It is often requested by management to have control over purchase order generation in SAP. Therefore SAP has introduced a functionality called release strategy for PO's, where you can have d…Full description
It is often requested by management to have control over purchase order generation in SAP. Therefore SAP has introduced a functionality called release strategy for PO's, where you can have d…Descrição completa
It is often requested by management to have control over purchase order generation in SAP. Therefore SAP has introduced a functionality called release strategy for PO's, where you can have d…Full description
ASCP
Descripción: Palo Alto HA config
hFull description
27/06/2011
My Oracle Support | Knowledge Brows…
How To Setu p Item s and MRP/ASCP Plan For For Auto -Releas e [ID 788742.1] 788742.1] Modified 30-MAY-2011
Type WHITE PAPER
Status PUBLISHED
In this Docume Docume nt Abstract Document History How To Setup Items and MR MRP P/ASCP Plan Plan For A uto-Release Define an employee in the HR module module and ass ociate to the user -name. Define planner code in INV module and ass ociate the employee. Defining Items for Auto-Release Defining Plans for Auto-Release Profile Options Notes Summary
Applies to: Oracle Materials Requirement Planning - Version: 10.7 to 12.1 - Release: 10.7 to 12.1 Oracle Adv anced Supply Chain Chain Planning - Vers ion: 10.7 to 12.1 [Release: 10.7 to 12.1] Information in this document applies to any platform. Materials Requirement Planning - Version: 10.7 to 12.1
Abstract The purpose of this document is to describe the steps needed to implement the the Auto-Release f unctionality for items items a nd MRP MRP/SCP or A SCP planning. These ste ps are c ommon ommon to the legacy Oracle MRP MRP and SCP SCP as w ell as the cur rent A dvanc ed Supply Chain Planning. Planning.
Document History iff Ozier Author : Cliff Create Date Date 09-MAR-2009 (scr een shots to be added in in the future)
How To Setup Items and MRP/ASCP Plan For Auto-Release
Define an employee employee in the HR module module and associa te to the user-nam e. The user-name user-name is us ed to stor e the PWB preferences s ettings ettings w hich includes includes the WIP job status.
Define planner planner code in INV module module and ass ociate the e mployee. INV > Setup > Planners The planner code is used by the Requisition Import process. Note: When the items items is VMI enabled enabled (Vendor Managed Inventor nventor y), t hey w ill be be ignored by auto release planned order s
Defining Definin g Items for Auto-Release Auto-Release INV > Items > Organization Items Bill Of Material tab Set BOM Item Type to Standard General tab Planner coded that you defined. Enter the Planner coded Item Planni ng M ethod to ethod to Not Planned. Set Item MPS/MRP Planning tab Set Release Time Fence option to: Cumulative Cumulative Manufa cturing Lead Time Cumulative Total Lead Time Total Lead Time User-Defined - Then Set the Release Time Fence Days value if user-defined option is chosen. Cannot Cannot be use d w ith auto-release auto-release Blank (NULL) Do NOT Auto-Release Do NOT Release (Kanban) Do NOT NOT Release ease (Au to or Manual) ( R12) -
Defining Plans for Auto-Release Navigate to your plan names form. MPS or MRP, DRP DRP or Adv anc ed Supply Chain Plan names Select Production box (mandatory) (mandatory) -
Profile Options Set the Profile MRP: Requisition Load Group Option at the Site level. Supplier is default. MRP: MRP: Requisition Requisition Load Group Option determines how the requisitions are group ed.
support.oracle.com/CSP/ui/flash.html
1/2
27/06/2011
My Oracle Support | Knowledge Brows…
MSC: Auto-Release Compression Days Tolerance - For ASCP only - if you set this to a value e.g. 10, then if the planned order has been Compressed to meet the demand due date, and it is value for Compression Days = 10 days or less, then the order w ill still be released. (Standard MRP / Supply Chain Planning does not allow any c ompression day s)
The process Auto-Release Planned Orders is then launch by the planning process. Which w ill intern launch WIP Mass Load and/or Requisition Import WIP Mass Load w hich creat es the WIP Jobs Job Status is determined by the Planner Workbench preferences value for WIP job status. No material availability check is performed. Discr ete jobs only - no repetitive schedules. Requisition Import w hich launches Create Releases Releases Approved Purchase Requisitions. Grouping option from the Site profile option MRP: Requisition Load Group Option determines how the requisitions are grouped. -
Notes Note: You cannot auto-release recommendations to Oracle Order Management.
Summary Summary of Auto-Release Requirements Planner code assign to the item Valid Release Time Fence option Planned Order Date w ithin Release Time Fence. Lead Time is NOT compress ed - or in ASCP, you use the pr ofile to st ill allow release. Standard BOM Item Type Orders can not be f or Kanban items or repetitive schedules. Production box is checked for the Plan Planning Methods Item Attr ibute must be: MRP/SCP MPS, MPS/MPP Planned for (Std)MPS Plans MRP, MRP/MPP Planned for ( Std)MRP Plans MPP, MPS/MPP, MRP/MPP Planned f or ( OLD Std)DRP Plans ASCP MPS, MPS/MPP Planned for Manuf acturing Plans MRP, MRP/MPP Planned f or Production Plans MPP, MPS/MPP, MRP/MPP Planned for Mas ter Plans and Distr ibution Plans
Related Products More Applicat ions > Value Chain Planning > Supply Chain Planning > Oracle Materials Requirement Planning More Applications > Value Chain Planning > Supply Chain Planning > Oracle A dvanc ed Supply Chain Planning Keywords CREATE RELEASES; DEFINE ITEM; IMPORT; ITEM; ITEM ATTRIBUTES; PLA NNER; REQUISITION IMPORT; WIP MASS LOA D