REKAPITULASI ANALISA HARGA PEKERJAAN PROYEK TAHUN ANGGARAN 2014
NO
K. Baru
1 2 3 4 5 6 7 8 9 10 11 12 13 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 14 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79
A 02 A 04 A 05 A 07 B 01 B 02 B 03 B 04 B 05 B 06 C 01 C 02 C 04 D 01 D 02 D 03 D 06 D 08 D 10 D 11 D 12 D 13 D 14 D 15 D 16 D 17 D 18 D 19 D 21 D 22 D 23 D 24 D 25 E 01 E 05 E 08 E 11 F 01 F 02 F 03 F 04 F 05 F 06 F 08 G 05 G 06 H 02 H 03 H 04 H 14 H 15 I 01 I 02 I 03 I 04 I 05 I 06 I 08 J 03 J 04 N 11 N 12 Q 01 Q 02 Q 03 Q 04 Q 05 Q 06 Q 07 Q 08 Q 09 Q 10 Q 11 Q 12 Q 13 Q 14 Q 15 Q 19 R 10
PEKERJAAN
SATUAN
1 M1 PEK. PASANGAN BOUWPLANK
m
1 M2 PEK. KANTOR DIREKSI
m2
1 M2 PAPAN NAMA PROYEK
m2
PENGUKURAN DAN PEMASANGAN PATOK MOBILISASI ALAT BERAT (KHUSUS PEKERJAAN HOT MIX) JARAK JAUH/RIT
m Rit
MOBILISASI ALAT BERAT (KHUSUS PEKERJAAN HOT MIX) JARAK SEDANG/RIT
Rit
MOBILISASI ALAT BERAT (KHUSUS PEKERJAAN HOT MIX) JARAK DEKAT/RIT
Rit
MOBILISASI MATERIAL (UNTUK LANGSIR/KHUSUS PEKERJAAN BETON) JARAK JAUH / M3 (> 1 km)
m3
MOBILISASI MATERIAL (UNTUK LANGSIR/KHUSUS PEKERJAAN BETON) JARAK SEDANG / M3 (0,5 - 1 km)
m3
MOBILISASI MATERIAL (UNTUK LANGSIR/KHUSUS PEKERJAAN BETON) JARAK DEKAT / M3 (< 0,5 km)
m3
BONGKARAN BETON BERTULANG
m3
BONGKARAN BETON BERTULANG DENGAN MENGGUNAKAN ALAT
m3
BONGKARAN DINDING BATA/BATU
m3
GALIAN TANAH BIASA SEDALAM 1 M
m3
GALIAN TANAH BIASA SEDALAM 2 M
m3
GALIAN TANAH BIASA SEDALAM 3 M
m3
GALIAN TANAH KERAS SEDALAM 1 M
m3
GALIAN TANAH LUMPUR SEDALAM 1 M
m3
PEMBUANGAN TANAH SEJAUH 30 M
m3
PERATAAN TANAH
m3
PEMADATAN TANAH
m3
URUGAN PASIR
m3
PENGURUGAN DAN PEMADATAN DGN SIRTU (MENGGUNAKAN BURUH)
m3
PENGURUGAN DAN PEMADATAN DGN TANAH PILIHAN (MENGGUNAKAN BURUH)
m3
PENIMBUNAN BADAN JALAN (MENGGUNAKAN BURUH)
m3
PEMADATAN BADAN JALAN (MENGGUNAKAN BURUH)
m3
PENYIAPAN TANAH DASAR (MENGGUNAKAN BURUH)
ARE
PENYIAPAN TANAH DASAR (MENGGUNAKAN ALAT)
m3
PERATAAN TANAH DAN PEMADATAN SETIAP 20 CM DENGAN ALAT
m3
URUGAN PASIR DAN PEMADATAN SETIAP 20 CM DENGAN ALAT
m3
PEKERJAAN URUGAN SIRTU UNTUK PONDASI
m3
PEMBENTUKAN BAHU JALAN (MENGGUNAKAN BURUH)
m3
PEMBENTUKAN BAHU JALAN MATERIAL SPLIT 5 - 7 (MENGGUNAKAN BURUH)
m3
PEKERJAAN PONDASI BATAKO AD. 1 : 4
m3
PEKERJAAN STOOTWERK
m
PASANGAN SIARAN AD. 1 : 2
m2
PASANGAN BATU BELAH 1 PC : 4 PS (MENGADUK MORTAR DENGAN CONCRETE MIXER)
m3
PENGHAMPARAN BETON NON STRUKTUR/RABAT KELAS Bo (READY MIX CONCRETE)
m3
PENGHAMPARAN BETON STRUKTUR K 125 (READY MIX CONCRETE)
m3
PENGHAMPARAN BETON STRUKTUR K 175 (READY MIX CONCRETE)
m3
PENGHAMPARAN BETON STRUKTUR K 225 (READY MIX CONCRETE)
m3
PENGHAMPARAN BETON STRUKTUR K 300 (READY MIX CONCRETE)
m3
PENGHAMPARAN BETON STRUKTUR K 350 (READY MIX CONCRETE)
m3
BETON STRUKTUR K 225 (SITE MIX)
m3
1 M2 PASANGAN BATA MERAH 1 : 3
m2
1 M2 PASANGAN BATA MERAH 1 : 4
m2
1 M3 KUDA-KUDA BORNEO SUPER
m3
1 M3 KUDA-KUDA KAMPER KRUING
m3
1 M3 KUDA-KUDA KAMPER BANJAR
m3
PASANG ATAP SENG GELOMBANG
m2
PASANG BUBUNG SENG STEEL GELOMBANG
m
PERANCAH KAYU KONSTRUKSI BETON (BEKISTING)
m2
PASANG RANGKA DINDING PEMISAH KAYU KAMPER
m2
PASANG RANGKA DINDING PEMISAH KAYU BORNEO
m2
PASANG DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA KAYU KAMPER
m2
PASANG DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU KAMPER
m2
PASANG DINDING TRIPLEKS & RANGKA KAYU BALOK BORNEO
m2
PASANG TRIPLEKS TEBAL 3 MM
m2
1 M2 PLESTERAN DINDING 1 : 3 + ACIAN
m2
PLESTERAN 1 PC : 3 PS, TEBAL 15 MM
m2
PENGECATAN PERMUKAAN BAJA DOWEL DENGAN MENI BESI
m2
PENGECATAN PERMUKAAN BAJA GALVANIZE
m2
LAPIS PONDASI BAWAH KELAS A SIRTU TERSARING (MENGGUNAKAN ALAT)
m3
LAPIS PONDASI BAWAH KELAS C SIRTU TERSARING BERGRADASI (MENGGUNAKAN BURUH)
m3
LAPIS PONDASI BAWAH KELAS C AGREGAT PECAH TERSARING (MENGGUNAKAN BURUH)
m3
LAPIS PONDASI ATAS KELAS A AGREGAT PECAH TERSARING (MENGGUNAKAN BURUH)
m3
PASANGAN LAPIS ATB (MENGGUNAKAN ALAT)
m3
LABUR ASPAL DUA LAPIS (BURDA)
m2
PASANGAN LAPEN
m2
LAPIS ASPAL RESAP PELEKAT (PRIME COAT)
m2
LAPIS ASPAL PELEKAT (TACK COAT)
m2
PENGHAMPARAN LAPIS TIPIS ASPAL BETON (MENGGUNAKAN ALAT)
m2
PENGHAMPARAN LAPIS TIPIS ASPAL BETON
m2
PENGHAMPARAN LAPIS ASPAL BETON-LASTON AC (MENGGUNAKAN ALAT)
m2
PLASTIK BOND BREAKER 1 M1 JOINT CUTTER & JOINT SEALENT PASANGAN CANSTEEN UK. 20.30.60 1 M2 PASANGAN PAVING BLOCK NATURAL 8 CM MENEMPA GELAGAR BESI
m2 m bh m2 kg
NO
K. Baru
80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138
R 11 R 14 R 14a S 01 S 06 S 07 S 08 S 09 S 10 S 11 S 12 S 13 S 14 S 15 S 16 K.112 K.705 DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT DIHIT SNI-Bo SNI-PD5 SNI-CAT8 SNI-CAT14
PEKERJAAN
SATUAN
PASANG GELAGAR BESI
kg
PENULANGAN BETON (BESI ULIR)
kg
PENULANGAN BETON (BESI POLOS)
kg
1 M2 PASANGAN LEMPENGAN RUMPUT SAMPAI TUMBUH
m2
PAS. KISDAM + BONGKARAN (KARUNG)
m
PAS. KISDAM + BONGKARAN (BAMBU)
m
PASANGAN CERUCUK DOLKEN
m2
PASANGAN SULINGAN
m2
PEKERJAAN ANYAMAN BRONJONG TB. 3 MM UK. 1 M3
m
PASANGAN RAILING PIPA GALVANIS (2 BARIS)
m
PELUMURAN BESI DOWEL DENGAN OLI
ltr
1 BUAH PASANG PVC 1" untuk DOWEL
bh
1 BUAH PASANG DOP PVC 1" untuk DOWEL
bh
1 M PASANG PVC 4"
m
1 M1 PASANG BESI SIKU 5 CM
m
PASANGAN BATU PADA PARIT (MENGGUNAKAN BURUH)
m'
KONSTRUKSI PASANGAN BATU (MENGGUNAKAN BURUH) ADUKAN 1 : 5
m3
1 M2 MARKA JALAN THERMOPLASTIK
m
PEKERJAAN PASANGAN BRONJONG
m
RANGKA KAYU
m3
PENGECATAN TEMBOK LAMA
m2
1/2 BUIS BETON DIA. 20 / 1 M'
m
1/2 BUIS BETON DIA. 30 / 1 M' BUIS BETON DIA. 30 / 1 M'
m m
U - DITCH PRECAST WITH SPECIAL SUPPORT UK. 40 X 40
m
U - DITCH PRECAST WITH SPECIAL SUPPORT UK. 50 X 50
m
U - DITCH PRECAST WITH SPECIAL SUPPORT UK. 60 X 60
m
U - DITCH PRECAST WITH SPECIAL SUPPORT UK. 40 X 60
m
U - DITCH PRECAST WITH SPECIAL SUPPORT UK. 50 X 70
m
U - DITCH PRECAST WITH SPECIAL SUPPORT UK. 60 X 70
m
U - DITCH PRECAST WITH SPECIAL SUPPORT UK. 60 X 80
m
U - DITCH PRECAST TANPA TUTUP, UK. 40 X 40
m
U - DITCH PRECAST TANPA TUTUP, UK. 50 X 50
m
U - DITCH PRECAST TANPA TUTUP. UK. 60 X 60
m
U - DITCH PRECAST TANPA TUTUP, UK. 80 X 80
m
U - DITCH PRECAST TANPA TUTUP, UK. 100 X 100
m
U - DITCH PRECAST TANPA TUTUP, UK. 40 X 60
m
U - DITCH PRECAST TANPA TUTUP, UK. 50 X 70
m
U - DITCH PRECAST TANPA TUTUP, UK. 60 X 70
m
U - DITCH PRECAST TANPA TUTUP, UK. 60 X 80
m
PEKERJAAN BOX CULVERT BETON BERTULANG PRECAST UK. 40 X 40
m
PEKERJAAN BOX CULVERT BETON BERTULANG PRECAST, UK. 50 X 50
m
PEKERJAAN BOX CULVERT BETON BERTULANG PRECAST, UK. 60 X 60
m
PEKERJAAN BOX CULVERT BETON BERTULANG PRECAST, UK. 80 X 80
m
PEKERJAAN BOX CULVERT BETON BERTULANG PRECAST, UK. 100 X 100
m
PAS . COVER LIGHT DUTY UK. 40 @ 60 cm
bh
PAS . COVER HEAVY DUTY UK. 40 @ 60 cm
bh
PAS . COVER LIGHT DUTY UK. 50 @ 60 cm
bh
PAS . COVER HEAVY DUTY UK. 50 @ 60 cm
bh
PAS . COVER LIGHT DUTY UK. 60 @ 60 cm
bh
PAS . COVER HEAVY DUTY UK. 60 @ 60 cm
bh
PAS . COVER LIGHT DUTY UK. 80 @ 60 cm
bh
PAS . COVER HEAVY DUTY UK. 80 @ 60 cm
bh
PAS . COVER LIGHT DUTY UK. 100 @ 60 cm
bh
PAS . COVER HEAVY DUTY UK. 100 @ 60 cm
bh
BETON NON STRUKTUR/RABAT KELAS Bo (SITE MIX)
m3
PASANG PONDASI BATU BELAH 1 PC : 4 PS
m3
PENGECATAN BIDANG KAYU BARU (1 LPS PLAMIR, 1 LPS CAT DASAR, 2 LPS CAT PENUTUP)
m2
PENGECATAN TEMBOK BARU (1 LPS PLAMIR, 1 LPS CAT DASAR, 2 LPS CAT PENUTUP)
m2
- Harga Satuan Satuan Pekerjaan Pekerjaan sudah termasuk keuntungan 10% - Harga Satuan Satuan Pekerjaan Pekerjaan belum termasuk PPN 10 % - Harga Satuan Pekerjaan Pekerjaan per triwulan akan akan dievaluasi - Harga Satuan Pekerjaan belum belum termasuk antisipasi terhadap kenaikan kenaikan BBM
Depok,
November
ANALISA HARGA SATUAN DINAS BINA MARGA DAN SU KOTA DEPOK T.A.
Ir.H. EN ENCOK KU KURYA
NIP. 19571002 19571002 19840 19840
HARGA SAT. PEKERJAAN (Rp) 29,960.00 599,310.00 415,810.00 2,487.57 8,519,500.00 7,163,750.00 4,603,500.00 57,887.50 34,925.00 22,962.50 513,320.50 108,680.00 77,000.00 56,375.00 69,300.00 82,445.00 75,020.00 90,750.00 24,695.00 15,818.00 41,250.00 347,050.00 361,900.00 213,766.67 208,340.00 133,100.00 234,420.31 60,538.50 38,154.16 367,961.66 259,930.00 168,311.46 628,203.13 1,262,269.80 177,474.00 49,691.40 818,840.00 874,087.50 793,787.50 856,487.50 896,362.50 1,054,212.50 1,100,412.50 1,042,881.69 176,207.90 159,334.21 3,745,940.00 7,073,440.00 5,034,348.00 63,124.60 81,234.88 146,685.00 185,546.46 129,624.00 356,029.96 509,809.96 178,098.25 30,951.25 60,036.90 55,480.00 25,102.00 21,331.20 254,844.33 329,312.50 295,304.17 254,844.33 2,409,163.34 46,869.80 97,279.30 15,629.91 3,812.06 95,135.56 93,196.03 129,791.54 7,370.00 9,519.42 79,604.22 184,497.50 33,000.00
HARGA SAT. PEKERJAAN (Rp) 1,870.00 25,036.00 25,036.00 50,380.00 346,242.60 138,380.00 117,150.00 21,777.38 244,930.40 121,694.50 21,331.20 4,271.14 3,399.00 54,890.00 23,026.67 613,048.33 939,840.00 237,511.31 527,015.00 2,739,770.00 9,415.14 244,351.62 279,485.22 288,021.37 517,584.00 748,283.34 894,937.14 660,565.82 924,432.48 996,026.21 1,087,160.20 449,298.00 652,840.38 772,470.63 1,160,970.06 2,079,640.46 560,903.21 823,676.83 855,559.54 951,026.87 1,148,137.00 1,269,782.75 1,739,573.17 3,210,261.50 3,928,326.00 143,700.00 152,300.00 183,600.00 208,500.00 220,400.00 262,500.00 278,200.00 353,100.00 578,400.00 746,400.00 879,908.61 815,479.50 48,582.60 35,389.53
2013
PEKERJAAN BER DAYA AIR
2013
A, MM
3 1 005
DAFTAR HARGA SATUAN BAHAN/MATERIAL TAHUN ANGGARAN 2009 NO
BAHAN / MATERIAL
KODE
HARGA SATUAN
SATUAN
1
Abu Batu
m
3
Rp
209,000.00
2
Alat Bantu
set
Rp
300,000.00
3
Ampelas Halus
lbr
Rp
10,500.00
4
Ampelas Kasar
lbr
Rp
16,000.00
5
Ampelas Sedang
lbr
Rp
5,000.00
6
Arang Kayu
kg
Rp
10,000.00
7
Aspal Bitumen
kg
Rp
11,000.00
8
Asphalt Liter (AC) Laston
ton
Rp
944,000.00
9
Asphalt Liter Emulsion / Prime Coat
ltr
Rp
10,000.00
10
Asphalt Liter Lataston (HRS)
ton
Rp
1,154,000.00
11
Asphalt Liter Treated Based (ATB)
ton
Rp
907,000.00
12
III - Laston Spesial
ton
Rp
1,154,000.00
13
Shand Sheet
ton
Rp
1,411,000.00
14
Coldmix
ton
Rp
1,093,000.00
15
Bahan Bakar Residu
ltr
Rp
8,000.00
16
Bambu dia 7 s/d 10
btg
Rp
42,000.00
17
Bambu dia. 5 s/d 7
btg
Rp
21,000.00
18
Bambu Gombong
btg
Rp
66,000.00
16
Bata BA-6-A (6 cm Abu) 1 m2= 44 Bh
m2
Rp
51,200.00
17
Bata BA-6-A (6 cm Merah) 1 m2= 44 Bh
m2
Rp
57,000.00
18
Bata BA-8-A (8 cm Abu) 1 m2= 44 Bh
m2
Rp
66,600.00
19
Bata BA-8-A (8 cm Abu) 1 m2= 44 Bh
m2
Rp
68,300.00
20
Bata Merah Bakar Kelas I
bh
Rp
1,000.00
21
Bata Merah Bakar Kelas II
bh
Rp
1,000.00
22
Bata Merah Oven (Klingker)
bh
Rp
2,000.00
23
Batako Besar 8 x 20 x 30
bh
Rp
3,000.00
24
Batako Kecil 8 x 10 x 20
bh
Rp
2,000.00
25
Batang Kelapa
btg
Rp
258,700.00
26
Batu Belah 15 - 20 cm
M. 020
m
3
Rp
209,000.00
27
Batu Belah Pondasi
M. 020
m
3
Rp
188,000.00
3
Rp
143,000.00
2
Rp
42,000.00
3
Rp
173,000.00
3
Rp
258,000.00
3
Rp
198,000.00
3
Rp
290,000.00
3
Rp
403,000.00
3
Rp
172,000.00
3
Rp
159,000.00
3
Rp
159,000.00
3
m
Rp
188,000.00
bh
Rp
9,200.00
m
2
Rp
282,400.00
M. 061
28
Batu Bronjol (untuk Bronjong)
m
29
Batu Cadas Besar / Sedang
m
30
Batu Pecah 0,5 - 1 cm
M. 026
m
31
Batu Pecah 1 - 2 cm
M. 025
m
32
Batu Pecah 2 - 3 cm
M. 024
33
Batu Pecah 3 - 5 cm
M. 023
34
Batu Pecah 5 - 7 cm
M. 022
35
Batu Pecah Tersaring A
M. 012
36
Batu Pecah Tersaring B
M. 012
37
Batu Pecah Tersaring C
M. 012
38
Batu Kali
39
Baud (untuk jembatan)
40
Besi BCR Lengkap Tiang (Tanpa Pondasi)
M. 163
m m m m m
1 set @ 3 alat
41
Besi Beton U - 24 (Polos)
kg
Rp
18,000.00
15
42
Besi Beton U - 32 KS (Ulir)
kg
Rp
18,000.00
14.83333333
43
Besi Beton Diameter 6 mm
btg
Rp
23,000.00
44
Besi Beton Diameter 8 mm
btg
Rp
49,000.00
45
Besi Beton Diameter 10 mm
btg
Rp
72,000.00
46
Besi Beton Diameter 12 mm
btg
Rp
103,000.00
47
Besi Beton Diameter 16 mm
btg
Rp
189,000.00
48
Besi Beugel Kuda-kuda
kg
Rp
31,100.00
49
Besi Plat tebal 10 mm
m²
Rp
247,600.00
50
Besi Profil
kg
Rp
10,200.00
51
Besi Siku 3 x 30 x 30 mm ( 6 meter)
btg
Rp
47,000.00
52
Besi Siku 3 x 40 x 40 mm ( 6 meter)
btg
Rp
67,400.00
53
Besi Siku 3 x 50 x 50 mm (6 meter)
btg
Rp
101,600.00
54
Bilik Bambu (dengan Kulit)
lbr
Rp
98,900.00
55
Bilik Bambu (tanpa Kulit)
lbr
Rp
69,300.00
56
Blast Bit
57
Bensin Premium
58
Bondek Box Culvert 150.150.100
M. 167
m
KET.
m34
kg
Rp
42,800.00
ltr
Rp
6,500.00
lbr
Rp
119,385.00
(HEAVY DUTY)
m' (btg)
Rp
5,442,700.00
59
Box Culvert 100.100.100
(HEAVY DUTY)
m' (btg)
Rp
3,453,000.00
60
Box Culvert 40.40.100
(HEAVY DUTY)
m' (btg)
Rp
1,028,000.00
61
Box Culvert 50.50.100
(HEAVY DUTY)
m' (btg)
Rp
1,128,000.00
62
Box Culvert 60.60.100
(HEAVY DUTY)
m' (btg)
Rp
1,551,000.00
63
Box Culvert 80.80.100
(HEAVY DUTY)
m' (btg)
Rp
2,869,000.00
NO
BAHAN / MATERIAL
KODE
HARGA SATUAN
SATUAN
64
Buis Beton dia. 100
(Kwalitas 1)
bh
Rp
508,000.00
65
Buis Beton dia. 20
(Kwalitas 1)
bh
Rp
63,000.00
66
Buis Beton dia. 30
(Kwalitas 1)
bh
Rp
89,000.00
67
Buis Beton dia. 40
(Kwalitas 1)
bh
Rp
127,000.00
68
Buis Beton dia. 50
(Kwalitas 1)
bh
Rp
203,000.00
69
Buis Beton dia. 60
(Kwalitas 1)
bh
Rp
317,000.00
70
Buis Beton dia. 80
(Kwalitas 1)
bh
Rp
444,000.00
71
Buis Beton dia. 90
(Kwalitas 1)
bh
Rp
398,000.00
72
Cansteen 10.20.40
bh
Rp
40,000.00
73
Cansteen 15.25.40
bh
Rp
51,000.00
74
Cansteen 20.30.60
bh
Rp
57,000.00
75
Cat Besi
kg
Rp
69,000.00
76
Cat Besi
kg
Rp
37,000.00
77
Cat Bronze
kg
Rp
37,000.00
78
Cat Cansteen Putih
5 Kg
Rp
46,000.00
79
Cat Dasar Beton Eksterior (pelapis Alkali ICI)
ltr
Rp
16,000.00
80
Cat Dasar Beton Interior (2 Pelapis)
ltr
Rp
38,000.00
81
Cat Kayu
kg
Rp
65,000.00
82
Cat Menie
kg
Rp
21,000.00
83
Cat Minyak
kg
Rp
8,000.00
84
Cat Tembok Dulux Eksterior
galon
Rp
1,049,000.00
85
Cat Tembok Dulux Interior
galon
Rp
1,411,000.00
86
Cat Tembok Delux
galon
Rp
330,000.00
87
Cat Tembok Mowilex
galon
Rp
706,000.00
88
Cat Marka
kg
Rp
88,000.00
89
Chek Valve 1/2"
bh
Rp
61,740.00
90
Cover STU 100 Cm HD
btg
Rp
531,300.00
91
Cover STU 100 Cm LD
btg
Rp
411,600.00
92
Cover STU 40 Cm HD
btg
Rp
148,050.00
93
Cover STU 40 Cm LD
btg
Rp
139,650.00
94
Cover STU 50 Cm HD
btg
Rp
202,650.00
95
Cover STU 50 Cm LD
btg
Rp
178,500.00
96
Cover STU 60 Cm HD
btg
Rp
255,150.00
97
Cover STU 60 Cm LD
btg
Rp
214,200.00
98
Cover STU 80 Cm HD
btg
Rp
346,500.00
m17b
99
Cover STU 80 Cm LD
btg
Rp
273,000.00
101
Cover STU 160 Cm LD
btg
Rp
1,008,000.00
102
Cover STU 160 Cm HD
btg
Rp
1,079,400.00
103
De ep W ell dengan k elengkapannya kap. 150 l iter/me nit
set
Rp
223, 668,165. 00
104
Dempul San polac
kg
Rp
32,000.00
105
Dempul sanpolac special polyester
kg
Rp
40,000.00
106
Dempul Kayu
kg
Rp
40,000.00
107
Dempul Lilin
kg
Rp
15,000.00
108
Dempul Plastik
kg
Rp
25,000.00
109
Dempul Plitur
kg
Rp
20,000.00
110
Dolken 5 s/d 7
btg
Rp
18,000.00
111
Dolken 7 s/d 10
btg
Rp
22,000.00
112
Engsel Harmonika
m
Rp
32,000.00
113
Engsel Jendela
pasang
Rp
13,000.00
114
Engsel Patrun
pasang
Rp
18,000.00
115
Engsel Pintu
pasang
Rp
34,000.00
116
Gate Walve 1/2"
bh
Rp
38,535.00
117
Gembok
bh
Rp
29,000.00
118
Gergaji Besi
bh
Rp
50,000.00
119
GIP Sambungan dia.1 1/2"
bh
Rp
18,000.00
120
GIP Sambungan dia.1 1/4"
bh
Rp
16,000.00
121
GIP Sambungan dia.1 3/4"
bh
Rp
20,000.00
122
GIP Sambungan dia.1"
bh
Rp
13,000.00
123
GIP Sambungan dia.1/2"
bh
Rp
11,000.00
124
GIP Sambungan dia.2 1/2"
bh
Rp
21,000.00
125
GIP Sambungan dia.2"
bh
Rp
19,000.00
126
GIP Sambungan dia.3"
bh
Rp
26,000.00
127
GIP Sambungan dia.4"
bh
Rp
32,000.00
128
Grafel U 20 cm
m
Rp
24,000.00
129
Grafel U 30 cm
m
Rp
27,000.00
130
Grafel U 40 cm
m
Rp
45,000.00
131
Grendel 15 cm
bh
Rp
13,000.00
132
Grendel 5 cm
bh
Rp
3,000.00
133
Ijuk
ikat
Rp
11,000.00
131
Kape Kayu
bh
Rp
6,000.00
132
Kape Tembok
bh
Rp
6,000.00
KET.
NO
BAHAN / MATERIAL
KODE
HARGA SATUAN
SATUAN
m /kg
3
Rp
77,175.00
Karet Elastomerik
bh
Rp
1,370,880.00
Karet Elastomerik (400 x 400 x 30 mm)
bh
Rp
464,415.00
Karet Elastomerik (400 x 400 x 40 mm)
bh
Rp
624,330.00
Karet Penyambung Pipa dia. 100 cm
bh
Rp
198,975.00
138
Karet Penyambung Pipa dia. 60 cm
bh
Rp
82,425.00
139
Karet Penyambung Pipa dia. 80 cm
bh
Rp
121,275.00
140
Karung plastik 50 Kg
bh
Rp
6,195.00
141
Kawat BC (Tembaga)
kg
Rp
78,000.00
142
Kawat Beton
M. 167
kg
Rp
19,000.00
143
Kawat Bronjong
M. 162
kg
Rp
16,000.00
m
2
Rp
17,000.00
133
Kapur pasang/Kapur Tembok
134 135 136 137
144
Kawat Harmonika 2 cm
145
Kawat Harmonika 4 cm
m
2
Rp
26,000.00
146
Kayu Bakar
m
3
Rp
73,710.00
147
Kayu Balok Borneo
m
3
Rp
2,290,000.00
148
Kayu Balok Kamper
m
3
Rp
4,862,000.00
149
Kayu Balok Kruing
m
3
Rp
5,040,000.00
150
Kayu Balok Kamper Samarinda
m
3
Rp
7,721,250.00
151
Kayu Balok Rasamala
m
3
Rp
3,465,000.00
152
Kayu Kamper Singkil
m
3
Rp
3,354,800.00
m
3
Rp
2,220,000.00
m
3
Rp
1,691,000.00
m
3
Rp
6,195,000.00
m
3
Rp
5,145,000.00
m
3
Rp
5,285,000.00
m
3
Rp
1,586,000.00
153
Kayu Papan Cor Borneo
154
Kayu Borneo 5/7
155
Kayu Papan Kamper Singil
156
Kayu Papan Kruing 2 x 20 x 4m
157
Kayu Papan Kamper Samarinda
158
Kayu Reng 2/3 Borneo
159
Kayu Reng 2/3 Borneo
m
3
Rp
1,586,000.00
160
Kayu Reng 3/4 Borneo
m
3
Rp
1,586,000.00
161
Keramik 20 x 20
m2
Rp
47,000.00
162
Keramik 20 x 25
m2
Rp
50,000.00
163
Keramik 30 x 30
m2
Rp
53,000.00
164
Kunci 2 Slaag Ancor Asli
bh
Rp
74,600.00
165
Kunci 2 Slaag ISO
bh
Rp
74,600.00
166
Kunci 2 Slaag Kuda Terbang
bh
Rp
74,600.00
167
Kunci 2 Slaag ROYAL
bh
Rp
74,600.00
168
Kunci 2 Slaag Silinder SEIS Asli Type 210 s/d 226
bh
Rp
229,950.00
169
Kunci 2 Slaag Silinder Utama Standard
bh
Rp
275,625.00
170
Kunci Gembok Besar
bh
Rp
79,900.00
171
Kunci KM Bulat ALFA
bh
Rp
47,900.00
172 Kunci KM Bulat Kualitas Biasa
bh
Rp
40,750.00
173
Kunci Silinder ALFA Pintu Alumunium
bh
Rp
257,985.00
174
Kwas 3 "
bh
Rp
8,000.00
175
Lempengan Rumput
2
Rp
35,000.00
176
Lem Fox
kg
Rp
42,000.00
177
Lem Kuning (Aibon)
kg
Rp
48,000.00
178
Lem Mixed Epoxy Adhesive
kg
Rp
8,000.00
179
Lem Paralon
bh
Rp
10,000.00
180
Linggis
bh
Rp
44,000.00
181 Macam2 Samb. Paralon Ø 2 1/2"
bh
Rp
12,810.00
182
Macam2 Samb. Paralon Ø 3"
bh
Rp
22,575.00
183
Macam2 Samb. Paralon Ø 4"
bh
Rp
32,445.00
184 Macam2 Sambungan GIP Ø 1 1/4"
bh
Rp
11,235.00
m
185
Macam2 Sambungan GIP Ø 1"
bh
Rp
9,030.00
186
Macam2 Sambungan GIP Ø 1/2"
bh
Rp
4,515.00
187 Macam2 Sambungan GIP Ø 11/2"
bh
Rp
12,810.00
188 Macam2 Sambungan GIP Ø 13/4"
bh
Rp
19,005.00
189 Macam2 Sambungan GIP Ø 2 1/2"
bh
Rp
37,695.00
190
Macam2 Sambungan GIP Ø 2"
bh
Rp
26,355.00
191
Macam2 Sambungan GIP Ø 3"
bh
Rp
45,255.00
192
Macam2 Sambungan GIP Ø 3/4"
bh
Rp
5,880.00
193
Macam2 Sambungan GIP Ø 4"
bh
Rp
52,815.00
194
Macam2 Sambungan Paralon Ø 1 1/2"
bh
Rp
9,300.00
195
Macam2 Sambungan Paralon Ø 1 1/4"
bh
Rp
8,150.00
196
Macam2 Sambungan Paralon Ø 1 3/4"
bh
Rp
6,300.00
197 Macam2 Sambungan Paralon Ø 1"
bh
Rp
4,650.00
198
bh
Rp
2,900.00
199 Macam2 Sambungan Paralon Ø 2"
Macam2 Sambungan Paralon Ø 1/2"
bh
Rp
13,350.00
200
Macam2 Sambungan Paralon Ø 3/4"
bh
Rp
4,050.00
201
Meni Kayu / Besi
kg
Rp
27,000.00
202
Minyak Cat
ltr
Rp
19,200.00
203
Minyak Tanah
ltr
Rp
13,000.00
M.065
KET.
NO
204
BAHAN / MATERIAL
KODE
HARGA SATUAN
SATUAN
Multiplek 12 mm 120 x 240
lbr
Rp
137,000.00
205
Multiplek 18 mm 120 x 240
lbr
Rp
192,000.00
206
Multiplek 9 mm 120 x 240
lbr
Rp
91,000.00
207
Mur / Baut Beam 12 x 25 mm
bh
Rp
2,000.00
208
Mur / Baut Blocking 16 x 30 mm
bh
Rp
5,000.00
209
Mur / Baut Post 16 x 48 mm
bh
Rp
6,000.00
210
Mur Baut Biasa dia.19 s/d 16 (5 cm)
bh
Rp
5,000.00
211 Mur Baut HTB dia. 19 s/d 16 (5 cm)
bh
Rp
8,000.00
212
Mur/Baut 0,25"
bh
Rp
3,000.00
213
Mur/Baut 0,75"
bh
Rp
3,000.00
214
Mur/Baut 10 cm
bh
Rp
6,000.00
215
Oli (Drum)
liter
Rp
24,500.00
2
216
Pagar BR C
m
Rp
338,000.00
217
Pagar Panel Beton t = 2 m
m
2
Rp
393,330.00
218
Paku
kg
Rp
18,000.00
219
Paku Beton 7 cm
kg
Rp
37,000.00
220
Palu 0,5 Kg
kg
Rp
26,600.00
221
Papan 2/20 x 4
lbr
Rp
52,400.00
222
Pasir Beton
M. 041
m
3
Rp
238,000.00
223
Pasir Pasang
M.042
m
3
Rp
252,000.00
3
Rp
244,000.00
3
Rp
246,000.00
2
Rp
70,000.00
2
Rp
85,000.00
2
M. 166
224
Pasir Tras
M. 041
225
Pasir Urug
M. 040
226 Paving Block Natural 6 cm 227 Paving Block Natural 8 cm
m m m m
228
Paving Block Warna 6 cm
Rp
75,000.00
229
Paving Block Warna 8 cm
2
m
Rp
95,000.00
230
Tebal 1.6 mm Ø 600 mm
m'
Rp
512,900.00
231
Pipa Btn Brtlg Dia. 0.50 M
m'
Rp
399,000.00
232
Pipa Btn Brtlg Dia. 0.60 M
m'
Rp
352,000.00
233
Pipa Btn Brtlg Dia. 0.80 M
m'
Rp
975,000.00
234
Pipa Btn Brtlg Dia. 1 M
m'
Rp
1,542,000.00
235
Pipa GIP Medium A Ø 1 1/2"
btg
Rp
143,000.00
236
Pipa GIP Medium A Ø 1 1/4"
btg
Rp
119,000.00
237
Pipa GIP Medium A Ø 1 3/4"
btg
Rp
282,000.00
238
Pipa GIP Medium A Ø 1"
btg
Rp
95,000.00
239
Pipa GIP Medium A Ø 1/2"
btg
Rp
48,000.00
240
Pipa GIP Medium A Ø 2 1/2"
btg
Rp
264,000.00
241
Pipa GIP Medium A Ø 2" Tebal 1,8 mm
btg
Rp
190,000.00
242
Pipa GIP Medium A Ø 2" Tebal 2 mm
btg
Rp
211,000.00
243
Pipa GIP Medium A Ø 3" Tebal 2 mm
btg
Rp
317,000.00
244
Pipa GIP Medium A Ø 3/4" Tebal 1,8 mm
btg
Rp
79,000.00
245
Pipa GIP Medium A Ø 4" Tebal 1,8 mm
btg
Rp
381,000.00
246
Pipa GIP Medium A Ø 4" Tebal 2 mm
btg
Rp
611,000.00
247
Pipa GIP Medium A Ø 5" Tebal 1,8 mm
btg
Rp
476,000.00
248
Pipa GIP Medium A Ø 6" Tebal 1,8 mm
btg
Rp
571,000.00
249
Pipa GIP Medium A Ø 6" Tebal 2 mm
btg
Rp
634,000.00
250
Pipa GIP Medium A Ø 8" Tebal 1,8 mm
btg
Rp
761,000.00
251
Pipa PVC (Sambungan) Jenis AW 4 " TY
bh
Rp
239,700.00
252
Pipa PVC dia 1 1/2" (AW)
btg
Rp
47,000.00
253
Pipa PVC dia 1 1/4" (AW)
btg
Rp
41,000.00
254
Pipa PVC dia 1" (AW)
btg
Rp
27,000.00
255
Pipa PVC dia 1/2" (AW)
btg
Rp
17,000.00
256
Pipa PVC dia 2 1/2" (AW)
btg
Rp
88,000.00
257
Pipa PVC U dia 2" (AW)
btg
Rp
62,000.00
258
Pipa PVC dia 3" (AW)
btg
Rp
119,000.00
259
Pipa PVC 3/4" (AW)
btg
Rp
21,000.00
260
Pipa PVC dia 4" (AW)
btg
Rp
196,000.00
261
Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 1/2"
btg
Rp
33,000.00
262
Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 3/4"
btg
Rp
39,000.00
263
Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 1"
btg
Rp
46,000.00
264
Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 1 1/4"
btg
Rp
77,000.00
265
Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 1 1/2"
btg
Rp
100,000.00
266
Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 2"
btg
Rp
142,000.00
267
Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 2 1/2"
btg
Rp
182,000.00
268
Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 3"
btg
Rp
278,000.00
269
Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 4"
btg
Rp
429,000.00
270
Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 5"
btg
Rp
842,000.00
271
Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 6"
btg
Rp
692,000.00
272
Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 8"
btg
Rp
1,274,000.00
273
Plamir tembok
kg
Rp
16,590.00
m
KET.
NO
BAHAN / MATERIAL
KODE
HARGA SATUAN
SATUAN
274
Plat Besi Tipis 1 mm
kg
Rp
10,290.00
275
Plat Strip 2 x 30 mm (6m)
btg
Rp
29,400.00
276
Plat Strip 3 x 30 mm (6m)
btg
Rp
39,165.00
277
Ply Wood 18 mm (120 x 240)
lbr
Rp
262,100.00
278
Plastik Bond Breaker
m2
Rp
5,800.00
279
PVC (Sambungan) Ø 1 1/4"
bh
Rp
6,000.00
280
PVC (Sambungan) Ø 1 3/4"
bh
Rp
7,000.00
281
PVC (Sambungan) Ø 1"
bh
Rp
4,000.00
282
PVC (Sambungan) Ø 1/2"
bh
Rp
3,000.00
283
PVC (Sambungan) Ø 2"
bh
Rp
13,000.00
284
PVC (Sambungan) Ø 3/4"
bh
Rp
2,000.00
285
PVC (Sambungan) Ø 1 1/2"
bh
Rp
8,000.00
286
PVC (Sambungan) Ø 2 1/2"
bh
Rp
20,000.00
287
PVC (Sambungan) Ø 3"
bh
Rp
30,000.00
288
PVC (Sambungan) Ø 4"
bh
Rp
59,000.00
289
Pipa 200 CL Class 2 PC-I
Dusaspun (L=2.45 m)
btg
Rp
219,000.00
290
Pipa 300 CL Class 2 PC-I
Dusaspun
btg
Rp
398,000.00
291
Pipa 400 CL Class 2 PC-I
Dusaspun
btg
Rp
594,000.00
292
Pipa 500 CL Class 2 PC-I
Dusaspun
btg
Rp
814,000.00
293
Pipa 600 CL Class 2 PC-I
Dusaspun
btg
Rp
1,166,000.00
294
Pipa 700 CL Class 2 PC-I
Dusaspun
btg
Rp
1,476,000.00
295
Pipa 800 CL Class 2 PC-I
Dusaspun
btg
Rp
1,823,000.00
296
Pipa 900 CL Class 2 PC-I
Dusaspun
btg
Rp
2,224,000.00
297
Pipa 1000 CL Class 2 PC-I
Dusaspun
btg
Rp
2,643,000.00
298
Pipa 1100 CL Class 2 PC-I
Dusaspun
btg
Rp
3,316,000.00
299
Pipa 1200 CL Class 2 PC-I
Dusaspun
btg
Rp
4,200,000.00
300
Pipa 1300 CL Class 2 PC-I
Dusaspun
btg
Rp
4,785,000.00
301
Pipa 1400 CL Class 2 PC-I
Dusaspun
btg
Rp
5,299,000.00
302
Pipa 1500 CL Class 2 PC-I
Dusaspun
btg
Rp
5,847,000.00
303
Pipa 1600 CL Class 2 PC-I
Dusaspun
btg
Rp
8,468,000.00
304
Pipa 1650 CL Class 2 PC-I
Dusaspun
btg
Rp
6,464,000.00
305
Pipa 1800 CL Class 2 PC-I
Dusaspun
btg
Rp
7,731,000.00
306
Pipa 2000 CL Class 2 PC-I
Dusaspun
btg
Rp
18,128,000.00
307
Pipa 2100 CL Class 2 PC-I
Dusaspun (L=2.45 m)
btg
Rp
15,430,000.00
308
Pipa 300 FJ Class 2
Dusaspun
(L=2.5 m)
btg
Rp
375,000.00
309
Pipa 400 FJ Class 2
Dusaspun
(L=2.5 m)
btg
Rp
558,000.00
310
Pipa 500 FJ Class 2
Dusaspun
(L=2.5 m)
btg
Rp
756,000.00
311
Pipa 600 FJ Class 2
Dusaspun
(L=2.5 m)
btg
Rp
1,045,000.00
312
Pipa 700 FJ Class 2
Dusaspun
(L=2.5 m)
btg
Rp
1,279,000.00
313
Pipa 800 FJ Class 2
Dusaspun
(L=2.5 m)
btg
Rp
1,560,000.00
314
Pipa 900 FJ Class 2
Dusaspun
(L=2.5 m)
btg
Rp
1,866,000.00
315
Pipa 1000 FJ Class 2
Dusaspun
(L=2.5 m)
btg
Rp
2,132,000.00
316
Pipa 1100 FJ Class 2
Dusaspun
(L=2.5 m)
btg
Rp
2,488,000.00
317
Pipa 1200 FJ Class 2
Dusaspun
(L=2.5 m)
btg
Rp
2,945,000.00
318
Pipa 1300 FJ Class 2
Dusaspun
(L=2.5 m)
btg
Rp
3,359,000.00
319
Pipa 1400 FJ Class 2
Dusaspun
(L=2.5 m)
btg
Rp
3,701,000.00
320
Pipa 1500 FJ Class 2
Dusaspun
(L=2.5 m)
btg
Rp
4,106,000.00
321
Pipa 1650 FJ Class 2
Dusaspun
(L=2.5 m)
btg
Rp
4,897,000.00
322
Pipa 1800 FJ Class 2
Dusaspun
(L=2.5 m)
btg
Rp
5,758,000.00
323
Pipa 2100 FJ Class 2
Dusaspun
(L=2.5 m)
btg
Rp
8,266,000.00
324
Pipa 300 R Class L
Witera (L=1.25 m)
btg
Rp
284,000.00
325
Pipa 400 R Class L
Witera (L=1.25 m)
btg
Rp
416,000.00
326
Pipa 500 R Class L
Witera (L=1.25 m)
btg
Rp
608,000.00
327
Pipa 600 R Class L
Witera (L=2.5 m)
btg
Rp
1,432,000.00
328
Pipa 700 R Class L
Witera (L=2.5 m)
btg
Rp
1,908,000.00
329
Pipa 800 R Class L
Witera (L=2.5 m)
btg
Rp
2,505,000.00
330
Pipa 900 R Class L
Witera (L=2.5 m)
btg
Rp
3,195,000.00
331
Pipa 1000 R Class L
Witera (L=2.5 m)
btg
Rp
3,904,000.00
332
Pipa 1100 R Class L
Witera (L=2.5 m)
btg
Rp
4,835,000.00
333
Pipa 1200 R Class L
Witera (L=2.5 m)
btg
Rp
5,634,000.00
334
Pipa 1300 R Class L
Witera (L=2.5 m)
btg
Rp
6,577,000.00
335
Pipa 1500 R Class L
Witera (L=2.5 m)
btg
Rp
8,669,000.00
336
Pipa 300 NR Witera (L=1.25 m)
btg
Rp
279,000.00
337
Pipa 400 NR Witera (L=1.25 m)
btg
Rp
409,000.00
338
Pipa 500 NR Witera (L=1.25 m)
btg
Rp
600,000.00
339
Pipa 600 NR Witera (L=2.5 m)
btg
Rp
1,401,000.00
340
Pipa 700 NR Witera (L=2.5 m)
btg
Rp
1,866,000.00
341
Pipa 800 NR Witera (L=2.5 m)
btg
Rp
2,442,000.00
342
Pipa 900 NR Witera (L=2.5 m)
btg
Rp
3,126,000.00
343
Pipa 1000 NR Witera (L=2.5 m)
btg
Rp
3,824,000.00
344
Readymix Beton B0 Tanpa Pompa (Selang)
Rp
756,000.00
KET.
NO
345
BAHAN / MATERIAL
KODE
Readymix Beton K 125, Tampa Pompa (Selang)
Rp
683,000.00
3
Rp
740,000.00
3
Rp
770,000.00
3
Rp
913,500.00
Rp
955,500.00
346 Readymix Beton K 175, Tampa Pompa (Selang)
m
347 Readymix Beton K 225, Tampa Pompa (Selang)
m
348 Readymix Beton K 300, Tampa Pompa (Selang)
HARGA SATUAN
SATUAN
m
349
Readymix Beton K 350, Tampa Pompa (Selang)
350
Roll Cat Tembok
bh
Rp
43,155.00
351
Roll Meter 50 Meter (Bahan Plastik)
bh
Rp
69,900.00
352
Roll Meter 30 Meter (Bahan Plastik)
bh
Rp
69,900.00
353
Roll Meter 5 Meter (Bahan Plastik)
bh
Rp
15,435.00
354
Rumah Panel 30 x 60 cm (Kosong)
unit
Rp
115,710.00
355
Rumah TL In Bow / Out Bw 2 x 20 W (Kosong)
bh
Rp
88,200.00
356
Saklar Broco Seri Standard ( 1 Phase)
bh
Rp
26,000.00
357
Saklar Broco Tunggal Standard ( 1 Phase)
bh
Rp
20,000.00
358
Sambungan Pipa PVC Jenis AW 4 " TY
bh
Rp
78,015.00
359
Saringan Air Liter KM Stainless Steel
bh
Rp
40,750.00
360
Sekring Kas 2 Group Biasa
unit
Rp
127,470.00
361
Sekring Kas 3 Group Biasa
unit
Rp
161,385.00
362
Sekring Kas 5 Group Biasa
unit
Rp
339,045.00
363
Sekrup
bh
Rp
364
Sealent
kg
365
Selang Plastik untuk Water Pass dia 0,5 cm
366
Semen Portland/PC (50 Kg/zak)
367
Seng Gelombang 180 x 90 x 0,5 BJLS 30
lbr
Rp
62,000.00
368
Seng Plat 90 cm x 0,5 mm
lbr
Rp
36,000.00
369 Seng Plat BJLS 30 Lebar 60 cm
lbr
Rp
79,000.00
bh M. 080
2,153.00 45,000.00
Rp
zak
5,100.00 68,000.00
KET.
NO
BAHAN / MATERIAL
KODE
HARGA SATUAN
SATUAN
370 Seng Plat BJLS 30 Lebar 90 cm
lbr
Rp
97,000.00
371
Seng BJS 0.20 Gelombang 85 x 180 cm
lbr
Rp
45,000.00
372
Seng BJS 0.30 Gelombang 85 x 180 cm
lbr
Rp
62,000.00
373
Seng BJS 0.40 Gelombang 85 x 180 cm
lbr
Rp
94,000.00
3
Rp
158,000.00
374 Sirtu Pecah Tersaring
M. 042
375
Solar
M. 183
376
Solatip Leideng
377 378
m
ltr
5,500.00
bh
Rp
Stempet / Gemuk
kg
Rp
19,400.00
Stop Kontak Broco 3 Phase (In Bow)
bh
Rp
111,825.00
379
Stop Kontak Broco 3 Phase (Out Bow)
bh
Rp
65,625.00
380
Stop Kontak Broco Standard (1 Phase)
bh
Rp
19,950.00
381
Stop Kontak Handle 3 Phase
bh
Rp
65,625.00
382
Stop Kran 1 1/2" KIT
bh
Rp
176,925.00
383
Stop Kran 1" KIT
bh
Rp
117,915.00
384
Stop Kran 2 1/2" KIT
bh
Rp
510,300.00
385
Stop Kran 2" KIT
bh
Rp
221,130.00
386
Stop Kran 3" KIT
bh
Rp
578,640.00
387
Stop Kran 3/4" KIT
bh
Rp
86,940.00
388
STU 150.150.120 Cm
(Kwalitas 1)
bh
Rp
3,807,000.00
389
STU 100.100.120 Cm
(Kwalitas 1)
bh
Rp
2,027,000.00
390
STU 100.100.120 Cm + Support
btg
Rp
2,498,950.00
391
STU 40.40.120 Cm
btg
Rp
446,000.00
392
STU 40.40.120 Cm + Support
btg
Rp
523,000.00
393
STU 40.50.120 Cm
btg
Rp
504,000.00
394
STU 40.50.120 Cm + Support
btg
Rp
590,000.00
395
STU 40.60.120 Cm
btg
Rp
560,000.00
396
STU 40.60.120 Cm + Support
btg
Rp
655,000.00
397
STU 50.50.120 Cm
398
STU 50.50.120 Cm + Support
399
STU 50.60.120 Cm
400
STU 50.60.120 Cm + Support
401
STU 50.70.120 Cm
402
STU 50.70.120 Cm + Support
403
STU 60.60.120 Cm
404
STU 60.60.120 Cm + Support
405
STU 60.70.120 Cm
406
STU 60.70.120 Cm + Support
407
STU 60.80.120 Cm
408
STU 60.80.120 Cm + Support
409
STU 80.100.120 Cm
410
STU 80.100.120 Cm + Support
411
STU 80.80.120 Cm
412
STU 80.80.120 Cm + Support
413
Tanah Urug
414
Tangki Air Polyetiline (Panda)
415
Tangki Air Polyetiline (Panda)
416
Tangki Air Polyetiline (Panda)
TB 110
417
Teak Wood 3 mm 120 x 240
418
Teak Wood 3 mm 120 x 240 Ukuran Pintu
lbr
Rp
87,350.00
419
Teak Wood 4 mm 120 x 240
lbr
Rp
122,300.00
420
Teak Wood 4 mm 120 x 240 Ukuran Pintu
lbr
Rp
104,850.00
421
Terpal Plastik
m
Rp
7,000.00
(Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1) (Kwalitas 1)
2,415.00
btg
Rp
662,000.00
btg
Rp
777,000.00
btg
Rp
741,000.00
btg
Rp
872,000.00
btg
Rp
819,000.00
btg
Rp
960,000.00
btg
Rp
786,000.00
btg
Rp
925,000.00
btg
Rp
846,000.00
btg
Rp
1,013,000.00
btg
Rp
942,000.00
btg
Rp
1,105,000.00
btg
Rp
1,037,000.00
btg
Rp
1,588,700.00
btg
Rp
1,185,000.00
btg
Rp
1,390,000.00
3
Rp
63,000.00
TB 32
bh
Rp
722,000.00
TB 55
bh
Rp
1,117,000.00
bh
Rp
1,861,000.00
lbr
Rp
110,650.00
(Kwalitas 1)
m
422
Tiang Pancang PC SPUN Ø 300, Class A2 Panjang 6-8 m, Moment Crack=2.5t.m, Segmen Middle
m
Rp
285,000.00
423
Tiang Pancang PC SPUN Ø 300, Class A2 Panjang 6-8 m, Moment Crack=2.5t.m, Segmen Bottom Pencil
m
Rp
261,000.00
424
Tiang Pancang PC SPUN Ø 300, Class A2 Panjang 6-8 m, Moment Crack=2.5t.m, Segmen Bottom Mamira
m
Rp
298,000.00
425
Tiang Pancang PC SPUN Ø 300, Class A2 Panjang 9-11m, Moment Crack=2.5t.m, Segmen Middle
m
Rp
253,000.00
426
Tiang Pancang PC SPUN Ø 300, Class A2 Panjang 9-11m, Moment Crack=2.5t.m, Segmen Bottom Pencil
m
Rp
237,000.00
427
Tiang Pancang PC SPUN Ø 300, Class A2 Panjang 9-11m, Moment Crack=2.5t.m, Segmen Bottom Mamira
m
Rp
261,000.00
428
Tiang Pancang PC SPUN Ø 500, Class A1 Panjang 6-8 m, Moment Crack=10.5t.m, Segmen Middle
m
Rp
698,000.00
429
Tiang Pancang PC SPUN Ø 500, Class A1 Panjang 6-8 m, Moment Crack=10.5t.m, Segmen Bottom Pencil
m
Rp
617,000.00
430
Tiang Pancang PC SPUN Ø 500, Class A1 Panjang 6-8 m, Moment Crack=10.5t.m, Segmen Bottom Mamira
m
Rp
716,000.00
KET.
NO
BAHAN / MATERIAL
KODE
HARGA SATUAN
SATUAN
431
Tiang Pancang PC SPUN Ø 500, Class A1 Panjang 9-11 m, Moment Crack=10.5t.m, Segmen Middle
m
Rp
622,000.00
432
Tiang Pancang PC SPUN Ø 500, Class A1 Panjang 9-11 m, Moment Crack=10.5t.m, Segmen Bottom Pencil
m
Rp
569,000.00
433
Tiang Pancang PC SPUN Ø 500, Class A1 Panjang 9-11 m, Moment Crack=10.5t.m, Segmen Bottom Mamira
m
Rp
637,000.00
434
Tiang Pancang PC SPUN Ø 500, Panjang 12-14 m, Allowable Axia=185.3ton, Segmen Middle
Rp
586,000.00
435
Tiang Pancang PC SPUN Ø 500, Panjang 12-14 m, Allowable Axia=185.3ton, Segmen Bottom Pencil
Rp
546,000.00
436
Tiang Pancang PC SPUN Ø 500, Panjang 12-14 m, Allowable Axia=185.3ton, Segmen Bottom Mamira
Rp
595,000.00
437
Thinner
m33
liter
Rp
20,000.00
438
Timah Hitam
439
Timbunan Tanah Pilihan
kg
Rp
17,000.00
M. 050
m
3
Rp
57,000.00
440 441
Triplek tb. 4 mm
lbr
Rp
55,000.00
Tripleks 3 mm 120 x 240
lbr
Rp
47,000.00
442 443
Tripleks 4 mm 120 x 240
lbr
Rp
58,000.00
Tripleks 4 mm 120 x 240 Ukuran Pintu
lbr
Rp
79,000.00
444
Tripleks 6 mm 120 x 240
lbr
Rp
110,000.00
445
Tripleks 9 mm 120 x 240
lbr
Rp
110,000.00
430
Triplek 12 mm
lbr
Rp
153,000.00
431
Triplek 15 mm
lbr
Rp
189,000.00
432
Triplek 18 mm
lbr
Rp
215,000.00
433
Tutup Pipa 1"
bh
Rp
3,000.00
434
Tutup Pipa 1,5"
bh
Rp
4,000.00
435
Tutup Pipa 2"
bh
Rp
5,000.00
436
Tutup Pipa 2,5"
bh
Rp
5,000.00
437
Tutup Pipa 3"
bh
Rp
6,000.00
438
Tutup Pipa 3,5"
bh
Rp
6,000.00
439
Tutup Pipa 4"
bh
Rp
7,000.00
440
Tutup Pipa 4,5"
bh
Rp
7,000.00
441
Tutup Pipa 5"
bh
Rp
8,000.00
442
Tutup Pipa 5,5"
bh
Rp
8,000.00
443
Tutup Pipa 6"
bh
Rp
9,000.00
444
Tutup Pipa 6,5"
bh
Rp
10,000.00
445
Tutup Pipa 7"
bh
Rp
11,000.00
446
Tutup Pipa 7,5"
bh
Rp
12,000.00
447
Tutup Pipa 8"
bh
Rp
14,000.00
448
Wiremesh M6
batang
Rp
281,000.00
449
Wiremesh M8
batang
Rp
514,000.00
Depok,
November 2013
KET.
ANALISA HARGA SATUAN PEKERJAAN DINAS BINA MARGA DAN SUMBER DAYA AIR KOTA DEPOK T.A. 2013
Ir.H. ENCOK KURYASA, MM
DAFTAR HARGA SATUAN SEWA PERALATAN PER JAM KERJA TAHUN ANGGARAN 2012 NO.
ALAT
KAPASITAS ALAT
KODE
HARGA SATUAN
1
BULLDOZER
E-001
110 Hp
Rp
262,000.00
2
MOTOR GRADER
E-010
110 Hp
Rp
262,000.00
3
CRUSHER/SCR 30 T/H
E-031
30 T/jam - 185 Hp
Rp
249,000.00
4
SCREENING PLANT
E-040
-
Rp
125,000.00
5
LOADER WHEELED
E-052
115.0 Hp
Rp
188,000.00
6
ROLLER, 3 WHEELED
E-080
6 - 8 Ton
Rp
75,900.00
7
ROLLER, TANDEM
E-081
6 - 8 Ton
Rp
157,000.00
8
ROLLER, VIBR. SELF-P6-7T
E-082
Rp
125,000.00
9
ROLLER, PNEUMATIC
E-084
6 - 15 Ton
Rp
156,000.00
10
ROLLER, VIBR. PED 1 TONE
E-087
1 Ton
Rp
63,000.00
11
TAMPER, VIBR. PLATE
E-088
4 Hp
Rp
38,000.00
12
CONCRETE VIBRATOR
E-089
-
Rp
31,000.00
13
SPRAYER, SELFPROP
E-153
1,000.0 Liter
Rp
112,960.66
14
ASP. SPRAYER, TOWED
E-154
6.0 Ton
Rp
38,000.00
15
ASP. MIXING PLANT 30 T/H
E-155
Rp
400,000.00
16
ASPHALT FINISHER
E-157
1820 mm / 30 Hp
Rp
188,000.00
17
WATER TANK TRUCK
E-182
4,000.0 Liter
Rp
163,000.00
18
TRAILER, TOWED
E-191
10.0 Ton
Rp
438,000.00
19
DUMP TRUCK 3.5 T
E-211
3.5 Ton
Rp
800,000.00
20
DUMP TRUCK 5 T
E-212
5 Ton / 145 Hp
Rp
200,000.00
21
FLATBED TRUCK 3.5 T
E-221
3,5 Ton / 115 Hp
Rp
200,000.00
22
FLATBED TRUCK WITH CRANE
E-225
Rp
313,000.00
23
CONCRETE MIXER 0.125 M3
E-251
125 Liter
Rp
63,000.00
24
COMPRESSOR, AIR
E-301
210 M3/jam
Rp
101,625.00
25
PUMP, WATER (5 CM)
E-341
30 M3/jam
Rp
63,000.00
26
CONCRETE MIXER 0.25 M3
E-252
250 Liter
Rp
38,000.00
27
CONCRETE MIXER 0.5 M3
E-253
500 Liter
Rp
63,000.00
28
BLOWER
-
Rp
16,802.57
29
MES IN CUT TER CONCRE TE
Jam/m
Rp
44,714.29
30
JACK HAMMER
Jam/m
Rp
25,000.00
E-
30 T/jam
-
Depok,
KETERANGAN
November 2013
ANALISA HARGA SATUAN PEKERJAAN DINAS BINA MARGA DAN SUMBER DAYA AIR KOTA DEPOK T.A. 2013
Ir.H. ENCOK KURYASA, MM NIP. 19571002 198403 1 005
Per Hari
DAFTAR HARGA SATUAN UPAH PEKERJA DINAS BINA MARGA DAN SUMBER DAYA AIR NO
KOMPONEN
UPAH / HARI
KETERANGAN
1
PEKERJA
65,000.00
1 ORANG/ HR/ 8 JAM
2
PEKERJA SETENGAH TERAMPIL
70,000.00
1 ORANG/ HR/ 8 JAM
3
PEKERJA TERAMPIL
80,000.00
1 ORANG/ HR/ 8 JAM
4
TUKANG GALI
65,000.00
1 ORANG/ HR/ 8 JAM
5
TUKANG BATU SETENGAH TERAMPIL
70,000.00
1 ORANG/ HR/ 8 JAM
6
TUKANG BATU TERAMPIL
80,000.00
1 ORANG/ HR/ 8 JAM
7
KEPALA TUKANG BATU
91,000.00
1 ORANG/ HR/ 8 JAM
8
TUKANG KAYU SETENGAH TERAMPIL
70,000.00
1 ORANG/ HR/ 8 JAM
9
TUKANG KAYU TERAMPIL
80,000.00
1 ORANG/ HR/ 8 JAM
10
KEPALA TUKANG KAYU
91,000.00
1 ORANG/ HR/ 8 JAM
11
TUKANG CAT / PELITUR SETENGAH TERAMPIL
70,000.00
1 ORANG/ HR/ 8 JAM
12
TUKANG CAT / PELITUR TERAMPIL
80,000.00
1 ORANG/ HR/ 8 JAM
13
KEPALA TUKANG CAT / PELITUR
91,000.00
1 ORANG/ HR/ 8 JAM
14
TUKANG BESI BETON SETENGAH TERAMPIL
70,000.00
1 ORANG/ HR/ 8 JAM
15
TUKANG BESI BETON TERAMPIL
80,000.00
1 ORANG/ HR/ 8 JAM
16
KEPALA TUKANG BESI BETON
91,000.00
1 ORANG/ HR/ 8 JAM
17
TUKANG BESI PROFIL SETENGAH TERAMPIL
70,000.00
1 ORANG/ HR/ 8 JAM
18
TUKANG BESI PROFIL TERAMPIL
80,000.00
1 ORANG/ HR/ 8 JAM
19
KEPALA TUKANG BESI PROFIL
91,000.00
1 ORANG/ HR/ 8 JAM
20
MANDOR
100,000.00
1 ORANG/ HR/ 8 JAM
21
OPERATOR ALAT BESAR
100,000.00
1 ORANG/ HR/ 8 JAM
22
PEMBANTU OPERATOR / MEKANIK/ OPERATOR ALAT
80,000.00
1 ORANG/ HR/ 8 JAM
23
SUPIR TRUK
70,000.00
1 ORANG/ HR/ 8 JAM
24
KENEK TRUK
65,000.00
1 ORANG/ HR/ 8 JAM
25
PENJAGA MALAM
65,000.00
1 ORANG/ HR/ 8 JAM
26
PETUGAS HARIAN TETAP BIDANG KEBERSIHAN, KETERTIBAN P
65,000.00
1 ORANG/ HR/ 8 JAM
27
PHT PEMELIHARAAN RUAS JALAN
65,000.00
1 ORANG/ HR/ 8 JAM
28
SATGAS KEBERSIHAN/PENGANGKATAN SAMPAH DI SALURAN K
70,000.00
1 ORANG/ HR/ 8 JAM
CATATAN : *
OPERATOR YANG SUDAH BIASA DAN TRAMPIL MENGOPERASIKAN JENIS PERALATAN UNTUK MELAYANI PEKERJAAN BERAT : BULLDOZER, MOTOR GRADER, LOADER WHEEL, ASPHALT FINISHER, DAN LAIN- LAIN
**
OPERATOR YANG MENGOPERASIKAN JENIS PERALATAN UNTUK MELAYANI PEKERJAAN YANG AGAK RINGAN : STEEL WHEELED ROLLER, STAMPER, MACHANICAL RAMMER, MECHANICAL RAMMER CONCRETE MIXER/MESIN PENGADUK BETON
Depok,
November 2013
ANALISA HARGA SATUAN PEKERJAAN DINAS BINA MARGA DAN SUMBER DAYA AI KOTA DEPOK T.A. 2013
Ir.H. ENCOK KURYASA, MM NIP. 19571002 198403 1 005
HARGA SATUAN PEMBUATAN SALURAN TYPE U BETON BERTULANG U - DITCH PRECAST WITH SPECIAL SUPPORT UK. 40 X 40 / 1 M'
NO
URAIAN PEKERJAAN
SAT.
VOLUME
KODE
HARGA SAT.
SUB TOTAL
JUMLAH
A. Supply Material 1 Keb. U - Ditch 40 X 40 + support
M'
1.00
Rp.
435,833.33
Rp.
435,833.33
1 Pembersihan Lahan Lokasi Kerja
M'
1.00
2 Pek. Pemadatan Tanah (dg alat)
M3
0.04
Ls
Rp.
15,000.00
Rp.
15,000.00
D 21
Rp.
38,154.16
Rp.
1,526.17
3 Pas. Bedding Pasir tb. 10 Cm
M3
0.05
D 13
4 Pek. Penempatan & Penyetelan U - Ditch
M'
Rp.
347,050.00
Rp.
17,352.50
Rp.
30,600.00
Rp.
30,600.00
5 Pek. Urugan Tanah Sisi U - DitCh
M3
0.32
6 Pek. Pemadatan Tanah Sisi U - Ditch (dg alat)
M3
0.32
D 11
Rp.
15,818.00
Rp.
5,061.76
D 21
Rp.
38,154.16
Rp.
12,209.33
7 Pemberesan Lapangan
Ls
1.00
Ls
Rp.
Rp.
435,833.33
Rp.
81,749.76
Rp. Rp.
517,584.00
B. Pemasangan Material
1.00
Rp.
-
JUMLAH TOTAL :
PEMBULATAN
517,583.09
.
HARGA SATUAN PEMBUATAN SALURAN TYPE U BETON BERTULANG U - DITCH PRECAST WITH SPECIAL SUPPORT UK. 50 X 50 / 1 M'
NO
URAIAN PEKERJAAN
SAT.
VOLUME
KODE
HARGA SAT.
SUB TOTAL
JUMLAH
A. Supply Material Rp.
647,500.00
Rp.
100,783.34
JUMLAH TOTAL :
Rp.
748,283.34
PEMBULATAN
Rp.
748,284.00
1 Keb. U - Ditch 50 X 50 + support
M'
1.00
M'
1.00
Rp.
647,500.00
Rp.
647,500.00
Ls
Rp.
15,000.00
Rp.
15,000.00
B. Pemasangan Material 1 Pembersihan Lahan Lokasi Kerja 2 Pek. Pemadatan Tanah (dg alat)
M3
0.06
D 21
Rp.
38,154.16
Rp.
2,289.25
3 Pas. Bedding Pasir tb. 10 Cm
M3
0.06
D 13
Rp.
347,050.00
Rp.
20,823.00
Rp.
45,400.00
Rp.
45,400.00
0.32
D 11
Rp.
15,818.00
Rp.
5,061.76
0.32
D 21
Rp.
38,154.16
Rp.
12,209.33
1.00
Ls
Rp.
4 Pek. Penempatan & Penyetelan U - Ditch
M'
5 Pek. Urugan Tanah Sisi U - Ditch
M3
6 Pek. Pemadatan Tanah Sisi U - Ditch (dg alat)
M3
7 Pemberesan Lapangan
Ls
1.00
Rp.
-
HARGA SATUAN PEMBUATAN SALURAN TYPE U BETON BERTULANG U - DITCH PRECAST WITH SPECIAL SUPPORT UK. 60 X 60 / 1 M'
NO
URAIAN PEKERJAAN
SAT.
VOLUME
KODE
HARGA SAT.
SUB TOTAL
JUMLAH
A. Supply Material 1 Keb. U - Ditch 60 X 60 + support
M'
1.00
Ls
Rp.
770,833.33
Rp.
770,833.33
M'
1.00
Ls
Rp.
15,000.00
Rp.
15,000.00
Rp.
770,833.33
Rp.
124,103.80
B. Pemasangan Material 1 Pembersihan Lahan Lokasi Kerja 2 Pek. Pemadatan Tanah (dg alat)
M3
0.08
D 21
Rp.
38,154.16
Rp.
3,052.33
3 Pas. Bedding Pasir tb. 10 Cm
M3
0.08
D 13
Rp.
347,050.00
Rp.
27,764.00
4 Pek. Penempatan & Penyetelan U - Ditch
M'
1.00
Ls
Rp.
54,000.00
Rp.
54,000.00
5 Pek. Urugan Tanah Sisi U - Ditch
M3
0.45
D 11
Rp.
15,818.00
Rp.
7,118.10
6 Pek. Pemadatan Tanah Sisi U - Ditch (dg alat)
M3
0.45
D 21
Rp.
38,154.16
Rp.
17,169.37
JUMLAH TOTAL :
Rp.
894,937.14
PEMBULATAN
Rp.
894,938.00
.
HARGA SATUAN PEMBUATAN SALURAN TYPE U BETON BERTULANG U - DITCH PRECAST WITH SPECIAL SUPPORT UK. 80 X 80 / 1 M'
NO
URAIAN PEKERJAAN
SAT.
VOLUME
KODE
HARGA SAT.
SUB TOTAL
JUMLAH
A. Supply Material 1 Keb. U - Ditch 80 X 80 + support
M'
1.00
Ls
Rp.
1,158,333.33
1 Pembersihan Lahan Lokasi Kerja
M'
2 Pek. Pemadatan Tanah (dg alat)
M3
3 Pas. Bedding Pasir tb. 10 Cm
M3
4 Pek. Penempatan & Penyetelan U - Ditch
M'
Rp.
1,158,333.33
1.00
Ls
Rp.
0.10
D 21
Rp.
15,000.00
Rp.
15,000.00
38,154.16
Rp.
3,815.42
Rp.
1,158,333.33
Rp.
185,370.06
B. Pemasangan Material
0.10
D 13
Rp.
347,050.00
Rp.
34,705.00
1.00
Ls
Rp.
81,100.00
Rp.
81,100.00
5 Pek. Urugan Tanah Sisi U - Ditch
M3
0.94
D 11
Rp.
15,818.00
Rp.
14,884.74
6 Pek. Pemadatan Tanah Sisi U - Ditch (dg alat)
M3
0.94
D 21
Rp.
38,154.16
Rp.
35,864.91
7 Pemberesan Lapangan
Ls
1.00
Ls
Rp.
-
Rp.
-
Rp.
JUMLAH TOTAL :
Rp.
1,343,703.40
PEMBULATAN :
Rp.
1,343,704.00
. DAFTAR : RENCANA PEMBUATAN SALURAN TYPE U BETON BERTULANG U - DITCH PRECAST WITH SPECIAL SUPPORT UK. 100 X 100 / 1 M'
NO
URAIAN PEKERJAAN
SAT.
VOLUME
KODE
HARGA SAT.
SUB TOTAL
JUMLAH
A. Supply Material
1 Keb. U - Ditch 100 X 100 + support
M'
1.00
M'
1.00 2.23 0.32 0.32 1.00 1.20 1.20
Rp.
Rp.
2,082,458.33
15,000.00 Rp. 56,375.00 Rp. 38,154.16 Rp. 347,050.00 Rp. 145,800.00 Rp. 15,818.00 Rp. 38,154.16 Rp.
15,000.00 125,434.38 12,209.33 111,056.00 145,800.00 18,981.60 45,784.99
2,082,458.33
Rp.
2,082,458.33
Rp.
2,557,489.07
B. Pemasangan Material
1 2 3 4 5 6 7
Pembersihan Lahan Lokasi Kerja Pek. Galian Tanah
M3
Pek. Pemadatan Tanah (dg alat)
M3
Pas. Bedding Pasir tb. 10 Cm
M3
Pek. Penempatan & Penyetelan U - Ditch
M'
Pek. Urugan Tanah Sisi U - Ditch
M3
Pek. Pemadatan Tanah Sisi U - Ditch (dg alat)
M3
Ls D 01 D 21 D 13 Ls D 11 D 21
Rp. Rp. Rp. Rp. Rp. Rp. Rp.
JUMLAH TOTAL :
. HARGA SATUAN PEMBUATAN SALURAN TYPE U BETON BERTULANG U - DITCH PRECAST WITH SPECIAL SUPPORT UK. 40 X 60 / 1 M'
NO
URAIAN PEKERJAAN
SAT.
VOLUME
KODE
HARGA SAT.
SUB TOTAL
JUMLAH
A. Supply Material 1 Keb. U - Ditch 40 X 60 + support
M'
1.00
Ls
Rp.
545,833.33
Rp.
545,833.33
1 Pembersihan Lahan Lokasi Kerja
M'
1.00
Ls
Rp.
15,000.00
Rp.
15,000.00
2 Pek. Pemadatan Tanah (dg alat)
M3
0.06
D 21
Rp.
38,154.16
Rp.
2,289.25
3 Pas. Bedding Pasir tb. 10 Cm
M3
0.06
D 13
Rp.
347,050.00
Rp.
20,823.00
1.00
Ls
Rp.
38,300.00
Rp.
38,300.00
0.71
D 11
Rp.
15,818.00
Rp.
11,230.78
38,154.16
Rp.
27,089.45
Rp.
545,833.33
Rp.
114,732.48
B. Pemasangan Material
4 Pek. Penempatan & Penyetelan U - Ditch
M'
5 Pek. Urugan Tanah Sisi U - Ditch
M3
6 Pek. Pemadatan Tanah Sisi U - Ditch (dg alat)
M3
Buangan Tanah Sisa Galian 7 Pemberesan Lapangan
0.71
D 21
Rp.
M3
2.23
SNI-T8
Rp.
-
Rp.
-
Ls
1.00
Ls
Rp.
-
Rp.
-
JUMLAH TOTAL :
Rp.
660,565.82
PEMBULATAN :
Rp.
660,566.00
.
HARGA SATUAN PEMBUATAN SALURAN TYPE U BETON BERTULANG U - DITCH PRECAST WITH SPECIAL SUPPORT UK. 50 X 70 / 1 M'
NO
URAIAN PEKERJAAN
SAT.
VOLUME
KODE
HARGA SAT.
SUB TOTAL
JUMLAH
A. Supply Material 1 Keb. U - Ditch 50 X 70 + support
M'
1.00
Rp.
800,000.00
Rp.
800,000.00
Rp.
800,000.00
Rp.
124,432.48
JUMLAH TOTAL :
Rp.
924,432.48
PEMBULATAN :
Rp.
924,433.00
B. Pemasangan Material 1 Pembersihan Lahan Lokasi Kerja
M'
1.00
Ls
Rp.
15,000.00
Rp.
15,000.00
2 Pek. Pemadatan Tanah (dg alat)
M3
0.06
D 21
Rp.
38,154.16
Rp.
2,289.25
3 Pas. Bedding Pasir tb. 10 Cm
M3
0.06
D 13
Rp.
347,050.00
Rp.
20,823.00
4 Pek. Penempatan & Penyetelan U - Ditch
M'
1.00
Ls
Rp.
48,000.00
Rp.
48,000.00
5 Pek. Urugan Tanah Sisi U - Ditch
M3
0.71
D 11
Rp.
15,818.00
Rp.
11,230.78
6 Pek. Pemadatan Tanah Sisi U - Ditch (dg alat)
M3
38,154.16
Rp.
27,089.45
Buangan Tanah Sisa Galian 7 Pemberesan Lapangan
0.71
D 21
Rp.
M3
2.23
SNI-T8
Rp.
-
Rp.
-
Ls
1.00
Ls
Rp.
-
Rp.
-
. HARGA SATUAN PEMBUATAN SALURAN TYPE U BETON BERTULANG U - DITCH PRECAST WITH SPECIAL SUPPORT UK. 60 X 70 / 1 M'
NO
URAIAN PEKERJAAN
SAT.
VOLUME
KODE
HARGA SAT.
SUB TOTAL
JUMLAH
A. Supply Material 1 Keb. U - Ditch 60 X 70 + support
M'
1.00
Ls
Rp.
844,166.67
1 Pembersihan Lahan Lokasi Kerja
M'
2 Pek. Pemadatan Tanah (dg alat)
M3
3 Pas. Bedding Pasir tb. 10 Cm 4 Pek. Penempatan & Penyetelan U - Ditch
Rp.
844,166.67
Rp.
844,166.67
1.00
Ls
Rp.
0.13
D 21
Rp.
15,000.00
Rp.
15,000.00
38,154.16
Rp.
5,112.66
M3
0.13
D 13
Rp.
M'
1.00
Ls
Rp.
347,050.00
Rp.
46,504.70
50,700.00
Rp.
5 Pek. Urugan Tanah Sisi U - Ditch
M3
0.64
D 11
Rp.
50,700.00
15,818.00
Rp.
6 Pek. Pemadatan Tanah Sisi U - Ditch (dg alat)
M3
0.64
D 21
10,123.52
Rp.
38,154.16
Rp.
24,418.66
Rp.
151,859.54
JUMLAH TOTAL :
Rp.
996,026.21
PEMBULATAN :
Rp.
996,027.00
B. Pemasangan Material
Buangan Tanah Sisa Galian 7 Pemberesan Lapangan
M3
0.90
SNI-T8
Rp.
-
Rp.
-
Ls
1.00
Ls
Rp.
-
Rp.
-
. HARGA SATUAN PEMBUATAN SALURAN TYPE U BETON BERTULANG U - DITCH PRECAST WITH SPECIAL SUPPORT UK. 60 X 80 / 1 M'
NO
URAIAN PEKERJAAN
SAT.
VOLUME
KODE
HARGA SAT.
SUB TOTAL
JUMLAH
A. Supply Material Rp.
920,833.33
Rp.
166,326.87
JUMLAH TOTAL :
Rp.
1,087,160.20
PEMBULATAN :
Rp.
1,087,161.00
1 Keb. U - Ditch 60 X 80 + support
M'
1.00
Ls
Rp.
920,833.33
Rp.
920,833.33
15,000.00
B. Pemasangan Material 1 Pembersihan Lahan Lokasi Kerja
M'
1.00
Ls
Rp.
15,000.00
Rp.
2 Pek. Pemadatan Tanah (dg alat)
M3
0.14
D 21
Rp.
38,154.16
Rp.
5,341.58
3 Pas. Bedding Pasir tb. 10 Cm
M3
0.14
D 13
Rp.
347,050.00
Rp.
48,587.00
4 Pek. Penempatan & Penyetelan U - Ditch
M'
1.00
Ls
Rp.
55,300.00
Rp.
55,300.00
5 Pek. Urugan Tanah Sisi U - Ditch
M3
0.78
D 11
Rp.
15,818.00
Rp.
12,338.04
6 Pek. Pemadatan Tanah Sisi U - Ditch (dg alat)
M3
0.78
D 21
Rp.
38,154.16
Rp.
29,760.24
M3
0.95
SNI-T8
Rp.
-
Rp.
-
Ls
1.00
Ls
Rp.
-
Rp.
-
Buangan Tanah Sisa Galian 7 Pemberesan Lapangan
.
HARGA SATUAN PEMBUATAN SALURAN TYPE U BETON BERTULANG U - DITCH PRECAST TANPA TUTUP, UK. 40 X 40 / 1 M'
NO
URAIAN PEKERJAAN
SAT.
VOLUME
KODE
HARGA SAT.
SUB TOTAL
JUMLAH
A. Supply Material 1 Keb. U - Ditch 40 X 40
M'
1.00
Rp.
371,666.67
Rp.
371,666.67
Rp.
371,666.67
B. Pemasangan Material 1 Pembersihan Lahan Lokasi Kerja
1.00 0.61 0.05 0.05 1.00 0.32 0.32 0.61 1.00
M'
Pek. Galian Tanah
M3
2 Pek. Pemadatan Tanah (dg alat)
M3
3 Pas. Bedding Pasir tb. 10 Cm
M3
4 Pek. Penempatan & Penyetelan U - Ditch
M'
5 Pek. Urugan Tanah Sisi U - Ditch
M3
6 Pek. Pemadatan Tanah Sisi U - Ditch (dg alat)
M3
Buangan Tanah Sisa Galian
M3
7 Pemberesan Lapangan
Ls
Ls
Rp.
D 01
Rp.
15,000.00
D 21
Rp.
38,154.16
D 13
Rp.
347,050.00
Ls
Rp.
26,100.00
D 11
Rp.
15,818.00
D 21
Rp.
38,154.16
D 10
Rp.
-
Ls
Rp.
-
-
Rp. Rp. Rp. Rp.
15,000.00 1,907.71 17,352.50 26,100.00 5,061.76 12,209.33 Rp. Rp.
Rp. Rp. Rp. Rp.
JUMLAH TOTAL : PEMBULATAN
Rp. Rp.
77,631.30
449,297.97 449,298.00
. HARGA SATUAN PEMBUATAN SALURAN TYPE U BETON BERTULANG U - DITCH PRECAST TANPA TUTUP, UK. 50 X 50 / 1 M'
NO
URAIAN PEKERJAAN
SAT.
VOLUME
KODE
HARGA SAT.
SUB TOTAL
JUMLAH
A. Supply Material 1 Keb. U - Ditch 50 X 50
M'
1.00
Rp.
551,666.67
Rp.
551,666.67
Rp.
551,666.67
B. Pemasangan Material 1 Pembersihan Lahan Lokasi Kerja
1.00 0.81 0.07 0.07 1.00 0.38 0.38 0.81 1.00
M'
Pek. Galian Tanah
M3
2 Pek. Pemadatan Tanah (dg alat)
M3
3 Pas. Bedding Pasir tb. 10 Cm
M3
4 Pek. Penempatan & Penyetelan U - Ditch
M'
5 Pek. Urugan Tanah Sisi U - Ditch
M3
6 Pek. Pemadatan Tanah Sisi U - Ditch (dg alat)
M3
Buangan Tanah Sisa Galian
M3
7 Pemberesan Lapangan
Ls
Ls
Rp.
D 01
Rp.
15,000.00
D 21
Rp.
38,154.16
D 13
Rp.
347,050.00
-
Ls
Rp.
38,700.00
D 11
Rp.
15,818.00
D 21
Rp.
38,154.16
D 10
Rp.
-
Ls
Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
15,000.00 2,670.79 24,293.50 38,700.00 6,010.84 14,498.58 Rp. -
JUMLAH TOTAL : PEMBULATAN
Rp. Rp.
101,173.71
652,840.38 652,841.00
. HARGA SATUAN PEMBUATAN SALURAN TYPE U BETON BERTULANG U - DITCH PRECAST TANPA TUTUP. UK. 60 X 60 / 1 M'
NO
URAIAN PEKERJAAN
SAT.
VOLUME
KODE
HARGA SAT.
SUB TOTAL
JUMLAH
A. Supply Material 1 Keb. U - Dicth 60 X 60
M'
1.00
Rp.
655,000.00
Rp.
655,000.00
Rp.
655,000.00
B. Pemasangan Material 1 Pembersihan Lahan Lokasi Kerja Pek. Galian Tanah
M' M3
2 Pek. Pemadatan Tanah (dg alat)
M3
3 Pas. Bedding Pasir tb. 10 Cm
M3
4 Pek. Penempatan & Penyetelan U - Ditch
M'
5 Pek. Urugan Tanah Sisi U - Ditch
M3
6 Pek. Pemadatan Tanah Sisi U - Ditch (dg alat)
M3
Buangan Tanah Sisa Galian 7 Pemberesan Lapangan
JUMLAH TOTAL : PEMBULATAN
M3 Ls
1.00 1.09 0.07 0.07 1.00 0.52 0.52 1.09 1.00
Ls
Rp.
D 01
Rp.
15,000.00
D 21
Rp.
38,154.16
D 13
Rp.
347,050.00
-
Ls
Rp.
45,900.00
D 11
Rp.
15,818.00
D 21
Rp.
38,154.16
D 10
Rp.
-
Ls
Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
15,000.00 2,823.41 25,681.70 45,900.00 8,225.36 19,840.16 Rp. Rp. Rp.
117,470.63
772,470.63 772,471.00
HARGA SATUAN PEMBUATAN SALURAN TYPE U BETON BERTULANG U - DITCH PRECAST TANPA TUTUP, UK. 80 X 80 / 1 M'
NO
URAIAN PEKERJAAN
SAT.
VOLUME
KODE
HARGA SAT.
SUB TOTAL
JUMLAH
A. Supply Material 1 Keb. U - Ditch 80 X 80
M'
1.00
M'
1.00 1.57 0.10 0.10 1.00 0.94 0.94 1.57 1.00
Ls
Rp.
987,500.00
Rp.
987,500.00
Rp.
987,500.00
B. Pemasangan Material 1 Pembersihan Lahan Lokasi Kerja Pek. Galian Tanah
M3
2 Pek. Pemadatan Tanah (dg alat)
M3
3 Pas. Bedding Pasir tb. 10 Cm
M3
4 Pek. Penempatan & Penyetelan U - Ditch
M'
5 Pek. Urugan Tanah Sisi U - Ditch
M3
6 Pek. Pemadatan Tanah Sisi U - Ditch (dg alat)
M3
Buangan Tanah Sisa Galian
M3
7 Pemberesan Lapangan
Ls
Ls
Rp.
D 01
Rp.
15,000.00
D 21
Rp.
38,154.16
D 13
Rp.
347,050.00
-
Ls
Rp.
69,200.00
D 11
Rp.
15,818.00
D 21
Rp.
38,154.16
D 10
Rp.
-
Ls
Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
15,000.00 3,815.42 34,705.00 69,200.00 14,884.74 35,864.91 Rp. -
JUMLAH TOTAL : PEMBULATAN
Rp. Rp.
173,470.06
1,160,970.06 1,160,971.00
. HARGA SATUAN PEMBUATAN SALURAN TYPE U BETON BERTULANG U - DITCH PRECAST TANPA TUTUP, UK. 100 X 100 / 1 M'
NO
URAIAN PEKERJAAN
SAT.
VOLUME
KODE
HARGA SAT.
SUB TOTAL
JUMLAH
A. Supply Material M'
1.00
1 Pembersihan Lahan Lokasi Kerja
M'
2 Pek. Galian Tanah
M3
3 Pek. Pemadatan Tanah (dg alat)
M3
4 Pas. Bedding Pasir tb. 10 Cm
M3
1.00 2.23 0.32 0.32 1.00 1.20 1.20 2.23 1.00
1 Keb. U - Ditch 100 X 100
Rp.
1,689,166.67
Rp.
1,689,166.67
Rp.
1,689,166.67
B. Pemasangan Material
5 Pek. Penempatan & Penyetelan U - Ditch
M'
6 Pek. Urugan Tanah Sisi U - Ditch
M3
7 Pek. Pemadatan Tanah Sisi U - Ditch (dg alat)
M3
Buangan Tanah Sisa Galian
M3
7 Pemberesan Lapangan
Ls
Ls
Rp.
15,000.00
D 01
Rp.
31,075.00
D 21
Rp.
38,154.16
D 13
Rp.
347,050.00
Ls
Rp.
118,300.00
D 11
Rp.
15,818.00
D 21
Rp.
38,154.16
SNI-T8
Rp.
-
Ls
Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
15,000.00 69,141.88 12,209.33 111,056.00 118,300.00 18,981.60 45,784.99 Rp. Rp.
JUMLAH TOTAL : PEMBULATAN :
Rp. Rp.
390,473.80
2,079,640.46 2,079,641.00
. DAFTAR : RENCANA PEMBUATAN SALURAN TYPE U BETON BERTULANG U - DITCH PRECAST TANPA TUTUP, UK. 40 X 60 / 1 M'
NO
URAIAN PEKERJAAN
SAT.
VOLUME
KODE
HARGA SAT.
SUB TOTAL
JUMLAH
A. Supply Material 1 Keb. U - Ditch 40 X 60
M'
1.00
M'
1.00 0.75 0.06 0.06 1.00 0.71 0.32 0.75 1.00
Ls
Rp.
466,666.67
Rp.
466,666.67
Rp.
466,666.67
B. Pemasangan Material 1 Pembersihan Lahan Lokasi Kerja Pek. Galian Tanah
M3
2 Pek. Pemadatan Tanah (dg alat)
M3
3 Pas. Bedding Pasir tb. 10 Cm
M3
4 Pek. Penempatan & Penyetelan U - Ditch
M'
5 Pek. Urugan Tanah Sisi U - Ditch
M3
6 Pek. Pemadatan Tanah Sisi U - Ditch (dg alat)
M3
Buangan Tanah Sisa Galian 7 Pemberesan Lapangan
M3 Ls
Ls
Rp.
D 01
Rp.
15,000.00
D 21
Rp.
38,154.16
D 13
Rp.
347,050.00
-
Ls
Rp.
32,700.00
D 11
Rp.
15,818.00
D 21
Rp.
38,154.16
SNI-T8
Rp.
-
Ls
Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
15,000.00 2,289.25 20,823.00 32,700.00 11,214.96 12,209.33 Rp. Rp.
JUMLAH TOTAL : PEMBULATAN :
Rp. Rp.
.
94,236.54
560,903.21 560,904.00
DAFTAR : RENCANA PEMBUATAN SALURAN TYPE U BETON BERTULANG U - DITCH PRECAST TANPA TUTUP, UK. 50 X 70 / 1 M'
NO
URAIAN PEKERJAAN
SAT.
VOLUME
KODE
HARGA SAT.
SUB TOTAL
JUMLAH
A. Supply Material
M'
1 Keb. U - Ditch 50 X 70
1.00
Rp.
682,500.00
Rp.
682,500.00
Rp.
682,500.00
B. Pemasangan Material 1 Pembersihan Lahan Lokasi Kerja Pek. Galian Tanah 2 Pek. Pemadatan Tanah (dg alat) 3 Pas. Bedding Pasir tb. 10 Cm 4 Pek. Penempatan & Penyetelan U - Ditch 5 Pek. Urugan Tanah Sisi U - Ditch 6 Pek. Pemadatan Tanah Sisi U - Ditch (dg alat) Buangan Tanah Sisa Galian 7 Pemberesan Lapangan
M' M3 M3 M3 M' M3 M3 M3 Ls
1.00 0.90 0.12 0.12 1.00 0.57 0.57 0.90 1.00
Ls
Rp.
D 01
Rp.
15,000.00
D 21
Rp.
38,154.16
D 13
Rp.
347,050.00
-
Ls
Rp.
47,800.00
D 11
Rp.
15,818.00
D 21
Rp.
38,154.16
SNI-T8
Rp.
-
Ls
Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
15,000.00 4,578.50 43,034.20 47,800.00 9,016.26 21,747.87 Rp. Rp.
JUMLAH TOTAL : PEMBULATAN :
Rp. Rp.
141,176.83
823,676.83 823,677.00
DAFTAR : RENCANA PEMBUATAN SALURAN TYPE U BETON BERTULANG U - DITCH PRECAST TANPA TUTUP, UK. 60 X 70 / 1 M'
NO
URAIAN PEKERJAAN
SAT.
VOLUME
KODE
HARGA SAT.
SUB TOTAL
JUMLAH
A. Supply Material
M'
1 Keb. U - Ditch 60 X 70
1.00
Rp.
705,000.00
Rp.
705,000.00
Rp.
705,000.00
B. Pemasangan Material 1 Pembersihan Lahan Lokasi Kerja Pek. Galian Tanah 2 Pek. Pemadatan Tanah (dg alat) 3 Pas. Bedding Pasir tb. 10 Cm 4 Pek. Penempatan & Penyetelan U - Ditch 5 Pek. Urugan Tanah Sisi U - Ditch 6 Pek. Pemadatan Tanah Sisi U - Ditch (dg alat) Buangan Tanah Sisa Galian 7 Pemberesan Lapangan
M' M3 M3 M3 M' M3 M3 M3 Ls
1.00 0.90 0.13 0.13 1.00 0.64 0.64 0.90 1.00
Ls
Rp.
D 01
Rp.
15,000.00
D 21
Rp.
38,154.16
D 13
Rp.
347,050.00
-
Ls
Rp.
49,400.00
D 11
Rp.
15,818.00
D 21
Rp.
38,154.16
SNI-T8
Rp.
-
Ls
Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
15,000.00 5,112.66 46,504.70 49,400.00 10,123.52 24,418.66 Rp. -
JUMLAH TOTAL : PEMBULATAN :
Rp. Rp.
150,559.54
855,559.54 855,560.00
. DAFTAR : RENCANA PEMBUATAN SALURAN TYPE U BETON BERTULANG U - DITCH PRECAST TANPA TUTUP, UK. 60 X 80 / 1 M'
NO
URAIAN PEKERJAAN
A. Supply Material 1 Keb. U - Ditch 60 X 80
SAT.
M'
VOLUME
KODE
1.00
HARGA SAT.
Rp.
SUB TOTAL
JUMLAH
785,000.00
Rp.
785,000.00
Rp.
785,000.00
B. Pemasangan Material 1 Pembersihan Lahan Lokasi Kerja Pek. Galian Tanah 2 Pek. Pemadatan Tanah (dg alat) 3 Pas. Bedding Pasir tb. 10 Cm 4 Pek. Penempatan & Penyetelan U - Ditch 5 Pek. Urugan Tanah Sisi U - Ditch 6 Pek. Pemadatan Tanah Sisi U - Ditch (dg alat) Buangan Tanah Sisa Galian 7 Pemberesan Lapangan
JUMLAH TOTAL : PEMBULATAN :
M' M3 M3 M3 M' M3 M3 M3 Ls
1.00 0.95 0.14 0.14 1.00 0.78 0.78 0.95 1.00
Ls
Rp.
D 01
Rp.
15,000.00
D 21
Rp.
38,154.16
D 13
Rp.
347,050.00
-
Ls
Rp.
55,000.00
D 11
Rp.
15,818.00
D 21
Rp.
38,154.16
SNI-T8
Rp.
-
Ls
Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
15,000.00 5,341.58 48,587.00 55,000.00 12,338.04 29,760.24 Rp. Rp. Rp.
166,026.87
951,026.87 951,027.00
HARGA SATUAN PEKERJAAN BOX CULVERT BETON BERTULANG PRECAST UK. 40 X 40 / 1 M'
NO
URAIAN PEKERJAAN
SAT.
VOLUME
KODE
HARGA SAT.
SUB TOTAL
JUMLAH
A. Supply Material 1 Keb. Box Culvert 40 X 40 ( heavy duty)
M'
1.00
M'
1.00 1.18 0.06 0.06 1.00 0.20 0.20 0.98 1.00
Ls
Rp.
1,028,000.00 Rp.
1,028,000.00
Rp.
1,028,000.00
B. Pemasangan Material 1 Pembersihan Lahan Lokasi Kerja Pek. Galian Tanah
M3
2 Pek. Pemadatan Tanah (dg alat)
M3
3 Pas. Bedding Pasir tb. 10 Cm
M3
4 Pek. Penempatan & Penyetelan Box Culvert
M'
5 Pek. Urugan Tanah Sisi Box Culvert
M3
6 Pek. Pemadatan Tanah Sisi Box Culvert (dg alat
M3
Buangan Tanah Sisa Galian
M3
7 Pemberesan Lapangan
Ls
Ls
Rp.
D 01
Rp.
15,000.00
D 21
Rp.
38,154.16
D 13
Rp.
347,050.00
-
Ls
Rp.
72,000.00
D 11
Rp.
15,818.00
D 21
Rp.
38,154.16
D 10
Rp.
-
Ls
Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
15,000.00 2,212.94 20,128.90 72,000.00 3,163.60 7,630.83 Rp. -
JUMLAH TOTAL : PEMBULATAN :
Rp. Rp.
120,136.27
1,148,136.27 1,148,137.00
HARGA SATUAN PEKERJAAN BOX CULVERT BETON BERTULANG PRECAST, UK. 50 X 50 / 1M'
NO
URAIAN PEKERJAAN
SAT.
VOLUME
KODE
HARGA SAT.
SUB TOTAL
JUMLAH
A. Supply Material 1 Keb. Box Culvert 50 X 50 ( heavy duty)
M'
1.00
M'
1.00 1.30 0.07 0.07 1.00 0.40 0.40 1.30 1.00
Ls
Rp.
1,128,000.00 Rp.
1,128,000.00
Rp.
1,128,000.00
B. Pemasangan Material 1 Pembersihan Lahan Lokasi Kerja Pek. Galian Tanah
M3
2 Pek. Pemadatan Tanah (dg alat)
M3
3 Pas. Bedding Pasir tb. 10 Cm
M3
4 Pek. Penempatan & Penyetelan Box Culvert
M'
5 Pek. Urugan Tanah Sisi Box Culvert
M3
6 Pek. Pemadatan Tanah Sisi Box Culvert (dg alat
M3
Buangan Tanah Sisa Galian
M3
7 Pemberesan Lapangan
Ls
Ls
Rp.
D 01
Rp.
15,000.00
D 21
Rp.
38,154.16
D 13
Rp.
347,050.00
-
Ls
Rp.
79,000.00
D 11
Rp.
15,818.00
D 21
Rp.
38,154.16
D 10
Rp.
-
Ls
Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
15,000.00 2,594.48 23,599.40 79,000.00 6,327.20 15,261.66 Rp. -
JUMLAH TOTAL : PEMBULATAN :
Rp. Rp.
141,782.75
1,269,782.75 1,269,783.00
HARGA SATUAN PEKERJAAN PEKERJAAN BOX CULVERT BETON BERTULANG PRECAST, UK. 60 X 60 / 1M'
NO
URAIAN PEKERJAAN
SAT.
VOLUME
KODE
HARGA SAT.
SUB TOTAL
JUMLAH
A. Supply Material 1 Keb. Box Culvert 60 X 60 ( heavy duty)
M'
1.00
M'
1.00 1.42 0.08 0.08 1.00 0.62 0.62 1.42 1.00
Ls
Rp.
1,551,000.00 Rp.
1,551,000.00
Rp.
1,551,000.00
B. Pemasangan Material 1 Pembersihan Lahan Lokasi Kerja Pek. Galian Tanah
M3
2 Pek. Pemadatan Tanah (dg alat)
M3
3 Pas. Bedding Pasir tb. 10 Cm
M3
4 Pek. Penempatan & Penyetelan Box Culvert
M'
5 Pek. Urugan Tanah Sisi Box Culvert
M3
6 Pek. Pemadatan Tanah Sisi Box Culvert (dg alat
M3
Buangan Tanah Sisa Galian 7 Pemberesan Lapangan
JUMLAH TOTAL : PEMBULATAN :
M3 Ls
Ls
Rp.
D 01
Rp.
15,000.00
D 21
Rp.
38,154.16
D 13
Rp.
347,050.00
-
Ls
Rp.
108,600.00
D 11
Rp.
15,818.00
D 21
Rp.
38,154.16
D 10
Rp.
-
Ls
Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
15,000.00 3,052.33 28,458.10 108,600.00 9,807.16 23,655.58 Rp. Rp. Rp.
188,573.17
1,739,573.17 1,739,574.00
HARGA SATUAN PEKERJAAN PEKERJAAN BOX CULVERT BETON BERTULANG PRECAST, UK. 80 X 80 / 1M'
NO
URAIAN PEKERJAAN
SAT.
VOLUME
KODE
HARGA SAT.
SUB TOTAL
JUMLAH
A. Supply Material 1 Keb. Box Culvert 80 X 80 (heavy duty)
M'
B. Pemasangan Material 1 Pembersihan Lahan Lokasi Kerja
1.00 1.70 1.10 0.12 1.00 0.61 0.84 1.70 1.00
M'
Pek. Galian Tanah
M3
2 Pek. Pemadatan Tanah (dg alat)
M3
3 Pas. Bedding Pasir tb. 10 Cm
M3
4 Pek. Penempatan & Penyetelan Box Culvert
M'
5 Pek. Urugan Tanah Sisi Box Culvert
M3
6 Pek. Pemadatan Tanah Sisi Box Culvert (dg alat
M3
Buangan Tanah Sisa Galian
M3
7 Pemberesan Lapangan
1.00
Ls
Rp.
2,869,000.00
Ls
Rp.
D 01
Rp.
15,000.00
D 21
Rp.
38,154.16
D 13
Rp.
347,050.00
-
Ls
Rp.
200,900.00
D 11
Rp.
15,818.00
D 21
Rp.
38,154.16
D 10
Rp.
-
Ls
Rp.
-
Rp.
2,869,000.00
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
Rp.
15,000.00 41,969.58 41,646.00 200,900.00 9,696.43 32,049.49 Rp. -
JUMLAH TOTAL : PEMBULATAN :
Rp. Rp.
2,869,000.00
341,261.50
3,210,261.50 3,210,262.00
HARGA SATUAN PEKERJAAN BOX CULVERT BETON BERTULANG PRECAST, UK. 100 X 100 / 1M'
NO
URAIAN PEKERJAAN
SAT.
VOLUME
KODE
HARGA SAT.
SUB TOTAL
JUMLAH
A. Supply Material 1 Keb. Box Culvert 100 X 100 (heavy duty)
M'
1.00
M'
1.00 1.90 1.30 0.13 1.00 1.20 1.20 1.90 1.00
Ls
Rp.
3,453,000.00 Rp.
3,453,000.00
Rp.
3,453,000.00
B. Pemasangan Material 1 Pembersihan Lahan Lokasi Kerja Pek. Galian Tanah
M3
2 Pek. Pemadatan Tanah (dg alat)
M3
3 Pas. Bedding Pasir tb. 10 Cm
M3
4 Pek. Penempatan & Penyetelan Box Culvert
M'
5 Pek. Urugan Tanah Sisi Box Culvert
M3
6 Pek. Pemadatan Tanah Sisi Box Culvert (dg alat
M3
Buangan Tanah Sisa Galian 7 Pemberesan Lapangan
M3 Ls
Ls
Rp.
15,000.00
D 01
Rp.
31,075.00
D 21
Rp.
38,154.16
D 13
Rp.
347,050.00
Ls
Rp.
241,800.00
D 11
Rp.
15,818.00
D 21
Rp.
38,154.16
SNI-T8
Rp.
-
Ls
Rp.
633.62
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
15,000.00 59,042.50 49,600.41 45,116.50 241,800.00 18,981.60 45,784.99 Rp. 633.62
JUMLAH TOTAL : PEMBULATAN :
Rp. Rp.
475,326.00
3,928,326.00 3,928,326.00
HARGA SATUAN PEMASANGAN COVER U-DITCH PRECAST UK. 40 / 1 M'
NO
URAIAN PEKERJAAN
1 2 3 4 5
Cover Light Duty U - Ditch 40
1 2 3 4 5
Cover Heavy Duty U - Ditch 40
Pek. Pengukuran Pek. Perataan Perletakan Pemasangan Handling / Unhandling Perawatan dan Pembersihan
Pek. Pengukuran Pek. Perataan Perletakan Pemasangan Handling / Unhandling Perawatan dan Pembersihan
PAS . COVER LIGHT DUTY UK. 40/M' PAS . COVER HEAVY DUTY UK. 40/M'
SAT.
bh M' M' M' M' bh M' M' M' M'
0.1666667 VOLUME
KODE
HARGA SAT.
1.00 1.00 -
Ls Ls Ls Ls
Rp. Rp. Rp. Rp. Rp.
1.00 1.00 -
Ls Ls Ls Ls
Rp. Rp. Rp. Rp. Rp.
SUB TOTAL
JUMLAH
133,000.00 10,700.00 -
Rp. Rp. Rp. Rp. Rp.
133,000.00 10,700.00 -
Rp.
143,700.00
141,000.00 11,300.00 -
Rp. Rp. Rp. Rp. Rp.
141,000.00 11,300.00 -
Rp.
152,300.00
Rp. Rp.
143,700.00 152,300.00
HARGA SATUAN PEMASANGAN COVER U-DITCH PRECAST UK. 50 / 1 M'
NO
URAIAN PEKERJAAN
1 2 3 4 5
Cover Light Duty U - Ditch 50
1 2 3 4 5
Cover Heavy Duty U - Ditch 50
Pek. Pengukuran Pek. Perataan Perletakan Pemasangan Handling / Unhandling Perawatan dan Pembersihan
Pek. Pengukuran Pek. Perataan Perletakan Pemasangan Handling / Unhandling Perawatan dan Pembersihan
SAT.
bh M' M' M' M' bh M' M' M' M'
VOLUME
KODE
HARGA SAT.
1.00 1.00 -
Ls Ls Ls Ls
Rp. Rp. Rp. Rp. Rp.
1.00 1.00 -
Ls Ls Ls Ls
Rp. Rp. Rp. Rp. Rp.
SUB TOTAL
JUMLAH
170,000.00 13,600.00 -
Rp. Rp. Rp. Rp. Rp.
170,000.00 13,600.00 -
Rp.
183,600.00
193,000.00 15,500.00 -
Rp. Rp. Rp. Rp. Rp.
193,000.00 15,500.00 -
Rp.
208,500.00
Rp. Rp.
183,600.00 208,500.00
PAS . COVER LIGHT DUTY UK. 50/M' PAS . COVER HEAVY DUTY UK. 50/M'
HARGA SATUAN PEMASANGAN COVER U-DITCH PRECAST UK. 60 / 1 M'
NO
URAIAN PEKERJAAN
1 2 3 4 5
Cover Light Duty U - Ditch 60
1 2 3 4 5
Cover Heavy Duty U - Ditch 60
Pek. Pengukuran Pek. Perataan Perletakan Pemasangan Handling / Unhandling Perawatan dan Pembersihan
Pek. Pengukuran Pek. Perataan Perletakan Pemasangan Handling / Unhandling Perawatan dan Pembersihan
SAT.
bh M' M' M' M' bh M' M' M' M'
VOLUME
KODE
HARGA SAT.
1.00 1.00 -
Ls Ls Ls Ls Ls
Rp. Rp. Rp. Rp. Rp.
1.00 1.00 -
Ls Ls Ls Ls Ls
Rp. Rp. Rp. Rp. Rp.
SUB TOTAL
JUMLAH
204,000.00 16,400.00 -
Rp. Rp. Rp. Rp. Rp.
204,000.00 16,400.00 -
Rp.
220,400.00
243,000.00 19,500.00 -
Rp. Rp. Rp. Rp. Rp.
243,000.00 19,500.00 -
Rp.
262,500.00
Rp. Rp.
220,400.00 262,500.00
PAS . COVER LIGHT DUTY UK. 60/M' PAS . COVER HEAVY DUTY UK. 60/M'
HARGA SATUAN PEMASANGAN COVER U-DITCH PRECAST UK. 80 / 1 M'
NO
URAIAN PEKERJAAN
1 2 3 4 5
Cover Light Duty U - Ditch 80
1 2 3 4 5
Cover Heavy Duty U - Ditch 80
Pek. Pengukuran Pek. Perataan Perletakan Pemasangan Handling / Unhandling Perawatan dan Pembersihan
Pek. Pengukuran Pek. Perataan Perletakan Pemasangan Handling / Unhandling Perawatan dan Pembersihan
SAT.
bh M' M' M' M' bh M' M' M' M'
VOLUME
KODE
HARGA SAT.
1.00 1.00 -
Ls Ls Ls Ls Ls
Rp. Rp. Rp. Rp. Rp.
1.00 1.00 -
Ls Ls Ls Ls Ls
Rp. Rp. Rp. Rp. Rp.
SUB TOTAL
JUMLAH
260,000.00 18,200.00 -
Rp. Rp. Rp. Rp. Rp.
260,000.00 18,200.00 -
Rp.
278,200.00
330,000.00 23,100.00 -
Rp. Rp. Rp. Rp. Rp.
330,000.00 23,100.00 -
Rp.
353,100.00
Rp. Rp.
278,200.00 353,100.00
PAS . COVER LIGHT DUTY UK. 80/M' PAS . COVER HEAVY DUTY UK. 80/M'
Depok,
November 2013
ANALISA HARGA SATUAN PEKERJAAN DINAS BINA MARGA DAN SUMBER DAYA AIR KOTA DEPOK T.A. 2013
Ir.H. ENCOK KURYASA, MM
NIP. 19571002 198403 1 005
HARGA SATUAN PEMBUATAN SALURAN 1/2 BUIS BE 1/2 BUIS BETON DIA. 20 / 1 M'
NO
URAIAN PEKERJAAN
SAT.
VOLUME
KODE
HARGA SAT.
A. Supply Material 1 Keb. 1/2 Buis Beton dia. 20
M'
1.00
Rp.
48,360.31
B. Pemasangan Material 1 Galian Tanah
M3
0.20
D 01
Rp.
56,375.00
2 Pas. Bedding Pasir tb. 5 Cm
M3
0.02
D 13
Rp.
347,050.00
3 Pas. Beton Bo Samping Buis Kanan Kiri
M3
0.05
SNI-Bo
Rp.
879,908.61
4 Pek. Pas Bata Merah
M2
0.40
G 05
Rp.
176,207.90
5 Pek. Pleteran + Acian Pasangan Bata
M2
1.00
J 03
Rp.
60,036.90
6 Pemberesan Lapangan
LS
1.00
LS
Rp.
1,500.00
JUMLAH TOTAL :
HARGA SATUAN PEMBUATAN SALURAN 1/2 BUIS BE 1/2 BUIS BETON DIA. 30 / 1 M'
NO
URAIAN PEKERJAAN
SAT.
VOLUME
KODE
HARGA SAT.
A. Supply Material 1 Keb. 1/2 Buis Beton dia. 30
B. Pemasangan Material
M'
1.00
Rp.
39,165.00
1 Galian Tanah
M3
0.30
D 01
Rp.
56,375.00
2 Pas. Bedding Pasir tb. 5 Cm
M3
0.03
D 13
Rp.
347,050.00
3 Pas. Beton Bo Samping Buis Kanan Kiri
M3
0.09
SNI-Bo
Rp.
879,908.61
4 Pek. Pas Bata Merah
M2
0.40
G 05
Rp.
176,207.90
5 Pek. Pleteran + Acian Pasangan Bata
M2
1.00
J 03
Rp.
60,036.90
6 Pemberesan Lapangan
LS
1.00
LS
Rp.
1,500.00
JUMLAH TOTAL :
HARGA SATUAN PEMBUATAN SALURAN BUIS BET BUIS BETON DIA. 30 / 1 M'
NO
URAIAN PEKERJAAN
SAT.
VOLUME
KODE
HARGA SAT.
A. Supply Material 1 Keb. Buis Beton dia. 30
M'
1.00
Rp.
89,000.00
B. Pemasangan Material 1 Galian Tanah
M3
0.28
D 01
Rp.
56,375.00
2 Pas. Bedding Pasir tb. 5 Cm
M3
0.03
D 13
Rp.
347,050.00
3 Pas. Beton Bo Samping Buis Kanan Kiri
M3
0.20
SNI-Bo
Rp.
879,908.61
4 Pemberesan Lapangan
LS
1.00
LS
Rp.
1,500.00
JUMLAH TOTAL :
ANALI DINAS BI
I
TON
SUB TOTAL
JUMLAH
Rp.
48,360.31
Rp.
11,275.00
Rp.
6,941.00
Rp.
45,755.25
Rp.
70,483.16
Rp.
60,036.90
Rp.
1,500.00
Rp.
48,360.31
Rp.
195,991.31
-
Rp.
244,351.62
.
TON
SUB TOTAL
JUMLAH
Rp.
39,165.00
Rp.
39,165.00
51,648.38
Rp.
16,912.50
Rp.
8,676.25
Rp.
82,711.41
Rp.
70,483.16
Rp.
60,036.90
Rp.
1,500.00
Rp.
240,320.22
73200 73,200.00
Rp.
279,485.22
N
SUB TOTAL
JUMLAH
Rp.
89,000.00
Rp.
15,503.13
Rp.
8,676.25
Rp.
173,342.00
Rp.
1,500.00
Rp.
89,000.00
Rp.
199,021.37
90,000.000
Rp.
. Depok,
288,021.37
November 2013
A HARGA SATUAN PEKERJAAN NA MARGA DAN SUMBER DAYA AIR
KOTA DEPOK T.A. 2013
r.H. ENCOK KURYASA, MM
IP. 19571002 198403 1 005
#REF!
74000 #REF!
#REF!
0.760546643
#REF!
#REF!
#REF!
94000 #REF!
#REF!
#REF!
DAFTAR ANALISA SATUAN PEKERJAAN TAHUN ANGGARAN 2012 NO C 01
URAIAN
VOL.
SAT.
HARGA SAT.
1 M3 BONGKARAN BETON BERTULANG
Pekerja
6.6670
oh
65,000.00
433,355.00
Mandor
0.3330
oh
100,000.00
33,300.00
Jumlah
466,655.00
Jasa 10%
46,665.50
Jumlah Total D 01
513,320.50
1 M3 GALIAN TANAH BIASA SEDALAM 1 M
TUKANG GALI
0.7500
oh
65,000.00
48,750.00
Mandor
0.0250
oh
100,000.00
2,500.00
Jumlah
51,250.00
Jasa 10%
5,125.00
Jumlah Total D 02
56,375.00
1 M3 GALIAN TANAH BIASA SEDALAM 2 M
TUKANG GALI
0.9000
oh
65,000.00
58,500.00
Mandor
0.0450
oh
100,000.00
4,500.00
Jumlah
63,000.00
Jasa 10%
6,300.00
Jumlah Total D 03
69,300.00
1 M3 GALIAN TANAH BIASA SEDALAM 3 M
TUKANG GALI
1.0500
oh
65,000.00
68,250.00
Mandor
0.0670
oh
100,000.00
6,700.00
Jumlah
74,950.00
Jasa 10%
7,495.00
Jumlah Total D 06
82,445.00
1 M3 GALIAN TANAH KERAS SEDALAM 1 M
TUKANG GALI
1.0000
oh
65,000.00
65,000.00
Mandor
0.0320
oh
100,000.00
3,200.00
Jumlah
68,200.00
Jasa 10%
6,820.00
Jumlah Total D 08
75,020.00
1 M3 GALIAN TANAH LUMPUR SEDALAM 1 M
TUKANG GALI
1.2000
oh
65,000.00
Mandor
0.0450
oh
100,000.00
Jumlah
4,500.00 8,250.00
Jumlah Total
90,750.00
1 M3 PEMBUANGAN TANAH SEJAUH 30 M
Pekerja
0.3300
oh
65,000.00
Mandor
0.0100
oh
100,000.00
Jumlah
21,450.00 1,000.00 22,450.00
Jasa 10%
2,245.00
Jumlah Total D 11
78,000.00 82,500.00
Jasa 10% D 10
JUMLAH
24,695.00
1 M3 PERATAAN TANAH
Pekerja
0.1920
oh
65,000.00
12,480.00
Mandor Jumlah
0.0190
oh
100,000.00
1,900.00 14,380.00
Jasa 10% Jumlah Total
1,438.00 15,818.00
NO D 12
URAIAN
VOL.
SAT.
HARGA SAT.
JUMLAH
1 M3 PEMADATAN TANAH (PER 20 CM)
Pekerja
0.5000
oh
65,000.00
32,500.00
Mandor
0.0500
oh
100,000.00
5,000.00
Jumlah
37,500.00
Jasa 10%
3,750.00
Jumlah Total D 13
41,250.00
1 M3 URUGAN PASIR
Pasir urug
1.2000
m3
246,000.00
295,200.00
Pekerja
0.3000
oh
65,000.00
19,500.00
Mandor
0.0100
oh
80,000.00
800.00
Jumlah
315,500.00
Jasa 10%
31,550.00
Jumlah Total SNI-PD5
347,050.00
1 M3 PASANG PONDASI BATU BELAH 1 PC : 4 PS
Batu belah
1.2000
m3
209,000.00
250,800.00
Semen Portland
3.2600
Zak
Pasir pasang
0.5200
m3
68,000.00
221,680.00
252,000.00
131,040.00
Pekerja
1.0000
oh
65,000.00
65,000.00
Tukang Batu Terampil
0.7500
oh
80,000.00
60,000.00
Kepala Tukang
0.0750
oh
91,000.00
6,825.00
Mandor
0.0750
oh
80,000.00
Jumlah Jasa 10%
74,134.50
Jumlah Total E 11
815,479.50
1 M3 PASANGAN BATU BELAH 1 PC : 4 PS (MENGADUK MORTAR DENGAN CONCRETE MIXER)
Batu belah 15-20 cm
1.1000
m3
Semen Portland
Pasir pasang
209,000.00
229,900.00
3.2600
zak
0.5200
m3
68,000.00
221,680.00
252,000.00
131,040.00
Pekerja
1.0000
oh
65,000.00
65,000.00
Tukang Batu Terampil
0.6000
oh
80,000.00
48,000.00
Kepala Tukang
0.0600
oh
91,000.00
5,460.00
Mandor
0.0750
oh
80,000.00
6,000.00
Operator Concrete Mixer
0.0500
oh
100,000.00
5,000.00
Concrete Mixer 0.25m3
0.3200
jam
38,000.00
12,160.00
Waterpump 50 mm
0.3200
jam
63,000.00
Jumlah
74,440.00
Jumlah Total
818,840.00
1 M2 PLESTERAN 1 PC : 3 PP , TEBAL 15 MM
Semen Portland
0.1555
Zak
68,000.00
10,575.36
Pasir pasang
0.0230
m3
252,000.00
5,796.00
Pekerja
0.3000
oh
65,000.00
19,500.00
Tukang Batu Terampil
0.1500
oh
80,000.00
12,000.00
Kepala Tukang
0.0150
oh
91,000.00
1,365.00
Mandor
0.0150
oh
80,000.00
Jumlah
5,043.64
Jumlah Total
55,480.00
1 M2 PASANG RANGKA DINDING PEMISAH KAYU KAMPER
Kayu Kamper Singil, balok
0.0195
m3
3,354,800.00
65,418.60
Kayu Kamper Singil, papan
0.0070
m3
6,195,000.00
43,365.00
Paku biasa 2" - 5"
0.1000
kg
18,000.00
1,800.00
Pekerja
0.1500
oh
80,000.00
12,000.00
Tukang Kayu Terampil
0.4500
oh
80,000.00
36,000.00
Kepala Tukang
0.0450
oh
91,000.00
4,095.00
Mandor
0.0750
oh
80,000.00
6,000.00
Jumlah
168,678.60
Jasa 10%
16,867.86
Jumlah Total I 03
185,546.46
1 M2 PASANG RANGKA DINDING PEMISAH KAYU BORNEO
Kayu Borneo, balok
0.0195
m3
2,290,000.00
44,655.00
Kayu Borneo, papan Paku biasa 2" - 5"
0.0070
m3
2,220,000.00
15,540.00
0.1000
kg
18,000.00
1,800.00
Pekerja
0.1500
oh
65,000.00
9,750.00
Tukang Kayu Terampil
0.4500
oh
80,000.00
36,000.00
Kepala Tukang
0.0450
oh
91,000.00
4,095.00
Mandor
0.0750
oh
80,000.00
Jumlah
6,000.00 117,840.00
Jasa 10%
11,784.00
Jumlah Total I 04
1,200.00 50,436.36
Jasa 10% I 02
20,160.00 744,400.00
Jasa 10% J 04
6,000.00 741,345.00
129,624.00
1 M2 PASANG DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA KAYU KAMPER
Kayu Kamper Singil, balok Kayu Kamper Singil, papan Paku biasa 2" - 5"
0.0195 0.0070 0.1000
m3 m3 kg
3,354,800.00 6,195,000.00 18,000.00
65,418.60 43,365.00 1,800.00
NO
URAIAN
Lem kayu Teakwood 4' x 8' x 4 mm Pekerja Tukang Kayu Terampil Kepala Tukang Mandor Jumlah Jasa 10% Jumlah Total
VOL.
SAT.
HARGA SAT.
JUMLAH
0.5600 1.0000 0.2000 0.6000 0.0600
ltr lbr oh oh oh
42,000.00 122,300.00 65,000.00 80,000.00 91,000.00
23,520.00 122,300.00 13,000.00 48,000.00 5,460.00
0.0100
oh
80,000.00
800.00 323,663.60 32,366.36 356,029.96
NO I 05
URAIAN
VOL.
SAT.
HARGA SAT.
JUMLAH
1 M2 PASANG DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU KAMPER
Kayu Kamper Singil, balok Kayu Kamper Singil, papan Paku biasa 2" - 5"
0.0195 0.0070 0.1000
m3 m3 kg
3,354,800.00 6,195,000.00 18,000.00
65,418.60 43,365.00 1,800.00
Lem kayu Plywood 4' x 8' x 4 mm Pekerja Tukang Kayu Terampil Kepala Tukang Mandor
0.5600 1.0000 0.2000 0.6000 0.0600 0.0100
ltr lbr oh oh oh oh
42,000.00 262,100.00 65,000.00 80,000.00 91,000.00 80,000.00
23,520.00 262,100.00 13,000.00 48,000.00 5,460.00 800.00
Jumlah Jasa 10% Jumlah Total H 14
463,463.60 46,346.36 509,809.96
1 M2 PASANG ATAP SENG GELOMBANG
Seng gelombang 3' x 6' bjls 30 Paku biasa 1/2" - 1" Pekerja Tukang Kayu Terampil
Kepala Tukang Mandor Jumlah Jasa 10% Jumlah Total SNI-CAT8
0.7000 0.0200 0.1200 0.0600
lbr kg oh oh
62,000.00 18,000.00 65,000.00 80,000.00
43,400.00 360.00 7,800.00 4,800.00
0.0060 0.0060
oh oh
91,000.00 80,000.00
546.00 480.00 57,386.00 5,738.60 63,124.60
1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR), 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP
Cat meni Dempul kayu Cat dasar Cat penutup 2 kali Pekerja Tukang Cat Terampil Kepala Tukang Mandor Jumlah Jasa 10% Jumlah Total
0.2000 0.1500 0.1700 0.2600 0.0700 0.0090 0.0060 0.0025
kg kg kg kg oh oh oh oh
21,000.00 40,000.00 65,000.00 65,000.00 65,000.00 80,000.00 91,000.00 80,000.00
4,200.00 6,000.00 11,050.00 16,900.00 4,550.00 720.00 546.00 200.00 44,166.00 4,416.60 48,582.60
SNI-CAT14 1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
Plamir Cat dasar Cat penutup 2 kali Pekerja Tukang Cat Terampil Kepala Tukang Mandor Jumlah Jasa 10% Jumlah Total
PLH. KA BID BINA PROGRAM & TEKNIS DINAS PEKERJAAN UMUM
0.1000 0.1000 0.2600 0.0200 0.0630 0.0063 0.0025
kg kg kg oh oh oh oh
16,590.00 65,000.00 65,000.00 65,000.00 80,000.00 91,000.00 80,000.00
Depok,
November 2013
ANALISA HARGA SATUAN PEKERJAAN DINAS BINA MARGA DAN SUMBER DAYA AIR KOTA DEPOK T.A. 2013
Ir. H. ENCO KURYASA, MM NIP. 110 033 175 Ir.H. ENCOK KURYASA, MM
PLT. KEPALA DINAS PEKERJAAN UM NIP. 19571002 198403 1 005 KOTA DEPOK
Drs. OKA BARMARA SR, M.Si NIP. 480 115 207
1,659.00 6,500.00 16,900.00 1,300.00 5,040.00 573.30 200.00 32,172.30 3,217.23 35,389.53
DAFTAR ANALISA SATUAN PEKERJAAN TAHUN ANGGARAN 2012
NO A 02
URAIAN
VOL.
SAT.
HARGA SAT.
Kayu Borneo Super Paku Ongkos Pasang Jumlah Jasa 10% Jumlah Total
0.0100 0.0380 0.1550
m3 kg oh
2,290,000.00 18,000.00 23,584.00
Dibulatkan
A 04
29,960.00
0.1000 0.2500 1.1000 0.5000 0.1000 0.2500 70.0000 0.0200 0.1500
m³ kg lbr lbr zak m³ bh lot ls
2,290,000.00 18,000.00 79,000.00 47,000.00 68,000.00 252,000.00 1,000.00 353,359.50 360,426.69
54,483.12 599,314.31
0.1300 0.2500 1.0000 0.1250 0.1250
m³ kg ls ls ls
2,290,000.00 18,000.00 8,000.00 255,304.00 287,217.00
297,700.00 4,500.00 8,000.00 31,913.00 35,902.13 378,015.13
Jasa 10% Jumlah
37,801.51 415,816.64
Dibulatkan
415,810.00
1 M2 PASANGAN BATA MERAH 1 : 3
70.0000 0.4200 0.0540 0.4290 0.2140 0.0210 0.0110
bh zak m³ org org org org
1,000.00 68,000.00 252,000.00 70,000.00 70,000.00 91,000.00 100,000.00
70,000.00 28,560.00 13,608.00 30,030.00 14,980.00 1,911.00 1,100.00 160,189.00 16,018.90 176,207.90
70.0000 0.3354 0.0580 0.3218 0.1805 0.0158 0.0083
bh zak m³ org org org org
1,000.00 68,000.00 252,000.00 70,000.00 70,000.00 91,000.00 100,000.00
70,000.00 22,804.48 14,616.00 22,526.00 12,635.00 1,437.80 830.00 144,849.28 14,484.93 159,334.21
1.1000 5.8000 3.0000 5.0000 2.0000 0.4000
m³ kg org org org org
2,290,000.00 18,000.00 70,000.00 70,000.00 91,000.00 100,000.00
2,519,000.00 104,400.00 210,000.00 350,000.00 182,000.00 40,000.00 3,405,400.00 340,540.00 3,745,940.00
1.1000 5.8000 3.0000 5.0000 2.0000 0.4000
m³ kg org org org org
5,040,000.00 18,000.00 70,000.00 70,000.00 91,000.00 100,000.00
5,544,000.00 104,400.00 210,000.00 350,000.00 182,000.00 40,000.00 6,430,400.00 643,040.00
1 M2 PASANGAN BATA MERAH 1 : 4
Bata merah P.C (50 kg) Pasir pasang Pekerja setengah trampil Tk. batu setengah trampil Kep. Tukang batu Mandor Jumlah Jasa 10% Jumlah 1 M3 KUDA-KUDA BORNEO SUPER
Kayu balok Borneo Super Paku Pekerja setengah terampil Tk. kayu setengah terampil Kep. Tukang kayu Mandor Jumlah Jasa 10% Jumlah Total H 03
Jumlah
Bata merah P.C (50 kg) Pasir pasang Pekerja setengah trampil Tk. batu setengah trampil Kep. Tukang batu Mandor Jumlah Jasa 10% Jumlah
H 02
599,310.00
1 M2 PAPAN NAMA PROYEK
Kayu Borneo Super Paku Cat Minyak Penulisan Ongkos Pasang
G 06
229,000.00 4,500.00 86,900.00 23,500.00 6,800.00 63,000.00 70,000.00 7,067.19 54,064.00 544,831.19
Dibulatkan
G 05
22,900.00 684.00 3,655.52 27,239.52 2,723.95 29,963.47
1 M2 PEK. KANTOR DIREKSI
Kayu Borneo Super Paku Seng Glb BJLS 30 Triplex 3 mm PC (50 kg) Pasir pasang Bata merah Klas I Peralatan Ongkos Pasang Jumlah Jasa 10% Jumlah A 05
JUMLAH
1 M1 PEK. PASANGAN BOUWPLANK
1 M3 KUDA-KUDA KAMPER KRUING
Kayu balok kamper Kruing Paku Pekerja setengah terampil Tk. kayu setengah terampil Kep. Tukang kayu Mandor Jumlah Jasa 10%
H 04
J 03
Q 19
S 01
E 08
R 10
R 11
C 04
Jumlah Total 1 M3 KUDA-KUDA KAMPER BANJAR Kayu balok kamper Banjar 1.1000 Paku 5.8000 Pekerja setengah terampil 3.0000 Tk. kayu setengah terampil 5.0000 Kep. Tukang kayu 2.0000 Mandor 0.4000 Jumlah Jasa 10% Jumlah Total 1 M2 PLESTERAN DINDING 1 : 3 + ACIAN P.C (50 kg) 0.1600 Pasir pasang 0.0190 Pekerja setengah trampil 0.2860 Tk. batu setengah trampil 0.2140 Kep. Tukang batu 0.0210 Mandor 0.0200 Jumlah Jasa 10% Jumlah Total 1 M2 PASANGAN PAVING BLOCK NATURAL 8 CM Paving Block Natural 8 cm 1.0100 Pasir Beton 0.1000 Pekerja Setengah Terampil 0.2500 Tukang Batu Setengah Terampil 0.5000 Kepala Tukang Batu 0.0250 Mandor 0.0030 Peralatan 1.0000 Jumlah Jasa 10% Jumlah Total 1 M2 PASANGAN LEMPENGAN RUMPUT SAMPAI TUMBUH Lempengan Rumput Biasa (Teki) 1.2000 Pekerja Setengah Terampil 0.0400 Mandor 0.0100 Lempeng Rumput Jumlah Jasa 10% Jumlah Total 1 M2 PASANGAN SIARAN AD. 1 : 2 Pasir Pasang 0.0085 Semen Portland 0.1050 Pekerja 0.3600 Tukang Batu Terampil 0.1200 Kepala Tukang 0.0120 Mandor 0.0180 Jumlah Jasa 10% Jumlah Total 1 KG MENEMPA GELAGAR BESI Besi Profil Arang Kayu Pekerja Tukang Besi Terampil Kepala Tukang Jumlah Jasa 10% Jumlah Total 1 KG PASANG GELAGAR BESI Pekerja Tukang Besi Terampil Jumlah Jasa 10% Jumlah Total 1 M3 BONGKARAN DINDING BATA Pekerja Mandor Jumlah Jasa 10% Jumlah Total
7,073,440.00 m³ kg org org org org
3,354,800.00 18,000.00 70,000.00 70,000.00 91,000.00 100,000.00
3,690,280.00 104,400.00 210,000.00 350,000.00 182,000.00 40,000.00 4,576,680.00 457,668.00 5,034,348.00
zak m3 oh oh oh oh
68,000.00 252,000.00 70,000.00 70,000.00 91,000.00 100,000.00
10,880.00 4,788.00 20,020.00 14,980.00 1,911.00 2,000.00 54,579.00 5,457.90 60,036.90
m² m³ org org org org lot
85,000.00 238,000.00 70,000.00 70,000.00 91,000.00 100,000.00 3,000.00
85,850.00 23,800.00 17,500.00 35,000.00 2,275.00 300.00 3,000.00 167,725.00 16,772.50 184,497.50
m² org org
35,000.00 70,000.00 100,000.00
42,000.00 2,800.00 1,000.00 45,800.00 4,580.00 50,380.00
m3 zak oh oh oh oh
252,000.00 68,000.00 65,000.00 80,000.00 91,000.00 100,000.00
2,142.00 7,140.00 23,400.00 9,600.00 1,092.00 1,800.00 45,174.00 4,517.40 49,691.40
1.1000 0.3000 0.0900 0.0900 0.0300
kg kg oh oh oh
10,200.00 10,000.00 65,000.00 80,000.00 91,000.00
11,220.00 3,000.00 5,850.00 7,200.00 2,730.00 30,000.00 3,000.00 33,000.00
0.0200 0.0050
oh oh
65,000.00 80,000.00
1,300.00 400.00 1,700.00 170.00 1,870.00
1.0000 0.0500
oh oh
65,000.00 100,000.00
65,000.00 5,000.00 70,000.00 7,000.00 77,000.00
Depok,
November 2013
ANALISA HARGA SATUAN PEKERJAAN DINAS BINA MARGA DAN SUMBER DAYA AIR
KOTA DEPOK T.A. 2013
Ir.H. ENCOK KURYASA, MM
NIP. 19571002 198403 1 005
DAFTAR ANALISA SATUAN PEKERJAAN TAHUN ANGGARAN 2012 NO A 07
URAIAN 1 M' PENGUKURAN DAN PEMASANGAN PATOK
VOL.
Kayu 5/7 Borneo
Cat Kayu Sieve
0.00002
SAT.
HARGA SAT.
m3
1,691,000.00
41.43
0.05000
kg
37,000.00
1,850.00
Tukang Kayu Setengah Terampil
0.0020
oh
70,000.00
140.00
Pekerja
0.0020
oh
65,000.00
130.00
Mandor
0.0010
oh
100,000.00
100.00
Jumlah
2,261.43
Jasa 10%
226.14
Jumlah Total S 06
2,487.57
1 M' PAS. KISDAM + BO NGKARAN (KARUNG)
Pekerja Terampil
Mandor
Karung
0.6670
oh
70,000.00
46,690.00
0.1670
oh
100,000.00
16,700.00
12.0000
bh
6,195.00
74,340.00
Tanah urugan
0.6720
m3
63,000.00
42,336.00
Kawat Beton
1.0000
kg
19,000.00
19,000.00
Kayu Dolken 5-7 cm
6.0000
btg
18,000.00
108,000.00
Terpal plastik
1.1000
m'
7,000.00
7,700.00
Jumlah
314,766.00
Jasa 10%
31,476.60
Jumlah Total S 07
346,242.60
1 M' PAS. KISDAM + BONGKARAN (BAMBU)
Pekerja Terampil
Mandor
Bambu
Terpal plastik
Paku
0.1000
oh
70,000.00
0.0250
oh
100,000.00
2,500.00
5.0000
bh
21,000.00
105,000.00
1.1000
m3
7,000.00
7,700.00
0.2000
kg
18,000.00
Jumlah
138,380.00
1 M3 BONGKARAN BETON BERTULANG DENGAN MENGGUNAKAN ALAT
Pekerja
1.3600
oh
65,000.00
88,400.00
Mandor
0.0600
oh
100,000.00
6,000.00
Operator Jack Hammer
0.0800
oh
91,000.00
7,280.00
0.2800
jam
25,000.00
7,000.00
Jack Hammer Jumlah
108,680.00
Jasa 10%
10,868.00
Jumlah Total
119,548.00
1 M2 PASANGAN CERUCUK DOLKEN
Dolken dia. 7-10 cm
4.5000
btg
22,000.00
99,000.00
Pekerja
0.1000
oh
65,000.00
6,500.00
Mandor
0.0100
oh
100,000.00
1,000.00
Jumlah
106,500.00
Jasa 10%
10,650.00
Jumlah Total D 21
117,150.00
1 M3 PERATAAN TANAH DAN PEMADATAN SETIAP 20 CM DENGAN ALAT
Pekerja
0.2150
oh
65,000.00
13,975.00
Mandor
0.0690
oh
100,000.00
6,900.00
Operator Tamper
0.0430
jam
55,000.00
2,365.00
Temper Vibr Plate
0.3012
jam
38,000.00
11,445.60
Jumlah
34,685.60
Jasa 10%
3,468.56
Jumlah Total D 22
38,154.16
1 M3 URUGAN PASIR DAN PEMADATAN SETIAP 20 CM DENGAN ALAT
Pasir urug
1.2000
m3
246,000.00
295,200.00
oh
65,000.00
19,500.00
Pekerja
0.3000
Mandor
0.0600
oh
100,000.00
6,000.00
Operator Tamper
0.0430
jam
55,000.00
2,365.00
Temper Vibr Plate
0.3012
jam
38,000.00
Jumlah
33,451.06
Jumlah Total
367,961.66
1 M3 PEKERJAAN URUGAN SIRTU UNTUK PONDASI
Sirtu Pecah Tersaring
1.1000
m3
158,000.00
173,800.00
Pekerja
0.5000
oh
65,000.00
32,500.00
Pekerja Terampil
0.4000
oh
70,000.00
28,000.00
Mandor
0.0200
oh
100,000.00
Jumlah
2,000.00 236,300.00
Jasa 10%
23,630.00
Jumlah Total E 01
11,445.60 334,510.60
Jasa 10% D 23
3,600.00 12,580.00
Jumlah Total
S 08
7,000.00
125,800.00
Jasa 10% C 02
JUMLAH
259,930.00
1 M3 PEKERJAAN PONDASI BATAKO AD. 1 : 4
Pasir Pasang
0.2790
m3
252,000.00
70,308.00
NO
URAIAN
Semen Portland
VOL.
Batako PSPM
SAT.
HARGA SAT.
2.1700
zak
68,000.00
147,560.00
130.0000
bh
3,000.00
390,000.00
Pekerja
4.5000
oh
65,000.00
292,500.00
Tukang Batu Terampil
1.5000
oh
80,000.00
120,000.00
Kepala Tukang
1.1500
oh
91,000.00
104,650.00
Mandor
0.2250
oh
100,000.00
Jumlah
22,500.00 1,147,518.00
Jasa 10%
114,751.80
Jumlah Total S 10
JUMLAH
1,262,269.80
1 BH PEKERJAAN ANYAMAN BRONJONG TB. 3 MM UK. 1 M3
Kawat Bronjong
8.3340
kg
16,000.00
133,344.00
Pekerja
0.5760
oh
65,000.00
37,440.00
NO
URAIAN
VOL.
SAT.
HARGA SAT.
Pekerja Terampil
0.7040
oh
70,000.00
Mandor
0.0260
oh
100,000.00
Jumlah
244,930.40
1 M3 PEKERJAAN PASANGAN BRONJONG
Bronjong Kawat
1.0000
bh
222,664.00
222,664.00
Batu Bronjol 10 - 15 cm
1.1000
m3
143,000.00
157,300.00
Pekerja Terampil
1.3820
oh
70,000.00
96,740.00
Mandor
0.0240
oh
100,000.00
Jumlah
47,910.40
Jumlah Total
527,014.40
Dibulatkan
527,015.00
1 M2 PASANGAN SULINGAN
Pipa PVC dia. 2"
0.2500
btg
62,000.00
15,500.00
Ijuk
0.2500
ikat
11,000.00
2,750.00
Pekerja
0.0238
oh
65,000.00
Jumlah
1,547.62 19,797.62
Jasa 10%
1,979.76
Jumlah Total
21,777.38
1 M PASANGAN RAILING PIPA GALVANIS (2 BARIS)
Pipa Galvanis dia. 3"
0.3333
btg
317,000.00
105,666.67
Pekerja
0.0670
oh
65,000.00
4,355.00
Kepala Tukang
0.0067
oh
91,000.00
Jumlah
609.70 110,631.37
Jasa 10%
11,063.14
Jumlah Total Q 15
2,400.00 479,104.00
Jasa 10%
S 11
2,600.00 22,266.40
Jumlah Total
S 09
49,280.00 222,664.00
Jasa 10% DIHIT
JUMLAH
121,694.50
1 BH PASANGAN CANSTEEN UK. 20.30.60 BERIKUT PLESTERAN + ACIAN NAT
Cansteen
1.0000
bh
57,000.00
57,000.00
Plesteran + Acian
0.0400
m2
60,036.90
2,401.48
Alat bantu
0.0300
set
300,000.00
9,000.00
Pekerja
0.0360
oh
65,000.00
2,340.00
Tukang Batu Terampil
0.0120
oh
80,000.00
960.00
Kepala Tukang
0.0060
oh
91,000.00
546.00
Mandor
0.0012
oh
100,000.00
Jumlah Jasa 10% Jumlah Total
120.00 72,367.48 7,236.75 79,604.22
NO E 05
URAIAN
VOL.
SAT.
HARGA SAT.
Dolken kayu dia. 7-10 cm
7.0000
btg
22,000.00
154,000.00
Papan Kruing 2 x 20 x 4m
3.0000
lbr
92,800.00
278,400.00
Baud
7.0000
bh
9,200.00
64,400.00
Batang Kelapa
1.0000
btg
258,700.00
258,700.00
Pekerja
1.4000
oh
65,000.00
91,000.00
Kepala Tukang
0.4200
oh
91,000.00
38,220.00
Tukang Kayu
4.2000
oh
80,000.00
336,000.00
Mandor Lapangan
0.7000
oh
100,000.00
Jumlah per m'
16,134.00
Jumlah Total
177,474.00
1 M2 PASANG TRIPLEKS TEBAL 3 MM
Tripleks tb. 3 mm
0.4000
lbr
47,000.00
18,800.00
Paku biasa 1/2" - 1" Pekerja
0.0500 0.0250
kg oh
18,000.00 65,000.00
900.00 1,625.00
Tukang Kayu
0.0750
oh
80,000.00
6,000.00
Kepala Tukang
0.0075
oh
91,000.00
682.50
Mandor
0.0013
oh
100,000.00
130.00
Jumlah
28,137.50
Jasa 10%
2,813.75
Jumlah Total DIHIT
30,951.25
1 M3 RANGKA KAYU
Kayu Balok Borneo Paku
1.0000
m3
2,290,000.00
0.1500
kg
18,000.00
2,700.00
1.0000
oh
70,000.00
70,000.00
Tukang Kayu Terampil
1.0000
oh
80,000.00
80,000.00
Kepala Tukang
0.5000
oh
91,000.00
45,500.00
Mandor Jumlah
0.0250
oh
100,000.00
2,500.00 2,490,700.00 249,070.00
Jumlah Total
2,739,770.00
1 M2 PASANG DINDING TRIPLEKS & RANGKA KAYU BALOK BORNEO
Kayu Balok Borneo Kayu Papan Borneo
0.0195
m3
2,290,000.00
44,655.00 15,540.00
0.0070
m3
2,220,000.00
Paku biasa 2" - 5"
0.1000
kg
18,000.00
1,800.00
Lem kayu
0.2800
ltr
42,000.00
11,760.00
Triplek 4' x 8' x 4 mm
0.5000
lbr
58,000.00
29,000.00
Pekerja
0.1750
oh
65,000.00
11,375.00
Tukang Kayu Terampil
0.5250
oh
80,000.00
42,000.00
Kepala Tukang
0.0525
oh
91,000.00
4,777.50
Mandor
0.0100
oh
100,000.00
Jumlah
16,190.75
Jumlah Total
178,098.25
1 M' PASANG BUBUNG SENG STEEL GELOMBANG
Seng gelombang BJLS 30
0.5556
lbr
79,000.00
43,888.89
Paku sekrup 3,5"
6.0000
bh
2,153.00
12,918.00
Pekerja
0.0840
oh
65,000.00
5,460.00
Tukang Kayu Trampil
0.1250
oh
80,000.00
10,000.00
Kepala Tukang
0.0130
oh
91,000.00
1,183.00
Mandor
0.0040
oh
100,000.00
400.00
Jumlah
73,849.89
Jasa 10%
7,384.99
Jumlah Total N 11
1,000.00 161,907.50
Jasa 10% H 15
2,290,000.00
Pekerja Terampil
Jasa 10% I 06
70,000.00 161,340.00
Jasa 10% I 08
JUMLAH
8 M PEKERJAAN STOOTWERK
81,234.88
1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI
Meni besi
0.1000
kg
27,000.00
Pekerja
0.0200
oh
65,000.00
1,300.00
Tukang Cat Terampil
0.2000
oh
80,000.00
16,000.00
Kepala Tukang
0.0200
oh
91,000.00
1,820.00
Mandor
0.0100
oh
100,000.00
Jumlah Keuntungan max. 10% Jumlah Total
2,700.00
1,000.00 22,820.00 2,282.00 25,102.00
NO DIHIT
URAIAN
VOL.
SAT.
HARGA SAT.
1 M2 PENGECATAN TEMBOK LAMA
Cat Dasar
0.1200
kg
10,556.72
1,266.81
Cat Penutup
0.1800
kg
10,556.72
1,900.21
Pekerja
0.0280
oh
65,000.00
1,820.00
Tukang Cat
0.0420
oh
70,000.00
2,940.00
Kepala Tukang
0.0042
oh
91,000.00
382.20
Mandor
0.0025
oh
100,000.00
250.00
Jumlah
8,559.22
Jasa 10%
855.92
Jumlah Total N 12
9,415.14
1 M2 PENGECATAN PERMUKAAN BAJA GALVANIZE
Cat Besi Duco (Dasar)
0.1100
kg
69,000.00
7,590.00
Cat Besi Duco (Penutup)
0.0800
kg
69,000.00
5,520.00
Pekerja
0.0060
oh
65,000.00
390.00
Tukang Cat
0.0600
oh
70,000.00
4,200.00
Kepala Tukang
0.0120
oh
91,000.00
1,092.00
Mandor
0.0060
oh
100,000.00
Jumlah
1,939.20
Jumlah Total
21,331.20
PLASTIK BOND BREAKER
Plastik
1.0000
m2
5,800.00
5,800.00
Ongkos Pasang
1.0000
ls
900.00
900.00
Jumlah
6,700.00
Jasa 10%
670.00
Jumlah Total Q 14
7,370.00
1 M1 JOINT CUTTER & JOINT SEALENT
Cutter Concrete
0.0500
Jam/m
44,714.29
2,235.71
Sealent
0.1429
kg
32,000.00
4,572.80
PEKERJA TERAMPIL
0.0080
Oh
70,000.00
560.00
PEKERJA
0.0067
Oh
65,000.00
435.50
Mandor
0.0085
Oh
100,000.00
850.00
Jumlah
8,654.01
Jasa 10%
865.40
Jumlah Total S 12
9,519.42
PELUMURAN BESI DOWEL DENGAN OLI
Oli (Drum)
S 13
0.0500
Liter
24,500.00
1,225.00
Pekerja Tukang Cat Terampil
0.0100 0.0100
oh oh
65,000.00 80,000.00
650.00 800.00
Mandor
0.0062
oh
100,000.00
615.11
Alat Bantu
0.0050
set
300,000.00
1,500.00
Jumlah Keuntungan max. 10%
4,790.11 479.01
Jumlah Total
5,269.12
1 BUAH PASANG PVC 1" untuk DOWEL
PVC AW 1 "
0.1200
batang
27,000.00
3,240.00
Ongkos Pasang
1.0000
ls
642.86
642.86
Jumlah
3,882.86
Jasa 10%
388.29
Jumlah Total S 14
4,271.14
1 BUAH PASANG DOP PVC 1" untuk DOWEL
Dop PVC AW 1 "
1.0000
Buah
3,000.00
3,000.00
Ongkos Pasang
1.0000
ls
90.00
90.00
Jumlah
3,090.00
Jasa 10%
309.00
Jumlah Total S 15
600.00 19,392.00
Jasa 10% Q 13
JUMLAH
3,399.00
1 M PASANG PVC 4"
Dop PVC AW 4 "
0.2500
Buah
196,000.00
Ongkos Pasang
1.0000
ls
900.00
Jumlah Jasa 10%
49,000.00 900.00 49,900.00 4,990.00
NO
URAIAN
VOL.
SAT.
HARGA SAT.
JUMLAH
Jumlah Total S 16
54,890.00
1 M1 PASANG BESI SIKU 5 CM
Besi Siku 3 x 50 x 50 mm
0.1667
m1
101,600.00
16,933.33
Ongkos Pasang
1.0000
Ls
4,000.00
4,000.00
Jumlah
20,933.33
Jasa 10%
2,093.33
Jumlah Total B 01
23,026.67
MOBILISASI ALAT BERAT (KHUSUS PEKERJAAN HOT MIX) JARAK JAUH/RIT
Alat Berat Trailer Towed Sopir Truck
Solar
15.00
Jam
438,000.00
6,570,000.00
5.00
HO
70,000.00
350,000.00
150.00
liter
5,500.00
Jumlah
825,000.00 7,745,000.00
Jasa 10%
774,500.00
Jumlah Total
B 02
8,519,500.00
MOBILISASI ALAT BERAT (KHUSUS PEKERJAAN HOT MIX) JARAK SEDANG/RIT
Alat Berat Trailer Towed Sopir Truck
Solar
12.50
Jam
438,000.00
5,475,000.00
5.00
HO
70,000.00
350,000.00
125.00
liter
5,500.00
Jumlah
687,500.00 6,512,500.00
Jasa 10%
651,250.00
Jumlah Total
7,163,750.00 KOTA DEPOK
B 03
MOBILISASI ALAT BERAT (KHUSUS PEKERJAAN HOT MIX) JARAK DEKAT/RIT
Alat Berat Trailer Towed
Sopir Truck
Solar
7.50
Jam
438,000.00
3,285,000.00
5.00
HO
70,000.00
350,000.00
100.00
liter
5,500.00
550,000.00
Jumlah
4,185,000.00
Jasa 10%
418,500.00
Jumlah Total
4,603,500.00 NIP. 480 115 207
B 04
MOBILISASI MATERIAL (UNTUK LANGSIR/KHUSUS PEKERJAAN BETON) JARAK JAUH / M3 (> 1 km)
Dump Truck 3.5 T
0.25
Jam
200,000.00
50,000.00
Sopir Truck
0.02
HO
70,000.00
1,250.00
Solar
0.25
liter
5,500.00
Jumlah Jasa 10%
5,262.50
Jumlah Total B 05
57,887.50
MOBILISASI MATERIAL (UNTUK LANGSIR/KHUSUS PEKERJAAN BETON) JARAK SEDANG / M3 (0,5 - 1 km)
Dump Truck 3.5 T
0.15
Jam
200,000.00
30,000.00
Sopir Truck
0.01
HO
70,000.00
833.33
Solar
0.17
liter
5,500.00
916.67
Jumlah
31,750.00
Jasa 10%
3,175.00
Jumlah Total B 06
1,375.00 52,625.00
34,925.00
MOBILISASI MATERIAL (UNTUK LANGSIR/KHUSUS PEKERJAAN BETON) JARAK DEKAT / M3 (< 0,5 km)
Dump Truck 3.5 T
0.10
Jam
200,000.00
20,000.00
Sopir Truck
0.01
HO
70,000.00
416.67
Solar
0.08
liter
5,500.00
Jumlah
458.33 20,875.00
Jasa 10%
2,087.50
Jumlah Total
22,962.50
Depok,
November 2013
ANALISA HARGA SATUAN PEKERJAAN DINAS BINA MARGA DAN SUMBER DAYA AIR KOTA DEPOK T.A. 2013
Ir.H. ENCOK KURYASA, MM
NIP. 19571002 198403 1 005
ANALISA HARGA SATUAN
Analisa Harga Satuan ini hanya dipergunakan
BETON NON STRUKTUR/RABAT KELAS Bo (SITE MIX)
sebagai dasar/pendekatan dalam
(MENGGUNAKAN ALAT PENGADUK BETON 250 LTR)
penyusunan DASK dan Mengevaluasi Harga Penawaran
Propinsi :
Kota :
Disiapkan Oleh :
JAWA BARAT
DEPOK
DINAS BINA MARGA DAN SUMBER DAYA AIR
Proses :
Anggapan :
1. Pemasok mengirim material
1. Bahan-bahan dasar dikirim ke lokasi pekerjaan oleh pem
2. Beton diaduk di lokasi pekerjaan
2. Dipakai agregat pecah dan tersaring yang termurah
3. Beton dicor sampai padat
3. Dicor 11 m3/hari dengan 48 adukan/6 jam/hari 4. Adukan 1 m3 beton, dibutuhkan : semen : 247 kg/m3 ; P kerikil (maksimal 3 cm) : 999 kg/m3; Air : 215 lt/m3; 5. Sesuai Standar Nasional Indonesia (SNI 7394 :2008)
No.
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Org-hari
(Rp/Org/Hari)
1
Mandor
1.00
3.00
3.00
100,000.00
2
Kepala Tukang Batu
1.00
3.00
3.00
91,000.00
3
Tukang Batu
3.00
3.00
9.00
80,000.00
4
Pekerja
19.00
3.00
57.00
65,000.00
J UM L A H I
No
Material
Satuan
1
Pasir Beton
17.92
m3
2
Semen Portland
163.02
zak
3
Batu Pecah 1 - 2 cm
13.19
m3
4
Alat Bantu
3.00
Set
Kode
Total Vol.
Harga (Rp/Unit)
17.92
238,000.00
163.02
68,000.00
13.19
258,000.00
3.00
300,000.00
J UM LA H I I
No.
Peralatan
Jumlah
Hari Kerja
Kode
Jam Kerja
Harga (Rp/jam)
1
Pengaduk Beton 250 Lt/6 HP
2.00
3.00
E.251
36.00
38,000.00
2
Pump Water 50 mm - 30 m3/Jam
1.00
3.00
E.341
6.00
63,000.00
J UM LA H II I
BETON NON STRUKTUR Bo VOLUME :
33.00
satuan m3
Sub. Total Harga Satuan Rp.
799,916.91
Jasa 10 %
79,991.69
Total Harga Satuan Rp.
879,908.61
De
ANALISA DINAS BINA KO
Ir.H NIP.
KODE
SNI-Bo Tanggal : Nov-11
asok
asir Beton : 869 kg/m3 ;
Biaya
Sub Total
Rp
Rp
300,000.00 273,000.00 720,000.00 3,705,000.00 Pekerja
4,998,000.00
Biaya
Sub Total
(Rp)
(Rp)
4,265,703.75 11,085,360.00 3,402,194.40 900,000.00 Material
19,653,258.15
Biaya
Sub Total
(Rp)
(Rp)
1,368,000.00 378,000.00 Peralatan
1,746,000.00
Total (Rp)
26,397,258.15
Per m3 Per m3
ok,
November 2013
ARGA SATUAN PEKERJAAN MARGA DAN SUMBER DAYA AIR TA DEPOK T.A. 2013
ENCOK KURYASA, MM 19571002 198403 1 005
ANALISA HARGA SATUAN
Analisa Harga Satuan ini hanya dipergunakan
BETON STRUKTUR K 225 (SITE MIX)
sebagai dasar/pendekatan dalam
(MENGGUNAKAN ALAT PENGADUK BETON 250 LTR)
penyusunan DASK dan Mengevaluasi Harga Penawaran
Propinsi :
Kota :
Disiapkan Oleh :
JAWA BARAT
DEPOK
DINAS BINA MARGA DAN SUMBER DAYA AIR
Proses :
Anggapan :
1. Pemasok mengirim material
1. Bahan-bahan dasar dikirim ke lokasi pekerjaan oleh pem
2. Beton diaduk di lokasi pekerjaan
2. Dipakai agregat pecah dan tersaring yang termurah
3. Beton dicor sampai padat
3. Dicor 11 m3/hari dengan 48 adukan/6 jam/hari 4. Adukan 1 m3 beton, dibutuhkan : semen : 371 kg/m3 ; P kerikil (maksimal 3 cm) : 1031 kg/m3; Air : 215 lt/m3; 5. Beton non struktur dipakai untuk dasar dan lantai kerja 6. Sesuai Standar Nasional Indonesia (SNI 7394 :2008)
No.
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Org-hari
(Rp/Org/Hari)
1
Mandor
1.00
3.00
3.00
100,000.00
2
Kepala Tukang Batu
1.00
3.00
3.00
91,000.00
3
Tukang Batu
3.00
3.00
9.00
80,000.00
4
Pekerja
19.00
3.00
57.00
65,000.00
J UM L A H I
No
Material
Satuan
1
Pasir Beton
14.40
m3
2
Semen Portland
244.86
zak
3
Batu Pecah 1 - 2 cm
13.82
m3
4
Alat Bantu
3.00
Set
Kode
Total Vol.
Harga (Rp/Unit)
14.40
238,000.00
244.86
68,000.00
13.82
258,000.00
3.00
300,000.00
J UM LA H I I
No.
Peralatan
Jumlah
Hari Kerja
Kode
Jam Kerja
Harga (Rp/jam)
1
Pengaduk Beton 250 Lt/6 HP
2.00
3.00
E.251
36.00
38,000.00
2
Pump Water 50 mm - 30 m3/Jam
1.00
3.00
E.341
6.00
63,000.00
J UM LA H II I
BETON STRUKTUR K.225 VOLUME :
33.00
satuan m3
Sub. Total Harga Satuan Rp.
948,074.26
Jasa 10 %
94,807.43
Total Harga Satuan Rp.
1,042,881.69
De
ANALISA DINAS BINA KO
Ir.H NIP.
KODE
F 08 Tanggal : Nov-11
asok
asir Beton : 731 kg/m3 ; ondasi
Biaya
Sub Total
Rp
Rp
300,000.00 273,000.00 720,000.00 3,705,000.00 Pekerja
4,998,000.00
Biaya
Sub Total
(Rp)
(Rp)
3,426,307.50 16,650,480.00 3,565,663.20 900,000.00 Material
24,542,450.70
Biaya
Sub Total
(Rp)
(Rp)
1,368,000.00 378,000.00 Peralatan
1,746,000.00
Total (Rp)
31,286,450.70
Per m3
Per m3
ok,
November 2013
ARGA SATUAN PEKERJAAN MARGA DAN SUMBER DAYA AIR TA DEPOK T.A. 2013
ENCOK KURYASA, MM 19571002 198403 1 005
ANALISA HARGA SATUAN
Analisa Harga Satuan ini hanya dipergunakan
PASANGAN BATU PADA PARIT
sebagai dasar/pendekatan dalam
(MENGGUNAKAN BURUH)
penyusunan DPA dan Mengevaluasi Harga Penawaran
Propinsi :
Kota :
Disiapkan Oleh :
JAWA BARAT
DEPOK
DINAS BINA MARGA DAN SUMBER DAYA AIR
Proses :
Tanggal : Nov-11
Anggapan :
1. Galian tambahan ( 0,40 m3 / m' )
1. Parit yang ada vol. 0,54 m3/m'
2. Buat dasar pasangan batu
2. Ukuran parit bagian dalam tebal rata-rata dinding 20 cm, tebal dasar 25 cm
3. Buat dinding pasangan batu pada parit ber-
lebar dasar 50 cm, lebar atas 90 cm dan kedalaman 60 cm.
batasan dengan jalan untuk mendukung per-
3. 50 % sisa galian dibuang dengan truck bak terbuka, sejauh 1 km.
kerasan jalan dimana perlu.
4. 50 % sisa galian dibuang di sekitar lokasi.
4 . Urug kembali dan buang sisa galian.
5. Bahan-bahan dikirim ke tempat pekerjaan oleh pemasok. 6. Hasil produksi 60 m'/Hari
No.
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Biaya
Org-hari
(Rp/Org/Hari)
Rp
1
Mandor Lapangan
1.00
1.00
1.00
100,000.00
100,000.00
2
SUPIR TRUK
1.00
1.00
1.00
70,000.00
70,000.00
3
KENEK TRUK
1.00
1.00
1.00
65,000.00
65,000.00
4
Pekerja
36.00
1.00
36.00
65,000.00
2,340,000.00
JUMLAH I
No
Pekerja
Material
1
Konstruksi Pas. Batu (K.705)
2
Alat Bantu
Vol.
Satuan
Kode
Total Vol.
30.00
m3
K.705
1.44
Set
M.170
30.00
Harga
Biaya
(Rp/Unit)
(Rp)
854,400.00
25,632,000.00
300,000.00
432,000.00
JUMLAH II
No.
1
Material
Peralatan
Jumlah
Flatbed Truck 3,5 Ton/115 HP
1.00
Hari Kerja
1.00
Kode
E.221
Jam Kerja
6.00
Harga
Biaya
(Rp/jam)
(Rp)
800,000.00
4,800,000.00
JUMLAH III
Peralatan Total (Rp)
PASANGAN BATU PADA PARIT VOLUME :
60.00
satuan m'
Sub. Total Harga Satuan Rp.
557,316.67
Jasa 10 %
55,731.67
Total Harga Satuan Rp.
613,048.33
Per m' Per m'
KODE
K.112
,
Sub Total Rp
2,575,000.00 Sub Total (Rp)
26,064,000.00 Sub Total (Rp)
4,800,000.00 33,439,000.00
ANALISA HARGA SATUAN
Analisa Harga Satuan ini hanya dipergunakan sebagai dasar/pendekatan dalam penyusunan DPA dan
GALIAN TANAH UNTUK KONSTRUKSI
KODE
(MENGGUNAKAN BURUH)
K.224
Mengevaluasi Harga Penawaran
Propinsi :
Kota :
Disiapkan Oleh :
Tanggal :
JAWA BARAT
DEPOK
DINAS BINA MARGA DAN SUMBER DAYA AIR
Proses :
Anggapan :
1. Digali dengan tenaga manusia
1. Menggunakan tenaga manusia (40 m3/hari)
2. Membuang tanah galian sejauh
Nov-11
2. Kapasitas kerja per orang 1,3 m3/hari
30 m dari lubang galian
3. Kedalaman rata-rata galian s/d 3 m 4. Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat
No.
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Biaya
Sub Total
Org-hari
(Rp/Org/Hari)
Rp
Rp
1
Mandor
1.00
1.00
1.00
100,000.00
100,000.00
2
Pekerja
30.00
1.00
30.00
65,000.00
1,950,000.00
JUMLAH I
No
1
Pekerja
Material
Alat Bantu
Satuan
Kode
Set
M.170
Total Vol.
1.20
Harga
Biaya
Sub Total
(Rp/Unit)
(Rp)
(Rp)
300,000.00
360,000.00
JUMLAH II
No.
Material
Peralatan
Jumlah
Hari Kerja
Kode
Jam Kerja
2,050,000.00
360,000.00
Harga
Biaya
Sub Total
(Rp/jam)
(Rp)
(Rp)
1 JUMLAH III
Peralatan Total (Rp)
GALIAN TANAH UNTUK KONSTRUKSI VOLUME :
40.00
satuan m3
Sub. Total Harga Satuan Rp. Jasa 10 % Total Harga Satuan Rp.
60,250.00
Per m3
6,025.00
66,275.00
Per m3
2,410,000.00
ANALISA HARGA SATUAN
Analisa Harga Satuan ini hanya dipergunakan sebagai dasar/pendekatan dalam
PENGURUGAN DAN PEMADATAN DGN SIRTU
KODE
(MENGGUNAKAN BURUH)
D 14
penyusunan DPA dan Mengevaluasi Harga Penawaran
Propinsi :
Kota :
Disiapkan Oleh :
Tanggal :
JAWA BARAT
DEPOK
DINAS BINA MARGA DAN SUMBER DAYA AIR
Nov-11
Proses :
Anggapan :
1. Membersihkan struktur dari bahan-bahan
1. Bahan urugan dikirim ke lokasi pekerjaan oleh pemasok
organik.
2. Digunakan kerikil galian/sungai tidak tersaring yang termurah
2. Buruh mengurug bagian belakang struktur.
3. Urugan dipadatkan berlapis tebal 10 cm.
3. Memadatkan dengan tamper dan mesin gilas bergetar.
No.
Pekerja
Vol.
Hari
1
Mandor
1.00
1.00
2
Pekerja Terampil
3.00
1.00
3
Pekerja
10.00
1.00
Kode
Total Vol.
Upah
Biaya
Sub Total
Org-hari
(Rp/Org/Hari)
Rp
Rp
1.00
3.00
10.00
100,000.00
100,000.00
70,000.00
210,000.00
65,000.00
650,000.00
JUMLAH I
No
Pekerja
Material
Satuan
Kode
Total Vol.
20.00
1
Sirtu Pecah Tersaring
20.00
m3
M.042
2
Alat Bantu
0.40
set
M.170
0.40
Harga
Biaya
Sub Total
(Rp/Unit)
(Rp)
(Rp)
158,000.00
3,160,000.00
300,000.00
120,000.00
JUMLAH II
No.
1 2
Material
Peralatan
Jumlah
Roller Vibr. Ped 1 Ton
Tamp Vibr. Plate 4 HP
1.00 1.00
Hari Kerja
5.00 10.00
Biaya
Sub Total
(Rp/jam)
(Rp)
(Rp)
Jam Kerja
E.087
5.00
63,000.00
315,000.00
10.00
38,000.00
380,000.00
JUMLAH III
Peralatan
695,000.00
Total (Rp)
4,935,000.00
PENGURUGAN DAN PEMADATAN DGN SIRTU VOLUME :
15.00
satuan m3
Sub. Total Harga Satuan Rp.
329,000.00
Jasa 10 %
32,900.00
Total Harga Satuan Rp.
3,280,000.00
Harga
Kode
E.088
960,000.00
361,900.00
Per m3 Per m3
ANALISA HARGA SATUAN
Analisa Harga Satuan ini hanya dipergunakan sebagai dasar/pendekatan dalam
PENGURUGAN DAN PEMADATAN DGN TANAH PILIHAN
KODE
(MENGGUNAKAN BURUH)
D 15
penyusunan DPA dan Mengevaluasi Harga Penawaran
Propinsi :
Kota :
Disiapkan Oleh :
JAWA BARAT
DEPOK
DINAS BINA MARGA DAN SUMBER DAYA AIR
Proses :
Tanggal : Nov-11
Anggapan :
1. Membersihkan struktur dari bahan-Bahan
1. Bahan Urugan dikirim ke lokasi pekerjaan oleh pemasok
organik
2. Digunakan Tanah Pilihan
2. Buruh mengurug bagian belakang struktur
3. Urugan Dipadatkan berlapis tebal 10 cm.
3. Memadatkan dengan tamper dan mesin gilas bergetar.
No.
Pekerja
Vol.
1
Mandor
2
Pekerja Terampil
3
Pekerja
Hari
1.00
3.00
1.00
10.00
1.00
Kode
1.00
Total Vol.
Upah
Biaya
Sub Total
Org-hari
(Rp/Org/Hari)
Rp
Rp
1.00
100,000.00
100,000.00
3.00
70,000.00
210,000.00
10.00
65,000.00
650,000.00
JUMLAH I
No
Pekerja
Material
Satuan
Kode
1
Timbunan Tanah Pilihan
20.00
m3
M.050
2
Alat Bantu
0.40
set
M.170
Total Vol.
20.00
0.40
Harga
Biaya
Sub Total
(Rp/Unit)
(Rp)
(Rp)
57,000.00
1,140,000.00
300,000.00
120,000.00
JUMLAH II
No.
Material
Peralatan
Jumlah
Hari Kerja
Kode
Jam Kerja
Biaya
Sub Total
(Rp/jam)
(Rp)
(Rp)
Roller Vibr. Ped 1 Ton
1.00
5.00
E.087
5.00
63,000.00
315,000.00
2
Tamp Vibr. Plate 4 HP
1.00
10.00
E.088
10.00
38,000.00
380,000.00
JUMLAH III
Peralatan
695,000.00
Total (Rp)
2,915,000.00
PENGURUGAN DAN PEMADATAN DGN TANAH PILIHAN 15.00
satuan m3
Sub. Total Harga Satuan Rp.
194,333.33
Jasa 10 %
19,433.33
Total Harga Satuan Rp.
1,260,000.00
Harga
1
VOLUME :
960,000.00
213,766.67
Per m3 Per m3
ANALISA HARGA SATUAN
Analisa Harga Satuan ini hanya dipergunakan sebagai dasar/pendekatan dalam penyusunan DPA dan
PENIMBUNAN BADAN JALAN
KODE
(MENGGUNAKAN BURUH)
D 16
Mengevaluasi Harga Penawaran
Propinsi :
Kota :
Disiapkan Oleh :
Tanggal :
JAWA BARAT
DEPOK
DINAS BINA MARGA DAN SUMBER DAYA AIR
Proses :
Anggapan :
1. Material dihampar maksimum tebal setiap
1. Menggunakan tenaga manusia (60 m3/Hari)
lapis 20 cm
Nov-11
2. Material pilihan yang termurah untuk timbunan dikirim ke lokasi pekerjaan -
2. Setiap lapis dipadatkan minimum 4 kali
sejauh 10 km oleh Pemasok
lintasan dengan mesin gilas roda karet.
3. Harga material tergantung harga di lokasi pekerjaan 4. Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat
No.
Pekerja
Vol.
Hari
1
Mandor
2.00
1.00
2
Operator Terlatih
1.00
1.00
3
Pembantu Operator
1.00
1.00
4
SUPIR TRUK
1.00
1.00
5
KENEK TRUK
1.00
1.00
6
Pekerja
60.00
1.00
Kode
Total Vol.
Upah
Biaya
Sub Total
Org-hari
(Rp/Org/Hari)
Rp
Rp
2.00
100,000.00
200,000.00
1.00
100,000.00
100,000.00
1.00
80,000.00
80,000.00
70,000.00
70,000.00
1.00
1.00
65,000.00
65,000.00
60.00
65,000.00
3,900,000.00
JUMLAH I
No
Pekerja
Material
Satuan
Kode
Total Vol.
Harga
Biaya
Sub Total
(Rp/Unit)
(Rp)
(Rp)
1
Timbunan Tanah Pilihan
m3
M.050
72.00
57,000.00
4,104,000.00
2
Alat Bantu
Set
M.170
2.40
300,000.00
720,000.00
JUMLAH II
No.
Material
Peralatan
Jumlah
Hari Kerja
Kode
Jam Kerja
Biaya
Sub Total
(Rp/jam)
(Rp)
(Rp)
Roller Pneumatic 8 - 15 ton
1.00
1.00
E.084
5.00
163,000.00
815,000.00
2
Truk Tangki Air 115 HP
1.00
1.00
E.182
5.00
262,000.00
1,310,000.00
JUMLAH III
Peralatan
2,125,000.00
Total (Rp)
11,364,000.00
PENIMBUNAN BADAN JALAN 60.00
satuan m3
Sub. Total Harga Satuan Rp.
189,400.00
Jasa 10 %
18,940.00
Total Harga Satuan Rp.
4,824,000.00
Harga
1
VOLUME :
4,415,000.00
208,340.00
Per m3 Per m3
ANALISA HARGA SATUAN
Analisa Harga Satuan ini hanya dipergunakan sebagai dasar/pendekatan dalam penyusunan DPA dan
PEMADATAN BADAN JALAN
KODE
(MENGGUNAKAN BURUH)
D 17
Mengevaluasi Harga Penawaran
Propinsi :
Kota :
Disiapkan Oleh :
Tanggal :
JAWA BARAT
DEPOK
DINAS BINA MARGA DAN SUMBER DAYA AIR
Proses :
Anggapan :
1. Material dihampar maksimum tebal setiap
1. Menggunakan tenaga manusia (60 m3/hari)
lapis 20 Cm
Nov-11
2. Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat
2. Setiap lapis dipadatkan minimum 4 kali lintasan dengan mesin gilas roda karet
No.
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Biaya
Sub Total
Org-hari
(Rp/Org/Hari)
Rp
Rp
1
Mandor
2.00
1.00
2.00
100,000.00
200,000.00
2
Operator Terlatih
1.00
1.00
1.00
100,000.00
100,000.00
3
Pembantu Operator
1.00
1.00
1.00
80,000.00
80,000.00
4
SUPIR TRUK
1.00
1.00
1.00
70,000.00
70,000.00
5
KENEK TRUK
1.00
1.00
1.00
65,000.00
65,000.00
6
Pekerja
60.00
1.00
60.00
65,000.00
3,900,000.00
JUMLAH I
No
1
Pekerja
Material
Alat Bantu
Satuan
Kode
set
M.170
Total Vol.
2.40
Harga
Biaya
Sub Total
(Rp/Unit)
(Rp)
(Rp)
300,000.00
720,000.00
JUMLAH II
No.
Material
Peralatan
Jumlah
Hari Kerja
Kode
Jam Kerja
Harga
Biaya
Sub Total
(Rp)
(Rp)
Roller Pneumatic 8 - 15 ton
1.00
5.00
E.084
5.00
163,000.00
815,000.00
2
Truk Tangki Air 115 HP
1.00
5.00
E.182
5.00
262,000.00
1,310,000.00
JUMLAH III
Peralatan
2,125,000.00
Total (Rp)
7,260,000.00
PEMADATAN BADAN JALAN 60.00
satuan m3
Sub. Total Harga Satuan Rp. Jasa 10 % Total Harga Satuan Rp.
720,000.00
(Rp/jam)
1
VOLUME :
4,415,000.00
121,000.00
Per m3
12,100.00
133,100.00
Per m3
ANALISA HARGA SATUAN
Analisa Harga Satuan ini hanya dipergunakan sebagai dasar/pendekatan dalam
PENYIAPAN TANAH DASAR
KODE
penyusunan DPA dan
(MENGGUNAKAN BURUH)
D 18
Mengevaluasi Harga Penawaran
Propinsi :
Kota :
Disiapkan Oleh :
Tanggal :
JAWA BARAT
DEPOK
DINAS BINA MARGA DAN SUMBER DAYA AIR
Proses :
Anggapan :
1. Pem Pemb bentu entuk kan tana tanah h das dasar ar denga engan n ten tenag aga a
1. Men Meng ggunak unakan an tena tenaga ga orang ang (8 (8 m x 400 400 m/h m/har ari) i)
manusia
Nov-11
2. DAMIJA dibersihkan dari semak dan lain-lain
2. 2. Di pa pada tk tkan dengan mesin gi la la s roda baj a
3. Le ba bar dasar j al alan 8 m
sampai 100 % MDD (AASHTO T99)
4. Hasil kerja menyiapkan dasar jalan 400 m/Hari 5. Kapasitas kerja 40 m2/orang hari 6. Umur alat bantu rata-rata 1 bulan/orang/set @ 3 Alat
No.
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Biaya
Sub Total
Org-hari
(Rp/Org/Hari)
Rp
Rp
1
M Ma andor
1.00
1.00
1.00
100,000.00
100,000.00
2
Operator Terlatih
1.00
1.00
1.00
100,000.00
100,000.00
3
Pembantu Operator
1.00
1.00
80,000.00
80,000.00
4
Pekerja
80.00
1.00
65,000.00
5,200,000.00
1.00
80.00
JUMLAH I
No
1
Pekerja
Material
Alat Bantu
Satuan
Kode
Se t
M.170
Total Vol.
3.20
Harga
Biaya
Sub Total
(Rp/Unit)
(Rp)
(Rp)
300,000.00
960,000.00
JUMLAH II
No.
1
Material
Peralatan
Jumlah
Mesin Gilas 3 Roda
1.00
Hari Kerja
1.00
Kode
Jam Kerja
E. E.080
5.00
Harga
Biaya
Sub Total
(Rp)
(Rp)
75,900.00
379,500.00 Peralatan
379,500.00
Total (R (Rp)
6,819,500.00
PENYIAPAN TANAH DASAR 32.00
satuan ARE
Sub. Total Harga Satuan Rp.
213,109.38
Jasa 10 %
21,310.94
Total Harga Satuan Rp.
960,000.00
(Rp/jam)
JUMLAH III
VOLUME :
5,480,000.00
234,420.31
Per ARE Per ARE
ANALISA HARGA SATUAN
Analisa Harga Satuan ini hanya dipergunakan sebagai dasar/pendekatan dalam penyusunan DPAdan
PENYIAPAN TANAH DASAR
KODE
(MENGGUNAKAN ALAT)
D 19
Mengevaluasi Harga Penawaran
Propinsi :
Kota :
Disiapkan Oleh :
JAWA BARAT
DEPOK
DINAS BINA MARGA DAN SUMBER DAYA AIR
Proses :
Anggapan :
1.
1.
2.
2.
No.
Pekerja
Vol.
Hari
Kode
Tanggal : Nov-11
Total Vol.
Upah
Biaya
Sub Total
Org-hari
(Rp/Org/Hari)
Rp
Rp
1
M Ma andor
1.00
1.00
1.00
100,000.00
100,000.00
2
Operator Terlatih
2.00
1.00
2.00
100,000.00
200,000.00
3
Pembantu Operator
2.00
1.00
2.00
80,000.00
160,000.00
4
Pekerja
4.00
1.00
4.00
65,000.00
260,000.00
JUMLAH I
No
1
Pekerja
Material
Alat Bantu
Satuan
Kode
Se t
M.170
Total Vol.
0.16
Harga
Biaya
Sub Total
(Rp/Unit)
(Rp)
(Rp)
300,000.00
48,000.00
JUMLAH II
No.
Material
Peralatan
Jumlah
Hari Kerja
Kode
Jam Kerja
Biaya
Sub Total
(Rp/jam)
(Rp)
(Rp)
Motor Grader
1.00
6.00
E. E.010
6.00
163,000.00
978,000.00
2
Mesin Gilas 3 Roda
1.00
6.00
E. E.080
6.00
75,900.00
455,400.00
JUMLAH III
Peralatan
1,433,400.00
Total (R (Rp)
2,201,400.00
PENYIAPAN TANAH DASAR 40.00
satuan m3
Sub. Total Harga Satuan Rp. Jasa 10 % Total Harga Satuan Rp.
48,000.00
Harga
1
VOLUME :
720,000.00
55,035.00
Per m3
5,503.50
60,538.50
Per m3
ANALISA HARGA SATUAN
Analisa Harga Satuan ini hanya dipergunakan sebagai dasar/pendekatan dalam penyusunan DPA dan
PEMBENTUKAN BAHU JALAN
KODE
(MENGGUNAKAN BURUH)
D 24
Mengevaluasi Harga Penawaran
Propinsi :
Kota :
Disiapkan Oleh :
JAWA BARAT
DEPOK
DINAS BINA MARGA DAN SUMBER DAYA AIR
Proses :
Tanggal : Nov-11
Anggapan :
1. Mat Mater erial ial LPB LPB yang yang bai baik k dan dan ses sesuai uai diti ditimb mbun un
1. Men Mengg gguna unaka kan n tena tenaga ga oran orang g (96 (96 m3/ m3/ha hari ri,, pem pemad adat atan an 960 960 m' bah bahu u jala jalan/ n/har hari) i)
sepanjang bahu jalan oleh pemasok
2. 10 cm timbunan padat, dibutuhkan 1 m' lebar bahu jalan
2. 2. Ten Tenag aga a ter teram ampi pill men menga gatu turr pen penim imbu buna nan n
3. Mate Materi rial al LPB LPB yang yang term termur urah ah diki dikiri rim m ke loka lokasi si peke pekerj rjaa aan n ole oleh h pem pemas asok ok
3. Mat Mater eria iall dis diseb ebar ar deng engan tena tenag ga man manus usia ia
4. Pem Pemas asok ok menim enimb bun mater ateria iall LP LPB sep sepan anja jang ng bahu ahu jal jalan an
4. 4. Pemad emadat atan an deng dengan an mesin esin gilas ilas berg ergetar etar
5. Mate Materrial ial diseb isebar ar denga engan n tena tenag ga manus anusia ia
yang kecil.
6. 96 m3 dihamparkan dan dipadatkan setiap hari 7. Koefisien pemadatan = 1,2 8. Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat
No.
1
Pekerja
Vol.
Mandor
3.00
Hari
Kode
1.00
2
Pekerja Terampil
1.00
1.00
3
Pekerja
96.00
1.00
Total Vol.
Upah
Biaya
Sub Total
Org-hari
(Rp/Org/Hari)
Rp
Rp
3.00
1.00
96.00
100,000.00
300,000.00
70,000.00
70,000.00
65,000.00
6,240,000.00
JUMLAH I
No
Pekerja
Material
Satuan
Kode
1
Timbunan Tanah Pilihan
m3
M.050
2
Alat Bantu
Set
M.170
Total Vol.
116.00
3.84
Harga
Biaya
Sub Total
(Rp/Unit)
(Rp)
(Rp)
57,000.00
6,612,000.00
300,000.00
1,152,000.00
JUMLAH II
No.
1
Material
Peralatan
Jumlah
Roller Vibr. Ped 1 ton
1.00
Hari Kerja
5.00
Kode
Jam Kerja
E. E.087
5.00
Harga
Biaya
Sub Total
(Rp)
(Rp)
63,000.00
315,000.00 Peralatan
315,000.00
Total (R (Rp)
14,689,000.00
PEMBENTUKAN BAHU JALAN 96.00
satuan m3
Sub. Total Harga Satuan Rp.
153,010.42
Jasa 10 %
15,301.04
Total Harga Satuan Rp.
7,764,000.00
(Rp/jam)
JUMLAH III
VOLUME :
6,610,000.00
168,311.46
Per m3 Per m3
ANALISA HARGA SATUAN
Analisa Harga Satuan ini hanya dipergunakan sebagai dasar/pendekatan dalam
PEMBENTUKAN BAHU JALAN (MATERIAL SPLIT 5 - 7)
KODE
(MENGGUNAKAN BURUH)
D 25
penyusunan DPA dan Mengevaluasi Harga Penawaran
Propinsi :
Kota :
Disiapkan Oleh :
JAWA BARAT
DEPOK
DINAS BINA MARGA DAN SUMBER DAYA AIR
Proses :
Tanggal : Nov-11
Anggapan :
1. Material Split yang baik dan sesuai ditimbun
1. Menggunakan tenaga orang (96 m3/hari, pemadatan 960 m' bahu jalan/hari)
sepanjang bahu jalan oleh pemasok
2. 10 cm timbunan padat, dibutuhkan 1 m' lebar bahu jalan
2. Tenaga terampil mengatur penimbunan
3. Material Split yang termurah dikirim ke lokasi pekerjaan oleh pemasok
3. Material disebar dengan tenaga manusia
4. Pemasok menimbun material Split sepanjang bahu jalan
4 . Pemadatan de ngan me sin gilas be rgetar
5. Material disebar de ngan te naga manusi a
yang kecil.
6. 96 m3 dihamparkan dan dipadatkan setiap hari 7. Koefisien pemadatan = 1,2 8. Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat
No.
Pekerja
Vol.
1
Mandor
2
Pekerja Terampil
3
Pekerja
Hari
3.00
1.00
1.00
96.00
1.00
Kode
1.00
Total Vol.
Upah
Biaya
Sub Total
Org-hari
(Rp/Org/Hari)
Rp
Rp
3.00
100,000.00
300,000.00
1.00
70,000.00
70,000.00
96.00
65,000.00
6,240,000.00
JUMLAH I
No
Pekerja
Material
Satuan
Kode
1
Batu Pecah / Split 5 - 7
m3
M. 022
2
Alat Bantu
Set
M.170
Total Vol.
116.00
3.84
Harga
Biaya
Sub Total
(Rp/Unit)
(Rp)
(Rp)
403,000.00
46,748,000.00
300,000.00
1,152,000.00
JUMLAH II
No.
1
Material
Peralatan
Jumlah
Roller Vibr. Ped 1 ton
1.00
Hari Kerja
5.00
Kode
Jam Kerja
E.087
5.00
Harga
Biaya
Sub Total
(Rp)
(Rp)
63,000.00
315,000.00 Peralatan
315,000.00
Total (Rp)
54,825,000.00
PEMBENTUKAN BAHU JALAN (MATERIAL SPLIT 5 - 7) 96.00
satuan m3
Sub. Total Harga Satuan Rp.
571,093.75
Jasa 10 %
57,109.38
Total Harga Satuan Rp.
47,900,000.00
(Rp/jam)
JUMLAH III
VOLUME :
6,610,000.00
628,203.13
Per m3 Per m3
ANALISA HARGA SATUAN
Analisa Harga Satuan ini hanya dipergunakan sebagai dasar/pendekatan dalam
LAPIS PONDASI BAWAH KELAS A SIRTU TERSARING
KODE
(MENGGUNAKAN ALAT)
Q 01
penyusunan DPA dan Mengevaluasi Harga Penawaran
Propinsi :
Kota :
Disiapkan Oleh :
Tanggal :
JAWA BARAT
DEPOK
DINAS BINA MARGA DAN SUMBER DAYA AIR
Proses :
Anggapan :
Peke rj rjaan i ni ni harus dilaksa n na akan sesuai :
1. Menggunakan al alat be ra rat (150 m3/detik)
1. Bab Bab Satuan Satuan Peker Pekerjaa jaan n ini, Spesi Spesifik fikasi asi Jalan Jalan Kota, Kota, Bina Marga, Maret 1992
2. Materi Material al ditim ditimbun bun dise disepan panjang jang jalan jalan oleh oleh pemas pemasok ok 3. Dihampar dan dipadatkan sampai tebal padat 15 cm
2. Atau addendum yang berlaku
No.
Nov-11
4. Koefisien pemadatan = 1,3
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Biaya
Sub Total
Org-hari
(Rp/Org/Hari)
Rp
Rp
1
Mandor
1.00
1.00
1.00
100,000.00
100,000.00
2
Operator Terlatih
2.00
1.00
2.00
100,000.00
200,000.00
3
Pembantu Operator
2.00
1.00
2.00
80,000.00
160,000.00
4
SUPIR TRUK
1.00
1.00
1.00
70,000.00
70,000.00
5
KENEK TRUK
1.00
1.00
1.00
65,000.00
65,000.00
6
Pekerja
6.00
1.00
6.00
65,000.00
390,000.00
JUMLAH I
Pekerja
No
Material
Satuan
Kode
1
Batu Pecah Tersaring Bergradasi A
m3
M.012
2
Alat Bantu
Set
M.170
Total Vol.
195.00
0.24
Harga
Biaya
Sub Total
(Rp/Unit)
(Rp)
(Rp)
159,000.00
31,005,000.00
300,000.00
72,000.00
JUMLAH II
No.
Material
Peralatan
Jumlah
Hari Kerja
Kode
Jam Kerja
Harga
Biaya
Sub Total
(Rp)
(Rp)
Motor Grader 110 HP
1.00
1.00
E. E.010
5.00
262,000.00
1,310,000.00
2
Mesin Gilas 3 roda 6 - 8 Ton
1.00
1.00
E. E.080
5.00
75,900.00
379,500.00
5.00
200,000.00
1,000,000.00
Tru k Tangki Air
1.00
1.00
E. E.182
JUMLAH III
Peralatan
2,689,500.00
Total (R (Rp)
34,751,500.00
LAPIS PONDASI BAWAH KELAS A SIRTU TERSARING VOLUME :
150.00
satuan m3
Sub. Total Harga Satuan Rp. Jasa 10 % Total Harga Satuan Rp.
31,077,000.00
(Rp/jam)
1 3
985,000.00
231,676.67
Per m3
23,167.67
254,844.33
Per m3
ANALISA HARGA SATUAN
Analisa Harga Satuan ini hanya dipergunakan
LAPIS PONDASI BAWAH KELAS C SIRTU TERSARING BERGRADASI
sebagai dasar/pendekatan dalam
(MENGGUNAKAN BURUH)
penyusunan DPA dan Mengevaluasi Harga Penawaran
Propinsi :
Kota :
Disiapkan Oleh :
Tanggal :
JAWA BARAT
DEPOK
DINAS BINA MARGA DAN SUMBER DAYA AIR
Proses :
Anggapan :
1. Agregat egat batu atu pecah ecah ter tersarin aring g bergr ergrad adas asii
1. Meng Mengg gunak unakan an alat alat berat erat (60 (60 m3/deti detik k)
ditim itimb bun disam isamp ping ing jala jalan n oleh leh pem pemaso asok
Nov-11
2. Mate Materrial ial diti ditim mbun disep isepan anja jang ng jala jalan n oleh leh pemas emaso ok
2. Jalan disi ra ram air dengan truk air
3. Di ha hampar dengan tenaga manusia dalam 2 lapis da n dipadatkan sampai teba
3. Pema Pemada data tan n dal dalam am 2 lapi lapiss den denga gan n mes mesin in gila gilass
4. Koef Koefis isie ien n pem pemad adat atan an = 1,3 1,3
baja sampai 100 % MDD
5. Dihampar dan dipadatkan 600 m2/hari
4. Grader me mb mbentu k ulang permuka an an lama jalan
-
6. Umur alat bantu ra ta ta-rata 1 bulan
dan menghampar agregat dengan tenaga manusia 5. Perapihan dengan tenaga manusia
No.
Pekerja
Vol.
Hari
1
Mandor
2.00
1.00
2
Operator Terlatih
1.00
3
Pembantu Operator
1.00
4
SUPIR TRUK
1.00
5
KENEK TRUK
1.00
6
Pekerja
60.00
Kode
Total Vol.
Upah
Biaya
Org-hari
(Rp/Org/Hari)
Rp
2.00
100,000.00
200,000.00
1.00
1.00
1.00
100,000.00
100,000.00
1.00
80,000.00
80,000.00
1.00
1.00
1.00
70,000.00
70,000.00
1.00
65,000.00
65,000.00
1.00
60.00
65,000.00
3,900,000.00
JUMLAH I
Pekerja
No
Material
Satuan
1
Batu Pecah Tersaring Bergradasi C
2
Alat Bantu
Harga
Biaya
(Rp/Unit)
(Rp)
Kode
Total Vol.
m3
M.012
72.00
159,000.00
11,448,000.00
Set
M.170
2.40
300,000.00
720,000.00
JUMLAH II
No.
Material
Peralatan
Jumlah
Hari Kerja
Kode
Jam Kerja
Harga
Biaya
(Rp/jam)
(Rp)
1
Mesin Gilas 3 Roda 6 - 8 Ton
1.00
1.00
E. E.080
5.00
75,900.00
379,500.00
2
Truk Tangki Air
1.00
1.00
E. E.182
5.00
200,000.00
1,000,000.00
JUMLAH III
Peralatan Total (Rp)
LAPIS PONDASI BAWAH KELAS C SIRTU TERSARING BERGRADASI VOLUME :
60.00
satuan m3
Sub. Total Harga Satuan Rp.
299,375.00
Jasa 10 %
29,937.50
Total Harga Satuan Rp.
329,312.50
Per m3 Per m3
KODE
Q 02
l padat 10 cm
Sub Total Rp
4,415,000.00 Sub Total (Rp)
12,168,000.00 Sub Total (Rp)
1,379,500.00 17,962,500.00
ANALISA HARGA SATUAN
Analisa Harga Satuan ini hanya dipergunakan
LAPIS PONDASI BAWAH KELAS C AGREGAT
KODE
PECAH TERSARING (MENGGUNAKAN BURUH)
Q 03
sebagai dasar/pendekatan dalam penyusunan DPA dan Mengevaluasi Harga Penawaran
Propinsi :
Kota :
Disiapkan Oleh :
Tanggal :
JAWA BARAT
DEPOK
DINAS BINA MARGA DAN SUMBER DAYA AIR
Proses :
Anggapan :
1. Agregat batu pecah tersaring bergradasi
1. Menggunakan alat berat (60 m3/det)
ditimbun disamping jalan oleh pemasok
Nov-11
2. Material ditimbun disepanjang jalan oleh pemasok
2. Jalan disiram air dengan truk air
3. Dihampar dan dipadatkan sampai tebal padat 10 cm
3. Pemadatan dengan mesin gilas
4. Koefisien pemadatan 1,3
6 - 8 ton sampai 100 % MDD
No.
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Biaya
Sub Total
Org-hari
(Rp/Org/Hari)
Rp
Rp
1
Mandor
1.00
1.00
1.00
100,000.00
100,000.00
2
Operator Terlatih
1.00
1.00
3
Pembantu Operator
1.00
1.00
1.00
100,000.00
100,000.00
1.00
80,000.00
80,000.00
4
SUPIR TRUK
1.00
1.00
5
KENEK TRUK
1.00
1.00
1.00
70,000.00
70,000.00
1.00
65,000.00
65,000.00
6
Pekerja
33.00
1.00
33.00
65,000.00
2,145,000.00
JUMLAH I
Pekerja Harga
Biaya
Sub Total
(Rp/Unit)
(Rp)
(Rp)
No
Material
Satuan
Kode
Total Vol.
1
Batu Pecah Tersaring Bergradasi C
m3
M.012
72.00
159,000.00
11,448,000.00
2
Alat Bantu
Set
M.170
2.40
300,000.00
720,000.00
JUMLAH II
No.
Material
Peralatan
Jumlah
Hari Kerja
Kode
Jam Kerja
Biaya
Sub Total
(Rp/jam)
(Rp)
(Rp)
Mesin Gilas 3 Roda 6 - 8 Ton
1.00
1.00
E.080
5.00
75,900.00
379,500.00
2
Tru k Tangki Air
1.00
1.00
E.182
5.00
200,000.00
1,000,000.00
JUMLAH III
Peralatan
1,379,500.00
Total (Rp)
16,107,500.00
LAPIS PONDASI BAWAH KELAS C AGREGAT 60.00
satuan m3
Sub. Total Harga Satuan Rp.
268,458.33
Jasa 10 %
26,845.83
Total Harga Satuan Rp.
12,168,000.00
Harga
1
VOLUME :
2,560,000.00
295,304.17
Per m3 Per m3
ANALISA HARGA SATUAN
Analisa Harga Satuan ini hanya dipergunakan
LAPIS PONDASI ATAS KELAS A AGREGAT
KODE
PECAH TERSARING (MENGGUNAKAN ALAT)
Q 04
sebagai dasar/pendekatan dalam penyusunan DPA dan Mengevaluasi Harga Penawaran
Propinsi :
Kota :
Disiapkan Oleh :
Tanggal :
JAWA BARAT
DEPOK
DINAS BINA MARGA DAN SUMBER DAYA AIR
Proses :
Anggapan :
1. Agregat batu pecah tersaring bergradasi
1. Menggunakan alat berat (150 m3/detik)
ditimbun disamping jalan oleh pemasok
Nov-11
2. Material ditimbun di sepanjang jalan oleh pemasok
2. Grader menghampar agregat
3. Dihampar dan dipadatkan sampai tebal padat 10 cm
3. Jalan disiram air dengan truk air
4. Koefisien pemadatan 1,3
4. Pemadatan dengan mesin gilas 6 - 8 ton sampai 100 % MDD
No.
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Biaya
Sub Total
Org-hari
(Rp/Org/Hari)
Rp
Rp
1
Mandor
1.00
1.00
1.00
100,000.00
2
Operator Terlatih
2.00
1.00
3
Pembantu Operator
2.00
1.00
4
SUPIR TRUK
1.00
1.00
5
KENEK TRUK
1.00
1.00
6
Pekerja
6.00
1.00
100,000.00
2.00
100,000.00
200,000.00
2.00
80,000.00
160,000.00
1.00
70,000.00
70,000.00
1.00
65,000.00
65,000.00
6.00
65,000.00
390,000.00
JUMLAH I
Pekerja Harga
Biaya
Sub Total
(Rp/Unit)
(Rp)
(Rp)
No
Material
Satuan
Kode
Total Vol.
1
Batu Pecah Tersaring Bergradasi A
m3
M.012
195.00
159,000.00
31,005,000.00
2
Alat Bantu
Set
M.170
0.24
300,000.00
72,000.00
JUMLAH II
No.
Material
Peralatan
Jumlah
Hari Kerja
Kode
Jam Kerja
Biaya
Sub Total
(Rp/jam)
(Rp)
(Rp)
Motor Grader 110 HP
1.00
1.00
E.010
5.00
262,000.00
1,310,000.00
2
Mesin Gilas 3 Roda 6 - 8 Ton
1.00
1.00
E.080
5.00
75,900.00
379,500.00
3
Truk Tangki Air
1.00
1.00
E.182
5.00
200,000.00
1,000,000.00
JUMLAH III
Peralatan
2,689,500.00
Total (Rp)
34,751,500.00
LAPIS PONDASI ATAS KELAS A AGREGAT 150.00
satuan m3
Sub. Total Harga Satuan Rp. Jasa 10 % Total Harga Satuan Rp.
31,077,000.00
Harga
1
VOLUME :
985,000.00
231,676.67
Per m3
23,167.67
254,844.33
Per m3
ANALISA HARGA SATUAN
Analisa Harga Satuan ini hanya dipergunakan
PASANGAN LAPIS ATB
KODE
(MENGGUNAKAN ALAT)
Q 05
sebagai dasar/pendekatan dalam penyusunan DPA dan Mengevaluasi Harga Penawaran
Propinsi :
Kota :
Disiapkan Oleh :
Tanggal :
JAWA BARAT
DEPOK
DINAS BINA MARGA DAN SUMBER DAYA AIR
Proses :
Anggapan :
1. Permukaan jalan dibersihkan dan kering
1. Menggunakan alat berat (45 m3/hari)
2. Lapis tack/pengikat aspal catback dihampar
2. Dikirim ATB ke lokasi pekerjaan oleh pemasok dari AMP
@ 0,5 ltr/m2
Nov-11
3. ATB dihampar dan dipadatkan sampai tb. 10 cm
3. ATB dihampar dengan aspal finisher
4. BJ ATB padat 2,25 ton/m3
4. Temperatur ATB 120° C dan
5. Sesuai Spesifikasi BM No. 03/PT/B/1983 & Rev. Spesifikasi Umum Maret 1989 -
tidak kurang dari 100° C
Buku 3
5. Perapihan dengan tenaga manusia
No.
6. Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Biaya
Sub Total
Org-hari
(Rp/Org/Hari)
Rp
Rp
1
Mandor Lapangan
1.00
1.00
1.00
100,000.00
100,000.00
2
Operator Terlatih
4
1.00
4.00
100,000.00
400,000.00 320,000.00
3
PEMBANTU OPERATOR / MEKANIK
4.00
1.00
4.00
80,000.00
4
Pekerja Terampil
8.00
1.00
8.00
70,000.00
560,000.00
5
Pekerja
12.00
1.00
65,000.00
780,000.00
12.00
JUMLAH I
Pekerja
No
Material
Satuan
Kode
1
Asphalt Liter Treated Based (ATB)
Ton
-
2
Pasir Beton
m3
3
Aspal Bitumen
4
Minyak Tanah / Minyak Bakar
5
Alat Bantu
Total Vol.
Harga
Biaya
Sub Total
(Rp/Unit)
(Rp)
(Rp)
100.00
907,000.00
90,700,000.00
M.041
0.60
238,000.00
142,800.00
kg
M.061
180.00
11,000.00
1,980,000.00
lt
M.065
45.00
13,000.00
585,000.00
Set
M.170
300,000.00
144,000.00
0.48
JUMLAH II
No.
Material
Peralatan
Jumlah
Jam Kerja
Harga
Biaya
Sub Total
(Rp)
(Rp)
1.00
E.080
5.00
75,900.00
379,500.00
5.00
1.00
E.084
5.00
156,000.00
780,000.00
3.00
1.00
E.153
3.00
112,960.66
338,881.98
5.00
1.00
E.157
5.00
188,000.00
940,000.00
4.00
101,625.00
406,500.00
2
Roller Pneumatic 8 - 15 ton
3
Mesin Penyemprot Aspal 1000 ltr
4
Asphalt Finisher 1820 mm/30 HP
4.00
1.00
E.301
JUMLAH III
Peralatan
2,844,881.98
Total (Rp)
98,556,681.98
PASANGAN LAPIS ATB VOLUME :
45.00
Sub. Total Harga Satuan Rp.
satuan m3
Jasa 10 % Total Harga Satuan Rp.
@ j A
ÿ D
À D
À
93,551,800.00
(Rp/jam)
Mesin Gilas 3 Roda 6 - 8 Ton
Compressor Air 210 m3/jam
Kode
5.00
1
5
Hari Kerja
2,160,000.00
2,190,148.49
Per M3
219,014.85
2,409,163.34
Per M3
!@Ü d ߀
ANALISA HARGA SATUAN
Analisa Harga Satuan ini hanya dipergunakan sebagai dasar/pendekatan dalam penyusunan DPA dan
LABUR ASPAL DUA LAPIS (BURDA)
KODE
(MENGGUNAKAN ALAT)
Q 06
Mengevaluasi Harga Penawaran
Propinsi :
Kota :
Disiapkan Oleh :
JAWA BARAT
DEPOK
DINAS BINA MARGA DAN SUMBER DAYA AIR
Proses :
Anggapan :
Pekerjaan ini harus dilaksanakan sesuai :
1. Hasil kerja 600 m2/hari
1. Bab Satuan Pekerjaan ini, Spesifikasi Jalan Kota, Bina Marga, Maret 1992
Tanggal : Nov-11
2. Agregat ukuran 19 mm dan 9,5 mm tersaring unit pemecah 3. Batu ditimbun di lokasi pekerjaan oleh pemasok
2. Atau addendum yang berlaku
4. Permukaan yang akan diaspal telah selesai dipadatkan dan terikat dengan binder 5. Lapis seal/penutup menggunakan aspal catback @ 1,5 kg/m2 dan 1,2 kg/m2 6. Agregat ukuran 19 mm dan 9,5 mm dihampar dari dumptruck penghampar @ 55 m2/m3 dan 120 m/m3
No.
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Biaya
Sub Total
Org-hari
(Rp/Org/Hari)
Rp
Rp
1
Mandor Lapangan
1.00
3.00
3.00
100,000.00
300,000.00
2
Operator Terlatih
2.00
3.00
6.00
100,000.00
600,000.00
3
Pembantu Operator
2.00
3.00
6.00
80,000.00
480,000.00
4
Sopir
1.00
3.00
3.00
70,000.00
210,000.00
5
Pembantu Sopir
1.00
3.00
3.00
65,000.00
195,000.00
6
Pekerja Terampil
2.00
3.00
6.00
70,000.00
420,000.00
7
Pekerja
12.00
3.00
36.00
65,000.00
2,340,000.00
JUMLAH I
No
Pekerja
Material
Satuan
Kode
Total Vol.
Harga
Biaya
Sub Total
(Rp/Unit)
(Rp)
(Rp)
1
Batu Pecah 1 - 2 cm
m3
M.025
33.00
258,000.00
8,514,000.00
2
Batu Pecah 0,5 - 1 cm
m3
M.026
15.00
173,000.00
2,595,000.00
3
Aspal Bitumen
kg
M.061
4,958.00
11,000.00
54,538,000.00
4
Alat Bantu
Set
M.170
300,000.00
432,000.00
1.44
JUMLAH II
No.
1
Material
Peralatan
Jumlah
Roller Pneumatic 8 - 15 ton
1.00
Hari Kerja
3.00
Biaya
Sub Total
(Rp/jam)
(Rp)
(Rp)
Jam Kerja
E.084
15.00
156,000.00
2,340,000.00 1,140,000.00
2
Asp. Sprayer Towed
2.00
3.00
E.154
30.00
3
Dump Truck 3 - 5 T
1.00
3.00
E.211
15.00
156,000.00
2,340,000.00
15.00
16,802.57
252,038.55
Blower
1.00
3.00
JUMLAH III
Peralatan
6,072,038.55
Total (Rp)
76,696,038.55
LABUR ASPAL DUA LAPIS (BURDA) VOLUME :
1,800.00
satuan m2
Sub. Total Harga Satuan Rp.
42,608.91
Jasa 10 %
4,260.89
Total Harga Satuan Rp.
66,079,000.00
Harga
Kode
38,000.00
4
4,545,000.00
46,869.80
Per m2 Per m2
ANALISA HARGA SATUAN
Analisa Harga Satuan ini hanya dipergunakan sebagai dasar/pendekatan dalam
LAPIS PENETRASI/PERMUKAAN MAKADAM 50 MM LAPEN
KODE
(MENGGUNAKAN BURUH)
Q 07
penyusunan DPA dan Mengevaluasi Harga Penawaran
Propinsi :
Kota :
Disiapkan Oleh :
Tanggal :
JAWA BARAT
DEPOK
DINAS BINA MARGA DAN SUMBER DAYA AIR
Nov-11
Proses :
Anggapan :
1. Hamparan agregat pokok 3-5 cm
1. Permukaan jalan yang akan dilapis sudah di prime/tack coat
80 kg/m2 (20 m2/m3)
2. Menggunakan tenaga buruh
2. Digilas da n dipadatkan dengan mesin
3. Agre gat pecah sesuai ukuran, siap dilokasi
gilas roda baja 6 - 8 ton
4. Tebal padat perkerasan 5 cm
3. Semprotan aspal 2,5 kg/m2
5. Faktor kehilangan agregat = 1.02
4. Hamparkan agregat pengunci 1 - 2 cm 25 kg/m2 (64 m2/m3), digilas & dipadatkan 5. Semprotan aspal 1,5 kg/m2 6. Hamparkan agregat penutup 0,5 - 1 cm 14 kg/m2 (80 m2/m3), digilas & dipadatkan
No.
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Biaya
Sub Total
Org-hari
(Rp/Org/Hari)
Rp
Rp
1
Mandor
2.00
3.00
6.00
100,000.00
600,000.00
2
Operator Terlatih
2.00
3.00
3
Pembantu Operator
2.00
3.00
6.00
100,000.00
600,000.00
6.00
80,000.00
480,000.00
4
SUPIR TRUK
1.00
3.00
5
KENEK TRUK
1.00
3.00
3.00
70,000.00
210,000.00
3.00
65,000.00
195,000.00
6
Pekerja Terampil
2.00
3.00
6.00
70,000.00
420,000.00
7
Pekerja
66.00
3.00
198.00
65,000.00
12,870,000.00
JUMLAH I
No
Pekerja
Material
Satuan
Kode
Total Vol.
Harga
Biaya
Sub Total
(Rp/Unit)
(Rp)
(Rp)
1
Batu Pecah 3 - 5 cm
m3
M.023
71.40
290,000.00
20,706,000.00
2
Batu Pecah 1 - 2 cm
m3
M.025
22.31
258,000.00
5,755,980.00
3
Batu Pecah 0,5 - 1 cm
m3
M.026
12.50
173,000.00
2,162,500.00
4
Aspal Bitumen
Kg
M.061
5,712.00
11,000.00
62,832,000.00
5
Alat Bantu
Set
M.170
300,000.00
2,448,000.00
8.16
JUMLAH II
No.
Material
Peralatan
Jumlah
Hari Kerja
Kode
Jam Kerja
Harga
Biaya
Sub Total
(Rp)
(Rp)
75,900.00
Mesin Gilas 3 Roda 6 - 8 Ton
1.00
3.00
E.080
15.00
2
Asp. Sprayer Towed
2.00
3.00
E.154
30.00
38,000.00
1,140,000.00
3
Dump Truck 3,5 Ton - 115 Hp
1.00
3.00
E.211
15.00
800,000.00
12,000,000.00
4
Blower
1,138,500.00
1.00
3.00
15.00
16,802.57
252,038.55
JUMLAH III
Peralatan
14,530,538.55
Total (Rp)
123,810,018.55
LAPIS PENETRASI/PERMUKAAN MAKADAM 50 MM LAPEN 1,400.00
satuan m2
Sub. Total Harga Satuan Rp. Jasa 10 % Total Harga Satuan Rp.
93,904,480.00
(Rp/jam)
1
VOLUME :
15,375,000.00
88,435.73
Per m2
8,843.57
97,279.30
Per m2
ANALISA HARGA SATUAN
Analisa Harga Satuan ini hanya dipergunakan sebagai dasar/pendekatan dalam
LAPIS ASPAL RESAP PELEKAT
KODE
(PRIME COAT)
Q 08
penyusunan DPA dan Mengevaluasi Harga Penawaran
Propinsi :
Kota :
Disiapkan Oleh :
Tanggal :
JAWA BARAT
DEPOK
DINAS BINA MARGA DAN SUMBER DAYA AIR
Nov-11
Proses :
Anggapan :
Peke rjaan i ni haru s dilaksanakan sesuai :
1. Harga bahan, perangko (sia p dilokasi)
1. Bab Satuan Pekerjaan ini, Spesifikasi
2. Perbandingan aspal dengan minyak tanah = 100 bagian aspal : 100 bagian minyak tanah
Umum Jalan Kabupaten, Bina Marga
berdasarkan berat
Maret 1992
3. Berat jenis minyak tanah 0,86
2. Tingkat Penyemprotan 1 Kg/m2 di semprot
4. Berat jenis aspal 1,03
mempergunakan mesin penyemprot aspal
No.
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Biaya
Sub Total
Org-hari
(Rp/Org/Hari)
Rp
Rp
1
Mandor
1.00
0.50
L.061
0.50
100,000.00
50,000.00
2
Operator Terlatih
1.00
1.00
L.081
1.00
100,000.00
100,000.00
3
Pembantu Operator
1.00
1.00
L.083
1.00
80,000.00
80,000.00
4
Pekerja
4.00
1.00
L.101
4.00
65,000.00
260,000.00
JUMLAH I
No
1
Pekerja
Material
Aspal Bitumen
510.00
2
Minyak Tanah
599.00
3
Alat Bantu
0.16
Harga
Biaya
Sub Total
(Rp/Unit)
(Rp)
(Rp)
Satuan
Kode
Total Vol.
kg
M.061
510.00
11,000.00
5,610,000.00
599.00
13,000.00
7,787,000.00
300,000.00
48,000.00
lt
M.065
Set
M.170
0.16
JUMLAH II
No.
Material
Peralatan
Jumlah
Hari Kerja
1
Asp. Sprayer Towed 200 ltr
1.00
1.00
2
Blower
1.00
1.00
Harga
Biaya
Sub Total
(Rp)
(Rp)
Jam Kerja
E.154
5.00
38,000.00
190,000.00
5.00
16,802.57
84,012.85 Peralatan
274,012.85
Total (Rp)
14,209,012.85
LAPIS ASPAL RESAP PELEKAT (Prime Coat) 1,000.00
satuan M2
Sub. Total Harga Satuan Rp. Jasa 10 % Total Harga Satuan Rp.
13,445,000.00
(Rp/jam)
Kode
JUMLAH III
VOLUME :
490,000.00
14,209.01
per M2
1,420.90
15,629.91
per M2
ANALISA HARGA SATUAN
Analisa Harga Satuan ini hanya dipergunakan
LAPIS ASPAL PELEKAT
sebagai dasar/pendekatan dalam
(TACK COAT)
penyusunan DPA dan Mengevaluasi Harga Penawaran
Propinsi :
Kota :
Disiapkan Oleh :
Tanggal :
JAWA BARAT
DEPOK
DINAS BINA MARGA DAN SUMBER DAYA AIR
Nov-11
Proses :
Anggapan :
Pekerjaan ini harus dilaksanakan sesuai :
1. Harga bahan, perangko (siap dilokasi)
1. Bab Satuan Pekerjaan ini, Spesifikasi
2. Perbandingan aspal dengan minyak tanah = 100 bagian aspal : 25 bagian m
Umum Jalan Kabupaten, Bina Marga
berdasarkan berat
Maret 1992
3. Berat jenis minyak tanah 0,86
2. Ti ngkat Penyemprotan 0.2 Kg/m2 disemprot
4. Berat jen is aspal 1,03
mempergunakan mesin penyemprot aspal
No.
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Biaya
Org-hari
(Rp/Org/Hari)
Rp
1
Mandor
1.00
0.50
0.50
100,000.00
50,000.00
2
Operator Terlatih
2.00
1.00
1.00
100,000.00
100,000.00
3
Pembantu Operator
2.00
1.00
1.00
80,000.00
80,000.00
4
Pekerja
4.00
1.00
2.00
65,000.00
130,000.00
JUMLAH I
No
1
Pekerja
Material
Aspal Bitumen
2
Minyak Tanah
3
Alat Bantu
Harga
Biaya
(Rp/Unit)
(Rp)
Satuan
Kode
Total Vol.
kg
M.061
98.00
11,000.00
1,078,000.00 377,000.00 24,000.00
lt
M.065
29.00
13,000.00
Set
M.170
0.08
300,000.00
JUMLAH II
No.
Material
Peralatan
Jumlah
Hari Kerja
Kode
Jam Kerja
Harga
Biaya
(Rp/jam)
(Rp)
1
Asp. Sprayer Towed 200 ltr
1.00
1.00
E.154
3.00
38,000.00
114,000.00
2
Compressor 210 m3/jam
1.00
1.00
E.301
1.00
75,900.00
75,900.00
3.00
16,802.57
50,407.71
3
Blower
1.00
1.00
JUMLAH III
Peralatan Total (Rp)
LAPIS ASPAL PELEKAT (Tack Coat) VOLUME :
600.00 Satuan M2
Sub. Total Harga Satuan Rp. Jasa 10 % Total Harga Satuan Rp.
3,465.51
Per M2
346.55
3,812.06
Per M2
KODE
Q 09
inyak tanah
Sub Total Rp
360,000.00 Sub Total (Rp)
1,479,000.00 Sub Total (Rp)
240,307.71 2,079,307.71
ANALISA HARGA SATUAN
Analisa Harga Satuan ini hanya dipergunakan
PENGHAMPARAN LAPIS TIPIS ASPAL BETON - LATASTON
sebagai dasar/pendekatan dalam
(MENGGUNAKAN ALAT)
penyusunan DPA dan Mengevaluasi Harga Penawaran
Propinsi :
Kota :
Disiapkan Oleh :
Tanggal :
JAWA BARAT
DEPOK
DINAS BINA MARGA DAN SUMBER DAYA AIR
Proses :
Anggapan :
Pekerjaa n ini ha rus dilaksanakan se suai :
1. M enggunakan alat berat 1500 m2/hari
1. Bab Satuan Pekerjaan ini, Spesifikasi
2. Hot Roller Sheet (Lataston) dikirim kelokasi oleh pemasok dari AMP
Umum Jalan Kabupaten, Bina Marga
3. Tebal padat rata-rata 3 cm
Maret 1992
4. BJ lataston padat 2,2 t/m3
2. Atau Addendum yang Berlaku
No.
1
Nov-11
5. Sesuai spek B.M No. 12/PT/B/1983 (tabel 3.3) dan rev. Spek Umum B.M. Mare
Pekerja
Vol.
Mandor
1.00
Hari
Kode
1.00
Total Vol.
Upah
Biaya
Org-hari
(Rp/Org/Hari)
Rp
1.00
100,000.00
100,000.00 400,000.00
2
Operator Terlatih
4.00
1.00
4.00
100,000.00
3
Pembantu Operator
4.00
1.00
4.00
80,000.00
320,000.00
4
Pekerja Terampil
8.00
1.00
8.00
70,000.00
560,000.00
5
Pekerja
12.00
1.00
12.00
65,000.00
780,000.00
JUMLAH I
No
Pekerja
Material
1
HRS (LATASTON)
2
Aspal Bitumen
3
Minyak Tanah
4
Alat Bantu
Total Vol.
Harga
Biaya
(Rp/Unit)
(Rp)
Satuan
Kode
Ton
-
100.00
1,154,000.00
115,400,000.00
kg
M.061
600.00
11,000.00
6,600,000.00
lt
M.065
13,000.00
1,950,000.00
Set
M.170
300,000.00
144,000.00
150.00
0.48
JUMLAH II
No.
Material
Peralatan
Jumlah
Hari Kerja
Kode
Jam Kerja
Harga
Biaya
(Rp/jam)
(Rp)
1
Roller Tandem 6 - 10 Ton
1.00
1.00
E.081
5.00
157,000.00
785,000.00
2
Roller Pneumatic 8 - 15 ton
1.00
1.00
E.084
5.00
156,000.00
780,000.00
3
Mesin Penyemprot Aspal 1000 ltr
1.00
1.00
E.153
5.00
112,960.66
564,803.30
4
Asphalt Finisher 1820 mm / 301 HP
1.00
1.00
E.157
5.00
188,000.00
940,000.00
5
Compressor Air 210 m3/jam
1.00
1.00
E.301
4.00
101,625.00
406,500.00
JUMLAH III
Peralatan Total (Rp)
PENGHAMPARAN LAPIS TIPIS ASPAL BETON - LATASTON VOLUME :
1,500.00
satuan m2
Sub. Total Harga Satuan Rp.
86,486.87
Jasa 10 %
8,648.69
Total Harga Satuan Rp.
95,135.56
Per m2
Per m2
KODE
Q 10
t 89 buku 3
Sub Total Rp
2,160,000.00 Sub Total (Rp)
124,094,000.00 Sub Total (Rp)
3,476,303.30 129,730,303.30
ANALISA HARGA SATUAN
Analisa Harga Satuan ini hanya dipergunakan
PENGHAMPARAN LAPIS TIPIS ASPAL BETON
sebagai dasar/pendekatan dalam penyusunan DPA dan Mengevaluasi Harga Penawaran
Propinsi :
Kota :
Disiapkan Oleh :
Tanggal :
JAWA BARAT
DEPOK
DINAS BINA MARGA DAN SUMBER DAYA AIR
Proses :
Anggapan :
Pekerjaan ini harus dilaksanakan sesuai :
1. Menggunakan alat berat 1500 m2/hari
1. Bab Sa tuan Pekerjaan ini, Spesifikasi
2. Hot Roller Shee t (Lataston) diki rim kelokasi oleh pemasok dari AMP
Umum Jalan Kabupaten, Bina Marga
3. Tebal padat rata-rata 3 cm
Maret 1992
4. BJ lataston padat 2,2 t/m3
2. Atau Addendum yang Berlaku
No.
Nov-11
5. Sesuai spek B.M No. 12/PT/B/1983 (tabel 3.3) dan rev. Spek Umum B.M. Ma
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Biaya
Org-hari
(Rp/Org/Hari)
Rp
1
Mandor
1.00
1.00
1.00
100,000.00
100,000.00
2
Operator Terlatih
2.00
1.00
2.00
100,000.00
200,000.00
3
Pembantu Operator
2.00
1.00
2.00
80,000.00
160,000.00
4
Pekerja Terampil
8.00
1.00
8.00
70,000.00
560,000.00
5
Pekerja
12.00
1.00
12.00
65,000.00
780,000.00
JUMLAH I
No
Pekerja
Material
1
HRS (LATASTON)
2
Aspal Bitumen
3
Minyak Tanah
4
Alat Bantu
Total Vol.
Harga
Biaya
(Rp/Unit)
(Rp)
Satuan
Kode
Ton
-
100.00
1,154,000.00
115,400,000.00
kg
M.061
600.00
11,000.00
6,600,000.00 1,950,000.00 144,000.00
lt
M.065
150.00
13,000.00
Set
M.170
0.48
300,000.00
JUMLAH II
No.
Material
Peralatan
Jumlah
Hari Kerja
Kode
Jam Kerja
Harga
Biaya
(Rp/jam)
(Rp)
1
Roller Tandem 6 - 10 Ton
1.00
1.00
E.081
5.00
157,000.00
2
Roller Pneumatic 8 - 15 ton
-
1.00
E.084
-
156,000.00
-
3
Mesin Penyemprot Aspal 1000 ltr
-
1.00
E.153
-
112,960.66
-
4
Asphalt Finisher 1820 mm / 301 HP
-
1.00
E.157
-
188,000.00
-
5
Compressor Air 210 m3/jam
1.00
1.00
E.301
4.00
101,625.00
785,000.00
406,500.00
JUMLAH III
Peralatan Total (Rp)
PENGHAMPARAN LAPIS TIPIS ASPAL BETON VOLUME :
1,500.00
satuan m2
Sub. Total Harga Satuan Rp. Jasa 10 % Total Harga Satuan Rp.
84,723.67
Per m2
8,472.37
93,196.03
Per m2
KODE
Q 11
ret 89 buku 3
Sub Total Rp
1,800,000.00 Sub Total (Rp)
124,094,000.00 Sub Total (Rp)
1,191,500.00 127,085,500.00
ANALISA HARGA SATUAN
Analisa Harga Satuan ini hanya dipergunakan
PENGHAMPARAN LAPIS ASPAL BETON-LASTON AC
sebagai dasar/pendekatan dalam
(MENGGUNAKAN ALAT)
penyusunan DPA dan Mengevaluasi Harga Penawaran
Propinsi :
Kota :
Disiapkan Oleh :
Tanggal :
JAWA BARAT
DEPOK
DINAS BINA MARGA DAN SUMBER DAYA AIR
Proses :
Anggapan :
1. Pengisian material sampai bin dari spreader
1. Menggunakan alat berat 900 m2/hari
dari pemasok
Nov-11
2. Aspal Concrete (Laston) dikirim kelokasi oleh pemasok dari AMP
2. Material dihampar dengan spreader dan
3. Tebal padat rata-rata 5 cm
dipadatkan dengan mesin gilas baja dan
4. BJ laston padat 2,25 t/m3
mesin gilas pneumatic roda karet
5. Sesuai spek B.M No. 12/PT/B/1983 (tabel 3.3) dan rev. Spek Umum B.M. Ma 6. Lapis tack/pengikat aspal cutback dihampar @ 0,5 ltr/m2
No.
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Biaya
Org-hari
(Rp/Org/Hari)
Rp
1
Mandor
1.00
1.00
1.00
100,000.00
100,000.00
2
Operator Terlatih
5.00
1.00
5.00
100,000.00
500,000.00
3
Pembantu Operator
5.00
1.00
5.00
80,000.00
400,000.00
4
Pekerja Terampil
10.00
1.00
10.00
70,000.00
700,000.00
5
Pekerja
15.00
1.00
15.00
65,000.00
975,000.00
JUMLAH I
No
Pekerja
Material
Satuan
Kode
Total Vol.
Harga
Biaya
(Rp/Unit)
(Rp)
100.00
944,000.00
94,400,000.00
M.041
0.90
238,000.00
214,200.00
kg
M.061
360.00
11,000.00
3,960,000.00
lt
M.065
90.00
13,000.00
1,170,000.00
Set
M.170
0.48
300,000.00
144,000.00
1
LASTON AC
Ton
2
Pasir Beton
m3
3
Aspal Bitumen
4
Minyak Tanah / Minyak bakar
5
Alat Bantu JUMLAH II
No.
Material
Peralatan
Jumlah
Hari Kerja
Kode
Jam Kerja
Harga
Biaya
(Rp/jam)
(Rp)
1
Mesin Gilas 3 Roda 6 - 8 ton
1.00
1.00
E.080
5.00
75,900.00
379,500.00
2
Roller Tandem 6 - 10 Ton
1.00
1.00
E.081
5.00
157,000.00
785,000.00
3
Roller Pneumatic 8 - 15 ton
1.00
1.00
E.084
5.00
156,000.00
780,000.00
4
Mesin Penyemprot Aspal 100 ltr
1.00
1.00
E.153
3.00
112,960.66
338,881.98 940,000.00 406,500.00
5
Asphalt Finisher 1820 mm / 301 HP
1.00
1.00
E.157
5.00
188,000.00
6
Compressor Air 210 m3/jam
1.00
1.00
E.301
4.00
101,625.00
JUMLAH III
Peralatan Total (Rp)
PENGHAMPARAN LAPIS ASPAL BETON-LASTON AC VOLUME :
900.00
satuan m2
Sub. Total Harga Satuan Rp.
117,992.31
Jasa 10 %
11,799.23
Total Harga Satuan Rp.
129,791.54
Per m2 Per m2
KODE
Q 12
ret 89 buku 3
Sub Total Rp
2,675,000.00 Sub Total (Rp)
99,888,200.00 Sub Total (Rp)
3,629,881.98 106,193,081.98
ANALISA HARGA SATUAN
Analisa Harga Satuan ini hanya dipergunakan sebagai dasar/pendekatan dalam
KONSTRUKSI PASANGAN BATU ADUKAN 1 : 5
KODE
(MENGGUNAKAN BURUH)
K.705
penyusunan DPA dan Mengevaluasi Harga Penawaran
Propinsi :
Kota :
Disiapkan Oleh :
Tanggal :
JAWA BARAT
DEPOK
DINAS BINA MARGA DAN SUMBER DAYA AIR
Nov-11
Proses :
Anggapan :
1. Material ditimbun di lokasi pekerjaan
1. Dilakukan utk pekerjaan gorong-gorong, jembatan, dinding penahan tanah,
oleh pemasok
dan struktur lainnya yang menggunakan konstruksi pasangan batu
2. Pekerja membawa batu belah ke tempat
2. Material-material dikirim ketempat pekerjaan oleh pemasok
tukang batu bekerja
3. Tidak termasuk galian/timbunan
3. Tukang batu memasang batu pecah dengan
4. Biaya alat bantu tambahan sudah termasuk biaya kira-kira ekivalen dari
adukan pasir semen
bambu untuk lubang drainase 5. Koefisien lepas batu = 1,2 6. Mortar strain = 50 kg/cm2
No.
1
Pekerja
Vol.
Kepala Tukang Batu
1.00
Hari
Kode
Total Vol.
Upah
Biaya
Sub Total
Org-hari
(Rp/Org/Hari)
Rp
Rp
1.00
2
TUKANG BATU TERAMPIL
4.00
1.00
3
Pekerja
12.00
1.00
1.00
91,000.00
91,000.00
4.00
80,000.00
320,000.00
65,000.00
780,000.00
12.00
JUMLAH I
No
Pekerja
Material
Satuan
Kode
Total Vol.
Harga
Biaya
Sub Total
(Rp/Unit)
(Rp)
(Rp)
1
Batu Belah 15 - 20 cm
m3
M.020
6.00
209,000.00
1,254,000.00
2
Pasir Pasang
m3
M.042
1.00
252,000.00
252,000.00
3
Semen Portland
zak
M.080
68,000.00
1,224,000.00
4
Alat Bantu
Set
M.170
300,000.00
225,000.00
18.00
0.75
JUMLAH II
Material
No.
Peralatan
Jumlah
1
Pump Water 50 mm - 30 m3/Jam
1.00
Hari Kerja
1.00
Kode
Jam Kerja
E.341
2.00
Biaya
Sub Total
(Rp/jam)
(Rp)
(Rp)
63,000.00
126,000.00 Peralatan
126,000.00
Total (Rp)
4,272,000.00
KONSTRUKSI PASANGAN BATU ADUKAN 1 : 5 5.00
satuan m3
Sub. Total Harga Satuan Rp. Jasa 10 % Total Harga Satuan Rp.
2,955,000.00
Harga
JUMLAH III
VOLUME :
1,191,000.00
854,400.00
Per m3
85,440.00
939,840.00
Per m3
ANALISA HARGA SATUAN
Analisa Harga Satuan ini hanya dipergunakan sebagai dasar/pendekatan dalam penyusunan DPA dan
PERANCAH KAYU KONSTRUKSI BETON
KODE
(BEKISTING) KAYU Kls III
I 01
Mengevaluasi Harga Penawaran
Propinsi :
Kota :
Disiapkan Oleh :
Tanggal :
JAWA BARAT
DEPOK
DINAS BINA MARGA DAN SUMBER DAYA AIR
Nov-11
Proses :
Anggapan :
1. Kelompok tukang kayu memotong dan membuat
1. Kelompok tukang kayu memasang 20 m2 dalam 1 hari kerja
acuan
2. 1/3 material dapat dipakai kembali
2. Kelompok tukang kayu membongkar acua n
3. Pengadaan bahan oleh Pemasok
setelah beton cukup kuat
4. Untuk 1 m3 beton dipakai 2 lbr plywood (120 cm x 240 cm x 1,75 cm)
3. Kelompok tukang kayu membersihkan acuan
5. Kelompok tukang kayu membongkar acuan
untuk dipakai kembali
No.
1
Pekerja
Vol.
KEPALA TUKANG KAYU
1.00
Hari
Kode
Total Vol.
Upah
Biaya
Sub Total
Org-hari
(Rp/Org/Hari)
Rp
Rp
1.00
1.00
80,000.00
80,000.00 320,000.00
2
Tukang Kayu
4.00
1.00
4.00
80,000.00
3
Pekerja Terampil
3.00
1.00
3.00
80,000.00
240,000.00
7.00
65,000.00
455,000.00
4
Pekerja
7.00
1.00
JUMLAH I
No
Pekerja
Material
Satuan
Kode
Total Vol.
Harga
Biaya
Sub Total
(Rp/Unit)
(Rp)
(Rp)
1
Papan Cor Borneo
m3
M.180
0.60
2,220,000.00
1,332,000.00
2
Paku
kg
M.166
4.00
18,000.00
72,000.00
3
Alat Bantu
Set
M.170
300,000.00
168,000.00
0.56
JUMLAH II
No.
Material
Peralatan
Jumlah
Hari Kerja
Kode
Jam Kerja
1,095,000.00
1,572,000.00
Harga
Biaya
Sub Total
(Rp/jam)
(Rp)
(Rp)
1 JUMLAH III
Peralatan Total (Rp)
BEKISTING VOLUME :
20.00
satuan m2
Sub. Total Harga Satuan Rp.
133,350.00
Jasa 10 %
13,335.00
Total Harga Satuan Rp.
146,685.00
Per m2 Per m2
2,667,000.00
ANALISA HARGA SATUAN
Analisa Harga Satuan ini hanya dipergunakan
PENULANGAN BETON (BESI ULIR)
sebagai dasar/pendekatan dalam
KODE
R 14
penyusunan DPA dan Mengevaluasi Harga Penawaran
Propinsi :
Kota :
Disiapkan Oleh :
Tanggal :
JAWA BARAT
DEPOK
DINAS BINA MARGA DAN SUMBER DAYA AIR
Proses :
Anggapan :
1. Batang besi beton dipotong sesuai ukuran
1. 200 kg tulangan jadi disiapkan dalam 1 hari
panjang yang diperlukan
Nov-11
2. Besi tulangan dikirim ke tempat pekerjaan oleh pemasok
2. Perakitan tulangan besi beton dan diikat
3. Penyusutan akibat pemotongan dll dianggap 1 %
dengan kawat baja
4. Membengkok dan memasang batang besi beton dilaksanakan dengan tangan 5. 0,8 orang/hari memotong 200 kg batang besi beton 6. 1,0 orang/hari membengkok 200 kg batang besi beton 7. 1,2 orang/hari memasang dan mengikat 200 kg tulangan besi beton 8. Umur alat bantu rata-rata 1 bulan/set @ 3 alat
No.
1
Pekerja
Vol.
Mandor
1.00
Hari
Kode
Total Vol.
Upah
Biaya
Sub Total
Org-hari
(Rp/Org/Hari)
Rp
Rp
1.00
1.00
100,000.00
100,000.00 91,000.00
2
Tukang Kepala Besi Beton
1.00
1.00
1.00
91,000.00
3
Pekerja Terampil
1.00
1.00
1.00
80,000.00
80,000.00
4
Pekerja
3.00
1.00
3.00
65,000.00
195,000.00
JUMLAH I
No
Pekerja
Material
Satuan
Kode
Total Vol.
225.00
1
Besi Beton U - 32
Kg
M.167
2
Alat Bantu
Set
M.170
0.12
Harga
Biaya
Sub Total
(Rp/Unit)
(Rp)
(Rp)
18,000.00
4,050,000.00
300,000.00
36,000.00
JUMLAH II
No.
Material
Peralatan
Jumlah
Hari Kerja
Kode
Jam Kerja
466,000.00
4,086,000.00
Harga
Biaya
Sub Total
(Rp/jam)
(Rp)
(Rp)
1 JUMLAH III
Peralatan Total (Rp)
PENULANGAN BETON VOLUME :
200.00
satuan kg
Sub. Total Harga Satuan Rp.
22,760.00
Jasa 10 %
2,276.00
Total Harga Satuan Rp.
25,036.00
Per kg Per kg
4,552,000.00
ANALISA HARGA SATUAN
Analisa Harga Satuan ini hanya dipergunakan
PENULANGAN BETON (BETON POLOS)
sebagai dasar/pendekatan dalam
KODE
R 14a
penyusunan DPA dan Mengevaluasi Harga Penawaran
Propinsi :
Kota :
Disiapkan Oleh :
Tanggal :
JAWA BARAT
DEPOK
DINAS BINA MARGA DAN SUMBER DAYA AIR
Proses :
Anggapan :
1. Batang besi beton dipotong sesuai ukuran
1. 200 kg tulangan jadi disiapkan dalam 1 hari
panjang yang diperlukan
Nov-11
2. Besi tulangan dikirim ke tempat pekerjaan oleh pemasok
2. Perakitan tulangan besi beton dan diikat
3. Penyusutan akibat pemotongan dll dianggap 1 %
dengan kawat baja
4. Membengkok dan memasang batang besi beton dilaksanakan dengan tangan 5. 0,8 orang/hari memotong 200 kg batang besi beton 6. 1,0 orang/hari membengkok 200 kg batang besi beton 7. 1,2 orang/hari memasang dan mengikat 200 kg tulangan besi beton 8. Umur alat bantu rata-rata 1 bulan/set @ 3 alat
No.
1
Pekerja
Vol.
Mandor
1.00
Hari
1.00
Kode
Total Vol.
Upah
Biaya
Sub Total
Org-hari
(Rp/Org/Hari)
Rp
Rp
L.061
1.00
100,000.00
100,000.00 91,000.00
2
Tukang Kepala Besi Beton
1.00
1.00
L.073
1.00
91,000.00
3
Pekerja Terampil
1.00
1.00
L.106
1.00
80,000.00
80,000.00
4
Pekerja
3.00
1.00
L.101
3.00
65,000.00
195,000.00
JUMLAH I
No
Pekerja
Material
Satuan
Kode
Total Vol.
225.00
1
Besi Beton U - 24
Kg
M.167
2
Alat Bantu
Set
M.170
0.12
Harga
Biaya
Sub Total
(Rp/Unit)
(Rp)
(Rp)
18,000.00
4,050,000.00
300,000.00
36,000.00
JUMLAH II
No.
Material
Peralatan
Jumlah
Hari Kerja
Kode
Jam Kerja
466,000.00
4,086,000.00
Harga
Biaya
Sub Total
(Rp/jam)
(Rp)
(Rp)
1 JUMLAH III
Peralatan Total (Rp)
PENULANGAN BETON VOLUME :
200.00
satuan kg
Sub. Total Harga Satuan Rp.
22,760.00
Jasa 10 %
2,276.00
Total Harga Satuan Rp.
25,036.00
Per kg Per kg
4,552,000.00
ANALISA HARGA SATUAN
Analisa Harga Satuan ini hanya dipergunakan
PENGHAMPARAN BETON NON STRUKTUR/RABAT KELAS Bo (READY MIX CONCRETE)
sebagai dasar/pendekatan dalam penyusunan DPA dan Mengevaluasi Harga Penawaran
Provinsi :
Kota :
Disiapkan Oleh :
JAWA BARAT
DEPOK
DINAS BINA MARGA DAN SUMBER DAYA AIR
Tanggal : Nov-11
Proses :
Anggapan :
1. Pemasok mengirim Ready Mix
1. Tidak termasuk acuan dan tulangan besi beton yang sudah dipasang
2. Beton dihampar di lokasi pe kerj aan
2. Beton dipasang un tuk bagian stru ktur prate kan , lan tai jembatan, dll
3. Beton digetar sampai padat
3. Sesuai Peraturan Beton bertulang Indonesia (PBI 1971 N.1.2)
4. Acuan dan tulangan besi beton sudah dipasang
No.
PEKERJA
Vol.
Hari
Kode
Total Vol.
Upah
Biaya
Org-hari
(Rp/Org/Hari)
Rp
1
Mandor
1.00
1.00
1.00
100,000.00
100,000.00
2
Pekerja Terampil
1.00
1.00
1.00
80,000.00
80,000.00
3
Operator Alat
2.00
1.00
2.00
80,000.00
160,000.00
4
Pekerja
12.00
1.00
12.00
65,000.00
780,000.00
JUMLAH I
No
Pekerja
MATERIAL
Satuan
Kode
1
Beton Ready Mix Klas Bo
m3
M.041
2
Alat Bantu
Set
M.170
Total Vol.
48.00
1.00
Harga
Biaya
(Rp/Unit)
(Rp)
756,000.00
36,288,000.00
300,000.00
300,000.00
JUMLAH II
No.
1
Material
PERALATAN
Jumlah
Alat Penggetar Beton 4 HP
2.00
Jam Kerja
7.00
Kode
Jam Kerja
E.089
14.00
Harga
Biaya
(Rp/jam)
(Rp)
31,000.00
434,000.00
JUMLAH III
Peralatan Total (Rp)
BETON NON STRUKTUR / RABAT KELAS Bo VOLUME :
48.00
satuan m3
Sub. Total Harga Satuan Rp.
794,625.00
Jasa 10 %
79,462.50
Total Harga Satuan Rp.
874,087.50
Depok,
Per m3 Per m3
November 2013
ANALISA HARGA SATUAN PEKERJAAN DINAS BINA MARGA DAN SUMBER DAYA AIR KOTA DEPOK T.A. 2013
DINAS PEKERJAAN UMUM KOTA DEPOK
KODE
F 01
Sub Total Rp
1,120,000.00 Sub Total (Rp)
36,588,000.00 Sub Total (Rp)
434,000.00 38,142,000.00
DINAS PEKERJAAN UMUM KOTA DEPOK
ANALISA HARGA SATUAN
Analisa Harga Satuan ini hanya dipergunakan
PENGHAMPARAN BETON STRUKTUR K 125 (READY MIX CONCRETE)
sebagai dasar/pendekatan dalam penyusunan DPA dan Mengevaluasi Harga Penawaran
Provinsi :
Kota :
Disiapkan Oleh :
Tanggal :
JAWA BARAT
DEPOK
DINAS BINA MARGA DAN SUMBER DAYA AIR
Nov-11
Proses :
Anggapan :
1. Pemasok mengirim Ready Mix
1. Tidak termasuk acuan dan tulangan besi beton yang sudah dipasang
2. Beton dihampar di lokasi pekerjaan
2. Beton dipasang untuk bagian struktur pratekan, lantai jembatan, dll
3. Beton digetar sampai padat
3. Sesuai Peraturan Beton bertulang Indonesia (PBI 1971 N.1.2)
4. Acuan dan tulangan besi beton sudah dipasang
No.
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Biaya
Org-hari
(Rp/Org/Hari)
Rp
1
Mandor
1.00
1.00
1.00
100,000.00
100,000.00
2
Pekerja Terampil
1.00
1.00
1.00
80,000.00
80,000.00 160,000.00 780,000.00
3
Operator Alat
2.00
1.00
2.00
80,000.00
4
Pekerja
12.00
1.00
12.00
65,000.00
JUMLAH I
No
1 2
Pekerja
Material
Beton Ready Mix K.125 Alat Bantu
Harga
Biaya
(Rp/Unit)
(Rp)
Satuan
Kode
Total Vol.
m3
M.041
48.00
683,000.00
32,784,000.00
1.00
300,000.00
300,000.00
Set
M.170
JUMLAH II
No.
1
Material
Peralatan
Jumlah
Alat Penggetar Beton 4 HP
2.00
Jam Kerja
7.00
Kode
Jam Kerja
E.089
14.00
Harga
Biaya
(Rp/jam)
(Rp)
31,000.00
434,000.00
JUMLAH III
Peralatan Total (Rp)
BETON STRUKTUR K.125 VOLUME :
48.00
satuan m3
Sub. Total Harga Satuan Rp.
721,625.00
Jasa 10 %
72,162.50
Total Harga Satuan Rp.
793,787.50
Depok,
Per m3 Per m3
November 2013
ANALISA HARGA SATUAN PEKERJAAN DINAS BINA MARGA DAN SUMBER DAYA AIR KOTA DEPOK T.A. 2013
Ir.H. ENCOK KURYASA, MM
KODE
F 02
Sub Total Rp
1,120,000.00 Sub Total (Rp)
33,084,000.00 Sub Total (Rp)
434,000.00 34,638,000.00
ANALISA HARGA SATUAN
Analisa Harga Satuan ini hanya dipergunakan
PENGHAMPARAN BETON STRUKTUR K 175 (READY MIX CONCRETE)
sebagai dasar/pendekatan dalam
KODE
F 03
penyusunan DPA dan Mengevaluasi Harga Penawaran
Provinsi :
Kota :
Disiapkan Oleh :
JAWA BARAT
DEPOK
DINAS BINA MARGA DAN SUMBER DAYA AIR
Tanggal : Nov-11
Proses :
Anggapan :
1. Pemasok mengirim Ready Mix
1. Tidak termasuk acuan dan tulangan besi beton yang sudah dipasang
2. Beton dih ampar di lokasi pe kerjaan
2. Beton di pasang untuk bagian struktu r pratekan, lantai je mbatan , dll
3. Beton digetar sampai padat
3. Sesuai Peraturan Beton bertulang Indonesia (PBI 1971 N.1.2)
4. Acuan dan tulangan besi beton sudah dipasang
No.
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Biaya
Sub Total
Org-hari
(Rp/Org/Hari)
Rp
Rp
1.00
1.00
1.00
100,000.00
1.00
1.00
1.00
80,000.00
80,000.00
2.00
1.00
2.00
80,000.00
160,000.00
12.00
1.00
12.00
65,000.00
780,000.00
1
Mandor
2
Pekerja Terampil
3
Operator Alat
4
Pekerja
100,000.00
JUMLAH I
No
Pekerja
Material
Satuan
Kode
1
Beton Ready Mix K.175
m3
M.041
2
Alat Bantu
Set
M.170
Total Vol.
48.00
1.00
Harga
Biaya
Sub Total
(Rp/Unit)
(Rp)
(Rp)
740,000.00
35,520,000.00
300,000.00
300,000.00
JUMLAH II
No.
1
Material
Peralatan
Jumlah
Alat Penggetar Beton 4 HP
2.00
Jam Kerja
Kode
Jam Kerja
E.089
14.00
7.00
Harga
Biaya
Sub Total
(Rp)
(Rp)
31,000.00
434,000.00 Peralatan
434,000.00
Total (Rp)
37,374,000.00
BETON STRUKTUR K.175 48.00
satuan m3
Sub. Total Harga Satuan Rp.
778,625.00
Jasa 10 %
Per m3
77,862.50
Total Harga Satuan Rp.
856,487.50
Depok,
35,820,000.00
(Rp/jam)
JUMLAH III
VOLUME :
1,120,000.00
Per m3
November 2013
ANALISA HARGA SATUAN PEKERJAAN DINAS BINA MARGA DAN SUMBER DAYA AIR KOTA DEPOK T.A. 2013
Ir.H. ENCOK KURYASA, MM
ANALISA HARGA SATUAN
Analisa Harga Satuan ini hanya dipergunakan
PENGHAMPARAN BETON STRUKTUR K 225 (READY MIX CONCRETE)
sebagai dasar/pendekatan dalam penyusunan DPA dan Mengevaluasi Harga Penawaran
Provinsi :
Kota :
Disiapkan Oleh :
JAWA BARAT
DEPOK
DINAS BINA MARGA DAN SUMBER DAYA AIR
Tanggal : Nov-11
Proses :
Anggapan :
1. Pemasok mengirim Ready Mix
1. Tidak termasuk acuan dan tulangan besi beton yang sudah dipasang
2. Beton dihampar di lokasi pekerjaan
2. Beton dipasang untuk bagian struktur pratekan, lantai jembatan, dll
3. Beton digetar sampai padat
3. Sesuai Peraturan Beton bertulang Indonesia (PBI 1971 N.1.2)
4. Acuan dan tulangan besi beton sudah dipasang
No.
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Biaya
Org-hari
(Rp/Org/Hari)
Rp
1
Mandor
1.00
1.00
1.00
100,000.00
100,000.00
2
Pekerja Terampil
1.00
1.00
1.00
80,000.00
80,000.00
3
Operator Alat
2.00
1.00
2.00
80,000.00
160,000.00
4
Pekerja
12.00
1.00
12.00
65,000.00
780,000.00
JUMLAH I
No
Pekerja
Material
Satuan
Kode
Total Vol.
48.00
1
Beton Ready Mix K.225
m3
M.041
2
Alat Bantu
Set
M.170
2.00
Harga
Biaya
(Rp/Unit)
(Rp)
770,000.00
36,960,000.00
300,000.00
600,000.00
JUMLAH II
No.
1
Material
Peralatan
Jumlah
Alat Penggetar Beton 4 HP
2.00
Jam Kerja
7.00
Kode
Jam Kerja
E.089
14.00
Harga
Biaya
(Rp/jam)
(Rp)
31,000.00
434,000.00
JUMLAH III
Peralatan Total (Rp)
BETON STRUKTUR K.225 VOLUME :
48.00
satuan m3
Sub. Total Harga Satuan Rp.
814,875.00
Jasa 10 %
81,487.50
Total Harga Satuan Rp.
896,362.50
Depok,
Per m3 Per m3
November 2013
ANALISA HARGA SATUAN PEKERJAAN DINAS BINA MARGA DAN SUMBER DAYA AIR KOTA DEPOK T.A. 2013
Ir.H. ENCOK KURYASA, MM
KODE
F 04
Sub Total Rp
1,120,000.00 Sub Total (Rp)
37,560,000.00 Sub Total (Rp)
434,000.00 39,114,000.00
ANALISA HARGA SATUAN
Analisa Harga Satuan ini hanya dipergunakan
PENGHAMPARAN BETON STRUKTUR K 300 (READY MIX CONCRETE)
sebagai dasar/pendekatan dalam penyusunan DPA dan Mengevaluasi Harga Penawaran
Provinsi :
Kota :
Disiapkan Oleh :
JAWA BARAT
DEPOK
DINAS BINA MARGA DAN SUMBER DAYA AIR
Tanggal : Nov-11
Proses :
Anggapan :
1. Pemasok mengirim Ready Mix
1. Tidak termasuk acuan dan tulangan besi beton yang sudah dipasang
2. Beton dihampar di lokasi pekerjaan
2. Beton dipasang untuk bagian struktur pratekan, lantai jembatan, dll
3. Beton digetar sampai padat
3. Sesuai Peraturan Beton bertulang Indonesia (PBI 1971 N.1.2)
4. Acuan dan tulangan besi beton sudah dipasang
No.
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Biaya
Org-hari
(Rp/Org/Hari)
Rp
1
Mandor
1.00
1.00
1.00
100,000.00
100,000.00
2
Pekerja Terampil
1.00
1.00
1.00
80,000.00
80,000.00
3
Operator Alat
2.00
1.00
2.00
80,000.00
160,000.00
4
Pekerja
12.00
1.00
12.00
65,000.00
780,000.00
JUMLAH I
No
Pekerja
Material
Satuan
Kode
Total Vol.
48.00
1
Beton Ready Mix K.300
m3
M.041
2
Alat Bantu
Set
M.170
2.00
Harga
Biaya
(Rp/Unit)
(Rp)
913,500.00
43,848,000.00
300,000.00
600,000.00
JUMLAH II
No.
1
Material
Peralatan
Jumlah
Alat Penggetar Beton 4 HP
2.00
Jam Kerja
7.00
Kode
Jam Kerja
E.089
14.00
Harga
Biaya
(Rp/jam)
(Rp)
31,000.00
434,000.00
JUMLAH III
Peralatan Total (Rp)
BETON STRUKTUR K.300 VOLUME :
48.00
satuan m3
Sub. Total Harga Satuan Rp.
958,375.00
Jasa 10 %
95,837.50
Total Harga Satuan Rp.
1,054,212.50
Depok,
Per m3 Per m3
November 2013
ANALISA HARGA SATUAN PEKERJAAN DINAS BINA MARGA DAN SUMBER DAYA AIR KOTA DEPOK T.A. 2013
Ir.H. ENCOK KURYASA, MM
KODE
F 05
Sub Total Rp
1,120,000.00 Sub Total (Rp)
44,448,000.00 Sub Total (Rp)
434,000.00 46,002,000.00
ANALISA HARGA SATUAN
Analisa Harga Satuan ini hanya dipergunakan
PENGHAMPARAN BETON STRUKTUR K 350 (READY MIX CONCRETE)
sebagai dasar/pendekatan dalam penyusunan DPA dan Mengevaluasi Harga Penawaran
Provinsi :
Kota :
Disiapkan Oleh :
Tanggal :
JAWA BARAT
DEPOK
DINAS BINA MARGA DAN SUMBER DAYA AIR
Nov-11
Proses :
Anggapan :
1. Pemasok mengirim Ready Mix
1. Tidak termasuk acuan dan tulangan besi beton yang sudah dipasang
2. Beton dihampar di lokasi pekerjaan
2. Beton dipasang untuk bagian struktur pratekan, lantai jembatan, dll
3. Beton digetar sampai padat
3. Sesuai Peraturan Beton bertulang Indonesia (PBI 1971 N.1.2)
4. Acuan dan tulangan besi beton sudah dipasang
No.
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Biaya
Org-hari
(Rp/Org/Hari)
Rp
1
Mandor
1.00
1.00
1.00
100,000.00
100,000.00
2
Pekerja Terampil
1.00
1.00
1.00
80,000.00
80,000.00 160,000.00 780,000.00
3
Operator Alat
2.00
1.00
2.00
80,000.00
4
Pekerja
12.00
1.00
12.00
65,000.00
JUMLAH I
No
Pekerja
Material
Satuan
Kode
Total Vol.
48.00
1
Beton Ready Mix K.350
m3
M.041
2
Alat Bantu
Set
M.170
2.00
Harga
Biaya
(Rp/Unit)
(Rp)
955,500.00
45,864,000.00
300,000.00
600,000.00
JUMLAH II
No.
1
Material
Peralatan
Jumlah
Alat Penggetar Beton 4 HP
2.00
Jam Kerja
7.00
Kode
Jam Kerja
E.089
14.00
Harga
Biaya
(Rp/jam)
(Rp)
31,000.00
434,000.00
JUMLAH III
Peralatan Total (Rp)
BETON STRUKTUR K.350 VOLUME :
48.00
satuan m3
Sub. Total Harga Satuan Rp.
1,000,375.00
Jasa 10 %
Per m3
100,037.50
Total Harga Satuan Rp.
1,100,412.50
Depok,
Per m3
November 2013
ANALISA HARGA SATUAN PEKERJAAN DINAS BINA MARGA DAN SUMBER DAYA AIR KOTA DEPOK T.A. 2013
Ir.H. ENCOK KURYASA, MM NIP. 19571002 198403 1 005