd Party Inspection
REFERENCE
DATE
COST (AED)
TIME (Days)
DXB/AMT-01/0500/JLy/926
03-Oct-06
38,246.08
DXB/AMT-01/0500/JLy/926
03-Oct-06
120,370.11
DXB/AMT-01/0500/JLy/932
05-Oct-06
ur
ur
DXB/AMT-01/0500/JLy/1052
05-Nov-06 06-Nov-06
0.00 (valued in37-001)
ur
DXB/AMT-01/0500/JLy/1054 DXB/AMT-01/0500/015/JLy/235
07-Nov-06
522,748.23
ur
DXB/AMT-01/0500/JLy/1086
11-Nov-06
0.00
0
ER / F&G / JV AGREED VALUES
CERTIFIED AS AT
November 30, 2008 REMARKS / COMMENTS
COST (AED)
TIME (Days)
ur
38,246.08
ur
38,246.08
ETA Cost + 7% JV OH&P; as pe r original claim
ur
120,370.11
ur
120,370.11
JV Cost
ur
ur
0
NSC Revised Specifications for the Fire Fighting Equipments JV Provision of Inspectors
DXB/AMT-01/0600/EDM/1179
29-Nov-06
ur
ur
DXB/AMT-01/0500/JLy/1185
03-Dec-06
(valued in 127-001)
0
NSC Revised Architectural Drawings at 31st & 32nd Floor (MEP Works) NSC Revised Architectural and ID Drawings (MEP Works)
DXB/AMT-01/0600/EDM/1237
11-Dec-06
ur
DXB/AMT-01/0600/EDM/1238
11-Dec-06
Exceptionally Adverse Climatic Conditions
DXB/AMT-01/0500/JLy/1253
RFI No. 480 - Embedded Flush Tank
DXB/AMT-01/0500/JLy/1338
COST (AED)
OUTSTANDING CLAIMS
TIME (Days)
LETTER REF.
JAP016/TS/BW/0021 dated 12Nov-06
0.00 (valued in37-001)
0
0.00
0
(valued in 127-001)
0
JAP016/TS/ABS/0031 dated 28Dec-06
CLOSED
ur
CLOSED
CLOSED
522,748.23
ur
CLOSED
CLOSED
CERTIFIED TO-DATE
BALANCE TO-DATE
ETA to submit entitlements; rejected by Nakheel due to the Consultant's(Atkins)response ref. RD/4532/661/ML/R8-0344.
0.00
522,748.23
0.00
0.00
time implications. same as Claim No. 37-001, based on the F&G transmittal ref. F+G/ALMAS/TAISEI/01404 dtd 10-1506 based on the response from RFI No. 417
request by WS Atkins and F&G in the Technical Meeting to provide 3rd party safety inspection and issue of certificate prior to CTU; rejected by Nakheel. ETA to submit entitlements; revisions is due to the requirement of a UL/FM specifications
ur
ur
CLOSED
CLOSED
0.00
ur
ur
ur
To be included in the Prolongation Claims as this is a reliminaries items ETA to submit entitlements
ur
ur
ur
ur
ETA to submit entitlements
14-Dec-06
0.00
ur
0.00
CLOSED
ur
0.00
28-Dec-06
0.00
0
0.00
0
CLOSED
CLOSED
DXB/AMT-01/0600/EDM/1566
10-Feb-07
0
(valued in 65-001)
0
CLOSED
CLOSED
0.00
DXB/AMT-01/0500/JLy/1567
13-Feb-07
0
0.00
14-Feb-07
(valued in 33-030) 0.00
0
DXB/AMT-01/0500/JLy/1593
(valued in 65-001) (valued in 33-030) 0.00
Changes to Raised Access Floors at Tecom Rooms, Securit Rooms, and Tele hone Rooms NSC Installation of OCP's to Tenant Rooms NSC MEP Works - Revised External Services Drawings
DXB/AMT-01/0600/EDM/2507
11-Jul-07
12,494.21
ur
DXB/AMT-01/0500/JLy/1633
20-Feb-07
0
DXB/AMT-01/0600/EDM/1655
25-Feb-07
(valued in 35-001) (valued in 64-001)
NSC MEP Works - Revised Ground Floor Landscape Drawings JV Interfacing Detail between the Cladding and Blockwall JV Disabled Toilets (CVI No. 052 dated 18th March 2007 increase of openings to blockwork walls to 1.00m)
DXB/AMT-01/0600/EDM/1786
14-Mar-07
DXB/AMT-01/0500/JLy/1792
14-Mar-07
DXB/AMT-01/0500/JLy/1836
19-Mar-07
JV Shadow Groove to Ceilings JV Disabled Toilet NSC RFI No. 571 - Insulation and Backing Panels to Cladding JV Change of Back of House Doors Colours from White to Gra NSC Revision of ST-10 to ST-15 (ID Works Packa ge Provisional Sum JV Changes to D-04 & D-30 Hinges (ID Works Package)
DXB/AMT-01/0500/JLy/1885
26-Mar-07
NSC Revised MEP Drawings JV Provision of BMU JV Sanitary Ware Selection JV
0
0
JAP016/ALM/TCAC/06995 dated 18-Feb-2007
CLOSED
CLOSED
CLOSED
CLOSED
12,494.21
ur
0.00
0.00
due to inclement weather conditions at site
0.00
rejected by F&G as it is included specs M13. valued in Claim No. 65-001 not applicable
0.00 12,494.21
rejected by F&G as per the response letter Revision 1 - revised due to the changes in the works.
0
CLOSED
CLOSED
0.00
not applicable
0
(valued in 35-001) (valued in 64-001)
0
CLOSED
CLOSED
0.00
Included in Claim No. 64-001
(valued in 76-001)
0
(valued in 76-001)
0
CLOSED
CLOSED
0.00
Included in 76-001
(valued in 116-001)
0
0.00
0
CLOSED
CLOSED
0.00
0.00
0
0.00
0
(not done)
CLOSED
CLOSED
0.00
0
(valued in 41-001) 0.00
0
(valued in 41-001)
CLOSED
CLOSED
0.00
0
(not done)
CLOSED
CLOSED
0.00
ur
ur
ur
0.00
DXB/AMT-01/0500/JLy/1886
26-Mar-07
DXB/AMT-01/0500/JLy/2184
20-May-07
(valued in 41-001) 0.00 ur
DXB/AMT-01/0500/JLy/2347
16-Jun-07
0.00
0
DXB/AMT-01/0500/JLy/2350
16-Jun-07
2,704,866.52
ur
DXB/AMT-01/0600/EDM/2437
30-Jun-07
(valued at 41-001)
0
(valued at 41-001)
0
NSC Secondary Roof for the Towers JV Revised Interior Lighting Fixtures Layout at GF,1L,& 2L JV Provision of Downspouts at Ballroom/Function Room Roof CVI No. 122 JV Architectural Changes to Level 2 JV Omission of Mirror Mounted Paper Towel Dispenser
DXB/AMT-01/0600/EDM/2451
02-Jul-07
(valued in 220-001)
0
18-Jul-07
(valued in 220-001) (valued in 41-001)
ur
DXB/AMT-01/0600/EDM/2553
0
(valued in 41-001)
0
DXB/AMT-01/0600/EDM/4465
26-Jun-08
2,210.46
see NOC#127
DXB/AMT-01/0100/YOS/2628
31-Jul-07
0
DXB/AMT-01/0600/EDM/2731
18-Aug-07
(valued in 149) 165,993.30
NSC Plenum Box and Louvre for Vent Pipe of Garbage Chute and Stack Vent at 64th Level - RFI No. 462 (ETA Scope) NSC Plenum Box and Louvre for Vent Pipe of Garbage Chute and Stack Vent at 64th Level - RFI No. 462 (Al Abbar Sco e JV Plenum Box and Louvre for Vent Pipe of Garbage Chute and Stack Vent at 64th Level - RFI No. 462 (JV Sco e JV Changes to the Diamond Exchange Centre
DXB/AMT-01/0600/EDM/2768
26-Aug-07
91,147.85
DXB/AMT-01/0600/EDM/2768
26-Aug-07
DXB/AMT-01/0600/EDM/2768
NSC Revised Mechanical and Electrical Drawings at Basement 2 Securit Room JV Notification of Potential Delay due to the Review of
JAP016/TS/ALM/TCAC/06906 dated 14-Feb-07
0
0.00
0
(not done)
CLOSED
CLOSED
2,704,866.52
ur
CLOSED
CLOSED
included in Claim No. 116-001
0.00
not done
valued in Claim No. 41-013 not done AA to submit entitlements
no claim from subcontractors
2,704,866.52
BI costs of AED 2,527,912.64 + 7% JV OH&P
considered in Claim No. 41-007
0.00
CLOSED
CLOSED
0.00
to be valued in Claim N o. 220-001
CLOSED
CLOSED
0.00
TO BE VALUED IN CLAIM NO. 41-001 (ERI 16)
see NOC#127
2,210.46
CLOSED
0
CLOSED
CLOSED
see NOC#127
165,993.30
CLOSED
165,993.30
Arte Casa Cost + 12% OH&P + 3% Attendances
ur
91,147.85
ur
91,147.85
ETA costs + 12% OH&P + 3% Attendance s
11,909.40
ur
11,909.40
ur
11,909.40
Al Abbar cost + 12% OH&P + 3% Attendances
26-Aug-07
(valued in 113-001)
0
(valued in 113-001)
0
CLOSED
CLOSED
0.00
Included in Claim No. 113-001
DXB/AMT-01/0500/JLy/2805
02-Sep-07
(valued in 149-001)
see NOC#127001
(valued in 149-001)
see NOC#127001
CLOSED
CLOSED
0.00
valued in 149-001 under ERI No. 62
DXB/AMT-01/0600/EDM/2906
19-Sep-07
ur
ur
DXB/AMT-01/1100/WAE/2908
19-Sep-07
0.00
ur
(valued in 149)
see NOC#127
JAP016/ALM/TCAC/10523 dated 22-July-2007
ur
0.00
CLOSED
ur ur
2,210.46
ETA to submit entitlements
0.00
varied works at structural steel works and provision of Roof Drain on-hold area, awaiting details from Client
0.00
0.00
Potential Time Claim
VARIATION CLAIMS STATUS TO-DATE as at NOC NO.
SUB NO.
15 4
001
15 5
001
15 6
001
15 7
001
15 9
001
16 0 16 1 16 2
001 001 001
ERI NO.
V.O. TO
CLAIM NOTICE LETTER
DESCRIPTION
JV
Enclosure to the Irrigation Pipes running through the LV Room 2 RFI No. 894 NSC Second Floor Revised Lighting and Power Design NSC Lift L4 Mock-Up (Car Interior Finish @ Ground Floor Level) JV Request for Issue of Outstanding Drawings (DMCC Offices at L49-L51 & Add'l Toilets in Office Area at L52-L64 JV Special Holiday on 14th January 2008 JV JV JV
Notice of Excessive Rains Additional Architraves to Towel Dispensers Notification of a Possible Variation at Ballroom Electrical Cabinet Doors NSC Further Revisions to the Levels 49, 50, 51, 60 and 61 in accordance with DMCC Transmittal Ref. JAP016/TRNS/JV/ 00032 dated 22nd January 2008 MEP Works JV Notification of Disruption of Work due to discrepancy of Design Drawings at Second Floor
16 3
005
16 5
001
16 7
001
16 8 17 1 17 2
001 001 001
JV Inspections not done on Timely Basis NSC Sequencing of Spire Erection JV Abortive Cost for GL-07 (ID Works Package)
17 5
001
17 6
001
17 6
002
NSC Revised "For Construction" Drawings under the DMCC Transmittal Ref. JAP016/TRNS/JV/00033 dated 5th Februar 2008 MEP Works JV TECOM/DU Comments on Telephone Rooms Raised Access Floor Material Submittal NSC DU Requirements
17 6
003
17 6 17 7 18 0
004 001 001
NSC TECOM/DU Comments on Structured Cabling Material Submittal NSC TECOM/DU Comments - " Active " IDF Rooms JV Diamond Exchange Details NSC Increase in Water Tank Size
18 1 18 2
001 001
18 3
JV
CLAIM ENTITLEMENT APPLICATION
Delays due to Strong Winds
ER / F&G / JV AGREED VALUES
REFERENCE
DATE
COST (AED)
TIME (Days)
COST (AED)
DXB/AMT-01/0600/EDM/3313
11-Dec-07
1,600.56
DXB/AMT-01/0600/EDM/3314
11-Dec-07
ur
DXB/AMT-01/0500/JLy/3359
17-Dec-07
0.00
0
0.00
0
DXB/AMT-01/0100/YOS/3365
22-Dec-07
(valued in 163)
0
(valued in 163)
0
DXB/AMT-01/0600/EDM/3482
16-Jan-08
0.00
ur
0.00
0
DXB/AMT-01/0600/EDM/3483
16-Jan-08
0.00 96,768.00 0.00
ur
0.00
1,600.56
ur
ur
ur
ur
CLOSED
CLOSED
rejected by Nakheel as the proposed revisions was not done and was reverted back to original Aedas Specs
CLOSED
CLOSED
valued in another claim
CLOSED
CLOSED
0.00
to be considered in the EOT claim
CLOSED
ur
0.00
under review for time entitlements
DXB/AMT-01/0600/EDM/3492
19-Jan-08 24-Jan-08
DXB/AMT-01/0600/EDM/3770
03-Mar-08
ur
ur
DXB/AMT-01/1100/WAE/3603
04-Feb-08
(valued in 149-001)
ur
(valued in 149-001)
DXB/AMT-01/0500/JLy/3613
05-Feb-08
0.00
0
0.00
0
DXB/AMT-01/0500/JLy/3623
06-Feb-08
0
0.00
0
ur
0.00
0
0.00
DXB/AMT-01/0600/EDM/3771
03-Mar-08
ur
ur
DXB/AMT-01/0500/JLy/3814
10-Mar-08
(valued in 196)
ur
(valued in 196)
DXB/AMT-01/0500/JLy/3568
28-Jan-08
(valued in 196)
ur
(valued in 196)
DXB/AMT-01/1200/JIN/3827
13-Mar-08
(valued in 196)
ur
DXB/AMT-01/0600/DAN/3923
31-Mar-08 16-Mar-08
DXB/AMT-01/1200/RAN/3903
27-Mar-08
(valued in 196) (valued in 149-001) 71,922.15
ur
DXB/AMT-01/0500/JLy/3844
NSC Ducting in MDF Rooms NSC Additional Low Leakage Motorized Smoke Damper
DXB/AMT-01/1200/RAN/3906
27-Mar-08
DXB/AMT-01/1200/RAN/3915
001
NSC Height of Services at Level-49 on Shaft-6
18 4
001
18 5
001
18 7
001
18 7
002
18 8
001
001
19 2
001
19 3
001
19 4 19 4
001 002
19 5
001
19 8
001
19 9
001
LETTER REF.
JAP016/TS/GT/0142 dated 31Jan-08
JAP016/TS/GT/0259 dated 29M a - 08
0
17-Feb-08
19 1
TIME (Days)
DXB/AMT-01/1100/WAE/3542
09-Feb-08
001
REMARKS / COMMENTS
ur
DXB/AMT-01/0500/JLy/3634
001
October 15, 2013
November 30, 2008
TIME (Days)
DXB/AMT-01/0600/EDM/3676
19 0
CERTIFIED AS AT
COST (AED)
0.00 ur 0.00
18 9
OUTSTANDING CLAIMS
0
JAP016/TS/GT/0186 dated 27Mar-08
BALANCE TO-DATE 1,600.56 ETA to submit entitlements
96,768.00
-
96,768.00
CLOSED
CLOSED
0.00
ur
ur
submitted thru…3701 dtd 20-Feb-08 under review.
ETA to submit entitlements
ur
0.00
time claim.
CLOSED
CLOSED
0.00
rejected by Nakheel
CLOSED
CLOSED
0.00
To be included in the Prolongation Claims
CLOSED
JAP016/TS/GT/0152 dated 18Feb-08
CERTIFIED TO-DATE
EVS to submit entitlements
ur
ur
CLOSED
CLOSED
ur
ur
0
CLOSED
CLOSED
Lateral Systems to submit (Builders to be in another submittal)
0
CLOSED
CLOSED
(valued in 196)
0
CLOSED
CLOSED
ETA to submit entitlements (Builders to be in another submittal BC to submit entitlements (Builders Works if any to be in another submittal)
(valued in 196) (valued in 149-001)
0
CLOSED
CLOSED
CLOSED
ur
ur
71,922.15
ur
ur
ur
ur
29-Mar-08
ur 1,308,459.65
ur
1,308,459.65
ur
1,308,459.65
ETA Claim = AED 1,137,791.00, + JV's 12% (OH&P) and 3% (Attend)
DXB/AMT-01/1200/RAN/3932
02-Apr-08
36,435.37
ur
36,435.37
ur
36,435.37
NSC Additional Stone Cladding to Sides of Maintenance Stairs NSC Additional Work to Make-up Levels at Main Entrance
DXB/AMT-01/1100/WAE/3936
03-Apr-08
ur
ur
ur
ur
ETA Claim = AED 31,682.93, + JV's 12% (OH&P) and 3% Attend Al Bayader to submit e ntitlements
DXB/AMT-01/1100/WAE/3937
03-Apr-08
ur
ur
ur
ur
Al Bayader to submit e ntitlements
JV Design Change to External Ramps - Block Stopper U stand CVI No. 086 NSC Design Change to External Ramps - Waterproofing CVI No. 086 NSC Sprinkler Heads in Illuminated Ceiling (RFI No. 967 Rev. 0 NSC Additional Work to the Ball Room Parapet (CVI No. 084) NSC Additional Work to Lightweight Concrete to Pedestrian Path (RFI No. 976) NSC Additional Work to External Wall Finishing at Swimming Pool (RFI No. 920) NSC Additional Work to Concrete Under Maintenance Path Tiles RFI No. 929 JV Additional Aluminum Angles at RAF Termination
DXB/AMT-01/1100/WAE/3971
09-Apr-08
108,691.73
ur
108,691.73
ur
108,691.73
JV's portion of the works
DXB/AMT-01/1100/WAE/3971
09-Apr-08
86,593.30
ur
86,593.30
ur
86,593.30
AB cost + 12% OH&P + 3%Attend
0
ur
DXB/AMT-01/1200/RAN/3974
10-Apr-08
ur
ur
DXB/AMT-01/1100/WAE/3975
10-Apr-08
(valued in 107-007)
0
(valued in 107-007)
0
DXB/AMT-01/1100/WAE/3976
10-Apr-08
0.00
0
0.00
0
DXB/AMT-01/1100/WAE/3979
13-Apr-08
ur
DXB/AMT-01/1100/WAE/3980
13-Apr-08
ur
DXB/AMT-01/0600/EDM/4026
19-Apr-08
0.00
0
NSC Temporary Fire Alarm Systems (Installation) JV Temporary Fire Alarm Systems (Material / Testing and Commissionin NSC Mechanical Services at Tecom Room in Level 50
DXB/AMT-01/0600/EDM/4041
21-Apr-08
DXB/AMT-01/0600/EDM/4041
21-Apr-08
190,661.95 82,800.00
0 0
DXB/AMT-01/0600/EDM/4042
21-Apr-08
ur
NSC Change of Applied Cementitious Fireproofing to Intumescent Paint on Steel Beams at Diamond Exchan e Center NSC Design Change of Core Bulk Head at Ground Floor Escalator Lobby - MEP Rectification Works for the ID Works Packa e CVI No. 088
DXB/AMT-01/0600/EDM/4079
26-Apr-08
DXB/AMT-01/0600/EDM/4080
27-Apr-08
JAP016/TS/GT/0228 dated 13M a - 08
considered Nil due to the increase in the rates for GL07 as er letter ref. ETA to submit entitlements (Builders to be in another submittal)
ETA to submit entitlements valued in 149-001 under ERI No. 62
0.00
71,922.15
ETA Claim = AED 62,541.00, +JV's 12%(OH&P) and 3% (Attend) ETA to submit entitlements
ETA to submit entitlements
ur
ur
CLOSED
CLOSED
0.00
CLOSED
CLOSED
0.00
ur
ur
ur
ur
ur
ur
CLOSED
CLOSED
0.00
0
190,661.95
CLOSED
190,661.95
ETA to submit entitlements
0
82,800.00
CLOSED
82,800.00
JV thru Sibca to submit entitlements
ur
ur
ur
ur
ur
ur
ur
27,548.25
ur
27,548.25
ur
0.00
0
JAP016/TS/GT/0204 dated 14 Apr-08
JAP016/TS/GT/0233 dated 15mAY-08
Al Bayader to submit e ntitlements
0.00
Al Bayader to submit e ntitlements; claim notice rejected Al Bayader to submit e ntitlements
Al Bayader to submit e ntitlements
0.00
under review (done by Dubai Metals); rejected by Nakheel as it is part of MDS scope of works
ETA to submit entitlements (Builders Works if any to be in another submittal EVS to submit entitlements
27,548.25
ETA Claim = AED 23,955.00 + 12%JVOH&P + 3% Attendances
VARIATION CLAIMS STATUS TO-DATE as at NOC NO.
SUB NO.
ERI NO.
V.O. TO
24 2
001
24 3
001
24 4
001
24 5
001
JV
24 6
001
JV
OM-10
001
JV
CLAIM NOTICE LETTER
CLAIM ENTITLEMENT APPLICATION
DESCRIPTION
0
0
0 0
0
0
0
0 0
REMARKS / COMMENTS
TIME (Days)
NSC Structural Steel Support for Fans at Air Shaft
DXB/AMT-01/0600/MIC/5158
01-Dec-08
340,314.96
ur
340,314.96
ur
340,314.96
ETA cost + 12% OH&P + 3% Att
NSC HVAC Systems at Basement 1 Control Room and Lobb as er RFI No. 1087 JV Additional Door Closer and Selector at Basement 1 Management Office
DXB/AMT-01/0600/EDM/5189
13-Dec-08
13,460.75
ur
13,460.75
ur
13,460.75
ETA cost + 12% OH&P + 3% Attendances
DXB/AMT-01/0500/Jly/5252
24-Dec-08
1,732.06
ur
1,732.06
ur
1,732.06
Supply and installation of additional Ironmongeries at the Basement 1 Management Office main Entrance Door as per the F&G letter ref. JAP016/ALM/TCAC/23226 dtd 22-Dec-08
Coring for the Tenant Fit-Out Contractors
DXB/AMT-01/0500/Jly/5278
04-Jan-09
ur
ur
ur
ur
Additional Access Ladder at Penstock Chamber in Basement 4 PC Supply Rates
DXB/AMT-01/0600/MIC/5287
05-Jan-09
ur
ur
ur
ur
DXB/AMT-01/0600/DAN/5092
16-Nov-08
(21,806.96)
0
(21,806.96)
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
`
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
199,754,280.16
581
0
0
0
0
0
0
0
0
0
GRAND TOTAL
0
0
0
0
0
LETTER REF.
TIME (Days)
October 15, 2013
November 30, 2008
COST (AED)
TIME (Days)
COST (AED)
CERTIFIED AS AT
DATE
0
COST (AED)
OUTSTANDING CLAIMS
REFERENCE
TOTA L FO R CL AIMED/NOTIFIED VAR IATIONS (WITHO
0
ER / F&G / JV AGREED VALUES
10,993,091.15
00-Jan-00
00-Jan-00
00-Jan-00
00-Jan-00
581
118,692,853.45
0
BALANCE TO-DATE
as per the email request of Mr. Clarence Pinto of DMCC dated 4Jan-09 as per the EHS requirements
adjustment to the Contract Sums due to the PC Materials final rates
0.00
00-Jan-00
115,316,855.52
CERTIFIED TO-DATE
60,740,469.59
10,993,091.15
54,550,384.93
DMCC- AL MAS TOWER PROJECT JUMEIRAH LAKE TOWERS JAP016 : PACKAGE NO. 3 - MAIN BUILDING WORKS
VARIATION CLAIMS STATUS TO-DATE as at CLAIM NOTICE LETTER
NOC NO.
SUB NO.
ERI NO.
V.O. TO
13
001
04
JV
14
001
06
14 14
002 004
06 06
Site Establishment - Offices (Supply of ETA Temporary Site Office Purchased form Seidco Gen. Cont. Co. NSC ETA Site Offices (New Offices at Site) JV ETA/F&G Site Offices - Rubbish Removal
15
001R1
07
NSC ETA Site Offices Provision of Power Supply
16
001
08
JV
17
001
09
JV
14
003
10
20
001
11
28
001R1
12
NSC Cast Resin Bus Bars
OM-1
001
13
32
001
14
JV Omit Wall Plaster from Car Parking Areas in all 5 Basement Floors NSC Stainless Steel Members to Diamond Exchange Area
35
001a
15
35
001b
15
21 7
001
15.1
21 7
002
15.1
31
001
16
41
001R1
16/ 39
41
41
41
002R1
003R1
004R1
CLAIM ENTITLEMENT APPLICATION
DESCRIPTION
Additional Telephone Lines
JV
COST (AED)
TIME (Days)
13-May-06
0.00
13-May-06
278,155.63
501,971.39 56,840.00
0
REFERENCE
DATE
DXB/AMT-01/0500/JLy/429 DXB/AMT-01/0500/JLy/430
ER / F&G / JV AGREED VALUES COST (AED)
TIME (Days)
0
0.00
0
0
218,400.00
0
OUTSTANDING CLAIMS
CERTIFIED AS AT
October 15, 2013
November 30, 2008 REMARKS / COMMENTS
COST (AED)
TIME (Days)
CLOSED
CLOSED
0.00
0.00
CLOSED
CLOSED
218,400.00
59,755.63
501,971.39
CLOSED
501,971.39
ETA cost + 12% OH&P + 3% Attendan ces
56,840.00
0
56,840.00
1,193,235.54
CLOSED
765,834.58
427,400.96
JV scope of works; verbally agreed with F&G to be 5050 as at Se -08 ETA costs + 7% JV OH&P
JAP016/ALM/TCAC/04893 dated 30-Oct-06
CLOSED
CLOSED
128,324.82
30,846.96
Costs agreed by JV under letter ref. DXB/AMT01/0500/Jly/1065 dated 7-Nov-06.
JAP016/ALM/TCAC/08151 dated 09-Apr-07
CLOSED
ur
107,738.59
73,652.74
ERI No. 09; Internal Preliminary Assessment is equal to 10 days, but works has yet to be carried out to consider the EOT; cost evaluated by F&G accepted thru letter ref. DXB/AMT-01/0500/Jly/1072 dated 8Nov-06 but subject to add'l revisions and prolongat
LETTER REF. JAP016/ALM/TCAC/21287 dated 5-Oct-08 JAP016/ALM/TCAC/05508 dated 29-Nov-06
CERTIFIED TO-DATE
BALANCE TO-DATE to confirm if this is still needed; No need for additional tele hone lines F&G evaluation is based on a +12% OH&Pro, and prelims omitted and to be dealt with in EOT's
DXB/AMT-01/0600/MIC/____
13-Dec-08
DXB/AMT-01/0600/DAN/5012
26-Oct-08
DXB/AMT-01/0500/JLy/431 / DXB/AMT-01/0600/DAN/3648
13-May-06 / 12-Feb-08
1,193,235.54
0
Provision of Starter Bars to Podium within the Landscape Package Core Wall Thickening
DXB/AMT-01/0500/JLy/432
13-May-06
159,171.78
0
128,324.82
DXB/AMT-01/0500/JLy/501
26-Jun-06
181,391.33
ur
107,738.59
NSC Site Establishment - Offices (Supply and Installation of AC Units within the New Offices being established b Nakheel JV Supply of Potable Water to DMCC and F&G's Site Offices
DXB/AMT-01/0500/JLy/430
13-May-06
80,097.04
0
64,574.50
0
JAP016/ALM/TCAC/06385 dated 21-Jan-07
CLOSED
CLOSED
64,574.50
15,522.54
ETA cost of 60,350.00 + 7% JV OH&P
DXB/AMT-01/0500/JLy/655
16-Jul-06
23,551.60
0
25,076.80
0
CLOSED
CLOSED
10,841.60
12,710.00
Period from June 2006 - September 2007, and October-2007 - November 2008
DXB/AMT-01/0600/EDM/2402, DXB/AMT-01/0600/DAN/3172
24-Jun-07 , 14-Nov-07
2,071,622.24
ur
1,049,300.70
JAP016/ALM/TCAC/22075 dated 4-Nov-08, JAP016/ALM/TCAC/23417 dated 6-Jan-08 JAP016/ALM/TCAC/14871 dated 13-Jan-08
CLOSED
ur
1,049,300.70
1,022,321.54
NSC Provision of DB's in lieu of Isolators in the O ffices & Retail Units at 3rd to 49th Floors (MEP Works) JV
Provision of DB's in lieu of Isolators in the O ffices & Retail Units at 3rd to 49th Floors (Builders Work)
NSC SMDB's in lieu of Isolators at Level 52-63 and Retail Mall and Splitting of Landlord DB's for Ground Floor and First Floor as per DEWA Requirement (MEP Works JV SMDB's in lieu of Isolators at Level 52-63 and Retail Mall and Splitting of Landlord DB's for Ground Floor and First Floor as per DEWA Requirement (Builders Work JV Drawing Revisions to the Diamond Exchange Centre; due to revised Openings. JV
Interior Design Works (JV Internal Subcontractors)
0
0 0
0
ETA Cost + 7%; Time Effect shall be by NSC, if any; potential additional builders works, and attendance in reference to the Time. Confirmed by ETA under their letter ref. DIV.092/AM/TS/1342 dated 31-Jan-08
JAP016/ALM/TCAC/05257
16-Nov-06
(383,650.51)
0
(383,650.51)
CLOSED
(315,883.28)
(67,767.23)
cost implication sent under JV letter ref.DXB/AMT01/0800/Jly/1175 dated 29-Nov-06
DXB/AMT-01/0500/JLy/844
11-Sep-06
333,540.00
ur
317,914.82
0
JAP016/ALM/TCAC/05673 dated 11-Dec-06
CLOSED
CLOSED
317,914.82
15,625.18
DXB/AMT-01/0500/JLy/926
03-Oct-06
2,072,029.32
ur
1,220,076.06
ur
CLOSED
CLOSED
1,408,720.27
663,309.05
DXB/AMT-01/0500/JLy/926
03-Oct-06
102,131.48
ur
55,692.82
ur
JAP016/ALM/TCAC/18730 dated 8-Jun-08 JAP016/ALM/TCAC/22415 dated 18-Nov-08 JAP016/ALM/TCAC/18730 dated 8-Jun-08
EVSCost Effect is NSC Cost + 7% O&H + 2% Attendance, as this is an additional work; Time Effect shall be by NSC, if any; potential additional builders works. ETA costs + 7% JV OH&P; F&G revised a ssessment from their letter ref.JAP016/ALM/TCAC/18730 dtd 8Jun-08
CLOSED
CLOSED
102,131.44
0.04
DXB/AMT-01/0600/EDM/4512
06-Jul-08
538,459.90
ur
538,459.90
ur
538,459.90
DXB/AMT-01/0600/EDM/4512
06-Jul-08
7,538.64
ur
7,538.64
ur
7,538.64
builders works
DXB/AMT-01/0500/JLy/842
11-Sep-06
82,672.78
0
82,672.78
CLOSED
82,672.78
rejected by Nakheel due to relation with coordination issues with MEP requirements; awaiting response from NSC (Eversendai) on the rejection.
DXB/AMT-01/0500/JLy/877
24-Sep-06
28,894,792.49
see NOC#127
22,785,939.94
see NOC#127
3,879,153.39
see NOC#127
8,117,552.86
see NOC#127
3,107,564.82
28,365.12
16/ 39
NSC Interior Design Works (Other ID Works being done by Bond Interiors)
DXB/AMT-01/0500/JLy/877
16/ 39
NSC Interior Design Works (MEP Works by ETA)
DXB/AMT-01/0500/JLy/877
16/ 39
NSC Interior Design Works (Lift Finishes by Kone Middle East)
DXB/AMT-01/0500/JLy/877
24-Sep-06
24-Sep-06
24-Sep-06
5,064,844.41
8,423,604.53
3,111,331.22
69
001
16
JV
ID Works Package - Changes to CT-01 & CT-02
DXB/AMT-01/0600/EDM/1785
14-Mar-07
28,616.00
see NOC#127
79
001
16
JV
Raised Access Flooring System at the Diamond Exchnage Centre to Screeding Works
DXB/AMT-01/0500/JLy/2030
16-Apr-07
282,635.67
see NOC#127
0
0
JAP016/GEN/ABS/0010 dated 17-Oct-06
JV Cost; Note : the cost for OCP is omitted and will be dealt with separately; F&G revised assessment from their letter ref.JAP016/ALM/TCAC/18730 dtd 8-Jun-08
ETA's cost + 12% OH&P + 3% Attendances
agreed values is partial and see NOC#127 deemed to change
CLOSED
28,304,706.24
590,086.25
agreed values is partial and see NOC#127 deemed to change
CLOSED
4,062,428.29
1,002,416.12
updated cost and rates approval summary s tatus being sent regularly.
agreed values is partial and see NOC#127 deemed to change
CLOSED
7,573,568.93
850,035.60
updated cost and rates approval summary s tatus being sent regularly.
agreed values is partial and see NOC#127 deemed to change
CLOSED
2,774,842.92
336,488.30
updated cost and rates approval summary s tatus being sent regularly.
progressively, as it is based on the agreed rates only (+12%)
updated cost and rates approval summary status being sent regularly; cost submitted is the final applied claim
progressively, as it is based on the agreed rates only (+7%)
progressively, as it is based on the agreed rates only (+7%)
progressively, as it is based on the agreed rates only (+7%)
JAP016/ALM/TCAC/20228 see NOC#127 dated 12-Aug-08
see NOC#127
CLOSED
CLOSED
28,616.00
abortive materials only
282,635.67
CLOSED
282,635.67
Floor Screeding works; valued under the ERI No. 16 as per the F&G letter ref. JAP016/ALM/TCAC/21388 dated 7-Oct-08 and confirmed under our letter ref. DXB/…/4963 dtd 16-Oct-08
VARIATION CLAIMS STATUS TO-DATE as at NOC NO.
SUB NO.
ERI NO.
V.O. TO
33
006
21
JV
33
007
21
JV
33
008
21
33
009
21
CLAIM NOTICE LETTER
CLAIM ENTITLEMENT APPLICATION
DESCRIPTION
ER / F&G / JV AGREED VALUES
REFERENCE
DATE
COST (AED)
TIME (Days)
COST (AED)
TIME (Days)
Missing Spanmark as PB434 (RFI No. 029)
DXB/AMT-01/0500/JLy/881
24-Sep-06
3,223.52
0
(1,351.84)
0
Additional Reinforcement due to the Missing Details (RFI No. 042) First Floor Slab Details (RFI No. 072)
DXB/AMT-01/0500/JLy/881
24-Sep-06
1,894.77
0
JV
DXB/AMT-01/0500/JLy/881
24-Sep-06
657.99
0
530.47
0
JV
Second Basement Floor Beam - PB205A (RFI No. 075)
DXB/AMT-01/0500/JLy/881
24-Sep-06
427.04
0
343.82
0
DXB/AMT-01/0500/JLy/881
24-Sep-06
0
33
010
21
JV
Fourth Basement Beam - PB451A (RFI No. 078)
425.15
0
344.60
0
33
011
21
JV
Fourth Basement Beam - PB434 (RFI No. 144)
DXB/AMT-01/0500/JLy/881
24-Sep-06
1,150.44
0
1,063.46
0
33
012
21
JV
DXB/AMT-01/0500/JLy/881
24-Sep-06
13,820.28
0
12,180.62
0
33
013
21
JV
Tower Structural Drawings - Additional TB29 Beam RFI No. 146 Door Opening Height - First Floor (RFI No. 157)
DXB/AMT-01/0500/JLy/881
24-Sep-06
499.04
0
0.00
0
33
014
21
JV
Basement 2 Beams (RFI No. 162)
DXB/AMT-01/0500/JLy/881
24-Sep-06
3,461.71
0
548.61
0
33
015
21
JV
Lift F4 - Structural Details (RFI No. 171)
DXB/AMT-01/0500/JLy/881
24-Sep-06
1,556.34
0
1,233.74
0
33
016
21
JV
Reinforced Concrete Partition Wall @ the Basement 2 (RFI No. 182)
DXB/AMT-01/0500/JLy/881
24-Sep-06
41,554.32
0
33
017
21
JV
Increase in Beam Depths at First Floor - Section N1 RFI No. 192 Increase in Beam Depths to PB149 and PB150A (RFI No. 223) Additional Outrigger Walls at Service Floor Areas Structural Works
DXB/AMT-01/0500/JLy/881
24-Sep-06
4,353.86
0
DXB/AMT-01/0500/JLy/881
24-Sep-06
693.97
0
DXB/AMT-01/0500/JLy/881
24-Sep-06
956,279.08
0
OUTSTANDING CLAIMS
CERTIFIED AS AT
REMARKS / COMMENTS
COST (AED)
TIME (Days)
CERTIFIED TO-DATE
BALANCE TO-DATE
JAP016/GEN/ABS/1011 dtd 19Jun06; JAP016/ALM/TCAC/18884 dtd 12-Jun-08 JAP016/GEN/ABS/1011 dated 19-Jun-06
CLOSED
CLOSED
(1,351.84)
4,575.36
agreed with Consultant (F&G)
1,894.77
CLOSED
1,894.77
awaiting response from Client.
JAP016/ALM/TCAC/20933 dated 14-Se -07 JAP016/ALM/TCAC/09528 dated 12-Jun-07
CLOSED
CLOSED
530.47
127.52
agreed with Consultant (F&G)
CLOSED
CLOSED
343.82
83.22
agreed with Consultant (F&G)
JAP016/ALM/TCAC/09528 dated 12-Jun-07 JAP016/ALM/TCAC/14300 dated 12-Dec-06 JAP016/ALM/TCAC/14300 dated 12-Dec-06
CLOSED
CLOSED
344.60
80.55
agreed with Consultant (F&G)
CLOSED
CLOSED
1,063.46
86.98
agreed with Consultant (F&G)
CLOSED
CLOSED
12,180.62
1,639.66
agreed with Consultant (F&G)
JAP016/ALM/TCAC/17248 dated 16-A r-08 JAP016/ALM/TCAC/14300 dated 12-Dec-06 JAP016/ALM/TCAC/18352 dated 26-Ma -08 JAP016/ALM/TCAC/18118 dated 18-May-08
CLOSED
CLOSED
0.00
499.04
agreed with Consultant (F&G)
CLOSED
CLOSED
548.61
2,913.10
agreed with Consultant (F&G)
CLOSED
CLOSED
1,233.74
322.60
agreed with Consultant (F&G)
41,554.32
CLOSED
CLOSED
CLOSED
3,510.09
843.77
agreed with Consultant (F&G)
356.68
agreed with Consultant (F&G)
314,272.57
LETTER REF.
41,554.32
0
JAP016/ALM/TCAC/09528 dated 12-Jun-07
337.29
0
JAP016/ALM/TCAC/09528 dated 12-Jun-07
CLOSED
CLOSED
337.29
ur
642,006.51
0
JAP016/ALM/TCAC/20290 dated 13-August-08
CLOSED
CLOSED
642,006.51
3,510.09
October 15, 2013
November 30, 2008
rejected F&G assessment in their letter JAP016/ALM/TCAC/18118 dated 18-May-08 thru our letter ref.DXB/…./EDM/4262 dtd 22May08;F&G assessment under review by JV
33
018
21
JV
33
019
21
JV
OM-2
001
21
JV
Omission of Rebars in Core Walls
JAP/ALM/TCAC/11435
21-Aug-07
(693,815.82)
0
(676,513.69)
0
JAP016/ALM/TCAC/20290 dated 13-Aug-08
CLOSED
CLOSED
(693,815.82)
0.00
33
020
21
JV
DXB/AMT-01/0500/JLy/881
24-Sep-06
40,503.44
0
171.19
0
JAP016/ALM/TCAC/181187 dated 18-May-08
CLOSED
CLOSED
171.19
40,332.25
agreed with Consultant (F&G)
33
021
21
JV
Additional Mass Concrete at 2nd Level, and Revisions to the Stairs leading to the Vault at 2nd Level Additional Column Posts at 50th to 51st Level and Additional Core Walls, i.e., 400mm and 500mm thick
DXB/AMT-01/0500/JLy/881
24-Sep-06
43,839.53
0
33,011.38
0
JAP016/ALM/TCAC/20933 dated 14-Sep-07
CLOSED
CLOSED
33,011.38
10,828.15
agreed with Consultant (F&G)
33
022
21
JV
Additional Lifting Beams to the 64th Level Machine Rooms (@Level 288.650m and 285.350m)
DXB/AMT-01/0500/JLy/881
24-Sep-06
5,525.90
0
4,252.50
0
JAP016/ALM/TCAC/18884 dated 12-Jun-08
CLOSED
CLOSED
4,252.50
1,273.40
agreed with Consultant (F&G)
33
023
21
JV
Changes to Slab Steel Reinforcement to S11 to S12
DXB/AMT-01/0600/EDM/1868
26-Mar-07
36,827.93
0
35,529.29
0
JAP016/ALM/TCAC/08133 dated 09-Apr-07
CLOSED
CLOSED
35,529.29
1,298.64
agreed with Consultant (F&G)
33
024
21
JV
DXB/AMT-01/0600/DAN/1878
26-Mar-07
25,336.02
0
26,354.14
0
JAP016/ALM/TCAC/17248 dated 16-Apr-08
CLOSED
CLOSED
26,354.14
(1,018.12)
agreed with Consultant (F&G)
33
025
21
JV
026
21
JV
Additional Steel Reinforcement to Beams Located Around Tower Building and Connected to Precast Slab Additional rebars to basement retaining wall @ staircase and chan es of rebar to wall Changes in Shear Wall in Zone 4 Associated in Lift and Vault Wall Additional Rebar in First Basement Slab Additional Top Steel Reinforcement in Ground Floor Slab Additional Bottom Steel Reinforcement in Ground Floor Slab Additional Building Maintenance Units at Diamond Exchan e Centre Revisions to Contract Drawings in First Floor Levels
33 33
027R1
21
JV
33
028R1
21
JV
33
029R1
21
JV
33
030
21
JV
33
031R1
21
JV
33
032
21
33
033
21
50
001
21
54 59 13 5
001 001 001
21 21 21
51
001
22
55
001
23
46
001
24
JV
Revisions to Structural Contract Drawings in Second Floor JV Changes in Beam Steel Reinforcement at 29th to 34th Level JV Various Requirements under the F&G Transmittal Ref. F+G/ALMAS/TAISEI/ 01463 dated 12th December 2006 JV Provision of Additional Lift Pit Ladders JV Additional Coring Requirement JV Opening in Block Wall between Offices A & B at Level 29 (CVI No. 067) NSC Revision of Fire Protection System as per JAFZA EHS Fire & Rescue Re uirements NSC Category II Drawing Revisions for Office Floors -Air Conditioning NSC Fire Policy Layout (MEP Works)
revised cost impact submitted under ref. DXB/AMT01/0500/Jly/1080 dated 9-Nov-06 based on the approved Methodology; agreed with Consultant (F&G) joint measurement done and agreed; in connection with 33-019
DXB/AMT-01/0600/DAN/1883
26-Mar-07
7,878.22
0
7,878.22
0
JAP016/ALM/TCAC/08287 ated 16-Apr-07
CLOSED
CLOSED
7,878.22
0.00
agreed with Consultant (F&G)
DXB/AMT-01/0600/DAN/1888
24-Sep-06
17,649.58
0
14,661.14
0
JAP016/ALM/TCAC/08713 ated 7-May-07
CLOSED
CLOSED
14,661.14
2,988.44
agreed with Consultant (F&G)
DXB/AMT-01/0600/DAN/1990
10-Apr-07
101,960.65
0
97,675.24
0
CLOSED
CLOSED
97,675.24
4,285.41
agreed with Consultant (F&G)
DXB/AMT-01/0600/DAN/2020
15-Apr-07
140,340.33
0
137,782.64
0
JAP016/ALM/TCAC/20933 dated 14-Se -07 JAP016/ALM/TCAC/10244 ated 9-Jul-07
CLOSED
CLOSED
137,782.62
2,557.71
agreed with Consultant (F&G)
DXB/AMT-01/0600/DAN/2047
19-Apr-07
316,516.91
0
317,721.58
0
JAP016/ALM/TCAC/10549 ated 23-Jul-07
CLOSED
CLOSED
317,721.58
(1,204.67)
agreed with Consultant (F&G)
DXB/AMT-01/0600/EDM/2066
24-Apr-07
1,175,875.00
ur
1,175,875.00
ur
DXB/AMT-01/0600/EDM/2160
15-May-07
56,950.59
0
DXB/AMT-01/0600/EDM/2383
23-Jun-07
130,015.64
0
1,175,875.00
under review
50,995.22
0
JAP016/ALM/TCAC/11392 ated 20-Aug-07
CLOSED
CLOSED
50,995.22
5,955.37
agreed with Consultant (F&G)
55,259.32
0
JAP016/ALM/TCAC/14299 ated 12-Dec-07
CLOSED
CLOSED
55,259.32
74,756.32
agreed with Consultant (F&G)
0
JAP016/ALM/TCAC/10848 ated 1-Aug-07
CLOSED
CLOSED
7,928.10
1,428.02
agreed with Consultant (F&G)
DXB/AMT-01/0600/EDM/2548
18-Jul-07
9,356.12
0
DXB/AMT-01/0600/EDM/1301
21-Dec-06
28,025.73
ur
28,025.73
ur
28,025.73
JV to submit entitlements; note that the DVR's is valued in Claim No. 77; items to be valued under this Claim is only the Lifting Beams
ur
66,895.36
ur
66,895.36
await for final drawings.
ur
30,965.32
ur
30,965.32
based on the ETA letter request
ur
1,484.00
ur
1,484.00
demolition works
7,928.10
DXB/AMT-01/0500/JLy/1358
04-Jan-07
DXB/AMT-01/0600/EDM/1567
10-Feb-07
DXB/AMT-01/0600/EDM/3071
27-Oct-07
66,895.36 30,965.32 1,484.00
DXB/AMT-01/0600/EDM/1312
23-Dec-06
4,929,761.78
ur
4,929,761.78
ur
DXB/AMT-01/0500/JLy/1444
21-Jan-07
ur
ur
ur
ur
DXB/AMT-01/0600/EDM/1236
11-Dec-06
24,107.45
ur
CLOSED
ur
5,600.38
JAP016/TS/ABS/22577 dated 24-Nov-08
1,564,665.69
3,365,096.09
ETA costs of AED 4,607,254 + 7% OH&P
ETA to respond.
24,107.45
ETA costs + 7%OH&P
VARIATION CLAIMS STATUS TO-DATE as at NOC NO.
SUB NO.
ERI NO.
V.O. TO
18
002
37
JV
86
001
38
JV
OM-8
001
38
JV
87
001
41
JV
88 81
001 001
42 43
JV JV
10 3
001R1
44
13 9
001
44.1
70 OM-5
001 001
45 45
97
001
45.1
10 1
001
45.2
14 6
001
84
001
45 / 45.1 46
10 2
001
46
10 4
001
47
CLAIM NOTICE LETTER
CLAIM ENTITLEMENT APPLICATION
DESCRIPTION REFERENCE
DATE
COST (AED)
TIME (Days)
COST (AED)
TIME (Days)
106,370.21
ur
106,370.21
0
(valued in OM8-001)
ur
(valued in OM8-001)
0
Landscaping works - Screed for the Planter Boxes
DXB/AMT-01/0600/EDM/3098
31-Oct-07
Modification to Lift Opening at 36th and 48th Floor
DXB/AMT-01/0600/EDM/2311
09-Jun-07
Modification of Lift Openings at 36th Floor Low Rise Lift Machine Room and 48th Floor High Rise Lift Machine Rooms (Omission of Concrete Works due to the increase of Lift O enin Sizes Revised Drawing for Lift Machine Room on 3rd Service Floor Revised Drawing for Interior Design Works Changes of Levels to Room Nos. B1-073 (Corridor) and B1-074 (Mechanical Plant Room) Additional Wall in Security Room at Basement 2
JAP016/ALM/TCAC/22416
18-Nov-08
DXB/AMT-01/0600/EDM/2312 DXB/AMT-01/0600/EDM/2313 DXB/AMT-01/0600/EDM/2111
02-May-07
0
ur
1,587.60
0
JAP016/ALM/TCAC/21082 dated 21-Sep-08
0
(valued in Series 41)
0
0
6,205.97
0
25,999.57
0
09-Jun-07
1,771.88
09-Jun-07
(valued in Series 41) 7,275.43
17-Jul-07
26,634.44
see NOC#127
DXB/AMT-01/0600/EDM/3134
08-Nov-07
172,273.32
ur
DXB/AMT-01/0500/JLy/1781
14-Mar-07
0
JAP016/ALM/TCAC/19244
26-Jun-08
(valued in OM-5) (66,453.77)
DXB/AMT-01/0600/EDM/2438
30-Jun-07
ur
DXB/AMT-01/0600/EDM/2475
07-Jul-07
DXB/AMT-01/0500/JLy/3207
20-Nov-07
NSC Revision to the Lighting Layout at GF, L1, & L2
DXB/AMT-01/0600/EDM/2309
NSC Lighting Requirements to the Function Room / Ballroom JV Additional 40’ Container Storage, Office Chairs, and Computer for F+G Office NSC Telephone IDF/MDF Room Drawings
001
48
89
001
49
JV
18 6
001R1
49
JV
OM-9
001
49
92
001
49.2
16 3
006a
49.3
16 3
006b
49.3
16 3
009
49.4
20 8
001
49.5
10 9
001
50
94
001R2
51
95
001
52
95
002
11 4 93
001 001
Modification to the Structural Drawings at Levels 49, 50, and 51 Notification of Entittlements (CVI-089) - Doors to new washrooms at L49 and L50 (Lift Lobby Area)
JV Modification to the Structural Drawings at Levels 49, 50, and 51 NSC Various Revisions due to the revised For Construction Drawings (MEP Works) at Levels 49, 50, & 51 NSC Fire Fighting Systems at Levels 49, 50, & 51 (Abortive Work JV Fire Fighting Systems at Levels 49, 50, & 51 (Builders Work and Abortive Work) NSC Revised "For Construction" Security Drawings at Levels 49, 50, & 51 under the DMCC Transmittal Ref. JAP016/TRNS /JV/00044 dated 5th May 2008 (Security Works NSC Modification of Raised Floor Heights at Server Rooms at Level 49, 50, & 51 NSC Amendment to District Cooling Piping and Control Works (Heat Echangers and Strainers) JV Changes to Suspended Ceiling (ID Works Package)
106,370.21 0.00
CLOSED
CLOSED
CLOSED
CLOSED
1,587.60
CLOSED
CLOSED
0.00
CLOSED
CLOSED
6,205.97
valued under th ERI No. 37
under omission.
(1,988.48)
BI to confirm cost by F&G
184.28
Subcon Cost + 12% OH&P
considered in Claim Series 41 / ERI No. 16
1,069.46
25,999.57
634.87
74,900.00
97,373.32
Light weight Concrete and chipping works
architectural works only.
CLOSED
(66,453.77)
ur
ur
ur
ETA to submit entitlements
ur
ur
ur
ur
ETA to submit entitlements
ur
ur
ur
ur
JCI to submit entitlements
09-Jun-07
ur
ur
ur
ur
ETA to submit entitlements; Note this pertains to the electrical works, fixtures to be Claim No. 105; to be valued under ERI16 ref. JAP016/ALM/TCAC/09512 dtd 12Jun07
DXB/AMT-01/0600/EDM/2499
10-Jul-07
ur
ur
DXB/AMT-01/0600/EDM/2551
18-Jul-07
40,174.50
0
DXB/AMT-01/0600/EDM/2222
27-May-07
34,309.10
ur
DXB/AMT-01/0600/EDM/2315
09-Jun-07
(valued in OM9-001)
0
DXB/AMT-01/1100/WAE/3965
08-Apr-08
58,651.66
0 0
JAP016/ALM/TCAC/19244 dated 26-Jun-08
0
JAP016/ALM/TCAC/11909 dated 9-Sept-2007
13,517.00
0
JAP016/ALM/TCAC/21322 dated 5-Oct-08
(valued in OM9-001)
0
40,074.53
40,074.53
99.97
10,951.45
23,357.65
CLOSED
ur
58,651.66
ur
JAP016/ALM/TCAC/19245
26-Jun-08
(85,688.89)
0
(85,688.89)
0.00
DXB/AMT-01/0600/EDM/2375
21-Jun-07
218,960.00
ur
218,960.00
ur
DXB/AMT-01/0600/EDM/4034
20-Apr-08
ur
ur
ur
ur
DXB/AMT-01/0600/EDM/4034
20-Apr-08
1,903.78
ur
1,903.78
ur
DXB/AMT-01/0600/EDM/4162
10-May-08
ur
ur
ur
ur
DXB/AMT-01/0600/EDM/4335
02-Jun-08
17,250.00
ur
17,250.00
ur
DXB/AMT-01/0600/EDM/2433
30-Jun-07
653,624.24
0
653,624.24
52
NSC Variation Works due to Lift and Escalator Finishes (Adjustment to the Provisional Sums)
DXB/AMT-01/0600/EDM/2433
30-Jun-07
544,678.47
0
544,678.47
53 54
NSC Changes of Wallpaper in Typical Floor Corridors JV Changes to Mock-up Areas (ID Works)
DXB/AMT-01/0600/EDM/2802
01-Sep-07
DXB/AMT-01/0600/EDM/2400
24-Jun-07
ur 612,662.92
DXB/AMT-01/0600/EDM/2804
02-Sep-07
DXB/AMT-01/0600/EDM/2803
01-Sep-07
ETA cost + 7% OH&P
58,651.66
(85,688.89)
0.00
20,544.00
198,416.00
under review; to be under ERI #49 as per Nakheel letter ref. JAP016/TS/GT/0205 dated 15-Apr-08; SC cost +12%OH&P + 3% Attendances Omission of Office Partitions at Level 49
ETA cost + 12% OH&P + 3% Attendances
ETA to submit entitlements
24,824.00 1,903.78
builders works
JCI to submit entitlements
17,250.00
MDS cost + 12% OH&P + 3% Attendances; valued at ERI No. 49.5 as per Nakheel letter ref. JAP016/TS/GT/0271 dtd 9Jun08 ETA to submit entitlements
597,081.20
ur
393,521.39
203,559.81
JAP016/ALM/TCAC/21731 see NOC#127 dated 21-Oct-08
CLOSED
CLOSED
85,383.20
0.00
0
JAP016/ALM/TCAC/17360 dated 20-Apr-08
CLOSED
CLOSED
579,717.22
73,907.03
KONE costs + 7% JV OH&P
0
JAP016/TS/GT/0083 dated 9 Aug-2007
CLOSED
CLOSED
544,678.47
KONE costs + 7% JV OH&P; NOTE : Not considered as a variation by Consultant but adjsutment to the KONE Provisional Sums from AED500K to 1,009,045.30, and agreed amount s the nett costs.
ur see NOC#127
see NOC#127
4,044.20
0
0
764,729.70
ur
3,315.73
actual cost transmitted to F&G based on dayworks rates; agreed with F&G
valued under the omissions
0.00
JV Scope of Works - Omission of Office Partitions at the Level 30 due to the single tenancy arrangements
ETA to submit entitlements; Note this pertains to the electrical works, fixtures to be Claim No.107
ur CLOSED
CLOSED
ETA costs + 7% JV OH&P
see OM-5 below (omitted works)
0.00
ur
CLOSED
NSC Variation Works due to Lift and Escalator Finishes (Direct Variation to the Nominated S/C Works)
CLOSED
CLOSED
85,383.20
JV
CLOSED CLOSED
CLOSED
0
ur
57
0.00
CLOSED CLOSED
0.00
see NOC#127
001R1
BALANCE TO-DATE
CLOSED
85,383.20
11 6
CERTIFIED TO-DATE
CLOSED
(valued in OM-5) (66,453.77)
597,081.20
Change of Pressurization Duct Opening at 51st Floor Lift Lobb Additional Aluminum Flashing
REMARKS / COMMENTS
TIME (Days)
ur
05-Aug-07
JV
October 15, 2013
November 30, 2008
CLOSED
30-Jun-07 / 22-Dec-07
55
JAP016/ALM/TCAC/17848 see NOC#127 dated 8-May-2008
COST (AED)
CERTIFIED AS AT
CLOSED
DXB/AMT-01/0600/EDM/2655
001
JAP016/ALM/TCAC/21270 dated 29-Sep-08
OUTSTANDING CLAIMS
172,273.32
DXB/AMT-01/0600/EDM/2432 / DXB/AMT-01/0500/JLy/3369
11 5
JAP016/ALM/TCAC/90791 dated 19-Jun-08
(1,988.48)
(1,988.48)
DXB/AMT-01/0600/EDM/2540
82
LETTER REF.
JAP016/ALM/TCAC/22416 dated 18-ov-08
NSC Basement 2 Security Room - Revised Drawings for the Ventilation and Li htin Details JV Level 30 Partition Layouts JV Omission of Partition Walls in Level 30 for Single Tenancy Arrangements NSC Various Changes due to the revised MEP "For Construction" Drawings due to Modification at Level 30 NSC Various Revisions to the Electrical Works "For Construction" Drawin s NSC Relocation of Cameras at 30th Floor (RFI No. 859)
JV
ER / F&G / JV AGREED VALUES
JAP016/ALM/TCAC/20893 dated 11-Sep-08
subcon costs plus 12% (revised cost from 182,9 60.40 due to the meeting between FBI and DMCC)
BI to submit entitlements
ur
ur
(50,825.00)
612,662.92
CLOSED
400,000.00
212,662.92
CLOSED
CLOSED
3,315.73
728.47
764,729.70
ur
764,729.70
Bond Interiors cost + 12% JV Mark-up + 7% OH&P (Prov. Sums) agreed withConsultants (F&G)
Subcon Cost + 12%OH&P + 3% Attendances
VARIATION CLAIMS STATUS TO-DATE October 15, 2013
as at NOC NO.
CLAIM NOTICE LETTER
SUB NO.
ERI NO.
V.O. TO
DESCRIPTION
16 4
001
72
JV
12 3
001R2
73
JV
16 6
001
73
JV
16 6
002
73
JV
20 2
001
74
19 7
001a
74.1
19 7
001b
74.1
19 7
002
74.1
19 7
003
74.1
23 8
001
74.1
20 1 15 8
001 001R1
75 76
20 5
001
76.1
20 5
002
76.1
CLAIM ENTITLEMENT APPLICATION
REFERENCE
DATE
COST (AED)
BMS Room Furniture Requirements
DXB/AMT-01/0600/EDM/3589
02-Feb-08
Potential Delay due to Late Issuance of Revised Design Information in Sky Lobby Meeting Room at Level 48 ID Works Package - Lighting Requirements at Level 48 Meeting Room (MEP Works Scope)
DXB/AMT-01/1100/WAE/2955
01-Oct-07
DXB/AMT-01/0600/EDM/3609
ID Works Package - Lighting Requirements at L48 Meeting Room (JV Scope - Lever to Supply)
ER / F&G / JV AGREED VALUES
TIME (Days)
COST (AED)
TIME (Days)
40,216.65
0
39,167.52
0
12,637.06
ur
04-Feb-08
11,783.12
ur
DXB/AMT-01/0600/EDM/3609
04-Feb-08
2,254.00
DXB/AMT-01/0600/EDM/4137
06-May-08
DXB/AMT-01/0600/EDM/4053
Provision of Pantry Area in Ground and First Floor as per revised " For Construction" Drawings under DMCC transmittal JAP016/TRNS/JV/00040 (JV Scope ID works NSC Provision of Pantry Area in Ground and First Floor as per revised " For Construction" Drawings under DMCC transmittal JAP016/TRNS/JV/00040 (ID Scope of Works NSC Provision of Pantry Area in Ground and First Floor as per revised " For Construction" Drawings under DMCC transmittal JAP016/TRNS/JV/00040 (MEP Works NSC Revised " For Construction" drawings under the DMCC transmittal ref. JAP016/TRNS/JV/00040 dated 16-Apr-08 (Additional Voice/Data Points in GF & 1L)
OUTSTANDING CLAIMS
CERTIFIED AS AT
November 30, 2008 REMARKS / COMMENTS
COST (AED)
TIME (Days)
CERTIFIED TO-DATE
CLOSED
CLOSED
39,167.52
1,049.13
BF cost AED 34,971.00 + 12% JV OH&P
12,637.06
ur
12,637.06
confirmed to be valued under ERI No. 73 according to the Nakheel letter ref. JAP16/TS/GT/0267 dtd 8Jun08
11,783.12
ur
11,783.12
ETA cost + 12%OH&P + 3% Attendances; confirmed to be valued in ERI No. 73 according to Nakheel letter ref. JAP16/TS/GT/0267 dtd 8Jun08
ur
2,254.00
ur
2,254.00
73,986.40
ur
73,986.40
ur
22-Apr-08
18,228.31
ur
CLOSED
ur
DXB/AMT-01/0600/EDM/4053
22-Apr-08
57,459.68
ur
57,459.68
ur
DXB/AMT-01/0600/EDM/4053
22-Apr-08
ur
ur
ur
ur
DXB/AMT-01/0600/EDM/4127
05-May-08
50,319.40
ur
50,319.40
ur
50,319.40
ETA to submit entitlements
DXB/AMT-01/0500/JLy/5009
26-Oct-08
26,919.09
ur
26,919.09
ur
26,919.09
BC Cost + 7% OH&P; BC VO#9; BC t ime claim = 186 days
NSC ID Tiling Works-Attic Stock (ERI No. 75) JV Doors at DEWA Water Meter Rooms
DXB/AMT-01/0600/EDM/4135
06-May-08
DXB/AMT-01/0500/JLy/3401/ DXB/AMT-01/0500/JLy/3416
27 & 31Dec-07
ur 21,502.11
ur
NSC DEWA Water Meter Connection (MEP Works)
DXB/AMT-01/0600/EDM/4274
24-May-08
10,637.50
ur
7,908.70
DXB/AMT-01/0600/EDM/4274
24-May-08
5,263.09
ur
3,941.91
DXB/AMT-01/0600/EDM/4323
31-May-08
150,193.45
ur
MDF & IDF Rooms – DU’s Requirements as per the Mock-u Sna List JV Sco e NSC MDF & IDF Rooms – DU’s Requirements as per the Mock-up Snag List (ETA Scope) NSC MDF & IDF Rooms – DU’s Requirements as per the Mock-up Snag List (Bond Communication ScopeKrone Modules)
DXB/AMT-01/0600/EDM/4046
22-Apr-08
2,070.00
DXB/AMT-01/0600/EDM/4046
22-Apr-08
76,094.35
DXB/AMT-01/0600/EDM/4046
22-Apr-08
NSC Revised Domestic Water Layout at Ground and First Floor due to the Revised "For Construction" Drawings under the DMCC Transmittal JAP016/TRNS/JV/00042 JV Provision of Pantry Area in Ground and First Floor as per revised " For Construction" Drawings under DMCC transmittal JAP016/TRNS/JV/00040 (JV Scope masonry works, abortive works and coring works) JV
JV
DEWA Water Meter Connection (Builders Work)
NSC Tower Secondary Roof Clamping Section
JAP016/ALM/TCAC/21106 dated 22-Se -08
JAP016/ALM/TCAC/22447 dated 19-Nov-08
14,232.82
0
LETTER REF.
0
JAP016/TS/GT/20686 dated 28 Au -08 JAP016/TS/GT/20686 dated 28 Aug-08
BALANCE TO-DATE
19,688.00
54,298.40
JV to submit entitlements; confirmed to be valued in ERI No. 73 according to Nakheel letter ref. JAP16/TS/GT/0267 dtd 8Jun08; Lever cost + 12% OH&P + 3% Attendance ETA cost + 12% OH&P + 3% Att endances
27,042.36
(8,814.05)
Masonry Works, Abortive Works and Coring Works
57,459.68
Doors and Frames incl Ironmongery, and Ceiling Works
Bond Interiors to submit entitlements
BI to submit entitlements
ur
CLOSED
21,502.11
ur
21,502.11
JV Costs
CLOSED
ur
10,637.50
ETA cost + 7% OH&P
CLOSED
ur
3,941.91
1,321.18 150,193.45
JV works clsoing of opening and provision of new opening with waterproofing and sealing works Al Abbar cost + 12% OH&P + 3% Attendances
150,193.45
ur
ur
2,070.00
ur
2,070.00
valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/0304 dtd 5Aug08
ur
76,094.35
ur
76,094.35
62,002.57
ur
62,002.57
ur
62,002.57
ETA cost + 12% OH&P + 3% Attendances; valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/0304 dtd 5Au 08 BC to submit entitlements; valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/ 0304 dtd 5Aug08; BC Cost + 7% (BC VO#03); BC time claim = 147 days
20 7
001
77
19 6
001
78
19 6
002
78
19 6
003a
78
19 6
003b
78
NSC MDF & IDF Rooms – DU’s Requirements as per the Mock-up Snag List (Bond Communication ScopeVertical Cable Manager)
DXB/AMT-01/0600/EDM/4046
22-Apr-08
127,698.42
ur
127,698.42
ur
127,698.42
BC to submit entitlements; valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/ 0304 dtd 5Aug08; BC Cost + 7% (BC VO#05); BC time claim = 233 days
19 6
003c
78
NSC MDF & IDF Rooms – DU’s Requirements as per the Mock-up Snag List (Bond Communication ScopeHorizontal Cable Manager)
DXB/AMT-01/0600/EDM/4046
22-Apr-08
19,821.34
ur
19,821.34
ur
19,821.34
BC to submit entitlements; valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/ 0304 dtd 5Aug08; BC Cost + 7% (BC VO#11); bc time claim = 201 days
19 6
003d
78
NSC MDF & IDF Rooms – DU’s Requirements as per the Mock-up Snag List (Bond Communication ScopeCAT 3 Cables Installations)
DXB/AMT-01/0600/EDM/4046
22-Apr-08
336,915.53
ur
336,915.53
ur
336,915.53
BC to submit entitlements; valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/ 0304 dtd 5Aug08; BC Cost + 7% (BC VO#01); bc time claim = 275 days
19 6
003e
78
NSC MDF & IDF Rooms – DU’s Requirements as per the Mock-up Snag List (Bond Communication ScopeOM3 Fibre Optic Cable Installations)
DXB/AMT-01/0600/EDM/4046
22-Apr-08
321,379.43
ur
321,379.43
ur
321,379.43
BC to submit entitlements; valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/ 0304 dtd 5Aug08; BC Cost + 7% (BC VO#02); bc time claim = 273 days
19 6
004
78
JV
DXB/AMT-01/0600/EDM/4046
22-Apr-08
117,875.00
ur
117,875.00
ur
117,875.00
valued in ERI#78 as per Nakheel letter ref. JAP016/TS/GT/0304 dtd 5Aug08
19 6
005
78
JV
MDF & IDF Rooms – DU’s Requirements as per the Mock-up Snag List (Lateral Systems Scope) MDF & IDF Rooms – DU’s Additional Requirements, i.e., Stand for the UPS & Batteries in MDF Room & UPS Room at Basement 1
DXB/AMT-01/0600/EDM/4797
02-Sep-08
5,689.44
ur
5,689.44
ur
5,689.44
JV Internal Works
19 6
006
78
NSC MDF & IDF Rooms – DU’s Additional Requirements, i.e., DU's Requirements for the UPS
DXB/AMT-01/0600/MIC/5017
27-Oct-08
93,918.75
ur
93,918.75
ur
93,918.75
ETA cost + 12% OH&P + 3% Att end
JV
VARIATION CLAIMS STATUS TO-DATE October 15, 2013
as at NOC NO.
SUB NO.
35
002a
ERI NO.
V.O. TO
CLAIM NOTICE LETTER
DESCRIPTION
36
001
NSC Additional OCP's conduits to the Offices a nd Retail Units MEP Works JV Additional OCP's conduits to the Offices a nd Retail Unts Builders Work NSC Fire Alarm Shop Drawing
39 40
001 001
JV Nomination of Landscaping Subcontractor NSC Revised "For Construction" Drawings for ETA
42
001
NSC Fire Sprinkler Riser Pipes in Garbage Chute Shaft
43
001
44
001
45
001
47
001
48
001
49
001
JV
53
001
JV
58 60 61
001 001 001
62
001
63 66
001 001
71
001
72
001
73
001
74 75 83
001 001 001
90
001
35
002b
91
001
96
001
98 10 5
001 001
10 7
006
10 8 11 1
001 001
11 3
001
11 3
002
11 3
003
11 7
001
11 8
001
11 9
001
JV
CLAIM ENTITLEMENT APPLICATION
CTU 3rd Party Inspection
REFERENCE
DATE
COST (AED)
TIME (Days)
DXB/AMT-01/0500/JLy/926
03-Oct-06
38,246.08
DXB/AMT-01/0500/JLy/926
03-Oct-06
120,370.11
DXB/AMT-01/0500/JLy/932
05-Oct-06
ur
ur
DXB/AMT-01/0500/JLy/1052
05-Nov-06 06-Nov-06
0.00 (valued in37-001)
ur
DXB/AMT-01/0500/JLy/1054 DXB/AMT-01/0500/015/JLy/235
07-Nov-06
522,748.23
ur
DXB/AMT-01/0500/JLy/1086
11-Nov-06
0.00
0
ER / F&G / JV AGREED VALUES
CERTIFIED AS AT
November 30, 2008 REMARKS / COMMENTS
COST (AED)
TIME (Days)
ur
38,246.08
ur
38,246.08
ETA Cost + 7% JV OH&P; as per original claim
ur
120,370.11
ur
120,370.11
JV Cost
ur
ur
0
COST (AED)
OUTSTANDING CLAIMS
TIME (Days)
LETTER REF.
JAP016/TS/BW/0021 dated 12Nov-06
0.00 (valued in37-001)
0
0.00
0
(valued in 127-001)
0
JAP016/TS/ABS/0031 dated 28Dec-06
CERTIFIED TO-DATE
BALANCE TO-DATE
0.00
ETA to submit entitlements; rejected by Nakheel due to the Consultant's(Atkins)response ref. RD/4532/661/ML/R8-0344.
CLOSED
ur
0.00
time implications.
CLOSED
CLOSED
0.00
same as Claim No. 37-001, based on the F&G transmittal ref. F+G/ALMAS/TAISEI/01404 dtd 10-1506 based on the response from RFI No. 417
522,748.23
ur
CLOSED
CLOSED
522,748.23
0.00
0.00
request by WS Atkins and F&G in the Technical Meeting to provide 3rd party safety inspection and issue of certificate prior to CTU; rejected by Nakheel.
ur
ur
0.00
ETA to submit entitlements; revisions is due to the requirement of a UL/FM specifications
CLOSED
CLOSED
0.00
0.00
ur
ur
ur
0.00
To be included in the Prolongation Claims as this is a reliminaries items ETA to submit entitlements
ur
ur
ur
ur
0.00
ETA to submit entitlements
14-Dec-06
0.00
ur
0.00
CLOSED
ur
0.00
28-Dec-06
0.00
0
0.00
0
CLOSED
CLOSED
DXB/AMT-01/0600/EDM/1566
10-Feb-07
0
(valued in 65-001)
0
CLOSED
CLOSED
0.00
DXB/AMT-01/0500/JLy/1567
13-Feb-07
0
14-Feb-07
(valued in 33-030) 0.00
0
DXB/AMT-01/0500/JLy/1593
(valued in 65-001) (valued in 33-030) 0.00
Changes to Raised Access Floors at Tecom Rooms, Security Rooms, and Telephone Rooms NSC Installation of OCP's to Tenant Rooms NSC MEP Works - Revised External Services Drawings
DXB/AMT-01/0600/EDM/2507
11-Jul-07
12,494.21
ur
DXB/AMT-01/0500/JLy/1633
20-Feb-07
0
DXB/AMT-01/0600/EDM/1655
25-Feb-07
(valued in 35-001) (valued in 64-001)
NSC MEP Works - Revised Ground Floor Landscape Drawin s JV Interfacing Detail between the Cladding and Blockwall JV Disabled Toilets (CVI No. 052 dated 18th March 2007 increase of openings to blockwork walls to 1.00m)
DXB/AMT-01/0600/EDM/1786
14-Mar-07
DXB/AMT-01/0500/JLy/1792
14-Mar-07
DXB/AMT-01/0500/JLy/1836
19-Mar-07
JV Shadow Groove to Ceilings JV Disabled Toilet NSC RFI No. 571 - Insulation and Backing Panels to Claddin JV Change of Back of House Doors Colours from White to Gra NSC Revision of ST-10 to ST-15 (ID Works Package Provisional Sum) JV Changes to D-04 & D-30 Hinges (ID Works Package)
DXB/AMT-01/0500/JLy/1885
26-Mar-07
NSC Revised Specifications for the Fire Fighting Equipments JV Provision of Inspectors
DXB/AMT-01/0600/EDM/1179
29-Nov-06
ur
ur
DXB/AMT-01/0500/JLy/1185
03-Dec-06
(valued in 127-001)
0
NSC Revised Architectural Drawings at 31st & 32nd Floor (MEP Works) NSC Revised Architectural and ID Drawings (MEP Works)
DXB/AMT-01/0600/EDM/1237
11-Dec-06
ur
DXB/AMT-01/0600/EDM/1238
11-Dec-06
Exceptionally Adverse Climatic Conditions
DXB/AMT-01/0500/JLy/1253
RFI No. 480 - Embedded Flush Tank
DXB/AMT-01/0500/JLy/1338
NSC Revised MEP Drawings JV Provision of BMU JV Sanitary Ware Selection JV
0
0
JAP016/ALM/TCAC/06995 dated 18-Feb-2007
CLOSED
CLOSED
CLOSED
CLOSED
12,494.21
ur
0.00
due to inclement weather conditions at site
0.00
rejected by F&G as it is included specs M13.
0.00
valued in Claim No. 65-001
0.00
0.00
not applicable
0.00
0.00
rejected by F&G as per the response letter
12,494.21
Revision 1 - revised due to the changes in the works.
0
CLOSED
CLOSED
0.00
0.00
not applicable
0
(valued in 35-001) (valued in 64-001)
0
CLOSED
CLOSED
0.00
0.00
Included in Claim No. 64-001
(valued in 76-001)
0
(valued in 76-001)
0
CLOSED
CLOSED
0.00
0.00
Included in 76-001
(valued in 116-001)
0
0.00
0
CLOSED
CLOSED
0.00
0.00
included in Claim No. 116-001
0.00
0
0.00
0
(not done)
CLOSED
CLOSED
0.00
0.00
not done
0
(valued in 41-001) 0.00
0
(valued in 41-001)
CLOSED
CLOSED
0.00
0.00
0
(not done)
CLOSED
CLOSED
0.00
0.00
not done
ur
ur
ur
0.00
AA to submit entitlements
0.00
0.00
no claim from subcontractors
DXB/AMT-01/0500/JLy/1886
26-Mar-07
DXB/AMT-01/0500/JLy/2184
20-May-07
(valued in 41-001) 0.00 ur
DXB/AMT-01/0500/JLy/2347
16-Jun-07
0.00
0
DXB/AMT-01/0500/JLy/2350
16-Jun-07
2,704,866.52
ur
DXB/AMT-01/0600/EDM/2437
30-Jun-07
(valued at 41-001)
0
(valued at 41-001)
0
NSC Secondary Roof for the Towers JV Revised Interior Lighting Fixtures Layout at GF,1L,& 2L JV Provision of Downspouts at Ballroom/Function Room Roof (CVI No. 122) JV Architectural Changes to Level 2 JV Omission of Mirror Mounted Paper Towel Dispenser
DXB/AMT-01/0600/EDM/2451
02-Jul-07
(valued in 220-001)
0
18-Jul-07
(valued in 220-001) (valued in 41-001)
ur
DXB/AMT-01/0600/EDM/2553
0
(valued in 41-001)
0
DXB/AMT-01/0600/EDM/4465
26-Jun-08
2,210.46
see NOC#127
DXB/AMT-01/0100/YOS/2628
31-Jul-07
DXB/AMT-01/0600/EDM/2731
18-Aug-07
(valued in 149) 165,993.30
NSC Plenum Box and Louvre for Vent Pipe of Garbage Chute and Stack Vent at 64th Level - RFI No. 462 ETA Sco e NSC Plenum Box and Louvre for Vent Pipe of Garbage Chute and Stack Vent at 64th Level - RFI No. 462 (Al Abbar Sco e JV Plenum Box and Louvre for Vent Pipe of Garbage Chute and Stack Vent at 64th Level - RFI No. 462 (JV Sco e JV Changes to the Diamond Exchange Centre
DXB/AMT-01/0600/EDM/2768
26-Aug-07
91,147.85
DXB/AMT-01/0600/EDM/2768
26-Aug-07
DXB/AMT-01/0600/EDM/2768
NSC Revised Mechanical and Electrical Drawings at Basement 2 Securit Room JV Notification of Potential Delay due to the Review of
JAP016/TS/ALM/TCAC/06906 dated 14-Feb-07
0
0.00
0
(not done)
CLOSED
CLOSED
2,704,866.52
ur
CLOSED
CLOSED
2,704,866.52
0.00
valued in Claim No. 41-013
BI costs of AED 2,527,912.64 + 7% JV OH&P
0.00
considered in Claim No. 41-007
CLOSED
CLOSED
0.00
0.00
to be valued in Claim N o. 220-001
CLOSED
CLOSED
0.00
0.00
TO BE VALUED IN CLAIM NO. 41-001 (ERI 16)
2,210.46
CLOSED
0
CLOSED
CLOSED
see NOC#127
165,993.30
CLOSED
165,993.30
Arte Casa Cost + 12% OH&P + 3% Attendances
ur
91,147.85
ur
91,147.85
ETA costs + 12% OH&P + 3% Attendan ces
11,909.40
ur
11,909.40
ur
11,909.40
Al Abbar cost + 12% OH&P + 3% Attendances
26-Aug-07
(valued in 113-001)
0
(valued in 113-001)
0
CLOSED
CLOSED
0.00
0.00
Included in Claim No. 113-001
DXB/AMT-01/0500/JLy/2805
02-Sep-07
(valued in 149-001)
see NOC#127001
(valued in 149-001)
see NOC#127001
CLOSED
CLOSED
0.00
0.00
valued in 149-001 under ERI No. 62
DXB/AMT-01/0600/EDM/2906
19-Sep-07
ur
ur
0.00
ETA to submit entitlements
DXB/AMT-01/1100/WAE/2908
19-Sep-07
0.00
ur
0.00
0.00
Potential Time Claim
0
see NOC#127
(valued in 149)
see NOC#127
JAP016/ALM/TCAC/10523 dated 22-July-2007
ur
0.00
CLOSED
2,210.46 0.00
ur ur
0.00
varied works at structural steel works and provision of Roof Drain on-hold area, awaiting details from Client
VARIATION CLAIMS STATUS TO-DATE as at NOC NO.
SUB NO.
15 4
001
15 5
001
15 6
001
15 7
001
15 9
001
16 0 16 1 16 2
001 001 001
ERI NO.
V.O. TO
CLAIM NOTICE LETTER
DESCRIPTION
JV
Enclosure to the Irrigation Pipes running through the LV Room 2 RFI No. 894 NSC Second Floor Revised Lighting and Power Design NSC Lift L4 Mock-Up (Car Interior Finish @ Ground Floor Level) JV Request for Issue of Outstanding Drawings (DMCC Offices at L49-L51 & Add'l Toilets in Office Area at L52-L64 JV Special Holiday on 14th January 2008 JV JV JV
Notice of Excessive Rains Additional Architraves to Towel Dispensers Notification of a Possible Variation at Ballroom Electrical Cabinet Doors NSC Further Revisions to the Levels 49, 50, 51, 60 and 61 in accordance with DMCC Transmittal Ref. JAP016/TRNS/JV/ 00032 dated 22nd January 2008 MEP Works JV Notification of Disruption of Work due to discrepancy of Design Drawings at Second Floor
16 3
005
16 5
001
16 7
001
16 8 17 1 17 2
001 001 001
JV Inspections not done on Timely Basis NSC Sequencing of Spire Erection JV Abortive Cost for GL-07 (ID Works Package)
17 5
001
17 6
001
17 6
002
NSC Revised "For Construction" Drawings under the DMCC Transmittal Ref. JAP016/TRNS/JV/00033 dated 5th Februar 2008 MEP Works JV TECOM/DU Comments on Telephone Rooms Raised Access Floor Material Submittal NSC DU Requirements
17 6
003
17 6 17 7 18 0
004 001 001
NSC TECOM/DU Comments on Structured Cabling Material Submittal NSC TECOM/DU Comments - " Active " IDF Rooms JV Diamond Exchange Details NSC Increase in Water Tank Size
18 1 18 2
001 001
18 3
JV
CLAIM ENTITLEMENT APPLICATION
Delays due to Strong Winds
ER / F&G / JV AGREED VALUES
REFERENCE
DATE
COST (AED)
TIME (Days)
COST (AED)
DXB/AMT-01/0600/EDM/3313
11-Dec-07
1,600.56
DXB/AMT-01/0600/EDM/3314
11-Dec-07
ur
DXB/AMT-01/0500/JLy/3359
17-Dec-07
0.00
0
0.00
0
DXB/AMT-01/0100/YOS/3365
22-Dec-07
(valued in 163)
0
(valued in 163)
0
DXB/AMT-01/0600/EDM/3482
16-Jan-08
0.00
ur
0.00
0
DXB/AMT-01/0600/EDM/3483
16-Jan-08
0.00 96,768.00 0.00
ur
0.00
TIME (Days)
ur
1,600.56
ur
ur
ur
ur
CLOSED
DXB/AMT-01/0600/EDM/3492
19-Jan-08 24-Jan-08
DXB/AMT-01/0600/EDM/3770
03-Mar-08
ur
ur
DXB/AMT-01/1100/WAE/3603
04-Feb-08
(valued in 149-001)
ur
(valued in 149-001)
DXB/AMT-01/0500/JLy/3613
05-Feb-08
0.00
0
0.00
0
DXB/AMT-01/0500/JLy/3623
06-Feb-08
0
0.00
0
ur
0.00
0
0.00
09-Feb-08 17-Feb-08
DXB/AMT-01/0600/EDM/3771
03-Mar-08
ur
ur
DXB/AMT-01/0500/JLy/3814
10-Mar-08
(valued in 196)
ur
(valued in 196)
DXB/AMT-01/0500/JLy/3568
28-Jan-08
(valued in 196)
ur
(valued in 196)
DXB/AMT-01/1200/JIN/3827
13-Mar-08
(valued in 196)
ur
DXB/AMT-01/0600/DAN/3923
31-Mar-08 16-Mar-08
DXB/AMT-01/1200/RAN/3903
27-Mar-08
(valued in 196) (valued in 149-001) 71,922.15
ur
DXB/AMT-01/0500/JLy/3844
NSC Ducting in MDF Rooms NSC Additional Low Leakage Motorized Smoke Damper
DXB/AMT-01/1200/RAN/3906
27-Mar-08
DXB/AMT-01/1200/RAN/3915
001
NSC Height of Services at Level-49 on Shaft-6
18 4
001
18 5
001
18 7
001
18 7
002
18 8
001
001
19 1
001
19 2
001
19 3
001
19 4 19 4
001 002
19 5
001
19 8
001
19 9
001
LETTER REF.
JAP016/TS/GT/0142 dated 31Jan-08
JAP016/TS/GT/0259 dated 29M a - 08
0
DXB/AMT-01/0500/JLy/3634
001
TIME (Days)
DXB/AMT-01/1100/WAE/3542
DXB/AMT-01/0600/EDM/3676
19 0
CERTIFIED AS AT
COST (AED)
0.00 ur 0.00
18 9
OUTSTANDING CLAIMS
0
JAP016/TS/GT/0186 dated 27Mar-08
REMARKS / COMMENTS CERTIFIED TO-DATE
BALANCE TO-DATE 1,600.56 0.00
ETA to submit entitlements
CLOSED
0.00
rejected by Nakheel as the proposed revisions was not done and was reverted back to original Aedas Specs
CLOSED
CLOSED
0.00
valued in another claim
CLOSED
CLOSED
0.00
to be considered in the EOT claim
CLOSED
ur
0.00
under review for time entitlements
submitted thru…3701 dtd 20-Feb-08
96,768.00
-
96,768.00
CLOSED
CLOSED
0.00
under review.
ur
ur
0.00
ETA to submit entitlements
ur
0.00
0.00
time claim.
CLOSED
CLOSED
0.00
0.00
rejected by Nakheel
CLOSED
CLOSED
0.00
0.00
To be included in the Prolongation Claims
0.00
EVS to submit entitlements
0.00
considered Nil due to the increase in the rates for GL07 as er letter ref. ETA to submit entitlements (Builders to be in another submittal)
CLOSED
JAP016/TS/GT/0152 dated 18Feb-08
October 15, 2013
November 30, 2008
ur
ur
CLOSED
CLOSED
ur
ur
0
CLOSED
CLOSED
0.00
Lateral Systems to submit (Builders to be in another submittal)
0
CLOSED
CLOSED
0.00
(valued in 196)
0
CLOSED
CLOSED
0.00
ETA to submit entitlements (Builders to be in another submittal BC to submit entitlements (Builders Works if any to be in another submittal)
(valued in 196) (valued in 149-001)
0
CLOSED
CLOSED
CLOSED
ur
ur
71,922.15
ur
ur
ur
ur
29-Mar-08
ur 1,308,459.65
ur
1,308,459.65
ur
1,308,459.65
ETA Claim = AED 1,137,791.00, + JV's 12% (OH&P) and 3% (Attend)
DXB/AMT-01/1200/RAN/3932
02-Apr-08
36,435.37
ur
36,435.37
ur
36,435.37
NSC Additional Stone Cladding to Sides of Maintenance Stairs NSC Additional Work to Make-up Levels at Main Entrance
DXB/AMT-01/1100/WAE/3936
03-Apr-08
ur
ur
ur
ur
0.00
ETA Claim = AED 31,682.93, + JV's 12% (OH&P) and 3% Attend Al Bayader to submit e ntitlements
DXB/AMT-01/1100/WAE/3937
03-Apr-08
ur
ur
ur
ur
0.00
Al Bayader to submit e ntitlements
JV Design Change to External Ramps - Block Stopper Upstand (CVI No. 086) NSC Design Change to External Ramps - Waterproofing (CVI No. 086) NSC Sprinkler Heads in Illuminated Ceiling (RFI No. 967 Rev. 0) NSC Additional Work to the Ball Room Parapet (CVI No. 084 NSC Additional Work to Lightweight Concrete to Pedestrian Path RFI No. 976 NSC Additional Work to External Wall Finishing at Swimmin Pool RFI No. 920 NSC Additional Work to Concrete Under Maintenance Path Tiles RFI No. 929 JV Additional Aluminum Angles at RAF Termination
DXB/AMT-01/1100/WAE/3971
09-Apr-08
108,691.73
ur
108,691.73
ur
108,691.73
JV's portion of the works
DXB/AMT-01/1100/WAE/3971
09-Apr-08
86,593.30
ur
86,593.30
ur
86,593.30
AB cost + 12% OH&P + 3%Attend
0
ur
JAP016/TS/GT/0228 dated 13M a - 08
0.00
0.00
0.00
ETA to submit entitlements
0.00
valued in 149-001 under ERI No. 62
71,922.15
0.00
ETA Claim = AED 62,541.00, +JV's 12%(OH&P) and 3% (Attend) ETA to submit entitlements
ur
ur
0.00
ETA to submit entitlements
CLOSED
CLOSED
0.00
0.00
Al Bayader to submit e ntitlements
CLOSED
CLOSED
0.00
0.00
Al Bayader to submit e ntitlements; claim notice rejected
ur
ur
ur
0.00
Al Bayader to submit e ntitlements
ur
ur
ur
0.00
Al Bayader to submit e ntitlements
CLOSED
CLOSED
0.00
0.00
under review (done by Dubai Metals); rejected by Nakheel as it is part of MDS scope of works
0
190,661.95
CLOSED
190,661.95
ETA to submit entitlements
0
82,800.00
CLOSED
82,800.00
JV thru Sibca to submit entitlements
ur
ur
ur
ur
ur
ur
ur
0.00
27,548.25
ur
27,548.25
ur
27,548.25
DXB/AMT-01/1200/RAN/3974
10-Apr-08
ur
ur
DXB/AMT-01/1100/WAE/3975
10-Apr-08
(valued in 107-007)
0
(valued in 107-007)
0
DXB/AMT-01/1100/WAE/3976
10-Apr-08
0.00
0
0.00
0
DXB/AMT-01/1100/WAE/3979
13-Apr-08
ur
DXB/AMT-01/1100/WAE/3980
13-Apr-08
ur
DXB/AMT-01/0600/EDM/4026
19-Apr-08
0.00
0
NSC Temporary Fire Alarm Systems (Installation) JV Temporary Fire Alarm Systems (Material / Testing and Commissioning) NSC Mechanical Services at Tecom Room in Level 50
DXB/AMT-01/0600/EDM/4041
21-Apr-08
DXB/AMT-01/0600/EDM/4041
21-Apr-08
190,661.95 82,800.00
0 0
DXB/AMT-01/0600/EDM/4042
21-Apr-08
ur
NSC Change of Applied Cementitious Fireproofing to Intumescent Paint on Steel Beams at Diamond Exchan e Center NSC Design Change of Core Bulk Head at Ground Floor Escalator Lobby - MEP Rectification Works for the ID Works Packa e CVI No. 088
DXB/AMT-01/0600/EDM/4079
26-Apr-08
DXB/AMT-01/0600/EDM/4080
27-Apr-08
0.00
0
JAP016/TS/GT/0204 dated 14 Apr-08
JAP016/TS/GT/0233 dated 15mAY-08
0.00
ETA to submit entitlements (Builders Works if any to be in another submittal EVS to submit entitlements
ETA Claim = AED 23,955.00 + 12%JVOH&P + 3% Attendances
VARIATION CLAIMS STATUS TO-DATE as at NOC NO.
SUB NO.
ERI NO.
V.O. TO
24 2
001
24 3
001
24 4
001
24 5
001
JV
24 6
001
JV
OM-10
001
JV
CLAIM NOTICE LETTER
CLAIM ENTITLEMENT APPLICATION
DESCRIPTION
0
0
0 0
0
0
0
0 0
REMARKS / COMMENTS
TIME (Days)
NSC Structural Steel Support for Fans at Air Shaft
DXB/AMT-01/0600/MIC/5158
01-Dec-08
340,314.96
ur
340,314.96
ur
340,314.96
ETA cost + 1 2% OH&P + 3% Att
NSC HVAC Systems at Basement 1 Control Room and Lobb as er RFI No. 1087 JV Additional Door Closer and Selector at Basement 1 Management Office
DXB/AMT-01/0600/EDM/5189
13-Dec-08
13,460.75
ur
13,460.75
ur
13,460.75
ETA cost + 12% OH&P + 3% Attendances
DXB/AMT-01/0500/Jly/5252
24-Dec-08
1,732.06
ur
1,732.06
ur
1,732.06
Supply and installation of additional Ironmongeries at the Basement 1 Management Office main Entrance Door as per the F&G letter ref. JAP016/ALM/TCAC/23226 dtd 22-Dec-08
Coring for the Tenant Fit-Out Contractors
DXB/AMT-01/0500/Jly/5278
04-Jan-09
ur
ur
ur
ur
0.00
Additional Access Ladder at Penstock Chamber in Basement 4 PC Supply Rates
DXB/AMT-01/0600/MIC/5287
05-Jan-09
ur
ur
ur
ur
0.00
DXB/AMT-01/0600/DAN/5092
16-Nov-08
(21,806.96)
0
(21,806.96)
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
`
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
199,754,280.16
581
0
0
0
0
0
0
0
0
0
GRAND TOTAL
0
0
0
0
0
LETTER REF.
TIME (Days)
October 15, 2013
November 30, 2008
COST (AED)
TIME (Days)
COST (AED)
CERTIFIED AS AT
DATE
0
COST (AED)
OUTSTANDING CLAIMS
REFERENCE
TOTAL FOR CL AIMED/NOTIFIED VARIATIONS (WITHO
0
ER / F&G / JV AGREED VALUES
143,470,485.44
00-Jan-00
00-Jan-00
00-Jan-00
00-Jan-00
581
118,692,853.45
0
BALANCE TO-DATE
as per the email request of Mr. Clarence Pinto of DMCC dated 4Jan-09 as per the EHS requirements
adjustment to the Contract Sums due to the PC Materials final rates
0.00
00-Jan-00
247,794,249.81
CERTIFIED TO-DATE
60,740,469.59
141,419,286.30
184,976,580.08
DMCC- AL MAS TOWER PROJECT JUMEIRAH LAKE TOWERS JAP016 : PACKAGE NO. 3 - MAIN BUILDING WORKS
VARIATION CLAIMS STATUS TO-DATE as at CLAIM ENTITLEMENT APPLICATION
CLAIM NOTICE LETTER
NOC NO.
SUB NO.
ERI NO.
V.O. TO
17 0
001
16
JV
17 0
002
16
JV
12 2
001
16.1
77 76
001 001
17 34
78
001R1
35
78
002
35
78
003
35
78
004
35
85
001
35.1
99
001
35.1
Modifications to Function Room / Ball Room Facility (Structural Works) Modifications to Function Room / Ball Room Facility (Fireproofing Works) NSC Function Room / Ball Room Domestic Water Drawings NSC Mechanical Works for the Function Room / Ballroom
10 0
001
35.1
NSC Security Works for the Function Room / Ballroom
10 6
001
35.1
17 8
001
35.3
86
001
38
87
001
41
JV
88 81
001 001
42 43
JV JV
10 3
001R1
44
JV
13 9
001
44.1
97
001
45.1
84
001
46
10 2
001
46
10 4
001
47
82
001
48
89
001
49
JV
18 6
001R1
49
JV
92
001
49.2
10 9
001
50
94
001R2
51
95
001
52
95
002
11 4 93
DESCRIPTION
ER / F&G / JV AGREED VALUES
%
VALUE (AED)
see NOC#127
100,121.32
CLOSED
100%
100,121.32
0%
0.00
100,121.32
see NOC#127
CLOSED
CLOSED
0%
0.00
0%
0.00
0.00
ur
72,174.00
ur
0.00
100%
72,174.00
72,174.00
2 430 700.00 1,402,455.42
ur
2,430,700.00
ur
100%
2,430,700.00
0%
0.00
2,430,700.00
JCI costs + 7% JV OH&P
ur
1,402,455.42
ur
0%
0.00
100%
1,402,455.42
1,402,455.42
ETA costs + 7% JV OH&P; uilders works not yet included to be submitted under 76-002
23-Jun-07/ 4-Feb-08
2,183,160.00
see NOC#127
2,087,955.12
JAP016/ALM/TCAC/18101 see NOC#127 dated 18-May-08
CLOSED
CLOSED
100%
2,087,955.12
0%
0.00
2,087,955.12
0.00
EVS Cost + 12% OH&P but less works deemed included in the NSC
DXB/AMT-01/0600/EDM/2385/ DXB/AMT-01/0600/EDM/3608
23-Jun-07/ 4-Feb-08
196,416.80
see NOC#127
191,292.64
JAP016/ALM/TCAC/22536 see NOC#127 dated 23-Nov-08
CLOSED
CLOSED
100%
191,292.64
0%
0.00
191,292.64
0.00
Thermofire Cost AED 170,797.22 + 12% OH&P; confirmed to be valued in ERI 35 under the Nakheel letter ref. JAP016/TS/GT/0244 dtd 27May08
JV
DXB/AMT-01/0500/JLy/3863
18-Mar-08
204,700.00
see NOC#127
see NOC#127
204,700.00
CLOSED
100%
204,700.00
0%
0.00
179,424.00
25,276.00
EVS Cost + 12% OH&P + 3% attendances
JV
DXB/AMT-01/0500/JLy/3863
18-Mar-08
12,416.32
see NOC#127
see NOC#127
12,416.32
CLOSED
0.00
100%
12,416.32
12,416.32
Thermofire Cost + 12% OH&P + 3% attendances
DXB/AMT-01/0600/EDM/2310
09-Jun-07
(valued in 107-003)
see NOC#127
(valued in 107-003)
see NOC#127
CLOSED
CLOSED
0%
0.00
0%
0.00
0.00
0.00
Valued in 107-003
DXB/AMT-01/0600/EDM/2472
07-Jul-07
(valued in 107-003)
0
(valued in 107-003)
0
CLOSED
CLOSED
0%
0.00
0%
0.00
0.00
0.00
ETA to submit entitlements
DXB/AMT-01/0600/EDM/2474
07-Jul-07
ur
ur
ur
ur
ur
ur
ur
0.00
ETA to submit entitlements
DXB/AMT-01/0600/EDM/2554
18-Jul-07
(valued in 107-001)
0
CLOSED
CLOSED
0.00
0%
0.00
DXB/AMT-01/0600/EDM/3847
16-Mar-08
ur
ur
ur
ur
ur
ur
ur
DXB/AMT-01/0600/EDM/2311
09-Jun-07
(valued in OM8-001)
ur
(valued in OM8-001)
0
CLOSED
CLOSED
0%
0.00
0%
0.00
DXB/AMT-01/0600/EDM/2312
09-Jun-07
1,771.88
ur
1,587.60
0
CLOSED
CLOSED
100%
1,587.60
0%
0.00
DXB/AMT-01/0600/EDM/2313
09-Jun-07
0
(valued in Series 41)
0
CLOSED
CLOSED
0%
0.00
0%
0.00
DXB/AMT-01/0600/EDM/2111
02-May-07
(valued in Series 41) 7,275.43
0
6,205.97
0
JAP016/ALM/TCAC/21270 dated 29-Sep-08
CLOSED
CLOSED
100%
6,205.97
0%
DXB/AMT-01/0600/EDM/2540
17-Jul-07
26,634.44
see NOC#127
25,999.57
JAP016/ALM/TCAC/17848 see NOC#127 dated 8-May-2008
CLOSED
CLOSED
100%
25,999.57
NSC Basement 2 Security Room - Revised Drawings for the Ventilation and Lighting Details NSC Various Changes due to the revised MEP "For Construction" Drawings due to Modification at Level 30 NSC Revision to the Lighting Layout at GF, L1, & L2
DXB/AMT-01/0600/EDM/3134
08-Nov-07
172,273.32
ur
172,273.32
ur
43%
DXB/AMT-01/0600/EDM/2438
30-Jun-07
ur
ur
ur
DXB/AMT-01/0600/EDM/2309
09-Jun-07
ur
ur
ur
NSC Lighting Requirements to the Function Room / Ballroom JV Additional 40’ Container Storage, Office Chairs, and Computer for F+G Office NSC Telephone IDF/MDF Room Drawings
DXB/AMT-01/0600/EDM/2499
10-Jul-07
ur
ur
DXB/AMT-01/0600/EDM/2551
18-Jul-07
40,174.50
0
DXB/AMT-01/0600/EDM/2222
27-May-07
34,309.10
ur
DXB/AMT-01/0600/EDM/2315
09-Jun-07
(valued in OM9-001)
0
DXB/AMT-01/1100/WAE/3965
08-Apr-08
58,651.66
DXB/AMT-01/0600/EDM/2375
21-Jun-07
218,960.00
Revised Drawing for Lift Machine Room on 3rd Service Floor Revised Drawing for Interior Design Works Changes of Levels to Room Nos. B1-073 (Corridor) and B1-074 (Mechanical Plant Room) Additional Wall in Security Room at Basement 2
Modification to the Structural Drawings at Levels 49, 50, and 51 Notification of Entittlements (CVI-089) - Doors to new washrooms at L49 and L50 (Lift Lobby Area)
NSC Various Revisions due to the revised For Construction Drawings (MEP Works) at Levels 49, 50, & 51 NSC Amendment to District Cooling Piping and Control Works Heat Echan ers and Strainers JV Changes to Suspended Ceiling (ID Works Package)
DXB/AMT-01/1100/WAE/3632
09-Feb-07
100,121.32
see NOC#127
DXB/AMT-01/0500/JLy/3845
16-Mar-08
0.00
see NOC#127
DXB/AMT-01/0600/EDM/2954 /DXB/AMT-01/0600/EDM/3305
01-Oct-07/ 10-Dec-07
72,174.00
DXB/AMT-01/0500/JLy/1891
27-Mar-07
DXB/AMT-01/0500/JLy/1890
25-Mar-07
DXB/AMT-01/0600/EDM/2385/ DXB/AMT-01/0600/EDM/3608
COST (AED)
REMARKS / COMMENTS
VALUE (AED)
Revised Interior Lighting Fixtures Layout at Ballroom GF, Washroom GF, and Ballroom 2L NSC Ballroom/Function Room - Cladding to the Structural Steel Beams JV Modification to Lift Opening at 36th and 48th Floor
TIME (Days)
October 15, 2013
November 30, 2008
%
JV
COST (AED)
CERTIFIED AS AT
TIME (Days)
NSC ID Finishes for the Steel Columns at Ground Floor Entrance Lobby, 1st Floor Food Court and Retail Mall NSC DVR Stora e Units as er O tion III NSC Rainwater and Irrigation Waste Water Discharge from Planters JV Function Room / Ball Room Facility (Structural Works JV Function Room / Ball Room Facility (Fireproofing Works)
DATE
BALANCE OF WORK TO-DATE
COST (AED)
Potential Claim due to Late Design Changes Stainless Steel Door Frames L49-L64 Inclusive Additional Ironmongeries to Timber Door (DT-02) at Levels 49 upwards
REFERENCE
WORK DONE TO-DATE
OUTSTANDING CLAIMS
0.00
(valued in 107-001)
TIME (Days)
0
LETTER REF.
JAP016/ALM/TCAC/10523 dated 22-July-2007
JAP016/ALM/TCAC/21082 dated 21-Sep-08
CERTIFIED TO-DATE
BALANCE TO-DATE to be evaluated under ERI No. 16 as per letter ref. JAP016/ALM/TCAC/17030 dtd 8-Apr-08 under review (haroon & alpha star); to be evaluated under ERI No. 16 as per letter ref. JAP016/ALM/TCAC/17030 dtd 8-Apr-08; no changes made in the Ironmongeries as there was no formal instruction Al Abbar cost + 12% O H&P + 3% Attendances
0.00
TO BE VALUED IN CLAIM NO. 107-001 (ERI 35.1)
0.00
AA to submit entitlements
0.00
0.00
under omission.
1,587.60
0.00
Subcon Cost + 12% OH&P
0.00
0.00
considered in Claim Series 41 / ERI No. 16
0.00
6,205.97
0.00
Light weight Concrete and chipping works
0%
0.00
25,999.57
0.00
architectural works only.
74,900.00
57%
97,373.32
74,900.00
97,373.32
ETA costs + 7% JV OH&P
ur
ur
ur
ur
0.00
ETA to submit entitlements
ur
ur
ur
ur
0.00
ETA to submit entitlements; Note this pertains to the electrical works, fixtures t o be Claim No. 105; to be valued under ERI16 ref. JAP016/ALM/TCAC/09512 dtd 12Jun07
0%
0.00
ur
ur
ur
ur
ur
0.00
ETA to submit entitlements; Note this pertains to the electrical works, fixtures to be Claim No.107
40,074.53
0
JAP016/ALM/TCAC/11909 dated 9-Sept-2007
CLOSED
CLOSED
100%
40,074.53
0%
0.00
40,074.53
0.00
actual cost transmitted to F&G based on dayworks rates; agreed with F&G
13,517.00
0
JAP016/ALM/TCAC/21322 dated 5-Oct-08
CLOSED
CLOSED
100%
13,517.00
0%
0.00
10,951.45
2,565.55
(valued in OM9-001)
0
CLOSED
CLOSED
0%
0.00
0%
0.00
0.00
0.00
ur
58,651.66
ur
100%
58,651.66
0%
0.00
ur
218,960.00
ur
100%
218,960.00
0%
0.00
DXB/AMT-01/0600/EDM/2655
05-Aug-07
597,081.20
ur
DXB/AMT-01/0600/EDM/2432 / DXB/AMT-01/0500/JLy/3369
30-Jun-07 / 22-Dec-07
85,383.20
see NOC#127
85,383.20
NSC Variation Works due to Lift and Escalator Finishes (Direct Variation to the Nominated S/C Works)
DXB/AMT-01/0600/EDM/2433
30-Jun-07
653,624.24
0
653,624.24
52
NSC Variation Works due to Lift and Escalator Finishes (Adjustment to the Provisional Sums)
DXB/AMT-01/0600/EDM/2433
30-Jun-07
544,678.47
0
544,678.47
001 001
53 54
NSC Chan es of Wall a er in T ical Floor Corridors JV Changes to Mock-up Areas (ID Works)
DXB/AMT-01/0600/EDM/2802
01-Sep-07
DXB/AMT-01/0600/EDM/2400
24-Jun-07
ur 612,662.92
11 5
001
55
JV
DXB/AMT-01/0600/EDM/2804
02-Sep-07
4,044.20
0
11 6
001R1
57
JV
Change of Pressurization Duct Opening at 51st Floor Lift Lobby Additional Aluminum Flashing
DXB/AMT-01/0600/EDM/2803
01-Sep-07
764,729.70
11 2 80 13 4
001 001R1 001
58 59 60
NSC Chan es in the LV Schematic Dia ram JV False Beam/Bulk Head JV Omission of Proximity Access Card Reader and
DXB/AMT-01/0600/EDM/2763
25-Aug-07
DXB/AMT-01/0500/JLy/2098
30-Apr-07
DXB/AMT-01/0600/EDM/3069
27-Oct-07
506 665.14 1 706.32 (valued in OM6-001)
under review; to be under ERI #49 as per Nakheel letter ref. JAP016/TS/GT/0205 dated 15-Apr-08; SC cost +12%OH&P + 3% Attendances
20,544.00
198,416.00
ETA cost + 12% OH&P + 3% Attendances
ETA to submit entitlements
597,081.20
ur
66%
393,521.39
34%
203,559.81
393,521.39
203,559.81
CLOSED
CLOSED
100%
85,383.20
0%
0.00
85,383.20
0.00
0
JAP016/ALM/TCAC/17360 dated 20-Apr-08
CLOSED
CLOSED
89%
579,717.22
11%
73,907.02
579,717.22
73,907.02
KONE costs + 7% JV OH&P
0
JAP016/TS/GT/0083 dated 9 Aug-2007
CLOSED
CLOSED
70%
381,274.93
30%
163,403.54
381,274.93
163,403.54
KONE costs + 7% JV OH&P; NOTE : Not considered as a variation by Consultant but adjsutment to t he KONE Provisional Sums from AED500K to 1,009,045.30, and agreed amount s the nett costs.
ur
ur
ur
ur
ur
(50,825.00)
0.00
612,662.92
CLOSED
100%
612,662.92
0%
0.00
400,000.00
212,662.92
CLOSED
CLOSED
100%
3,315.73
0%
0.00
3,315.73
0.00
ur
764,729.70
ur
60%
458,837.82
40%
305,891.88
ur
506,665.14
ur
0%
ur
1,706.32
ur
CLOSED
CLOSED
0
see NOC#127
3,315.73
(valued in OM6-001)
valued under the omissions
58,651.66
JAP016/ALM/TCAC/21731 see NOC#127 dated 21-Oct-08
ur see NOC#127
ETA cost + 7% OH&P
0
0
JAP016/ALM/TCAC/20893 dated 11-Sep-08
0%
subcon costs plus 12% (revised cost from 182,960.40 due to the meeting between FBI and DMCC)
BI to submit entitlements Bond Interiors cost + 12% JV Mark-up + 7% OH&P (Prov. Sums) agreed withConsultants (F&G)
764,729.70
Subcon Cost + 12%OH&P + 3% Attendances
506,665.14
ETA costs + 12% OH&P + 3% Attendances
0.00
100%
506,665.14
0.00
100%
1,706.32
1,706.32
0.00
bulkheads only
0.00
0%
0.00
0.00
0.00
under review by JV and JCI.
VARIATION CLAIMS STATUS TO-DATE as at NOC NO.
SUB NO.
ERI NO.
V.O. TO
14 7
002
16
JV
16 9
001R2
16
JV
16 9
002R1
16
16 9
003
16
18 6
002
16
21 1
001
21 1
CLAIM ENTITLEMENT APPLICATION
CLAIM NOTICE LETTER
DESCRIPTION REFERENCE
DATE
ER / F&G / JV AGREED VALUES
COST (AED)
TIME (Days)
COST (AED)
TIME (Days)
LETTER REF.
WORK DONE TO-DATE
OUTSTANDING CLAIMS COST (AED)
TIME (Days)
BALANCE OF WORK TO-DATE
%
VALUE (AED)
%
VALUE (AED)
CERTIFIED AS AT
October 15, 2013
November 30, 2008 REMARKS / COMMENTS
CERTIFIED TO-DATE
BALANCE TO-DATE Coring Subcon Cost + 12% OH&P + 3% Attendances
DXB/AMT-01/0500/JLy/3209
21-Nov-07
4,134.48
ur
4,134.48
ur
0.00
100%
4,134.48
4,134.48
Revisions to the ID Works Package “For Construction” Drawings at the Ground Floor and First Floor GL-19 & GL-07 JV Revisions to the ID Works Package “For Construction” Drawings at the Ground Floor and First Floor Structural Su orts to GL-07 NSC Revisions to the ID Works Package “For Construction” Drawings at the Ground Floor for the termination of GL-07 and other adjacent Finishing Materials CVI No. 093 JV DMCC Offices - Core Toilets Level 49 & 50 (Revision of Ironmongeries)
DXB/AMT-01/0600/EDM/3626
07-Feb-08
541,470.46
ur
541,470.46
ur
90%
487,323.41
10%
54,147.05
541,470.46
S/C costs + 12% OH&P + 3% Attendances; to be valued at E RI 16 as per F&g letter ref. JAP016/TS/GT/0254 dtd 29May08
DXB/AMT-01/0600/EDM/3626
07-Feb-08
34,314.41
ur
34,314.41
ur
100%
34,314.41
0%
0.00
34,314.41
EVS to submit entitlements; EVS cost + 12% OH&P + 3% Attendances
DXB/AMT-01/0600/EDM/4520
07-Jul-08
ur
ur
ur
ur
100%
ur
ur
ur
DXB/AMT-01/0600/EDM/4671
03-Aug-08
4,137.35
ur
4,137.35
ur
100%
4,137.35
0%
0.00
4,137.35
scope shall be removal, supply and installation of ironmongeries; valued in ERI No. 16 as per Nakheel letter ref. JAP016/TS/GT/0318 dtd 20Aug08
16
NSC Supply and Installation of Interior Design Finishing Works - Basement 1 VIP Lounge Feature Ceiling
DXB/AMT-01/0600/EDM/4352
05-Jun-08
25,112.55
ur
25,112.55
ur
0.00
100%
25,112.55
25,112.55
002
16
NSC Supply and Installation of Interior Design Finishing Works - Basement 1 VIP Lounge Feature Ceiling (MEP Works by ETA)
DXB/AMT-01/0600/MIC/5014
26-Oct-08
247,839.95
ur
247,839.95
ur
0.00
100%
247,839.95
247,839.95
BI to submit entitlements; Revised design for feature ceiling as per the Nakheel letter ref. JAP016/TS/GT/0265 dtd 1Jun08; BI cost + 12% OH&P + 3% Attendances Revised design for feature ceiling as per the Nakheel letter ref. JAP016/TS/GT/0265 dtd 1Jun08; Electrical Works by ETA; ETA cost+ 12% OH&P + 3% Attend
21 1
003
16
JV
Supply and Installation of Interior Design Finishing Works - Basement 1 VIP Lounge Feature Ceiling (Supply of O2 Light Fixtures from M/s.Lever Electric)
DXB/AMT-01/0600/MIC/5040
05-Nov-08
39,243.75
ur
39,243.75
ur
0.00
100%
39,243.75
39,243.75
Revised design for feature ceiling as per the Nakheel letter ref. JAP016/TS/G T/0265 dtd 1Jun08; Supply only of light fittings from Lever
41
001R1
16/ 39
JV
Interior Design Works (JV Internal Subcontractors)
DXB/AMT-01/0500/JLy/877
24-Sep-06
28,894,792.49
see NOC#127
22,785,939.94
see NOC#127
3,879,153.39
see NOC#127
8,117,552.86
see NOC#127
3,107,564.82
ur
678,543.71
32,341.10
41
41
41
002R1
003R1
004R1
Internal Water Feature (Related Builders Work)
98%
28,304,706.24
2%
590,086.25
28,304,706.24
(28,304,706.24)
updated cost and rates approval summary status being sent reg ularly; cost submitted is the final applied claim
agreed values is partial and see NOC#127 deemed to change
CLOSED
80%
4,062,428.29
20%
1,002,416.12
4,062,428.29
(4,062,428.29)
updated cost and rates approval summary status being sent regularly.
agreed values is partial and see NOC#127 deemed to change
CLOSED
90%
7,573,568.93
10%
850,035.60
7,573,568.93
(7,573,568.93)
updated cost and rates approval summary status being sent regularly.
agreed values is partial and see NOC#127 deemed to change
CLOSED
89%
2,774,842.92
11%
336,488.30
2,774,842.92
(2,774,842.92)
updated cost and rates approval summary status being sent regularly.
CLOSED
ur
95%
642,000.00
5%
36,543.71
642,000.00
36,543.71
DXB/AMT-01/0500/JLy/877
16/ 39
NSC Interior Design Works (MEP Works by ETA)
DXB/AMT-01/0500/JLy/877
16/ 39
NSC Interior Design Works (Lift Finishes by Kone Middle East)
DXB/AMT-01/0500/JLy/877
NSC Chilled Water Monitoring and installation (Revised District Cooling Chilled Water Connections Re uirements JV 40' Container for Office Storage
DXB/AMT-01/0500/JLy/925
03-Oct-06
DXB/AMT-01/0600/EDM/1011
29-Oct-06
32,340.85
0
DXB/AMT-01/0600/EDM/988
22-Oct-06
262,569.93
ur
DXB/AMT-01/0500/JLy/112
18-Sep-05
1,434.82
0
DXB/AMT-01/0500/JLy/362
18-Apr-06
19,047.23
ur
JAP016/GEN/ABS/1051 dated 8-Aug-06
DXB/AMT-01/0500/JLy/362
18-Apr-06
1,579,708.41
ur
JAP016/GEN/ABS/1051 dated 8-Aug-06
DXB/AMT-01/0500/JLy/432
13-May-06
35,825.47
0
25,157.54
0
DXB/AMT-01/0500/JLy/623
05-Jul-06
14,639.13
0
14,560.51
0
DXB/AMT-01/0500/JLy/691
06-Aug-06
2,848.23
0
2,296.25
DXB/AMT-01/0500/JLy/748
12-Aug-06
28,033.99
0
DXB/AMT-01/0500/JLy/881
24-Sep-06
(not used)
DXB/AMT-01/0500/JLy/881
24-Sep-06
27,175.35
0
DXB/AMT-01/0500/JLy/881
24-Sep-06
229,129.54
34
001
18
38
001
19
37
001
20
3
002
21
12
001
21
NSC Revision of Duties and Capacities of the Ground and First Floor AHU's JV Additional Works to the Extra Piles Driven by the Pilin Contractor CVI No. 007 JV Amendments to Basement 1 Generator Rooms (Architectural Works) NSC Amendments to Basement 1 Generator Rooms (MEP Works by ETA) JV Nibs for the Approach Slabs
24-Sep-06
24-Sep-06
8,423,604.53
3,111,331.22
1,566,116.20
Bond Interiors to submit entitlements
CLOSED
progressively, as it is based on the agreed rates only (+12%)
NSC Interior Design Works (Other ID Works being done by Bond Interiors)
5,064,844.41
0.00
agreed values is partial and see NOC#127 deemed to change
16/ 39
24-Sep-06
progressively, as it is based on the agreed rates only (+7%)
progressively, as it is based on the agreed rates only (+7%)
progressively, as it is based on the agreed rates only (+7%) JAP016/ALM/TCAC/22578 dated 24-Nov-08
0
JAP/ALM/TCAC/06743 dated 6Feb-07
ETA costs + 7% JV OH&P
actual cost transmitted to F&G based on dayworks rates a reed with F&G ETA costs + 7% JV OH&P
CLOSED
CLOSED
100%
32,341.10
0%
0.00
32,341.10
0.00
262,569.93
ur
32%
84,537.51
68%
178,032.42
84,537.51
178,032.42
1,434.82
CLOSED
100%
1,434.82
0%
0.00
1,156.76
19,047.23
ur
100%
19,047.23
0%
0.00
19,047.23
1,579,708.41
ur
100%
1,579,708.41
0%
0.00
1,579,708.41
JAP016/ALM/TCAC/18884 dated 12-Jun-08 JAP016/ALM/TCAC/04947 dated 1-Nov-06
CLOSED
CLOSED
100%
25,157.54
0%
0.00
CLOSED
CLOSED
100%
14,560.51
0%
0.00
14,560.51
Various changes to the ID Package affecting the MC Package; i.e., blockworks
0
JAP016/ALM/TCAC/05297 dated 19-Nov-06
CLOSED
CLOSED
100%
2,296.25
0%
0.00
2,296.25
21,880.70
0
JAP016/ALM/TCAC/06567 dated 29-Jan-07
CLOSED
CLOSED
100%
21,880.70
0%
0.00
21,880.70
(not used)
0
CLOSED
CLOSED
0%
0.00
0%
0.00
0.00
0.00
Door which is not provided with an opening tag, in reference with Tender Query, Item No.6 dt d 16-May05 a es 9 Various revisions to the drawing under the F&G transmittal sheet ref. F&G/ALMAS/ TAISEI/01356 dtd 01-Au -06 NOT USED
26,646.79
0
JAP016/ALM/TCAC/181187 dated 18-May-08
CLOSED
CLOSED
100%
26,646.79
0%
0.00
25,766.44
880.35
agreed with Consultant (F&G)
0
23,398.50
0
JAP016/ALM/TCAC/16338 dated 17-Mar-08 JAP016/ALM/TCAC/18352 dated 26-Ma -08 JAP016/ALM/TCAC/17247 dated 16-Apr-08
CLOSED
CLOSED
100%
23,398.50
0%
0.00
23,398.50
0.00
agreed with Consultant (F&G)
CLOSED
CLOSED
100%
18,036.01
0%
0.00
18,036.01
0.00
agreed with Consultant (F&G)
CLOSED
CLOSED
100%
123,805.08
0%
0.00
123,805.08
0.00
agreed with Consultant (F&G)
JAP016/GEN/ABS/1011 dtd 19Jun06; JAP016/ALM/TCAC/18884 dtd - JAP016/GEN/ABS/1011 dated 19-Jun-06
CLOSED
CLOSED
100%
(1,351.84)
0%
0.00
(1,351.84)
0.00
agreed with Consultant (F&G)
1,894.77
CLOSED
100%
1,894.77
0%
0.00
1,894.77
awaiting response from Client.
JAP016/ALM/TCAC/20933 dated 14-Se -07 JAP016/ALM/TCAC/09528 dated 12-Jun-07
CLOSED
CLOSED
100%
530.47
0%
0.00
530.47
0.00
agreed with Consultant (F&G)
CLOSED
CLOSED
100%
343.82
0%
0.00
343.82
0.00
agreed with Consultant (F&G)
JAP016/ALM/TCAC/09528 dated 12-Jun-07 JAP016/ALM/TCAC/14300 dated 12-Dec-06 JAP016/ALM/TCAC/14300 dated 12-Dec-06
CLOSED
CLOSED
100%
344.60
0%
0.00
344.60
0.00
agreed with Consultant (F&G)
CLOSED
CLOSED
100%
1,063.46
0%
0.00
1,063.46
0.00
agreed with Consultant (F&G)
CLOSED
CLOSED
100%
12,180.62
0%
0.00
12,180.62
0.00
agreed with Consultant (F&G)
JAP016/ALM/TCAC/17248 dated 16-A r-08 JAP016/ALM/TCAC/14300 dated 12-Dec-06 JAP016/ALM/TCAC/18352 dated 26-Ma -08 JAP016/ALM/TCAC/18118 dated 18-May-08
CLOSED
CLOSED
100%
0.00
0%
0.00
0.00
0.00
agreed with Consultant (F&G)
CLOSED
CLOSED
100%
548.61
0%
0.00
548.61
0.00
agreed with Consultant (F&G)
CLOSED
CLOSED
100%
1,233.74
0%
0.00
1,233.74
0.00
agreed with Consultant (F&G)
41,554.32
CLOSED
100%
41,554.32
0%
0.00
0
12
002
21
16
002
21
19
001
21
JV
21
001
21
JV
23
001
21
JV
33
001
21
JV
33
002R1
21
JV
33
003
21
JV
Interior Design Package Changes affecting the Main Contract Package Door Details (Door Type for Telephone Room (01052) at First Floor) DTS referenced AM/015/515 dated 5th August 2006 (Architectural and Structural Works) List of "For Construction" Drawings transmitted by Nakheel Changes in the Lift Pit Depths, and Revisions to the Galvanised Steel Ladder at 64th Level Changes to the Access Floor Heights
33
004
21
JV
Various Revisions at the Parking Areas
DXB/AMT-01/0500/JLy/881
24-Sep-06
22,371.54
0
18,036.01
0
33
005
21
JV
DXB/AMT-01/0500/JLy/881
24-Sep-06
153,565.57
0
123,805.08
0
33
006
21
JV
Additional Architectural Works to the Service Floor Areas (1-3) Missing Spanmark as PB434 (RFI No. 029)
DXB/AMT-01/0500/JLy/881
24-Sep-06
3,223.52
0
(1,351.84)
0
33
007
21
JV
24-Sep-06
1,894.77
0
008
21
JV
Additional Reinforcement due to the Missing Details RFI No. 042 First Floor Slab Details (RFI No. 072)
DXB/AMT-01/0500/JLy/881
33
DXB/AMT-01/0500/JLy/881
24-Sep-06
657.99
0
530.47
0
33
009
21
JV
DXB/AMT-01/0500/JLy/881
24-Sep-06
427.04
0
343.82
0
33
010
21
JV
Second Basement Floor Beam - PB205A (RFI No. 075 Fourth Basement Beam - PB451A (RFI No. 078)
DXB/AMT-01/0500/JLy/881
24-Sep-06
425.15
0
344.60
0
33
011
21
JV
Fourth Basement Beam - PB434 (RFI No. 144)
DXB/AMT-01/0500/JLy/881
24-Sep-06
1,150.44
0
1,063.46
0
DXB/AMT-01/0500/JLy/881
24-Sep-06
13,820.28
0
12,180.62
0
DXB/AMT-01/0500/JLy/881
24-Sep-06
499.04
0
0.00
0
0
33
012
21
JV
33
013
21
JV
Tower Structural Drawings - Additional TB29 Beam (RFI No. 146) Door Opening Height - First Floor (RFI No. 157)
33
014
21
JV
Basement 2 Beams (RFI No. 162)
DXB/AMT-01/0500/JLy/881
24-Sep-06
3,461.71
0
548.61
0
33
015
21
JV
Lift F4 - Structural Details (RFI No. 171)
DXB/AMT-01/0500/JLy/881
24-Sep-06
1,556.34
0
1,233.74
0
33
016
21
JV
Reinforced Concrete Partition Wall @ the Basement 2 (RFI No. 182)
DXB/AMT-01/0500/JLy/881
24-Sep-06
41,554.32
0
0
25,157.54
278.06
0.00
41,554.32
awaiting response from Client.
rejected by Nakheel due to notice not served as per the required time period under the Contract. ETA Cost of AED 1,476,363 + 7% JV OH&P
awaiting response from Client.
rejected F&G assessment in t heir letter JAP016/ALM/TCAC/18118 dated 18-May-08 thru our letter ref.DXB/…./EDM/4262 dtd 22May08;F&G assessment under review by JV
VARIATION CLAIMS STATUS TO-DATE as at NOC NO.
SUB NO.
ERI NO.
V.O. TO
78
005
35.5
JV
10 7
004b
35.5
10 7
004c
35.5
18
001R1
37
18
002
37
70 14 6
001 001
CLAIM ENTITLEMENT APPLICATION
CLAIM NOTICE LETTER
DESCRIPTION
ER / F&G / JV AGREED VALUES
REFERENCE
DATE
COST (AED)
TIME (Days)
COST (AED)
Function Room / Ball Room Fac ility Parapet (Structural Works)
DXB/AMT-01/0500/JLy/3964
08-Apr-08
144,684.43
see NOC#127
see NOC#127
NSC Ballroom/Function Room (Roof Parapet Works - CVI No. 084) JV Ballroom/Function Room (Roof Parapet Works GI Claddin - CVI No. 084 JV Landscaping Works; i.e., provision of Civil/Structural Works as confirmed under Nakheel Letter ref. JAP016/GEN/ABS/1058 dated 14-Aug-06
DXB/AMT-01/0600/EDM/4032
20-Apr-08
ur
see NOC#127
DXB/AMT-01/0600/DAN/____
12-Jan-09
26,312.00
see NOC#127
DXB/AMT-01/0500/JLy/586
26-Jun-06
3,775,777.57
ur
WORK DONE TO-DATE
OUTSTANDING CLAIMS
BALANCE OF WORK TO-DATE
CERTIFIED AS AT
October 15, 2013
November 30, 2008 REMARKS / COMMENTS
COST (AED)
TIME (Days)
%
VALUE (AED)
%
VALUE (AED)
CERTIFIED TO-DATE
BALANCE TO-DATE
144,684.43
CLOSED
100%
144,684.43
0%
0.00
123,200.00
21,484.43
see NOC#127
ur
CLOSED
ur
ur
ur
see NOC#127
26,312.00
CLOSED
0.00
100%
26,312.00
0%
0.00
2,661,716.46
0.00
Confirmed by Nakheel under the letter as mentioned, and instructed under ERI No. 37
TIME (Days)
LETTER REF.
0.00 26,312.00
EVS Cost + 12% OH&P + 3% attendances and Scaffolding supplied by JV; to be valued under ERI35.5 as per Nakheel letter ref. JAP016/TS/GT/0255 dtd 29Ma 08 Subcontractor : Al Abbar; shall be valued under ERI 35.5 as per Nakheel Letter JAP016/TS/GT/0255 dtd 29Ma -08 additional GI sheets cover to parapet for the preparation of EPDM by AL Abbar
2,661,716.46
0
JAP016/ALM/TCAC/90791 dated 19-Jun-08
CLOSED
CLOSED
100%
2,661,716.46
JAP016/ALM/TCAC/90791 dated 19-Jun-08
CLOSED
CLOSED
100%
106,370.21
0%
0.00
106,370.21
0.00
valued under th ERI No. 37
CLOSED
CLOSED
0%
0.00
0%
0.00
0.00
0.00
see OM-5 below (omitted works)
DXB/AMT-01/0600/EDM/3098
31-Oct-07
106,370.21
ur
106,370.21
0
JV Level 30 Partition La outs NSC Relocation of Cameras at 30th Floor (RFI No. 859)
DXB/AMT-01/0500/JLy/1781
14-Mar-07
0
valued in OM-5
0
DXB/AMT-01/0500/JLy/3207
20-Nov-07
valued in OM-5 ur
ur
ur
ur
ur
ur
ur
0.00
JCI to submit entitlements
NSC Various Revisions to the Electrical Works "For Construction" Drawings NSC Fire Fighting Systems at Levels 49, 50, & 51 Abortive Work JV Fire Fighting Systems at Levels 49, 50, & 51 Builders Work and Abortive Work NSC Revised "For Construction" Security Drawings at Levels 49, 50, & 51 u nder the DMCC Transmittal Ref. JAP016/TRNS /JV/00044 dated 5th May 2008 Securit Works NSC Modification of Raised Floor Heights at Server Rooms at Level 49, 50, & 51 NSC Drainage Piping in Medium and High Rise Lift Machine Room JV Cuttings in Corridor Ceiling at Level 2 as required by Bond Communication
DXB/AMT-01/0600/EDM/2475
07-Jul-07
ur
ur
ur
ur
ur
ur
ur
0.00
ETA to submit entitlements
DXB/AMT-01/0600/EDM/4034
20-Apr-08
ur
ur
ur
ur
ur
ur
ur
0.00
ETA to submit entitlements
DXB/AMT-01/0600/EDM/4034
20-Apr-08
1,903.78
ur
1,903.78
ur
1,903.78
0%
0.00
DXB/AMT-01/0600/EDM/4162
10-May-08
ur
ur
ur
ur
ur
ur
ur
DXB/AMT-01/0600/EDM/4335
02-Jun-08
17,250.00
ur
17,250.00
ur
100%
17,250.00
0%
0.00
DXB/AMT-01/0600/EDM/3561
28-Jan-08
133,301.39
ur
133,301.39
ur
100%
133,301.39
0%
0.00
17,120.00
116,181.39
DXB/AMT-01/0600/EDM/____
28-Oct-08
0.00
0
CLOSED
CLOSED
0%
0.00
0%
0.00
0.00
0.00
FBI shall submit entitlements as per the F &G letter ref. JAP016/ALM/TCAC/21815 dtd 26-Oct-08; BACKCHARGE TO BOND COMMUNICATION DUE NON-COORDINATION
NSC Additional Counter at the Security Room level 2 as per the M/s. Nakheel letter ref. JAP016/TS/BW/0366 dated 16-Nov-08 JV Design Changes due to the Omission of Operable Partition at Level 2 Offices (ERI No. 62) and Stainless Steel Rubbish Bins ERI No. 16 NSC Revisions to Diamond Exchange Centre (Fire Policy La out NSC Revisions to Diamond Exchange Centre (CCTV and Access Control) NSC Emergency Cables to the Tenant's DB
DXB/AMT-01/0600/EDM/5104
19-Nov-08
ur
ur
ur
ur
ur
ur
ur
0.00
BI to submit entitlements
DXB/AMT-01/0600/EDM/4464
26-Jun-08
(valued in 41-001 & 149001)
ur
CLOSED
ur
0.00
0%
0.00
0.00
considered in 41-001 and 149-001
DXB/AMT-01/0600/EDM/4134
06-May-08
ur
ur
ur
ur
ur
ur
ur
0.00
ETA to submit entitlements
DXB/AMT-01/0600/EDM/4144
07-May-08
ur
ur
ur
ur
ur
ur
ur
0.00
JCI to submit entitlements; based on transmittal …./00043 dtd 4May08 (drwg. No. 4494/Y/009 Rev.4)
DXB/AMT-01/0600/EDM/3091
30-Oct-07
394,252.82
ur
394,252.82
ur
82%
322,070.00
18%
72,182.82
322,070.00
72,182.82
DXB/AMT-01/0600/EDM/3588
02-Feb-08
127,141.12
ur
CLOSED
ur
100%
100,469.43
0%
0.00
100,469.43
0.00
100%
JV
10 1
001
45 45 / 45.1 45.2
16 3
006a
49.3
16 3
006b
49.3
16 3
009
49.4
20 8
001
49.5
80
002
59.1
14 9
007
62
14 9
010
62
21 4
001
62 / 16
14 9
004
62.2
14 9
003b
62.3
13 7
001
63
16 3
001
66 66.1
16 3
007
66.1
17 4
001
66.1
17 4
002
66.1
16 3
008
15 2
001
67/ 66 71
16 4
001
72
12 3
001R2
73
JV
16 6
001
73
JV
16 6
002
73
JV
20 2
001
74
19 7
001a
74.1
19 7
001b
74.1
19 7
002
74.1
JV
Landscaping works - Screed for the Planter Boxes
Provision of Toilets at upper floors, Levels 49,50,51, and 62 (Civil and Architectural Works, and Abortive Works-Coring at 49, 50, & 51, Plastering at Pantry Wall at L49, and add'l opening at SF3 for Level 49)
0.00
0
(valued in 41-001 & 149-001)
JAP016/ALM/TCAC/21426 dated 9-Oct-08
100,469.43
100%
0%
24,824.00
1,903.78
0.00
17,250.00
0.00
NSC Reworks at the New DMCC Washrooms (Levels 49, 50, & 51) for FCU's NSC Design Changes - Additional Dummy Mullions and Back Pans at Levels 49-62 (NSC Works)
DXB/AMT-01/0600/EDM/4048
22-Apr-08
14,283.00
ur
14,283.00
ur
14,283.00
0%
0.00
DXB/AMT-01/0600/EDM/3716
24-Feb-08
ur
ur
ur
ur
ur
ur
ur
JV Design Changes-Additional Aluminum Flashing due to the revised Curtain Wall Cladding NSC Relocation of FCU to the New Toilet Area at Levels 52,53,54,59, & 62 JV Additional Works to the Metal Cladding (MT-20) behind Glazed Balustrades caused by the Lowering of Ceiling at Ground Floor Level Due to the MEP Works Metal Claddin - MT20 JV BMS Room Furniture Requirements
DXB/AMT-01/0600/EDM/3716
24-Feb-08
8,452.50
ur
CLOSED
ur
0.00
100%
8,232.00
DXB/AMT-01/0600/EDM/4047
22-Apr-08
ur
ur
ur
ur
ur
ur
ur
DXB/AMT-01/0600/EDM/3270
03-Dec-07
294,350.71
see NOC#127
176,646.32
CLOSED
CLOSED
0%
0.00
0%
0.00
0.00
39,167.52
39,167.52
JAP016/ALM/TCAC/22470 see NOC#127 dated 20-Nov-08
JAP016/ALM/TCAC/21106 dated 22-Se -08
8,232.00
0.00
MDS cost + 12% OH&P + 3% Attendances; valued at ERI No. 49.5 as per Nakheel letter ref. JAP016/TS/GT/0271 dtd 9Jun08 ETA costs = AED 115,914.25 + 12% JV OH&P + 3% Attendances
ETA costs + 7% JV OH&P; confirmed to be ERI No. 63 as per F&G letter ref. JAP016/ALM/TCAC/18721 dtd 8Jun08 under review by JV; additional coring works to ERI 66.1 as confirmed by F&G letter ref. JAP016/ALM/TCAC/17867 dtd 8May08; addl plaster at Pantry L49 under 66.1 as per JAp016/ALM/TCAC/18766 dt d9Jun08;ERI 66.1 confirmed by Nakheel to cover coring works by B ETA cost + 12% OH&P + 3% Attendances
Al Abbar to submit claim / JV to submit builders works claim; to be valued under the ERI 66.1 refer to F&G letter JAP016/ALM/TCAC/18209 dtd 20May08 Best Steel cost + 12% OH&P; to be valued under the ERI 66.1 refer to F &G letter JAP016/ALM/TCAC/18209 dtd 20Ma 08 ETA to submit entitlements; Level 52,53,54,59 under ERI67, and Level 62 under ERI66
0.00
using Bond Interiors rates + 7% OH&P
0.00
BF cost AED 34,971.00 + 12% JV OH&P
DXB/AMT-01/0600/EDM/3589
02-Feb-08
40,216.65
0
CLOSED
CLOSED
100%
39,167.52
0%
0.00
DXB/AMT-01/1100/WAE/2955
01-Oct-07
12,637.06
ur
12,637.06
ur
100%
12,637.06
0%
0.00
12,637.06
confirmed to be valued under ERI No. 73 according to the Nakheel letter ref. JAP16/TS/GT/0267 dtd 8Jun08
DXB/AMT-01/0600/EDM/3609
04-Feb-08
11,783.12
ur
11,783.12
ur
100%
11,783.12
0%
0.00
11,783.12
ETA cost + 12%OH&P + 3% Attendances; confirmed to be valued in ERI No. 73 according to Nakheel letter ref. JAP16/TS/GT/0267 dtd 8Jun08
ID Works Package - Lighting Requirements at L48 Meeting Room (JV Scope - Lever to Supply)
DXB/AMT-01/0600/EDM/3609
04-Feb-08
2,254.00
ur
2,254.00
ur
100%
2,254.00
0%
0.00
2,254.00
DXB/AMT-01/0600/EDM/4137
06-May-08
73,986.40
ur
73,986.40
ur
0.00
100%
73,986.40
19,688.00
54,298.40
JV to submit entitlements; confirmed to be valued in ERI No. 73 according to Nakheel letter ref. JAP16/TS/GT/0267 dtd 8Jun08; Lever cost + 12% OH&P + 3% Attendance ETA cost + 12% OH&P + 3% Attendances
DXB/AMT-01/0600/EDM/4053
22-Apr-08
18,228.31
ur
CLOSED
ur
0.00
100%
14,232.82
27,042.36
(12,809.54)
Masonry Works, Abortive Works and Coring Works
DXB/AMT-01/0600/EDM/4053
22-Apr-08
57,459.68
ur
57,459.68
ur
0.00
100%
57,459.68
57,459.68
Doors and Frames incl Ironmongery, and Ceiling Works
DXB/AMT-01/0600/EDM/4053
22-Apr-08
ur
ur
ur
ur
ur
ur
ur
Provision of Pantry Area in Ground and First Floor as per revised " For Construction" Drawings under DMCC transmittal JAP016/TRNS/JV/00040 (JV Scope ID works NSC Provision of Pantry Area in Ground and First Floor
14,232.82
0
0.00
JCI to submit entitlements
Potential Delay due to Late Issuance of Revised Design Information in Sky Lobby Meeting Room at Level 48 ID Works Package - Lighting Requirements at Level 48 Meeting Room (MEP Works Scope)
NSC Revised Domestic Water Layout at Ground and First Floor due to the Revised "For Construction" Drawings under the DMCC Transmittal JAP016/TRNS/JV/00042 JV Provision of Pantry Area in Ground and First Floor as per revised " For Construction" Drawings under DMCC transmittal JAP016/TRNS/JV/00040 (JV Scope masonry works, abortive works and coring works) JV
JAP016/ALM/TCAC/22576 dated 24-Nov-08
8,232.00
14,283.00
builders works
JAP016/ALM/TCAC/22447 dated 19-Nov-08
0.00
Bond Interiors to submit entitlements
VARIATION CLAIMS STATUS TO-DATE as at CLAIM ENTITLEMENT APPLICATION
CLAIM NOTICE LETTER
NOC NO.
SUB NO.
ERI NO.
V.O. TO
OM-8
001
38
JV
OM-9
001
49
JV
0
001
JV
Delay in Site Mobilization
1
001
JV
Design Modification of Pile Caps
2
001
JV
3
001
JV
Excavation to the difference in the Tender Drawings and the Actual Site Conditions Pile Head Levels and Associated Problem
4
001
JV
5
001
6 7
DESCRIPTION
ER / F&G / JV AGREED VALUES
REFERENCE
DATE
COST (AED)
TIME (Days)
COST (AED)
TIME (Days)
JAP016/ALM/TCAC/22416
18-Nov-08
(1,988.48)
0
(1,988.48)
0
JAP016/ALM/TCAC/19245
26-Jun-08
(85,688.89)
0
TDB/P3/AM059
05-Sep-05
0.00
see NOC#127
TDB/P3/AM/CN-001A
05-Sep-05
611,739.00
see NOC#127
TDB/P3/AM/CN-002A
17-Sep-05
259,943.16
DXB/AMT-01/0500/JLy/112
18-Sep-05
Nominated Subcontractor Appointment (ETA)
DXB/AMT-01/0500/JLy/068
JV
Fuel Price Increases
001
JV
001
JV
WORK DONE TO-DATE
OUTSTANDING CLAIMS
BALANCE OF WORK TO-DATE
REMARKS / COMMENTS
TIME (Days)
%
VALUE (AED)
%
VALUE (AED)
CLOSED
CLOSED
100%
(1,988.48)
0%
0.00
(85,688.89)
0.00
1.00
(85,688.89)
0.00
0.00
see NOC#127
CLOSED
CLOSED
0%
0.00
0%
0.00
see NOC#127
611,739.00
CLOSED
100%
611,739.00
0%
0.00
611,739.00
see NOC#127
see NOC#127
259,943.16
CLOSED
100%
259,943.16
0%
0.00
259,943.16
258,088.62
see NOC#127
see NOC#127
258,088.62
CLOSED
100%
258,088.62
0%
0.00
258,088.62
03-Oct-05
0.00
ur
0.00
JAP016/GEN/ABS/1051 dated 8-Aug-06
CLOSED
ur
0%
0.00
0%
0.00
DXB/AMT-01/0500/JLy/070
03-Oct-05
0.00
0
0.00
JAP016/GEN/ABS/1051 dated 8-Aug-06
CLOSED
CLOSED
0%
0.00
0%
0.00
Delay of receipt of the Building Permit and "For Constructon" Drawings Delay in Raft Pour in Zones 1 & 2
DXB/AMT-01/0500/JLy/131
30-Nov-05
0.00
ur
0.00
JAP016/GEN/ABS/1051 dated 8-Aug-06
CLOSED
ur
0%
0.00
0%
0.00
DXB/AMT-01/0500/JLy/134
04-Dec-05
0.00
see NOC#127
0.00
28-Dec-05
0.00
ur
Modification of Lift Openings at 36th Floor Low Rise Lift Machine Room and 48th Floor High Rise Lift Machine Rooms (Omission of Concrete Works due to the increase of Lift O enin Sizes Modification to the Structural Drawings at Levels 49, 50, and 51
0.00
rejected by Nakheel due to dates relating to NSC in the Baseline Programme is not yet accepted.
2
0.00
JAP016/GEN/ABS/1014 dated 24-Jun-06, & JAP016/GEN/ ABS/1051 dated 8-Aug-06
CLOSED
2
0%
0.00
0%
0.00
0.00
Rejected by Nakheel in accordance to Clause 44.1 of CoC, as 1 day is non working day and 2 days is not sufficient to award an entitlement; our letter ref. DXB/….Jly/5013 dtd 26Oct08 again requested for 2 days EOT
0.00
(not provided)
CLOSED
CLOSED
0%
0.00
0%
0.00
0.00
ETA to submit entitlements; Permanent Power now in place done by ETA.
ur
ur
ur
ur
ur
0.00
ETA to submit entitlements; rejected by Nakheel due to notice not served as per the required time period under the Contract.
0
31,782.05
CLOSED
100%
31,782.05
0%
0.00
0
CLOSED
CLOSED
0%
0.00
0%
0.00
NSC ETA Site Establishment (Provision of Temporary Power Su l NSC Revised Contract Drawings by ETA
DXB/AMT-01/0500/JLy/353
17-Apr-06
0.00
0
001
DXB/AMT-01/0500/JLy/360
18-Apr-06
ur
ur
DXB/AMT-01/0500/JLy/726
05-Aug-06
0
DXB/AMT-01/0500/JLy/748
12-Aug-06
0
002a 002b
36
0
JAP016/GEN/ABS/1051 dated 8-Aug-06
DXB/AMT-01/0500/JLy/749
31,782.05 (valued in 107-003 & 175001 12-Aug-06 ur
ur
ur
ur
ur
ur
ur
DXB/AMT-01/0500/JLy/750
12-Aug-06
ur
ur
ur
ur
ur
ur
ur
DXB/AMT-01/0500/JLy/759
15-Aug-06
0
CLOSED
CLOSED
0%
0.00
0%
0.00
DXB/AMT-01/0500/JLy/760
15-Aug-06
DXB/AMT-01/0500/JLy/796
26-Aug-06
(valued in 67-001) (valued in 33) 0.00
NSC Factory Inspections for Al Abbar
DXB/AMT-01/0500/JLy/802
29-Aug-06
DXB/AMT-01/0500/JLy/926 DXB/AMT-01/0500/JLy/926
001
NSC Additional OCP's conduits to the Offices and Retail Units MEP Works JV Additional OCP's conduits to the Offices and Retail Unts (Builders Work) NSC Fire Alarm Shop Drawing
39 40
001 001
JV Nomination of Landsca in Subcontractor NSC Revised "For Construction" Drawings for ETA
42
001
NSC Fire Sprinkler Riser Pipes in Garbage Chute Shaft
43
001
44
001
45
001
47
001
48
001
49
001
JV
53
001
JV
58 60
001 001
61
001
JV
62
001
JV
63 66
001 001
71
001
CTU 3rd Party Inspection
rejection letter ref. JAP016/GEN/ABS/1051 dated 8 Aug-06 does not detail the reasons for rejection of Claim No. 5. rejected by Nakheel due to notice not served as per the required time period under the Contract.
0.00
0.00
001
35
0.00
rejected by Nakheel due to notice not served as per the required time period under the Contract.
0.00
0.00
11
see NOC#127
0.00
0.00
0.00
10
35
progressed under a separate claim.
0.00
0%
0.00
001
progressed under a separate claim.
0%
08-Jan-06
30
progressed under a separate claim.
0.00
DXB/AMT-01/0500/JLy/171
001 001 001
This is due to the late possession of site as detailed in the referred letter.
0.00
Closure of Site and Offices (due to the death of Sheik Maktoom, 5-7 January 2006)
26 27 29
0.00
0%
JV
001
Omission of Office Partitions at Level 49
0%
001
25
0.00
0.00
ur
9
001
(85,688.89)
BI to confirm cost by F&G
CLOSED
Late Notification of Subcontractors
24
(1,988.48)
CLOSED
JV
JV Builders Works Drawings NSC DTS referenced AM/015/515 dated 5th August 2006 MEP Works NSC DTS referenced AM/015/509 dated 1st August 2006 (MEP Works) NSC DTS referenced AM/015/516 dated 7th August 2006 MEP Works NSC LV Schematic Dia ram JV Revised Structural Drawin s NSC Storage Area for KONE
BALANCE TO-DATE
CLOSED
001
001 002
0
JAP016/ALM/TCAC/22416 dated 18-ov-08
CERTIFIED TO-DATE
JAP016/TS/BW/0018 dated 31Oct-06
8
22 23
0.00
LETTER REF.
October 15, 2013
November 30, 2008
COST (AED)
DXB/AMT-01/0500/JLy/159
JV
CERTIFIED AS AT
(valued in 107-003 & 175-001
0.00
0.00
0.00
0.00 progressed under a separate claim; t ime related claim.
31,782.05
Internal S/C Works + 12% OH&P
0.00
included in Claim Nos. 107-003 & 175-001
0.00
ETA to submit entitlements
0.00
ETA to submit entitlements
0.00
0.00
included in Claim Nos. 67-001 valued under the Claims Series 33
0.00
0
0 0
(valued in 67-001) valued in 33 0.00
CLOSED
CLOSED
0%
0.00
0%
0.00
0.00
0.00
0
JAP016/TS/ABS/0004 dated 12Sep-06
CLOSED
CLOSED
0%
0.00
0%
0.00
0.00
0.00
KONE to submit entitlements; rejected by Nakheel due to Clause 20.1-Care of Works on the CoC.
0.00
0
0.00
0
JAP016/GEN/ABS/1070 dated 06-Sep-06
CLOSED
CLOSED
0%
0.00
0%
0.00
0.00
0.00
AA to submit entitlements; rejected by Nakheel due to Tech Specifications H11/20, Clause 871, and Clause 3b of CoC.
03-Oct-06
38,246.08
ur
38,246.08
ur
100%
38,246.08
0%
0.00
38,246.08
ETA Cost + 7% JV OH&P; as per original claim
03-Oct-06
120,370.11
ur
120,370.11
ur
100%
120,370.11
0%
0.00
120,370.11
JV Cost
DXB/AMT-01/0500/JLy/932
05-Oct-06
ur
ur
ur
ur
ur
ur
ur
DXB/AMT-01/0500/JLy/1052
05-Nov-06 06-Nov-06
0.00 (valued in37-001)
ur
DXB/AMT-01/0500/JLy/1054 DXB/AMT-01/0500/015/JLy/235
07-Nov-06
522,748.23
ur
DXB/AMT-01/0500/JLy/1086
11-Nov-06
0.00
0
0
NSC Revised Specifications for the Fire Fighting Equipments JV Provision of Inspectors
DXB/AMT-01/0600/EDM/1179
29-Nov-06
ur
ur
DXB/AMT-01/0500/JLy/1185
03-Dec-06
(valued in 127-001)
0
NSC Revised Architectural Drawings at 31st & 32nd Floor MEP Works NSC Revised Architectural and ID Drawings (MEP Works)
DXB/AMT-01/0600/EDM/1237
11-Dec-06
ur
DXB/AMT-01/0600/EDM/1238
11-Dec-06
Exceptionally Adverse Climatic Conditions
DXB/AMT-01/0500/JLy/1253
RFI No. 480 - Embedded Flush Tank
0
JAP016/TS/BW/0021 dated 12Nov-06
0.00 (valued in37-001)
0
0.00
0
(valued in 127-001)
0
JAP016/TS/ABS/0031 dated 28Dec-06
0.00
ETA to submit entitlements; rejected by Nakheel due to the Consultant's(Atkins)response ref. RD/4532/661/ML/R8-0344.
CLOSED
ur
0%
0.00
0%
0.00
0.00
time implications.
CLOSED
CLOSED
0%
0.00
0%
0.00
0.00
522,748.23
ur
100%
522,748.23
0%
0.00
522,748.23
same as Claim No. 37-001, based on the F&G transmittal ref. F+G/ALMAS/TAISEI/01404 dtd 10-1506 based on the response from RFI No. 417
CLOSED
CLOSED
0%
0.00
0%
0.00
ur
ur
ur
0%
0.00
0%
0.00
0.00
request by WS Atkins and F&G in the Technical Meeting to provide 3rd party safety inspection and issue of certificate prior to CTU; rejected by Nakheel.
0.00
ETA to submit entitlements; revisions is due to the requirement of a UL/FM specifications
0.00
To be included in the Prolongation Claims as this is a preliminaries items
ur
ur
CLOSED
CLOSED
ur
ur
ur
ur
ur
ur
0.00
ETA to submit entitlements
ur
ur
ur
ur
ur
ur
ur
0.00
ETA to submit entitlements
14-Dec-06
0.00
ur
0.00
CLOSED
ur
0%
0.00
0%
0.00
0.00
due to inclement weather conditions at site
DXB/AMT-01/0500/JLy/1338
28-Dec-06
0.00
0
0.00
0
CLOSED
CLOSED
0%
0.00
0%
0.00
0.00
rejected by F&G as it is included specs M13.
DXB/AMT-01/0600/EDM/1566
10-Feb-07
0
(valued in 65-001)
0
CLOSED
CLOSED
0%
0.00
0%
0.00
0.00
0.00
valued in Claim No. 65-001
DXB/AMT-01/0500/JLy/1567
13-Feb-07
(valued in 65-001) (valued in 33-030)
0
(valued in 33-030)
0
CLOSED
CLOSED
0%
0.00
0%
0.00
0.00
0.00
not applicable
DXB/AMT-01/0500/JLy/1593
14-Feb-07
0.00
0
0.00
0
CLOSED
CLOSED
0%
0.00
0%
0.00
0.00
0.00
rejected by F&G as per the response letter
Changes to Raised Access Floors at Tecom Rooms, Securit Rooms, and Tele hone Rooms NSC Installation of OCP's to Tenant Rooms NSC MEP Works - Revised External Services Drawings
DXB/AMT-01/0600/EDM/2507
11-Jul-07
12,494.21
ur
12,494.21
ur
100%
12,494.21
0%
0.00
DXB/AMT-01/0500/JLy/1633
20-Feb-07
0
DXB/AMT-01/0600/EDM/1655
25-Feb-07
valued in 35-001 (valued in 64-001)
NSC MEP Works - Revised Ground Floor Landscape Drawings
DXB/AMT-01/0600/EDM/1786
14-Mar-07
(valued in 76-001)
NSC Revised MEP Drawings JV Provision of BMU Sanitary Ware Selection
JAP016/TS/ALM/TCAC/06906 dated 14-Feb-07
JAP016/ALM/TCAC/06995 dated 18-Feb-2007
0.00
0.00
0.00
12,494.21
Revision 1 - revised due to the changes in the works.
0
CLOSED
CLOSED
0%
0.00
0%
0.00
0.00
0.00
not applicable
0
valued in 35-001 (valued in 64-001)
0
CLOSED
CLOSED
0%
0.00
0%
0.00
0.00
0.00
Included in Claim No. 64-001
0
(valued in 76-001)
0
CLOSED
CLOSED
0%
0.00
0%
0.00
0.00
0.00
Included in 76-001
VARIATION CLAIMS STATUS TO-DATE as at NOC NO.
SUB NO.
14 9
005b
14 9
005c
14 9
006
14 9
008
14 9
009
14 9
011
15 0
001
15 1 15 3 15 4
001 001 001
15 5
001
15 6
001
15 7
001
15 9
001
16 0 16 1 16 2
001 001 001
16 3
005
16 5
001
ERI NO.
V.O. TO
CLAIM ENTITLEMENT APPLICATION
CLAIM NOTICE LETTER
DESCRIPTION
ER / F&G / JV AGREED VALUES
REFERENCE
DATE
COST (AED)
TIME (Days)
NSC Modification Works due to the Tenant Requirements at the Diamond Exchange Centre (ETA scope of works JV Modification Works due to the Tenant Requirements at the Diamond Exchange Centre (JV scope of works NSC Vertical Cable Manager for Diamond Exchange AV System at the Multi Purpose Room in accordance with the F&G letter ref. JAP016/ALM/TCAC/20991 dated 16-Se -08 JV Break Glass Pedestals at the Diamond Exchange Centre in accordance with the F&G transmittal ref. F+G/ALMAS/TAISEI/01961 NSC Revisions to the Electrical Works at the Diamond Exchange Centre and Level 2 as per the F&G transmittal ref. F+G/ALMAS/TAISEI/01574 and DMCC transmittal ref. JAP016/TRNS/JV/00048
DXB/AMT-01/0600/EDM/4741
18-Aug-08
ur
ur
DXB/AMT-01/0600/EDM/4741
18-Aug-08
(valued in 149-001)
0
DXB/AMT-01/0500/JLy/5003
25-Oct-08
11,996.83
DXB/AMT-01/0600/EDM/5027
01-Nov-08
DXB/AMT-01/0600/EDM/5059
NSC Changes to the Diamond Exchange Centre as per the instructions given via M/s. DMCC letter referenced JAP016/GEN/BW/0177 dated 20-Oct-08 JV
Notification of a Potential Delay Determination of Scope of Work at L49, L50, & L51 (DMCC Floors)
NSC Containment (Security Services) JV Provision of Toilets at Levels 53 to 63 JV Enclosure to the Irrigation Pipes running through the LV Room 2 RFI No. 894 NSC Second Floor Revised Lighting and Power Design NSC Lift L4 Mock-Up (Car Interior Finish @ Ground Floor Level) JV Request for Issue of Outstanding Drawings (DMCC Offices at L49-L51 & Add'l Toilets in Office Area at L52-L64 JV Special Holiday on 14th January 2008 JV JV JV
16 7
001
Notice of Excessive Rains Additional Architraves to Towel Dis ensers Notification of a Possible Variation at Ballroom Electrical Cabinet Doors NSC Further Revisions to the Levels 49, 50, 51, 60 and 61 in accordance with DMCC Transmittal Ref. JAP016/TRNS/JV/ 00032 dated 22nd January 2008 MEP Works JV Notification of Disruption of Work due to discrepancy of Design Drawings at Second Floor JV Delays due to Strong Winds
16 8 17 1 17 2
001 001 001
JV Inspections not done on Timely Basis NSC Se uencin of S ire Erection JV Abortive Cost for GL-07 (ID Works Package)
17 5
001
17 6
001
17 6
002
17 6
003
17 6 17 7 18 0
COST (AED)
TIME (Days)
ur
ur
CLOSED
CLOSED
ur
11,996.83
9,200.00
ur
10-Nov-08
222,906.80
DXB/AMT-01/0600/EDM/5154
29-Nov-08
DXB/AMT-01/1100/WAE/3235
BALANCE OF WORK TO-DATE
October 15, 2013
November 30, 2008 REMARKS / COMMENTS
%
VALUE (AED)
ur
ur
ur
0.00
0%
0.00
ur
0.00
100%
11,996.83
11,996.83
BC cost + 7% OH&P; BC VO#14; BC time claim = 119 days
9,200.00
ur
0.00
100%
9,200.00
9,200.00
Dubai Metals cost + 12% OH&P + 3% Attand
ur
222,906.80
ur
0.00
100%
222,906.80
222,906.80
ETA cost + 12% OH&P + 3% Attendances
44,538.44
ur
44,538.44
ur
0.00
100%
44,538.44
44,538.44
BC cost + 7%; BC VO#17; BC time claim = 91 days
25-Jan-08
0.00
ur
CLOSED
ur
0.00
0%
0.00
0.00
Time related claim to be submitted separately.
DXB/AMT-01/0500/JLy/3252
28-Nov-07
ur valued in 163 1,600.56
ur
0.00
ETA to submit entitlements
0.00
valued in another claim
(valued in 149-001)
TIME (Days)
LETTER REF.
0
0.00
DXB/AMT-01/0500/JLy/3276
03-Dec-07
DXB/AMT-01/0600/EDM/3313
11-Dec-07
DXB/AMT-01/0600/EDM/3314
11-Dec-07
ur
ur
DXB/AMT-01/0500/JLy/3359
17-Dec-07
0.00
0
0.00
0
DXB/AMT-01/0100/YOS/3365
22-Dec-07
(valued in 163)
0
(valued in 163)
0
DXB/AMT-01/0600/EDM/3482
16-Jan-08
0.00
ur
0.00
0
DXB/AMT-01/0600/EDM/3483
16-Jan-08
0.00
19-Jan-08
DXB/AMT-01/1100/WAE/3542
24-Jan-08
0.00 96,768.00 0.00
ur
DXB/AMT-01/0600/EDM/3492
DXB/AMT-01/0600/EDM/3770
03-Mar-08
ur
ur
DXB/AMT-01/1100/WAE/3603
04-Feb-08
(valued in 149-001)
ur
valued in 163
0
ur
JAP016/TS/GT/0142 dated 31Jan-08
JAP016/TS/GT/0259 dated 29M a - 08
0
0.00
0
JAP016/TS/GT/0186 dated 27Mar-08
(valued in 149-001)
DXB/AMT-01/0500/JLy/3613
05-Feb-08
0.00
0
0.00
0
DXB/AMT-01/0500/JLy/3623
06-Feb-08
0
0.00
0
ur
0.00
0
DXB/AMT-01/0500/JLy/3634
09-Feb-08
DXB/AMT-01/0600/EDM/3676
17-Feb-08
0.00 ur 0.00
NSC Revised "For Construction" Drawings under the DMCC Transmittal Ref. JAP016/TRNS/JV/00033 dated 5th Februar 2008 MEP Works JV TECOM/DU Comments on Telephone Rooms Raised Access Floor Material Submittal NSC DU Requirements
DXB/AMT-01/0600/EDM/3771
03-Mar-08
ur
ur
DXB/AMT-01/0500/JLy/3814
10-Mar-08
(valued in 196)
ur
(valued in 196)
DXB/AMT-01/0500/JLy/3568
28-Jan-08
(valued in 196)
ur
(valued in 196)
DXB/AMT-01/1200/JIN/3827
13-Mar-08
(valued in 196)
ur
004 001 001
NSC TECOM/DU Comments on Structured Cabling Material Submittal NSC TECOM/DU Comments - " Active " IDF Rooms JV Diamond Exchan e Details NSC Increase in Water Tank Size
DXB/AMT-01/0600/DAN/3923
31-Mar-08
valued in 196 valued in 149-001 71,922.15
ur ur
18 1 18 2
001 001
ur
18 3
JAP016/TS/GT/0152 dated 18Feb-08
%
0%
ur
ur
CLOSED
CLOSED
0%
0.00
0%
0.00
1,600.56
ur
100%
1,600.56
ur
0%
ur
0.00
ur
CERTIFIED TO-DATE
0.00
0.00
BALANCE TO-DATE 0.00
ETA to submit entitlements
0.00
considered in 149-001 (ERI No. 62)
1,600.56
ur
ur
ur
ur
ur
0.00
ETA to submit entitlements
CLOSED
CLOSED
0.00
0%
0.00
0.00
rejected by Nakheel as the proposed revisions was not done and was reverted back to original Aedas Specs
CLOSED
CLOSED
0.00
0%
0.00
0.00
valued in another claim
CLOSED
CLOSED
0%
0.00
to be considered in the EOT claim
CLOSED
ur
0%
0.00
0%
0.00
0.00
under review for time entitlements
96,768.00
-
100%
96,768.00
0%
0.00
96,768.00
CLOSED
CLOSED
0%
0.00
0%
0.00
0.00
under review.
ur
ur
ur
ur
ur
0.00
ETA to submit entitlements
CLOSED
ur
0%
0.00
0%
0.00
0.00
0.00
time claim.
CLOSED
CLOSED
0%
0.00
0%
0.00
0.00
0.00
rejected by Nakheel
CLOSED
CLOSED
0%
0.00
0%
0.00
0.00
0.00
To be included in the Prolongation Claims
ur
ur
ur
0.00
EVS to submit entitlements
0%
0.00
0%
0.00
0.00
ur
ur
ur
considered Nil due to the increase in the rates for GL07 as er letter ref. ETA to submit entitlements (Builders to be in another submittal)
0%
0.00
0%
0.00
ur
ur CLOSED
ur
ur
0
CLOSED
CLOSED
0%
0.00
0%
0.00
0.00
Lateral Systems to submit (Builders to be in another submittal)
0
CLOSED
CLOSED
0%
0.00
0%
0.00
0.00
(valued in 196)
0
CLOSED
CLOSED
0%
0.00
0%
0.00
0.00
ETA to submit entitlements (Builders to be in another submittal BC to submit entitlements (Builders Works if any to be in another submittal)
valued in 196 valued in 149-001
0
CLOSED
CLOSED
0%
CLOSED
ur
0%
0.00
0%
0.00
71,922.15
ur
0.00
100%
71,922.15
ur
ur
ur
ur
ur
ur
1,308,459.65
ur
0.00
100%
1,308,459.65
1,308,459.65
ETA Claim = AED 1,137,791.00, + JV's 12% (OH&P) and 3% (Attend)
36,435.37 0.00
ETA Claim = AED 31,682.93, + JV's 12% (OH&P) and 3% Attend Al Bayader to submit entitlements
0.00
Al Bayader to submit entitlements
ur
JAP016/TS/GT/0228 dated 13M a - 08
0.00
0%
submitted thru…3701 dtd 20-Feb-08
CLOSED
0
16-Mar-08 27-Mar-08
NSC Ductin in MDF Rooms NSC Additional Low Leakage Motorized Smoke Damper
DXB/AMT-01/1200/RAN/3906
27-Mar-08
DXB/AMT-01/1200/RAN/3915
29-Mar-08
ur 1,308,459.65
001
NSC Height of Services at Level-49 on Shaft-6
DXB/AMT-01/1200/RAN/3932
02-Apr-08
36,435.37
ur
36,435.37
ur
0.00
100%
36,435.37
18 4
001
DXB/AMT-01/1100/WAE/3936
03-Apr-08
ur
ur
ur
ur
ur
ur
ur
18 5
001
NSC Additional Stone Cladding to Sides of Maintenance Stairs NSC Additional Work to Make-up Levels at Main Entrance
DXB/AMT-01/1100/WAE/3937
03-Apr-08
ur
ur
ur
ur
18 7
001
JV
DXB/AMT-01/1100/WAE/3971
09-Apr-08
108,691.73
ur
108,691.73
ur
18 7
002
NSC
DXB/AMT-01/1100/WAE/3971
09-Apr-08
86,593.30
ur
86,593.30
ur
18 8
001
NSC
18 9
001
NSC
19 0
001
NSC
19 1
001
NSC
19 2
001
NSC
19 3
001
JV
DXB/AMT-01/1200/RAN/3974
10-Apr-08
ur
ur
DXB/AMT-01/1100/WAE/3975
10-Apr-08
(valued in 107-007)
0
(valued in 107-007)
0
DXB/AMT-01/1100/WAE/3976
10-Apr-08
0.00
0
0.00
0
DXB/AMT-01/1100/WAE/3979
13-Apr-08
ur
ur
DXB/AMT-01/1100/WAE/3980
13-Apr-08
ur
ur
DXB/AMT-01/0600/EDM/4026
19-Apr-08
0.00
0
0.00
0
JAP016/TS/GT/0204 dated 14 Apr-08
JAP016/TS/GT/0233 dated 15mAY-08
100%
0.00
0.00
ETA to submit entitlements
0.00
valued in 149-001 under ERI No. 62
71,922.15
0.00
ETA Claim = AED 62,541.00, +JV's 12%(OH&P) and 3% (Attend) ETA to submit entitlements
ur
ur
ur
108,691.73
0%
0.00
108,691.73
JV's portion of the works
0.00
100%
86,593.30
86,593.30
AB cost + 12% OH&P + 3%Attend
ur
ur
ur
ur
ur
CLOSED
CLOSED
0%
0.00
0%
0.00
CLOSED
CLOSED
0%
0.00
0%
0.00
ur
ur
ur
ur
ur
ur
ur
ur
ur
ur
CLOSED
CLOSED
0.00
0%
0.00
0%
0.00
0.00
DXB/AMT-01/0500/JLy/3844 DXB/AMT-01/1200/RAN/3903
Design Change to External Ramps - Block Stopper U stand CVI No. 086 Design Change to External Ramps - Waterproofing (CVI No. 086) Sprinkler Heads in Illuminated Ceiling (RFI No. 967 Rev. 0 Additional Work to the Ball Room Parapet (CVI No. 084 Additional Work to Lightweight Concrete to Pedestrian Path RFI No. 976 Additional Work to External Wall Finishing at Swimming Pool (RFI No. 920) Additional Work to Concrete Under Maintenance Path Tiles (RFI No. 929) Additional Aluminum Angles at RAF Termination
CERTIFIED AS AT
VALUE (AED)
0
COST (AED)
WORK DONE TO-DATE
OUTSTANDING CLAIMS
0.00
ETA to submit entitlements
0.00
0.00
Al Bayader to submit entitlements
0.00
0.00
Al Bayader to submit entitlements; claim notice rejected
0.00
Al Bayader to submit entitlements
0.00
Al Bayader to submit entitlements
0.00
under review (done by Dubai Metals); rejected by Nakheel as it is part of MDS scope of works
0.00
VARIATION CLAIMS STATUS TO-DATE as at SUB NO.
24 4
001
JV
Additional Door Closer and Selector at Basement 1 Management Office
24 5
001
JV
24 6
001
JV
OM-10
001
JV
0
0
0
0 0
0
0
0
0 0
ERI NO.
V.O. TO
DESCRIPTION
ER / F&G / JV AGREED VALUES
REFERENCE
DATE
COST (AED)
TIME (Days)
DXB/AMT-01/0500/Jly/5252
24-Dec-08
1,732.06
Coring for the Tenant Fit-Out Contractors
DXB/AMT-01/0500/Jly/5278
04-Jan-09
Additional Access Ladder at Penstock Chamber in Basement 4 PC Supply Rates
DXB/AMT-01/0600/MIC/5287
05-Jan-09
DXB/AMT-01/0600/DAN/5092
16-Nov-08
0
0
0
0
0
0
0
0
0
0
0
CLAIM ENTITLEMENT APPLICATION
CLAIM NOTICE LETTER
NOC NO.
CLAIM STATUS (ADDITION)
0
0
0
0
COST (AED)
COST (AED)
TIME (Days)
ur
1,732.06
ur
ur
ur
ur
(21,806.96)
0
TIME (Days)
LETTER REF.
00-Jan-00
00-Jan-00
00-Jan-00
00-Jan-00
WORK DONE TO-DATE
OUTSTANDING CLAIMS
BALANCE OF WORK TO-DATE
CERTIFIED AS AT
REMARKS / COMMENTS
VALUE (AED)
%
VALUE (AED)
ur
0.00
100%
1,732.06
ur
ur
ur
ur
ur
0.00
ur
ur
ur
ur
ur
0.00
(21,806.96)
0.00
0.00
0
0.00
0%
0.00
0.00
0.00
0
0.00
0%
0.00
0.00
0.00
0
0.00
0%
0.00
0.00
0.00
0
0.00
0%
0.00
0.00
0.00
0
0.00
0%
0.00
0.00
0.00
0
0.00
0%
0.00
0.00
0.00
0
0.00
0%
0.00
0.00
0.00
0
0.00
0%
0.00
0.00
0.00
0
0.00
0%
0.00
0.00
0.00
0
0.00
0%
0.00
0.00
0.00
0
0.00
0
0.00
0%
0.00
0.00
0.00
0
0.00
0%
0.00
0.00
0.00
0
0.00
0%
0.00
0.00
0.00
0
0.00
0
0.00
0%
0.00
0.00
0.00
0
0.00
0%
0.00
0.00
0.00
0
0.00
0%
0.00
0.00
0.00
0
0.00
0
0.00
0%
0.00
0.00
0.00
0
0.00
0%
0.00
0.00
0.00
0
0.00
0%
0.00
0.00
0.00
0
0.00
0%
0.00
0.00
0.00
0
0.00
0
0.00
0%
0.00
0.00 0.00
0
00-Jan-00
0.00
0
0
00-Jan-00
0.00
0
%
October 15, 2013
November 30, 2008
CERTIFIED TO-DATE
BALANCE TO-DATE 1,732.06
Supply and installation of additional Ironmongeries at the Basement 1 Management Office main Entrance Door as per the F&G letter ref. JAP016/ALM/TCAC/23226 dtd 22-Dec-08 as per the email request of Mr. Clarence Pinto of DMCC dated 4Jan-09 as per the EHS requirements
adjustment to the Contract Sums due to the PC Materials final rates
0.00
0.00
0.00
0.00 0.00
380
Nos.
216
Nos.
57%
NO. OF CLAIMS WITH ERI
164
Nos.
43%
NO. OF CLAIMS WITHOUT ERI
317
Nos.
83%
NO. OF CLAIMS APPLIED
63
Nos.
17%
NO. OF CLAIMS OUTSTANDING
0.00
177
Nos.
47%
NO. OF AGREED CLAIMS
0.00
203
Nos.
53%
NO. OF UNAGREED CLAIMS
0.00
101
Nos.
27%
NO. OF CERTIFIED ON-ACCOUNT
0.00
278
Nos.
73%
NO. OF UNCERTIFIED APPLICATIONS
0.00
203
Nos.
53%
NO. OF CLAIMS TO JV
0.00
177
Nos.
47%
NO. OF CLAIMS TO NSC
0.00
NO. OF CLAIMS TO-DATE
TOTAL FOR CL AIMED/NOTIFIED VARIATIONS
247,406,867.46
581
59,346,426.72
0
170,575,879.75
581
152,915,269.25
87,599,620.81
60,998,772.87
127,420,586.33
0.00
(315,883.28)
(67,767.23)
cost implication sent under JV letter ref.DXB/AMT01/0800/Jly/1175 dated 29-Nov-06
(693,815.82)
17,302.13
joint measurement done and agreed; in connection with 33-019
0.00
(223,000.00)
164,014.82
(196,129.34)
OMISSIONS TO-DATE:001
13
JV
001
21
JV
OM-3
001
27
JV
OM-4
001
28
OM-4
002
28
OM-5
001
45
OM-6
001
60
OM-7
001
71
OM-8
001
38
OM-9
001
49
OM-1 OM-2
Omit Wall Plaster from Car Parking Areas in all 5 Basement Floors Omission of Rebars in Core Walls
JAP016/ALM/TCAC/05257
16-Nov-06
(383,650.51)
0
(383,650.51)
CLOSED
100%
(383,650.51)
0%
JAP/ALM/TCAC/11435
21-Aug-07
(693,815.82)
0
(676,513.69)
0
JAP016/ALM/TCAC/20290 dated 13-Aug-08
CLOSED
CLOSED
100%
(676,513.69)
0%
Omission of Render from the vertical element of whole three Services Floor (S1, S2, & S3) Plant Rooms Revisions to Office Partitions - Masonry Works
JAP016/ALM/TCAC/06046
04-Jan-07
(277,596.39)
0
(58,985.18)
0
????
CLOSED
CLOSED
100%
(58,985.18)
0%
JAP016/ALM/TCAC/19000
17-Jun-08
(126,440.24)
0
(126,440.24)
0
JAP016/ALM/TCAC/19000 dated 17-Jun-08
100%
(126,440.24)
0%
0.00
JAP016/ALM/TCAC/19000
17-Jun-08
(69,689.10)
0
0.00
100%
(69,689.10)
JV
JAP016/ALM/TCAC/19244
26-Jun-08
(66,453.77)
0
(66,453.77)
0
JV
DXB/AMT-01/0600/MIC/5011
26-Oct-08
(2,856.00)
0
(2,822.40)
0
JAP016/ALM/TCAC/22470
20-Nov-08
(132,210.53)
0
JAP016/ALM/TCAC/22416
18-Nov-08
(1,988.48)
0
JAP016/ALM/TCAC/19245
26-Jun-08
(85,688.89)
0
JV
NSC Revisions to Office Partitions - OCP Works Omission of Partition Walls in Level 30 for Single Tenancy Arrangements Omission of Proximity Access Card Reader and Access Cards at Basement 1 Boom-Gate NSC Omission of Wall Tiles due to the extension of Metal Cladding Behind Glass Ballustrades caused by the lowerin of Ceilin JV Modification of Lift Openings at 36th Floor Low Rise Lift Machine Room and 48th Floor High Rise Lift Machine Rooms (Omission of Concrete Works due to the increase of Lift O enin Sizes JV Modification to the Structural Drawings at Levels 49,
0
(1,988.48)
0
IPC NO. 41
69,689.10
JV scope of works, i.e., omission of blockworks and plaster
(69,689.10)
BondCommunication scope of works + 7% OH&P; AWAITING RESPONSE FROM m/S. Bond Communication JV Scope of Works - Omission of Office Partitions at the Level 30 due to t he single tenancy arrangements
CLOSED
CLOSED
(69,689.10)
0.00
JAP016/ALM/TCAC/19244 dated 26-Jun-08
CLOSED
CLOSED
100%
(66,453.77)
0%
0.00
JAP016/ALM/TCAC/22410 DATED 18-Nov-08
CLOSED
CLOSED
100%
(2,822.40)
0%
0.00
(2,822.40)
(132,210.53)
0.00
0.00
100%
(132,210.53)
(132,210.53)
BI to confirm cost by F&G
CLOSED
CLOSED
100%
(1,988.48)
0%
0.00
(1,988.48)
BI to confirm cost by F&G
(85,688.89)
0.00
1.00
(85,688.89)
0.00
0.00
JAP016/ALM/TCAC/22416 dated 18-ov-08
(66,453.77)
(85,688.89)
0.00
0.00
considered Sultan Hareb rates x no. of slots in Basement 1 + 12% OH&P
Omission of Office Partitions at Level 49
DMCC ALMAS TOWER (JAP016) JUMEIRAH LAKE TOWERS
DESCRIPTION
TOTAL AMOUNT
AMOUNT CERTIFIED
PERCENT CERTIFIED
OUTSTANDING AMOUNT
PERCENT OUTSTANDING
EFFECTIVE CONTRACT AMOUNT
261,161,000.00
259,509,675.51
99.37%
1,651,324.49
0.63%
OUTSTANDING CLAIMS WITH ERI
107,761,116.98
60,740,469.59
56.37%
47,020,647.39
43.63%
0.00%
5,482,732.44
100.00%
54,154,704.32
14.46%
OUTSTANDING CLAIMS WITHOUT ERI
GRAND TOTAL
5,482,732.44
374,404,849.42
320,250,145.10
85.54%
REMARKS
DMCC- AL MAS TOWER PROJECT JUMEIRAH LAKE TOWERS JAP016 : PACKAGE NO. 3 - MAIN BUILDING WORKS
VARIATION CLAIMS STATUS TO-DATE October 15, 2013 NOC NO.
SUB NO.
ERI NO.
V.O. TO
13
001
04
JV
CLAIM ENTITLEMENT APPLICATION DESCRIPTION
JV COST (AED)
ER / F&G / JV AGREED VALUES
NSC COST (AED)
JV COST (AED)
0.00
0.00
NSC COST (AED)
OUTSTANDING CLAIMS LETTER REFERENCE
JV COST (AED)
JAP016/ALM/TCAC/21287 dated 5-Oct-08
CLOSED
NSC COST (AED)
REMARKS / COMMENTS
ERI NO. 4 Additional Telephone Lines
SUB-TOTAL
0.00
0.00
0.00
0.00
0.00
to confirm if this is still needed; No need for additional telephone lines
0.00
ERI NO. 6 14
001
06
14
002
06
14
004
06
Site Establishment - Offices (Supply of ETA Temporary Site Office Purchased form Seidco Gen. Cont. Co.) NSC ETA Site Offices (New Offices at Site) JV
JV
ETA/F&G Site Offices - Rubbish Removal
SUB-TOTAL
278,155.63
501,971.39 56,840.00
334,995.63
JAP016/ALM/TCAC/05508 dated 29-Nov-06
218,400.00
#REF!
#REF!
#REF! #REF!
#REF!
#REF!
501,971.39
#REF!
#REF!
1,193,235.54
#REF!
#REF!
1,193,235.54
#REF!
#REF!
F&G evaluation is based on a +12% OH&Pro, and prelims omitted and to be dealt with in EOT's
CLOSED
501,971.39
JV scope of works; verbally agreed with F&G to be 5050; as at Sep-08
56,840.00
56,840.00
ETA cost + 12% OH&P + 3% Attendances
501,971.39
ERI NO. 7 15
001R1
07
NSC ETA Site Offices Provision of Power Supply
SUB-TOTAL
0.00
#REF!
1,193,235.54
0.00
ETA costs + 7% JV OH&P
1,193,235.54
ERI NO. 8 16
001
08
JV
Provision of Starter Bars to Podium within the Landscape Package
SUB-TOTAL
159,171.78
159,171.78
JAP016/ALM/TCAC/04893 dated 30-Oct-06
128,324.82
0.00
128,324.82
0.00
Costs agreed by JV under letter ref. DXB/AMT01/0500/Jly/1065 dated 7-Nov-06.
CLOSED
0.00
0.00
ERI NO. 9 17
001
09
JV
Core Wall Thickening
SUB-TOTAL
181,391.33
181,391.33
JAP016/ALM/TCAC/08151 dated 09-Apr-07
107,738.59
0.00
107,738.59
0.00
ERI No. 09; Internal Preliminary Assessment is equal to 10 days, but works has yet to be carried out to consider the EOT; cost evaluated by F&G accepted thru letter ref. DXB/AMT-01/0500/Jly/1072 dated 8-Nov-06 but subject to add'l revisions and prolongat
CLOSED
0.00
0.00
ERI NO. 10 14
003
10
NSC Site Establishment - Offices (Supply and Installation of AC Units within the New Offices being established b Nakheel
SUB-TOTAL
80,097.04
0.00
80,097.04
64,574.50
0.00
JAP016/ALM/TCAC/06385 dated 21-Jan-07
64,574.50
CLOSED
0.00
ETA cost of 60,350.00 + 7% JV OH&P
0.00
ERI NO. 11 20
001
11
JV
Supply of Potable Water to DMCC and F&G's Site Offices
SUB-TOTAL
23,551.60
23,551.60
JAP016/ALM/TCAC/22075 dated 4-Nov-08, JAP016/ALM/TCAC/23417 dated 6-Jan-08
25,076.80
0.00
25,076.80
0.00
Period from June 2006 - September 2007, and October2007 - November 2008
CLOSED
0.00
0.00
ERI NO. 12 28
001R1
12
NSC Cast Resin Bus Bars
SUB-TOTAL
2,071,622.24
0.00
2,071,622.24
1,049,300.70
0.00
JAP016/ALM/TCAC/14871 dated 13-Jan-08
1,049,300.70
CLOSED
0.00
ETA Cost + 7%; Time Effect shall be by NSC, if any; potential additional builders works, and attendance in reference to the Time. Confirmed by ETA under their letter ref. DIV.092/AM/TS/1342 dated 31-Jan-08
0.00
ERI NO. 13 OM-1
001
13
JV
Omit Wall Plaster from Car Parking Areas in all 5 Basement Floors
(383,650.51)
#REF!
#REF!
(383,650.51)
cost implication sent under JV letter ref.DXB/AMT01/0800/Jly/1175 dated 29-Nov-06
VARIATION CLAIMS STATUS TO-DATE October 15, 2013 NOC NO.
SUB NO.
ERI NO.
V.O. TO
12 4
001
####
JV
13 2
001
16
JV
13 8
001
####
JV
CLAIM ENTITLEMENT APPLICATION DESCRIPTION Late Issuance of Design Information (Specifications of Lighting Fixtures in ID Areas) ID Works Package (GL-08)
Notification of Delay to the ID Works Package Signages #### NSC Modification in Specification of Some ID Lighting Fixtures #### JV Notification of Delay to the ID Doors Package
14 0
001
14 1
001
14 2
001
14 4 14 5
001 001
14 7
001
14 7
002
14 7
003
#### NSC Internal Water Feature (MEP Scope)
15 6
001
#### NSC Lift L4 Mock-Up (Car Interior Finish @ Ground Floor Level) #### JV Additional Architraves to Towel Dispensers
16 1
001
#### NSC Disruption of Works resulting from Design Conflict in Basement 1 – VIP Lounge #### JV Delays due to Design Issues Related to GL-07 #### JV Notification of a Possible Delay to the Glass Feature Wall (GL-05) under the ID Works Package 16 JV Internal Water Feature (Aqua-Teknik Scope) 16
16 9
001R2
16
16 9
002R1
16
16 9
003
16
17 0
001
16
17 0
002
16
18 6
002
16
18 8
001
JV
Internal Water Feature (Related Builders Work)
Revisions to the ID Works Package “For Construction” Drawings at the Ground Floor and First Floor (GL-19 & GL-07) JV Revisions to the ID Works Package “For Construction” Drawings at the Ground Floor and First Floor (Structural Supports to GL-07) NSC Revisions to the ID Works Package “For Construction” Drawings at the Ground Floor for the termination of GL-07 and other adjacent Finishing Materials CVI No. 093 JV Potential Claim due to Late Design Changes Stainless Steel Door Frames L49-L64 Inclusive JV Additional Ironmongeries to Timber Door (DT-02) at Levels 49 upwards JV
JV
DMCC Offices - Core Toilets Level 49 & 50 (Revision of Ironmongeries)
JV COST (AED)
NSC COST (AED)
JV COST (AED)
0.00
#REF!
#REF!
#REF!
CLOSED
time claim.
1,774,080.00
1,774,080.00
CLOSED
Mozart Marble cost + 12% OH&P
(valued in 149-001)
#REF!
JAP016/TS/GT/0103 dated 18Oct-2007 JAP016/ALM/TCAC/22521 dated 20-Nov-08 #REF!
CLOSED
time claim.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00 (valued in 41-001)
#REF! #REF!
#REF! #REF!
#REF!
626,750.00
#REF!
#REF!
#REF!
626,750.00
4,134.48
#REF!
#REF!
#REF!
4,134.48
#REF!
#REF!
#REF!
ur (valued in 149-001) 25,787.60
ur 0.00 96,768.00
#REF!
ur
time claim.
CLOSED 25,787.60
under review for time entitlements
Aqua-Teknik cost + 12% OH&P + 3% Attend Coring Subcon Cost + 12% OH&P + 3% Attendances
ur CLOSED
#REF!
#REF!
96,768.00 541,470.46
34,314.41
ETA Cost + 12%OH&P + 3% Attendances
under review; time entitlements
CLOSED CLOSED
JAP016/TS/GT/0142 dated 31Jan-08
ETA tnd Lever to submit entitlements
ETA to submit entitlements rejected by Nakheel as the proposed revisions was not done and was reverted back to original Aedas Specs submitted thru…3701 dtd 20-Feb-08
541,470.46
#REF!
#REF!
#REF!
34,314.41
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
100,121.32
#REF!
#REF!
#REF!
100,121.32
0.00
#REF!
#REF!
#REF!
CLOSED
4,137.35
#REF!
#REF!
#REF!
4,137.35
#REF!
#REF!
#REF!
ur 27,548.25
ETA Claim = AED 23,955.00 + 12% JVOH&P + 3% Attendances
42,963.29
ETA Cost + 12%OH&P + 3% Attendances
ur
ur
S/C costs + 12% OH&P + 3% Attendances; to be valued at ERI 16 as per F &g letter ref. JAP016/TS/GT/0254 dtd 29May08 EVS to submit entitlements; EVS cost + 12% OH&P + 3% Attendances
ur
under review (haroon & alpha star); to be evaluated under ERI No. 16 as per letter ref. JAP016/ALM/TCAC/17030 dtd 8-Apr-08; no changes made in the Ironmongeries as there was no formal instruction scope shall be removal, supply and installation of ironmongeries; valued in ERI No. 16 as per Nakheel letter ref. JAP016/TS/GT/0318 dtd 20Aug08
27,548.25
#REF!
#REF!
42,963.29
#REF!
#REF!
#REF!
ur
#REF!
#REF!
#REF!
ur
25,112.55
#REF!
#REF!
#REF!
25,112.55
#REF!
#REF!
#REF!
247,839.95
39,243.75
#REF!
#REF!
#REF!
39,243.75
7,797.46
#REF!
#REF!
#REF!
7,797.46
#REF!
#REF!
001
20 6
001
21 1
001
16
NSC Supply and Installation of Interior Design Finishing Works - Basement 1 VIP Lounge Feature Ceiling
21 1
002
16
247,839.95
21 1
003
16
NSC Supply and Installation of Interior Design Finishing Works - Basement 1 VIP Lounge Feature Ceiling (MEP Works by ETA) JV Supply and Installation of Interior Design Finishing Works - Basement 1 VIP Lounge Feature Ceiling (Supply of O2 Light Fixtures from M/s.Lever Electric)
23 0
001
####
18,364.91
#REF!
Bond Interiors to submit entitlements
to be evaluated under ERI No. 16 as per letter ref. JAP016/ALM/TCAC/17030 dtd 8-Apr-08
#REF!
20 0
001
0.00 #REF!
001
23 6
#REF!
NSC COST (AED)
REMARKS / COMMENTS
LETTER REFERENCE
19 9
Signage at the Entrance of VIP Carpark in Basement 1 #### NSC Additional Voice/Data Points at Level 48 as per
OUTSTANDING CLAIMS
NSC COST (AED)
#### NSC Sprinkler Heads in Illuminated Ceiling (RFI No. 967 Rev. 0) #### NSC Design Change of Core Bulk Head at Ground Floor Escalator Lobby - MEP Rectification Works for the ID Works Package (CVI No. 088) #### NSC Additional Extract Ducts in Basement 1 Male and Female Toilet , and VIP Toilet #### NSC Carpets at Level 48
JV
ER / F&G / JV AGREED VALUES JV COST (AED)
ETA to submit entitlements
Bond Interiors to submit entitlements BI to submit entitlements; Revised design for feature ceiling as per the Nakheel letter ref. JAP016/TS/GT/0265 dtd 1Jun08; BI cost + 12% OH&P + 3% Attendances Revised design for feature ceiling as per the Nakheel letter ref. JAP016/TS/GT/0265 dtd 1Jun08; Electrical Works by ETA; ETA cost+ 12% OH&P + 3% Attend Revised design for feature ceiling as per the Nakheel letter ref. JAP016/TS/GT/0265 dtd 1Jun08; Supply only of light fittings from Lever
under ID Works
18,364.91
BC Cost + 7% OH&P; BC VO#6; BC time claim = 165
VARIATION CLAIMS STATUS TO-DATE October 15, 2013 NOC NO.
SUB NO.
ERI NO.
V.O. TO
33
005
21
JV
33
006
21
JV
33
007
21
JV
CLAIM ENTITLEMENT APPLICATION DESCRIPTION
JV COST (AED)
NSC COST (AED)
ER / F&G / JV AGREED VALUES JV COST (AED)
NSC COST (AED)
OUTSTANDING CLAIMS LETTER REFERENCE
JV COST (AED)
NSC COST (AED)
REMARKS / COMMENTS
Additional Architectural Works to the Service Floor Areas (1-3) Missing Spanmark as PB434 (RFI No. 029)
153,565.57
123,805.08
JAP016/ALM/TCAC/17247 dated 16-Apr-08
CLOSED
agreed with Consultant (F&G)
3,223.52
(1,351.84)
CLOSED
agreed with Consultant (F&G)
Additional Reinforcement due to the Missing Details RFI No. 042 First Floor Slab Details (RFI No. 072)
1,894.77
#REF!
JAP016/GEN/ABS/1011 dtd 19Jun06; JAP016/ALM/TCAC/18884 dtd 12Jun-08 JAP016/GEN/ABS/1011 dated 19Jun-06
1,894.77
awaiting response from Client.
JAP016/ALM/TCAC/20933 dated 14-Sep-07 JAP016/ALM/TCAC/09528 dated 12-Jun-07
CLOSED
agreed with Consultant (F&G)
CLOSED
agreed with Consultant (F&G)
JAP016/ALM/TCAC/09528 dated 12-Jun-07 JAP016/ALM/TCAC/14300 dated 12-Dec-06 JAP016/ALM/TCAC/14300 dated 12-Dec-06
CLOSED
agreed with Consultant (F&G)
CLOSED
agreed with Consultant (F&G)
CLOSED
agreed with Consultant (F&G)
JAP016/ALM/TCAC/17248 16-Apr-08 JAP016/ALM/TCAC/14300 12-Dec-06 JAP016/ALM/TCAC/18352 26-Ma -08 JAP016/ALM/TCAC/18118 18-May-08
dated
CLOSED
agreed with Consultant (F&G)
dated
CLOSED
agreed with Consultant (F&G)
dated
CLOSED
agreed with Consultant (F&G)
dated
41,554.32
rejected F&G assessment in their letter JAP016/ALM/TCAC/18118 dated 18-May-08 thru our letter ref.DXB/…./EDM/4262 dtd 22May08;F&G assessment under review by JV
33
008
21
JV
33
009
21
JV
33
010
21
JV
Second Basement Floor Beam - PB205A (RFI No. 075 Fourth Basement Beam - PB451A (RFI No. 078)
425.15
344.60
33
011
21
JV
Fourth Basement Beam - PB434 (RFI No. 144)
1,150.44
1,063.46
33
012
21
JV
13,820.28
12,180.62
657.99
530.47
427.04
343.82
33
013
21
JV
Tower Structural Drawings - Additional TB29 Beam (RFI No. 146) Door Opening Height - First Floor (RFI No. 157)
499.04
0.00
33
014
21
JV
Basement 2 Beams (RFI No. 162)
3,461.71
548.61
33
015
21
JV
Lift F4 - Structural Details (RFI No. 171)
1,556.34
1,233.74
33
016
21
JV
Reinforced Concrete Partition Wall @ the Basement 2 (RFI No. 182)
41,554.32
#REF!
33
017
21
JV
4,353.86
3,510.09
JAP016/ALM/TCAC/09528 dated 12-Jun-07
CLOSED
agreed with Consultant (F&G)
33
018
21
JV
693.97
337.29
JAP016/ALM/TCAC/09528 dated 12-Jun-07
CLOSED
agreed with Consultant (F&G)
33
019
21
JV
Increase in Beam Depths at First Floor - Section N1 (RFI No. 192) Increase in Beam Depths to PB149 and PB150A (RFI No. 223) Additional Outrigger Walls at Service Floor Areas Structural Works
956,279.08
642,006.51
JAP016/ALM/TCAC/20290 dated 13-August-08
CLOSED
revised cost impact submitted under ref. DXB/AMT01/0500/Jly/1080 dated 9-Nov-06 based on the approved Methodology; agreed with Consultant (F&G)
33
020
21
JV
40,503.44
171.19
JAP016/ALM/TCAC/181187 dated 18-May-08
CLOSED
agreed with Consultant (F&G)
33
021
21
JV
Additional Mass Concrete at 2nd Level, and Revisions to the Stairs leading to the Vault at 2nd Level Additional Column Posts at 50th to 51st Level and Additional Core Walls, i.e., 400mm and 500mm thick
43,839.53
33,011.38
JAP016/ALM/TCAC/20933 dated 14-Sep-07
CLOSED
agreed with Consultant (F&G)
33
022
21
JV
Additional Lifting Beams to the 64th Level Machine Rooms (@Level 288.650m and 285.350m)
5,525.90
4,252.50
JAP016/ALM/TCAC/18884 dated 12-Jun-08
CLOSED
agreed with Consultant (F&G)
33
023
21
JV
Changes to Slab Steel Reinforcement to S11 to S12
36,827.93
35,529.29
JAP016/ALM/TCAC/08133 dated 09-Apr-07
CLOSED
agreed with Consultant (F&G)
33
024
21
JV
25,336.02
26,354.14
JAP016/ALM/TCAC/17248 dated 16-Apr-08
CLOSED
agreed with Consultant (F&G)
33
025
21
JV
7,878.22
7,878.22
JAP016/ALM/TCAC/08287 ated 16-Apr-07
CLOSED
agreed with Consultant (F&G)
33
026
21
JV
17,649.58
14,661.14
JAP016/ALM/TCAC/08713 ated 7May-07
CLOSED
agreed with Consultant (F&G)
33
027R1
21
JV
Additional Steel Reinforcement to Beams Located Around Tower Building and Connected to Precast Slab Additional rebars to basement retaining wall @ staircase and changes of rebar to wall Changes in Shear Wall in Zone 4 Associated in Lift and Vault Wall Additional Rebar in First Basement Slab
101,960.65
97,675.24
JAP016/ALM/TCAC/20933 dated 14-Sep-07
CLOSED
agreed with Consultant (F&G)
33
028R1
21
JV
Additional Top Steel Reinforcement in Ground Floor Slab
140,340.33
137,782.64
JAP016/ALM/TCAC/10244 ated 9Jul-07
CLOSED
agreed with Consultant (F&G)
33
029R1
21
JV
Additional Bottom Steel Reinforcement in Ground Floor Slab
316,516.91
317,721.58
JAP016/ALM/TCAC/10549 ated 23-Jul-07
CLOSED
agreed with Consultant (F&G)
33
030
21
JV
1,175,875.00
#REF!
33
031R1
21
JV
Additional Building Maintenance Units at Diamond Exchange Centre Revisions to Contract Drawings in First Floor Levels
56,950.59
50,995.22
JAP016/ALM/TCAC/11392 ated 20-Aug-07
CLOSED
agreed with Consultant (F&G)
130,015.64
55,259.32
JAP016/ALM/TCAC/14299 ated 12-Dec-07
CLOSED
agreed with Consultant (F&G)
9,356.12
7,928.10
JAP016/ALM/TCAC/10848 ated 1 Aug-07
CLOSED
agreed with Consultant (F&G)
#REF!
#REF!
28,025.73
JV to submit entitlements; note that the DVR's is valued in Claim No. 77; items to be valued under this Claim is
33
032
21
JV
33
033
21
JV
50
001
21
JV
Revisions to Structural Contract Drawings in Second Floor Changes in Beam Steel Reinforcement at 29th to 34th Level Various Requirements under the F&G Transmittal Ref. F+G/ALMAS/TAISEI/ 01463 dated 12th
28,025.73
#REF!
#REF!
#REF!
1,175,875.00
under review
VARIATION CLAIMS STATUS TO-DATE October 15, 2013 CLAIM ENTITLEMENT APPLICATION
NOC NO.
SUB NO.
ERI NO.
V.O. TO
65
001
31
58
001
####
NSC Revision of Office Partitions - Mechanical & Fire Polic Drawin s NSC Revised MEP Drawings
DESCRIPTION
SUB-TOTAL
JV COST (AED)
ER / F&G / JV AGREED VALUES
OUTSTANDING CLAIMS
NSC COST (AED)
JV COST (AED)
NSC COST (AED)
LETTER REFERENCE
ur
#REF!
#REF!
#REF!
#REF!
JV COST (AED)
NSC COST (AED)
REMARKS / COMMENTS
ur
ETA to submit entitlements
CLOSED
valued in Claim No. 65-001
(valued in 65-001)
#REF!
#REF!
0.00
0.00
#REF!
#REF!
0.00
43,688.96
0.00
39,083.00
(valued in 76-001)
#REF!
#REF!
#REF!
CLOSED
1,402,455.42
#REF!
#REF!
#REF!
1,402,455.42
1,402,455.42
#REF!
#REF!
(valued in 107-003 & 175001
#REF!
#REF!
#REF!
#REF!
#REF!
CLOSED
supeseded by claim no. 107
0.00
0.00
ERI NO. 32 68
001
32
NSC Trip to Italy for Stone Quarry Inspection
SUB-TOTAL
43,688.96
39,083.00
JAP016/ALM/TCAC/16129 dated 5-Mar-08
CLOSED
0.00
BI costs AED 36,526.17 + 7% JV OH&P
0.00
ERI NO. 34 71
001
####
76
001
34
NSC MEP Works - Revised Ground Floor Landscape Drawings NSC Rainwater and Irrigation Waste Water Discharge from Planters
SUB-TOTAL
0.00
0.00
Included in 76-001
ETA costs + 7% JV OH&P; uilders works not yet included to be submitted under 76-002
1,402,455.42
ERI NO. 35 / 35.2 / 35.1 / 35.3 / 35.4 / 35.5 23
002
####
NSC DTS referenced AM/015/515 dated 5th August 2006 (MEP Works) JV Possible Addition of Ballroom
52
001
35.1
78
001R1
35
JV
78
002
35
JV
78
003
35
JV
78
004
35
JV
78
005
35.5
JV
85
001
35.1
99
001
35.1
10 0 10 6 10 7
10 7 10 7
10 7 10 7 10 7 10 7 10 7 10 7
10 7
Modifications to Function Room / Ball Room Facility Structural Works Modifications to Function Room / Ball Room Facility Fire roofin Works Function Room / Ball Room Facility Parapet (Structural Works)
included in Claim Nos. 107-003 & 175-001
(valued in Claims No. 78 & 107) 2,183,160.00
2,087,955.12
JAP016/ALM/TCAC/18101 dated 18-May-08
CLOSED
EVS Cost + 12% OH&P but less works deemed included in the NSC
196,416.80
191,292.64
JAP016/ALM/TCAC/22536 dated 23-Nov-08
CLOSED
Thermofire Cost AED 170,797.22 + 12% OH&P; confirmed to be valued in ERI 35 under the Nakheel letter ref. JAP016/TS/GT/0244 dtd 27May08
204,700.00
#REF!
#REF!
#REF!
204,700.00 12,416.32 144,684.43
EVS Cost + 12% OH&P + 3% attendances
12,416.32
#REF!
#REF!
#REF!
144,684.43
#REF!
#REF!
#REF!
(valued in 107-003)
#REF!
#REF!
#REF!
CLOSED
(valued in 107-003)
#REF!
#REF!
#REF!
CLOSED
ETA to submit entitlements
#REF! (valued in 107-001)
#REF!
#REF!
ur
ETA to submit entitlements
#REF!
#REF!
NSC Function Room / Ball Room Domestic Water Drawings NSC Mechanical Works for the Function Room / Ballroom
NSC Security Works for the Function Room / Ballroom JV Revised Interior Lighting Fixtures Layout at Ballroom GF, Washroom GF, and Ballroom 2L 35.1/ NSC Ballroom / Function Room (ID Works to the Walls 001 35.2/ facing the Retail Mall) 35.4 002R2 35.1/ JV Ballroom / Function Room (Concrete and Masonry 35.2 Works 35.1/ NSC Ballroom/Function Room (MEP Works) 003 35.2/ 35.4 004a 35.1/ JV Ballroom/Function Room (CW Roofing, Curtain Wall 35.2 Claddin Aluminum Panel Bulkheads Work 004b 35.5 NSC Ballroom/Function Room (Roof Parapet Works - CVI No. 084) 004c 35.5 JV Ballroom/Function Room (Roof Parapet Works GI Cladding - CVI No. 084) 35 005 JV Ballroom/Function Room (Provision of Scaffolds and Access) #### 006 JV Provision of Downspouts at Ballroom/Function Room Roof (CVI No. 122) 35.1/ NSC Ballroom/Function Room (External Stoneworks) 007 35.2/ 35.4 35.4 008 JV Ballroom/Function Room (Additional Plaster Works 001 001
35.1 35.1
Function Room / Ball Room Facility (Structural Works Function Room / Ball Room Facility (Fireproofing Works)
#REF!
CLOSED
ur (valued in 107-001) ur
785,658.59
JAP016/ALM/TCAC/10523 dated 22-July-2007
ur 26,312.00
Bond Interiors to submit entitlements
Subcontractor : JV Internal
CLOSED
JAP016/ALM/TCAC/21289 dated 5-Oct-08
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
26,312.00 CLOSED
Scaffolding to be used by the Nominated Subcontractors; Fit-Out Contractor to work on the MEP Scope
2,210.46
varied works at structural steel works and provision of Roof Drain
#REF!
0.00
#REF!
#REF!
#REF!
2,210.46
#REF!
#REF!
#REF!
310,797.76
JAP016/ALM/TCAC/22293 dated 13-Nov-08
#REF!
#REF!
357,161.60
2,710.59
ur
3,318,315.35
3,318,315.35
284,794.05
EVS Cost + 12% OH&P + 3% attendances and Scaffolding supplied by JV; to be valued under ERI35.5 as per Nakheel letter ref. JAP016/TS/GT/0255 dtd 29Ma 08 Valued in 107-003
TO BE VALUED IN CLAIM NO. 107-001 (ERI 35.1)
CLOSED
#REF!
JAP016/ALM/TCAC/19604 dated 14-July-2008
728,934.60
Thermofire Cost + 12% OH&P + 3% attendances
#REF!
CLOSED
Al Abbar cost + 12% + 3% attendances
284,794.05 ur
CLOSED
2,710.59
Subcontractor : ETA; under review by ETA due to the revised scope of works; confirmed by ETA
Subcontractor : Al Abbar; shall be valued under ERI 35.5 as per Nakheel Letter JAP016/TS/GT/0255 dtd 29-May08 additional GI sheets cover to parapet for the preparation of EPDM by AL Abbar
Al Bayader cost + 12% OH&P
Plaster works only based on BOQ rates
VARIATION CLAIMS STATUS TO-DATE October 15, 2013 NOC NO.
SUB NO.
ERI NO.
V.O. TO
84
001
46
10 2
001
46
CLAIM ENTITLEMENT APPLICATION DESCRIPTION
ER / F&G / JV AGREED VALUES
OUTSTANDING CLAIMS
JV COST (AED)
NSC COST (AED)
LETTER REFERENCE
NSC Revision to the Lighting Layout at GF, L1, & L2
ur
#REF!
#REF!
#REF!
ur
ETA to submit entitlements; Note this pertains to the electrical works, fixtures to be Claim No. 105; to be valued under ERI16 ref. JAP016/ALM/TCAC/09512 dtd 12Jun07
NSC Lighting Requirements to the Function Room / Ballroom
ur
#REF!
#REF!
#REF!
ur
ETA to submit entitlements; Note this pertains to the electrical works, fixtures to be Claim No.107
0.00
#REF!
#REF!
0.00
JV COST (AED)
0.00
NSC COST (AED)
REMARKS / COMMENTS
NSC COST (AED)
SUB-TOTAL
JV COST (AED)
0.00
ERI NO. 47 10 4
001
47
JV
Additional 40’ Container Storage, Office Chairs, and Computer for F+G Office
SUB-TOTAL
40,174.50
40,174.50
JAP016/ALM/TCAC/11909 dated 9-Sept-2007
40,074.53
0.00
40,074.53
0.00
actual cost transmitted to F&G based on dayworks rates; agreed with F&G
CLOSED
0.00
0.00
ERI NO. 48 82
001
48
NSC Telephone IDF/MDF Room Drawings
SUB-TOTAL
34,309.10
0.00
34,309.10
13,517.00
JAP016/ALM/TCAC/21322 dated 5-Oct-08
0.00
13,517.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF! #REF!
#REF! #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
CLOSED
0.00
ETA cost + 7% OH&P
0.00
ERI NO. 49 / 49.2 / 49.3 / 49.4 / 49.5 89 92
15 3 15 7
16 3 16 3 16 3
18 6
Modification to the Structural Drawings at Levels 49, 50, and 51 49.2 NSC Various Revisions due to the revised For 001 Construction Drawings (MEP Works) at Levels 49, 50, & 51 #### JV Provision of Toilets at Levels 53 to 63 001 #### JV Request for Issue of Outstanding Drawings (DMCC 001 Offices at L49-L51 & Add'l Toilets in Office Area at L52-L64) 006a 49.3 NSC Fire Fighting Systems at Levels 49, 50, & 51 (Abortive Work) 006b 49.3 JV Fire Fighting Systems at Levels 49, 50, & 51 (Builders Work and Abortive Work) 49.4 NSC Revised "For Construction" Security Drawings at 009 Levels 49, 50, & 51 under the DMCC Transmittal Ref. JAP016/TRNS /JV/00044 dated 5th May 2008 (Security Works) 001R1 49 JV Notification of Entittlements (CVI-089) - Doors to new washrooms at L49 and L50 (Lift Lobby Area) 001
49
20 8
001
49.5
OM-9
001
49
JV
NSC Modification of Raised Floor H eights at Server Rooms at Level 49, 50, & 51 JV Modification to the Structural Drawings at Levels 49, 50, and 51
SUB-TOTAL
(valued in OM9-001) 218,960.00
(valued in 163) (valued in 163)
ur 1,903.78 ur
58,651.66
17,250.00 (85,688.89)
(25,133.45)
#REF!
#REF!
#REF!
236,210.00
#REF!
#REF!
597,081.20
#REF!
#REF!
597,081.20
#REF!
#REF!
valued under the omissions
CLOSED 218,960.00
valued in another claim
CLOSED CLOSED
valued in another claim
ur
ETA to submit entitlements
builders works
1,903.78 ur
JCI to submit entitlements
under review; to be under ERI #49 as per Nakheel letter ref. JAP016/TS/GT/0205 dated 15-Apr-08; SC cost +12%OH&P + 3% Attendances
58,651.66
17,250.00 (85,688.89)
(25,133.45)
ETA cost + 12% OH&P + 3% Attendances
MDS cost + 12% OH&P + 3% Attendances; valued at ERI No. 49.5 as per Nakheel letter ref. JAP016/TS/GT/0271 dtd 9Jun08 Omission of Office Partitions at Level 49
236,210.00
ERI NO. 50 10 9
001
50
NSC Amendment to District Cooling Piping and Control Works (Heat Echangers and Strainers)
SUB-TOTAL
0.00
#REF!
597,081.20
0.00
ETA to submit entitlements
597,081.20
ERI NO. 51 94
001R2
51
JV
Changes to Suspended Ceiling (ID Works Package)
SUB-TOTAL
85,383.20
85,383.20
JAP016/ALM/TCAC/21731 dated 21-Oct-08
85,383.20
0.00
85,383.20
0.00
subcon costs plus 12% (revised cost from 182,960.40 due to the meeting between FBI and DMCC)
CLOSED
0.00
0.00
ERI NO. 52 95 95
001 002
52 52
NSC Variation Works due to Lift and Escalator Finishes Direct Variation to the Nominated S/C Works NSC Variation Works due to Lift and Escalator Finishes (Adjustment to the Provisional Sums)
653,624.24 544,678.47
653,624.24
JAP016/ALM/TCAC/17360 dated 20-Apr-08
CLOSED
KONE costs + 7% JV OH&P
544,678.47
JAP016/TS/GT/0083 dated 9-Aug2007
CLOSED
KONE costs + 7% JV OH&P; NOTE : Not considered as a variation by Consultant but adjsutment to the KONE Provisional Sums from AED500K to 1,009,045.30, and agreed amount s the nett costs.
VARIATION CLAIMS STATUS TO-DATE October 15, 2013 CLAIM ENTITLEMENT APPLICATION
NOC NO.
SUB NO.
ERI NO.
V.O. TO
14 9
003b
62.3
14 9
004
62.2
NSC Revisions to Diamond Exchange Centre (CCTV and Access Control) NSC Revisions to Diamond Exchange Centre (Fire Policy La out NSC Modification Works due to the Tenant Requirements at the Diamond Exchange Centre (Bond Communication Scope - Additional Voice/Data Points at Level 2 NSC Modification Works due to the Tenant Requirements at the Diamond Exchange Centre (ETA scope of works) JV Modification Works due to the Tenant Requirements at the Diamond Exchange Centre (JV scope of works) NSC Vertical Cable Manager for Diamond Exchange AV System at the Multi Purpose Room in accordance with the F&G letter ref. JAP016/ALM/TCAC/20991 dated 16-Se -08 JV Cuttings in Corridor Ceiling at Level 2 as required by Bond Communication
DESCRIPTION
14 9
005a
####
14 9
005b
####
14 9
005c
####
14 9
006
####
14 9
007
62
14 9
008
####
14 9
009
####
14 9
010
62
14 9
011
####
16 5
001
####
JV
Notification of Disruption of Work due to discrepancy of Design Drawings at Second Floor
17 7
001
####
JV
Diamond Exchange Details
21 4
001
62 / 16
JV
Design Changes due to the Omission of Operable Partition at Level 2 Offices (ERI No. 62) and Stainless Steel Rubbish Bins (ERI No. 16)
Break Glass Pedestals at the Diamond Exchange Centre in accordance with the F&G transmittal ref. F+G/ALMAS/TAISEI/01961 NSC Revisions to the Electrical Works at the Diamond Exchange Centre and Level 2 as per the F&G transmittal ref. F+G/ALMAS/TAISEI/01574 and DMCC transmittal ref. JAP016/TRNS/JV/00048 JV
JV COST (AED)
OUTSTANDING CLAIMS JV COST (AED)
NSC COST (AED)
REMARKS / COMMENTS
JV COST (AED)
NSC COST (AED)
LETTER REFERENCE
ur
#REF!
#REF!
#REF!
ur
JCI to submit entitlements; based on transmittal …./00043 dtd 4May08 (drwg. No. 4494/Y/009 Rev.4)
ur
#REF!
#REF!
#REF!
ur
ETA to submit entitlements
24,628.70
ur
24,628.70
#REF!
#REF!
#REF!
ur
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
#REF!
#REF!
CLOSED
FBI shall submit entitlements as per the F&G letter ref. JAP016/ALM/TCAC/21815 dtd 26-Oct-08; BACKCHARGE TO BOND COMMUNICATION DUE NON-COORDINATION
9,200.00
#REF!
#REF!
#REF!
9,200.00
Dubai Metals cost + 12% OH&P + 3% Attand
222,906.80
#REF!
#REF!
#REF!
222,906.80
ur
#REF!
#REF!
#REF!
ur
44,538.44
#REF!
#REF!
#REF!
44,538.44
(valued in 149-001)
#REF!
#REF!
#REF!
CLOSED
time claim.
(valued in 149-001)
#REF!
#REF!
#REF!
CLOSED
valued in 149-001 under ERI No. 62
(valued in 41-001 & 149001)
#REF!
#REF!
#REF!
CLOSED
considered in 41-001 and 149-001
3,601,000.31
#REF!
#REF!
394,252.82
#REF!
#REF!
394,252.82
#REF!
#REF!
56,553.22
#REF!
#REF!
56,553.22
#REF!
#REF!
(valued in 149-001)
11,996.83
NSC Additional Counter at the Security Room level 2 as per the M/s. Nakheel letter ref. JAP016/TS/BW/0366 dated 16-Nov-08 NSC Changes to the Diamond Exchange Centre as per the instructions given via M/s. DMCC letter referenced JAP016/GEN/BW/0177 dated 20-Oct-08
SUB-TOTAL
ER / F&G / JV AGREED VALUES
NSC COST (AED)
6,584,157.21
ETA to submit entitlements
considered in 149-001 (ERI No. 62)
CLOSED
11,996.83
#REF!
BC cost + 7% OH&P; BC VO#10; BC time claim = 147 days
BC cost + 7% OH&P; BC VO#14; BC time claim = 119 days
ETA cost + 12% OH&P + 3% Attendances
BI to submit entitlements
BC cost + 7%; BC VO#17; BC time claim = 91 days
3,601,000.31
ERI NO. 63 13 7
001
63
NSC Emergency Cables to the Tenant's DB
SUB-TOTAL
0.00
#REF!
394,252.82
0.00
ETA costs + 7% JV OH&P; confirmed to be ERI No. 63 as per F&G letter ref. JAP016/ALM/TCAC/18721 dtd 8Jun08
394,252.82
ERI NO. 64 12 6
001
64
NSC Modification of Male Washroom at 36th Floor - RFI 767 (Rev. 0,1&2)
SUB-TOTAL
0.00
#REF!
56,553.22
0.00
ETA part = AED 50,475.00
56,553.22
ERI NO. 65 11 0
001R1
65
NSC Furniture / Console at Basement 2 Security Room
SUB-TOTAL ERI NO. 66 / 66.1
29,808.00
0.00
29,808.00
29,030.40
0.00
29,030.40
JAP016/ALM/TCAC/21105 dated 22-Sep-08
CLOSED
0.00
0.00
BF claim AED 25,920 + 12% OH&P
VARIATION CLAIMS STATUS TO-DATE October 15, 2013 NOC NO.
SUB NO.
ERI NO.
V.O. TO
12 3
001R2
73
JV
16 6
001
73
JV
16 6
002
73
JV
CLAIM ENTITLEMENT APPLICATION DESCRIPTION
JV COST (AED)
NSC COST (AED)
ER / F&G / JV AGREED VALUES
OUTSTANDING CLAIMS
JV COST (AED)
NSC COST (AED)
LETTER REFERENCE
JV COST (AED)
NSC COST (AED)
REMARKS / COMMENTS
ERI NO. 73 Potential Delay due to Late Issuance of Revised Design Information in Sky Lobby Meeting Room at Level 48 ID Works Package - Lighting Requirements at Level 48 Meeting Room (MEP Works Scope)
12,637.06
#REF!
#REF!
#REF!
12,637.06
confirmed to be valued under ERI No. 73 according to the Nakheel letter ref. JAP 16/TS/GT/0267 dtd 8Jun08
11,783.12
#REF!
#REF!
#REF!
11,783.12
ETA cost + 12%OH&P + 3% Attendances; confirmed to be valued in ERI No. 73 according to Nakheel letter ref. JAP16/TS/GT/0267 dtd 8Jun08
ID Works Package - Lighting Requirements at L48 Meeting Room (JV Scope - Lever to Supply)
2,254.00
#REF!
#REF!
#REF!
2,254.00
JV to submit entitlements; confirmed to be valued in ERI No. 73 according to Nakheel letter ref. JAP16/TS/GT/0267 dtd 8Jun08; Lever cost + 12% OH&P + 3% Attendance
#REF!
#REF!
SUB-TOTAL
26,674.18
0.00
26,674.18
0.00
ERI NO. 74 / 74.1 JAP016/ALM/TCAC/22447 dated 19-Nov-08
CLOSED
Masonry Works, Abortive Works and Coring Works
#REF!
#REF!
57,459.68
Doors and Frames incl Ironmongery, and Ceiling Works
#REF!
#REF!
#REF!
ur
50,319.40
#REF!
#REF!
#REF!
50,319.40
ETA to submit entitlements
73,986.40
#REF!
#REF!
#REF!
73,986.40
ETA cost + 12% OH&P + 3% Attendances
26,919.09
#REF!
#REF!
#REF!
26,919.09
BC Cost + 7% OH&P; BC VO#9; BC time claim = 186 days
75,687.99
151,224.89
#REF!
#REF!
ur
#REF!
#REF!
0.00
0.00
#REF!
#REF!
#REF!
#REF!
19 7
001a
74.1
JV
Provision of Pantry Area in Ground and First Floor as per revised " For Construction" Drawings under DMCC transmittal JAP016/TRNS/JV/00040 (JV Scope - masonry works, abortive works and coring works)
18,228.31
14,232.82
19 7
001b
74.1
JV
57,459.68
#REF!
19 7
002
74.1
NSC
ur
19 7
003
74.1
NSC
20 2
001
74
NSC
23 8
001
74.1
NSC
Provision of Pantry Area in Ground and First Floor as per revised " For Construction" Drawings under DMCC transmittal JAP016/TRNS/JV/00040 (JV Scope - ID works) Provision of Pantry Area in Ground and First Floor as per revised " For Construction" Drawings under DMCC transmittal JAP016/TRNS/JV/00040 (ID Scope of Works Provision of Pantry Area in Ground and First Floor as per revised " For Construction" Drawings under DMCC transmittal JAP016/TRNS/JV/00040 (MEP Works Revised Domestic Water Layout at Ground and First Floor due to the Revised "For Construction" Drawings under the DMCC Transmittal JAP016/TRNS/JV/00042 Revised " For Construction" drawings under the DMCC transmittal ref. JAP016/TRNS/JV/00040 dated 16-Apr-08 (Additional Voice/Data Points in GF & 1L)
SUB-TOTAL
57,459.68
151,224.89
0.00
0.00
Bond Interiors to submit entitlements
ERI NO. 75 20 1
001
75
NSC ID Tiling Works-Attic Stock (ERI No. 75)
SUB-TOTAL
#REF!
ur
BI to submit entitlements
ERI NO. 76 / 76.1 15 8
001R1
76
20 5
001
76.1
20 5
002
76.1
JV
Doors at DEWA Water Meter Rooms
21,502.11
NSC DEWA Water Meter Connection (MEP Works) JV
DEWA Water Meter Connection (Builders Work)
SUB-TOTAL
10,637.50 5,263.09
26,765.20
7,908.70 3,941.91
#REF!
JAP016/TS/GT/20686 dated 28 Au -08 JAP016/TS/GT/20686 dated 28 Aug-08
10,637.50
#REF!
#REF!
150,193.45
#REF!
#REF!
150,193.45
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
JV Costs
21,502.11 CLOSED
21,502.11
ETA cost + 7% OH&P JV works clsoing of opening and provision of new opening with waterproofing and sealing works
CLOSED
0.00
ERI NO. 77 20 7
001
77
NSC Tower Secondary Roof Clamping Section
SUB-TOTAL
0.00
#REF!
150,193.45
0.00
Al Abbar cost + 12% OH&P + 3% Attendances
150,193.45
ERI NO. 78 17 6
001
####
17 6
002
####
TECOM/DU Comments on Telephone Rooms Raised Access Floor Material Submittal NSC DU Requirements JV
(valued in 196) (valued in 196)
Lateral Systems to submit (Builders to be in another submittal)
CLOSED CLOSED
ETA to submit entitlements (Builders to be in another
VARIATION CLAIMS STATUS TO-DATE October 15, 2013 CLAIM ENTITLEMENT APPLICATION
NOC NO.
SUB NO.
ERI NO.
V.O. TO
23 3
001
83
NSC Revisions to Landscaping Package in accordance with the M/s. Nakheel letter ref. JAP016/TS/BW/0347 dated 21-Sep-08
DESCRIPTION
JV COST (AED)
ER / F&G / JV AGREED VALUES
OUTSTANDING CLAIMS
NSC COST (AED)
JV COST (AED)
NSC COST (AED)
LETTER REFERENCE
66,615.70
#REF!
#REF!
#REF!
66,615.70
#REF!
#REF!
JV COST (AED)
REMARKS / COMMENTS
NSC COST (AED)
ERI NO. 83
SUB-TOTAL
0.00
66,615.70
0.00
Al Bayader cost + 12% OH&P + 3% Attendances
66,615.70
OUTSTANDING CLAIMS WITHOUT ERI 1
001
####
JV
Design Modification of Pile Caps
611,739.00
#REF!
#REF!
#REF!
611,739.00
progressed under a separate claim.
2
001
####
JV
Excavation to the difference in the Tender Drawings and the Actual Site Conditions
259,943.16
#REF!
#REF!
#REF!
259,943.16
progressed under a separate claim.
3
001
####
JV
Pile Head Levels and Associated Problem
258,088.62
#REF!
#REF!
#REF!
258,088.62
progressed under a separate claim.
35
002a
####
#REF!
#REF!
#REF!
35
002b
####
#REF!
#REF!
#REF!
522,748.23
42
001
####
44
001
####
NSC Additional OCP's conduits to the Offices and Retail Units (MEP Works) JV Additional OCP's conduits to the Offices and Retail Unts (Builders Work) NSC Fire Sprinkler Riser Pipes in Garbage Chute Shaft
38,246.08 120,370.11
#REF!
#REF!
ur
#REF!
#REF!
#REF!
ur
ETA to submit entitlements; revisions is due to the requirement of a UL/FM specifications
#REF!
#REF!
#REF!
ur
ETA to submit entitlements
#REF!
#REF!
#REF!
001
####
62
001
####
63
001
####
36
001
####
NSC Fire Alarm Shop Drawing
ur
83
001
####
NSC RFI No. 571 - Insulation and Backing Panels to Claddin NSC Secondary Roof for the Towers
ur
001
####
001
####
11 3
002
####
11 3
003
####
11 8
001
####
12 5
001
####
ur 12,494.21 (valued in 35-001)
#REF!
#REF! #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
CLOSED
to be valued in Claim N o. 220-001
#REF!
#REF!
91,147.85
ETA costs + 12% OH&P + 3% Attendances
11,909.40
#REF!
#REF!
#REF!
11,909.40
Al Abbar cost + 12% OH&P + 3% Att endances
#REF!
#REF!
#REF!
ur
#REF!
#REF!
#REF!
ur
ETA to submit entitlements
ur
#REF!
#REF!
#REF!
ur
ETA to submit entitlements
ur
ETA to submit entitlements
17 1
001
ur
#REF!
#REF!
17 5
001
####
NSC Revised "For Construction" Drawings under the
ur
#REF!
#REF!
#REF!
14 8
001
####
15 1 15 4
001 001
#### ####
15 5
AA to submit entitlements
#REF!
#REF!
####
ur
#REF!
NSC Sequencing of Spire Erection
001
ETA to submit entitlements; rejected by Nakheel due to the Consultant's(Atkins)response ref. RD/4532/661/ML/R8-0344.
91,147.85
####
13 3
not applicable
ur
(valued in 220-001)
####
####
CLOSED
#REF!
001
001
based on the response from RFI No. 417
Revision 1 - revised due to the changes in the works.
12,494.21
JAP016/TS/BW/0021 dated 12Nov-06
NSC Plenum Box and Louvre for Vent Pipe of Garbage Chute and Stack Vent at 64th Level - RFI No. 462 (ETA Scope) NSC Plenum Box and Louvre for Vent Pipe of Garbage Chute and Stack Vent at 64th Level - RFI No. 462 (Al Abbar Scope) JV Plenum Box and Louvre for Vent Pipe of Garbage Chute and Stack Vent at 64th Level - RFI No. 462 (JV Scope) NSC Revised Mechanical and Electrical Drawings at Basement 2 Securit Room NSC Level 2 Fire Policy Layouts (Transmittal Ref. JAP016/TRNS/JV/00014) NSC Drainage on Swimming Pool Deck at Level 1 (RFI No. 831 NSC Further Revisions to “For Construction” Drawings under transmittals ref. JAP016/TRNS/JV/00015 and 00016 NSC Power Supply and Fire Alarm Interface to Smoke Ventilation Window (RFI No. 783) NSC Containment (Security Services) JV Enclosure to the Irrigation Pipes running through the LV Room 2 (RFI No. 894) NSC Second Floor Revised Lighting and Power Design
13 0
JV Cost
120,370.11
522,748.23
47
98
ETA Cost + 7% JV OH&P; as per original claim
#REF!
NSC Revised Specifications for the Fire Fighting Equipments NSC Revised Architectural Drawings at 31st & 32nd Floor (MEP Works) JV Changes to Raised Access Floors at Tecom Rooms, Security Rooms, and Telephone Rooms NSC Installation of OCP's to Tenant Rooms
11 3
38,246.08
(valued in 113-001)
Included in Claim No. 113-001
CLOSED
ur
#REF!
#REF!
#REF!
ur
#REF!
#REF!
#REF!
ur
ETA & JV to submit entitlements
ur
#REF!
#REF!
#REF!
ur
ETA to submit entitlements
ur
#REF! #REF!
#REF! #REF!
#REF!
ur
ETA to submit entitlements
#REF!
#REF!
ur
ETA to submit entitlements
ur
EVS to submit entitlements
ur
ETA to submit entitlements (Builders to be in another
1,600.56 ur
#REF!
#REF!
#REF!
1,600.56
VARIATION CLAIMS STATUS TO-DATE October 15, 2013 NOC NO.
SUB NO.
22 6
002
22 9
001
23 7
ERI NO.
CLAIM ENTITLEMENT APPLICATION
V.O. TO
DESCRIPTION
JV COST (AED)
ER / F&G / JV AGREED VALUES
OUTSTANDING CLAIMS
JV COST (AED)
NSC COST (AED)
LETTER REFERENCE
#### NSC Modification Works due to the EHS r equirement in accordance with EHS Inspection Report (20-Jul-08) MEP Scope of Works #### NSC Additional Works at Entrance Ramps - Type 3 & 5
110,641.50
#REF!
#REF!
#REF!
110,641.50
16,654.95
#REF!
#REF!
#REF!
16,654.95
Al Bayader cost + 12% OH&P + 3% Attendances
001
#### NSC Revised "For Construction" Drawings under the DMCC Transmittal Ref. JAP016/TRNS/JV/00002 dated 10th July 2007 (Additional Voice / Data Points)
34,599.52
#REF!
#REF!
#REF!
34,599.52
BC Cost + 7% OH&P; BC VO#7; BC time claim = 201 days
23 9
001
#### NSC Additional Power Supply Lines for External Water Features, Irrigation Pumps, and Swimming Pool
141,276.06
#REF!
#REF!
#REF!
141,276.06
24 0
001
ur
#REF!
#REF!
#REF!
ur
24 1
001
ur
#REF!
#REF!
#REF!
ur
24 2
001
340,314.96
#REF!
#REF!
#REF!
340,314.96
24 3
001
13,460.75
#REF!
#REF!
#REF!
13,460.75
24 4
001
#### NSC Trimming of Cantilever Beams at the Diamond Exchange Center as per the RFI No. 1085 #### NSC Modification of Soffit Cladding for the Swimming Pool to Conceal Service Pipings as per the RFI No. 1054 #### NSC Structural Steel Support for Fans at Air Shaft #### NSC HVAC Systems at Basement 1 Control Room and Lobby as per RFI No. 1087 #### JV Additional Door Closer and Selector at Basement 1 Management Office
1,732.06
#REF!
#REF!
#REF!
1,732.06
Supply and installation of additional Ironmongeries at the Basement 1 Management Office main Entrance Door as per the F&G letter ref. JAP016/ALM/TCAC/23226 dtd 22Dec-08
24 5
001
####
JV
Coring for the Tenant Fit-Out Contractors
ur
#REF!
#REF!
#REF!
ur
24 6
001
####
JV
Additional Access Ladder at Penstock Chamber in
ur
#REF!
#REF!
#REF!
ur
as per the email request of Mr. Clarence Pinto of DMCC dated 4Jan-09 as per the EHS requirements
OM-10
001
####
JV
PC Supply Rates
(21,806.96)
SUB-TOTAL
1,553,881.33
JV COST (AED)
NSC COST (AED)
REMARKS / COMMENTS
NSC COST (AED)
#REF!
#REF!
#REF!
1,553,881.33
ETA cost + 12% OH&P + 3% Attendances
note that the structural works was based on the structural drawings provided to EVS; EVS to submit entitlements AA to submit entitlements
ETA cost + 12% OH&P + 3% Att ETA cost + 12% OH&P + 3% Attendances
adjustment to the Contract Sums due to the PC Materials final rates
(21,806.96)
3,928,851.11
ETA cost + 12% OH&P + 3% Attendances
3,928,851.11
TIME RELATED/ESCALATION CLAIMS 0
001
####
JV
Delay in Site Mobilization
0.00
#REF!
4
001
####
JV
Nominated Subcontractor Appointment (ETA)
0.00
0.00
6
001
####
JV
7
001
####
8
001
####
9
001
39
001
45
001
#REF!
CLOSED
This is due to the late possession of site as detailed in the referred letter.
JAP016/GEN/ABS/1051 dated 8 Aug-06
CLOSED
rejected by Nakheel due to notice not served as per the required time period under the Contract.
JAP016/GEN/ABS/1051 dated 8 Aug-06
CLOSED
rejected by Nakheel due to notice not served as per the required time period under the Contract.
0.00
0.00
JV
Delay of receipt of the Building Permit and "For Constructon" Drawings Delay in Raft Pour in Zones 1 & 2
0.00
#REF!
CLOSED
progressed under a separate claim; time related claim.
JV
Late Notification of Subcontractors
0.00
0.00
JAP016/TS/BW/0018 dated 31Oct-06
CLOSED
rejected by Nakheel due to dates relating to NSC in the Baseline Programme is not yet accepted.
####
JV
Closure of Site and Offices (due to the death of Sheik Maktoom, 5-7 January 2006)
0.00
0.00
JAP016/GEN/ABS/1014 dated 24Jun-06, & JAP016/GEN/ ABS/1051 dated 8-Aug-06
CLOSED
Rejected by Nakheel in accordance to Clause 44.1 of CoC, as 1 day is non working day and 2 days is not sufficient to award an entitlement; our letter ref. DXB/….Jly/5013 dtd 26Oct08 again requested for 2 days EOT
####
JV
Nomination of Landscaping Subcontractor
0.00
#REF!
#REF!
#REF!
CLOSED
time implications.
#REF!
#REF!
CLOSED
To be included in the Prolongation Claims as this is a preliminaries items
####
JV
Provision of Inspectors
(valued in 127-001)
#REF!
#REF!
#REF!
49
001
####
JV
Exceptionally Adverse Climatic Conditions
0.00
#REF!
#REF!
#REF!
CLOSED
due to inclement weather conditions at site
11 9
001
####
JV
0.00
#REF!
#REF!
#REF!
CLOSED
Potential Time Claim
12 7
001
####
JV
Notification of Potential Delay due to the Review of Shop Drawings Prolongation Costs
131,765,411.17
#REF!
#REF!
#REF!
131,765,411.17
12 7
002
####
JV
Additional Payment as a Result of the Escalating Cost of Materials
711,983.12
#REF!
#REF!
#REF!
711,983.12
14 3
001
####
JV
Notice of Disruption of Work at Function Room/Ballroom due to Design Conflict
0.00
#REF!
#REF!
#REF!
CLOSED
EOT of 585 days includes the previous 96 days and 138days claimed; Claim for additional pile works reduced to 132 from 138, thus reducing the overall claim to 579 days
in connection to the prolongation claim
time claim.
VARIATION CLAIMS STATUS TO-DATE October 15, 2013 NOC NO.
SUB NO.
ERI NO.
V.O. TO
CLAIM ENTITLEMENT APPLICATION DESCRIPTION
ER / F&G / JV AGREED VALUES
OUTSTANDING CLAIMS
JV COST (AED)
NSC COST (AED)
JV COST (AED)
NSC COST (AED)
LETTER REFERENCE
JV COST (AED)
NSC COST (AED)
REMARKS / COMMENTS
#### #### #### ####
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#### #### 0 ####
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF! #REF!
#### ####
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF! #REF!
#### ####
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF! #REF!
#### ####
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF! #REF! #REF! #REF! #REF! #REF! 0
0
0
0
0
#### #### #REF! #REF! #### #### #REF! #REF! #### #### 0
0
0
####
#REF! #REF!
0
0
0
####
#### #### #REF! #REF! #### #### #REF! #REF! #### ####
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#### #### 0 ####
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#### ####
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
187,243,368.65
60,550,881.16
#REF!
#REF!
#REF!
#REF!
#REF! #REF!
#REF! #REF! 0
0
#REF! #REF! 0
0
0
0
0
CLAIM STATUS #REF! Nos.
NO. OF CLAIMS TO-DATE
#REF! Nos.
#REF!
NO. OF CLAIMS WITH ERI
#REF! Nos.
#REF!
NO. OF CLAIMS WITHOUT ERI
#REF! Nos.
#REF!
NO. OF CLAIMS APPLIED
#REF! Nos.
#REF!
NO. OF CLAIMS OUTSTANDING
#REF! Nos.
#REF!
NO. OF AGREED CLAIMS
#REF! Nos.
#REF!
NO. OF UNAGREED CLAIMS
#REF! Nos.
#REF!
NO. OF CLAIMS TO JV
#REF! Nos.
#REF!
NO. OF CLAIMS TO NSC
GRAND TOTAL
247,794,249.81
#REF!
#REF!
DMCC- AL MAS TOWER PROJECT JUMEIRAH LAKE TOWERS JAP016 : PACKAGE NO. 3 - MAIN BUILDING WORKS
VARIATION CLAIMS STATUS TO-DATE October 15, 2013 NOC NO.
SUB NO.
ERI NO.
V.O. TO
1
001
####
JV
2
001
####
3
001
####
35
002a
####
35
002b
####
42
001
####
44
001
####
CLAIM ENTITLEMENT APPLICATION
CLAIM LETTER
DESCRIPTION LETTER REF.
DATE
JV COST (AED)
Design Modification of Pile Caps
TDB/P3/AM/CN-001A
17-Sep-05
JV
Excavation to the difference in the Tender Drawings and the Actual Site Conditions
TDB/P3/AM/CN-002A
JV
Pile Head Levels and Associated Problem
NSC COST (AED)
ER / F&G / JV AGREED VALUES
OUTSTANDING CLAIMS REMARKS / COMMENTS
JV COST (AED)
NSC COST (AED)
LETTER REFERENCE
JV COST (AED)
NSC COST (AED)
611,739.00
#REF!
#REF!
#REF!
611,739.00
progressed under a separate claim.
18-Sep-05
259,943.16
#REF!
#REF!
#REF!
259,943.16
progressed under a separate claim.
DXB/AMT-01/0500/Jly/112
13-Nov-05
258,088.62
#REF!
#REF!
#REF!
258,088.62
progressed under a separate claim.
DXB/AMT-01/0600/DAN/3032
18-Oct-07
#REF!
#REF!
#REF!
DXB/AMT-01/0600/DAN/3032
18-Oct-07
#REF!
#REF!
#REF!
DXB/AMT-01/0600/DAN/3768
03-Mar-08
522,748.23
#REF!
#REF!
#REF!
522,748.23
ur
#REF!
#REF!
#REF!
ur
ETA to submit entitlements; revisions is due to the requirement of a UL/FM specifications
#REF!
#REF!
ur
ETA to submit entitlements
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
CLOSED
#REF!
JAP016/TS/BW/0021 dated 12Nov-06
ur
ETA to submit entitlements; rejected by Nakheel due to the Consultant's(Atkins)response ref. RD/4532/661/ML/R8-0344.
#REF!
#REF!
ur
AA to submit entitlements
OUTSTANDING CLAIMS WITHOUT ERI
NSC Additional OCP's conduits to the Offices and Retail Units MEP Works JV Additional OCP's conduits to the Offices and Retail Unts Builders Work NSC Fire Sprinkler Riser Pipes in Garbage Chute Shaft
38,246.08 120,370.11
001
####
62
001
####
63
001
####
NSC Revised Specifications for the Fire Fighting Equipments NSC Revised Architectural Drawings at 31st & 32nd Floor (MEP Works) JV Changes to Raised Access Floors at Tecom Rooms, Securit Rooms, and Tele hone Rooms NSC Installation of OCP's to Tenant Rooms
36
001
####
NSC Fire Alarm Shop Drawing
ur
83
NSC RFI No. 571 - Insulation and Backing Panels to Claddin NSC Secondary Roof for the Towers
ur
47
001
####
98
001
####
11 3
001
####
11 3
002
####
11 3
003
####
11 8
001
####
12 5
001
####
13 0
001
####
13 3
001
####
14 8
001
####
15 1 15 4
001 001
#### ####
15 5
001
####
NSC Plenum Box and Louvre for Vent Pipe of Garbage Chute and Stack Vent at 64th Level - RFI No. 462 ETA Sco e NSC Plenum Box and Louvre for Vent Pipe of Garbage Chute and Stack Vent at 64th Level - RFI No. 462 (Al Abbar Sco e JV Plenum Box and Louvre for Vent Pipe of Garbage Chute and Stack Vent at 64th Level - RFI No. 462 (JV Sco e NSC Revised Mechanical and Electrical Drawings at Basement 2 Securit Room NSC Level 2 Fire Policy Layouts (Transmittal Ref. JAP016/TRNS/JV/00014 NSC Drainage on Swimming Pool Deck at Level 1 (RFI No. 831 NSC Further Revisions to “For Construction” Drawings under transmittals ref. JAP016/TRNS/JV/00015 and 00016 NSC Power Supply and Fire Alarm Interface to Smoke Ventilation Window (RFI No. 783) NSC Containment (Security Services) JV Enclosure to the Irrigation Pipes running through the LV Room 2 RFI No. 894 NSC Second Floor Revised Lighting and Power Design
17 1
001
####
17 5
001
####
18 0
001
18 1 18 2
001 001
18 3
ur DXB/AMT-01/0600/EDM/2508
11-Jul-07
12,494.21 (valued in 35-001)
#REF!
#REF!
38,246.08
ETA Cost + 7% JV OH&P; as per original claim
JV Cost
120,370.11
based on the response from RFI No. 417
Revision 1 - revised due to the changes in the works.
12,494.21
not applicable
(valued in 220-001)
#REF!
#REF!
#REF!
CLOSED
to be valued in Claim N o. 220-001
DXB/AMT-01/0600/MIC/4491
02-Jul-08
91,147.85
#REF!
#REF!
#REF!
91,147.85
ETA costs + 12% OH&P + 3% Attendances
DXB/AMT-01/0600/MIC/4559
13-Jul-08
11,909.40
#REF!
#REF!
#REF!
11,909.40
Al Abbar cost + 12% OH&P + 3% Attendances
#REF!
#REF!
#REF!
ur
#REF!
#REF!
#REF!
ur
ETA to submit entitlements
ur
#REF!
#REF!
#REF!
ur
ETA to submit entitlements
ur
#REF!
#REF!
#REF!
ur
ETA to submit entitlements
ur
#REF!
#REF!
#REF!
ur
ETA & JV to submit entitlements
ur
#REF!
#REF!
#REF!
ur
ETA to submit entitlements
ur
#REF! #REF!
#REF! #REF!
#REF!
ur
ETA to submit entitlements
ur
#REF!
#REF!
#REF!
ur
ETA to submit entitlements
NSC Sequencing of Spire Erection
ur
#REF!
#REF!
#REF!
ur
EVS to submit entitlements
ur
#REF!
#REF!
#REF!
ur
ETA to submit entitlements (Builders to be in another submittal)
####
NSC Revised "For Construction" Drawings under the DMCC Transmittal Ref. JAP016/TRNS/JV/00033 dated 5th Februar 2008 MEP Works NSC Increase in Water Tank Size
30-Mar-08
71,922.15
#REF!
#REF!
#REF!
71,922.15
#### ####
NSC Ductin in MDF Rooms NSC Additional Low Leakage Motorized Smoke Damper
#REF! #REF!
ur 1,308,459.65
ETA Claim = AED 62,541.00, +JV's 12%(OH&P) and 3% Attend ETA to submit entitlements
13-Apr-08
#REF! #REF!
#REF!
DXB/AMT-01/0600/EDM/3983
ur 1,308,459.65
001
####
NSC Height of Services at Level-49 on Shaft-6
DXB/AMT-01/0600/DAN/3967
08-Apr-08
36,435.37
#REF!
#REF!
#REF!
36,435.37
18 4
001
####
ur
#REF!
#REF!
#REF!
ur
18 5
001
####
NSC Additional Stone Cladding to Sides of Maintenance Stairs NSC Additional Work to Make-up Levels at Main Entrance
ur
#REF!
#REF!
#REF!
ur
Al Bayader to submit entitlements
001
####
#REF!
#REF!
18 7
002
####
86,593.30
AB cost + 12% OH&P + 3%Attend
19 1
001
####
ur
Al Bayader to submit entitlements
18 7
Design Change to External Ramps - Block Stopper U stand CVI No. 086 NSC Design Change to External Ramps - Waterproofing CVI No. 086 NSC Additional Work to External Wall Finishing at Swimming Pool (RFI No. 920) JV
\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--Claims List (ERI) (2).monvabad
(valued in 113-001)
DXB/AMT-01/0600/PMG/4679
DXB/AMT-01/0600/DAN/3916
05-Aug-08
DXB/AMT-01/0600/PMG/4691
09-Aug-08
DXB/AMT-01/0600/MIC/5049
06-Nov-08
1,600.56
108,691.73
#REF!
#REF!
86,593.30
#REF!
#REF!
ur
#REF!
#REF!
#REF!
#REF!
1,600.56
#REF!
#REF!
Included in Claim No. 113-001
CLOSED
ETA Claim = AED 1,137,791.00, + JV's 12% (OH&P) and 3% (Attend) ETA Claim = AED 31,682.93, + JV's 12% (OH&P) and 3% Attend Al Bayader to submit entitlements
JV's portion of the works
108,691.73
33 - 52
VARIATION CLAIMS STATUS TO-DATE October 15, 2013 NOC NO.
SUB NO.
ERI NO.
19 2
001
####
19 4 19 4
001 002
#### ####
19 5
001
####
19 8
001
####
20 9
001
####
20 9
002
####
21 0
001
####
001
####
21 3 21 6
001 001
#### ####
21 8
001
####
21 8
002
####
001
####
21 2
21 9 21 9
002
####
22 0
001
####
22 1
001R1 ####
22 2
001
####
22 4
001
####
22 5
001
####
22 6
001
####
22 6
002
####
22 9
001
####
23 7
001
####
23 9
001
24 0
001
CLAIM ENTITLEMENT APPLICATION
CLAIM LETTER
V.O. TO
DESCRIPTION
NSC Additional Work to Concrete Under Maintenance Path Tiles RFI No. 929 NSC Tem orar Fire Alarm S stems Installation JV Temporary Fire Alarm Systems (Material / Testing and Commissionin NSC Mechanical Services at Tecom Room in Level 50 NSC Change of Applied Cementitious Fireproofing to Intumescent Paint on Steel Beams at Diamond Exchan e Center NSC Fire Protection Systems at Basement 2 Security Room - Supply of Additional Wall Mounted Dry Powder and CO2 Fire Extin uishers NSC Fire Protection Systems at Basement 2 Security Room - Removal of Existing Fire Fighting Systems and Installation of ETA Supplied Fire Fighting E ui ment JV Closure of the Opening in Parapet Wall on Elevation 4 for S ire Connection NSC Back Boxes for Seismic Detectors at Basement 5 and Level 2 Vault Rooms NSC BMS Monitor for the Revolvin / Slidin Doors NSC Additional Screed at Road Type 2 and Ramps
LETTER REF.
DATE
DXB/AMT-01/0600/EDM/4041
21-Apr-08
DXB/AMT-01/0600/EDM/4041
21-Apr-08
DXB/AMT-01/0600/MIC/5089
16-Nov-08
JV COST (AED)
23-Jun-08
DXB/AMT-01/0600/MIC/5046
06-Nov-08
NSC Additional Requirements for Etisalat Room in Basement 1 (MEP Works) JV Additional Requirements for Etisalat Room in Basement 1 Door Amendments JV False Ceiling at Basement 5 Vault Lobby and Services Room (RFI No. 511) NSC Fire Sprinkler above False Ceiling at Basement 5 Vault Lobb & Services Room RFI No. 511 NSC Vapour Barrier underneath all Parapet Composite Cladding of the 6 Wings and Diamond Exchange Centre JV Modification to Louvers and Additional Aluminum Doors at Various Areas NSC Additional 6" diam. Line from B5 Pump Room to S2 Level Fire Tank NSC Paving and Landscaping Works at Ramps (originally under Wade Adams Scope) NSC Planter Area at Level 2 - Change of 500mm thick Sweet Soil to Pol sterene JV Modification Works due to the EHS requirement in accordance with EHS Inspection Report (20-Jul-08) JV sco e of works NSC Modification Works due to the EHS requirement in accordance with EHS Inspection Report (20-Jul-08) MEP Sco e of Works NSC Additional Works at Entrance Ramps - Type 3 & 5
DXB/AMT-01/0600/MIC/4672
03-Aug-08
DXB/AMT-01/0600/MIC/5039
05-Nov-08
DXB/AMT-01/0600/MIC/5051
08-Nov-08
OUTSTANDING CLAIMS
JV COST (AED)
NSC COST (AED)
LETTER REFERENCE
ur
#REF!
#REF!
#REF!
ur
190,661.95
#REF! #REF!
#REF! #REF!
#REF!
190,661.95
ur
#REF!
#REF!
#REF!
ur
ETA to submit entitlements (Builders Works if any to be in another submittal)
ur
#REF!
#REF!
#REF!
ur
EVS to submit entitlements
ur
#REF!
#REF!
#REF!
ur
ETA to submit entitlements; Nakheel letter ref. JAP016/TS/GT/0285 dtd 23Jun08 reject the claim and no ERI's shall be issued
ur
#REF!
#REF!
#REF!
ur
JCI to submit entitlements
#REF!
#REF!
#REF!
#REF!
#REF!
ur 99,660.15 37,147.81
82,800.00
11,682.47
#REF!
#REF!
JV COST (AED)
NSC COST (AED)
REMARKS / COMMENTS
NSC COST (AED)
ur DXB/AMT-01/0600/MIC/4449
ER / F&G / JV AGREED VALUES
Al Bayader to submit entitlements
ETA to submit entitlements JV thru Sibca to submit entitlements
82,800.00
Intherpro Cost + 12% OH&P + 3% attendances
11,682.47
ETA to submit entitlements
99,660.15 37,147.81
#REF! #REF!
#REF! #REF!
#REF!
41,743.85
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
1,286.00
#REF!
#REF!
37,895.22 ur
ETA to submit entitlements
ur
Al Abbar to submit entitlements
1,286.00 37,895.22
#REF!
#REF!
41,743.85
ETA cost + 12% OH&P + 3% Attendances Al Bayader cost + 12% OH&P + 3% Attendances ETA cost + 12% OH&P + 3% Attendances
Belgium Alkuminum cost + 12% OH&P +3 % Attend
FBI + EVS cost + 12% OH&P + 3% Attend
ur
#REF!
#REF!
#REF!
ur
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
404,090.45
ETA cost + 12% OH&P + 3% Attendances
305,837.13
Al Bayader cost + 12% OH&P + 3% Attendances
DXB/AMT-01/0600/MIC/4874
22-Sep-08
DXB/AMT-01/0600/MIC/4577
15-Jul-08
404,090.45
#REF!
#REF!
#REF!
DXB/AMT-01/0600/MIC/5045
06-Nov-08
305,837.13
#REF!
#REF!
#REF!
25,300.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
32,364.90
cost from domestic subcons + 12%OH&P + 3% Attendances
32,364.90
AB cost + 12% OH&P + 3% Attend
DXB/AMT-01/0600/MIC/5117
23-Nov-08
DXB/AMT-01/0600/MIC/5196
14-Dec-08
DXB/AMT-01/0600/MIC/5197
14-Dec-08
110,641.50
#REF!
#REF!
#REF!
110,641.50
DXB/AMT-01/0600/MIC/5041
05-Nov-08
16,654.95
#REF!
#REF!
#REF!
16,654.95
Al Bayader cost + 12% OH&P + 3% Attendances
NSC Revised "For Construction" Drawings under the DMCC Transmittal Ref. JAP016/TRNS/JV/00002 dated 10th July 2007 (Additional Voice / Data Points)
DXB/AMT-01/0500/JLy/5010
26-Oct-08
34,599.52
#REF!
#REF!
#REF!
34,599.52
BC Cost + 7% OH&P; BC VO#7; BC time claim = 201 days
####
NSC Additional Power Supply Lines for External Water Features, Irrigation Pumps, and Swimming Pool
DXB/AMT-01/0600/MIC/5081
15-Nov-08
141,276.06
#REF!
#REF!
#REF!
141,276.06
####
NSC Trimming of Cantilever Beams at the Diamond Exchange Center as per the RFI No. 1085 NSC Modification of Soffit Cladding for the Swimming Pool to Conceal Service Pipings as per the RFI No. 1054 NSC Structural Steel Support for Fans at Air Shaft
ur
#REF!
#REF!
#REF!
ur ur
24 1
001
####
24 2
001
####
24 3
001
####
24 4
001
####
24 5
001
####
JV
24 6
001
####
JV
OM-10
001
####
JV
PC Supply Rates
NSC HVAC Systems at Basement 1 Control Room and Lobb as er RFI No. 1087 JV Additional Door Closer and Selector at Basement 1 Management Office
35,000.25
ur
#REF!
#REF!
#REF!
25,300.00
DXB/AMT-01/0600/MIC/5158
01-Dec-08
340,314.96
#REF!
#REF!
#REF!
340,314.96
DXB/AMT-01/0600/MIC/5282
05-Jan-09
13,460.75
#REF!
#REF!
#REF!
13,460.75
DXB/AMT-01/0600/DAN/5315
13-Jan-09
1,732.06
1,732.06
#REF!
#REF!
#REF!
Coring for the Tenant Fit-Out Contractors
ur
#REF!
#REF!
#REF!
ur
Additional Access Ladder at Penstock Chamber in
ur
#REF!
#REF!
#REF!
ur
#REF!
#REF!
DXB/AMT-01/0600/DAN/5092
SUB-TOTAL
\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--Claims List (ERI) (2).monvabad
JV Internal Works
35,000.25
16-Nov-08
(21,806.96)
1,553,881.33
1,553,881.33
ETA cost + 12% OH&P + 3% Attendances
note that the structural works was based on the structural drawings provided to EVS; EVS to submit entitlements AA to submit entitlements
ETA cost + 12% OH&P + 3% Att ETA cost + 12% OH&P + 3% Attendances
Supply and installation of additional Ironmongeries at the Basement 1 Management Office main Entrance Door as per the F&G letter ref. JAP016/ALM/TCAC/23226 dtd 22-Dec-08 as per the email request of Mr. Clarence Pinto of DMCC dated 4Jan-09 as per the EHS requirements adjustment to the Contract Sums due to the PC Materials final rates
(21,806.96)
3,928,851.11
ETA cost + 12% OH&P + 3% Attendances
3,928,851.11
34 - 52
DMCC- AL MAS TOWER PROJECT JUMEIRAH LAKE TOWERS JAP016 : PACKAGE NO. 3 - MAIN BUILDING WORKS
VARIATION CLAIMS STATUS TO-DATE October 15, 2013 CLAIM ENTITLEMENT APPLICATION
CLAIM LETTER
NOC NO.
SUB NO.
ERI NO.
V.O. TO
1
001
####
JV
2
001
####
3
001
####
35
002a
35
002b
42 62 11 3
001
11 3
002
15 4
001
18 0
001
Changes to Raised Access Floors at Tecom Rooms, Security Rooms, and Telephone Rooms #### NSC Plenum Box and Louvre for Vent Pipe of Garbage Chute and Stack Vent at 64th Level - RFI No. 462 (ETA Scope) #### NSC Plenum Box and Louvre for Vent Pipe of Garbage Chute and Stack Vent at 64th Level - RFI No. 462 (Al Abbar Sco e #### JV Enclosure to the Irrigation Pipes running through the LV Room 2 (RFI No. 894) #### NSC Increase in Water Tank Size
18 2
001
#### NSC Additional Low Leakage Motorized Smoke Damper
18 3
001
#### NSC Height of Services at Level-49 on Shaft-6
DXB/AMT-01/0600/D AN/3967
08-Apr-08
18 7
001
####
DXB/AMT-01/0600/PMG/4691
09-Aug-08
18 7
002
#### NSC
DXB/AMT-01/0600/MIC/5049
06-Nov-08
19 4 19 4
001 002
#### NSC #### JV
D XB/AMT-01/0600/EDM/4041
21-Apr-08
D XB/AMT-01/0600/EDM/4041
21-Apr-08
82,800.00
JV thru Sibca to sub mit entitlements
21 0
001
####
DXB/AMT-01/0600/MIC/5089
16-Nov-08
11,682.47
Intherpro Cost + 12% OH&P + 3% attendances
21 3 21 6
001 001
#### NSC #### NSC
DESCRIPTION
REMARKS / COMMENTS
LETTER REF.
DATE
JV COST (AED)
NSC COST (AED)
Design Modification of Pile Caps
TDB/P3/AM/CN-001A
17-Sep-05
611,739.00
progressed under a separate claim.
JV
Excavation to the difference in the Tender Drawings and the Actual Site Conditions
TDB/P3/AM/CN-002A
18-Sep-05
259,943.16
progressed under a separate claim.
JV
Pile Head Levels and Associated Problem
DXB/AMT-01/0500/Jl y/112
13-Nov-05
258,088.62
progressed under a separate claim.
DXB/AMT-01/0600/D AN/3032
18-O ct-07
DXB/AMT-01/0600/D AN/3032
18-O ct-07
001
#### NSC Additional OCP's conduits to the Offices and Retail Units (MEP Works) #### JV Additional OCP's conduits to the Offices and Retail Unts (Builders Work) #### NSC Fire Sprinkler Riser Pipes in Garbage Chute Shaft
DXB/AMT-01/0600/DAN/3768
03-Mar-08
001
####
D XB/AMT-01/0600/EDM/2508
11-Jul -07
DXB/AMT-01/0600/MIC/4491
02-Jul -08
91,147.85
ETA costs + 12% OH&P + 3% Attendances
DXB/AMT-01/0600/MIC/4559
13-Jul -08
11,909.40
Al Abbar cost + 12% OH&P + 3% Attendances
DXB/AMT-01/0600/PMG/4679
05-Aug-08
DXB/AMT-01/0600/DAN/3916
30-Mar-08
71,922.15
D XB/AMT-01/0600/EDM/3983
13-Apr-08
1,308,459.65
OUTSTANDING CLAIMS WITHOUT ERI
21 8 21 8 21 9 22 1
JV
JV
JV
Design Change to External Ramps - Block Stopper Upstand (CVI No. 086) Design Change to External Ramps - Waterproofing (CVI No. 086) Temporary Fire Alarm Systems (Installation) Temporary Fire Alarm Systems (Material / Testing and Commissioning) Closure of the Opening in Parapet Wall on Elevation 4 for Spire Connection BMS Monitor for the Revolving / Sliding Doors Additional Screed at Road Type 2 and Ramps
#### NSC Additional Requirements for Etisalat Room in Basement 1 (MEP Works) #### JV Additional Requirements for Etisalat Room in 002 Basement 1 (Door Amendments) #### JV False Ceiling at Basement 5 Vault Lobby and 001 Services Room (RFI No. 511) 001R1 #### JV Modification to Louvers and Additional Aluminum Doors at Various Areas 001
38,246.08
ETA Cost + 7% JV OH&P; as per original claim
JV Cost
120,370.11 522,748.23
based on the response from RFI No. 417 Revision 1 - revised due to the changes in the works.
12,494.21
#REF!
1,600.56
ETA Claim = AED 62,541.00, +JV's 12%(OH&P) and 3% Attend ETA Claim = AED 1,137,791.00, + JV's 12% (OH&P) and 3% (Attend)
36,435.37
ETA Claim = AED 31,682.93, + JV's 12% (OH&P) and 3% Attend JV's portion of the works
86,593.30
AB cost + 12% OH&P + 3%Attend
108,691.73
190,661.95
ETA to submit entitlements
ETA cost + 12% OH&P + 3% Attendances
DXB/AMT-01/0600/MIC/4449
23-Jun-08
DXB/AMT-01/0600/MIC/5046
06-Nov-08
99,660.15 37,147.81
DXB/AMT-01/0600/MIC/4672
03-Aug-08
41,743.85
DXB/AMT-01/0600/MIC/5039
05-Nov-08
1,286.00
DXB/AMT-01/0600/MIC/5051
08-Nov-08
37,895.22
FBI + EVS cost + 12% OH&P + 3% Attend
DXB/AMT-01/0600/MIC/4874
22-Sep-08
32,364.90
cost from domestic subcons + 12%OH&P + 3% Attendances
Al Bayader cost + 12% OH&P + 3% Attendances ETA cost + 12% OH&P + 3% Attendances
Belgium Alkuminum cost + 12% OH&P +3 % Attend
DMCC- AL MAS TOWER PROJECT JUMEIRAH LAKE TOWERS JAP016 : PACKAGE NO. 3 - MAIN BUILDING WORKS
VARIATION CLAIMS STATUS TO-DATE October 15, 2013 NOC NO.
SUB NO.
ERI NO.
V.O. TO
1
001
####
JV
2
001
####
3
001
35
CLAIM ENTITLEMENT APPLICATION
CLAIM LETTER
DESCRIPTION
REMARKS / COMMENTS
LETTER REF.
DATE
JV COST (AED)
Design Modification of Pile Caps
TDB/P3/AM/CN-001A
17-Sep-05
611,739.00
progressed under a separate claim.
JV
Excavation to the difference in the Tender Drawings and the Actual Site Conditions
TDB/P3/AM/CN-002A
18-Sep-05
259,943.16
progressed under a separate claim.
####
JV
Pile Head Levels and Associated Problem
DXB/A MT-01/0500/Jly/112
13-Nov-05
258,088.62
progressed under a separate claim.
002b
####
JV
DXB/AMT-01/0600/DAN/3032
18-Oct-07
120,370.11
JV Cost
62
001
####
JV
DXB/AMT-01/0600/EDM/2508
11-Jul-07
12,494.21
15 4
001
####
JV
DXB/AMT-01/0600/PMG/4679
05-Aug-08
1,600.56
18 7
001
####
JV
DXB/AMT-01/0600/PMG/4691
09-Aug-08
108,691.73
19 4
002
####
JV
DXB/AMT-01/0600/EDM/4041
21-Apr-08
82,800.00
JV thru Sibca to submit entitlements
21 0
001
####
JV
DXB/AMT-01/0600/MIC/5089
16-Nov-08
11,682.47
Intherpro Cost + 12% OH&P + 3% attendances
21 8
002
####
JV
DXB/AMT-01/0600/MIC/5039
05-Nov-08
1,286.00
21 9
001
####
JV
DXB/AMT-01/0600/MIC/5051
08-Nov-08
37,895.22
FBI + EVS cost + 12% OH&P + 3% Attend
001R1 ####
JV
Additional OCP's conduits to the Offices and Retail Unts (Builders Work) Changes to Raised Access Floors at Tecom Rooms, Security Rooms, and Telephone Rooms Enclosure to the Irrigation Pipes running through the LV Room 2 (RFI No. 894) Design Change to External Ramps - Block Stopper Upstand (CVI No. 086) Temporary Fire Alarm Systems (Material / Testing and Commissioning) Closure of the Opening in Parapet Wall on Elevation 4 for Spire Connection Additional Requirements for Etisalat Room in Basement 1 (Door Amendments) False Ceiling at Basement 5 Vault Lobby and Services Room (RFI No. 511) Modification to Louvers and Additional Aluminum Doors at Various Areas Modification Works due to the EHS requirement in accordance with EHS Inspection Report (20-Jul-08) JV scope of works Additional Door Closer and Selector at Basement 1 Management Office
DXB/AMT-01/0600/MIC/4874
22-Sep-08
32,364.90
cost from domestic subcons + 12%OH&P + 3% Attendances
DXB/AMT-01/0600/MIC/5196
14-Dec-08
35,000.25
JV Internal Works
DXB/AMT-01/0600/DAN/5315
13-Jan-09
1,732.06
Supply and installation of additional Ironmongeries at the Basement 1 Management Office main Entrance Door as per the F&G letter ref. JAP016/ALM/TCAC/23226 dtd 22Dec-08
DXB/AMT-01/0600/DAN/5092
16-Nov-08
(21,806.96)
adjustment to the Contract Sums due to the PC Materials final rates
OUTSTANDING CLAIMS WITHOUT ERI
22 1 22 6
001
####
JV
24 4
001
####
JV
OM-10
001
####
JV
PC Supply Rates
TOTAL
\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--Outstanding (JV).monvabad
Revision 1 - revised due to the changes in the works.
#REF!
JV's portion of the works
Belgium Alkuminum cost + 12% OH&P +3 % Attend
1,553,881.33
36 - 53
DMCC ALMAS TOWER (JAP016) JUMEIRAH LAKE TOWERS
DESCRIPTION
TOTAL AMOUNT
AMOUNT CERTIFIED
PERCENT CERTIFIED
OUTSTANDING AMOUNT
PERCENT OUTSTANDING
EFFECTIVE CONTRACT AMOUNT
261,161,000.00
259,509,675.51
99.37%
1,651,324.49
0.63%
OUTSTANDING CLAIMS WITH ERI
52,764,973.04
50,744,847.95
96.17%
2,020,125.09
3.83%
0.00%
1,553,881.33
100.00%
OUTSTANDING CLAIMS WITHOUT ERI
GRAND TOTAL
1,553,881.33
315,479,854.36
310,254,523.46
98.34%
5,225,330.90
1.66%
REMARKS
DMCC- AL MAS TOWER PROJECT JUMEIRAH LAKE TOWERS JAP016 : PACKAGE NO. 3 - MAIN BUILDING WORKS
VARIATION CLAIMS STATUS TO-DATE October 15, 2013 NOC NO.
SUB NO.
ERI NO.
V.O. TO
13
001
04
JV
CLAIM ENTITLEMENT APPLICATION DESCRIPTION
JV COST (AED)
ER / F&G / JV AGREED VALUES
NSC COST (AED)
JV COST (AED)
0.00
0.00
NSC COST (AED)
OUTSTANDING CLAIMS LETTER REFERENCE
JV COST (AED)
JAP016/ALM/TCAC/21287 dated 5-Oct-08
CLOSED
NSC COST (AED)
REMARKS / COMMENTS
ERI NO. 4 Additional Telephone Lines
SUB-TOTAL
0.00
0.00
0.00
0.00
0.00
to confirm if this is still needed; No need for additional telephone lines
0.00
ERI NO. 6 14
001
06
14
002
06
14
004
06
Site Establishment - Offices (Supply of ETA Temporary Site Office Purchased form Seidco Gen. Cont. Co. NSC ETA Site Offices (New Offices at Site) JV
JV
ETA/F&G Site Offices - Rubbish Removal
SUB-TOTAL
278,155.63
501,971.39 56,840.00
334,995.63
JAP016/ALM/TCAC/05508 dated 29-Nov-06
218,400.00
#REF!
#REF!
#REF! #REF!
#REF!
#REF!
501,971.39
#REF!
#REF!
1,193,235.54
#REF!
#REF!
1,193,235.54
#REF!
#REF!
F&G evaluation is based on a +12% OH&Pro, and prelims omitted and to be dealt with in EOT's
CLOSED
501,971.39
JV scope of works; verbally agreed with F&G to be 5050 as at Se -08
56,840.00
56,840.00
ETA cost + 12% OH&P + 3% Attendances
501,971.39
ERI NO. 7 15
001R1
07
NSC ETA Site Offices Provision of Power Supply
SUB-TOTAL
0.00
#REF!
1,193,235.54
0.00
ETA costs + 7% JV OH&P
1,193,235.54
ERI NO. 8 16
001
08
JV
Provision of Starter Bars to Podium within the Landscape Package
SUB-TOTAL
159,171.78
159,171.78
JAP016/ALM/TCAC/04893 dated 30-Oct-06
128,324.82
0.00
128,324.82
0.00
Costs agreed by JV under letter ref. DXB/AMT01/0500/Jly/1065 dated 7-Nov-06.
CLOSED
0.00
0.00
ERI NO. 9 17
001
09
JV
Core Wall Thickening
SUB-TOTAL
181,391.33
181,391.33
JAP016/ALM/TCAC/08151 dated 09-Apr-07
107,738.59
0.00
107,738.59
0.00
ERI No. 09; Internal Preliminary Assessment is equal to 10 days, but works has yet to be carried out to consider the EOT; cost evaluated by F&G accepted thru letter ref. DXB/AMT-01/0500/Jly/1072 dated 8-Nov-06 but subject to add'l revisions and prolongat
CLOSED
0.00
0.00
ERI NO. 10 14
003
10
NSC Site Establishment - Offices (Supply and Installation of AC Units within the New Offices being established by Nakheel)
SUB-TOTAL
80,097.04
0.00
80,097.04
64,574.50
0.00
JAP016/ALM/TCAC/06385 dated 21-Jan-07
64,574.50
CLOSED
0.00
ETA cost of 60,350.00 + 7% JV OH&P
0.00
ERI NO. 11 20
001
11
JV
Supply of Potable Water to DMCC and F&G's Site Offices
SUB-TOTAL
23,551.60
23,551.60
JAP016/ALM/TCAC/22075 dated 4-Nov-08, JAP016/ALM/TCAC/23417 dated 6-Jan-08
25,076.80
0.00
25,076.80
0.00
Period from June 2006 - September 2007, and October2007 - November 2008
CLOSED
0.00
0.00
ERI NO. 12 28
001R1
12
NSC Cast Resin Bus Bars
SUB-TOTAL
2,071,622.24
0.00
2,071,622.24
1,049,300.70
0.00
JAP016/ALM/TCAC/14871 dated 13-Jan-08
1,049,300.70
CLOSED
0.00
ETA Cost + 7%; Time Effect shall be by NSC, if any; potential additional builders works, and attendance in reference to the Time. Confirmed by ETA under their letter ref. DIV.092/AM/TS/1342 dated 31-Jan-08
0.00
ERI NO. 13 OM-1
001
13
JV
Omit Wall Plaster from Car Parking Areas in all 5 Basement Floors
(383,650.51)
#REF!
#REF!
(383,650.51)
cost implication sent under JV letter ref.DXB/AMT01/0800/Jly/1175 dated 29-Nov-06
VARIATION CLAIMS STATUS TO-DATE October 15, 2013 NOC NO.
SUB NO.
ERI NO.
V.O. TO
12 4
001
####
JV
13 2
001
16
JV
13 8
001
####
JV
CLAIM ENTITLEMENT APPLICATION DESCRIPTION Late Issuance of Design Information (Specifications of Lighting Fixtures in ID Areas) ID Works Package (GL-08)
Notification of Delay to the ID Works Package Signages #### NSC Modification in Specification of Some ID Lighting Fixtures #### JV Notification of Delay to the ID Doors Package
14 0
001
14 1
001
14 2
001
14 4 14 5
001 001
14 7
001
14 7
002
14 7
003
#### NSC Internal Water Feature (MEP Scope)
15 6
001
#### NSC Lift L4 Mock-Up (Car Interior Finish @ Ground Floor Level) #### JV Additional Architraves to Towel Dispensers
16 1
001
#### NSC Disruption of Works resulting from Design Conflict in Basement 1 – VIP Lounge #### JV Delays due to Design Issues Related to GL-07 #### JV Notification of a Possible Delay to the Glass Feature Wall (GL-05) under the ID Works Package 16 JV Internal Water Feature (Aqua-Teknik Scope) 16
JV
Internal Water Feature (Related Builders Work)
NSC COST (AED)
JV COST (AED)
0.00
#REF!
#REF!
#REF!
CLOSED
time claim.
1,774,080.00
1,774,080.00
CLOSED
Mozart Marble cost + 12% OH&P
(valued in 149-001)
#REF!
JAP016/TS/GT/0103 dated 18Oct-2007 JAP016/ALM/TCAC/22521 dated 20-Nov-08 #REF!
CLOSED
time claim.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00 (valued in 41-001)
#REF! #REF!
#REF! #REF!
#REF!
626,750.00
#REF!
#REF!
#REF!
626,750.00
4,134.48
#REF!
#REF!
#REF!
4,134.48
#REF!
#REF!
#REF!
ur (valued in 149-001) 25,787.60
ur 0.00 96,768.00
time claim.
CLOSED 25,787.60
under review for time entitlements
Aqua-Teknik cost + 12% OH&P + 3% Attend Coring Subcon Cost + 12% OH&P + 3% Attendances
ur CLOSED
#REF!
#REF!
96,768.00 541,470.46
34,314.41
ETA Cost + 12%OH&P + 3% Attendances
under review; time entitlements
CLOSED CLOSED
JAP016/TS/GT/0142 dated 31Jan-08
ETA tnd Lever to submit entitlements
ETA to submit entitlements rejected by Nakheel as the proposed revisions was not done and was reverted back to original Aedas Specs submitted thru…3701 dtd 20-Feb-08
541,470.46
#REF!
#REF!
34,314.41
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
100,121.32
#REF!
#REF!
#REF!
100,121.32
0.00
#REF!
#REF!
#REF!
CLOSED
4,137.35
#REF!
#REF!
#REF!
4,137.35
ur
#REF!
#REF!
#REF!
ur
27,548.25
#REF!
#REF!
#REF!
27,548.25
ETA Claim = AED 23,955.00 + 12% JVOH&P + 3% Attendances
42,963.29
#REF!
#REF!
#REF!
42,963.29
ETA Cost + 12%OH&P + 3% Attendances
ur
#REF!
#REF!
#REF!
ur
25,112.55
#REF!
#REF!
#REF!
25,112.55
#REF!
#REF!
#REF!
247,839.95
39,243.75
#REF!
#REF!
#REF!
39,243.75
7,797.46
#REF!
#REF!
#REF!
7,797.46
#REF!
#REF!
16
16 9
003
16
17 0
001
16
17 0
002
16
18 6
002
16
18 8
001
19 9
001
20 0
001
20 6
001
21 1
001
16
NSC Supply and Installation of Interior Design Finishing Works - Basement 1 VIP Lounge Feature Ceiling
21 1
002
16
247,839.95
21 1
003
16
NSC Supply and Installation of Interior Design Finishing Works - Basement 1 VIP Lounge Feature Ceiling (MEP Works by ETA) JV Supply and Installation of Interior Design Finishing Works - Basement 1 VIP Lounge Feature Ceiling (Supply of O2 Light Fixtures from M/s.Lever Electric)
23 0
001
####
ur
#### NSC Sprinkler Heads in Illuminated Ceiling (RFI No. 967 Rev. 0) #### NSC Design Change of Core Bulk Head at Ground Floor Escalator Lobby - MEP Rectification Works for the ID Works Package (CVI No. 088) #### NSC Additional Extract Ducts in Basement 1 Male and Female Toilet , and VIP Toilet #### NSC Carpets at Level 48
Signage at the Entrance of VIP Carpark in Basement 1 #### NSC Additional Voice/Data Points at Level 48 as per
#REF!
ur
#REF!
002R1
JV
0.00 #REF!
16 9
DMCC Offices - Core Toilets Level 49 & 50 (Revision of Ironmongeries)
#REF!
NSC COST (AED)
REMARKS / COMMENTS
LETTER REFERENCE
16
JV
OUTSTANDING CLAIMS
NSC COST (AED)
001R2
JV
ER / F&G / JV AGREED VALUES JV COST (AED)
16 9
001
Revisions to the ID Works Package “For Construction” Drawings at the Ground Floor and First Floor (GL-19 & GL-07) JV Revisions to the ID Works Package “For Construction” Drawings at the Ground Floor and First Floor Structural Su orts to GL-07 NSC Revisions to the ID Works Package “For Construction” Drawings at the Ground Floor for the termination of GL-07 and other adjacent Finishing Materials (CVI No. 093) JV Potential Claim due to Late Design Changes Stainless Steel Door Frames L49-L64 Inclusive JV Additional Ironmongeries to Timber Door (DT-02) at Levels 49 upwards
JV COST (AED)
18,364.91
#REF!
S/C costs + 12% OH&P + 3% Attendances; to be valued at ERI 16 as per F&g letter ref. JAP016/TS/GT/0254 dtd 29May08 EVS to submit entitlements; EVS cost + 12% OH&P + 3% Attendances
ur
Bond Interiors to submit entitlements
to be evaluated under ERI No. 16 as per letter ref. JAP016/ALM/TCAC/17030 dtd 8-Apr-08 under review (haroon & alpha star); to be evaluated under ERI No. 16 as per letter ref. JAP016/ALM/TCAC/17030 dtd 8-Apr-08; no changes made in the Ironmongeries as there was no formal instruction scope shall be removal, supply and installation of ironmongeries; valued in ERI No. 16 as per Nakheel letter ref. JAP016/TS/GT/0318 dtd 20Aug08 ETA to submit entitlements
Bond Interiors to submit entitlements BI to submit entitlements; Revised design for feature ceiling as per the Nakheel letter ref. JAP016/TS/GT/0265 dtd 1Jun08; BI cost + 12% OH&P + 3% Attendances Revised design for feature ceiling as per the Nakheel letter ref. JAP016/TS/GT/0265 dtd 1Jun08; Electrical Works by ETA; ETA cost+ 12% OH&P + 3% Attend Revised design for feature ceiling as per the Nakheel letter ref. JAP016/TS/GT/0265 dtd 1Jun08; Supply only of light fittings from Lever
under ID Works
18,364.91
BC Cost + 7% OH&P; BC VO#6; BC time claim = 165
VARIATION CLAIMS STATUS TO-DATE October 15, 2013 NOC NO.
SUB NO.
ERI NO.
V.O. TO
33
005
21
JV
33
006
21
JV
33
007
21
JV
CLAIM ENTITLEMENT APPLICATION DESCRIPTION
JV COST (AED)
NSC COST (AED)
ER / F&G / JV AGREED VALUES JV COST (AED)
NSC COST (AED)
OUTSTANDING CLAIMS LETTER REFERENCE
JV COST (AED)
NSC COST (AED)
REMARKS / COMMENTS
Additional Architectural Works to the Service Floor Areas (1-3) Missing Spanmark as PB434 (RFI No. 029)
153,565.57
123,805.08
JAP016/ALM/TCAC/17247 dated 16-Apr-08
CLOSED
agreed with Consultant (F&G)
3,223.52
(1,351.84)
CLOSED
agreed with Consultant (F&G)
Additional Reinforcement due to the Missing Details (RFI No. 042) First Floor Slab Details (RFI No. 072)
1,894.77
#REF!
JAP016/GEN/ABS/1011 dtd 19Jun06; JAP016/ALM/TCAC/18884 dtd 12Jun-08 JAP016/GEN/ABS/1011 dated 19Jun-06
1,894.77
awaiting response from Client.
JAP016/ALM/TCAC/20933 dated 14-Se -07 JAP016/ALM/TCAC/09528 dated 12-Jun-07
CLOSED
agreed with Consultant (F&G)
CLOSED
agreed with Consultant (F&G)
JAP016/ALM/TCAC/09528 dated 12-Jun-07 JAP016/ALM/TCAC/14300 dated 12-Dec-06 JAP016/ALM/TCAC/14300 dated 12-Dec-06
CLOSED
agreed with Consultant (F&G)
CLOSED
agreed with Consultant (F&G)
CLOSED
agreed with Consultant (F&G)
JAP016/ALM/TCAC/17248 16-Apr-08 JAP016/ALM/TCAC/14300 12-Dec-06 JAP016/ALM/TCAC/18352 26-Ma -08 JAP016/ALM/TCAC/18118 18-May-08
dated
CLOSED
agreed with Consultant (F&G)
dated
CLOSED
agreed with Consultant (F&G)
dated
CLOSED
agreed with Consultant (F&G)
dated
41,554.32
rejected F&G assessment in their letter JAP016/ALM/TCAC/18118 dated 18-May-08 thru our letter ref.DXB/…./EDM/4262 dtd 22May08;F&G assessment under review by JV
33
008
21
JV
33
009
21
JV
33
010
21
JV
Second Basement Floor Beam - PB205A (RFI No. 075) Fourth Basement Beam - PB451A (RFI No. 078)
425.15
344.60
33
011
21
JV
Fourth Basement Beam - PB434 (RFI No. 144)
1,150.44
1,063.46
33
012
21
JV
13,820.28
12,180.62
657.99
530.47
427.04
343.82
33
013
21
JV
Tower Structural Drawings - Additional TB29 Beam (RFI No. 146) Door Opening Height - First Floor (RFI No. 157)
499.04
0.00
33
014
21
JV
Basement 2 Beams (RFI No. 162)
3,461.71
548.61
33
015
21
JV
Lift F4 - Structural Details (RFI No. 171)
1,556.34
1,233.74
33
016
21
JV
Reinforced Concrete Partition Wall @ the Basement 2 (RFI No. 182)
41,554.32
#REF!
33
017
21
JV
4,353.86
3,510.09
JAP016/ALM/TCAC/09528 dated 12-Jun-07
CLOSED
agreed with Consultant (F&G)
33
018
21
JV
693.97
337.29
JAP016/ALM/TCAC/09528 dated 12-Jun-07
CLOSED
agreed with Consultant (F&G)
33
019
21
JV
Increase in Beam Depths at First Floor - Section N1 RFI No. 192 Increase in Beam Depths to PB149 and PB150A (RFI No. 223) Additional Outrigger Walls at Service Floor Areas Structural Works
956,279.08
642,006.51
JAP016/ALM/TCAC/20290 dated 13-August-08
CLOSED
revised cost impact submitted under ref. DXB/AMT01/0500/Jly/1080 dated 9-Nov-06 based on the approved Methodology; agreed with Consultant (F&G)
33
020
21
JV
40,503.44
171.19
JAP016/ALM/TCAC/181187 dated 18-May-08
CLOSED
agreed with Consultant (F&G)
33
021
21
JV
Additional Mass Concrete at 2nd Level, and Revisions to the Stairs leading to the Vault at 2nd Level Additional Column Posts at 50th to 51st Level and Additional Core Walls, i.e., 400mm and 500mm thick
43,839.53
33,011.38
JAP016/ALM/TCAC/20933 dated 14-Sep-07
CLOSED
agreed with Consultant (F&G)
33
022
21
JV
Additional Lifting Beams to the 64th Level Machine Rooms (@Level 288.650m and 285.350m)
5,525.90
4,252.50
JAP016/ALM/TCAC/18884 dated 12-Jun-08
CLOSED
agreed with Consultant (F&G)
33
023
21
JV
Changes to Slab Steel Reinforcement to S11 to S12
36,827.93
35,529.29
JAP016/ALM/TCAC/08133 dated 09-Apr-07
CLOSED
agreed with Consultant (F&G)
33
024
21
JV
25,336.02
26,354.14
JAP016/ALM/TCAC/17248 dated 16-Apr-08
CLOSED
agreed with Consultant (F&G)
33
025
21
JV
7,878.22
7,878.22
JAP016/ALM/TCAC/08287 ated 16-Apr-07
CLOSED
agreed with Consultant (F&G)
33
026
21
JV
Additional Steel Reinforcement to Beams Located Around Tower Building and Connected to Precast Slab Additional rebars to basement retaining wall @ staircase and changes of rebar to wall Changes in Shear Wall in Zone 4 Associated in Lift and Vault Wall Additional Rebar in First Basement Slab
17,649.58
14,661.14
JAP016/ALM/TCAC/08713 ated 7May-07
CLOSED
agreed with Consultant (F&G)
97,675.24
JAP016/ALM/TCAC/20933 dated 14-Sep-07
CLOSED
agreed with Consultant (F&G)
CLOSED
agreed with Consultant (F&G)
CLOSED
agreed with Consultant (F&G)
33
027R1
21
JV
101,960.65
33
028R1
21
JV
Additional Top Steel Reinforcement in Ground Floor Slab
140,340.33
137,782.64
JAP016/ALM/TCAC/10244 ated 9Jul-07
33
029R1
21
JV
Additional Bottom Steel Reinforcement in Ground Floor Slab
316,516.91
317,721.58
JAP016/ALM/TCAC/10549 ated 23-Jul-07
33
030
21
JV
Additional Building Maintenance Units at Diamond Exchange Centre Revisions to Contract Drawings in First Floor Levels
1,175,875.00
#REF!
33
031R1
21
JV
33
032
21
JV
33
033
21
JV
50
001
21
JV
Revisions to Structural Contract Drawings in Second Floor Changes in Beam Steel Reinforcement at 29th to 34th Level Various Requirements under the F&G Transmittal Ref. F+G/ALMAS/TAISEI/ 01463 dated 12th
#REF!
#REF!
1,175,875.00
under review
56,950.59
50,995.22
JAP016/ALM/TCAC/11392 ated 20-Aug-07
130,015.64
55,259.32
JAP016/ALM/TCAC/14299 ated 12-Dec-07
CLOSED
agreed with Consultant (F&G)
9,356.12
7,928.10
JAP016/ALM/TCAC/10848 ated 1 Aug-07
CLOSED
agreed with Consultant (F&G)
#REF!
#REF!
28,025.73
JV to submit entitlements; note that the DVR's is valued in Claim No. 77; items to be valued under this Claim is
28,025.73
#REF!
CLOSED
agreed with Consultant (F&G)
VARIATION CLAIMS STATUS TO-DATE October 15, 2013 CLAIM ENTITLEMENT APPLICATION
NOC NO.
SUB NO.
ERI NO.
V.O. TO
65
001
31
58
001
####
NSC Revision of Office Partitions - Mechanical & Fire Policy Drawings NSC Revised MEP Drawings
DESCRIPTION
SUB-TOTAL
JV COST (AED)
NSC COST (AED) ur
ER / F&G / JV AGREED VALUES JV COST (AED) #REF!
OUTSTANDING CLAIMS
NSC COST (AED) #REF!
LETTER REFERENCE
#REF!
JV COST (AED)
#REF!
NSC COST (AED) ur CLOSED
REMARKS / COMMENTS
ETA to submit entitlements
valued in Claim No. 65-001
valued in 65-001
#REF!
#REF!
0.00
0.00
#REF!
#REF!
0.00
43,688.96
0.00
39,083.00
(valued in 76-001)
#REF!
#REF!
#REF!
CLOSED
1,402,455.42
#REF!
#REF!
#REF!
1,402,455.42
1,402,455.42
#REF!
#REF!
(valued in 107-003 & 175001
#REF!
#REF!
#REF!
#REF!
#REF!
CLOSED
supeseded by claim no. 107
0.00
0.00
ERI NO. 32 68
001
32
NSC Trip to Italy for Stone Quarry Inspection
SUB-TOTAL
43,688.96
39,083.00
JAP016/ALM/TCAC/16129 dated 5-Mar-08
CLOSED
0.00
BI costs AED 36,526.17 + 7% JV OH&P
0.00
ERI NO. 34 71
001
####
76
001
34
NSC MEP Works - Revised Ground Floor Landscape Drawings NSC Rainwater and Irrigation Waste Water Discharge from Planters
SUB-TOTAL
0.00
0.00
Included in 76-001
ETA costs + 7% JV OH&P; uilders works not yet included to be submitted under 76-002
1,402,455.42
ERI NO. 35 / 35.2 / 35.1 / 35.3 / 35.4 / 35.5 23
002
####
NSC DTS referenced AM/015/515 dated 5th August 2006 (MEP Works) JV Possible Addition of Ballroom
52
001
35.1
78
001R1
35
JV
78
002
35
JV
78
003
35
JV
78
004
35
JV
78
005
35.5
JV
85
001
35.1
99
001
35.1
10 0 10 6 10 7
10 7 10 7
10 7 10 7 10 7 10 7 10 7 10 7
10 7
Modifications to Function Room / Ball Room Facility (Structural Works) Modifications to Function Room / Ball Room Facility Fire roofin Works Function Room / Ball Room Facility Parapet (Structural Works)
included in Claim Nos. 107-003 & 175-001
(valued in Claims No. 78 & 107 2,183,160.00
2,087,955.12
JAP016/ALM/TCAC/18101 dated 18-May-08
CLOSED
EVS Cost + 12% OH&P but less works deemed included in the NSC
196,416.80
191,292.64
JAP016/ALM/TCAC/22536 dated 23-Nov-08
CLOSED
Thermofire Cost AED 170,797.22 + 12% OH&P; confirmed to be valued in ERI 35 under the Nakheel letter ref. JAP016/TS/GT/0244 dtd 27May08
204,700.00
#REF!
#REF!
#REF!
204,700.00 12,416.32 144,684.43
EVS Cost + 12% OH&P + 3% att endances
12,416.32
#REF!
#REF!
#REF!
144,684.43
#REF!
#REF!
#REF!
(valued in 107-003)
#REF!
#REF!
#REF!
CLOSED
(valued in 107-003)
#REF!
#REF!
#REF!
CLOSED
ETA to submit entitlements
#REF! (valued in 107-001)
#REF!
#REF!
ur
ETA to submit entitlements
#REF!
#REF!
NSC Function Room / Ball Room Domestic Water Drawings NSC Mechanical Works for the Function Room / Ballroom
NSC Security Works for the Function Room / Ballroom JV Revised Interior Lighting Fixtures Layout at Ballroom GF, Washroom GF, and Ballroom 2L 35.1/ NSC Ballroom / Function Room (ID Works to the Walls 001 35.2/ facing the Retail Mall) 35.4 002R2 35.1/ JV Ballroom / Function Room (Concrete and Masonry 35.2 Works 35.1/ NSC Ballroom/Function Room (MEP Works) 003 35.2/ 35.4 004a 35.1/ JV Ballroom/Function Room (CW Roofing, Curtain Wall 35.2 Claddin Aluminum Panel Bulkheads Work 004b 35.5 NSC Ballroom/Function Room (Roof Parapet Works - CVI No. 084) 004c 35.5 JV Ballroom/Function Room (Roof Parapet Works GI Cladding - CVI No. 084) 35 005 JV Ballroom/Function Room (Provision of Scaffolds and Access) #### JV Provision of Downspouts at Ballroom/Function 006 Room Roof (CVI No. 122) 35.1/ NSC Ballroom/Function Room (External Stoneworks) 007 35.2/ 35.4 35.4 008 JV Ballroom/Function Room (Additional Plaster Works 001 001
35.1 35.1
Function Room / Ball Room Facility (Structural Works Function Room / Ball Room Facility (Fireproofing Works)
#REF!
CLOSED
ur (valued in 107-001) ur
785,658.59
JAP016/ALM/TCAC/10523 dated 22-July-2007
ur 26,312.00
Bond Interiors to submit entitlements
Subcontractor : JV Internal
CLOSED
JAP016/ALM/TCAC/21289 dated 5-Oct-08
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
26,312.00 CLOSED
Scaffolding to be used by the Nominated Subcontractors; Fit-Out Contractor to work on the MEP Scope
2,210.46
varied works at structural steel works and provision of Roof Drain
0.00
#REF!
#REF!
#REF!
2,210.46
#REF!
#REF!
#REF!
310,797.76
JAP016/ALM/TCAC/22293 dated 13-Nov-08
#REF!
#REF!
357,161.60
2,710.59
ur
3,318,315.35
3,318,315.35
284,794.05
EVS Cost + 12% OH&P + 3% att endances and Scaffolding supplied by JV; to be valued under ERI35.5 as per Nakheel letter ref. JAP016/TS/GT/0255 dtd 29Ma 08 Valued in 107-003
TO BE VALUED IN CLAIM NO. 107-001 (ERI 35.1)
CLOSED
#REF!
JAP016/ALM/TCAC/19604 dated 14-July-2008
728,934.60
Thermofire Cost + 12% OH&P + 3% attendances
#REF!
CLOSED
Al Abbar cost + 12% + 3% attendances
284,794.05 ur
CLOSED
2,710.59
Subcontractor : ETA; under review by ETA due to the revised scope of works; confirmed by ETA
Subcontractor : Al Abbar; shall be valued under ERI 35.5 as per Nakheel Letter JAP016/TS/GT/0255 dtd 29-May08 additional GI sheets cover to parapet for the preparation of EPDM by AL Abbar
Al Bayader cost + 12% OH&P
Plaster works only based on BOQ rates
VARIATION CLAIMS STATUS TO-DATE October 15, 2013 NOC NO.
SUB NO.
ERI NO.
V.O. TO
84
001
46
10 2
001
46
CLAIM ENTITLEMENT APPLICATION DESCRIPTION
ER / F&G / JV AGREED VALUES
OUTSTANDING CLAIMS
JV COST (AED)
NSC COST (AED)
LETTER REFERENCE
NSC Revision to the Lighting Layout at GF, L1, & L2
ur
#REF!
#REF!
#REF!
ur
ETA to submit entitlements; Note this pertains to the electrical works, fixtures to be Claim No. 105; to be valued under ERI16 ref. JAP016/ALM/TCAC/09512 dtd 12Jun07
NSC Lighting Requirements to the Function Room / Ballroom
ur
#REF!
#REF!
#REF!
ur
ETA to submit entitlements; Note this pertains to the electrical works, fixtures to be Claim No.107
0.00
#REF!
#REF!
0.00
JV COST (AED)
0.00
NSC COST (AED)
REMARKS / COMMENTS
NSC COST (AED)
SUB-TOTAL
JV COST (AED)
0.00
ERI NO. 47 10 4
001
47
JV
Additional 40’ Container Storage, Office Chairs, and Computer for F+G Office
SUB-TOTAL
40,174.50
40,174.50
JAP016/ALM/TCAC/11909 dated 9-Sept-2007
40,074.53
0.00
40,074.53
0.00
actual cost transmitted to F&G based on dayworks rates; agreed with F&G
CLOSED
0.00
0.00
ERI NO. 48 82
001
48
NSC Telephone IDF/MDF Room Drawings
SUB-TOTAL
34,309.10
0.00
34,309.10
13,517.00
JAP016/ALM/TCAC/21322 dated 5-Oct-08
0.00
13,517.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF! #REF!
#REF! #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
CLOSED
0.00
ETA cost + 7% OH&P
0.00
ERI NO. 49 / 49.2 / 49.3 / 49.4 / 49.5 89
001
49
92
001
49.2
15 3 15 7
001 001
#### ####
16 3
006a
49.3
16 3
006b
49.3
16 3
009
49.4
18 6
001R1
49
20 8
001
49.5
OM-9
001
49
Modification to the Structural Drawings at Levels 49, 50, and 51 NSC Various Revisions due to the revised For Construction Drawings (MEP Works) at Levels 49, 50, & 51 JV Provision of Toilets at Levels 53 to 63 JV Request for Issue of Outstanding Drawings (DMCC Offices at L49-L51 & Add'l Toilets in Office Area at L52-L64 NSC Fire Fighting Systems at Levels 49, 50, & 51 Abortive Work JV Fire Fighting Systems at Levels 49, 50, & 51 Builders Work and Abortive Work NSC Revised "For Construction" Security Drawings at Levels 49, 50, & 51 under the DMCC Transmittal Ref. JAP016/TRNS /JV/00044 dated 5th May 2008 Securit Works JV Notification of Entittlements (CVI-089) - Doors to new washrooms at L49 and L50 (Lift Lobby Area) JV
NSC Modification of Raised Floor H eights at Server Rooms at Level 49, 50, & 51 JV Modification to the Structural Drawings at Levels 49, 50, and 51
SUB-TOTAL
(valued in OM9-001) 218,960.00
valued in 163 (valued in 163)
ur 1,903.78 ur
58,651.66
17,250.00 (85,688.89)
(25,133.45)
#REF!
#REF!
#REF!
236,210.00
#REF!
#REF!
597,081.20
#REF!
#REF!
597,081.20
#REF!
#REF!
valued under the omissions
CLOSED 218,960.00
valued in another claim
CLOSED CLOSED
valued in another claim
ur
ETA to submit entitlements
builders works
1,903.78 ur
JCI to submit entitlements
under review; to be under ERI #49 as per Nakheel letter ref. JAP016/TS/GT/0205 dated 15-Apr-08; SC cost +12%OH&P + 3% Attendances
58,651.66
17,250.00 (85,688.89)
(25,133.45)
ETA cost + 12% OH&P + 3% Attendances
MDS cost + 12% OH&P + 3% Attendances; valued at ERI No. 49.5 as per Nakheel letter ref. JAP016/TS/GT/0271 dtd 9Jun08 Omission of Office Partitions at Level 49
236,210.00
ERI NO. 50 10 9
001
50
NSC Amendment to District Cooling Piping and Control Works Heat Echan ers and Strainers
SUB-TOTAL
0.00
#REF!
597,081.20
0.00
ETA to submit entitlements
597,081.20
ERI NO. 51 94
001R2
51
JV
Changes to Suspended Ceiling (ID Works Package)
SUB-TOTAL
85,383.20
85,383.20
JAP016/ALM/TCAC/21731 dated 21-Oct-08
85,383.20
0.00
85,383.20
0.00
subcon costs plus 12% (revised cost from 182,960.40 due to the meeting between FBI and DMCC)
CLOSED
0.00
0.00
ERI NO. 52 95 95
001 002
52 52
NSC Variation Works due to Lift and Escalator Finishes Direct Variation to the Nominated S/C Works NSC Variation Works due to Lift and Escalator Finishes (Adjustment to the Provisional Sums)
653,624.24 544,678.47
653,624.24
JAP016/ALM/TCAC/17360 dated 20-Apr-08
CLOSED
KONE costs + 7% JV OH&P
544,678.47
JAP016/TS/GT/0083 dated 9-Aug2007
CLOSED
KONE costs + 7% JV OH&P; NOTE : Not considered as a variation by Consultant but adjsutment to the KONE Provisional Sums from AED500K to 1,009,045.30, and agreed amount s the nett costs.
VARIATION CLAIMS STATUS TO-DATE October 15, 2013 CLAIM ENTITLEMENT APPLICATION
NOC NO.
SUB NO.
ERI NO.
V.O. TO
14 9
003b
62.3
14 9
004
62.2
NSC Revisions to Diamond Exchange Centre (CCTV and Access Control) NSC Revisions to Diamond Exchange Centre (Fire Policy Layout) NSC Modification Works due to the Tenant Requirements at the Diamond Exchange Centre (Bond Communication Scope - Additional Voice/Data Points at Level 2 NSC Modification Works due to the Tenant Requirements at the Diamond Exchange Centre (ETA scope of works) JV Modification Works due to the Tenant Requirements at the Diamond Exchange Centre (JV scope of works NSC Vertical Cable Manager for Diamond Exchange AV System at the Multi Purpose Room in accordance with the F&G letter ref. JAP016/ALM/TCAC/20991 dated 16-Se -08 JV Cuttings in Corridor Ceiling at Level 2 as required by Bond Communication
DESCRIPTION
14 9
005a
####
14 9
005b
####
14 9
005c
####
14 9
006
####
14 9
007
62
14 9
008
####
14 9
009
####
14 9
010
62
14 9
011
####
16 5
001
####
JV
Notification of Disruption of Work due to discrepancy of Design Drawings at Second Floor
17 7
001
####
JV
Diamond Exchange Details
21 4
001
62 / 16
JV
Design Changes due to the Omission of Operable Partition at Level 2 Offices (ERI No. 62) and Stainless Steel Rubbish Bins (ERI No. 16)
Break Glass Pedestals at the Diamond Exchange Centre in accordance with the F&G transmittal ref. F+G/ALMAS/TAISEI/01961 NSC Revisions to the Electrical Works at the Diamond Exchange Centre and Level 2 as per the F&G transmittal ref. F+G/ALMAS/TAISEI/01574 and DMCC transmittal ref. JAP016/TRNS/JV/00048 JV
JV COST (AED)
OUTSTANDING CLAIMS JV COST (AED)
NSC COST (AED)
REMARKS / COMMENTS
JV COST (AED)
NSC COST (AED)
LETTER REFERENCE
ur
#REF!
#REF!
#REF!
ur
JCI to submit entitlements; based on transmittal …./00043 dtd 4May08 (drwg. No. 4494/Y/009 Rev.4)
ur
#REF!
#REF!
#REF!
ur
ETA to submit entitlements
24,628.70
ur
24,628.70
#REF!
#REF!
#REF!
ur
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
#REF!
#REF!
CLOSED
FBI shall submit entitlements as per the F&G letter ref. JAP016/ALM/TCAC/21815 dtd 26-Oct-08; BACKCHARGE TO BOND COMMUNICATION DUE NON-COORDINATION
9,200.00
#REF!
#REF!
#REF!
9,200.00
Dubai Metals cost + 12% OH&P + 3% Attand
222,906.80
#REF!
#REF!
#REF!
222,906.80
ur
#REF!
#REF!
#REF!
ur
44,538.44
#REF!
#REF!
#REF!
44,538.44
(valued in 149-001)
#REF!
#REF!
#REF!
CLOSED
time claim.
(valued in 149-001)
#REF!
#REF!
#REF!
CLOSED
valued in 149-001 under ERI No. 62
(valued in 41-001 & 149001)
#REF!
#REF!
#REF!
CLOSED
considered in 41-001 and 149-001
3,601,000.31
#REF!
#REF!
394,252.82
#REF!
#REF!
394,252.82
#REF!
#REF!
56,553.22
#REF!
#REF!
56,553.22
#REF!
#REF!
(valued in 149-001)
11,996.83
NSC Additional Counter at the Security Room level 2 as per the M/s. Nakheel letter ref. JAP016/TS/BW/0366 dated 16-Nov-08 NSC Changes to the Diamond Exchange Centre as per the instructions given via M/s. DMCC letter referenced JAP016/GEN/BW/0177 dated 20-Oct-08
SUB-TOTAL
ER / F&G / JV AGREED VALUES
NSC COST (AED)
6,584,157.21
ETA to submit entitlements
considered in 149-001 (ERI No. 62)
CLOSED
11,996.83
#REF!
BC cost + 7% OH&P; BC VO#10; BC time claim = 147 days
BC cost + 7% OH&P; BC VO#14; BC time claim = 119 days
ETA cost + 12% OH&P + 3% Attendances
BI to submit entitlements
BC cost + 7%; BC VO#17; BC time claim = 91 days
3,601,000.31
ERI NO. 63 13 7
001
63
NSC Emergency Cables to the Tenant's DB
SUB-TOTAL
0.00
#REF!
394,252.82
0.00
ETA costs + 7% JV OH&P; confirmed to be ERI No. 63 as per F&G letter ref. JAP016/ALM/TCAC/18721 dtd 8Jun08
394,252.82
ERI NO. 64 12 6
001
64
NSC Modification of Male Washroom at 36th Floor - R FI 767 (Rev. 0,1&2)
SUB-TOTAL
0.00
#REF!
56,553.22
0.00
ETA part = AED 50,475.00
56,553.22
ERI NO. 65 11 0
001R1
65
NSC Furniture / Console at Basement 2 Security Room
SUB-TOTAL ERI NO. 66 / 66.1
29,808.00
0.00
29,808.00
29,030.40
0.00
29,030.40
JAP016/ALM/TCAC/21105 dated 22-Sep-08
CLOSED
0.00
0.00
BF claim AED 25,920 + 12% OH&P
VARIATION CLAIMS STATUS TO-DATE October 15, 2013 NOC NO.
SUB NO.
ERI NO.
V.O. TO
12 3
001R2
73
JV
16 6
001
73
JV
16 6
002
73
JV
CLAIM ENTITLEMENT APPLICATION DESCRIPTION
JV COST (AED)
NSC COST (AED)
ER / F&G / JV AGREED VALUES
OUTSTANDING CLAIMS
JV COST (AED)
NSC COST (AED)
LETTER REFERENCE
JV COST (AED)
NSC COST (AED)
REMARKS / COMMENTS
ERI NO. 73 Potential Delay due to Late Issuance of Revised Design Information in Sky Lobby Meeting Room at Level 48 ID Works Package - Lighting Requirements at Level 48 Meeting Room (MEP Works Scope)
12,637.06
#REF!
#REF!
#REF!
12,637.06
confirmed to be valued under ERI No. 73 according to the Nakheel letter ref. JAP16/TS/GT/0267 dtd 8Jun08
11,783.12
#REF!
#REF!
#REF!
11,783.12
ETA cost + 12%OH&P + 3% Attendances; confirmed to be valued in ERI No. 73 according to Nakheel letter ref. JAP16/TS/GT/0267 dtd 8Jun08
ID Works Package - Lighting Requirements at L48 Meeting Room (JV Scope - Lever to Supply)
2,254.00
#REF!
#REF!
#REF!
2,254.00
JV to submit entitlements; confirmed to be valued in ERI No. 73 according to Nakheel letter ref. JAP16/TS/GT/0267 dtd 8Jun08; Lever cost + 12% OH&P + 3% Attendance
#REF!
#REF!
SUB-TOTAL
26,674.18
0.00
26,674.18
0.00
ERI NO. 74 / 74.1 JAP016/ALM/TCAC/22447 dated 19-Nov-08
CLOSED
Masonry Works, Abortive Works and Coring Works
#REF!
#REF!
57,459.68
Doors and Frames incl Ironmongery, and Ceiling Works
#REF!
#REF!
#REF!
ur
50,319.40
#REF!
#REF!
#REF!
50,319.40
ETA to submit entitlements
73,986.40
#REF!
#REF!
#REF!
73,986.40
ETA cost + 12% OH&P + 3% Attendances
26,919.09
#REF!
#REF!
#REF!
26,919.09
BC Cost + 7% OH&P; BC VO#9; BC time claim = 186 days
75,687.99
151,224.89
#REF!
#REF!
ur
#REF!
#REF!
0.00
0.00
#REF!
#REF!
#REF!
#REF!
19 7
001a
74.1
JV
Provision of Pantry Area in Ground and First Floor as per revised " For Construction" Drawings under DMCC transmittal JAP016/TRNS/JV/00040 (JV Scope - masonry works, abortive works and coring works)
18,228.31
14,232.82
19 7
001b
74.1
JV
57,459.68
#REF!
19 7
002
74.1
NSC
ur
19 7
003
74.1
NSC
20 2
001
74
NSC
23 8
001
74.1
NSC
Provision of Pantry Area in Ground and First Floor as per revised " For Construction" Drawings under DMCC transmittal JAP016/TRNS/JV/00040 (JV Scope - ID works) Provision of Pantry Area in Ground and First Floor as per revised " For Construction" Drawings under DMCC transmittal JAP016/TRNS/JV/00040 (ID Scope of Works Provision of Pantry Area in Ground and First Floor as per revised " For Construction" Drawings under DMCC transmittal JAP016/TRNS/JV/00040 (MEP Works) Revised Domestic Water Layout at Ground and First Floor due to the Revised "For Construction" Drawings under the DMCC Transmittal JAP016/TRNS/JV/00042 Revised " For Construction" drawings under the DMCC transmittal ref. JAP016/TRNS/JV/00040 dated 16-Apr-08 (Additional Voice/Data Points in GF & 1L)
SUB-TOTAL
57,459.68
151,224.89
0.00
0.00
Bond Interiors to submit entitlements
ERI NO. 75 20 1
001
75
NSC ID Tiling Works-Attic Stock (ERI No. 75)
SUB-TOTAL
#REF!
ur
BI to submit entitlements
ERI NO. 76 / 76.1 15 8
001R1
76
20 5
001
76.1
20 5
002
76.1
JV
Doors at DEWA Water Meter Rooms
21,502.11
NSC DEWA Water Meter Connection (MEP Works) JV
DEWA Water Meter Connection (Builders Work)
SUB-TOTAL
10,637.50 5,263.09
26,765.20
7,908.70 3,941.91
#REF!
JAP016/TS/GT/20686 dated 28 Au -08 JAP016/TS/GT/20686 dated 28 Aug-08
10,637.50
#REF!
#REF!
150,193.45
#REF!
#REF!
150,193.45
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
JV Costs
21,502.11 CLOSED
21,502.11
ETA cost + 7% OH&P JV works clsoing of opening and provision of new opening with waterproofing and sealing works
CLOSED
0.00
ERI NO. 77 20 7
001
77
NSC Tower Secondary Roof Clamping Section
SUB-TOTAL
0.00
#REF!
150,193.45
0.00
Al Abbar cost + 12% OH&P + 3% Attendances
150,193.45
ERI NO. 78 17 6
001
####
17 6
002
####
TECOM/DU Comments on Telephone Rooms Raised Access Floor Material Submittal NSC DU Requirements JV
(valued in 196) (valued in 196)
Lateral Systems to submit (Builders to be in another submittal)
CLOSED CLOSED
ETA to submit entitlements (Builders to be in another
VARIATION CLAIMS STATUS TO-DATE October 15, 2013 CLAIM ENTITLEMENT APPLICATION
NOC NO.
SUB NO.
ERI NO.
V.O. TO
23 3
001
83
NSC Revisions to Landscaping Package in accordance with the M/s. Nakheel letter r ef. JAP016/TS/BW/0347 dated 21-Sep-08
DESCRIPTION
JV COST (AED)
ER / F&G / JV AGREED VALUES
OUTSTANDING CLAIMS
NSC COST (AED)
JV COST (AED)
NSC COST (AED)
LETTER REFERENCE
66,615.70
#REF!
#REF!
#REF!
66,615.70
#REF!
#REF!
JV COST (AED)
REMARKS / COMMENTS
NSC COST (AED)
ERI NO. 83
SUB-TOTAL
0.00
66,615.70
0.00
Al Bayader cost + 12% OH&P + 3% Attendances
66,615.70
OUTSTANDING CLAIMS WITHOUT ERI 1
001
####
JV
Design Modification of Pile Caps
611,739.00
#REF!
#REF!
#REF!
611,739.00
progressed under a separate claim.
2
001
####
JV
Excavation to the difference in the Tender Drawings and the Actual Site Conditions
259,943.16
#REF!
#REF!
#REF!
259,943.16
progressed under a separate claim.
3
001
####
JV
Pile Head Levels and Associated Problem
258,088.62
#REF!
#REF!
#REF!
258,088.62
progressed under a separate claim.
35
002a
####
#REF!
#REF!
#REF!
35
002b
####
#REF!
#REF!
#REF!
522,748.23
42
001
####
44
001
####
47
001
####
NSC Additional OCP's conduits to the Offices and Retail Units (MEP Works) JV Additional OCP's conduits to the Offices and Retail Unts Builders Work NSC Fire Sprinkler Riser Pipes in Garbage Chute Shaft
38,246.08 120,370.11
#REF!
#REF!
ur
#REF!
#REF!
#REF!
ur
ETA to submit entitlements; revisions is due to the requirement of a UL/FM specifications
ur
#REF!
#REF!
#REF!
ur
ETA to submit entitlements
#REF!
#REF!
001
####
63
001
####
36
001
####
NSC Fire Alarm Shop Drawing
ur
83
001
####
NSC RFI No. 571 - Insulation and Backing Panels to Cladding NSC Secondary Roof for the Towers
ur
001
####
001
####
11 3
002
####
11 3
003
####
11 8
001
####
12 5
001
####
13 0
001
####
13 3
001
####
14 8
001
####
15 1 15 4
001 001
#### ####
15 5
001
####
NSC Plenum Box and Louvre for Vent Pipe of Garbage Chute and Stack Vent at 64th Level - RFI No. 462 ETA Sco e NSC Plenum Box and Louvre for Vent Pipe of Garbage Chute and Stack Vent at 64th Level - RFI No. 462 (Al Abbar Scope) JV Plenum Box and Louvre for Vent Pipe of Garbage Chute and Stack Vent at 64th Level - RFI No. 462 (JV Sco e NSC Revised Mechanical and Electrical Drawings at Basement 2 Securit Room NSC Level 2 Fire Policy Layouts (Tr ansmittal Ref. JAP016/TRNS/JV/00014) NSC Drainage on Swimming Pool Deck at Level 1 (RFI No. 831) NSC Further Revisions to “For Construction” Drawings under transmittals ref. JAP016/TRNS/JV/00015 and 00016 NSC Power Supply and Fire Alarm Interface to Smoke Ventilation Window (RFI No. 783) NSC Containment (Security Services) JV Enclosure to the Irrigation Pipes running through the LV Room 2 (RFI No. 894) NSC Second Floor Revised Lighting and Power Design
JV Cost
120,370.11
522,748.23
62
98
ETA Cost + 7% JV OH&P; as per original claim
#REF!
NSC Revised Specifications for the Fire Fighting Equipments NSC Revised Architectural Drawings at 31st & 32nd Floor (MEP Works) JV Changes to Raised Access Floors at Tecom Rooms, Security Rooms, and Telephone Rooms NSC Installation of OCP's to Tenant Rooms
11 3
38,246.08
12,494.21
#REF! (valued in 35-001)
#REF!
#REF! #REF!
#REF!
#REF!
#REF!
#REF!
Revision 1 - revised due to the changes in the works.
12,494.21 CLOSED
JAP016/TS/BW/0021 dated 12Nov-06
based on the response from RFI No. 417
not applicable
ur
ETA to submit entitlements; rejected by Nakheel due to the Consultant's(Atkins)response ref. RD/4532/661/ML/R8-0344.
ur
AA to submit entitlements
(valued in 220-001)
#REF!
#REF!
#REF!
CLOSED
to be valued in Claim N o. 220-001
91,147.85
#REF!
#REF!
#REF!
91,147.85
ETA costs + 12% OH&P + 3% Attendances
11,909.40
#REF!
#REF!
#REF!
11,909.40
Al Abbar cost + 12% OH&P + 3% Att endances
#REF!
#REF!
#REF!
ur
#REF!
#REF!
#REF!
ur
ETA to submit entitlements
ur
#REF!
#REF!
#REF!
ur
ETA to submit entitlements
ur
ETA to submit entitlements
(valued in 113-001)
Included in Claim No. 113-001
CLOSED
ur
#REF!
#REF!
#REF!
ur
#REF!
#REF!
#REF!
ur
ETA & JV to submit entitlements
ur
#REF!
#REF!
#REF!
ur
ETA to submit entitlements
ur
#REF! #REF!
#REF! #REF!
#REF!
ur
ETA to submit entitlements
#REF!
#REF!
ur
ETA to submit entitlements
ur
EVS to submit entitlements
ur
ETA to submit entitlements (Builders to be in another
1,600.56 ur
#REF!
#REF!
17 1
001
####
NSC Sequencing of Spire Erection
ur
#REF!
#REF!
#REF!
17 5
001
####
NSC Revised "For Construction" Drawings under the
ur
#REF!
#REF!
#REF!
#REF!
1,600.56
VARIATION CLAIMS STATUS TO-DATE October 15, 2013 NOC NO.
SUB NO.
22 6
002
22 9
001
23 7
ERI NO.
CLAIM ENTITLEMENT APPLICATION
V.O. TO
DESCRIPTION
ER / F&G / JV AGREED VALUES
OUTSTANDING CLAIMS
JV COST (AED)
NSC COST (AED)
LETTER REFERENCE
#### NSC Modification Works due to the EHS requirement in accordance with EHS Inspection Report (20-Jul-08) MEP Sco e of Works #### NSC Additional Works at Entrance Ramps - Type 3 & 5
110,641.50
#REF!
#REF!
#REF!
110,641.50
16,654.95
#REF!
#REF!
#REF!
16,654.95
Al Bayader cost + 12% OH&P + 3% Attendances
001
#### NSC Revised "For Construction" Drawings under the DMCC Transmittal Ref. JAP016/TRNS/JV/00002 dated 10th July 2007 (Additional Voice / Data Points)
34,599.52
#REF!
#REF!
#REF!
34,599.52
BC Cost + 7% OH&P; BC VO#7; BC time claim = 201 days
23 9
001
#### NSC Additional Power Supply Lines for External Water Features, Irrigation Pumps, and Swimming Pool
141,276.06
#REF!
#REF!
#REF!
141,276.06
24 0
001
ur
#REF!
#REF!
#REF!
ur
24 1
001
ur
#REF!
#REF!
#REF!
ur
24 2
001
#### NSC Trimming of Cantilever Beams at the Diamond Exchange Center as per the RFI No. 1085 #### NSC Modification of Soffit Cladding for the Swimming Pool to Conceal Service Pipings as per the RFI No. 1054 #### NSC Structural Steel Support for Fans at Air Shaft
340,314.96
#REF!
#REF!
#REF!
340,314.96
24 3
001
13,460.75
#REF!
#REF!
#REF!
13,460.75
24 4
001
1,732.06
#REF!
#REF!
#REF!
1,732.06
Supply and installation of additional Ironmongeries at the Basement 1 Management Office main Entrance Door as per the F&G letter ref. JAP016/ALM/TCAC/23226 dtd 22Dec-08
24 5
001
####
JV
Coring for the Tenant Fit-Out Contractors
ur
#REF!
#REF!
#REF!
ur
24 6
001
####
JV
Additional Access Ladder at Penstock Chamber in
ur
#REF!
#REF!
#REF!
ur
as per the email request of Mr. Clarence Pinto of DMCC dated 4Jan-09 as per the E HS requirements
OM-10
001
####
JV
PC Supply Rates
(21,806.96)
SUB-TOTAL
JV COST (AED)
NSC COST (AED)
REMARKS / COMMENTS
NSC COST (AED)
#### NSC HVAC Systems at Basement 1 Control Room and Lobby as per RFI No. 1087 #### JV Additional Door Closer and Selector at Basement 1 Management Office
JV COST (AED)
#REF!
#REF!
1,553,881.33
ETA cost + 12% OH&P + 3% Attendances
note that the structural works was based on the structural drawings provided to EVS; EVS to submit entitlements AA to submit entitlements
ETA cost + 12% OH&P + 3% Att ETA cost + 12% OH&P + 3% Attendances
adjustment to the Contract Sums due to the PC Materials final rates
(21,806.96)
#REF!
ETA cost + 12% OH&P + 3% Attendances
3,928,851.11
TIME RELATED/ESCALATION CLAIMS #REF!
CLOSED
This is due to the late possession of site as detailed in the referred letter.
0.00
JAP016/GEN/ABS/1051 dated 8 Aug-06
CLOSED
rejected by Nakheel due to notice not served as per the required time period under the Contract.
JAP016/GEN/ABS/1051 dated 8 Aug-06
CLOSED
rejected by Nakheel due to notice not served as per the required time period under the Contract.
#REF!
0
001
####
JV
Delay in Site Mobilization
0.00
#REF!
4
001
####
JV
Nominated Subcontractor Appointment (ETA)
0.00
6
001
####
JV
7
001
####
8
001
####
9
001
39
001
45
001
0.00
0.00
JV
Delay of receipt of the Building Permit and "For Constructon" Drawings Delay in Raft Pour in Zones 1 & 2
0.00
#REF!
CLOSED
progressed under a separate claim; time related claim.
JV
Late Notification of Subcontractors
0.00
0.00
JAP016/TS/BW/0018 dated 31Oct-06
CLOSED
rejected by Nakheel due to dates relating to NSC in the Baseline Programme is not yet accepted.
####
JV
Closure of Site and Offices (due to the death of Sheik Maktoom, 5-7 January 2006)
0.00
0.00
JAP016/GEN/ABS/1014 dated 24Jun-06, & JAP016/GEN/ ABS/1051 dated 8-Aug-06
CLOSED
Rejected by Nakheel in accordance to Clause 44.1 of CoC, as 1 day is non working day and 2 days is not sufficient to award an entitlement; our letter ref. DXB/….Jly/5013 dtd 26Oct08 again requested for 2 days EOT
####
JV
Nomination of Landscaping Subcontractor
0.00
#REF!
#REF!
#REF!
CLOSED
time implications.
#REF!
#REF!
CLOSED
To be included in the Prolongation Claims as this is a preliminaries items
####
JV
Provision of Inspectors
(valued in 127-001)
#REF!
#REF!
49
001
####
JV
Exceptionally Adverse Climatic Conditions
0.00
#REF!
#REF!
#REF!
CLOSED
due to inclement weather conditions at site
11 9
001
####
JV
0.00
#REF!
#REF!
#REF!
CLOSED
Potential Time Claim
12 7
001
####
JV
Notification of Potential Delay due to the Review of Shop Drawings Prolongation Costs
131,765,411.17
#REF!
#REF!
#REF!
131,765,411.17
12 7
002
####
JV
Additional Payment as a Result of the Escalating Cost of Materials
711,983.12
#REF!
#REF!
#REF!
711,983.12
14 3
001
####
JV
Notice of Disruption of Work at Function Room/Ballroom due to Design Conflict
0.00
#REF!
#REF!
#REF!
CLOSED
EOT of 585 days includes the previous 96 days and 138days claimed; Claim for additional pile works reduced to 132 from 138, thus reducing the overall claim to 579 days
in connection to the prolongation claim
time claim.
VARIATION CLAIMS STATUS TO-DATE October 15, 2013 NOC NO.
SUB NO.
ERI NO.
V.O. TO
CLAIM ENTITLEMENT APPLICATION DESCRIPTION
ER / F&G / JV AGREED VALUES
OUTSTANDING CLAIMS
JV COST (AED)
NSC COST (AED)
JV COST (AED)
NSC COST (AED)
LETTER REFERENCE
JV COST (AED)
NSC COST (AED)
REMARKS / COMMENTS
#REF! #REF!
#### ####
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF! #REF!
#### ####
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF! #REF!
#### #### 0 ####
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#### #### #REF! #REF! #### ####
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#### ####
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0
0
#REF! #REF! #REF! #REF! 0
0
0
0
0
####
#REF! #REF!
#### ####
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF! #REF!
#### ####
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF! #REF!
#### ####
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0
0
0
0
####
#REF! #REF!
#### ####
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF! #REF!
#### ####
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF! #REF!
#### ####
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF! #REF!
#### ####
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
52,764,973.04
54,996,143.95
#REF!
#REF!
#REF!
#REF!
0
0
#REF! #REF! 0
0
0
0
####
#### ####
#REF!
0
0
CLAIM STATUS #REF! Nos.
107,761,116.98
NO. OF CLAIMS TO-DATE
#REF! Nos.
#REF!
NO. OF CLAIMS WITH ERI
#REF! Nos.
#REF!
NO. OF CLAIMS WITHOUT ERI
#REF! Nos.
#REF!
NO. OF CLAIMS APPLIED
#REF! Nos.
#REF!
NO. OF CLAIMS OUTSTANDING
#REF! Nos.
#REF!
NO. OF AGREED CLAIMS
#REF! Nos.
#REF!
NO. OF UNAGREED CLAIMS
#REF! Nos.
#REF!
NO. OF CLAIMS TO JV
#REF! Nos.
#REF!
NO. OF CLAIMS TO NSC
GRAND TOTAL
52,764,973.04
54,996,143.95
107,761,116.98
#REF!
#REF!
DMCC- AL MAS TOWER PROJECT JUMEIRAH LAKE TOWERS JAP016 : PACKAGE NO. 3 - MAIN BUILDING WORKS
VARIATION CLAIMS STATUS TO-DATE October 15, 2013 NOC NO.
SUB NO.
ERI NO.
V.O. TO
CLAIM ENTITLEMENT APPLICATION DESCRIPTION
SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB-TOTAL SUB TOTAL
ER / F&G / JV AGREED VALUES
JV COST (AED)
NSC COST (AED)
JV COST (AED)
NSC COST (AED)
0.00 334,995.63 0.00 159,171.78 181,391.33 0.00 23,551.60 0.00 (383,650.51) 0.00 109,670.12 32,683,527.48 0.00 0.00 32,340.85 0.00 3,137,980.87 0.00 0.00 0.00 51,929.76 0.00 (277,596.39) (126,440.24) 0.00 0.00 0.00 0.00 3,843,063.24 3,882,147.78 (1,988.48) 1,771.88 0.00 7,275.43 26,634.44 (66,453.77) 0.00 40,174.50 0.00 (25,133.45) 0.00 85,383.20 0.00 0.00 612,662.92 4,044.20 764 729 70
0.00 501,971.39 1,193,235.54 0.00 0.00 80,097.04 0.00 2,071,622.24 0.00 333,540.00 2,610,489.22 19,764,437.23 2,430,700.00 1,566,116.20 0.00 262,569.93 1,579,708.41 4,929,761.78 0.00 41,685.20 0.00 2,951,483.26 0.00 (69,689.10) 102,143.27 0.00 43,688.96 1,402,455.42 3,696,022.85 0.00 0.00 0.00 0.00 0.00 172,273.32 0.00 0.00 0.00 34,309.10 236,210.00 597,081.20 0.00 1,198,302.72 0.00 0.00 0.00 0 00
0.00 #REF! #REF! 128,324.82 107,738.59 0.00 25,076.80 0.00 #REF! 0.00 #REF! #REF! #REF! 0.00 32,341.10 #REF! #REF! #REF! #REF! #REF! 51,929.76 #REF! (58,985.18) #REF! #REF! #REF! 0.00 #REF! #REF! 2,768,086.67 #REF! 1,587.60 #REF! 6,205.97 #REF! #REF! #REF! 40,074.53 0.00 #REF! #REF! 85,383.20 0.00 #REF! #REF! 3,315.73 #REF!
0.00 #REF! #REF! 0.00 0.00 64,574.50 0.00 1,049,300.70 0.00 317,914.82 #REF! #REF! #REF! 678,543.71 0.00 #REF! #REF! #REF! #REF! #REF! 0.00 #REF! 0.00 #REF! #REF! #REF! 39,083.00 #REF! #REF! 0.00 #REF! 0.00 #REF! 0.00 #REF! #REF! #REF! 0.00 13,517.00 #REF! #REF! 0.00 1,198,302.71 #REF! #REF! 0.00 #REF!
OUTSTANDING CLAIMS LETTER REFERENCE
JV COST (AED)
NSC COST (AED)
0.00 56,840.00 0.00 0.00 0.00 0.00 0.00 0.00 (383,650.51) 0.00 7,538.64 #REF! 0.00 0.00 0.00 0.00 1,398,958.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 677,827.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 (25,133.45) 0.00 0.00 0.00 0.00 612,662.92 0.00 764,729.70
0.00 501,971.39 1,193,235.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 538,459.90 #REF! 2,430,700.00 0.00 0.00 262,569.93 1,579,708.41 4,929,761.78 0.00 17,577.75 0.00 2,951,483.26 0.00 (69,689.10) 102,143.27 0.00 0.00 1,402,455.42 20,545.90 0.00 0.00 0.00 0.00 0.00 172,273.32 0.00 0.00 0.00 0.00 236,210.00 597,081.20 0.00 0.00 0.00 0.00 0.00 0.00
REMARKS / COMMENTS
DMCC- AL MAS TOWER PROJECT JUMEIRAH LAKE TOWERS JAP016 : PACKAGE NO. 3 - MAIN BUILDING WORKS
VARIATION CLAIMS STATUS TO-DATE
NOC NO.
SUB NO.
ERI NO.
V.O. TO
CLAIM LETTER
F&G/NAKHEEL's RESPONSE
DESCRIPTION LETTER REF.
DATE
LETTER REF.
DATE
CLAIM ENTITLEMENT APPLICATION JV COST (AED)
OUTSTANDING CLAIMS WITHOUT ERI TDB/P3/AM/CN-001A
17-Sep-05
JAP016/GEN/MF/873
11-Mar-06
1
001
####
JV
Design Modification of Pile Caps
DXB/AMT-01/0600/EDM/446
16-May-06
JAP016/GEN/ABS/1006
11-Jun-06
TDB/P3/AM/CN-002A
18-Sep-05
JAP016/GEN/MF/873
11-Mar-06
2
001
####
JV
Excavation to the difference in the Tender Drawings and the Actual Site Conditions
DXB/AMT-01/0600/EDM/446
16-May-06
JAP016/GEN/ABS/1006
11-Jun-06
DXB/AMT-01/0500/Jly/112
13-Nov-05
JAP016/GEN/MF/873
11-Mar-06
3
001
####
JV
Pile Head Levels and Associated Problem
DXB/AMT-01/0600/EDM/446
16-May-06
JAP016/GEN/ABS/1006
11-Jun-06
35
002b
####
JV
Additional OCP's conduits to the Offices and Retail Unts (Builders Work)
DX B/A MT -0 1/ 060 0/DAN/ 30 32
1 8-Oct-07
DXB/AMT-01/0600/EDM/2507
11-Jul-07
JAP016/TS/GT/0078
26-Jul-07
62
001
####
JV
15 4
001
####
JV
18 7
001
####
JV
19 4
002
####
JV
21 0
001
####
JV
21 8
002
####
JV
21 9
22 1 22 6
001
####
001R1 #### 001
####
JV
JV JV
Changes to Raised Access Floors at Tecom Rooms, Security Rooms, and Telephone Rooms Enclosure to the Irrigation Pipes running through the LV Room 2 (RFI No. 894) Design Change to External Ramps - Block Stopper Upstand (CVI No. 086) Temporary Fire Alarm Systems (Material / Testing and Commissioning) Closure of the Opening in Parapet Wall on Elevation 4 for Spire Connection Additional Requirements for Etisalat Room in Basement 1 (Door Amendments)
False Ceiling at Basement 5 Vault Lobby and Services Room (RFI No. 511)
Modification to Louvers and Additional Aluminum Doors at Various Areas Modification Works due to the EHS requirement in accordance with EHS Inspection Report (20-Jul-08) JV scope of works
\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--Outstanding (JV) (2).monvabad
611,739.00
259,943.16
258,088.62
120,370.11 12,494.21
DXB /AMT-01 /0 60 0/ PMG/4 67 9
0 5-Au g-0 8
1,600.56
DXB /AMT-01 /0 60 0/ PMG/4 69 1
0 9-Au g-0 8
108,691.73
DXB /AMT-0 1/ 06 00/ EDM/ 404 1
2 1-A pr-08
82,800.00
DXB /AMT-0 1/ 06 00/ MIC/ 508 9
1 6-No v-0 8
11,682.47
DXB /AMT-0 1/ 06 00/ MIC/ 503 9
0 5-No v-0 8
1,286.00
DXB/AMT-01/0600/MIC/5051
08-Nov-08
JAP016/TS/BW/0370
18-Nov-08
DXB/AMT-01/0500/JLy/5137
25-Nov-08
JAP016/TS/BW/0388
21-Dec-08
DXB/ AMT-0 1/0 500 /JLy/5 270
3 0-De c-0 8
DXB /AMT-0 1/ 06 00/ MIC/ 487 4
2 2-Se p-0 8
32,364.90
DXB /AMT-0 1/ 06 00/ MIC/ 519 6
1 4-De c-0 8
35,000.25
37,895.22
49 - 53
VARIATION CLAIMS STATUS TO-DATE
NOC NO.
SUB NO.
ERI NO.
V.O. TO
24 4
001
####
JV
OM-10
001
####
JV
CLAIM LETTER
F&G/NAKHEEL's RESPONSE
DESCRIPTION DATE
Additional Door Closer and Selector at Basement 1 Management Office
DX B/ AMT -01 /0 60 0/ DA N/ 53 15
13 -J an- 09
1,732.06
PC Supply Rates
DX B/ AMT -01 /0 60 0/ DA N/ 50 92
16 -No v- 08
(21,806.96)
\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--Outstanding (JV) (2).monvabad
DATE
JV COST (AED)
LETTER REF.
TOTAL
LETTER REF.
CLAIM ENTITLEMENT APPLICATION
1,553,881.33
50 - 53
October 15, 2013 REMARKS / COMMENTS
progressed under a separate claim.
progressed under a separate claim.
progressed under a separate claim.
JV Cost
Revision 1 - revised due to the changes in the works.
#REF!
JV's portion of the works
JV thru Sibca to submit entitlements
Intherpro Cost + 12% OH&P + 3% attendances
Belgium Alkuminum cost + 12% OH&P +3 % Attend
FBI + EVS cost + 12% OH&P + 3% Attend
cost from domestic subcons + 12%OH&P + 3% Attendances
JV Internal Works
\\vboxsrv\conversion_tmp\scratch_2\180403984.xls.ms_office--Outstanding (JV) (2).monvabad
51 - 53