Daftar harga suku cadang dan komponen-komponen Bis : Bus Sedang 6.00 6.00 3.00 0.50 0.50
jumlah oli mesin jumlah oli gardan jumlah oli transmisi jumlah oli rem penambahan oli No.
Komponen Bis
Satuan
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Ban Ban Vulkanisir Oli Gardan Oli Transmisi Oli rem Oli mesin Filter oli Filter Solar Filter udara Kampas rem depan Kampas rem belakang Kampas kopling I njector In Alternator Regulator Accu Tie rod Lager depan
bh bh lt lt lt lt pc pc pc set (2) set (2) set set set set pc set set
Bus Besar 18.00 6.00 5.00 1.00 0.50
Harga spare part Bis sedang Bis besar
Jasa montir Bis sedang Bis besar
450,000
1,100,000
10,000
10,000
200,000
450,000
10,000
10,000
16,000
16,000
5,000
7,000
16,000
16,000
5,000
7,000
26,000
26,000
3,000
5,000
16,000
16,000
3,000
3,000
40,000
60,000
10,000
15,000
130,000
150,000
25,000
60,000
80,000
125,000
5,000
10,000
110,000
300,000
30,000
60,000
110,000
300,000
50,000
100,000
550,000
2,180,000
150,000
300,000
9,00 9,000, 0,0 000
15,00 5,000, 0,0 000
150,0 50,00 00
350, 350,00 000 0
2,200,000
5,000,000
50,000
80,000
1,000,000
1,500,000
40,000
60,000
550,000
700,000
40,000
60,000
350,000
1,000,000
60,000
80,000
300,000
950,000
60,000
80,000
Perh Perhit itun unga gan n Pen Penda dapa pata tan n Bus Bus Angk Angkut utan an Kota Kota (Kon (Kondi disi si Eksi Eksist stin ing) g)
Perh Perhit itun unga gan n Pen Penda dapa pata tan n Bus Bus Angk Angkut utan an Kota Kota (Kon (Kondi disi si Akan Akan Data Datang ng))
Jenis
Jenis
Bu Bus Besar
Data:
Bus Besar
Data:
Operational Cost (Rp/km)
:
Trip Length (km)
:
2,661 (h ( hitungan konsultan)
Capacity (pax)
:
50 (data Bu Rini)
Capacity (pax)
:
50 (hitungan konsultan)
Load Factor (%)
:
100% (data Bu Rini)
Load Factor (%)
:
100% (hitungan konsultan)
Tarif (Rp/trip/org)
:
1,507 (h (hitungan konsultan)
Tarif (Rp/trip/org)
:
1,500 (h (hitungan konsultan)
Trip (kali/hari)
:
Trip (kali/hari)
:
16 (hitungan konsultan)
Setoran (Rp/hari)
:
750,000 (A (Asumsi)
Operational Cost Total (Rp/hari)
:
638,531
Operational Cost Total (Rp/hari)
:
956,995 (h ( hitungan konsultan)
Daily Estimation Revenue (Rp/hari)
:
602,719
Daily Estimation Revenue (Rp/hari)
:
1,232,877 (hitungan konsultan)
Net Profit Sopir (Rp/hari)
:
-147,281
Net Profit Sopir (Rp/hari)
:
151,667 (h (hitungan konsultan)
Net Profit Company (Rp/hari)
:
111,469
Net Profit Company (Rp/hari)
:
275,882 (h (hitungan konsultan)
30 (data Bu Rini)
8 (data Bu Rini)
Hasil Perhitungan:
Operational Cost (Rp/km)
:
3,881 (h ( hitungan konsultan)
Trip Length (km)
:
15 (hitungan konsultan)
Hasil Perhitungan:
PERHITUNGAN BIAYA OPERASIONAL KENDARAAN UNTUK BIS BESAR AC A
VARI VARIAB ABE EL COS COST T Pemeliharaan Sukucadang
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Ban Ban Ban Vul Vulka kani nisi sir r Oli Oli Ga Garda rdan Oli Oli Tran Transm smis isii Oli rem Oli Oli mesi mesinn Fil Filter ter oli oli Filt Filter er Sola Solar r Filt Filter er uda udara ra Kampas Kampas rem depan depan Kampas Kampas rem rem belakan belakangg Kampas Kampas kopli kopling ng Inje Inject ctor or Altern Alternato ator r Regul Regulato ator r Accu Tie Tie rod rod Lager Lager depan depan Lager Lager belaka belakang ng Piston Piston + stang piston piston Ring Ring piston piston Metal Metal jalan jalan Metal Metal dud duduk uk Kle Klep Packin Packingg set
spare part
ja s a
total
ganti tiap
50,000 km
=
132,000
200
132,200
ganti tiap
30,000 km
=
90,000
333
0
ganti tiap
15,000 km
=
6,400
467
6,867
ganti tiap
15,000 km
=
5,333
467
5,800
ganti tiap
15,000 km
=
1,733
333
2,067
ganti tiap
5,000 km
=
57,600
600
58,200
ganti tiap
15,000 km
=
4,000
1,000
5,000
ganti tiap
15,000 km
=
10,000
4,000
14,000
ganti tiap
15,000 km
=
8,333
667
9,000
ganti tiap
50,000 km
=
6,000
1,200
7,200
ganti tiap
50,000 km
=
6,000
2,000
8,000
ganti tiap
80,000 km
=
27,250
3,750
31,000
ganti tiap
200,000 km
=
75,000
1,750
76,750
ganti tiap
200,000 km
=
25,000
400
25,400
ganti tiap
200,000 km
=
7,500
300
7,800
ganti tiap
100,000 km
=
7,000
600
7,600
ganti tiap
100,000 km
=
10,000
800
10,800
ganti tiap
100,000 km
=
9,500
800
10,300
ganti tiap
100,000 km
=
10,000
1,000
11,000
ganti tiap
200,000 km
=
12,000
4,000
16,000
ganti tiap
100,000 km
=
13,000
700
13,700
ganti tiap
200,000 km
=
4,250
400
4,650
ganti tiap
200,000 km
=
6,000
250
6,250
ganti tiap
120,000 km
=
1,667
292
1,958
ganti tiap
100 000 km
=
18 000
1 000
19 000
4 STNK
tiap th
1,700,000
=
Total fixed cost/1000 km C
21,465 rupiah/1000 km 31,566 rupiah/1000 km
DEPRESIASI
harga lama:
1 Harga kendaraan (Rp)
=
750,000,000 rupiah
2 Nilai sisa (20%)
=
150,000,000 rupiah
3 Umur rencana
=
4 Depresiasi/1000 km
=
1, 1,082,251 rupiah/1000 km
=
202,922 rupiah/1000 km
=
1,285,173 rupiah/1000 km
5 Bunga atas modal
15%
Total depresiasi/1000 km D
635,000,000
7 th
OTHERS Biaya Pengelolaan pertahun: a.Penyusutan bangunan kantor
2,500,000
=
316 rupiah/1000 km
b.Bengkel, ATK, sarana bengkel
40,000,000
=
5,051 rupiah/1000 km
c.Biaya administrasi umum kantor
18,000,000
=
2,273 rupiah/1000 km
d.Biaya pemeliharaan kantor
72,000,000
=
9,091 rupiah/1000 km
e.Penyusutan pool dan bengkel (Rp)
40,000,000
=
5,051 rupiah/1000 km
0
=
0 rupiah/1000 km
7,000,000
=
884 rupiah/1000 km
0
=
0 rupiah/1000 km
f.Biaya perjalanan dinas g.Biaya pajak perusahaan h.Biaya pemasaran Biaya pegawai kantor per tahun untuk a. Direktur
100 bus 5,000,000
1 =
7,576 rupiah/1000 km
b. Manajer Adm & Keuangan
4,000,000
1 =
6,061 rupiah/1000 km
c. Manajer Operasional
4,000,000
1 =
6,061 rupiah/1000 km
d. Bag Adm. & Keuangan
1,500,000
5 =
11,364 rupiah/1000 km
e. Bag. Teknik
2,000,000
25 =
75,758 rupiah/1000 km
f. Bag. Operasi
1,250,000
12 =
22,727 rupiah/1000 km
Total lain-lain/1000 km
152,210 rupiah/1000 km
total peg.
rasio dg bus
45
45%
PERHITUNGAN BIAYA OPERASIONAL KENDARAAN UNTUK BIS BESAR NON AC A
VARIABE ABEL COST COST
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45
Ban Ban Ban Vul Vulka kani nisi sir r Oli Oli Garda ardann Oli Oli Tran Transm smis isii Oli rem Oli Oli mes mesin Fil Filter ter oli oli Filt Filter er Sola Solar r Filt Filter er udar udaraa Kampas Kampas rem depa depann Kampas Kampas rem rem belakan belakangg Kampas Kampas koplin koplingg Inje Inject ctor or Alte Alterna rnato tor r Regu Regula lato tor r Accu Tie Tie rod rod Lage Lagerr depa depann Lager Lager bela belakan kangg Piston Piston + stang piston piston Ring Ring pis pisto tonn Metal Metal jal jalan an Metal Metal dud duduk uk Klep Packin Packingg set Shock Shock breake breakerr depan Shock Shock breaker breaker belakang belakang Radi Radiat ator or Bolam Bolam lampu lampu depa depann Knal Knalpo pott Wipe Wiper r Streng Streng kompres kompresso sor r AC - isi isi freo freonn Kompr Kompres esso sor r Servis Servis kompressor kompressor Drier Drier kompre kompress ssor or Expansi Expansi kompessor kompessor Kenteng, Kenteng, las las dan spet spet Cat Cat ulan ulangg Penambahan Penambahan olie mesin/hari mesin/hari Biaya Biaya cuci cuci bis/hari bis/hari Perbai Perbaikan kan kurs kursii Perbai Perbaikan kan Interi Interior or Sera Seraga gam m Solar Solar 1 liter liter untuk untuk
Pemeliharaan Sukucadang
jasa
total
ganti ti ap
50,000 km
=
132,000
200
132,200
ganti ti ap
30,000 km
=
spare part 90,000
333
0
ganti ti ap
15,000 km
=
6,400
467
6,867
ganti ti ap
15,000 km
5,333
467
ganti ti ap
15,000 km
=
1,733
333
2,067
ganti ti ap
5,000 km
=
57,600
600
58,200
ganti ti ap
15,000 km
=
4,000
1, 1,000
5,000
ganti ti ap
15,000 km
=
10,000
4,000
14,000
ganti ti ap
15,000 km
=
8,333
667
9,000
ganti ti ap
50,000 km
6,000
1, 1,200
ganti ti ap
50,000 km
=
6,000
2, 2,000
8,000
ganti ti ap
80,000 km
=
27,250
3,750
31,000
ganti ti ap
200,000 km
=
75,000
1,750
76,750
ganti ti ap
200,000 km
=
25,000
400
25,400
ganti ti ap
200,000 km
=
7,500
300
ganti ti ap
100,000 km
=
7,000
600
7,600
ganti ti ap
100,000 km
=
10,000
800
10,800
ganti ti ap
100,000 km
=
9,500
800
10,300
ganti ti ap
100,000 km
=
10,000
1,000
ganti ti ap
200,000 km
=
12,000
4,000
16,000
ganti ti ap
100,000 km
=
13,000
700
13,700
ganti ti ap
200,000 km
=
4,250
400
4,650
ganti ti ap
200,000 km
=
6,000
250
6,250
ganti ti ap
120,000 km
=
1,667
292
1,958
ganti ti ap
100,000 km
=
18,000
1,000
19,000
ganti ti ap
216,000 km
=
4,630
370
ganti ti ap
216,000 km
=
4,167
278
4,444
ganti ti ap
200,000 km
=
9,000
200
9,200
ganti ti ap
50,000 km
=
3,000
300
3,300
ganti ti ap
200,000 km
=
15,000
250
15,250
ganti ti ap
72,000 km
=
12,500
167
12,667
ti ap ti ap
216,000 km
=
=
0
0
7,200
7,800
11,000
5,000
0
50,000 km
=
0
0
0
=
0
0
0
ti ap
50,000 km
=
0
0
0
ti ap
100,000 km
=
0
0
ti ap
100,000 km
=
0
0
0
ti ap
72,000 km
=
8,333
0
8,333
ti ap
350,000 km
=
12,857
0
12,857
246 km
ti ap
0
=
32,520
0
32,520
246 km
=
24,390
0
24,390
ganti ti ap
250,000 km
=
4,000
0
4,000
ganti ti ap
250,000 km
=
3,200
0
3,200
ganti ti ap
250,000 km
=
300
0
=
400,000
0
ti ap
3.5 km
=
FIXED COST 1 tahun = 12 bl x 25 x 264
=
300 400,000 1,026,004
79,200 km
1 Peri ji nan
ti ap th
100,000
=
1,263 rupi ah/1000 km
2 KIR
ti ap th
100,000
=
1,263 rupi ah/1000 km
3 Retri busi
ti ap th
600,000
=
4 STNK
ti ap th
1,700,000
=
Total fixed cost/1000 km
5,800
200,000 km
ganti ti ap
Jumlah total maintenance/1000 km B
=
7,576 rupi ah/1000 km 21,465 rupi ah/1000 km 31,566 rupiah/1000 km
PERHITUNGAN BIAYA POKOK ANGKUTAN KOTA BUS BESAR PATAS AC HASIL AKHIR LAPANGAN AGUSTUS TAHUN 2001 A. KARAKTERISTIK KENDARAAN 1. Type 2. Jenis pelayanan 3. Kapasitas/daya angkut 4. Penumpang, Load Factor = 70%
: : : :
Bus Besar SD (Single Decker ker) Patas AC 50.00 orang 35.00 orang
B. PRODUKSI 1. Km-tempuh/rit 2. Frekwensi / hari 3. Km-tempuh/hari 4. Hari Operasi / bulan 5. Hari Operasi / tahun 6. Km-tempuh/bulan 7. Km-tempuh/tahun 8. Penumpang/rit 9. Penumpang/hari (PH) 10. Penumpang/bulan(PB) 11. Penumpang/tahun(PT) C. BIAY BIAYA A PER PER PENU PENUMP MPAN ANG G
: : : : : : : : : : :
30.00 8.00 240.00 25.00 300.00 6,000.00 72,000.00 35.00 280.00 7,000.00 84,000.00
km rit Km / hari hari hari Km Km K Km m pn p p np pn pn p pn p
2) Upah dan Tunjangan a) Gaji/upah per bulan (1) sopir/orang (2) kondektur/orang (3) upah per tahun
= Rp. = Rp. = Rp.
800,000.00 600,000.00 20,160,000.00
b) Tunjangan sosial (1) Jasa produksi (2) Pengobatan - Per Orang/bln - Per Tahun
= Rp. = Rp.
50,000.00 1,440,000.00
(3) Pakaian dinas - Per Orang/thn - Per stel - Per Tahun
= Rp. = Rp.
2.00 stel 75,000.00 360,000.00
(4) Astek - Per Orang/bln - Per Tahun
= Rp. = Rp.
20,000.00 576,000.00
= Rp.
22,536,000.00
3) Biaya awak bus/tahun 4) Biaya awak/bus per penumpang Rumus : Biaya awak bus/tahun PT d. Biaya BBM
= Rp.
268.29 /Pnp
1). Service kecil a) Service kecil dilakukan setiap b) Biaya bahan : (1) Olie mesin harga per liter Total
=
= Rp. = Rp.
5,000.00 km 18.00 lt 10,144.00 182,592.00
(2) Olie gardan Harga per liter Total
5.50 lt 11,077.00 60,923.50
(3) Olie transmisi Harga per liter Total
1.00 lt 11,077.00 11,077.00
(4) Gemuk Harga per kg Total
0.50 Kg 10,383.00 5,191.50
Rp. Rp.
(5) Filter Oli Harga per buah Total
0.00 bh 36,750.00 0.00
(6) Filter Udara Harga per buah Total
0.00 bh 0.00 0.00
c) Upah service d) Biaya service e) Biaya service per penumpang
Rp. Rp. = Rp. = Rp.
0.00 259,784.00
(5) Minyak rem Harga per liter Total (6) Filter Olie Harga per buah Total (7) Filter Udara Harga per buah Total (8) Elemen Lainnya Harga per liter Total c) Upah service d) Biaya service e) Biaya service per penumpang Rumus : Biaya Sekali Service 3 x PB 3). Overhoul Mesin a) Dilakukan setiap b) Biay Biaya a over overho houl ul (5% (5% dari dari harg harga a chasis) c. Biaya per penumpang 4). Overhoul Body
Rp. Rp.
1.50 Lt 15,000.00 22,500.00
Rp. Rp.
1.00 bh 36,750.00 36,750.00
Rp. Rp.
1.00 bh 100,000.00 100,000.00 -
Rp. Rp. = Rp.
0.00
= Rp.
474,072.00
= Rp.
= Rp Rp.. = Rp.
22.57 /Pnp
200,000.00 Km 21,3 21,306 06,0 ,000 00.0 .00 0 91.31 /Pnp
9). Pemeliharaan dan Repair /pnp
= Rp.
646.34 /Pnp
g. Biaya Retribusi Terminal 1) Biaya per hari per bus 2) Biaya per penumpang
= Rp. = Rp.
2,000.00 7.14 /Pnp
h. Biaya Retribusi izin trayek 1) Biaya per tahun per bus 2) Biaya per penumpang
= Rp. = Rp.
100,000.00 1.19 /Pnp
i. Biaya PKB (STNK) 1) Biaya per tahun per bus 2) Biaya per penumpang
= Rp. = Rp.
1,688,400.00 20.10 /Pnp
= Rp. = Rp. = Rp.
2.00 Kali 40,000.00 80,000.00 0.95 /Pnp
= Rp.
0.00
= Rp.
0.00 /Pnp
j. Biaya Keur 1) Keur per tahun per bus 2) Biaya per sekali Keur 3) Biaya keur per tahun per bus 4) Biaya keur per penumpang k. Biaya Asuransi kendaraan 1) Asuransi per bus per tahun (2 % harga kendaraan) 2) Biaya asuransi per penumpang II. Biaya Tidak Langsung
- per tahun
Rp.
3,360,000.00
(3) Pangan - per orang per bulan - per tahun
Rp. Rp.
0.00 0.00
(4) Pengobatan - per orang per bulan - per tahun
Rp. Rp.
40,000.00 6,720,000.00
2) Biaya pegawai per tahun Biaya pegawai per Penumpang
Rp. Rp.
146,580,000.00 193.89 /pnp
b. Biaya Pengelolaan 1) Penyusutan Bangunan Kantor (a) Nilai (b) Penyusutan per tahun
Rp. Rp.
50,000,000.00 2,500,000.00
2) Penyusutan bangunan pool & bengkel (a) Nilai (b) Penyusutan per tahun
Rp. Rp.
25,000,000.00 1,250,000.00
3) Penyusutan perlatan kantor (a) Nilai (b) Penyusutan per tahun
Rp. Rp.
10,000,000.00 2,000,000.00
4) Penyusutan perlatan pool & bengkel (a) Nilai (b) Penyusutan per tahun
Rp. Rp
20,000,000.00 4 000 000 00
1. Biaya Biaya langsu langsung ng a. Penyusutan b. Bunga modal c. Aw Awak Bus d. B B M e. Ban f. Service kecil g. Service besar h. Overhaul Mesin I. Overhoul Body j. Penambahan olie mesin k. Cuci bus l. Penggantian suku cadang m. Pemeliharaan body n. Retribusi terminal o. Retribusi Izin Trayek p. Biaya PKB (STNK) q. Keur r. As Asuransi Jumlah 2
= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.
2. Biaya Biaya tidak tidak langsun langsung g a. Biaya Pegawai b. Biaya pengelolaan Jumlah 2
= Rp. = Rp. = Rp
865.31 318.00 268.29 308.57 17.14 37.11 22.57 91.31 204.43 18.11 21.43 101.46 149.91 7.14 1.19 20.10 0.95 0.00 2,453.03
/Pnp /Pnp /Pnp /Pnp /Pnp /Pnp /Pnp /P /Pnp /P /Pnp /Pnp /Pnp /Pnp /Pnp /Pnp /P /Pnp /Pnp /P /Pnp /Pnp /Pnp
193.89 /P /Pnp 83.66 /P / Pnp 277 55 /Pnp
Gambaran Peran Angkutan Umum di DKI Jakarta Jenis Bus besar Bus sedang Minibus Bajaj/bemo Taxi Total Umum Mobil Penp Sep. Mo Motor Total Pribadi
Populasi Kapasitas Trip km/th 5,411 50 90,000 4,981 30 75,000 11,848 8 60,000 16,208 4 45,000 22,357 4 82,500 60,805 96 352,500 1,125,334 6 30,000 2,092,053 2 18,000 3,217,387 8 48,000
TOTAL
3,278,192
400,500
1.4 Total Trip Prod satuan Prod total (teori) Prod total (nyata) juta km/th pax-km/th juta seat-km/th juta pax-km/th 487 4,500,000 24,350 34 , 089 374 2,250,000 11,207 14,569 711 480,000 5,687 10,237 729 180,000 2 , 917 2,917 1,844 330,000 7,378 5 , 164 4,145 7,740,000 51,539 66,977 33,760 180,000 202,560 70,896 37,657 36,000 75,314 45,188 71,417 216,000 277,874 116,084 75, 562
329,413
Konsumsi BBM kl/th Kl/tahun 139,140 Solar 62,263 201,403 88,860 Bensin 60,780 354,579 204,939 555,982 4,220,003 1,255,232 5,475,234
Efis Teori Efis Nyata ml/pax-km ml/pax-km 5.71 4.08 5.56 4.27 15.63 8.68 20.83 20.83 27.78 39.68 10.79 8.30 20.83 59.52 16.67 27.78 19.70 47.17
183,062 6,031,216 Bus Sedang
246.5753425
Bus Besar
Perkiraan Operating cost Rp/km Total cost (Rp.juta) Tarif/trip (Rp) Trip length (km) Revenue total (Rp.juta)
Pesimis 1,993 970,747 700 10 2,386,251
Optimis 1,500 730,485 700 15 1,590,834
Pesimis 2,066 1,006,009 700 10 2,386,251
Optimis 2,000 973,980 700 15 1,590,834
Surplus/defisit (R ( Rp.juta)
1,415,504
860,349
1,380,242
616,854