Construction Estimates- Electrical and Plumbing Works Labor Cost and EstimatesFull description
How to accomplish bill of Materials in Construction Industry.
Deskripsi lengkap
price list
example of bill of material for a simple structure/building
CE142Full description
Full description
A SAMPLE BSNL BILL FOR CONSUMERSFull description
sample billFull description
Bill airtel sample
Bill airtel sampleFull description
Microstructure
ddd
control and management of cost elements, material and labour. Compiles by Burt Baguma
This is a sample thesis only but can use as reference
produccion estimada de aguaFull description
kususm
Full description
Proposed Project: Client Name: Location:
COMMERCIAL SARI-SARI STORE Mrs. Elvira Macasero Ubayon, Loon, Bohol
BILL OF MATERIALS AND COST ESTIMATES Item 1. Concrete and Masonry Quantity
Unit Measure
10 3 2 2 20
bags cu.m cu.m kls pcs
Description
Unit Cost
Total Cost
Portland Cement P 220.00 Stone Aggregates (Gravel Stones) P 700.00 Sand P 700.00 #16 Tie Wire P 50.00 10mm Corrugated Reinforcing Bars P 120.00
P 2,200.00 P 2,100.00 P 1,400.00 P 100.00 P 2,400.00
(for Footing)
10
pcs
16mm Corrugated Reinforcing Bars P 210.00
P 2,100.00
(for Columns & Matting)
Note:
Labor and Supervision Supervision Fees are not yet included on the estimation estimation of materials.
2. Walling Quantity
Unit Measure
10 20
pcs pcs
Description
1/4 Plywood 2” x 2” x 10’ Coco Lumber
Unit Cost
Total Cost
P 330.00 P 38.00
P 3,300.00 P 760.00
P 40.00
P
(for flooring included)
1 Note:
kl
1/2 -inch Ordinary Nails to fasten
30.00
Labor and Supervision Fees are not yet included on the estimation of materials.
3. Roof Framing, Roofing and Appurtendaces Quantity
Unit Measure
8 8
pcs pcs
Note:
Description
Unit Cost
Total Cost
Corrugated G.I. Sheet Roof 2” x 4” x 10” Coco Lumber
P 320.00 P 240
P 2,560.00 P 1,920.00
Labor and Supervision Fees are not yet included on the estimation of materials. Welder’s professional fee is not yet included on the on the estimation of materials.