DAFTAR ANALISA BIAYA KONSTRUKSI KONSTRUKSI ( ABK ) SNI ( STANDAR NASIONAL INDONESIA ) KODE KOEFISIEN A. A.1 A.1.1
1 M'
0.020 0.007
A.1.2 0.100 0.100 0.010 0.005
2
1M
A.2.1 1.700 0.210
Tenaga Oh Oh Oh Oh
Bahan Btg 3
1.500
M Lbr
2.000 1.000 0.200 0.050
Tenaga Oh Oh Oh Oh
2
1M
Balok Kayu 5/7 Kelas III
@
Rp
1,568,750.00
Rp
Paku Biasa 2" - 5"
@
Rp
16,000.00
Rp
320.00
Kayu Papan 3/20 Kelas III
@
Rp
1,212,500.00
Rp
8,487.50
Jumlah ( 1 )
Rp
27,632.50
74,500.00 46,500.00 82,500.00 73,500.00 Jumlah ( 2 ) Jumlah ( 1 ) + ( 2 )
Rp Rp Rp Rp Rp Rp
7,450.00 4,650.00 825.00 367.50 13,292.50 40,925.00
Tukang Kayu Pekerja Kepala tukang Kayu Mandor
@ @ @ @
Rp Rp Rp Rp
18,825.00
PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT
0.050
Dolken kayu O 8-10/400 cm
@
Rp
7,500.00
Rp
12,750.00
Kayu
@
Rp
1,212,500.00
Rp
254,625.00
Paku Biasa 2" - 5" Semen Portland
@ @
Rp Rp
16,000.00 1,200.00
Rp Rp
4,800.00 12,600.00
3
Pasir Beton
@
Rp
155,000.00
Rp
4,650.00
3
Koral Beton
@
Rp
225,000.00
Rp
11,250.00
Seng Gelombang bjls 32
@
Rp
75,000.00 Jumlah ( 1 )
Rp Rp
112,500.00 413,175.00
Tukang Pekerja Kepala tukang Mandor
@ @ @ @
Rp Rp Rp Rp
74,500.00 46,500.00 82,500.00 73,500.00 Jumlah ( 2 ) Jumlah ( 1 ) + ( 2 )
Rp Rp Rp Rp Rp Rp
149,000.00 46,500.00 16,500.00 3,675.00 215,675.00 628,850.00
@ @
Rp Rp
46,500.00 73,500.00 Jumlah
Rp Rp Rp
4,650.00 3,675.00 8,325.00
@ @
Rp Rp
46,500.00 73,500.00 Jumlah
Rp Rp Rp
34,875.00 1,837.50 36,712.50
@ @
Rp Rp
46,500.00 73,500.00 Jumlah
Rp Rp Rp
41,850.00 3,307.50 45,157.50
MEMBERSIHKAN LAPANGAN DAN PERATAAN Tenaga Oh Oh
Pekerja Mandor
PEKERJAAN TANAH 3
1M
0.750 0.025
B.2.1
M
M
B.1.1
B.2
3
0.030
0.100 0.050
B.1
3
M Kg
0.300 10.500
A.3.1
B.
JUMLAH HARGA
PENG PENGUK UKUR URAN AN DAN DAN PEM PEMAS ASAN ANGA GAN N BOU BOUWP WPLAN LANK K Bahan
M Kg Kg
A.2.2
A.3
HARGA SATUAN
PEKERJAAN PERSIAPAN
0.012
A.2
JENIS PEKERJAAN BAHAN DAN UPAH KERJA
SA TU TUAN
3
1M
GALIAN TANAH BIASA ( KedaLaman maks. 1 M' ) Tenaga Oh Oh
Pekerja Mandor Upah Kerja Galian
GALIAN TANAH BIASA ( Kedalaman maks. 2 M' )
Tenaga 0.900 Oh 0.045 Oh
Pekerja Mandor Upah Kerja Galian
Analisa Biaya Konstruksi 1
B.3 B.3.1.
B.4
3
1M
3
1M
B.4.1 0.500 0.050
B.5
GALIAN TANAH BIASA ( KedaLaman maks. 3 M' )
Tenaga 1.050 Oh 0.067 Oh
3
1M
B.5.1
Pekerja Mandor Upah Kerja Galian
@ @
Rp Rp
46,500.00 73,500.00 Jumlah
Rp Rp Rp
48,825.00 4,924.50 53,749.50
Pekerja Mandor Upah Kerja Pemadatan
@ @
Rp Rp
46,500.00 73,500.00 Jumlah
Rp Rp Rp
23,250.00 3,675.00 26,925.00
3
Pasir Urug
@
Rp
105,300.00
Rp
126,360.00
3
Tanah Timbunan
@
Rp
67,500.00
Rp
81,000.00
Pekerja Mandor Upah Kerja Urugan
@ @
Rp Rp
46,500.00 73,500.00 Jumlah 2 Pasir Urug Tanah Timbunan
Rp Rp Rp Rp Rp
13,950.00 735.00 14,685.00 141,045.00 95,685.00
PEMADATAN TANAH (PER 20CM) Tenaga Oh Oh
URUGAN Bahan
1.200 1.200 B.5.2 0.300 0.010
M M
Tenaga Oh Oh
Jumlah ( 1 ) + ( 2 )
B.6
3
1M
B.6.1
URUGAN SIRTU Bahan
1.200 1.200 B.6.2 0.250 0.025
3
Sirtu
@
Rp
162,750.00
Rp
195,300.00
4
Kerikil
@
Rp
225,000.00
Rp
270,000.00
Pekerja Mandor Upah Kerja Urugan Sirtu
@ @
Rp Rp
46,500.00 73,500.00 Jumlah
Rp Rp Rp Rp Rp
11,625.00 1,837.50 13,462.50 208,762.50 283,462.50
M M
Tenaga Oh Oh
Jumlah ( 1 ) + ( 2 )
B.7
2
1M
B.7.1
C.1
PASNGAN IJUK LAPISAN TEBAL 10 CM, UNTUK BIDANG PERESAPAN
6.000
Bahan Kg
Ijuk
@
Rp
10,000.00 Jumlah ( 1 )
Rp Rp
60,000.00 60,000.00
0.150 0.015
Tenaga Oh Oh
Pekerja Mandor
@ @
Rp Rp
46,500.00 73,500.00 Jumlah ( 2 ) Jumlah ( 1 ) + ( 2 )
Rp Rp Rp Rp
6,975.00 1,102.50 8,077.50 68,077.50
@
Rp
165,000.00
Rp
198,000.00 195,600.00
B.7.2
C.
Sirtu Kerikil
PEKERJAAN PONDASI 3
1M
C.1.1
PASANGAN PONDASI BATU GUNUNG, 1 PC : 4 Ps Bahan
1.200
3
163.000
M Kg
0.520
M
C.1.2 0.750 0.075 1.500 0.075
3
Tenaga Oh Oh Oh Oh
Batu Gunung Semen
@
Rp
1,200.00
Rp
Pasir Pasang
@
Rp
175,000.00
Rp
91,000.00
Jumlah ( 1 )
Rp
484,600.00
73,500.00 84,500.00 46,500.00 73,500.00 Jumlah ( 2 ) Jumlah ( 1 ) + ( 2 )
Rp Rp Rp Rp Rp Rp
55,125.00 6,337.50 69,750.00 5,512.50 136,725.00 621,325.00
Tukang Batu Kepala tukang Batu Pekerja Mandor
@ @ @ @
Analisa Biaya Konstruksi 2
Rp Rp Rp Rp
C.2
3
1M
C.2.1 1.200 0.432 C.2.2 0.390 0.039 0.780 0.039
C.3 C.3.1
2
1M
3
Batu Gunung
@
Rp
3
Pasir Urug
@
Rp
M M
Tenaga Oh Oh Oh Oh
C.3.2 0.135 0.0135 0.720 0.036
3
M
Tenaga Oh Oh Oh Oh
Rp
198,000.00
105,300.00
Rp
45,489.60
Jumlah ( 1 )
Rp
243,489.60
73,500.00 84,500.00 46,500.00 73,500.00 Jumlah ( 2 ) Jumlah ( 1 ) + ( 2 )
Rp Rp Rp Rp Rp Rp
28,665.00 3,295.50 36,270.00 2,866.50 71,097.00 314,586.60
@ @ @ @
Rp Rp Rp Rp
Paving Blok t = 6 Cm
@
Rp
3,000.00
Rp
150,000.00
Pasir Urug
@
Rp
105,300.00
Rp
21,060.00
Jumlah ( 1 )
Rp
171,060.00
Tukang Batu Kepala tukang batu Pekerja Mandor
@ @ @ @
Rp Rp Rp Rp
73,500.00 84,500.00 46,500.00 73,500.00 Jumlah ( 2 ) Paving Blok t = 6 Cm
Rp Rp Rp Rp Rp Rp
9,922.50 1,140.75 33,480.00 2,646.00 47,189.25 218,249.25
Batu Merah 5x11x22cm Semen
@ @
Rp Rp
700.00 1,200.00
Rp Rp
98,000.00 31,860.00
Pasir pasang
@
Rp
175,000.00
Rp
16,275.00
Jumlah ( 1 )
Rp
146,135.00
PEKERJAAN DINDING 2
D.1
1M
D.1.1
Bahan 140.000 Bh 26.550 Kg
0.093 D.1.2 0.200 0.020 0.600 0.030
D.2
Tukang Batu Kepala tukang Batu Pekerja Mandor
165,000.00
PASANGAN PAVING BLOK
Bahan 50.000 Bh
0.200
D.
PASANGAN PONDASI BATU KOSONG Bahan
2
1M
D.2.1 70.000 11.500 0.043 D.2.2 0.100 0.010 0.300 0.015
PASANGAN BATU MERAH TEBAL 1 BATU, 1 PC : 4 Ps
3
M
Tenaga Oh Oh Oh Oh
Tukang Batu Kepala tukang Batu Pekerja Mandor
@ @ @ @
Rp Rp Rp Rp
73,500.00 84,500.00 46,500.00 73,500.00 Jumlah ( 2 ) Jumlah ( 1 ) + ( 2 )
Rp Rp Rp Rp Rp Rp
14,700.00 1,690.00 27,900.00 2,205.00 46,495.00 192,630.00
Batu Merah 5x11x22cm Semen
@ @
Rp Rp
700.00 1,200.00
Rp Rp
49,000.00 13,800.00
Pasir pasang
@
Rp
PASANGAN BATU MERAH TEBAL 1/2 BATU, 1 PC : 4 Ps Bahan Bh Kg 3
M
Tenaga Oh Oh Oh Oh
Tukang Batu Kepala tukang Batu Pekerja Mandor
@ @ @ @
Analisa Biaya Konstruksi 3
Rp Rp Rp Rp
175,000.00
Rp
7,525.00
Jumlah ( 1 )
Rp
70,325.00
73,500.00 84,500.00 46,500.00 73,500.00 Jumlah ( 2 ) Jumlah ( 1 ) + ( 2 )
Rp Rp Rp Rp Rp Rp
7,350.00 845.00 13,950.00 1,102.50 23,247.50 93,572.50
E.
E.1 E.1.1
PEKERJAAN PLESTERAN 2
1M
E.1.2 0.100 0.010 0.200 0.01
E.2
E.2.1
2
1M
E.2.2 0.150 0.015 0.300 0.015
2
1M
E.3.1
6.240 0.024
E.3.2
0.150 0.015 0.300 0.015
E.4 E.4.1
Tenaga Oh Oh Oh Oh
Semen PC
@
Rp
1,200.00 Jumlah ( 1 )
Rp Rp
3,900.00 3,900.00
Tukang Batu Kepala tukang Batu Pekerja Mandor
@ @ @ @
Rp Rp Rp Rp
73,500.00 84,500.00 46,500.00 73,500.00 Jumlah ( 2 ) Jumlah ( 1 ) + ( 2 )
Rp Rp Rp Rp Rp Rp
7,350.00 845.00 9,300.00 735.00 18,230.00 22,130.00
9,331.20
PLESTERAN 1 PC : 3 Ps, TEBAL 15 MM
Bahan 7.776 Kg
0.023
E.3
ACIAN TEMBOK SEMEN PC
Bahan 3.250 Kg
3
M
Tenaga Oh Oh Oh Oh
Semen
@
Rp
1,200.00
Rp
Pasir Pasang
@
Rp
175,000.00
Rp
4,025.00
Jumlah ( 1 )
Rp
13,356.20
73,500.00 84,500.00 46,500.00 73,500.00 Jumlah ( 2 ) Jumlah ( 1 ) + ( 2 )
Rp Rp Rp Rp Rp Rp
11,025.00 1,267.50 13,950.00 1,102.50 27,345.00 40,701.20
Tukang Batu Kepala tukang Batu Pekerja Mandor
@ @ @ @
Rp Rp Rp Rp
PLESTERAN 1 PC : 4 Ps, TEBAL 15 MM Bahan Kg 3
M
Tenaga Oh Oh Oh Oh
Semen
@
Rp
1,200.00
Rp
7,488.00
Pasir Pasang
@
Rp
175,000.00
Rp
4,200.00
Jumlah ( 1 )
Rp
11,688.00
Tukang Batu Kepala tukang Batu Pekerja Mandor
@ @ @ @
Rp Rp Rp Rp
73,500.00 84,500.00 46,500.00 73,500.00 Jumlah ( 2 ) Jumlah ( 1 ) + ( 2 )
Rp Rp Rp Rp Rp Rp
11,025.00 1,267.50 13,950.00 1,102.50 27,345.00 39,033.00
@ @
Rp Rp
1,200.00 175,000.00
Rp Rp Rp
6,220.80 4,550.00 10,770.80
@ @ @ @
Rp Rp Rp Rp
73,500.00 84,500.00 46,500.00 73,500.00 Jumlah ( 2 ) Jumlah ( 1 ) + ( 2 )
Rp Rp Rp Rp Rp Rp
11,025.00 1,267.50 13,950.00 1,102.50 27,345.00 38,115.80
2
PLESTERAN 1 PC : 5 Ps, TEBAL 15 MM Bahan 5.184 Kg Semen 3 0.026 Pasir Pasang M
1M
E.4.2
Tenaga
0.150 0.015 0.300 0.015
Oh Oh Oh Oh
Tukang Batu Kepala tukang Batu Pekerja Mandor
Analisa Biaya Konstruksi 4
F.
F.1
PEKERJAAN KAYU 3
1M
F.1.1 1.100 1.250 1.000
21.000 2.100 7.000 0.350
Tenaga Oh Oh Oh Oh
Rp
7,875,000.00
Rp
8,662,500.00
Paku 10 Cm Lem Kayu
@ @
Rp Rp
16,000.00 45,900.00 Jumlah ( 1 )
Rp Rp Rp
20,000.00 45,900.00 8,728,400.00
Tukang Kayu Kepala tukang kayu Pekerja Mandor
@ @ @ @
Rp Rp Rp Rp
74,500.00 84,500.00 46,500.00 73,500.00 Jumlah ( 2 ) Jumlah ( 1 ) + ( 2 )
Rp Rp Rp Rp Rp Rp
1,564,500.00 177,450.00 325,500.00 25,725.00 2,093,175.00 10,821,575.00
@ @
Rp Rp
10,500,000.00 45,900.00 Jumlah ( 1 )
Rp Rp Rp
420,000.00 22,950.00 442,950.00
@ @ @ @
Rp Rp Rp Rp
74,500.00 84,500.00 46,500.00 73,500.00 Jumlah ( 2 ) Jumlah ( 1 ) + ( 2 )
Rp Rp Rp Rp Rp Rp
223,500.00 25,350.00 46,500.00 3,675.00 299,025.00 741,975.00
PASANG PINTU PANEL KAYU KELAS I Bahan 3 0.040 Papan Kayu KLs I M 0.500 Kg Lem Kayu
2
1M
0.040
Tenaga Oh Oh Oh Oh
3
0.050
1.050 0.105 0.350 0.018
Tenaga Oh Oh Oh Oh
2
1M
F.4.1
Tukang kayu Kepala tukang kayu Pekerja Mandor
PASANG PINTU KLAMP KAYU KELAS II Bahan
M Kg
F.3.2
Papan Kayu
@
Rp
3,281,250.00
Rp
131,250.00
Paku biasa 1" - 5"
@
Rp
16,000.00 Jumlah ( 1 )
Rp Rp
800.00 132,050.00
Tukang Kayu Kepala tukang kayu Pekerja Mandor
@ @ @ @
Rp Rp Rp Rp
74,500.00 84,500.00 46,500.00 73,500.00 Jumlah ( 2 ) Jumlah ( 1 ) + ( 2 )
Rp Rp Rp Rp Rp Rp
78,225.00 8,872.50 16,275.00 1,323.00 104,695.50 236,745.50
PASANG PINTU DAN JENDELA KACA KAYU KELAS I ATAU KELAS II Bahan
0.024
3
0.300
M Kg
2.400 0.240 0.800 0.040
Tenaga Oh Oh Oh Oh
F.4.2
F.5 F.56.1
@
2
3.000 0.300 1.000 0.050
F.4
Balok Kayu
1M
F.2.2
F.3 F.3.1
3
M Kg Kg
F.1.2
F.2 F.2.1
PASANG KUSEN PINTU DAN JENDELA KAYU KELAS I Bahan
Papan Kayu KLs II
@
Rp
3,281,250.00
Rp
78,750.00
Lem Kayu
@
Rp
45,900.00 Jumlah ( 1 )
Rp Rp
13,770.00 92,520.00
Tukang Kayu Kepala tukang kayu Pekerja Mandor
@ @ @ @
Rp Rp Rp Rp
74,500.00 84,500.00 46,500.00 73,500.00 Jumlah ( 2 ) Jumlah ( 1 ) + ( 2 )
Rp Rp Rp Rp Rp Rp
178,800.00 20,280.00 37,200.00 2,940.00 239,220.00 331,740.00
@ @
Rp Rp
26,250.00 25,000.00 Jumlah ( 1 )
Rp Rp Rp
26,250.00 2,500.00 28,750.00
@ @ @ @
Rp Rp Rp Rp Rp
74,500.00 84,500.00 46,500.00 73,500.00 Jumlah ( 2 ) Jumlah ( 1 ) + ( 2 )
Rp Rp Rp Rp Rp Rp
14,900.00 2,112.50 4,650.00 367.50 22,030.00 50,780.00
1M'
PASAN PASANG G LIST LISTPLA PLANK NK UKUR UKURAN AN ( 2 X 30 30 ) CM, CM, WOO WOODP DPLAN LANK K Bahan 1.00 m' Papan Woodplank 0.100 Kg Skrup
F.5.2 0.200 0.025 0.100 0.005
Tenaga oh oh oh oh
Tukang Kayu Kepala tukang kayu Pekerja Mandor
Analisa Biaya Konstruksi 5
G. G.1 G.1 G.1.1
G.1.2
6.5 6.5 6.5.1
PEKERJAAN BETON 1 M³ M³
MEMB MEMBUA UAT T LANT LANTAI AI KERJ KERJA A BETO BETON N MUTU MUTU Fc = 7.4 7.4 Mpa Mpa (K 100) 100),, Slu Slump mp (3-6 (3-6)C )CM, M, w/c w/c = 0.87 0.87 Bahan 230.000 Kg Semen @ Rp 1,200.00 0.638 m³ Pasir @ Rp 155,000.00 0.761 m³ Kerikil ( maksimum 30 mm) @ Rp 225,000.00 Jumlah (1) Tenaga 1.200 Oh Pekerja @ Rp 46,500.00 0.200 Oh Tukang Batu @ Rp 73,500.00 0.020 Oh Kepala Tukang @ Rp 84,500.00 0.060 Oh Mandor @ Rp 73,500.00 Jumlah (2) Jumlah (1 (1) + (2) MEMB MEMBUA UAT T BETO BETON N MUTU MUTU Fc = 9,8 9,8 Mpa Mpa (K 125) 125),, Slu Slump mp (12± (12±2) 2)Cm Cm Bahan 276.000 Kg Semen 0.591 M3 Pasir 0.750 M3 Kerikil ( maksimum 30 mm)
Rp Rp Rp Rp Rp Rp
55,800.00 14,700.00 1,690.00 4,410.00 76,600.00 622,634.52
@ @ @
Rp Rp Rp
1,200.00 155,000.00 225,000.00 Jumlah (1)
Rp Rp Rp Rp
331,200.00 91,671.43 168,666.67 591,538.10
@ @ @ @
Rp Rp Rp Rp
46,500.00 73,500.00 84,500.00 73,500.00 Jumlah (2) Jumlah (1 (1) + (2)
Rp Rp Rp Rp Rp Rp
76,725.00 20,212.50 2,366.00 6,100.50 105,404.00 696,942.10
ME MB MBUAT BETON M UT UTU Fc = 12 1. 1. 7 M pa pa (K 22 5) 5), S lu lump (1 2± 2±2)Cm Bahan 371.000 Kg Semen @ 0.499 m³ Pasir @ 0.776 m³ Kerikil ( maksimum 30 mm) @
Rp Rp Rp
1,200.00 155,000.00 225,000.00 Jumlah (1)
Rp Rp Rp Rp
445,200.00 77,278.57 174,500.00 696,978.57
@ @ @ @
Rp Rp Rp Rp
46,500.00 73,500.00 84,500.00 73,500.00 Jumlah (2) Jumlah (1 (1) + (2)
Rp Rp Rp Rp Rp Rp
76,725.00 20,212.50 2,366.00 6,100.50 105,404.00 802,382.57
@ @ @
Rp Rp Rp
1,212,500.00 16,000.00 12,500.00 Jumlah (1)
Rp Rp Rp Rp
48,500.00 4,800.00 1,250.00 54,550.00
@ @ @ @
Rp Rp Rp Rp
46,500.00 73,500.00 84,500.00 73,500.00 Jumlah (2) Jumlah (1 (1) + (2) Untuk 2 x Pakai
Rp Rp Rp Rp Rp Rp Rp
24,180.00 19,110.00 2,197.00 1,911.00 47,398.00 101,948.00 50,974.00
Tenaga Oh Oh Oh Oh
Pekerja Tukang Batu Kepala Tukang Mandor
1 M³
G.2.2 1.650 0.275 0.028 0.083
G.3 G.3.1
276,000.00 98,867.86 171,166.67 546,034.52
1 M³ M³
1.650 0.275 0.028 0.083
G.2 G.2.1
Rp Rp Rp Rp
Tenaga Oh Oh Oh Oh
Pekerja Tukang Batu Kepala Tukang Mandor
1 M²
MEMBUAT BEKESTING UNTUK PONDASI Bahan 0.040 m³ Kayu Kelas III 0.300 Kg Paku 5 Cm - 10 Cm 0.100 Liter Minyak Bekesting
G.3.2 0.520 0.260 0.026 0.026
Tenaga Oh Oh Oh Oh
Pekerja Tukang Batu Kepala Tukang Mandor
Analisa Biaya Konstruksi 6
G.4 G.4.1
1 M²
PEMBESIAN 1 0 KG DENGAN BESI POLOS ATAU BESI ULIR Bahan 10.500 Kg Besi Beton ( Polos / Ulir) 0.150 Kg Kawat Beton
G.4.2 0.070 0.070 0.007 0.004
G.5 G.5.1
MEMBUAT BEKESTING UNTUK SLOEF Bahan 0.045 m³ Kayu Kelas III 0.300 Kg Paku 5 Cm - 10 Cm 0.100 Liter Minyak Bekesting
0.520 0.260 0.026 0.026
1 M² 0.040 0.400 0.200 0.015 2.000
G.6.2 0.660 0.330 0.033 0.033
G.7 G.7.1
Pekerja Tukang Batu Kepala Tukang Mandor
Rp Rp
@ @ @ @
Rp Rp Rp Rp
@ @ @
Rp Rp Rp
@ @ @ @
10,000.00 17,000.00 Jumlah (1)
Rp Rp Rp
105,000.00 2,550.00 107,550.00
Rp Rp Rp Rp Rp Rp Rp
3,255.00 5,145.00 591.50 294.00 9,285.50 116,835.50 11,683.55
1,212,500.00 16,000.00 12,500.00 Jumlah (1)
Rp Rp Rp Rp
54,562.50 4,800.00 1,250.00 60,612.50
Rp Rp Rp Rp
46,500.00 73,500.00 84,500.00 73,500.00 Jumlah (2) Jumlah (1 (1) + (2) Untuk 2 x Pakai
Rp Rp Rp Rp Rp Rp Rp
24,180.00 19,110.00 2,197.00 1,911.00 47,398.00 108,010.50 54,005.25
@ @ @ @ @
Rp Rp Rp Rp Rp Rp
1,212,500.00 16,000.00 12,500.00 3,181,000.00 7,500.00 Jumlah (1)
Rp Rp Rp Rp Rp Rp
48,500.00 6,400.00 2,500.00 47,715.00 15,000.00 120,115.00
@ @ @ @
Rp Rp Rp Rp
46,500.00 73,500.00 84,500.00 73,500.00 Jumlah (2) Jumlah (1 (1) + (2) Untuk 4 x Pakai
Rp Rp Rp Rp Rp Rp Rp
30,690.00 24,255.00 2,788.50 2,425.50 60,159.00 180,274.00 45,068.50
@ @ @ @ @
Rp Rp Rp Rp Rp Rp
1,212,500.00 16,000.00 12,500.00 3,181,000.00 7,500.00 Jumlah (1)
Rp Rp Rp Rp Rp Rp
48,500.00 6,400.00 2,500.00 47,715.00 15,000.00 120,115.00
@ @ @ @
Rp Rp Rp Rp
46,500.00 73,500.00 84,500.00 73,500.00 Jumlah (2) Jumlah (1 (1) + (2) Untuk 2 x Pakai
Rp Rp Rp Rp Rp Rp Rp
30,690.00 24,255.00 2,788.50 2,425.50 60,159.00 180,274.00 90,137.00
46,500.00 73,500.00 84,500.00 73,500.00 Jumlah (2) Jumlah (1 (1) + (2) Untuk Pembesian 1Kg
1 M²
G.5.2
G.6 G.6.1
Tenaga Oh Oh Oh Oh
@ @
1 M² 0.040 0.400 0.200 0.015 2.000
G.7.2 0.660 0.330 0.033 0.033
Tenaga Oh Oh Oh Oh
Pekerja Tukang Batu Kepala Tukang Mandor
MEMBUAT BEKESTING UNTUK KOLOM PRAKTIS Bahan m³ Kayu Kelas III Kg Paku 5 Cm - 10 Cm Liter Minyak Bekesting m³ Balok Kayu Kelas II Btg Bambu Tenaga Oh Oh Oh Oh
Pekerja Tukang Batu Kepala Tukang Mandor
MEMBUAT BEKESTING UNTUK KOLOM Bahan m³ Kayu Kelas III Kg Paku 5 Cm - 10 Cm Liter Minyak Bekesting m³ Balok Kayu Kelas II Btg Bambu Tenaga Oh Oh Oh Oh
Pekerja Tukang Batu Kepala Tukang Mandor
Analisa Biaya Konstruksi 7
G.8 G.8.1
1 M² 0.040 0.400 0.200 0.018 2.000
G.8.2 0.660 0.330 0.033 0.033
G.9 G.9.1
1 M² M² 0.040 0.400 0.200 0.015 6.000
G.9.2 0.660 0.330 0.033 0.033
G.10 G.10.1
1 M² 0.030 0.400 0.200 0.020 3.000 4.000
G.10.2 0.660 0.330 0.033 0.033
H. H.1
MEMBUAT BEKESTING UNTUK BALOK Bahan m³ Kayu Kelas III Kg Paku 5 Cm - 10 Cm Liter Minyak Bekesting m³ Balok Kayu Kelas II Btg Bambu Tenaga Oh Oh Oh Oh
Pekerja Tukang Batu Kepala Tukang Mandor
MEMBUAT BEKESTING UNTUK LANTAI Bahan m³ Kayu Kelas III Kg Paku 5 Cm - 10 Cm Liter Minyak Bekesting m³ Balok Kayu Kelas II Btg Bambu Tenaga Oh Oh Oh Oh
Pekerja Tukang Batu Kepala Tukang Mandor
MEMBUAT BEKESTING UNTUK DINDING Bahan m³ Kayu Kelas III Kg Paku 5 Cm - 10 Cm Liter Minyak Bekesting m³ Balok Kayu Kelas II Btg Bambu Buah Formite/Penjaga Jarak Bekesting Tenaga Oh Oh Oh Oh
Pekerja Tukang Batu Kepala Tukang Mandor
@ @ @ @ @
Rp Rp Rp Rp Rp Rp
1,212,500.00 16,000.00 12,500.00 3,181,000.00 7,500.00 Jumlah (1)
Rp Rp Rp Rp Rp Rp
48,500.00 6,400.00 2,500.00 57,258.00 15,000.00 129,658.00
@ @ @ @
Rp Rp Rp Rp
46,500.00 73,500.00 84,500.00 73,500.00 Jumlah (2) Jumlah (1 (1) + (2) Untuk 2 x Pakai
Rp Rp Rp Rp Rp Rp Rp
30,690.00 24,255.00 2,788.50 2,425.50 60,159.00 189,817.00 94,908.50
@ @ @ @ @
Rp Rp Rp Rp Rp Rp
1,212,500.00 16,000.00 12,500.00 3,181,000.00 7,500.00 Jumlah (1)
Rp Rp Rp Rp Rp Rp
48,500.00 6,400.00 2,500.00 47,715.00 45,000.00 150,115.00
@ @ @ @
Rp Rp Rp Rp
46,500.00 73,500.00 84,500.00 73,500.00 Jumlah (2) Jumlah (1 (1) + (2) Untuk 2 x Pakai
Rp Rp Rp Rp Rp Rp Rp
30,690.00 24,255.00 2,788.50 2,425.50 60,159.00 210,274.00 105,137.00
@ @ @ @ @ @
Rp Rp Rp Rp Rp Rp Rp
1,212,500.00 16,000.00 12,500.00 3,181,000.00 7,500.00 Jumlah (1)
Rp Rp Rp Rp Rp Rp Rp
36,375.00 6,400.00 2,500.00 63,620.00 22,500.00 131,395.00
46,500.00 73,500.00 84,500.00 73,500.00 Jumlah (2) Jumlah (1 (1) + (2) Untuk 2 x Pakai
Rp Rp Rp Rp Rp Rp Rp
30,690.00 24,255.00 2,788.50 2,425.50 60,159.00 191,554.00 95,777.00
@ @ @ @
Rp Rp Rp Rp
PEKERJAAN LANTAI KERAMIK DAN KERAMIK DINDING 1 M²
H.1.1
MEMASANG LANTAI KERAMIK UKURAN (40 X 40) CM
6.630 9.800 0.045 1.300
Bahan Buah Kg m³ Kg
Keramik 40x40 Semen Pasir Semen Warna
@ @ @ @
Rp Rp Rp Rp Rp
9,843.67 1,200.00 175,000.00 2,250.00 Jumlah (1)
Rp Rp Rp Rp Rp
65,263.51 11,760.00 7,875.00 2,925.00 87,823.51
0.250 0.125 0.013 0.013
Tenaga Oh Oh Oh Oh
Pekerja Tukang Batu Kepala Tukang Mandor
@ @ @ @
Rp Rp Rp Rp Rp
46,500.00 73,500.00 84,500.00 73,500.00 Jumlah (2) Jumlah (1) + (2)
Rp Rp Rp Rp
11,625.00 9,187.50 1,098.50 955.50 22,866.50 110,690.01
H.1.2
Analisa Biaya Konstruksi 8
H.2
1 M²
MEMASANG LANTAI KERAMIK UKURAN (30 X 30) CM
11.870 10.000 0.045 1.500
Bahan Buah Kg m³ Kg
Keramik 30x30 Semen Pasir Semen Warna
@ @ @ @
Rp Rp Rp Rp Rp
3,500.00 1,200.00 175,000.00 2,250.00 Jumlah (1)
Rp Rp Rp Rp Rp
41,545.00 12,000.00 7,875.00 3,375.00 64,795.00
0.700 0.350 0.035 0.035
Tenaga Oh Oh Oh Oh
Pekerja Tukang Batu Kepala Tukang Mandor
@ @ @ @
Rp Rp Rp Rp Rp
46,500.00 73,500.00 84,500.00 73,500.00 Jumlah (2) Jumlah (1) + (2)
Rp Rp Rp Rp
32,550.00 25,725.00 2,957.50 2,572.50 63,805.00 128,600.00
H.2.1
H.2.2
H.3
1 M²
MEMASANG LANTAI KERAMIK UKURAN (20 X 20) CM
26.500 10.400 0.045 1.620
Bahan Buah Kg m³ Kg
Keramik 20x20 Semen Pasir Semen Warna
@ @ @ @
Rp Rp Rp Rp Rp
1,500.00 1,200.00 175,000.00 2,250.00 Jumlah (1)
Rp Rp Rp Rp Rp
39,750.00 12,480.00 7,875.00 3,645.00 63,750.00
0.700 0.350 0.035 0.035
Tenaga Oh Oh Oh Oh
Pekerja Tukang Batu Kepala Tukang Mandor
@ @ @ @
Rp Rp Rp Rp Rp
46,500.00 73,500.00 84,500.00 73,500.00 Jumlah (2) Jumlah (1) + (2)
Rp Rp Rp Rp
32,550.00 25,725.00 2,957.50 2,572.50 63,805.00 127,555.00
H.3.1
H.3.2
H.4
1 M²
MEMASANG DINDING KERAMIK UKURAN ( 20 X 25 ) CM
22.000 8.190 0.045 2.750
Bahan Buah Kg m³ Kg
Keramik Aristik Semen Pasir Semen Warna
@ @ @ @
Rp Rp Rp Rp Rp
2,490.00 1,200.00 175,000.00 2,250.00 Jumlah (1)
Rp Rp Rp Rp Rp
54,780.00 9,828.00 7,875.00 6,187.50 78,670.50
0.700 0.350 0.035 0.035
Tenaga Oh Oh Oh Oh
Pekerja Tukang Batu Kepala Tukang Mandor
@ @ @ @
Rp Rp Rp Rp Rp
46,500.00 73,500.00 84,500.00 73,500.00 Jumlah (2) Jumlah (1) + (2)
Rp Rp Rp Rp
32,550.00 25,725.00 2,957.50 2,572.50 63,805.00 142,475.50
Besi Profil Siku 50.50.5 Besi Profil Siku 70.70.7
@ @
Rp 5,685.23 Rp 10,372.63 Jumlah (1) Siku 50.50.5 Jumlah (1) Siku 70.70.7
Pekerja Tukang Las Kepala Tukang Mandor
@ @ @ @
Rp Rp Rp Rp
H.4.1
H.4.2
I I.1 I.1.1
PEKERJA PEKERJAAN AN BESI, BESI, ALUMUNI ALUMUNIUM, UM, PLAFOND PLAFOND DAN KONSTR KONSTRUKS UKSII PENU PENUTUP TUP 1 KG
MEMASANG BESI PROFIL
Bahan 1.150 Kg 1.150 Kg
I.1.2 0.060 0.060 0.006 0.003
Tenaga Oh Oh Oh Oh
Analisa Biaya Konstruksi 9
46,500.00 66,500.00 84,500.00 73,500.00 Jumlah ( 2 ) Siku 50.50.5 Siku 70.70.7
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
6,538.02 11,928.52 6,538.02 11,928.52 2,790.00 3,990.00 507.00 220.50 7,507.50 14,045.52 19,436.02
I.2 I.2.1
1M²
Bahan 1.000 m²
I.2.2 1.000 1.000 0.100 0.050
I.3 I.3.1
1 M2 3.500 3.000 2.250 8.000 25.000 1.000
I.3.2 0.300 0.030 0.300 0.015
I.4 I.4.1
@
Rp
Pekerja Tukang Aluminium Kepala Tukang Mandor
@ @ @ @
Rp Rp Rp Rp Rp
500,000.00 Rp Jumlah (1) 46,500.00 66,500.00 84,500.00 73,500.00 Jumlah ( 2 ) Jumlah (1) + (2)
500,000.00 500,000.00
Rp Rp Rp Rp Rp Rp
46,500.00 66,500.00 8,450.00 3,675.00 125,125.00 625,125.00
PEK. PEK. RANG RANGKA KA ATAP ATAP BAJA BAJA RING RINGAN AN Bahan M' Canal C Truss 75 M' GOC 0.35 mm (Reng+Skoring Angin) M' L Braket Bh Dynabolt Lbr Self Drilling Screw Ls Alat Bantu
@ @ @ @ @ @
Rp Rp Rp Rp Rp Rp
14,000.00 8,250.00 14,000.00 3,000.00 275.00 15,000.00 Jumlah ( 1 )
Rp Rp Rp Rp Rp Rp Rp
49,000.00 24,750.00 31,500.00 24,000.00 6,875.00 15,000.00 151,125.00
Tenaga oh oh oh oh
@ @ @ @
Rp Rp Rp Rp Rp Rp
73,500.00 84,500.00 46,500.00 73,500.00 Jumlah ( 2 ) Jumlah ( 1 ) + ( 2 )
Rp Rp Rp Rp Rp Rp
22,050.00 2,535.00 13,950.00 1,102.50 39,637.50 190,762.50
@ @
Rp Rp
60,000.00 275.00 Jumlah ( 1 )
Rp Rp Rp
66,000.00 1,650.00 67,650.00
@ @ @ @
Rp Rp Rp Rp Rp
46,500.00 73,500.00 84,500.00 73,500.00 Jumlah ( 2 ) Jumlah ( 1 ) + ( 2 )
Rp Rp Rp Rp Rp Rp
279.00 8,820.00 5,070.00 441.00 14,610.00 82,260.00
@ @
Rp Rp
28,750.00 275.00 Jumlah ( 1 )
Rp Rp Rp
31,625.00 1,650.00 33,275.00
@ @ @ @
Rp Rp Rp Rp Rp
73,500.00 84,500.00 46,500.00 73,500.00 Jumlah ( 2 ) Jumlah ( 1 ) + ( 2 )
Rp Rp Rp Rp Rp Rp
11,025.00 5,915.00 372.00 441.00 17,753.00 51,028.00
Tukang Kepala tukang Pekerja Mandor
PASA PASANG NG ATA ATAP P ZINC ZINCAL ALUM UME E (SPA (SPAND NDEK EK)) Bahan 1.100 m2 Atap Spandek 0,30 mm 6.000 bh Paku skrup+Mur
0.006 0.120 0.060 0.006
Tenaga oh oh oh oh
Pekerja Tukang Kepala tukang Mandor
1M2 1M2
PASA PASAN NG AT ATAP AP NOK NOK ZINC ZINCAL ALUM UME E Bahan 1.100 m' Nok Zincalume 6.000 bh Paku skrup+Mur
I.5.2 0.150 0.070 0.008 0.006
I.6
Tenaga Oh Oh Oh Oh
Rolling Door Alumunium
1M2 1M2
I.4.2
I.5 I.5.1
MEMASANG ROLLING DOOR ALUMUNIUM
2
1M
I.6.1
Tenaga oh oh oh oh
Tukang Kepala tukang Pekerja Mandor
PASANG RANGKA HOLLOW + PLAFOND GYPSUM BOARD 9 mm
4.600 0.250 0.110 0.364
Bahan m' Kg Kg Lbr
Besi Hollow 20x40 & 40x40 Kawat Penggantung Skrup Gypsum Board
@ @ @ @
Rp Rp Rp Rp Rp
15,000.00 17,000.00 25,000.00 70,000.00 Jumlah ( 1 )
Rp Rp Rp Rp Rp
69,000.00 4,250.00 2,750.00 25,480.00 101,480.00
0.050 0.005 0.100 0.005
Tenaga oh oh oh oh
Tukang Plafond Kepala tukang Pekerja Mandor
@ @ @ @
Rp Rp Rp Rp Rp
73,500.00 84,500.00 46,500.00 73,500.00 Jumlah ( 2 ) Jumlah ( 1 ) + ( 2 )
Rp Rp Rp Rp Rp Rp
3,675.00 422.50 4,650.00 367.50 9,115.00 110,595.00
I.6.2
Analisa Biaya Konstruksi 10
2
I.7
1M
I.7.1 4.600 0.250 0.110 0.364
Besi Hollow 20x40 & 40x40 Kawat Beton Skrup Calsiboard 3,5 mm
@ @ @ @
Rp Rp Rp Rp Rp
15,000.00 17,000.00 25,000.00 62,475.00 Jumlah ( 1 )
Rp Rp Rp Rp Rp
69,000.00 4,250.00 2,750.00 22,740.90 98,740.90
0.050 0.005 0.100 0.005
Tenaga oh oh oh oh
Tukang Plafond Kepala tukang Pekerja Mandor
@ @ @ @
Rp Rp Rp Rp Rp
73,500.00 84,500.00 46,500.00 73,500.00 Jumlah ( 2 ) Jumlah ( 1 ) + ( 2 )
Rp Rp Rp Rp Rp Rp
3,675.00 422.50 4,650.00 367.50 9,115.00 107,855.90
I.7.2
J J.1 J.1.1
PEKE PEKERJ RJAA AAN N PI PIPA PA DAN DAN SANI SANITE TER R 1 BH
3.000 1.100 0.001 0.160
J.2.1
1 BH
Tenaga Oh Oh Oh Oh
1.000 1.500 1.500 0.160
1 BH
J.4.1
Tenaga Oh Oh Oh Oh
@ @
Rp Rp Rp
1,706,000.00 Rp 102,360.00 Rp Jumlah (1) Rp
1,706,000.00 102,360.00 1,808,360.00
Pekerja Tukang Batu Kepala Tukang Mandor
@ @ @ @
Rp Rp Rp Rp Rp
46,500.00 73,500.00 84,500.00 73,500.00 Jumlah (2) Jumlah (1) + (2)
Rp Rp Rp Rp Rp Rp
139,500.00 80,850.00 84.50 11,760.00 232,194.50 2,040,554.50
Kloset Jongkok Porselen Semen Portland Pasir Pasang
@ @ @
Rp Rp Rp Rp Rp
242,000.00 1,200.00 175,000.00 Jumlah (1)
Rp Rp Rp Rp
242,000.00 7,200.00 1,750.00 250,950.00
Pekerja Tukang Batu Kepala Tukang Mandor
@ @ @ @
Rp Rp Rp Rp Rp
46,500.00 73,500.00 84,500.00 73,500.00 Jumlah (2) Jumlah (1) + (2)
Rp Rp Rp Rp Rp Rp
46,500.00 110,250.00 126,750.00 11,760.00 295,260.00 546,210.00
Urinoir Perlengkapan dari nilai Material Semen Portland Pasir Pasang
@ @ @ @
Rp Rp Rp Rp Rp Rp
918,000.00 9,180.00 1,200.00 175,000.00 Jumlah (1)
Rp Rp Rp Rp Rp
918,000.00 275,400.00 7,200.00 1,750.00 1,202,350.00
Pekerja Tukang Batu Kepala Tukang Mandor
@ @ @ @
Rp Rp Rp Rp Rp
46,500.00 73,500.00 84,500.00 73,500.00 Jumlah (2) Jumlah (1) + (2)
Rp Rp Rp Rp Rp Rp
46,500.00 73,500.00 8,450.00 7,350.00 135,800.00 1,338,150.00
MEMASANG 1 BUAH URINIOR
1.000 30.00 6.000 0.010
Bahan Bh % Kg m³
1.000 1.000 0.100 0.100
Tenaga Oh Oh Oh Oh
J.4.2
Kloset Duduk/Monoblok Perlengkapan
MEMASANG KLOSET JONGKOK PORSELEN
Bahan 1.000 Bh 6.000 Kg 0.010 m³
J.1.2
J.4
MEMASANG KLOSET DUDUK/MONOBLOK
Bahan 1.000 Bh 6.000 %
J.1.2
J.2
PASANG RANGKA HOLLOW + PLAFOND CALSIBOARD 3,5 mm Bahan m' Kg Kg Lbr
Analisa Biaya Konstruksi 11
J.23 J.23.1
1M'
Bahan 1.200 m' 35.00 %
J.23.2 0.108 0.180 0.018 0.005
J.2 J.2.1
1M'
0.036 0.060 0.006 0.002
J.3.1
1M'
0.036 0.060 0.006 0.002
J.4.1
1M'
0.036 0.060 0.006 0.002
J.5 J.5.1
Tenaga Oh Oh Oh Oh
1M'
Tenaga Oh Oh Oh Oh
0.036 0.060 0.006 0.002
Rp Rp
Pekerja Tukang Kepala Tukang Mandor
@ @ @ @
Rp Rp Rp Rp Rp
Pipa Union Untuk Kabel Perlengkapan dari Nilai Material
@ @
Rp Rp
Pekerja Tukang Batu Kepala Tukang Mandor
@ @ @ @
Rp Rp Rp Rp
Pipa PVC Perlengkapan dari Nilai Material
@ @
Rp Rp
Pekerja Tukang Batu Kepala Tukang Mandor
@ @ @ @
Rp Rp Rp Rp Rp
Pipa PVC Perlengkapan dari Nilai Material
@ @
Rp Rp
Pekerja Tukang Batu Kepala Tukang Mandor
@ @ @ @
Rp Rp Rp Rp Rp
Pipa PVC Perlengkapan dari Nilai Material
@ @
Rp Rp
Pekerja Tukang Batu Kepala Tukang Mandor
@ @ @ @
Rp Rp Rp Rp Rp
126,866.67 Rp 1,268.67 Rp Jumlah (1) Rp 46,500.00 73,500.00 84,500.00 73,500.00 Jumlah (2) Jumlah (1) + (2)
152,240.00 44,403.33 196,643.33
Rp Rp Rp Rp Rp Rp
5,022.00 13,230.00 1,521.00 396.90 20,169.90 216,813.23
1,625.00 Rp 16.25 Rp Jumlah (1) Rp
1,950.00 568.75 2,518.75
Jumlah (2) Jumlah (1) + (2)
Rp Rp Rp Rp Rp Rp
2,518.75
1,750.00 Rp 17.50 Rp Jumlah (1) Rp
2,100.00 612.50 2,712.50
46,500.00 73,500.00 84,500.00 73,500.00 Jumlah (2) Jumlah (1) + (2)
Rp Rp Rp Rp Rp Rp
1,674.00 4,410.00 507.00 132.30 6,723.30 9,435.80
2,400.00 Rp 24.00 Rp Jumlah (1) Rp
2,880.00 840.00 3,720.00
MEMASANG PIPA PVC TIPE AW DIAMETER 3/4 "
Tenaga Oh Oh Oh Oh
46,500.00 73,500.00 84,500.00 73,500.00 Jumlah (2) Jumlah (1) + (2)
Rp Rp Rp Rp Rp Rp
1,674.00 4,410.00 507.00 132.30 6,723.30 10,443.30
3,266.67 Rp 32.67 Rp Jumlah (1) Rp
3,920.00 1,143.33 5,063.33
MEMASANG PIPA PVC TIPE AW DIAMETER 1 "
Bahan 1.200 m' 35.00 %
J.5.2
@ @
MEMASANG PIPA PVC TIPE AW DIAMETER 1/2 "
Bahan 1.200 m' 35.00 %
J.4.2
Pipa GIP Perlengkapan dari Nilai Material
MEMASA MEM ASANG NG PIP PIPA A UNIO UNION N UNTU UNTUK K KABE KABELL DIAME DIAMETE TER R 5/8 5/8 "
Bahan 1.200 m' 35.00 %
J.3.2
J.4
Tenaga Oh Oh Oh Oh
Bahan 1.200 m' 35.00 %
J.2.2
J.3
MEMASANG PIPA GIP DIAMETER 3 "
Tenaga Oh Oh Oh Oh
Analisa Biaya Konstruksi 12
46,500.00 73,500.00 84,500.00 73,500.00 Jumlah (2) Jumlah (1) + (2)
Rp Rp Rp Rp Rp Rp
1,674.00 4,410.00 507.00 132.30 6,723.30 11,786.63
J.6 J.6.1
1 M'
Bahan 1.200 m' 35.00 %
J.6.2 0.036 0.060 0.006 0.002
J.7 J.7.1
1M'
0.054 0.090 0.009 0.003
J.9.1
1 M'
0.036 0.060 0.006 0.002
J.10.1
1 M'
0.081 0.135 0.014 0.0041
J.11 J.11.1
Tenaga Oh Oh Oh Oh
1 M'
Tenaga Oh Oh Oh Oh
0.081 0.135 0.014 0.0041
Rp Rp
Pekerja Tukang Batu Kepala Tukang Mandor
@ @ @ @
Rp Rp Rp Rp Rp
Pipa PVC Perlengkapan dari Nilai Material
@ @
Rp Rp
Pekerja Tukang Batu Kepala Tukang Mandor
@ @ @ @
Rp Rp Rp Rp Rp
Pipa PVC Perlengkapan dari Nilai Material
@ @
Rp Rp
Pekerja Tukang Batu Kepala Tukang Mandor
@ @ @ @
Rp Rp Rp Rp Rp
Pipa PVC Perlengkapan dari Nilai Material
@ @
Rp Rp
Pekerja Tukang Batu Kepala Tukang Mandor
@ @ @ @
Rp Rp Rp Rp Rp
Pipa PVC Perlengkapan dari Nilai Material
@ @
Rp Rp
Pekerja Tukang Batu Kepala Tukang Mandor
@ @ @ @
Rp Rp Rp Rp Rp
5,466.67 Rp 54.67 Rp Jumlah (1) Rp 46,500.00 73,500.00 84,500.00 73,500.00 Jumlah (2) Jumlah (1) + (2)
6,560.00 1,913.33 8,473.33
Rp Rp Rp Rp Rp Rp
1,674.00 4,410.00 507.00 132.30 6,723.30 15,196.63
7,650.00 Rp 76.50 Rp Jumlah (1) Rp
9,180.00 2,677.50 11,857.50
46,500.00 73,500.00 84,500.00 73,500.00 Jumlah (2) Jumlah (1) + (2)
Rp Rp Rp Rp Rp Rp
2,511.00 6,615.00 760.50 198.45 10,084.95 21,942.45
9,833.33 Rp 98.33 Rp Jumlah (1) Rp
11,800.00 3,441.67 15,241.67
46,500.00 73,500.00 84,500.00 73,500.00 Jumlah (2) Jumlah (1) + (2)
Rp Rp Rp Rp Rp Rp
1,674.00 4,410.00 507.00 132.30 6,723.30 21,964.97
12,016.67 Rp 120.17 Rp Jumlah (1) Rp
14,420.00 4,205.83 18,625.83
MEMASANG PIPA PV PVC TIPE AW AW DI DIAMETER 3 "
Tenaga Oh Oh Oh Oh
46,500.00 73,500.00 84,500.00 73,500.00 Jumlah (2) Jumlah (1) + (2)
Rp Rp Rp Rp Rp Rp
3,766.50 9,922.50 1,140.75 301.35 15,131.10 33,756.93
18,583.33 Rp 185.83 Rp Jumlah (1) Rp
22,300.00 6,504.17 28,804.17
MEMASANG PIPA PV PVC TIPE AW AW DI DIAMETER 4 "
Bahan 1.200 m' 35.00 %
J.11.2
@ @
MEMASANG PIPA PV PVC TIPE AW AW DI DIAMETER 2 1/ 1/2 "
Bahan 1.200 m' 35.00 %
J.10.2
Pipa PVC Perlengkapan dari Nilai Material
MEMASANG PIPA PVC TIPE AW DIAMETER 2 "
Bahan 1.200 m' 35.00 %
J.9.2
J.10
Tenaga Oh Oh Oh Oh
Bahan 1.200 m' 35.00 %
J.8
J.9
MEMASANG PIPA PV PVC TIPE AW AW DI DIAMETER 1 1/ 1/2 "
Tenaga Oh Oh Oh Oh
Analisa Biaya Konstruksi 13
46,500.00 73,500.00 84,500.00 73,500.00 Jumlah (2) Jumlah (1) + (2)
Rp Rp Rp Rp Rp Rp
3,766.50 9,922.50 1,140.75 301.35 15,131.10 43,935.27
J.12 J.12.1
1 BH BH
Bahan 1.000 Bh 0.250 Bh
J.12.2 0.010 0.100 0.010 0.005
J.13 J.13.1
1 BH
0.010 0.100 0.010 0.005
K. 1 K.1.1
1 BH
1 BH
0.010 0.500 0.010 0.005
K.3.1
Tenaga Oh Oh Oh Oh
Rp Rp
Pekerja Tukang Batu Kepala Tukang Mandor
@ @ @ @
Rp Rp Rp Rp Rp
Floor Drain
@
Rp
Pekerja Tukang Batu Kepala Tukang Mandor
@ @ @ @
Rp Rp Rp Rp Rp
Kunci Tanam 2x Putar
@
Rp
Pekerja Tukang Kayu Kepala Tukang Mandor
@ @ @ @
Rp Rp Rp Rp Rp
Kunci 2X Slag
@
Rp Rp
Pekerja Tukang Kayu Kepala Tukang Mandor
@ @ @ @
Rp Rp Rp Rp Rp
Kunci Kamar Mandi
@
Rp Rp
Pekerja Tukang Kayu Kepala Tukang Mandor
@ @ @ @
Rp Rp Rp Rp Rp
13,500.00 Rp 2,000.00 Rp Jumlah (1) Rp 46,500.00 73,500.00 84,500.00 73,500.00 Jumlah (2) Jumlah (1) + (2)
13,500.00 500.00 14,000.00
Rp Rp Rp Rp Rp Rp
465.00 7,350.00 845.00 367.50 9,027.50 23,027.50
27,500.00 Rp Jumlah (1) Rp
27,500.00 27,500.00
46,500.00 73,500.00 84,500.00 73,500.00 Jumlah (2) Jumlah (1) + (2)
Rp Rp Rp Rp Rp Rp
465.00 7,350.00 845.00 367.50 9,027.50 36,527.50
102,000.00 Rp Jumlah (1) Rp
102,000.00 102,000.00
MEMASANG KU KUNCI TANAM ANTIK
Tenaga Oh Oh Oh Oh
1 BH
Tenaga Oh Oh Oh Oh
0.005 0.500 0.005 0.0025
Rp Rp Rp Rp Rp Rp
2,790.00 44,700.00 5,070.00 220.50 52,780.50 154,780.50
62,000.00 Rp Jumlah (1) Rp
62,000.00 62,000.00
46,500.00 74,500.00 84,500.00 73,500.00 Jumlah ( 2 ) Jumlah (1 ) + ( 2 )
Rp Rp Rp Rp Rp Rp
465.00 37,250.00 845.00 367.50 38,927.50 100,927.50
62,000.00 Rp Jumlah (1) Rp
62,000.00 62,000.00
MEMASANG KU KUNCI KAMAR MANDI
Bahan 1.000 Bh
K.3.2
46,500.00 74,500.00 84,500.00 73,500.00 Jumlah ( 2 ) Jumlah (1 ) + ( 2 )
MEMASANG KU KUNCI TANAM BIASA
Bahan 1.000 Bh
K.2.2
K. 3
@ @
MEMASANG FLOOR DRAIN
Bahan 1.000 Bh
0.060 0.600 0.060 0.003
K.2.1
Kran Air Seal Tape
PEKE PEKERJ RJAA AAN N KUN KUNCI CI DAN DAN KAC KACA A
K.1.2
K. 2
Tenaga Oh Oh Oh Oh
Bahan 1.000 Bh
J.13.2
K
MEMASANG KR KRAN DI DIAMETER 3/ 3/4 " ATAU 1/ 1/2 "
Tenaga Oh Oh Oh Oh
Analisa Biaya Konstruksi 14
46,500.00 74,500.00 84,500.00 73,500.00 Jumlah ( 2 ) Jumlah (1 ) + ( 2 )
Rp Rp Rp Rp Rp Rp
232.50 37,250.00 422.50 183.75 38,088.75 100,088.75
K. 4 K.4.1
1 BH
Bahan 1.000 Bh
K.4.2 0.005 0.500 0.005 0.0025
K. 5 K.5.1
1 BH
0.015 0.150 0.015 0.00075
K.7.1
1 BH
Pekerja Tukang Kayu Kepala Tukang Mandor
@ @ @ @
Rp Rp Rp Rp Rp
Engsel Pintu
@
Rp Rp
Pekerja Tukang Kayu Kepala Tukang Mandor
@ @ @ @
Rp Rp Rp Rp Rp
Tenaga Oh Oh Oh Oh
Pekerja Tukang Kayu Kepala Tukang Mandor
@ @ @ @
Rp Rp Rp Rp Rp
Door Holder
@
Rp Rp
Pekerja Tukang Kayu Kepala Tukang Mandor
@ @ @ @
Rp Rp Rp Rp Rp
Kaca 5 mm
@
Rp Rp
Pekerja Tukang Kayu Kepala Tukang Mandor
@ @ @ @
Rp Rp Rp Rp Rp
Tenaga Oh Oh Oh Oh
0.015 0.150 0.015 0.00075
232.50 37,250.00 422.50 183.75 38,088.75 53,588.75
32,500.00 Rp Jumlah (1) Rp
32,500.00 32,500.00
46,500.00 74,500.00 84,500.00 73,500.00 Jumlah ( 2 ) Jumlah (1 ) + ( 2 )
Rp Rp Rp Rp Rp Rp
697.50 11,175.00 1,267.50 55.13 13,195.13 45,695.13
26,000.00 Rp Jumlah (1) Rp
26,000.00 26,000.00
46,500.00 74,500.00 84,500.00 73,500.00 Jumlah ( 2 ) Jumlah (1 ) + ( 2 )
Rp Rp Rp Rp Rp Rp
930.00 14,900.00 1,690.00 735.00 18,255.00 44,255.00
46,500.00 Rp Jumlah (1) Rp
46,500.00 46,500.00
46,500.00 74,500.00 84,500.00 73,500.00 Jumlah ( 2 ) Jumlah (1 ) + ( 2 )
Rp Rp Rp Rp Rp Rp
2,325.00 37,250.00 4,225.00 183.75 43,983.75 90,483.75
82,000.00 Rp Jumlah (1) Rp
90,200.00 90,200.00
MEMASANG KACA , TEBAL 5 mm
Bahan 1.100 m²
K.9.2
Rp Rp Rp Rp Rp Rp
MEMASANG PEGANGAN PINTU / DO DOOR HOLDER
Bahan 1.000 Bh
1 M²
46,500.00 74,500.00 84,500.00 73,500.00 Jumlah ( 2 ) Jumlah (1 ) + ( 2 )
15,500.00 15,500.00
MEMASANG EN ENGSEL JENDELA
Tenaga Oh Oh Oh Oh
1 BH BH
15,500.00 Rp Jumlah (1) Rp
MEMASANG EN ENGSEL PINTU
Rp Rp Rp
0.050 0.500 0.050 0.0025
K.9.1
Rp Rp
@
K.8.2
K. 9
@
Engsel Jendela
0.020 0.200 0.020 0.010
K.8.1
Kunci lemari mutu baik
Bahan 1.000 Bh
K.7.2
K. 8
Tenaga Oh Oh Oh Oh
Bahan 1.000 Bh
K.5.2
K. 7
MEMASANG LE LEMARI MUTU BAIK
Tenaga Oh Oh Oh Oh
Analisa Biaya Konstruksi 15
46,500.00 74,500.00 84,500.00 73,500.00 Jumlah ( 2 ) Jumlah (1 ) + ( 2 )
Rp Rp Rp Rp Rp Rp
697.50 11,175.00 1,267.50 55.13 13,195.13 103,395.13
L L.1 L.1.1
P EK EKERJA AN AN P EN ENGECATAN 1 M² 0.200 0.150 0.170 0.260
L.1.2 0.070 0.009 0.0060 0.0025
L.2 L.2.1
1 M² 0.100 0.100 0.260
L.2.2 0.020 0.063 0.006 0.0025
M M.1 M.1.1
Rp Rp Rp Rp Rp Rp
3,255.00 661.50 507.00 183.75 4,607.25 32,798.25
Rp Rp Rp Rp
2,650.00 1,300.00 3,380.00 7,330.00
Rp Rp Rp Rp Rp Rp
930.00 4,630.50 532.35 183.75 6,276.60 13,606.60
14,000.00 Rp 1,400.00 Rp Jumlah ( 1 ) Rp
16,800.00 2,100.00 18,900.00
PENGECATAN TEMBOK BARU ( 1 LAPIS PLAMUR , 1 LAPIS CAT DASAR , 2 LAPIS CAT PENUTUP ) Bahan Kg Plamur @ Rp 26,500.00 Kg Cat Dasar @ Rp 13,000.00 Kg Cat Penutup 2 X @ Rp Rp 13,000.00 Jumlah ( 1 ) Tenaga Oh Pekerja @ Rp 46,500.00 Oh Tukang Cat @ Rp 73,500.00 Oh Kepala Tukang @ Rp Rp 84,500.00 Oh Mandor @ Rp 73,500.00 Jumlah ( 2 ) Jumlah ( 1 ) + ( 2 )
KABEL JARINGAN LISTRIK Bahan 1.200 m' m' Kabel Jaringan Listrik NYA 2.5mm 15 % Perlengkapan dari Nilai Material Tenaga Oh Oh Oh Oh
Pekerja Tukang Listrik Kepala Tukang Mandor
MEMASANG PANEL MCB Bahan 1.000 BH Panel MCB
@ @
Rp Rp
@ Rp @ Rp @ Rp Rp @ Rp
46,500.00 73,500.00 84,500.00 73,500.00 Jumlah ( 2 ) Jumlah ( 1 ) + ( 2 )
Rp Rp Rp Rp Rp Rp
1,674.00 4,410.00 507.00 132.30 6,723.30 25,623.30
26,250.00 Rp Jumlah ( 1 ) Rp
26,250.00 26,250.00
1 BH
M.2.2 0.042 0.085 0.008 0.008
M.3.1
3,920.00 3,975.00 8,024.00 12,272.00 28,191.00
1 M'
0.036 0.060 0.006 0.002
M.3
Rp Rp Rp Rp Rp
PEKE PEKER RJAAN JAAN KELI KELIST STR RIKAN IKAN
M.1.2
M.2 M.2.1
PENGECATAN BIDANG KAYU BARU ( 1 LAPIS PLAMIR) , 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP Bahan Kg Cat meni @ Rp 19,600.00 Kg Plamir @ Rp 26,500.00 Kg Cat Dasar @ Rp 47,200.00 Kg Cat Penutup 2 Kali @ Rp Rp 47,200.00 Jumlah ( 1 ) Tenaga Oh Pekerja @ Rp 46,500.00 Oh Tukang Cat @ Rp 73,500.00 Oh Kepala Tukang @ Rp Rp 84,500.00 Oh Mandor @ Rp 73,500.00 Jumlah ( 2 ) Jumlah ( 1 ) + ( 2 )
Tenaga Oh Oh Oh Oh
Pekerja Tukang Listrik Kepala Tukang Mandor
MEMASANG LAMPU SL 20 WATT Bahan 1.000 Buah Lampu SL 20 watt
@
Rp
@ Rp @ Rp @ Rp Rp @ Rp
46,500.00 73,500.00 84,500.00 73,500.00 Jumlah ( 2 ) Jumlah ( 1 ) + ( 2 )
Rp Rp Rp Rp Rp Rp
1,965.32 6,212.93 714.28 621.29 9,513.82 35,763.82
43,181.25 Rp Jumlah ( 1 ) Rp
43,181.25 43,181.25
1 BH
M.3.2 0.007 0.014 0.001 0.001
Tenaga Oh Oh Oh Oh
Pekerja Tukang Listrik Kepala Tukang Mandor
@
Rp
@ Rp @ Rp @ Rp Rp @ Rp
Analisa Biaya Konstruksi 16
46,500.00 73,500.00 84,500.00 73,500.00 Jumlah ( 2 ) Jumlah ( 1 ) + ( 2 )
Rp Rp Rp Rp Rp Rp
336.91 1,065.07 122.45 106.51 1,630.94 44,812.19
M.4 M.4.1
MEMASANG LAMPU SL 15 WATT Bahan 1.000 Buah Lampu SL 15 watt
1 BH
M.4.2 0.010 0.021 0.002 0.00004
M.5 M.5.1
MEMASANG STOP KONTAK 16 Amp. Bahan 1.000 Buah Stop kontak 16 Amp.
0.023 0.047 0.005 0.005
M.6.1
Pekerja Tukang Listrik Kepala Tukang Mandor
Tenaga Oh Oh Oh Oh
Pekerja Tukang Listrik Kepala Tukang Mandor
MEMASANG SAKLAR GANDA Bahan 1.000 Buah Saklar Ganda
0.025 0.051 0.005 0.005
M.8.1
46,500.00 73,500.00 84,500.00 73,500.00 Jumlah ( 2 ) Jumlah ( 1 ) + ( 2 )
40,096.88 40,096.88
Rp Rp Rp Rp Rp Rp
486.65 1,538.44 176.87 3 .2 0 2,205.15 42,302.03
@
Rp
14,500.00 Rp Jumlah ( 1 ) Rp
14,500.00 14,500.00
@ Rp @ Rp @ Rp Rp @ Rp
46,500.00 73,500.00 84,500.00 73,500.00 Jumlah ( 2 ) Jumlah ( 1 ) + ( 2 )
Rp Rp Rp Rp Rp Rp
1,085.60 3,431.91 394.55 343.19 5,255.25 19,755.25
@
Rp
10,500.00 Rp Jumlah ( 1 ) Rp
10,500.00 10,500.00
@ Rp @ Rp @ Rp Rp @ Rp
46,500.00 73,500.00 84,500.00 73,500.00 Jumlah ( 2 ) Jumlah ( 1 ) + ( 2 )
Rp Rp Rp Rp Rp Rp
786.13 2,485.17 285.71 248.52 3,805.53 14,305.53
15,750.00 Rp Jumlah ( 1 ) Rp
15,750.00 15,750.00
1 BH
M.7.2
M.8
Tenaga Oh Oh Oh Oh
MEMASANG SAKLAR TUNGGAL Bahan 1.000 Buah Saklar Tunggal
0.017 0.034 0.003 0.003
M.7.1
@ Rp @ Rp @ Rp Rp @ Rp
40,096.88 Rp Jumlah ( 1 ) Rp
1 BH
M.6.2
M.7
Pekerja Tukang Listrik Kepala Tukang Mandor
Rp
1 BH
M.5.2
M.6
Tenaga Oh Oh Oh Oh
@
Tenaga Oh Oh Oh Oh
Pekerja Tukang Listrik Kepala Tukang Mandor
MEMASANG PANIL BOX Bahan 1.000 Bu Buah Panil Box + Accecories + Lengkap
@
Rp
@ Rp @ Rp @ Rp Rp @ Rp
46,500.00 73,500.00 84,500.00 73,500.00 Jumlah ( 2 ) Jumlah ( 1 ) + ( 2 )
Rp Rp Rp Rp Rp Rp
1,179.19 3,727.76 428.57 372.78 5,708.29 21,458.29
75,000.00 Rp Jumlah ( 1 ) Rp
75,000.00 75,000.00
1 BH
M.8.2 0.031 0.063 0.006 0.006
Tenaga Oh Oh Oh Oh
Pekerja Tukang Listrik Kepala Tukang Mandor
@
Rp
@ Rp @ Rp @ Rp Rp @ Rp
Analisa Biaya Konstruksi 17
46,500.00 73,500.00 84,500.00 73,500.00 Jumlah ( 2 ) Jumlah ( 1 ) + ( 2 )
Rp Rp Rp Rp Rp Rp
1,459.95 4,615.32 530.61 461.53 7,067.41 82,067.41
M.9 M.9.1
MEMASANG INSTALASI TITIK LAMPU Bahan 1.000 Buah Fitting Lampu
1 BH
M.9.2 0.007 0.014 0.001 0.001
M.10 M.10.1
Tenaga Oh Oh Oh Oh
@
Pekerja Tukang Listrik Kepala Tukang Mandor
Rp
@ Rp @ Rp @ Rp Rp @ Rp
MEMASANG INSTALASI STOP KONTAK & SAKLAR Bahan 1.200 m' Instalasi Kabel NYA 1,5mm
7,500.00 Rp Jumlah ( 1 ) Rp 46,500.00 73,500.00 84,500.00 73,500.00 Jumlah ( 2 ) Jumlah ( 1 ) + ( 2 )
7,500.00 7,500.00
Rp Rp Rp Rp Rp Rp
336.91 1,065.07 122.45 106.51 1,630.94 9,130.94
3,920.00 Rp Jumlah ( 1 ) Rp
4,704.00 4,704.00
1 BH
M.10.2 0.007 0.014 0.001 0.001
Tenaga Oh Oh Oh Oh
Pekerja Tukang Listrik Kepala Tukang Mandor
@
Rp
@ Rp @ Rp @ Rp Rp @ Rp
Sumber : * SNI Tahun Tahun 2007 2007 Tentang Tentang Tata Cara Perhitu Perhitungan ngan Harga Satuan Satuan Pekerjaan Pekerjaan Konstru Konstruksi ksi Bangunan Gedung dan Perumahan Departemen Pekerjaan Umum * Handbook Handbook SNI Tahun 2008 Tentang Tentang Tata Tata Cara Perhitunga Perhitungan n Harga Harga Satuan Satuan Pekerjaan Pekerjaan Konstruksi Konstruksi Bangunan Gedung dan Perumahan Badan Standarisasi Nas ional
Analisa Biaya Konstruksi 18
46,500.00 73,500.00 84,500.00 73,500.00 Jumlah ( 2 ) Jumlah ( 1 ) + ( 2 )
Rp Rp Rp Rp Rp Rp
336.91 1,065.07 122.45 106.51 1,630.94 6,334.94