Descripción: Campo petrolero del Norte de Monagas.
Steps to be taken to prevent Road Accidents, How to prevent Road Accidents, Road Accident Preventions Tips, Steps to be taken by Government to reduce road accidents. Traffic safety awareness…Full description
manciniFull description
Road Map for WCFFull description
BOQ
BOQFull description
contorh boq
contorh boqDeskripsi lengkap
Rencana anggara biaya untuk pekerjaan bandara, merukapakan pekrjaan yang bergerak di bidang teknik sipilDeskripsi lengkap
Full description
Interior decoration work BoqFull description
boqFull description
BOQ
School
BORTFull description
dubai boq
Ref. to MoRTH Spec.
Description
Unit
Quantity
Rate Rs
say
21,183.00 162,403.00 270.67 271.00
4966.00 53.76 138.00 52.00 0.30
11,670.10 1,186.98 231.84 512.20 540.00
e) Contractor's profi t @ 15% on (a+b+c+d) Cost for 640 sqm = a+b+c+d+e Rate per sq m = a+b+c+d+e)/640
804 6.6
K il om et re Sto ne Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fi xing i n posi tion including painting and printing etc 5th kilometre stone (precast) Unit = Nos. Taking outpu t = 6 Nos. a) M-15 grade of concrete b) Steel reinforc ement @ 5 kg per sqm c) Excavation in soil for foundation d) Painting two coats on concrete surface
6.6.1
e) Lettering on km post (average 30 letters of 10 cm height each) Transportation and fixing f) Labour Mate Mason Mazdoor including loading/unloading g) Machinery Tractor-trolley h) Overhead charg es @ 15% on (f+g) i) Contractor's profit @ 15% on (f+g+h) Cost for 6 Nos. 5th km stone = a+b+c+ d+e +f+g+h +i Rat e fo r eac h 5th k m s to ne = (a+b +c + d +e +f+g +h +i ) /6
cum kg cum sqm per cm per letter
2.350 22.080 1.680 9.850 1800.000
day day day
0.260 0.600 6.000
140.00 200.00 125.00
36.40 120.00 750.00
hour
6.000
346.00
2,076.00 447.36 514.46 18,085.34 3,014.22
Ordinary kilometer stone (precast) Unit = Nos. Taking outp ut = 14 Nos. cum a) M-15 grade of concrete kg b) Steel reinforc ement @ 5 kg per sqm cum c) Excavation in soil for foundation sqm d) Painting two coats on concrete surface e) Lettering on km post ( average 12 letters of 10 per cm per letter cm height each) Transportation and fixing f) Labour Mate day Mason day Mazdoor day g) Machinery Tractor-trolley hour h) Overhead charg es @ 15% on (f+g) i) Contractor's profit @ 15% on (f+g+h) Cost for 14 Nos. ordinary km stone = (a+b+ c +d+e+f+g+h+i) Rate for each ordinary km stone = (a+b+ c +d+e+f+g+h+j) /14
6.6.2
say
3,014.00
4966.00 53.76 138.00 52.00 0.30
18,721.82 1,414.91 382.26 593.32 504.00
0.320 1.000 7.000
140.00 200.00 125.00
44.80 200.00 875.00
6.000
346.00
2,076.00 479.37 551.28
3.770 26.320 2.770 11.410 1680.000
25,842.76 1,845.91 say
Hectometer stone (precast) Unit = Nos. Taking outp ut = 33 Nos. a) M-15 grade of concrete